HomeMy WebLinkAboutLD25-1461Permit Number: LD25-1461
LD - Utilities/ Utility Maintenance
Issued: 03/28/2025
Expired: 09/24/2025
Job Address: 41607 Enterprise Circle N.
Legal Description:
City of Temecula - Land Development Division
41000 Main Street - Temecula, CA 92590
Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033
Phone: (951) 308-6395 Fax: (951) 694-6475
Melissa Martin
1209 Nevada St.
Redlands, CA 92374
(626) 862-9996
Applicant:
Ferreira Construction Co., Inc.
10370 Commerce Center Drive, B-200
Rancho Cucamonga, CA 91730
(909) 606-5900
Contractor:
Utility Work Order Number: TD 2199087
Description:
SCE - TD2199087, 41607 Enterprise Circle North N/S, 665' N/O Winchester Road.
WORK HOURS SHALL BE:
MONDAY THRU FRIDAY, NO HOLIDAYS, 7:00 A.M. - 4:00 P.M.
Proposed Work:
SCE crews will remove and replace vault lid and replace, Remove and replace sidewalk panels from scoreline
to scoreline as shown on the approved SCE "Final Design Plan", LD25-1461.
Permitee Date
City Engineer or Authorized Representative Date
03/28/2025
Page 1 of 1
1 of 4 | Page
PWRD-88 Request for “Underground Civil Contract Construction & Inspection” Form
PWRD-88 Request for “Underground Civil Contract Construction & Inspection”, March 2023
District Name Approver’s Name
(Print)Title Signature Date
SAP Order#:DIMP Y/N:UG Civil Only Work Order:
E5 Notification#:DIMP Due Date: DIMP Notifcation#:
Requestor:Requestor's Contact Number:
Description of Work:
Location:City:
Structure#:
(Must be provided and clearly marked on the maps)
SCE GeoView Grid# / FIM#:
Circuit:
(Must include readable map w/pkg.)
Substation:Environmental Requirements Document Required:
(For example: Ground and/or vegetation disturbing activities)
Permit Required: (Must be included in package)
NOTE: All permits including Blankets must be included in package at time of submission.
Reason: Private Property, Other *:
* IF “OTHER”, PROVIDE COMPLETE, VALID REASON
Easement Required:
Easement Secured:
Work Order Type (Select the appropriate category):
i.Customer Out of Power / Immediate Danger to the Public
ii.Outage or Electrical Crew Meet Related Contact Name:Ph#:
iii.Third-Party Connection Contact Name: Ph#:
iv. M&M / Project
Proposed Civil Construction Start Date:
Emergency Reason:
Required Civil Completion Date:
MATERIAL TYPE (DESCRIPTION)QUANTITY
E-Crew Meet Date:Time:
UNIT OF MEASURE UNIT COST (PRICE) EXTENDED COST
TOTAL ESTIMATED COST (Sheet A): $
TOTAL ESTIMATED COST (Sheet B): $
GRAND TOTAL ESTIMATED COST (Sheet A+B+C+D): $
Documentation of Actual Cost Required:Send to:Email Address:
For Underground Construction Use Only
SCE Inspector:UCC Release#P-Req / PO#
Contractor:Electrical Partner:QA Included:
Construction Comments:
Non-Emergency Call Out (ECO) work received (executable work order package) with a required start date of six (6) business
days or less (dates cannot be adjusted) Shall be performed under the TEM Contract
Please reach out to the area UG Civil Inspector or Advisor for any assistance with completing this form.
TOTAL ESTIMATED COST (Sheet C): $
TOTAL ESTIMATED COST (Sheet D): $
Yes No (see below)
SH TD2199087-300 PR300382/C-4031
FCC
4/11/2025 4/11/2025
2 of 4 | Page
PWRD-88 Request for “Underground Civil Contract Construction & Inspection”
PWRD-88 Request for “Underground Civil Contract Construction & Inspection”, March 2023
Materials Form (CONT.)
