HomeMy WebLinkAboutParcel Map 22863 Parcel 1 Hydro Report
VENTURA ENGINEERING INLAND, INC.
27393 YNEZ ROAD, SUITE 159, TEMECULA, CALIFORNIA 92591
(951) 252-7632
FINAL HYDROLOGY REPORT
PROPOSED DRIVE-THRU BUILDINGS
PA23-0026, PA23-0027, PA23-0030
29540 RANCHO CALIFORNIA ROAD
TEMECULA, CALIFORNIA 92591
APN: 921-320-061
PREPARED FOR:
FAIRWAY COLIMA CA SEVEN, LLC
21700 COPLAY DRIVE, SUITE 320
SAN DIEGO, CALIFORNIA 91765
(909) 594-3388
PREPARED BY:
VENTURA ENGINEERING INLAND
27393 YNEZ ROAD, SUITE 159
TEMECULA, CALIFORNIA 92591
(951) 252-7632
ORIGINAL DATE: May 14, 2024
I hereby declare that I am the engineer of work for this project, that I have exercised responsible charge over
the design of the project as defined in Section 6703 of the Business and Professions code, and that the
design is consistent with current standards.
_____________________________ ______________
WILFREDO VENTURA DATE
R.C.E. NO. 66532
EXPIRES 6/30/26
5/14/24
APPROVED BY
CITY OF TEMECULA
PUBLIC WORKS
david.pina 07/02/2024
07/02/2024 07/02/2024
07/02/20
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
2024-099 Temecula Ono - i - Original: 5/14/24
TABLE OF CONTENTS
DESCRIPTIONS PAGE
COVER SHEET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i
TABLE OF CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii
1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2.0 LOCATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
3.0 METHODOLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
4.0 RUNOFF INDEX NUMBERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
5.0 EXISTING CONDITIONS CALCULATIONS . . . . . . . . . . . . . . . . . . . . 1
6.0 PROPOSED CONDITIONS CALCULATIONS . . . . . . . . . . . . . . . . . . 2
7.0 COMPARISON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
8.0 CONCLUSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
9.0 REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
10.0 DECLARATION OF RESPONSIBLE CHARGE . . . . . . . . . . . . . . . . . 4
11.0 ATTACHMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
11.1 ATTACHMENT 1: STANDARDS EXCERPTS . . . . . . . . . . . . . 4
11.2 ATTACHMENT 2: EXISTING CONDITIONS CALCULATIONS 4
11.3 ATTACHMENT 3: PROPOSED CONDITIONS
CALCULATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5
11.4 ATTACHMENT 4: EXHIBITS . . . . . . . . . . . . . . . . . . . . . . . . . . 5
11.5 ATTACHMENT 5: FEMA ANALYSIS . . . . . . . . . . . . . . . . . . . . 5
ATTACHMENT 1: STANDARDS EXCERPTS
ATTACHMENT 2: EXISTING CONDITIONS CALCULATIONS
ATTACHMENT 3: PROPOSED CONDITIONS CALCULATIONS
ATTACHMENT 4: EXHIBITS
ATTACHMENT 5: FEMA ANALYSIS
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
2024-099 Temecula Ono - 1 - Original: 5/14/24
1.0 INTRODUCTION
The purpose of this report is to calculate the impacts of the redevelopment of the Claim Jumper pad into
two pads for 2 new restaurants with drive-thru lanes. The project is located at 29540 Rancho California
Road in Temecula, California and is part of an existing retail shopping area. The project site is currently a
vacant restaurant. The site will be redeveloped into two separate restaurants, drive thru lanes, and a new
ADA access path to Rancho California Road.
2.0 LOCATION
A vicinity map is provided for reference in Attachment 4.
3.0 METHODOLOGY
Based on conversations and discussions with the City this report calculates only the 100-Year and 10-year
Peak Runoff based on the Riverside County Flood Control and Water Conservation District Hydrology
Manual (April 1978) rational methodology for the portion of the site that is being disturbed that is tributary
to the existing storm drain inlet in the lowest corner of the project site. Clean copies of the standard excerpts
and a selection of other design references have been included in Attachment 1: Standards Excerpts for
ease of use.
4.0 COVER TYPE
Based on conversations with the City, this report will be utilizing the existing conditions as being
commercial as the area was already allocated as buildings and walkways by the original plans and
reports and their subsequently installed infrastructure.
5.0 EXISTING CONDITIONS CALCULATIONS
The existing conditions have been evaluated using the Rational Method from the Riverside County Flood
Control and Water Conservation District Hydrology Manual (April 1978). Certain tables and figures from
the Standards are referenced in this report and have been included in Attachment 1: Standards Excerpts.
The existing conditions calculations are in Attachment 2 for reference. The existing conditions exhibit is
provided for reference in Attachment 4. A summary of the existing conditions calculations are as follows:
CONFLUENCE POINT A EXISTING CONDITIONS SUMMARY
DATA 100-YEAR 10-YEAR
AMC III II
TIME OF CONCENTRATION (MIN) 6.74 6.93
INTENSITY (IN/HR) 4.326 2.885
AREA (ACRES) 1.447 1.447
TOTAL DISCHARGE (CFS) 5.8 3.9
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
2024-099 Temecula Ono - 2 - Original: 5/14/24
6.0 PROPOSED CONDITIONS CALCULATIONS
The proposed conditions have been evaluated using the Rational Method from the Riverside County Flood
Control and Water Conservation District Hydrology Manual (April 1978). Certain tables and figures from
the Standards are referenced in this report and have been included in Attachment 1: Standards Excerpts.
The proposed conditions calculations are located in Attachment 3 for reference. The proposed conditions
exhibit is provided for reference in Attachment 4. The proposed conditions exhibit is provided for reference
in Attachment 4. A summary of the proposed conditions calculations are as follows:
CONFLUENCE POINT A PROPOSED CONDITIONS SUMMARY
DATA 100-YEAR 10-YEAR
AMC III II
TIME OF CONCENTRATION (MIN) 6.57 6.73
INTENSITY (IN/HR) 4.388 2.930
AREA (ACRES) 1.487 1.487
TOTAL DISCHARGE (CFS) 5.8 3.8
It should also be noted that the proposed conditions are conservative in design and do not consider the
proposed BMP as a retention/detention element; but rather, a pipe run. The time to fill the required HMP
cistern is not considered in these calculations. Since this is not considered, these calculations are more
conservative and only consider the cistern in its bypass configuration with all runoff directly into the outlet
pipe.
