Loading...
HomeMy WebLinkAboutLD25-1461Permit Number: LD25-1461 LD - Utilities/ Utility Maintenance Issued: 03/28/2025 Expired: 09/24/2025 Job Address: 41607 Enterprise Circle N. Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Melissa Martin 1209 Nevada St. Redlands, CA 92374 (626) 862-9996 Applicant: Ferreira Construction Co., Inc. 10370 Commerce Center Drive, B-200 Rancho Cucamonga, CA 91730 (909) 606-5900 Contractor: Utility Work Order Number: TD 2199087 Description: SCE - TD2199087, 41607 Enterprise Circle North N/S, 665' N/O Winchester Road. WORK HOURS SHALL BE: MONDAY THRU FRIDAY, NO HOLIDAYS, 7:00 A.M. - 4:00 P.M. Proposed Work: SCE crews will remove and replace vault lid and replace, Remove and replace sidewalk panels from scoreline to scoreline as shown on the approved SCE "Final Design Plan", LD25-1461. Permitee Date City Engineer or Authorized Representative Date 03/28/2025 Page 1 of 1 1 of 4 | Page PWRD-88 Request for “Underground Civil Contract Construction & Inspection” Form PWRD-88 Request for “Underground Civil Contract Construction & Inspection”, March 2023 District Name Approver’s Name (Print)Title Signature Date SAP Order#:DIMP Y/N:UG Civil Only Work Order: E5 Notification#:DIMP Due Date: DIMP Notifcation#: Requestor:Requestor's Contact Number: Description of Work: Location:City: Structure#: (Must be provided and clearly marked on the maps) SCE GeoView Grid# / FIM#: Circuit: (Must include readable map w/pkg.) Substation:Environmental Requirements Document Required: (For example: Ground and/or vegetation disturbing activities) Permit Required: (Must be included in package) NOTE: All permits including Blankets must be included in package at time of submission. Reason: Private Property, Other *: * IF “OTHER”, PROVIDE COMPLETE, VALID REASON Easement Required: Easement Secured: Work Order Type (Select the appropriate category): i.Customer Out of Power / Immediate Danger to the Public ii.Outage or Electrical Crew Meet Related Contact Name:Ph#: iii.Third-Party Connection Contact Name: Ph#: iv. M&M / Project Proposed Civil Construction Start Date: Emergency Reason: Required Civil Completion Date: MATERIAL TYPE (DESCRIPTION)QUANTITY E-Crew Meet Date:Time: UNIT OF MEASURE UNIT COST (PRICE) EXTENDED COST TOTAL ESTIMATED COST (Sheet A): $ TOTAL ESTIMATED COST (Sheet B): $ GRAND TOTAL ESTIMATED COST (Sheet A+B+C+D): $ Documentation of Actual Cost Required:Send to:Email Address: For Underground Construction Use Only SCE Inspector:UCC Release#P-Req / PO# Contractor:Electrical Partner:QA Included: Construction Comments: Non-Emergency Call Out (ECO) work received (executable work order package) with a required start date of six (6) business days or less (dates cannot be adjusted) Shall be performed under the TEM Contract Please reach out to the area UG Civil Inspector or Advisor for any assistance with completing this form. TOTAL ESTIMATED COST (Sheet C): $ TOTAL ESTIMATED COST (Sheet D): $ Yes No (see below) SH TD2199087-300 PR300382/C-4031 FCC 4/11/2025 4/11/2025 2 of 4 | Page PWRD-88 Request for “Underground Civil Contract Construction & Inspection” PWRD-88 Request for “Underground Civil Contract Construction & Inspection”, March 2023 Materials Form (CONT.) MATERIAL TYPE (DESCRIPTION)QUANTITY UNIT OF MEASURE UNIT COST (PRICE)EXTENDED COST TOTAL ESTIMATED COST (B): $ Please reach out to the area UG Civil Inspector or Advisor for any assistance with completing this form. 3 of 4 | Page PWRD-88 Request for “Underground