Loading...
HomeMy WebLinkAboutLD25-1360Permit Number: LD25-1360 LD - Onsite Improvements/ Public Work clearance Issued: 03/25/2025 Expired: 09/21/2025 Job Address: 31950 Via Cordoba Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 ANY NOTICE OR NOTICES REQUIRED TO BE GIVEN PURSUANT TO THIS PERMIT SHALL BE SERVED ON THE OTHER PARTY BY FIRST CLASS MAIL, POSTAGE PREPAID, AT THE FOLLOWING ADDRESS: Steven Hill 43533 Ridge Park Drive Temecula, CA 92590 (951) 234-2215 Applicant: Contractor: Description: Addition of a 231 sqft loft in the second story of existing house and relocating existing windows vertically - Hyer Residence Permitee Date City Engineer or Authorized Representative Date 03/25/2025 Page 1 of 1 Page i of 11 Template Date: February 21st, 2023 City of Temecula WATER QUALITY MANAGEMENT PLAN (WQMP) Accessory Dwelling Unit (ADU) PROJECT ADDRESS: PROJECT APN: PREPARED BY: Name _________________________________ Address _________________________________ _________________________________ Phone _________________________________ Email _________________________________ PREPARED FOR: Name _________________________________ Address _________________________________ _________________________________ Phone _________________________________ Email _________________________________ PUBLIC WORKS CLEARANCE STAMP REQUIRED 38340 Innovation Ct, Murrieta, CA 92563 951-200-4147 Steve@SevenHillsEng.com Jaron Hyer 31950 Via Cordoba, Temecula, CA 92592 951-723-7132 31950 Via Cordoba, Temecula, CA 92592 Steven Hill 961-141-018 CLEARED BY CITY OF TEMECULA PUBLIC WORKS SUBJECT TO BUILDING DEPARTMENT APPROVAL PERMITS ARE REQUIRED Chris.White 03/25/2025 03/25/2025 03/25/2025 03/25/20 WQMP Page ii of 11 Template Date: February 21st, 2023 Applicant's Certification APPLICANT'S CERTIFICATION I have read and understand that the City of Temecula has adopted minimum requirements for managing urban runoff, including stormwater, from land development activities, as described in the BMP Design Manual. I certify that this WQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this WQMP by City staff is confined to a review and does not relieve me, as the Applicant, of my responsibilities for project design. I hereby declare that the design is consistent with the requirements of the City of Temecula BMP Design Manual, which is a design manual for compliance with local City of Temecula Stormwater and Urban Runoff Management and Discharge Controls Ordinance (Chapter 8.28 et seq.) and regional MS4 Permit (California Regional Water Quality Control Board San Diego Region Order No. R9-2013-0001 as amended by R9-2015-0001 and R9-2015-0100) requirements for stormwater management; as well as the requirements of the City of Temecula Engineering and Construction Manual (Chapter 18) and the City of Temecula Erosion and Sediment Control Ordinance (Chapter 18.18 et seq.). Applicant’s Signature Date: Print Name Company STOP! Before continuing this form, review the table below from Chapter 1.3, Table 1-2 of the BMP Design Manual. If your project type is listed, permanent stormwater requirements do not apply to your project. Write your exempt project category in the space provided below and skip to Step 3. Do not complete Steps 1, 2, or 4 of this WQMP. Exempt Project Category Table 1-2. Applicability of Permanent, Post-Construction Storm Water Requirements Do permanent stormwater requirements apply to your project ? Requirements DO NOT apply to: A. Replacement of impervious surfaces that are part of a routine maintenance activity, such as: 1. Replacing roof material on an existing building 2. Restoring pavement or other surface materials affected by trenches from utility work 3. Resurfacing existing roads and parking lots, including slurry, overlay and restriping 4. Routine replacement of damaged pavement if the sole purpose is to repair the damage pavement 5. Resurfacing existing roadways, sidewalks, pedestrian ramps, or bike lanes on existing roads 6. Restoring a historic building to