MATERIAL TYPE (DESCRIPTION)QUANTITY UNIT OF MEASURE UNIT COST (PRICE)EXTENDED COST
TOTAL ESTIMATED COST (B): $
Please reach out to the area UG Civil Inspector or Advisor for any assistance with completing this form.
3 of 4 | Page
PWRD-88 Request for “Underground Civil Contract Construction & Inspection”
PWRD-88 Request for “Underground Civil Contract Construction & Inspection”, March 2023
Materials Form (CONT.)
MATERIAL TYPE (DESCRIPTION)QUANTITY UNIT OF MEASURE UNIT COST (PRICE)EXTENDED COST
TOTAL ESTIMATED COST (C): $
Please reach out to the area UG Civil Inspector or Advisor for any assistance with completing this form.
4 of 4 | Page
PWRD-88 Request for “Underground Civil Contract Construction & Inspection”
PWRD-88 Request for “Underground Civil Contract Construction & Inspection”, March 2023
Materials Form (CONT.)
MATERIAL TYPE (DESCRIPTION)QUANTITY UNIT OF MEASURE UNIT COST (PRICE)EXTENDED COST
TOTAL ESTIMATED COST (D): $
Please reach out to the area UG Civil Inspector or Advisor for any assistance with completing this form.
ENVIRONMENTAL REQUIREMENTS
TD2199087 CAPITAL MAINTENANCEChange Request:
436802ESF #:ESF Project Details:
Detailed Description
DistributionProject Type:
Preventive MaintenanceDistribution Activity Type:
ZEVO 12KV % MURRIETTA 2Circuit / Facility Name:
Transmission Activity Type:
San JacintoRegion:
WildomarDistrict:
Transmission Grid:
Project Coordinates
Unique Id Coordinates Label Unique Id Coordinates Label Unique Id Coordinates Label Unique Id Coordinates Label
001 V5361675
Auto-SC+EZ+CSWClearance:
Notes
N/A
Clearance Conditions
Proceed with Work. Read and follow the requirements for field work below. Environmental concerns can be
answered at ENVIRONMENTALREQUIREMENTS@SCE.COM or call 833-723-2362 (833-SCE2ENC).
ENVIRONMENTAL REQUIREMENTS
Site Stabilization: Excess soil from ground disturbing activities shall be compacted or stabilized to return the area to pre-
construction conditions or disposed of at SCE approved facility per Operating Unit standard practice. For storm water
related questions, please call the number above.
Tailboard Briefing: This document must be kept on site. The Environmental Requirements will be read to the crew to
ensure requirements are understood prior to starting work. If any of these requirements are infeasible given a safety or
scope concern, please contact Environmental Services at the email or phone number above.
Vegetation: No vegetation/tree removal or trimming/mowing was approved for this project.
Work Areas: Vehicles and equipment must remain on the existing access routes and immediate vicinity of towers/work
areas identified in the project scope. If any work needs to be conducted outside these access routes or work areas,
please contact Environmental Services at the email or phone number above.
Crew Check: Prior to starting work, crews will check the workspace for bird nests (e.g., pole cavities, vegetation to be
removed). Call the number above prior to work within 200 feet of an active nest.
Trapped Wildlife: Prior to the start of work, crews will look in holes and trenches, construction material, and equipment. If
wildlife has become trapped call the number above.
Spill Release/Prevention: Vehicles/equipment must be inspected for leaks (e.g., fuel, oil, hydraulic fluids, etc.) and
repaired prior to work. Fueling should not be conducted near a drainage feature. Spill kits/absorbent clean-up materials
shall be available onsite and if used, disposed of properly.
Archaeological/Human Remains/Paleontological Discoveries: If Archaeological resources (Native American or historical
artifacts), fossils, or human remains are encountered, stop work, and call the number above or the SCE Operator
626-302-1212 and ask for an on-call Archaeologist.