Civil Contract Construction & Inspection” PWRD-88 Request for “Underground Civil Contract Construction & Inspection”, March 2023 Materials Form (CONT.) MATERIAL TYPE (DESCRIPTION)QUANTITY UNIT OF MEASURE UNIT COST (PRICE)EXTENDED COST TOTAL ESTIMATED COST (C): $ Please reach out to the area UG Civil Inspector or Advisor for any assistance with completing this form. 4 of 4 | Page PWRD-88 Request for “Underground Civil Contract Construction & Inspection” PWRD-88 Request for “Underground Civil Contract Construction & Inspection”, March 2023 Materials Form (CONT.) MATERIAL TYPE (DESCRIPTION)QUANTITY UNIT OF MEASURE UNIT COST (PRICE)EXTENDED COST TOTAL ESTIMATED COST (D): $ Please reach out to the area UG Civil Inspector or Advisor for any assistance with completing this form. ENVIRONMENTAL REQUIREMENTS TD2199087 CAPITAL MAINTENANCEChange Request: 436802ESF #:ESF Project Details: Detailed Description DistributionProject Type: Preventive MaintenanceDistribution Activity Type: ZEVO 12KV % MURRIETTA 2Circuit / Facility Name: Transmission Activity Type: San JacintoRegion: WildomarDistrict: Transmission Grid: Project Coordinates Unique Id Coordinates Label Unique Id Coordinates Label Unique Id Coordinates Label Unique Id Coordinates Label 001 V5361675 Auto-SC+EZ+CSWClearance: Notes N/A Clearance Conditions Proceed with Work. Read and follow the requirements for field work below. Environmental concerns can be answered at ENVIRONMENTALREQUIREMENTS@SCE.COM or call 833-723-2362 (833-SCE2ENC). ENVIRONMENTAL REQUIREMENTS Site Stabilization: Excess soil from ground disturbing activities shall be compacted or stabilized to return the area to pre- construction conditions or disposed of at SCE approved facility per Operating Unit standard practice. For storm water related questions, please call the number above. Tailboard Briefing: This document must be kept on site. The Environmental Requirements will be read to the crew to ensure requirements are understood prior to starting work. If any of these requirements are infeasible given a safety or scope concern, please contact Environmental Services at the email or phone number above. Vegetation: No vegetation/tree removal or trimming/mowing was approved for this project. Work Areas: Vehicles and equipment must remain on the existing access routes and immediate vicinity of towers/work areas identified in the project scope. If any work needs to be conducted outside these access routes or work areas, please contact Environmental Services at the email or phone number above. Crew Check: Prior to starting work, crews will check the workspace for bird nests (e.g., pole cavities, vegetation to be removed). Call the number above prior to work within 200 feet of an active nest. Trapped Wildlife: Prior to the start of work, crews will look in holes and trenches, construction material, and equipment. If wildlife has become trapped call the number above. Spill Release/Prevention: Vehicles/equipment must be inspected for leaks (e.g., fuel, oil, hydraulic fluids, etc.) and repaired prior to work. Fueling should not be conducted near a drainage feature. Spill kits/absorbent clean-up materials shall be available onsite and if used, disposed of properly. Archaeological/Human Remains/Paleontological Discoveries: If Archaeological resources (Native American or historical artifacts), fossils, or human remains are encountered, stop work, and call the number above or the SCE Operator 626-302-1212 and ask for an