its original historic design 7. Maintain activities that are part of a larger master planning effort (for example, a programmatic effort to bring a jurisdiction in compliance with ADA requirements) 8. Installation of ground mounted solar arrays over existing impermeable surface Note: Work that creates impervious surface outside of the existing impervious footprint is not considered routine maintenance. B. Repair or improvements to an existing building or structure that do not alter the size: 1. Plumbing, electrical and HVAC work 2. Interior alterations including major interior remodels and tenant build-out within an existing commercial building 3. Exterior alterations that do not increase existing impervious surface footprint and do not expose underlying soil during construction (e.g. roof replacement) Digitally signed by HILL, STEVEN 03/13/25 Steven Hill Seven Hills Engineering Inc. WQMP Page 3 of 11 Template Date: February 21st, 2023 Step 1: Source Control BMP Checklist Source Control BMPs All development projects must implement source control BMPs 4.2.1 through 4.2.6 where applicable and feasible. See Chapter 4.2 and Appendix E of the City BMP Design Manual for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following: •"Yes" means the project will implement the source control BMP as described in Chapter 4.2 and/or Appendix E of the City BMP Design Manual. Discussion / justification must be provided and show locations on the project plans. Select applicable Source Controls in the Source Control BMP summary on the following page. •"No" means the BMP is applicable to the project but it is not feasible to implement. Discussion / justification must be provided. •"N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion / justification must be provided. •Complete all highlighted sections. Source Control Requirement Applied? 4.2.1 Prevention of Illicit Discharges into the MS4 ☒Yes ☐No ☐N/A Discussion / justification: ROOF RUNS OFF TO EXISTING SITE DRAINAGE 4.2.2 Storm Drain Stenciling or Signage ☐Yes ☐No ☒N/A Discussion / justification: NO PROPOSED STORM DRAINS 4.2.3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal ☐Yes ☐No ☐N/A Discussion / justification: 4.2.4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and Wind Dispersal ☐Yes ☐No ☐N/A Discussion / justification: 4.2.5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal ☐Yes ☐No ☒N/A Discussion / justification: NO TRASH STORAGE AREAS PROPOSED. 4.2.6 Additional BMPs Based on Potential Sources of Runoff Pollutants ☐Yes ☐No ☒N/A Discussion / justification. Clearly identify which sources of runoff pollutants are discussed: NO ADDITIONAL BMP’S PROPOSED No outdoor material storage areas No outdoor material storage areas 4 4 WQMP Page 4 of 11 Template Date: February 21st, 2023 Source Control BMP Summary Select all source control BMPs identified for your project in sections 4.2.1 through 4.2.6 above in the coulumn on the left below. Then select “yes” if the BMP has been implemented and shown on the project plans, “No” if the BMP has not been implemented, or “N/A” if the BMP is not applicable to your project. ☐SC-A. On-site storm drain inlets ☐Yes ☐No ☒N/A ☐SC-B. Interior floor drains and elevator shaft sump pumps ☐Yes ☐No ☒N/A ☐SC-C. Interior parking garages ☐Yes ☐No ☒N/A ☐SC-D1. Need for future indoor & structural pest control ☐Yes ☐No ☒N/A ☐SC-D2. Landscape/outdoor pesticide use ☐Yes ☐No ☒N/A ☐SC-E. Pools, spas, ponds, fountains, and other water features ☐Yes ☐No ☒N/A ☐SC-F. Food service ☐Yes ☐No ☒N/A ☐SC-G. Refuse areas ☐Yes ☐No ☒N/A ☐SC-H. Industrial processes ☐Yes ☐No ☒N/A ☐SC-I. Outdoor storage of equipment or materials ☐Yes ☐No ☐N/A ☐SC-J. Vehicle and equipment cleaning ☐Yes ☐No ☒N/A ☐SC-K. Vehicle/equipment repair and maintenance ☐Yes ☐No ☒N/A ☐SC-L. Fuel dispensing areas ☐Yes ☐No ☒N/A ☐SC-M. Loading docks ☐Yes ☐No ☒N/A ☐SC-N. Fire sprinkler test water ☐Yes ☐No ☒N/A ☐SC-O. Miscellaneous drain or wash water ☐Yes ☐No ☒N/A ☐SC-P. Plazas, sidewalks, and parking lots ☐Yes ☐No ☒N/A ☐SC-Q. Large trash generating facilities ☐Yes ☐No ☒N/A ☐SC-R. Animal facilities ☐Yes ☐No ☒N/A ☐SC-S. Plant nurseries and garden centers ☐Yes ☐No ☒N/A ☐SC-T. Automotive facilities ☐Yes ☐No ☒N/A Note: Show all source control measures applied above on the plan sheets. 