Eagle-Safe: This project is within an SCE-defined Eagle Zone. Construct the new structures to be eagle-safe according
to SCE Construction Standards.
Related Objects
Leading Object of the Change Request:
Maintenance OrderType:TD2199087Object:CAPITAL MAINTENANCE
Object Type Object Description Added by
Maintenance Order TD2199087 CAPITAL MAINTENANCE Rosalind Locklin
People Involved
Role Business Partner Name E-Mail Telephone
Initiator 10010963 Rosalind Locklin ROSALIND.LOCKLIN@SCE.COM 951-249-8445
ESF Coordinator 10165843 ESF Coordinator ESFCoordinator@sce.com
From: $ppAdm4
Sent: Wednesday, February 28, 2024 9:45 AM
To: 88 Permit/SCE/EIX
Cc: Rosalind Locklin; Daniel Jauregui
Subject: 2199087 - Temecula
Importance: Low
PERMIT REQUEST FORM
Your request has been successfully submitted. The permit manager for the area designated has been
notified and will be reaching out to you shortly should they require additional information.
Date Created : 02/28/2024
Organization : Technical Planning
Work Group : DPM
District : 88
TD/SAP # : 2199087
PIF # :
Date Permit Needed By :
Approximate Start Work Date :
Compliance Due Date : 2024-06-03
Project Location : 41607 ENTERPRISE CIRCLE NORTH
Agency Name : Temecula
Agency Type : City
Description of Work :
2024 CPRR VAULT RESTRAINT
Estimated work Duration (Civil+Electrical) :
P-SPEC Name / Phone :
JPA Required : False
Outage Required :
Pedestrian Traffic Control Required : True
Structure Location : In Sidewalk
Structure/Pole Number : V5361675
Trench Location :
Excavation Dimensions :
Attachments :
TD2199087_FINAL.pdf
After the Fact : No
Comments :
High Fire : Yes
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
Pedestrian Traffic Control (PTC) Planner’s Checklist
If you have any questions about filling out this form or need advice as to whether a project may require Pedestrian Traffic
Control, contact Design Support with a question via the Help Desk Form.
Product/TD Number: Today’s Date:
Project Name and Type: Start Work Date:
Project Location: Email:
SCE/Contract Planner: Pony Location: PAX/Phone:
1. Does the work match any of the following descriptions?
If you answered YES, PTC is not required per the PTC manual. The crew must provide
protection to public and employee safety.
The work is not forecasted to
reduce an established pedestrian
path of travel to < 48” for more than
two hours.
The work is the first stage of an
emergency response.
The work is routine construction,
maintenance or inspection that will
last less than 2 hours.
SCE did not originate the work and
SCE will not reduce an established
pedestrian path of travel to < 48” for
more than two hours.
SCE is not responsible for the final
permitting of the final construction
site and SCE will not reduce an
established pedestrian path of travel
to < 48” for more than two hours.
There are no existing improved
pedestrian right of ways within the
construction area.
If yes, skip questions 2&3. Put this form in the Field Package of the work order and place Decal
D124 on work order map, put “N” for PTC Req’d.
No Yes
2. Does the work match any of the following descriptions?
If you answered YES, it is recommended to utilize a vendor to provide the PTC.
The work site includes a state or
federal highway, freeway or an on-
ramp or off-ramp to a highway or
freeway.
The work site includes a major
street or thoroughfare; such as one
with more than two lanes each
direction, and speeds of 45 MPH or
higher.
The work site requires vehicular
traffic control by a Vendor, the use
of flagmen for vehicular traffic
control, or closure of lanes to direct
pedestrians into the closed lanes?
The work site requires the use of an
alternative walkway consisting of
ramps and/or plywood that exceeds
20 feet in length for traversing
landscaping.
The work site includes multiple
vertical levels, or steps, or the cross
slope constructed could exceed
2%.
The work site requires traffic control
material not available to SCE crews
and not included in the kits for PTC.