on-call Archaeologist. Eagle-Safe: This project is within an SCE-defined Eagle Zone. Construct the new structures to be eagle-safe according to SCE Construction Standards. Related Objects Leading Object of the Change Request: Maintenance OrderType:TD2199087Object:CAPITAL MAINTENANCE Object Type Object Description Added by Maintenance Order TD2199087 CAPITAL MAINTENANCE Rosalind Locklin People Involved Role Business Partner Name E-Mail Telephone Initiator 10010963 Rosalind Locklin ROSALIND.LOCKLIN@SCE.COM 951-249-8445 ESF Coordinator 10165843 ESF Coordinator ESFCoordinator@sce.com From: $ppAdm4 Sent: Wednesday, February 28, 2024 9:45 AM To: 88 Permit/SCE/EIX Cc: Rosalind Locklin; Daniel Jauregui Subject: 2199087 - Temecula Importance: Low PERMIT REQUEST FORM Your request has been successfully submitted. The permit manager for the area designated has been notified and will be reaching out to you shortly should they require additional information. Date Created : 02/28/2024 Organization : Technical Planning Work Group : DPM District : 88 TD/SAP # : 2199087 PIF # : Date Permit Needed By : Approximate Start Work Date : Compliance Due Date : 2024-06-03 Project Location : 41607 ENTERPRISE CIRCLE NORTH Agency Name : Temecula Agency Type : City Description of Work : 2024 CPRR VAULT RESTRAINT Estimated work Duration (Civil+Electrical) : P-SPEC Name / Phone : JPA Required : False Outage Required : Pedestrian Traffic Control Required : True Structure Location : In Sidewalk Structure/Pole Number : V5361675 Trench Location : Excavation Dimensions : Attachments : TD2199087_FINAL.pdf After the Fact : No Comments : High Fire : Yes The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. Pedestrian Traffic Control (PTC) Planner’s Checklist If you have any questions about filling out this form or need advice as to whether a project may require Pedestrian Traffic Control, contact Design Support with a question via the Help Desk Form. Product/TD Number: Today’s Date: Project Name and Type: Start Work Date: Project Location: Email: SCE/Contract Planner: Pony Location: PAX/Phone: 1. Does the work match any of the following descriptions? If you answered YES, PTC is not required per the PTC manual. The crew must provide protection to public and employee safety.  The work is not forecasted to reduce an established pedestrian path of travel to < 48” for more than two hours.  The work is the first stage of an emergency response.  The work is routine construction, maintenance or inspection that will last less than 2 hours.  SCE did not originate the work and SCE will not reduce an established pedestrian path of travel to < 48” for more than two hours.  SCE is not responsible for the final permitting of the final construction site and SCE will not reduce an established pedestrian path of travel to < 48” for more than two hours.  There are no existing improved pedestrian right of ways within the construction area. If yes, skip questions 2&3. Put this form in the Field Package of the work order and place Decal D124 on work order map, put “N” for PTC Req’d.  No  Yes 2. Does the work match any of the following descriptions? If you answered YES, it is recommended to utilize a vendor to provide the PTC.  The work site includes a state or federal highway, freeway or an on- ramp or off-ramp to a highway or freeway.  The work site includes a major street or thoroughfare; such as one with more than two lanes each direction, and speeds of 45 MPH or higher.  