4 WQMP Page 5 of 11 Template Date: February 21st, 2023 Step 2: Site Design BMP Checklist Site Design BMPs All development projects must implement site design BMPs SD-A through SD-H where applicable and feasible. See Chapter 4.3 and Appendix E of the City BMP Design Manual for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following: •"Yes" means the project will implement the site design BMP as described in Chapter 4.3 and/or Appendix E of the City BMP Design Manual. Discussion / justification must be provided and show locations on the project plans. •"No" means the BMP is applicable to the project but it is not feasible to implement. Discussion / justification must be provided. •"N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project site has no existing natural areas to conserve). Discussion / justification must be provided. •Complete all highlighted sections. Site Design Requirement Applied? 4.3.1 Maintain Natural Drainage Pathways and Hydrologic Features ☐Yes ☐No ☒N/A Discussion / justification: PROJECT DOES NOT AFFECT SITE DRAINAGE 4.3.2 Conserve Natural Areas, Soils, and Vegetation ☐Yes ☐No ☒N/A Discussion / justification: PROJECT DOES NOT AFFECT NATURAL AREAS, SOIL OR VEGETATION 4.3.3 Minimize Impervious Area ☒Yes ☐No ☐N/A Discussion / justification: ROOF RUNS OFF TO EXISTING SITE DRAINAGE 4.3.4 Minimize Soil Compaction ☒Yes ☐No ☐N/A Discussion / justification: PROJECT DOES NOT AFFECT EXISTING SOIL COMPACTION 4.3.5 Impervious Area Dispersion ☒Yes ☐No ☐N/A Discussion / justification: PROJECT WILL DRAIN TO EXISTING LANDSCAPE 4.3.6 Runoff Collection ☒Yes ☐No ☐N/A Discussion / justification: PROJECT WILL DRAIN TO EXISTING LANDSCAPE 4.3.7 Landscaping with Native or Drought Tolerant Species ☐Yes ☐No ☐N/A Discussion / justification: 4.3.8 Harvesting and Using Precipitation ☐Yes ☒No ☐N/A Discussion / justification: NO HARVESTING PROPOSED. Existing landscaping to remain 4 WQMP Page 6 of 11 Template Date: February 21st, 2023 Step 3: Construction Stormwater BMP Checklist Minimum Required Standard Construction Stormwater BMPs If you answer “Yes” to any of the questions below, your project is subject to Table 1 on the following page (Minimum Required Standard Construction Stormwater BMPs). As noted in Table 1, please select at least the minimum number of required BMPs 1, or as many as are feasible for your project. If no BMP is selected, an explanation must be given in the box provided. The following questions are intended to aid in determining construction BMP requirements for your project. Note: All selected BMPs below must be included on the BMP plan incorporated into the construction plan sets. 1.Will there be soil disturbing activities that will result in exposed soil areas? (This includes minor grading and trenching.) Reference Table 1 Items A, B, D, and E Note: Soil disturbances NOT considered significant include, but are not limited to, change in use, mechanical/electrical/plumbing activities, signs, temporary trailers, interior remodeling, and minor tenant improvement. ☒Yes ☐No 2.Will there be asphalt paving, including patching? Reference Table 1 Items D and F ☐Yes ☒No 3.Will there be slurries from mortar mixing, coring, or concrete saw cutting? Reference Table 1 Items D and F ☐Yes ☒No 4.Will there be solid wastes from concrete demolition and removal, wall construction, or form work? Reference Table 1 Items D and F ☐Yes ☒No 5.Will there be stockpiling (soil, compost, asphalt, concrete, solid waste) for over 24 hours? Reference Table 1 Items D and F ☐Yes ☐No 6.Will there be dewatering operations? Reference Table 1 Items C and D ☐Yes ☒No 7.Will there be temporary on-site storage of construction materials, including mortar mix, raw landscaping and soil