7.0 COMPARISON
The project site proposes the use of slope flattening and permeable areas to meet low impact development
processes. The comparison data summaries at Confluence Points A is as follows:
CONFLUENCE POINT A COMPARISON – 100-YEAR DESIGN STORM EVENT
DATA EXISTING
CONDITIONS
100-YEAR
PROPOSED
CONDITION
100-YEAR
COMPARISON
AMC III III NO CHANGE
TIME OF CONCENTRATION (MIN) 6.74 6.57 - 0.17
INTENSITY (IN/HR) 4.326 4.388 + 0.062
AREA (ACRES) * 1.447 1.487 + 0.040
TOTAL DISCHARGE (CFS) 5.8 5.8 NO CHANGE
* THE PROPOSED CONDITIONS EXCLUDES ADDITIONAL AREA ALONG THE TOP OF
THE PAD AS IT HAS BEEN FLATTENED TO ACCOMMODATE THE ADDITION OF AN
ADA PATH TO RANCHO CALIFORNIA ROAD.
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
2024-099 Temecula Ono - 3 - Original: 5/14/24
CONFLUENCE POINT A COMPARISON – 10-YEAR DESIGN STORM EVENT
DATA EXISTING
CONDITIONS
100-YEAR
PROPOSED
CONDITION
100-YEAR
COMPARISON
AMC II II NO CHANGE
TIME OF CONCENTRATION (MIN) 6.93 6.73 + 0.20
INTENSITY (IN/HR) 2.885 2.930 + 0.045
AREA (ACRES) * 1.447 1.487 + 0.040
TOTAL DISCHARGE (CFS) 3.9 3.8 - 0.1
* THE PROPOSED CONDITIONS EXCLUDES ADDITIONAL AREA ALONG THE TOP OF
THE PAD AS IT HAS BEEN FLATTENED TO ACCOMMODATE THE ADDITION OF AN
ADA PATH TO RANCHO CALIFORNIA ROAD.
8.0 CONCLUSION
The proposed project site will construct two new restaurants, new drive thru lanes, new eating areas, new
landscaping, and new HMP BMPs on a previously development single restaurant pad. The project
illustrates that in the 100-Year there is no change to the 100-Year Design Storm Peak Discharge Rate and
a 0.1 cfs decrease in the 10-Year Design Storm Peak Discharge Rate. Furthermore, the project site also
includes an underground cistern with a detention volume of 2,680 cu-ft (0.0615 acre-ft) of storage upstream
of a Modular Wetlands flow-thru biofiltration device. This development will not impact downstream
properties or infrastructure.
In addition, the following statements also apply to the project site as proposed:
Existing Drainage Pattern Impact Statement: The project site does not substantially alter the
existing drainage patterns of the project site or localized streams that would result in substantial
erosion or siltation on- or -off site.
Surface Runoff Statement: The project site does not substantially alter the existing drainage
patterns of the project site or localized streams that would result in substantial surface water
increase on- or -off site.
Existing Storm Drain Improvements Statement: The project site does not substantially alter the
existing drainage patterns of the project site or localized streams that would result in substantial
impact the existing storm drain improvements on the retail shopping center/area.
House in a 100-Year Flood Hazard Area Impact Statement: The project site does not propose
any habitable structures; however, the FEMA analysis provided in Attachment 5 illustrate that the
project site will not posse a flooding risk or impact at this time and the project site is located in Zone
X.
Structures in a 100-Year Flood Hazard Area Impact Statement: FEMA analysis provided in
Attachment 5 illustrate that the project site is not proposing any structures in the 100-Year Flood
Hazard Area as defined by FEMA Mapping.
Flood Impact Statement: It is the opinion of the engineer of record for this project that, as
proposed, the project improvements will not expose people or structures toa significant risk of loss,
injury, or death involving flooding as a result of the failure of the proposed improvements, let alone
a levee or dam, which are not present at this time.
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
2024-099 Temecula Ono - 4 - Original: 5/14/24
9.0 REFERENCES
The following references were utilized in the creation of this hydrology report:
Brater & King, Handbook of Hydraulics, 6th ed.
Design Handbook for Low Impact Development Best Management Practices, Riverside County
Flood Control & Water Conservation District, September 2011.
Hydrology Manual, Riverside County Flood Control & Water Conservation District, April 1978
10.0 DECLARATION OF RESPONSIBLE CHARGE
I hereby declare that I am the engineer of work for this project, that I have exercised responsible charge
over the design of the project as defined in Section 6703 of the Business and Professions code, and that
the design is consistent with current standards.
I understand that the check of project drawings and specifications by the agency is confined to a review
only and does not relieve me, as engineer of work, of my responsibilities for project design.
__________________________ ________________
Wilfredo Ventura Date
11.0 ATTACHMENTS
The following attachment sections are provided for reference:
11.1 ATTACHMENT 1: STANDARD EXCERPTS
This attachment contains excerpts from the standards and other design reference materials. Please
refer to the attached references.
11.2 ATTACHMENT 2: EXISTING CONDITIONS CALCULATIONS
This attachment contains the existing conditions calculations. The existing conditions calculations
are summarized in Section 4 of the report. Calculations are provided here for reference.
5/14/24
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
2024-099 Temecula Ono - 5 - Original: 5/14/24
11.3 ATTACHMENT 3: PROPOSED CONDITIONS CALCULATIONS
This attachment contains the proposed conditions calculations. The proposed conditions
calculations are summarized in Section 5 of the report. Calculations are provided here for
reference.
11.4 ATTACHMENT 4: EXHIBITS
This attachment contains the Vicinity Map, Hydrology Exhibits, and BMP Details.
11.5 ATTACHMENT 5: FEMA ANALYSIS
The site-specific FEMA Analysis is provided here for reference.
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
ATTACHMENT 1: STANDARD EXCERPTS
This attachment contains various excerpts from the Riverside County Flood Control & Water
Conservation District Hydrology Manual (April 1978 edition). Please see the attached excerpts from the
standards.