The work site requires vehicular traffic control by a Vendor, the use of flagmen for vehicular traffic control, or closure of lanes to direct pedestrians into the closed lanes?  The work site requires the use of an alternative walkway consisting of ramps and/or plywood that exceeds 20 feet in length for traversing landscaping.  The work site includes multiple vertical levels, or steps, or the cross slope constructed could exceed 2%.  The work site requires traffic control material not available to SCE crews and not included in the kits for PTC.  Set-up and take down of the site will take more than 2 man hours (e.g., 4 man crew at 15 minutes each, or a 2 man crew one half hour).  No  Yes 3. Does the work mirror or approximate any one of the eight (8) scenarios provided in the Pedestrian Traffic Control Manual (PTCM)? If yes, indicate which route to use #_____________ If you answered YES to only this question, it is recommended that the PTC be assigned to an SCE crew.  No  Yes NOTE: Put this form in the Field Package for the work order when PTC is required and place Decal D124 on work order map, put ‘Y’ for PTC Req’d. Material Requisition/Service Request TRANS MONTH SAP MATERIAL NO.DESCRIPTION LESS THN A SPAN ✔ Foreman SAP Work Order No. Date Wanted Prefabed by Truck No. Time Wanted Date Put in staging area Crew will be at jobsite On trailer/dolly Boom truck will be at job site Withdrawal Return Crew will pick up W.O. map attached See over for delivery mapPlease load the following material for the above Work Order on Vehicle No. SCE 14-511 REV 2/09 (CW) Ref. No. QUANTITIES NEEDED/USED SERV. SEC. ST. LT. PRI. OTHER DISTRIBUTION SERVICE REQUEST PRICING RECAP OF APPLICANT - FURNISHED UNDERGROUND FACILITIES DATE DPB 2940 TIME PAGE 103/14/2024 13:21.58 RULE 15DISTRICT CUSTOMER NAME -88 - WILDOMAR PRODUCT # -PROJECT ADDRESS - 2199087 CA 92590 TEMECULAPLNR -CITY Luis Rodrigo Chavez OTHER LEGEND CODE REFUNDABLE ACCOUNT CONTRIBUTIONS ACCOUNT REIMBURSABLE ACCOUNTU/P CODE CU ID DESCRIPTION QTY EX PRODUCT NAME-CAPITAL MAINTENANCE .MISC-U-VLT-RST-1 MISC-U-VLT-RST-1 EXCAVATION COST 1 CI 6,300.00 .MISC-U-VLT-RST-1 MISC-U-VLT-RST-1 NEW INSTALL 1 CI 9,200.00 TOTALS : 15,500.00 COMMENT : DATE DISTRIBUTION SERVICE REQUEST PRICING PROJECT MATERIAL LIST BY MATERIAL TYPE DPB 8255 TIME 03/14/2024 13:21.45 DISTRICT PLNR - 88 - WILDOMAR Luis Rodrigo Chavez CUSTOMER NAME - PROJECT ADDRESS - CITY DATE PRICED - CA 92590 TEMECULA FOREMAN -DATE WANTED -CCM - SAP MATL NUM DESCRIPTION PLAN QTY UNIT JOB QTY PD LEG CODE TYPE U/P CODE TOTAL COST REMARKS* Page 2199087PRODUCT # - 1 11/16/2023 PRODUCT NAME -CAPITAL MAINTENANCE CUSTOMER INSTALLED/FURNISHED VAULT COVER SWIVELOC RETROFIT TYPE 1-2 1 EA CI .$15,500.00 CUSTOMER INSTALLED/FURNISHED TOTAL -$15,500.00 EDISON TOTAL - * METERS, TRANSFORMERS AND SERVICE CABLE COST NOT INCLUDED IN MATERIAL COST TOTALS $0.00 CUSTOMER INFORMATION FIELD JIS PLNR- MSR PRINT:TIME PROJ DESC TRACT NUMBER CUST/ BILL ADDRESS CUSTOMER NAME PROJECT ADDRESS CNTRCT DSNR APPROVALS SCE GROSS $ APPROVED BY APPROVED BY APPROVED BY TITLE TITLE TITLE DATE DATE DATEXSTRT 41607 ENTERPRISE CIR NORTH,TEMECULA CA 92590 2024 - CPRR - V5361675 - ZEVO 12KV % MURRIETTA2 22,813.13 Chavez, Luis Rodrigo Locklin, Rosalind K Chavez, Luis Rodrigo 3/14/2024 1:19:41PM 1:19:41PM DATETITLEAPPROVED BY DATETITLEAPPROVED BY #C RUN#EST QTY ACT GOOD JUNK ABDN BOJ VERSIONDESIGN#PRODUCT#MAT STA# STRUCT# LOC- MATERIAL DETAILS 1 5361675 2NF V/MH Lid UG REPL1680392 0.01 