stabilization materials, treated lumber, rebar, and plated metal fencing materials? Reference Table 1 Items E and F ☐Yes ☐No 8.Will trash or solid waste product be generated from this project? Reference Table 1 Item F ☒Yes ☐No 9.Will construction equipment be stored on site (e.g.: fuels, oils, trucks, etc.?) Reference Table 1 Item F ☐Yes ☐No 10.Will Portable Sanitary Services (“Porta-potty”) be used on the site? Reference Table 1 Item F ☐Yes ☐No 1 Minimum required BMPs are those necessary to comply with the City of Temecula Erosion and Sediment Control Ordinance (Chapter 18.18 et seq.) and the City of Temecula Engineering and Construction Manual (Chapter 18). 4 4 4 WQMP Page 7 of 11 Template Date: February 21st, 2023 Table 1. Construction Stormwater BMP Checklist Minimum Required Best Management Practices (BMPs) CALTRANS SW Handbook 2 Detail  BMP Selected Reference sheet No.’s where each selected BMP is shown on the plans. If no BMP is selected, an explanation must be provided. A.Select Erosion Control Method for Disturbed Slopes (choose at least one for the appropriate season) Vegetation Stabilization Planting 3 (Summer) SS-2, SS-4 ☐ N/A Hydraulic Stabilization Hydroseeding2 (Summer) SS-4 ☐ Bonded Fiber Matrix or Stabilized Fiber Matrix 4 (Winter) SS-3 ☐ Physical Stabilization Erosion Control Blanket3 (Winter) SS-7 ☐ B.Select erosion control method for disturbed flat areas (slope < 5%) (choose at least one) Will use erosion control measures from Item A on flat areas also SS-3, 4, 7 ☐ Sediment Desilting Basin (must treat all site runoff) SC-2 ☐ Mulch, straw, wood chips, soil application SS-6, SS-8 ☐ 2 State of California Department of Transportation (Caltrans). 2003. Storm Water Quality Handbooks, Construction Site Best Management Practices (BMPs) Manual. March. Available online at: http://www.dot.ca.gov/hq/construc/stormwater/manuals.htm. 3 If Vegetation Stabilization (Planting or Hydroseeding) is proposed for erosion control it may be installed between May 1st and August 15th. Slope irrigation is in place and needs to be operable for slopes >3 feet. Vegetation must be watered and established prior to October 1st. The owner must implement a contingency physical BMP by August 15th if vegetation establishment does not occur by that date. If landscaping is proposed, erosion control measures must also be used while landscaping is being established. Established vegetation must have a subsurface mat of intertwined mature roots with a uniform vegetative coverage of 70 percent of the natural vegetative coverage or more on all disturbed areas. 4 All slopes over three feet must have established vegetative cover prior to final permit approval. N/A - INTERIOR LOFT ADDITION ONLY. WQMP Page 8 of 11 Template Date: February 21st, 2023 Table 1. Construction Stormwater BMP Checklist (continued) Minimum Required Best Management Practices (BMPs) CALTRANS SW Handbook Detail  BMP Selected Reference sheet No.’s where each selected BMP is shown on the plans. If no BMP is selected, an explanation must be provided. C.If runoff or dewatering operation is concentrated, velocity must be controlled using an energy dissipater Energy Dissipater Outlet Protection 5 SS-10 ☐N/A D.Select sediment control method for all disturbed areas (choose at least one) Silt Fence SC-1 ☐ Fiber Rolls (Straw Wattles) SC-5 ☐ Gravel & Sand Bags SC-6 & 8 ☐ Dewatering Filtration NS-2 ☐ Storm Drain Inlet Protection SC-10 ☐ Engineered Desilting Basin (sized for 10-year flow) SC-2 ☐ E.Select method for preventing offsite tracking of sediment (choose at least one) Stabilized Construction Entrance TC-1 ☐ Construction Road Stabilization TC-2 ☐ Entrance/Exit Tire Wash TC-3 ☐ Entrance/Exit Inspection & Cleaning Facility TC-1 ☐ Street Sweeping and Vacuuming SC-7 ☐ F.Select the general site management BMPs F.1 Materials Management Material Delivery & Storage WM-1 ☒ Spill Prevention and Control WM-4 ☒ F.2 Waste Management 6 Waste Management Concrete Waste Management WM-8 ☒ Solid Waste Management WM-5 ☐ Sanitary Waste Management WM-9 ☐ Hazardous Waste Management WM-6 ☐ Note: The Construction General Permit (Order No. 2009-0009-DWQ) also requires all projects not subject to the BMP Design Manual to comply with runoff reduction requirements through the implementation of post-construction BMPs as described in Section XIII of the order. 