Set-up and take down of the site
will take more than 2 man hours
(e.g., 4 man crew at 15 minutes
each, or a 2 man crew one half
hour).
No Yes
3. Does the work mirror or approximate any one of the eight (8) scenarios provided in the
Pedestrian Traffic Control Manual (PTCM)? If yes, indicate which route to use #_____________
If you answered YES to only this question, it is recommended that the PTC be assigned to
an SCE crew.
No Yes
NOTE: Put this form in the Field Package for the work order when PTC is required and place
Decal D124 on work order map, put ‘Y’ for PTC Req’d.
Material Requisition/Service Request TRANS MONTH
SAP MATERIAL NO.DESCRIPTION LESS THN
A SPAN ✔
Foreman
SAP Work Order No.
Date Wanted
Prefabed by
Truck No.
Time Wanted
Date
Put in staging area
Crew will be at jobsite
On trailer/dolly
Boom truck will be at job site
Withdrawal
Return
Crew will pick up
W.O. map attached
See over for delivery mapPlease load the following material for the above Work Order on Vehicle No.
SCE 14-511 REV 2/09 (CW)
Ref. No.
QUANTITIES NEEDED/USED
SERV. SEC. ST. LT. PRI. OTHER
DISTRIBUTION SERVICE REQUEST PRICING
RECAP OF APPLICANT - FURNISHED
UNDERGROUND FACILITIES
DATE
DPB 2940
TIME
PAGE 103/14/2024
13:21.58
RULE 15DISTRICT CUSTOMER NAME -88 - WILDOMAR
PRODUCT # -PROJECT ADDRESS - 2199087 CA 92590
TEMECULAPLNR -CITY Luis Rodrigo Chavez
OTHER
LEGEND
CODE
REFUNDABLE
ACCOUNT
CONTRIBUTIONS
ACCOUNT
REIMBURSABLE
ACCOUNTU/P CODE CU ID DESCRIPTION QTY EX
PRODUCT NAME-CAPITAL MAINTENANCE
.MISC-U-VLT-RST-1 MISC-U-VLT-RST-1 EXCAVATION COST 1 CI 6,300.00
.MISC-U-VLT-RST-1 MISC-U-VLT-RST-1 NEW INSTALL 1 CI 9,200.00
TOTALS : 15,500.00
COMMENT :
DATE DISTRIBUTION SERVICE REQUEST PRICING
PROJECT MATERIAL LIST
BY MATERIAL TYPE
DPB 8255
TIME
03/14/2024
13:21.45
DISTRICT
PLNR -
88 - WILDOMAR
Luis Rodrigo Chavez
CUSTOMER NAME -
PROJECT ADDRESS -
CITY
DATE PRICED -
CA 92590
TEMECULA
FOREMAN -DATE WANTED -CCM -
SAP MATL
NUM DESCRIPTION
PLAN
QTY UNIT
JOB
QTY PD
LEG
CODE TYPE U/P CODE TOTAL COST REMARKS*
Page
2199087PRODUCT # -
1
11/16/2023
PRODUCT NAME -CAPITAL MAINTENANCE
CUSTOMER INSTALLED/FURNISHED
VAULT COVER SWIVELOC RETROFIT TYPE
1-2
1 EA CI .$15,500.00
CUSTOMER INSTALLED/FURNISHED TOTAL -$15,500.00
EDISON TOTAL -
* METERS, TRANSFORMERS AND SERVICE CABLE COST NOT INCLUDED IN MATERIAL COST TOTALS
$0.00