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 2 - 1 -
ATTACHMENT 2: EXISTING CONDITIONS CALCULATIONS
This attachment contains the existing conditions calculations. Please see the attached calculations.
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 2 - 2 -
EXISTING CONDITIONS – CONFLUENCE POINT A
100 YEAR DESIGN STORM EVENT
Riverside County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2014 Version 9.0
Rational Hydrology Study Date: 12/02/22 File:onoedd1100.out
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
English (in-lb) Units used in input data file
------------------------------------------------------------------------
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) = 100.00 Antecedent Moisture Condition = 3
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360(In/Hr)
10 year storm 60 minute intensity = 0.880(In/Hr)
100 year storm 10 minute intensity = 3.480(In/Hr)
100 year storm 60 minute intensity = 1.300(In/Hr)
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300(In/Hr)
Slope of intensity duration curve = 0.5500
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.110 to Point/Station 1.210
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
Initial area flow distance = 100.000(Ft.)
Top (of initial area) elevation = 1054.200(Ft.)
Bottom (of initial area) elevation = 1049.000(Ft.)
Difference in elevation = 5.200(Ft.)
Slope = 0.05200 s(percent)= 5.20
TC = k(0.300)*[(length^3)/(elevation change)]^0.2
Warning: TC computed to be less than 5 min.; program is assuming the
time of concentration is 5 minutes.
Initial area time of concentration = 5.000 min.
Rainfall intensity = 5.099(In/Hr) for a 100.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.897
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 0.672(CFS)
Total initial stream area = 0.147(Ac.)
Pervious area fraction = 0.100
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 2 - 3 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.210 to Point/Station 1.310
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Estimated mean flow rate at midpoint of channel = 2.702(CFS)
Depth of flow = 0.097(Ft.), Average velocity = 2.561(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.25
2 34.00 0.00
3 56.00 0.25
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 2.702(CFS)
' ' flow top width = 21.739(Ft.)
' ' velocity= 2.561(Ft/s)
' ' area = 1.055(Sq.Ft)
' ' Froude number = 2.049
Upstream point elevation = 1049.000(Ft.)
Downstream point elevation = 1042.900(Ft.)
Flow length = 215.000(Ft.)
Travel time = 1.40 min.
Time of concentration = 6.40 min.
Depth of flow = 0.097(Ft.)
Average velocity = 2.561(Ft/s)
Total irregular channel flow = 2.702(CFS)
Irregular channel normal depth above invert elev. = 0.097(Ft.)
Average velocity of channel(s) = 2.561(Ft/s)
Adding area flow to channel
COMMERCIAL subarea type
Runoff Coefficient = 0.896
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 4.452(In/Hr) for a 100.0 year storm
Subarea runoff = 3.983(CFS) for 0.998(Ac.)
Total runoff = 4.655(CFS) Total area = 1.145(Ac.)
Depth of flow = 0.119(Ft.), Average velocity = 2.935(Ft/s)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 2 - 4 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.310 to Point/Station 1.320
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Estimated mean flow rate at midpoint of channel = 5.269(CFS)
Depth of flow = 0.163(Ft.), Average velocity = 2.911(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.25
2 16.00 0.00
3 34.00 0.25
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 5.269(CFS)
' ' flow top width = 22.189(Ft.)
' ' velocity= 2.911(Ft/s)
' ' area = 1.810(Sq.Ft)
' ' Froude number = 1.796
Upstream point elevation = 1042.900(Ft.)
Downstream point elevation = 1041.800(Ft.)
Flow length = 60.000(Ft.)
Travel time = 0.34 min.
Time of concentration = 6.74 min.
Depth of flow = 0.163(Ft.)
Average velocity = 2.911(Ft/s)
Total irregular channel flow = 5.269(CFS)
Irregular channel normal depth above invert elev. = 0.163(Ft.)
Average velocity of channel(s) = 2.911(Ft/s)
Adding area flow to channel
COMMERCIAL subarea type
Runoff Coefficient = 0.896
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 4.326(In/Hr) for a 100.0 year storm
Subarea runoff = 1.171(CFS) for 0.302(Ac.)
Total runoff = 5.827(CFS) Total area = 1.447(Ac.)
Depth of flow = 0.169(Ft.), Average velocity = 2.985(Ft/s)
End of computations, total study area = 1.45 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Area averaged pervious area fraction(Ap) = 0.100
Area averaged RI index number = 75.0
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 2 - 5 -
EXISTING CONDITIONS – CONFLUENCE POINT A
10 YEAR DESIGN STORM EVENT
Riverside County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2014 Version 9.0
Rational Hydrology Study Date: 12/02/22 File:onoedd110.out
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
English (in-lb) Units used in input data file
------------------------------------------------------------------------
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) = 10.00 Antecedent Moisture Condition = 2
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360(In/Hr)
10 year storm 60 minute intensity = 0.880(In/Hr)
100 year storm 10 minute intensity = 3.480(In/Hr)
100 year storm 60 minute intensity = 1.300(In/Hr)
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880(In/Hr)
Slope of intensity duration curve = 0.5500
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.110 to Point/Station 1.210
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
Initial area flow distance = 100.000(Ft.)
Top (of initial area) elevation = 1054.200(Ft.)
Bottom (of initial area) elevation = 1049.000(Ft.)
Difference in elevation = 5.200(Ft.)
Slope = 0.05200 s(percent)= 5.20
TC = k(0.300)*[(length^3)/(elevation change)]^0.2
Warning: TC computed to be less than 5 min.; program is assuming the
time of concentration is 5 minutes.
Initial area time of concentration = 5.000 min.
Rainfall intensity = 3.452(In/Hr) for a 10.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.890
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 0.451(CFS)
Total initial stream area = 0.147(Ac.)
Pervious area fraction = 0.100
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 2 - 6 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.210 to Point/Station 1.310
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Estimated mean flow rate at midpoint of channel = 1.798(CFS)
Depth of flow = 0.083(Ft.), Average velocity = 2.314(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.25
2 34.00 0.00
3 56.00 0.25
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 1.799(CFS)
' ' flow top width = 18.662(Ft.)
' ' velocity= 2.314(Ft/s)
' ' area = 0.777(Sq.Ft)
' ' Froude number = 1.998
Upstream point elevation = 1049.000(Ft.)