5 Regional Standard Drawing D-40 – Rip Rap Energy Dissipater is also acceptable for velocity reduction. 6 Not all projects will have every waste identified. The applicant is responsible for identifying wastes that will be onsite and applying the appropriate BMP. For example, if concrete will be used, BMP WM-8 must be selected. N/A - INTERIOR LOFT ADDITION ONLY. N/A - INTERIOR LOFT ADDITION ONLY. WQMP Page 9 of 11 Template Date: February 21st, 2023 Step 4: Project type determination (Standard or Priority Development Project) Is the project part of another Priority Development Project (PDP)? ☐Yes ☒ No If so, Standard and PDP requirements apply. Go to Step 4.1 and select “PDP” The project is (select one): ☒New Development ☐Redevelopment 7 The total proposed newly created or replaced impervious area is: _______________ ft2 The total existing (pre-project) impervious area is: _______________ ft2 The total area disturbed by the project is: _______________ ft2 If the total area disturbed by the project is 1 acre (43,560 sq. ft.) or more OR the project is part of a larger common plan of development disturbing 1 acre or more, a Waste Discharger Identification (WDID) number must be obtained from the State Water Resources Control Board. WDID: N/A Is the project in any of the following categories, (a) through (f)?8 Yes ☐ No ☒ (a) New development projects that create 10,000 square feet or more of impervious surfaces 9(collectively over the entire project site). This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. Yes ☐ No ☒ (b) Redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface (collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surfaces). This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. Yes ☐ No ☒ (c) New and redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface (collectively over the entire project site), and support one or more of the following uses: (i)Restaurants. This category is defined as a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). (ii)Hillside development projects. This category includes development on any natural slope that is twenty-five percent or greater. (iii)Parking lots. This category is defined as a land area or facility for the temporary parking or storage of motor vehicles used personally, for business, or for commerce. (iv)Streets, roads, highways, freeways, and driveways. This category is defined as any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7 Redevelopment is defined as: The creation and/or replacement of impervious surface on an already developed site. Examples include the expansion of a building footprint, road widening, the addition to or replacement of a structure, and creation or addition of impervious surfaces. Replacement of impervious surfaces includes any activity that is not part of a routine maintenance activity where impervious material(s) are removed, exposing underlying soil during construction. Redevelopment does not include routine maintenance activities, such as trenching and resurfacing associated with utility work; pavement grinding; resurfacing existing roadways; new sidewalks construction; pedestrian ramps; or bike lanes on existing roads; and routine replacement of damaged pavement, such as pothole repair. 