41607 ENTERPRISE CR. N/O WINCHESTER RD 2199087 88 - WILDOMARDISTRICT NOT# 1 CI D VAULT COVER SWIVELOC RETROFIT TYPE 1-2 LENGTH- ________ WIDTH- ________ DEPTH- ______ MATL TYPE- __ DEVICE ID- MAT'L ITEM 01 VAULT COVER SWIVELOC RETROFIT TYPE 1-2 0 0 1 ------------------------- REASON FOR CHANGE WO FCMP YES-NO-DATE-FOREMAN- COMMENTS : CONTRACTOR COMPANY Page 1 of 1SCE FOREMAN PERNR CUSTOMER INFORMATION PLNR- MSR PRINT:TIME PROJ DESC TRACT NUMBER CUST/ BILL ADDRESS CUSTOMER NAME PROJECT ADDRESS CNTRCT DSNR APPROVALS SCE GROSS $ APPROVED BY APPROVED BY APPROVED BY TITLE TITLE TITLE DATE DATE DATEXSTRT 41607 ENTERPRISE CIR NORTH,TEMECULA CA 92590 2024 - CPRR - V5361675 - ZEVO 12KV % MURRIETTA2 22,813.13 Chavez, Luis Rodrigo Locklin, Rosalind K Chavez, Luis Rodrigo 3/14/2024 1:19:41PM 1:19:41PM DATETITLEAPPROVED BY DATETITLEAPPROVED BY CONTRACT JIS #C RUN#EST QTY ACT GOOD JUNK ABDN BOJ VERSIONDESIGN#PRODUCT#MAT STA# STRUCT# LOC- MATERIAL DETAILS 1 5361675 2NF V/MH Lid UG REPL1680392 0.01 41607 ENTERPRISE CR. N/O WINCHESTER RD 2199087 88 - WILDOMARDISTRICT NOT# 1 CI D VAULT COVER SWIVELOC RETROFIT TYPE 1-2 LENGTH- ________ WIDTH- ________ DEPTH- ______ MATL TYPE- __ DEVICE ID- MAT'L ITEM VAULT COVER SWIVELOC RETROFIT TYPE 1-2 0 0 1 ------------------------- REASON FOR CHANGE WO FCMP YES-NO-DATE-FOREMAN- COMMENTS : CONTRACTOR COMPANY Page 1 of 1SCE FOREMAN PERNR 3 2 2 3 2 2 3 2 2 3 2 2 3 2 2 3 2 2 3 2 2 4312 21 3 4 321 4 PS 1944 PRER I G G E D OS18 3 0 P 4 POS. 4 1 5243 2 4 3 1 51243 2 31 4 2 5 6413 4321 3 412 312 4 5 21 3 4 4312 2 5431 32 41 1 423 R A G 321 1 432 3 R A G 412 2 R A G 431 2 31 4 512342134 1 32 B A A B BA B A 0134656 600 212551S A 0187725 1800 P5530212 A 400 A FI00 4 4 7 600A FI005 4 8 POS. 4 F I 0 7 4 4 9 FI00549 POS.2 J675A J664A V5321336 J336A LOCATED IN VAULT LID J971A 2315068E BF09003 40A P5627430 4977344E CL JBARS V5359476 GS2073 GUARD P5362565 M5362040 406 0 2 4 6 E 4057602E STADLER X5550242 P5388709 P5360708 P5550243 P5359301 P5360707 PME1626 P5367674 V5361671 OS1830 P5390301 P5359405 P5359678 V5321335 GS1233 V5321342 GS1241 P5343836 P5344014 V5361675 OS2004 P5359466 P5492418 P5384366 P5359677 P5359447 V5361676 GS2005 J676A P5387848 X5466964 P5342469 P5492419 X5359467 P5466965 P5427315 P5362989 P5358950 4140062E LOAD BREAK A D A P T A B L E P5359468 P5359469 V5361674 GS2003 P5358912 P5358911 P5384317V5361673 GS2002 P5425822 P5360477 X5359664 X5540968 V5361672 GS2001 JBARS P5544999 P5359665 X5362552 P5388750 TACKLE STADLER X5388724 X5427131 X5492310 P5492311 P5388270 P5388556 P5467095 P5343830 J340A V5342474 GS1238 P5344024 P5388725 V5321337 P5389978 GS1235 P5549930 P5731756 V5321341 GS1240 J341A P5359406 X5359404 X5359403 P5359401P5359402 P5390094 500KVA V5321340 GS1239 P5362567 X5390059 P5302838 P5387843 P5390060 P5302834 P5362969 GS1279 V5328304 P5388710 V5342471 GS1280 P5344022 GS1275 V5342488 V5328303 GS1278 P5390093 X5390092 VIA NORTE MORAGA VIA NORTE MORAGA V5321338 GS1236 V5321339 GS1237 J487A GS1274 V5342487 P5360741 P5342846 P5388554 P5362064 P5390748 X5362971 6 5 3 A 6 A 1/0 A T W 1/0 A T W 6 5 3 A 1/ 0 J C N 1000 CLP 1/ 0 C L P 35 0 C L P 3 5 0 C L P 1/0 C L P 2 C L P 35 0 C L P 3 5 0 C L P 35 0 C L P 1/0 C L P 1/0 C L P 1/ 0 C L P 1/0 C L P 2 C L P 2 C L P 2 C L P 2 C L P 35 0 C L P 1/0 CLP 350 CLP 1/ 0 C L P 350 C L P 75 0 C L P 10 0 0 C L P 1000 CLP 1/0 CLP 1000 CLP 1 / 0 J C N 1/0 J C N A D A M S A V CHE R R Y S T D I A Z R D CHE R R Y S T J E F F E R S O N A V T E M E C U L A V A L L E Y F R