CUSTOMER INFORMATION FIELD JIS
PLNR-
MSR
PRINT:TIME
PROJ DESC
TRACT NUMBER
CUST/ BILL ADDRESS
CUSTOMER NAME
PROJECT ADDRESS
CNTRCT
DSNR
APPROVALS
SCE GROSS $
APPROVED BY
APPROVED BY
APPROVED BY
TITLE
TITLE
TITLE
DATE
DATE
DATEXSTRT 41607 ENTERPRISE CIR
NORTH,TEMECULA CA 92590
2024 - CPRR - V5361675 - ZEVO 12KV %
MURRIETTA2
22,813.13
Chavez, Luis Rodrigo
Locklin, Rosalind K
Chavez, Luis Rodrigo
3/14/2024 1:19:41PM 1:19:41PM
DATETITLEAPPROVED BY
DATETITLEAPPROVED BY
#C RUN#EST QTY ACT GOOD JUNK ABDN BOJ
VERSIONDESIGN#PRODUCT#MAT
STA#
STRUCT#
LOC-
MATERIAL DETAILS
1
5361675
2NF V/MH Lid UG REPL1680392 0.01
41607 ENTERPRISE CR. N/O WINCHESTER RD
2199087 88 - WILDOMARDISTRICT
NOT#
1 CI D VAULT COVER SWIVELOC RETROFIT TYPE 1-2
LENGTH- ________ WIDTH- ________ DEPTH- ______ MATL TYPE- __
DEVICE ID-
MAT'L ITEM 01 VAULT COVER SWIVELOC RETROFIT TYPE 1-2 0 0 1 -------------------------
REASON FOR CHANGE
WO FCMP YES-NO-DATE-FOREMAN-
COMMENTS :
CONTRACTOR COMPANY Page 1 of 1SCE FOREMAN PERNR
CUSTOMER INFORMATION
PLNR-
MSR
PRINT:TIME
PROJ DESC
TRACT NUMBER
CUST/ BILL ADDRESS
CUSTOMER NAME
PROJECT ADDRESS
CNTRCT
DSNR
APPROVALS
SCE GROSS $
APPROVED BY
APPROVED BY
APPROVED BY
TITLE
TITLE
TITLE
DATE
DATE
DATEXSTRT 41607 ENTERPRISE CIR
NORTH,TEMECULA CA 92590
2024 - CPRR - V5361675 - ZEVO 12KV %
MURRIETTA2
22,813.13
Chavez, Luis Rodrigo
Locklin, Rosalind K
Chavez, Luis Rodrigo
3/14/2024 1:19:41PM 1:19:41PM
DATETITLEAPPROVED BY
DATETITLEAPPROVED BY
CONTRACT JIS
#C RUN#EST QTY ACT GOOD JUNK ABDN BOJ
VERSIONDESIGN#PRODUCT#MAT
STA#
STRUCT#
LOC-
MATERIAL DETAILS
1
5361675
2NF V/MH Lid UG REPL1680392 0.01
41607 ENTERPRISE CR. N/O WINCHESTER RD
2199087 88 - WILDOMARDISTRICT
NOT#
1 CI D VAULT COVER SWIVELOC RETROFIT TYPE 1-2
LENGTH- ________ WIDTH- ________ DEPTH- ______ MATL TYPE- __
DEVICE ID-
MAT'L ITEM VAULT COVER SWIVELOC RETROFIT TYPE 1-2 0 0 1 -------------------------
REASON FOR CHANGE
WO FCMP YES-NO-DATE-FOREMAN-
COMMENTS :
CONTRACTOR COMPANY Page 1 of 1SCE FOREMAN PERNR
3
2
2
3
2
2
3
2
2
3
2
2
3
2
2
3
2
2
3
2
2
4312
21 3 4
321 4
PS
1944
PRER
I
G
G
E
D
OS18
3
0
P
4
POS.
4
1 5243
2
4
3 1
51243
2 31 4
2 5 6413
4321
3 412
312 4 5
21 3 4
4312
2 5431
32 41
1 423
R
A
G
321
1 432
3 R
A
G
412
2 R
A
G
431
2 31 4
512342134
1 32
B
A
A B
BA
B
A
0134656
600
212551S
A
0187725
1800
P5530212
A
400
A
FI00
4
4
7
600A
FI005
4
8
POS.