8 Applicants should note that any development project that will create and/or replace 10,000 square feet or more of impervious surface (collectively over the entire project site) is considered a new development. N/A 2912 0 WQMP Page 10 of 11 Template Date: February 21st, 2023 Project type determination (continued) Yes ☐ No ☒ (d) New or redevelopment projects that create and/or replace 2,500 square feet or more of impervious surface (collectively over the entire project site), and discharging directly to an Environmentally Sensitive Area (ESA). “Discharging directly to” includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands). Note: ESAs are areas that include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Board and San Diego Water Board; State Water Quality Protected Areas; water bodies designated with the RARE beneficial use by the State Water Board and San Diego Water Board; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. See BMP Design Manual Chapter 1.4.2 for additional guidance. Yes ☐ No ☒ (e) New development projects, or redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface, that support one or more of the following uses: (i) Automotive repair shops. This category is defined as a facility that is categorized in any one of the following SIC codes: 5013, 5014, 5541, 7532-7534, or 7536- 7539. (ii) Retail gasoline outlets (RGOs). This category includes RGOs that meet the following criteria: (a) 5,000 square feet or more or (b) a projected Average Daily Traffic (ADT) of 100 or more vehicles per day. Yes ☐ No ☒ (f) New or redevelopment projects that result in the disturbance of one or more acres of land and are expected to generate pollutants post construction. Note: See BMP Design Manual Chapter 1.4.2 for additional guidance. Does the project meet the definition of one or more of the Priority Development Project categories (a) through (f) listed above? ☒No – the project is not a Priority Development Project (Standard Project). ☐ Yes– the project is a Priority Development Project (PDP). Further guidance may be found in Chapter 1 and Table 1-2 of the BMP Design Manual. The following is for redevelopment PDPs only: The area of existing (pre-project) impervious area at the project site is: _______________ ft2 (A) The total proposed newly created or replaced impervious area is _______________ ft2 (B) Percent impervious surface created or replaced (B/A)*100: _______________ % The percent impervious surface created or replaced is (select one based on the above calculation): ☐ less than or equal to fifty percent (50%) – only newly created or replaced impervious areas are considered a PDP and subject to stormwater requirements OR ☐ greater than fifty percent (50%) – the entire project site is considered a PDP and subject to stormwater requirements WQMP Page 11 of 11 Template Date: February 21st, 2023 Step 4.1: Water Quality Management Plan requirements Step Answer Progression Is the project a Standard Project, Priority Development Project (PDP), or exception to PDP definitions? To answer this item, complete Step 4 Project Type Determination Checklist, and see PDP exemption information below. For further guidance, see Chapter 1.4 of the BMP Design Manual in its entirety. ☒ Standard Project Standard Project requirements apply, STOP, you have satisfied stormwater requirements. ☐ PDP Standard and PDP requirements apply. Complete Exhibit A “PDP Requirements.” http://temeculaca.gov/wqmpa2 ☐ PDP Exemption Go to Step 4.2 below. Step 4.2: Exemption to PDP definitions Is the project exempt from PDP definitions based on either of the following: ☐ Projects that are only new or retrofit paved sidewalks, bicycle lanes, or trails that meet the following criteria: (i) Designed and constructed to direct stormwater runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (ii) Designed and constructed to be hydraulically disconnected from paved streets or roads [i.e., runoff from the new improvement does not drain directly onto paved streets or roads]; OR (iii) Designed and constructed with permeable pavements or surfaces in accordance with City of Temecula Guidance on Green Infrastructure; If so: Standard Project requirements apply, AND any additional requirements specific to the type of project. City concurrence with the exemption is required. Provide discussion and list any additional requirements below in this form. STOP, you have satisfied