Downstream point elevation = 1042.900(Ft.)
Flow length = 215.000(Ft.)
Travel time = 1.55 min.
Time of concentration = 6.55 min.
Depth of flow = 0.083(Ft.)
Average velocity = 2.314(Ft/s)
Total irregular channel flow = 1.798(CFS)
Irregular channel normal depth above invert elev. = 0.083(Ft.)
Average velocity of channel(s) = 2.314(Ft/s)
Adding area flow to channel
COMMERCIAL subarea type
Runoff Coefficient = 0.888
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 2.976(In/Hr) for a 10.0 year storm
Subarea runoff = 2.638(CFS) for 0.998(Ac.)
Total runoff = 3.089(CFS) Total area = 1.145(Ac.)
Depth of flow = 0.102(Ft.), Average velocity = 2.649(Ft/s)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 2 - 7 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.310 to Point/Station 1.320
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Estimated mean flow rate at midpoint of channel = 3.497(CFS)
Depth of flow = 0.140(Ft.), Average velocity = 2.627(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.25
2 16.00 0.00
3 34.00 0.25
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 3.497(CFS)
' ' flow top width = 19.027(Ft.)
' ' velocity= 2.627(Ft/s)
' ' area = 1.331(Sq.Ft)
' ' Froude number = 1.751
Upstream point elevation = 1042.900(Ft.)
Downstream point elevation = 1041.800(Ft.)
Flow length = 60.000(Ft.)
Travel time = 0.38 min.
Time of concentration = 6.93 min.
Depth of flow = 0.140(Ft.)
Average velocity = 2.627(Ft/s)
Total irregular channel flow = 3.497(CFS)
Irregular channel normal depth above invert elev. = 0.140(Ft.)
Average velocity of channel(s) = 2.627(Ft/s)
Adding area flow to channel
COMMERCIAL subarea type
Runoff Coefficient = 0.888
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 2.885(In/Hr) for a 10.0 year storm
Subarea runoff = 0.774(CFS) for 0.302(Ac.)
Total runoff = 3.863(CFS) Total area = 1.447(Ac.)
Depth of flow = 0.145(Ft.), Average velocity = 2.694(Ft/s)
End of computations, total study area = 1.45 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Area averaged pervious area fraction(Ap) = 0.100
Area averaged RI index number = 75.0
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 1 -
ATTACHMENT 3: PROPOSED CONDITIONS CALCULATIONS
This attachment contains the proposed conditions calculations. Please see the attached calculations.
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 2 -
PROPOSED CONDITIONS – CONFLUENCE POINT A
100 YEAR DESIGN STORM EVENT
Riverside County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2014 Version 9.0
Rational Hydrology Study Date: 12/02/22 File:onoprd1.out
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
English (in-lb) Units used in input data file
------------------------------------------------------------------------
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) = 100.00 Antecedent Moisture Condition = 3
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360(In/Hr)
10 year storm 60 minute intensity = 0.880(In/Hr)
100 year storm 10 minute intensity = 3.480(In/Hr)
100 year storm 60 minute intensity = 1.300(In/Hr)
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300(In/Hr)
Slope of intensity duration curve = 0.5500
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.110 to Point/Station 1.210
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
Initial area flow distance = 85.000(Ft.)
Top (of initial area) elevation = 1044.600(Ft.)
Bottom (of initial area) elevation = 1043.400(Ft.)
Difference in elevation = 1.200(Ft.)
Slope = 0.01412 s(percent)= 1.41
TC = k(0.300)*[(length^3)/(elevation change)]^0.2
Warning: TC computed to be less than 5 min.; program is assuming the
time of concentration is 5 minutes.
Initial area time of concentration = 5.000 min.
Rainfall intensity = 5.099(In/Hr) for a 100.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.897
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 0.247(CFS)
Total initial stream area = 0.054(Ac.)
Pervious area fraction = 0.100
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 3 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.210 to Point/Station 1.320
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Estimated mean flow rate at midpoint of channel = 0.352(CFS)
Depth of flow = 0.087(Ft.), Average velocity = 1.695(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.50
2 0.00 0.00
3 12.00 0.22
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 0.352(CFS)
' ' flow top width = 4.761(Ft.)
' ' velocity= 1.695(Ft/s)
' ' area = 0.208(Sq.Ft)
' ' Froude number = 1.430
Upstream point elevation = 1043.400(Ft.)
Downstream point elevation = 1042.300(Ft.)
Flow length = 75.000(Ft.)
Travel time = 0.74 min.
Time of concentration = 5.74 min.
Depth of flow = 0.087(Ft.)
Average velocity = 1.695(Ft/s)
Total irregular channel flow = 0.352(CFS)
Irregular channel normal depth above invert elev. = 0.087(Ft.)
Average velocity of channel(s) = 1.695(Ft/s)
Adding area flow to channel
COMMERCIAL subarea type
Runoff Coefficient = 0.897
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 4.728(In/Hr) for a 100.0 year storm
Subarea runoff = 0.195(CFS) for 0.046(Ac.)
Total runoff = 0.442(CFS) Total area = 0.100(Ac.)
Depth of flow = 0.095(Ft.), Average velocity = 1.794(Ft/s)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.310 to Point/Station 1.320
**** SUBAREA FLOW ADDITION ****
______________________________________________________________________
COMMERCIAL subarea type
Runoff Coefficient = 0.897
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 4 -
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Time of concentration = 5.74 min.
Rainfall intensity = 4.728(In/Hr) for a 100.0 year storm
Subarea runoff = 0.827(CFS) for 0.195(Ac.)
Total runoff = 1.269(CFS) Total area = 0.295(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.320 to Point/Station 1.420
**** PIPEFLOW TRAVEL TIME (User specified size) ****
______________________________________________________________________
Upstream point/station elevation = 1040.300(Ft.)
Downstream point/station elevation = 1037.700(Ft.)
Pipe length = 110.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 1.269(CFS)
Given pipe size = 8.00(In.)
Calculated individual pipe flow = 1.269(CFS)
Normal flow depth in pipe = 4.85(In.)
Flow top width inside pipe = 7.82(In.)
Critical Depth = 6.39(In.)
Pipe flow velocity = 5.73(Ft/s)
Travel time through pipe = 0.32 min.