4
F
I
0
7
4
4
9
FI00549
POS.2
J675A
J664A
V5321336
J336A
LOCATED
IN VAULT
LID
J971A
2315068E
BF09003
40A
P5627430
4977344E
CL
JBARS
V5359476
GS2073
GUARD
P5362565
M5362040
406
0
2
4
6
E
4057602E
STADLER
X5550242
P5388709
P5360708
P5550243
P5359301
P5360707
PME1626
P5367674
V5361671
OS1830
P5390301
P5359405
P5359678
V5321335
GS1233
V5321342
GS1241
P5343836
P5344014
V5361675
OS2004
P5359466
P5492418
P5384366
P5359677
P5359447
V5361676
GS2005
J676A
P5387848
X5466964
P5342469
P5492419
X5359467
P5466965
P5427315
P5362989
P5358950
4140062E
LOAD BREAK
A
D
A
P
T
A
B
L
E
P5359468
P5359469
V5361674
GS2003
P5358912
P5358911 P5384317V5361673
GS2002
P5425822
P5360477
X5359664
X5540968
V5361672
GS2001
JBARS
P5544999
P5359665
X5362552
P5388750
TACKLE
STADLER
X5388724
X5427131
X5492310
P5492311
P5388270
P5388556
P5467095
P5343830
J340A
V5342474
GS1238
P5344024
P5388725
V5321337
P5389978
GS1235
P5549930
P5731756
V5321341
GS1240
J341A P5359406
X5359404
X5359403
P5359401P5359402
P5390094
500KVA
V5321340
GS1239
P5362567
X5390059
P5302838
P5387843
P5390060
P5302834
P5362969
GS1279
V5328304
P5388710
V5342471
GS1280
P5344022
GS1275
V5342488
V5328303
GS1278
P5390093
X5390092
VIA NORTE
MORAGA
VIA NORTE
MORAGA
V5321338
GS1236 V5321339
GS1237 J487A
GS1274
V5342487
P5360741
P5342846
P5388554
P5362064
P5390748
X5362971
6
5
3
A
6 A
1/0
A
T
W
1/0
A
T
W
6
5
3
A
1/
0
J
C
N
1000 CLP
1/
0
C
L
P
35
0
C
L
P
3
5
0
C
L
P
1/0
C
L
P
2 C
L
P
35
0
C
L
P
3
5
0
C
L
P
35
0
C
L
P
1/0
C
L
P
1/0
C
L
P
1/
0
C
L
P
1/0
C
L
P
2
C
L
P
2
C
L
P
2
C
L
P
2
C
L
P
35
0
C
L
P
1/0 CLP
350 CLP
1/
0
C
L
P
350
C
L
P
75
0
C
L
P
10
0
0
C
L
P
1000 CLP
1/0 CLP
1000 CLP
1
/
0
J
C
N
1/0
J
C
N
A
D
A
M
S
A
V
CHE
R
R
Y
S
T
D
I
A
Z
R
D
CHE
R
R
Y
S
T
J
E
F
F
E
R
S
O
N
A
V
T
E
M
E
C
U
L
A
V
A
L
L
E
Y
F
R
W
Y
WIN
C
H
E
S
T
E
R
R
D
J
E
F
F
E
R
S
O
N
A
V
ENT
E
R
P
R
I
S
E
C
I
R
N
WIN
C
H
E
S
T
E
R
R
D
CHE
R
R
Y
S
T
D
I
A
Z
R
D
DIA
Z
R
D
S E
N
T
E
R
P
R
I
S
E
C
O
M
M
E
R
C
E
J488A
RID
E
R
OV
E
R
L
A
N
D
D
R
C
O
M
M
E
R
C
E
C
T
R
E
N
T
E
R
P
R
I
S
E
WIN
C
H
E
S
T
E
R
DEN
D
Y
P
K
W
Y
Y
N
E
Z
R
D
WIN
C
H
E
S
T
E
R
R
D
T
E
M
E
C
U
L
A
V
A
L
L
E
Y
F
R
W
Y
J
E
F
F
E
R
S
O
N
A
V
J
E
F
F
E
R
S
O
N
A
V
PRIORITY NOTIFICATION :
FAULT INDICATORS ON
LOOP STATIONS :
AUTOMATIC SW. GEAR (SCADA):
NETCOMM EQUIPMENT :
FOREMEN DATE
C2
ZEVO 12KV
MURRIETTA 2 SUB (A1)
CODE: 19826
CODE: 8195SCALE: 400
STURGEON
PAR
WILDOMAR 88
01/18/2023
11/27/2023
SYSTEM: VALLEY
NO
NO
NO
B1B1
CONFIDENTIAL: CRITICAL ENERGY INFRASTRUCTURE INFORMATION (CEII) AS DEFINED IN SCE-OPS-RM-ST-451
Contact USA
Dial 811 or 800-422-4133
UNDERGROUND SERVICE ALERT
www.digalert.org/contact