W Y WIN C H E S T E R R D J E F F E R S O N A V ENT E R P R I S E C I R N WIN C H E S T E R R D CHE R R Y S T D I A Z R D DIA Z R D S E N T E R P R I S E C O M M E R C E J488A RID E R OV E R L A N D D R C O M M E R C E C T R E N T E R P R I S E WIN C H E S T E R DEN D Y P K W Y Y N E Z R D WIN C H E S T E R R D T E M E C U L A V A L L E Y F R W Y J E F F E R S O N A V J E F F E R S O N A V PRIORITY NOTIFICATION : FAULT INDICATORS ON LOOP STATIONS : AUTOMATIC SW. GEAR (SCADA): NETCOMM EQUIPMENT : FOREMEN DATE C2 ZEVO 12KV MURRIETTA 2 SUB (A1) CODE: 19826 CODE: 8195SCALE: 400 STURGEON PAR WILDOMAR 88 01/18/2023 11/27/2023 SYSTEM: VALLEY NO NO NO B1B1 CONFIDENTIAL: CRITICAL ENERGY INFRASTRUCTURE INFORMATION (CEII) AS DEFINED IN SCE-OPS-RM-ST-451 Contact USA Dial 811 or 800-422-4133 UNDERGROUND SERVICE ALERT www.digalert.org/contact CONFID ENTIAL: CRITICAL EN ERGY INFRAST RUCTURE IN FORMATION (CEII)This information is class ified as CEII a s defined in 18 Code of Federal Regulatio ns se ctio n 388.113(c)(1), should be trea te d as suc h, a nd sho uld not be supplied to third -pa rty/non-SC E entities withou t the re quired authorization/ap pro val in adva nce pe r SCE-OPS-CEII-PL-451. Th e information is inten ded to be us ed for re fe ren ce only as it is not a legal re prese ntation o f re al property. This information may no t be electron ic ally or phy sically copie d or distrib uted without the ex press written pe rmiss ion o f Southern C alifornia Edison . Remin der to contact “Dig Alert” a t 811 p rior to site excavation. P r i n t e d : 0 1 -1 9 -2 0 2 4 0 50 10025 Feet1:600 W I L D O M A R T E M E C U L A , R I V E R S I D EMT-8 4 0 9 -G 4 Tota l P a ge s: 1 M T -8 4 0 9 -G 2 M T -8 4 0 8 -A 2 M T - 8 4 0 9 - G 3 M T - 8 4 0 9 - H 3 Land Development Inspection Request Inspection requests made by 3:00 p.m. will be scheduled for the next working day (Monday-Friday), any requests made after 3:00 p.m. will be scheduled two working days out, if there is availability.  Permit Number * LD25- 014 ex: LDXX-XXXX Requested Inspection Date * 04/01/2025 Requested date is subject to availability* Inspection Hours * Morning Hours Afternoon Hours Night Hours Requested time is subject to availability* Inspection Type * Utility Please Elaborate on Inspection Type * Crew will be on site to replace vault casting. Dates 4/1, 4/2, 4/4. Work Hours 7am - 4pm Full Address of Inspection Location * Street Address 41607 Enterprise Cir North Address Line 2 City Temecula State/Province/Region ca Postal/Zip Code 92590 Country United States Inspection Location Details (Cross Streets, etc)* Cross Street/ Business Park dr, Temecula On-site Contractor * Isaac Villalobos Contractor Phone Number * 9097277490 ex: 9999999999 Contractor E-mail * clopez@ferreiraconstruction.com Additional Comments/Details of Work * Vault replacement 4/1 Concrete Restoration 4/2 Chain Installation & Restoration inside vault 4/4. Additional Documentation PR300382_TD2199087-300_SH_D88.pdf 1.93MB 41607 Enterprise Cir North, Temecula.PNG 164.39KB 2025 - City of Temecula Annual LD25-0147.pdf 129.14KB Please be advised that the requested inspection date and time is only a REQUEST and are subject to change based on availability. You will receive a confirmation email once your inspection is scheduled. If you proceed with work prior to your inspection being scheduled, you will be issued a Stop Work Order. Requester Name *Requester E-mail * Carlos Lopez clopez@ferreiraconstruction.com