Time of concentration (TC) = 6.06 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.410 to Point/Station 1.420
**** SUBAREA FLOW ADDITION ****
______________________________________________________________________
COMMERCIAL subarea type
Runoff Coefficient = 0.897
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Time of concentration = 6.06 min.
Rainfall intensity = 4.588(In/Hr) for a 100.0 year storm
Subarea runoff = 0.062(CFS) for 0.015(Ac.)
Total runoff = 1.330(CFS) Total area = 0.310(Ac.)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 5 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.420 to Point/Station 1.630
**** PIPEFLOW TRAVEL TIME (User specified size) ****
______________________________________________________________________
Upstream point/station elevation = 1037.700(Ft.)
Downstream point/station elevation = 1037.500(Ft.)
Pipe length = 24.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 1.330(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 1.330(CFS)
Normal flow depth in pipe = 5.34(In.)
Flow top width inside pipe = 11.93(In.)
Critical Depth = 5.85(In.)
Pipe flow velocity = 3.93(Ft/s)
Travel time through pipe = 0.10 min.
Time of concentration (TC) = 6.16 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.110 to Point/Station 1.630
**** CONFLUENCE OF MINOR STREAMS ****
______________________________________________________________________
Along Main Stream number: 1 in normal stream number 1
Stream flow area = 0.310(Ac.)
Runoff from this stream = 1.330(CFS)
Time of concentration = 6.16 min.
Rainfall intensity = 4.547(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.510 to Point/Station 1.610
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
Initial area flow distance = 75.000(Ft.)
Top (of initial area) elevation = 1043.100(Ft.)
Bottom (of initial area) elevation = 1042.800(Ft.)
Difference in elevation = 0.300(Ft.)
Slope = 0.00400 s(percent)= 0.40
TC = k(0.300)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 5.090 min.
Rainfall intensity = 5.049(In/Hr) for a 100.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.897
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 0.172(CFS)
Total initial stream area = 0.038(Ac.)
Pervious area fraction = 0.100
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 6 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.610 to Point/Station 1.620
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Estimated mean flow rate at midpoint of channel = 0.588(CFS)
Depth of flow = 0.118(Ft.), Average velocity = 1.337(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.50
2 0.00 0.00
3 12.00 0.19
4 24.00 0.31
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 0.588(CFS)
' ' flow top width = 7.451(Ft.)
' ' velocity= 1.337(Ft/s)
' ' area = 0.440(Sq.Ft)
' ' Froude number = 0.970
Upstream point elevation = 1042.800(Ft.)
Downstream point elevation = 1041.400(Ft.)
Flow length = 230.000(Ft.)
Travel time = 2.87 min.
Time of concentration = 7.96 min.
Depth of flow = 0.118(Ft.)
Average velocity = 1.337(Ft/s)
Total irregular channel flow = 0.588(CFS)
Irregular channel normal depth above invert elev. = 0.118(Ft.)
Average velocity of channel(s) = 1.337(Ft/s)
Adding area flow to channel
COMMERCIAL subarea type
Runoff Coefficient = 0.896
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 3.949(In/Hr) for a 100.0 year storm
Subarea runoff = 0.775(CFS) for 0.219(Ac.)
Total runoff = 0.947(CFS) Total area = 0.257(Ac.)
Depth of flow = 0.141(Ft.), Average velocity = 1.507(Ft/s)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 7 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.620 to Point/Station 1.630
**** PIPEFLOW TRAVEL TIME (User specified size) ****
______________________________________________________________________
Upstream point/station elevation = 1039.400(Ft.)
Downstream point/station elevation = 1037.500(Ft.)
Pipe length = 55.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.947(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 0.947(CFS)
Normal flow depth in pipe = 3.06(In.)
Flow top width inside pipe = 10.47(In.)
Critical Depth = 4.89(In.)
Pipe flow velocity = 5.98(Ft/s)
Travel time through pipe = 0.15 min.
Time of concentration (TC) = 8.11 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.510 to Point/Station 1.630
**** CONFLUENCE OF MINOR STREAMS ****
______________________________________________________________________
Along Main Stream number: 1 in normal stream number 2
Stream flow area = 0.257(Ac.)
Runoff from this stream = 0.947(CFS)
Time of concentration = 8.11 min.
Rainfall intensity = 3.908(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In/Hr)
1 1.330 6.16 4.547
2 0.947 8.11 3.908
Largest stream flow has longer or shorter time of concentration
Qp = 1.330 + sum of
Qa Tb/Ta
0.947 * 0.759 = 0.719
Qp = 2.049
Total of 2 streams to confluence:
Flow rates before confluence point:
1.330 0.947
Area of streams before confluence:
0.310 0.257
Results of confluence:
Total flow rate = 2.049(CFS)
Time of concentration = 6.159 min.
Effective stream area after confluence = 0.567(Ac.)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 8 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.630 to Point/Station 1.840
**** PIPEFLOW TRAVEL TIME (User specified size) ****
______________________________________________________________________
Upstream point/station elevation = 1035.000(Ft.)
Downstream point/station elevation = 1034.000(Ft.)
Pipe length = 60.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 2.049(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 2.049(CFS)
Normal flow depth in pipe = 5.61(In.)
Flow top width inside pipe = 11.98(In.)
Critical Depth = 7.34(In.)
Pipe flow velocity = 5.69(Ft/s)
Travel time through pipe = 0.18 min.
Time of concentration (TC) = 6.33 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.110 to Point/Station 1.840
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 0.567(Ac.)
Runoff from this stream = 2.049(CFS)
Time of concentration = 6.33 min.
Rainfall intensity = 4.477(In/Hr)
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.810 to Point/Station 1.810
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
Initial area flow distance = 100.000(Ft.)
Top (of initial area) elevation = 1054.200(Ft.)
Bottom (of initial area) elevation = 1049.000(Ft.)
Difference in elevation = 5.200(Ft.)
Slope = 0.05200 s(percent)= 5.20
TC = k(0.300)*[(length^3)/(elevation change)]^0.2
Warning: TC computed to be less than 5 min.; program is assuming the
time of concentration is 5 minutes.
Initial area time of concentration = 5.000 min.
Rainfall intensity = 5.099(In/Hr) for a 100.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.897
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 0.672(CFS)
Total initial stream area = 0.147(Ac.)