CONFID ENTIAL: CRITICAL EN ERGY INFRAST RUCTURE IN FORMATION (CEII)This information is class ified as CEII a s defined in 18 Code of Federal Regulatio ns se ctio n 388.113(c)(1), should be trea te d as suc h, a nd sho uld not be supplied to third -pa rty/non-SC E entities withou t the re quired authorization/ap pro val in adva nce pe r SCE-OPS-CEII-PL-451. Th e information is inten ded to be us ed for re fe ren ce only as it is not a legal re prese ntation o f re al property. This information may no t be electron ic ally or phy sically copie d or distrib uted without the ex press written pe rmiss ion o f Southern C alifornia Edison .
Remin der to contact “Dig Alert” a t 811 p rior to site excavation.
P r i n t e d : 0 1 -1 9 -2 0 2 4 0 50 10025 Feet1:600
W I L D O M A R
T E M E C U L A , R I V E R S I D EMT-8 4 0 9 -G 4
Tota l P a ge s: 1
M T -8 4 0 9 -G 2
M T -8 4 0 8 -A 2
M
T
-
8
4
0
9
-
G
3
M
T
-
8
4
0
9
-
H
3
Land Development Inspection Request
Inspection requests made by 3:00 p.m. will be scheduled for the next working day (Monday-Friday), any requests made after 3:00 p.m. will be
scheduled two working days out, if there is availability.
Permit Number *
LD25- 014
ex: LDXX-XXXX
Requested Inspection Date *
04/01/2025
Requested date is subject to availability*
Inspection Hours *
Morning Hours
Afternoon Hours
Night Hours
Requested time is subject to availability*
Inspection Type *
Utility
Please Elaborate on Inspection Type *
Crew will be on site to replace vault casting.
Dates 4/1, 4/2, 4/4.
Work Hours 7am - 4pm
Full Address of Inspection Location *
Street Address
41607 Enterprise Cir North
Address Line 2
City
Temecula
State/Province/Region
ca
Postal/Zip Code
92590
Country
United States
Inspection Location Details (Cross Streets, etc)*
Cross Street/ Business Park dr, Temecula
On-site Contractor *
Isaac Villalobos
Contractor Phone Number *
9097277490
ex: 9999999999
Contractor E-mail *
clopez@ferreiraconstruction.com
Additional Comments/Details of Work *
Vault replacement 4/1
Concrete Restoration 4/2
Chain Installation & Restoration inside vault 4/4.
Additional Documentation
PR300382_TD2199087-300_SH_D88.pdf 1.93MB
41607 Enterprise Cir North, Temecula.PNG 164.39KB
2025 - City of Temecula Annual LD25-0147.pdf 129.14KB
Please be advised that the requested inspection date and time is only a REQUEST and are subject to change based on availability. You
will receive a confirmation email once your inspection is scheduled. If you proceed with work prior to your inspection being scheduled,
you will be issued a Stop Work Order.
Requester Name *Requester E-mail *
Carlos Lopez clopez@ferreiraconstruction.com