stormwater requirements. ☐ Projects that are only retrofitting or redeveloping existing paved alleys, streets or roads that are designed and constructed in accordance with the City of Temecula Guidance on Green Infrastructure. Complete Exhibit A “PDP Requirements.” Select Green Streets Exemptions where applicable. Discussion / justification, and additional requirements for exceptions to PDP definitions, if applicable: 2% 2 % 2% 2% 2% 2% 2% 2% 2%2%2%2%2%2% 2 % 2 % 2 % 2% 5%5% 5% 2% 4" / 1 2 " 4" / 12" 4" / 1 2 " UP UP EXISTING CONSTRUCTION TO BE DEMOLISHED LEGEND EXISTING CONSTRUCTION TO BE REMAINED NEW CONSTRUCTION JURISDICTION HAVING AUTHORITY: CITY OF TEMECULA, CA 92592 ASSESSORS PARCEL NO. APN: 961-141-018 LEGAL DESCRIPTION: LOT 103 MB 240/020 TR 23267-3 IN FLOOD ZONE FEMA SHFA'S: FLOOD ZONE X CONSTRUCTION TYPE: V-B ZONING: LM OCCUPANCY GROUP: R3/U SPRINKLERS: NO NUMBER OF STORIES: 2 STORIES BUILDING MAX HEIGHT: NO CHANGE (E) PROVIDED SETBACKS: FRONT: NO CHANGE REAR: NO CHANGE SIDE: NO CHANGE LOT SIZE :8,276 SF / 0.190 ACRES TOTAL: 2,912 SF MAXIMUM LOT COVERAGE: 35% NO CHANGE OPEN SPACE REQUIRED:25% -NO CHANGE EXISTING: (E) MAIN HOUSE LIVING AREA 2,118 SF (E) 3-CAR GARAGE AREA 600 SF (VERIFY IN FIELD BY CONTRACTOR) (E) PATIO DECK 204 SF (VERIFY IN FIELD BY CONTRACTOR) NEW CONSTRUCTION: (N) LOFT AT 2ND FLOOR 231 SF NEW 231 SF LOFT ADDITION ON 2ND FLOOR: •DEMOLISH CEILING & KEEP EXISTING RAFTERS IN PLACE. •MOVE THE UPPER WINDOWS UP TO AVOID THE NEW LOFT FLOOR JOIST. THE CURRENT PREVAILING BUILDING AND CONSTRUCTION CODES ARE AS FOLLOWS: 2022 CALIFORNIA BUILDING CODE 2022 CALIFORNIA RESIDENTIAL CODE 2022 CALIFORNIA FIRE CODE 2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA ELECTRICAL CODE 2022 CALIFORNIA PLUMBING CODE 2022 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE REGULATION OF THE STATE AND LOCAL FIRE MARSHALS & CITY ORDINANCE. CITY OF TEMECULA AMENDMENTS AND MUNICIPAL CODE. LEGAL JURISDICTION : CITY OF TEMECULA, CA 92592 PROJECT SITE (N) ADDITION LOFT ON 2ND FLOOR 231 SF P L 2 7 .7 8 'PL 38.86' PL 1 3 3 . 1 7 ' PL 1 3 5 . 2 8 ' PL 52.57' (E) DECK 204 SF (E) DRIVEWAY (E) LANDSCAPE (E) LANDSCAPE (E) CONCRETE YARD (E ) W A L K W A Y (E ) W A L K W A Y 4" / 1 2 " 4" / 12"4" / 12" 4" / 1 2 " 4" / 1 2 " STREET CURB & GUTTER VÍA CORDOBA CENTERLINE OF STREET (E) WALKWAY (E) SINGLE FAMILY RESIDENCE 31950 Vía Cordoba, Temecula, CA 92592 2,118 SF (E) GARAGE 204 SF (E ) 26 ' - 1 0 " (E) 4'-11 " (E) 5'-11 1 /2 " (E) 22'-10" (E ) 4' - 0 " (E) BLOCK WALL (E) BLOCK WALL 33' TO STREET CENTERLINE 6'-0" (E) GATE (E) GATE TY P . 1' - 0 " 4" / 12" 4" / 1 2 " 4" / 12" (E) 6'-5" (E) (E ) 13 ' - 1 0 " (E ) 10 ' - 7 " (E ) 24 ' - 9 " (E) 6'-7"(E)4'-3"(E) 11'-2" (E ) 12 ' - 1 0 " (E) 4'-9" (E) 3'-0" (E) 3'-0" (E) ENTRY (E) LIVING ROOM STEP SL 4040 FX 2 0 5 0 FX 2050 FX 2 0 5 0 SL 5040 (E) OFFICE A A.02 A A.02 B A.02 B A.02 C A.02 C A.02 (E) HALLWAY OPEN TO BELOW (E) LANDING 3'-0" 3' - 0 " (E ) H A L L W A Y (E) CEILING TO BE DEMOLISHED (E) BEDROOM A A.02 A A.02 FX 2 0 2 0 FX 2020 ARCH TOP B A.02 B A.02 C A.02 C A.02 # Sheet No Date Revisions Description Checked by Project Eng. Sheet Name Job No Rev. Drawn by Scale Date NOT FOR CONSTRUCTION -THIS PLAN IS FOR BUILDING DEPARTMENT REVIEW ONLY. SUBJECT TO REVISION 31 9 5 0 V i a C o r d o b a , Te m e c u l a , C A 9 2 5 9 2 COVER SHEET & EXISTING FLOOR PLAN A.01 LO F T A D D I T I O N VICINITY MAP PROJECT DATASHEET INDEX ARCHITECTURAL A.01 COVER SHEET & EXISTING FLOOR PLAN A.02 EXISTING SECTIONS A.03 PROPOSED FLOOR PLAN & SECTIONS SCOPE OF WORK APPLICABLE CODE PARCEL MAP 1/8" = 1'-0"A.01 1 PROPOSED SITE PLAN 1/4" = 1'-0"A.01 2 EXISTING 1ST FLOOR PLAN 1/4" = 1'-0"A.01 3 EXISTING 2ND FLOOR PLAN MURRIETA OFFICE 38340 Innovation Court, Suite #511, Murrieta, CA 92563 Phone: 951.200.4147 E-Mail: Contact@SevenHillsEng.com www.SevenHillsEng.com 11/07/2024 CLEARED BY CITY OF TEMECULA PUBLIC WORKS SUBJECT TO BUILDING DEPARTMENT APPROVAL PERMITS ARE REQUIRED Chris.White 03/25/2025 03/25/2025 03/25/2025 03/25/20