Pervious area fraction = 0.100
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 9 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.810 to Point/Station 1.820
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Estimated mean flow rate at midpoint of channel = 2.250(CFS)
Depth of flow = 0.090(Ft.), Average velocity = 2.467(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.25
2 34.00 0.00
3 56.00 0.25
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 2.250(CFS)
' ' flow top width = 20.213(Ft.)
' ' velocity= 2.467(Ft/s)
' ' area = 0.912(Sq.Ft)
' ' Froude number = 2.047
Upstream point elevation = 1049.000(Ft.)
Downstream point elevation = 1043.200(Ft.)
Flow length = 200.000(Ft.)
Travel time = 1.35 min.
Time of concentration = 6.35 min.
Depth of flow = 0.090(Ft.)
Average velocity = 2.467(Ft/s)
Total irregular channel flow = 2.250(CFS)
Irregular channel normal depth above invert elev. = 0.090(Ft.)
Average velocity of channel(s) = 2.467(Ft/s)
Adding area flow to channel
COMMERCIAL subarea type
Runoff Coefficient = 0.896
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 3) = 88.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 4.470(In/Hr) for a 100.0 year storm
Subarea runoff = 3.098(CFS) for 0.773(Ac.)
Total runoff = 3.770(CFS) Total area = 0.920(Ac.)
Depth of flow = 0.110(Ft.), Average velocity = 2.807(Ft/s)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 10 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.820 to Point/Station 1.830
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Depth of flow = 0.462(Ft.), Average velocity = 5.879(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.50
2 1.50 0.00
3 3.00 0.50
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 3.770(CFS)
' ' flow top width = 2.774(Ft.)
' ' velocity= 5.879(Ft/s)
' ' area = 0.641(Sq.Ft)
' ' Froude number = 2.155
Upstream point elevation = 1043.200(Ft.)
Downstream point elevation = 1042.000(Ft.)
Flow length = 60.000(Ft.)
Travel time = 0.17 min.
Time of concentration = 6.52 min.
Depth of flow = 0.462(Ft.)
Average velocity = 5.879(Ft/s)
Total irregular channel flow = 3.770(CFS)
Irregular channel normal depth above invert elev. = 0.462(Ft.)
Average velocity of channel(s) = 5.879(Ft/s)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.830 to Point/Station 1.840
**** PIPEFLOW TRAVEL TIME (User specified size) ****
______________________________________________________________________
Upstream point/station elevation = 1037.100(Ft.)
Downstream point/station elevation = 1034.000(Ft.)
Pipe length = 35.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 3.770(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 3.770(CFS)
Normal flow depth in pipe = 4.22(In.)
Flow top width inside pipe = 15.25(In.)
Critical Depth = 8.90(In.)
Pipe flow velocity = 11.95(Ft/s)
Travel time through pipe = 0.05 min.
Time of concentration (TC) = 6.57 min.
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 11 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.710 to Point/Station 1.840
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.920(Ac.)
Runoff from this stream = 3.770(CFS)
Time of concentration = 6.57 min.
Rainfall intensity = 4.388(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In/Hr)
1 2.049 6.33 4.477
2 3.770 6.57 4.388
Largest stream flow has longer time of concentration
Qp = 3.770 + sum of
Qb Ia/Ib
2.049 * 0.980 = 2.009
Qp = 5.779
Total of 2 main streams to confluence:
Flow rates before confluence point:
2.049 3.770
Area of streams before confluence:
0.567 0.920
Results of confluence:
Total flow rate = 5.779(CFS)
Time of concentration = 6.570 min.
Effective stream area after confluence = 1.487(Ac.)
End of computations, total study area = 1.49 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Area averaged pervious area fraction(Ap) = 0.100
Area averaged RI index number = 75.0
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 12 -
PROPOSED CONDITIONS – CONFLUENCE POINT A
10 YEAR DESIGN STORM EVENT
Riverside County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2014 Version 9.0
Rational Hydrology Study Date: 12/02/22 File:onoprd110.out
------------------------------------------------------------------------
********* Hydrology Study Control Information **********
English (in-lb) Units used in input data file
------------------------------------------------------------------------
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) = 10.00 Antecedent Moisture Condition = 2
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360(In/Hr)
10 year storm 60 minute intensity = 0.880(In/Hr)
100 year storm 10 minute intensity = 3.480(In/Hr)
100 year storm 60 minute intensity = 1.300(In/Hr)
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880(In/Hr)
Slope of intensity duration curve = 0.5500
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.110 to Point/Station 1.210
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
Initial area flow distance = 85.000(Ft.)
Top (of initial area) elevation = 1044.600(Ft.)
Bottom (of initial area) elevation = 1043.400(Ft.)
Difference in elevation = 1.200(Ft.)
Slope = 0.01412 s(percent)= 1.41
TC = k(0.300)*[(length^3)/(elevation change)]^0.2
Warning: TC computed to be less than 5 min.; program is assuming the
time of concentration is 5 minutes.
Initial area time of concentration = 5.000 min.
Rainfall intensity = 3.452(In/Hr) for a 10.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.890
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 0.166(CFS)
Total initial stream area = 0.054(Ac.)
Pervious area fraction = 0.100
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 13 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.210 to Point/Station 1.320
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Estimated mean flow rate at midpoint of channel = 0.236(CFS)
Depth of flow = 0.075(Ft.), Average velocity = 1.534(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.50
2 0.00 0.00
3 12.00 0.22
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 0.236(CFS)
' ' flow top width = 4.100(Ft.)
' ' velocity= 1.534(Ft/s)
' ' area = 0.154(Sq.Ft)
' ' Froude number = 1.395
Upstream point elevation = 1043.400(Ft.)
Downstream point elevation = 1042.300(Ft.)
Flow length = 75.000(Ft.)
Travel time = 0.81 min.
Time of concentration = 5.81 min.
Depth of flow = 0.075(Ft.)
Average velocity = 1.534(Ft/s)
Total irregular channel flow = 0.236(CFS)
Irregular channel normal depth above invert elev. = 0.075(Ft.)
Average velocity of channel(s) = 1.534(Ft/s)
Adding area flow to channel
COMMERCIAL subarea type
Runoff Coefficient = 0.889
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 3.177(In/Hr) for a 10.0 year storm
Subarea runoff = 0.130(CFS) for 0.046(Ac.)
