Loading...
HomeMy WebLinkAboutLD25-0110Permit Number: LD25-0110 LD - Utilities/ Utility Maintenance Issued: 01/07/2025 Expired: 09/08/2025 Job Address: City Wide 29870 Mira Loma Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Jay Phan 24487 Prelipp Rd 24487 Prielipp Rd Wildomar, CA 92595 (951) 837-1762 Applicant: Southern California Edison (Utility Billing) 24487 Prielipp Wildomar, CA 92595 (951) 440-9074 Contractor: Utility Work Order Number: 904707690 Description: SCE - 904707690, 29870 Mira Loma Drive. WORK HOURS SHALL BE: MONDAY THRU THURSDAY, NO HOLIDAYS, 9:00 A.M. - 2:00 P.M. 1-08-25 - 1-17-25. Proposed Location: Calle Carranza and Mira Loma Drive intersection at 29870 Mira Loma Drive E/S. Proposed Work: Remove and replace damaged or broken cable thru existing conduit as shown on the approved SCE "Distribution Repair Order Form", LD 25-0110. All facilities shall be installed in accordance with City Standard Drawing 117. Traffic Control shall be in accordance with approved Traffic Control Plan LD25-0110. Permittee shall comply with all applicable Traffic Control General Notes. Safe pedestrian/bicycle traffic and driveway access shall be maintained at all times. Concrete repair shall be in accordance with City Standards and the Greenbook. Trench repair shall be in accordance with City Standard Drawing 407. Final compaction test results shall be provided by a soils engineer. Concrete curbs, walks, gutters, cross gutters and driveway approaches damaged during construction shall be removed from joint to joint and reconstructed in accordance with City Standards and the Greenbook. All disturbed landscaping and other improvements shall be removed/repaired and replaced to the satisfaction of Page 1 of 2 Permit Number: LD25-0110 LD - Utilities/ Utility Maintenance the City Engineer or their designated assignee. Permittee shall contact LDInspections@temeculaca.gov a minimum of two (2) business days prior to any work. Permittee must also request a final inspection to verify completion of project. Permitee Date City Engineer or Authorized Representative Date 01/07/2025 Page 2 of 2