Total runoff = 0.296(CFS) Total area = 0.100(Ac.)
Depth of flow = 0.082(Ft.), Average velocity = 1.623(Ft/s)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 14 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.310 to Point/Station 1.320
**** SUBAREA FLOW ADDITION ****
______________________________________________________________________
COMMERCIAL subarea type
Runoff Coefficient = 0.889
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Time of concentration = 5.81 min.
Rainfall intensity = 3.177(In/Hr) for a 10.0 year storm
Subarea runoff = 0.551(CFS) for 0.195(Ac.)
Total runoff = 0.846(CFS) Total area = 0.295(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.320 to Point/Station 1.420
**** PIPEFLOW TRAVEL TIME (User specified size) ****
______________________________________________________________________
Upstream point/station elevation = 1040.300(Ft.)
Downstream point/station elevation = 1037.700(Ft.)
Pipe length = 110.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.846(CFS)
Given pipe size = 8.00(In.)
Calculated individual pipe flow = 0.846(CFS)
Normal flow depth in pipe = 3.79(In.)
Flow top width inside pipe = 7.99(In.)
Critical Depth = 5.23(In.)
Pipe flow velocity = 5.20(Ft/s)
Travel time through pipe = 0.35 min.
Time of concentration (TC) = 6.17 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.410 to Point/Station 1.420
**** SUBAREA FLOW ADDITION ****
______________________________________________________________________
COMMERCIAL subarea type
Runoff Coefficient = 0.889
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Time of concentration = 6.17 min.
Rainfall intensity = 3.076(In/Hr) for a 10.0 year storm
Subarea runoff = 0.041(CFS) for 0.015(Ac.)
Total runoff = 0.887(CFS) Total area = 0.310(Ac.)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 15 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.420 to Point/Station 1.630
**** PIPEFLOW TRAVEL TIME (User specified size) ****
______________________________________________________________________
Upstream point/station elevation = 1037.700(Ft.)
Downstream point/station elevation = 1037.500(Ft.)
Pipe length = 24.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.887(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 0.887(CFS)
Normal flow depth in pipe = 4.28(In.)
Flow top width inside pipe = 11.50(In.)
Critical Depth = 4.73(In.)
Pipe flow velocity = 3.53(Ft/s)
Travel time through pipe = 0.11 min.
Time of concentration (TC) = 6.28 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.110 to Point/Station 1.630
**** CONFLUENCE OF MINOR STREAMS ****
______________________________________________________________________
Along Main Stream number: 1 in normal stream number 1
Stream flow area = 0.310(Ac.)
Runoff from this stream = 0.887(CFS)
Time of concentration = 6.28 min.
Rainfall intensity = 3.045(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.510 to Point/Station 1.610
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
Initial area flow distance = 75.000(Ft.)
Top (of initial area) elevation = 1043.100(Ft.)
Bottom (of initial area) elevation = 1042.800(Ft.)
Difference in elevation = 0.300(Ft.)
Slope = 0.00400 s(percent)= 0.40
TC = k(0.300)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 5.090 min.
Rainfall intensity = 3.418(In/Hr) for a 10.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.890
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 0.116(CFS)
Total initial stream area = 0.038(Ac.)
Pervious area fraction = 0.100
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 16 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.610 to Point/Station 1.620
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Estimated mean flow rate at midpoint of channel = 0.410(CFS)
Depth of flow = 0.103(Ft.), Average velocity = 1.222(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.50
2 0.00 0.00
3 12.00 0.19
4 24.00 0.31
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 0.410(CFS)
' ' flow top width = 6.511(Ft.)
' ' velocity= 1.222(Ft/s)
' ' area = 0.336(Sq.Ft)
' ' Froude number = 0.949
Upstream point elevation = 1042.800(Ft.)
Downstream point elevation = 1041.400(Ft.)
Flow length = 230.000(Ft.)
Travel time = 3.14 min.
Time of concentration = 8.23 min.
Depth of flow = 0.103(Ft.)
Average velocity = 1.222(Ft/s)
Total irregular channel flow = 0.410(CFS)
Irregular channel normal depth above invert elev. = 0.103(Ft.)
Average velocity of channel(s) = 1.222(Ft/s)
Adding area flow to channel
COMMERCIAL subarea type
Runoff Coefficient = 0.887
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 2.625(In/Hr) for a 10.0 year storm
Subarea runoff = 0.510(CFS) for 0.219(Ac.)
Total runoff = 0.625(CFS) Total area = 0.257(Ac.)
Depth of flow = 0.121(Ft.), Average velocity = 1.358(Ft/s)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 17 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.620 to Point/Station 1.630
**** PIPEFLOW TRAVEL TIME (User specified size) ****
______________________________________________________________________
Upstream point/station elevation = 1039.400(Ft.)
Downstream point/station elevation = 1037.500(Ft.)
Pipe length = 55.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.625(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 0.625(CFS)
Normal flow depth in pipe = 2.49(In.)
Flow top width inside pipe = 9.74(In.)
Critical Depth = 3.95(In.)
Pipe flow velocity = 5.30(Ft/s)
Travel time through pipe = 0.17 min.
Time of concentration (TC) = 8.40 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.510 to Point/Station 1.630
**** CONFLUENCE OF MINOR STREAMS ****
______________________________________________________________________
Along Main Stream number: 1 in normal stream number 2
Stream flow area = 0.257(Ac.)
Runoff from this stream = 0.625(CFS)
Time of concentration = 8.40 min.
Rainfall intensity = 2.595(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In/Hr)
1 0.887 6.28 3.045
2 0.625 8.40 2.595
Largest stream flow has longer or shorter time of concentration
Qp = 0.887 + sum of
Qa Tb/Ta
0.625 * 0.748 = 0.468
Qp = 1.355
Total of 2 streams to confluence:
Flow rates before confluence point:
0.887 0.625
Area of streams before confluence:
0.310 0.257
Results of confluence:
Total flow rate = 1.355(CFS)
Time of concentration = 6.281 min.
Effective stream area after confluence = 0.567(Ac.)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 18 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.630 to Point/Station 1.840
**** PIPEFLOW TRAVEL TIME (User specified size) ****
______________________________________________________________________
Upstream point/station elevation = 1035.000(Ft.)
Downstream point/station elevation = 1034.000(Ft.)
Pipe length = 60.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 1.355(CFS)
Given pipe size = 12.00(In.)
Calculated individual pipe flow = 1.355(CFS)
Normal flow depth in pipe = 4.46(In.)
Flow top width inside pipe = 11.60(In.)
Critical Depth = 5.91(In.)
Pipe flow velocity = 5.10(Ft/s)
Travel time through pipe = 0.20 min.
Time of concentration (TC) = 6.48 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.110 to Point/Station 1.840
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 0.567(Ac.)
Runoff from this stream = 1.355(CFS)
Time of concentration = 6.48 min.
Rainfall intensity = 2.994(In/Hr)
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.810 to Point/Station 1.810
**** INITIAL AREA EVALUATION ****
______________________________________________________________________
Initial area flow distance = 100.000(Ft.)
Top (of initial area) elevation = 1054.200(Ft.)
Bottom (of initial area) elevation = 1049.000(Ft.)
Difference in elevation = 5.200(Ft.)
Slope = 0.05200 s(percent)= 5.20
TC = k(0.300)*[(length^3)/(elevation change)]^0.2
Warning: TC computed to be less than 5 min.; program is assuming the
time of concentration is 5 minutes.
Initial area time of concentration = 5.000 min.
Rainfall intensity = 3.452(In/Hr) for a 10.0 year storm
COMMERCIAL subarea type
Runoff Coefficient = 0.890
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Initial subarea runoff = 0.451(CFS)
Total initial stream area = 0.147(Ac.)
Pervious area fraction = 0.100
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 19 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.810 to Point/Station 1.820
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Estimated mean flow rate at midpoint of channel = 1.519(CFS)
Depth of flow = 0.078(Ft.), Average velocity = 2.236(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.25
2 34.00 0.00
3 56.00 0.25
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 1.519(CFS)
' ' flow top width = 17.446(Ft.)
' ' velocity= 2.236(Ft/s)
' ' area = 0.679(Sq.Ft)
' ' Froude number = 1.997
Upstream point elevation = 1049.000(Ft.)
Downstream point elevation = 1043.200(Ft.)
Flow length = 200.000(Ft.)
Travel time = 1.49 min.
Time of concentration = 6.49 min.
Depth of flow = 0.078(Ft.)
Average velocity = 2.236(Ft/s)
Total irregular channel flow = 1.519(CFS)
Irregular channel normal depth above invert elev. = 0.078(Ft.)
Average velocity of channel(s) = 2.236(Ft/s)
Adding area flow to channel
COMMERCIAL subarea type
Runoff Coefficient = 0.888
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 0.100; Impervious fraction = 0.900
Rainfall intensity = 2.990(In/Hr) for a 10.0 year storm
Subarea runoff = 2.053(CFS) for 0.773(Ac.)
Total runoff = 2.505(CFS) Total area = 0.920(Ac.)
Depth of flow = 0.094(Ft.), Average velocity = 2.534(Ft/s)
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 20 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.820 to Point/Station 1.830
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
______________________________________________________________________
Depth of flow = 0.397(Ft.), Average velocity = 5.308(Ft/s)
******* Irregular Channel Data ***********
-----------------------------------------------------------------
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.50
2 1.50 0.00
3 3.00 0.50
Manning's 'N' friction factor = 0.013
-----------------------------------------------------------------
Sub-Channel flow = 2.505(CFS)
' ' flow top width = 2.380(Ft.)
' ' velocity= 5.308(Ft/s)
' ' area = 0.472(Sq.Ft)
' ' Froude number = 2.100
Upstream point elevation = 1043.200(Ft.)
Downstream point elevation = 1042.000(Ft.)
Flow length = 60.000(Ft.)
Travel time = 0.19 min.
Time of concentration = 6.68 min.
Depth of flow = 0.397(Ft.)
Average velocity = 5.308(Ft/s)
Total irregular channel flow = 2.505(CFS)
Irregular channel normal depth above invert elev. = 0.397(Ft.)
Average velocity of channel(s) = 5.308(Ft/s)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.830 to Point/Station 1.840
**** PIPEFLOW TRAVEL TIME (User specified size) ****
______________________________________________________________________
Upstream point/station elevation = 1037.100(Ft.)
Downstream point/station elevation = 1034.000(Ft.)
Pipe length = 35.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 2.505(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 2.505(CFS)
Normal flow depth in pipe = 3.45(In.)
Flow top width inside pipe = 14.16(In.)
Critical Depth = 7.19(In.)
Pipe flow velocity = 10.60(Ft/s)
Travel time through pipe = 0.06 min.
Time of concentration (TC) = 6.73 min.
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
Attachment 3 - 21 -
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.710 to Point/Station 1.840
**** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.920(Ac.)
Runoff from this stream = 2.505(CFS)
Time of concentration = 6.73 min.
Rainfall intensity = 2.930(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In/Hr)
1 1.355 6.48 2.994
2 2.505 6.73 2.930
Largest stream flow has longer time of concentration
Qp = 2.505 + sum of
Qb Ia/Ib
1.355 * 0.979 = 1.326
Qp = 3.831
Total of 2 main streams to confluence:
Flow rates before confluence point:
1.355 2.505
Area of streams before confluence:
0.567 0.920
Results of confluence:
Total flow rate = 3.831(CFS)
Time of concentration = 6.734 min.
Effective stream area after confluence = 1.487(Ac.)
End of computations, total study area = 1.49 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Area averaged pervious area fraction(Ap) = 0.100
Area averaged RI index number = 75.0
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
ATTACHMENT 4: EXHIBITS
This attachment contains the vicinity map, the existing condition exhibit, the proposed condition exhibit
and details. Please see the attached exhibits.
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSDSDSDSD
SD
SD
SD
SDNO
P
A
R
K
I
N
G
NO
P
A
R
K
I
N
G
FINAL HYDROLOGY REPORT
PA23-0026, PA23-0027, PA23-0030
PROPOSED DRIVE-THRU BUILDINGS
29540 RANCHO CALIFORNIA ROAD, TEMECULA, CA 92591
ATTACHMENT 5: FEMA ANALYSIS
This attachment contains the data used in the FEMA determination.