Loading...
HomeMy WebLinkAboutLD23-0519Permit Number: LD23-0519 LD - Offsite Improvements/ Street & Storm Drain Improvements Issued: 03/25/2025 Expired: 09/22/2025 Job Address: Tract Map 36483 Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 Ed Lenth 17320 Redhill Ave. Ste. 350 35 Snowdrop Tree, 350 Irvine, CA 92614 Applicant: Contractor: Description: Tract Map 36483 Villages at Paseo Del Sol (Elderberry) Street and Storm Drain Improvement Plans The following separate permits will be required: 1. Encroachment permit for ALL work within the City right-of-way 2. Haul Route Permit for the import/export of material 3. Private utilities Maximum 2:1 slopes. All grading and erosion & sediment control improvements shall be as specified on the approved plans and per the preliminary soils report. Page 1 of 2*****See Page 2 of this Permit for Permittee Responsibilities***** Permit Number: LD23-0519 LD - Offsite Improvements/ Street & Storm Drain Improvements Permittee Responsibilities This Permittee agrees to indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Trench repair shall be pursuant to City of Temecula Standard Drawing No. 407. 3.Traffic control devices shall be utilized to protect and control pedestrian and vehicular traffic in the construction area in accordance with the latest revision of the “Manual of Uniform Traffic Control Devices for Streets and Highways” (MUTCD). The contractor shall submit a specific traffic control plan for review and approval by the City in accordance with City “Traffic Control Plan Guidelines” for all work within Major Circulation Element streets. 2.BEFORE YOU DIG - CALL (TOLL FREE) 800-422-4133 A pre-construction meeting is required two (2) business days prior to any scheduled work. Permittee shall contact LDInspections@TemeculaCA.gov to schedule a meeting. 1. 4. Water Quality: Contractor shall remain in compliance with the City Water Pollution Control Ordinance. Contractor is required to provide protection of the City storm drain system. 5. Work hours shall be limited between 7:30 AM and 4:30 PM, Monday through Friday, unless otherwise noted. No work shall be allowed during City-recognized holidays." 6. THIS PERMIT IS ISSUED AND ACCEPTED SUBJECT TO THE FOLLOWING CONDITIONS AND ANY ATTACHED PROVISIONS: All U.S.A. mark outs shall be removed prior to completion of project.7. 8.All contractors and subcontractors shall have a valid City of Temecula business license and valid Certificate of Liability prior to start of work. 9.Should there be any claim against the City and the property owner with the encroachment being the proximate cause, the property owner shall be notified in writing to remove the encroachment within 30 days or the City will remove and bill the owner. 10.Permission is hereby requested to encroach into public right of way to perform work as set forth above. It is understood that this permit is limited to the work described herein and that all work is to be done in compliance with the provisions attached to this permit and with all other applicable rules. Permittee shall be responsible for said compliance, for acceptability of the work, for repair or replacement thereof if defective, and for repair or replacement of any existing improvement damaged by the doing of the work I hereby certify and agree on behalf of the Permittee that all laws, regulations and ordinances of the City of Temecula and the State of California and the terms and conditions of the Permit shall be complied with whether herein stated or not. 11. 12.I hereby warrant and represent to the City that I am authorized to execute this Permit Application on behalf of the Permittee and bind the Permittee to the agreements contained herein and any conditions of the Permit. ******Contractor and all subcontractors shall be present at the pre-construction meeting; otherwise, the meeting will be rescheduled to a later date****** Any work commencing within the City right-of-way before permit issuance or a pre-construction meeting shall be subject to a 72-Hour suspension of said work and an assessment of double permit fees.13. Permitee Date City Engineer or Authorized Representative Date 03/25/2025 Page 2 of 2 FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA CALIFORNIA PREPARED FOR: MDS CONSULTING 17320 REDHILL AVENUE, SUITE 350 IRVINE, CA 92614 (949) 251-8821 PREPARED BY: 36263 CALLE DE LOBO MURRIETA, CA 92562 (951) 304-9552 • FAX (951) 304-3568 DATE PREPARED: MARCH 23, 2023 DATE REVISED: MAY 23, 2023 JULY 19, 2023 SEPTEMBER 18, 2023 JANUARY 15, 2024 JUNE 20, 2024 SEPTEMBER 20, 2024 DECEMBER 12, 2024 APPROVED BY CITY OF TEMECULA PUBLIC WORKS valerie.caragan 01/06/2025 01/06/2025 01/06/2025 01/06/20 FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx This report has been prepared by or under the direction of the following registered civil engineer who attests to the technical information contained herein. The registered civil engineer has also judged the qualifications of any technical specialists providing engineering data upon which recommendations, conclusions, and decisions are based. 12/12/2024 Joseph L. Castaneda RCE 59835 Date Seal Registered Civil Engineer FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx TABLE OF CONTENTS I. INTRODUCTION .................................................................................................. 1 II. Project Site and Drainage Area Overview ....................................................... 1 III. Hydrology Analysis .......................................................................................... 2 IV. Hydraulic Analysis ........................................................................................... 3 V. Conclusions ..................................................................................................... 8 VI. References ...................................................................................................... 8 FIGURES FIGURE 1: VICINITY MAP FIGURE 2: OPEN SPACE HYDROLOGY AND HYDRAULICS MAP APPENDICES APPENDIX A: POST-PROJECT CONDITION ONSITE RATIONAL METHOD HYDROLOGY ANALYSIS APPENDIX A.1: AREA A APPENDIX A.2: AREA B APPENDIX A.3: AREA C APPENDIX A.4: AREA D APPENDIX A.5: AREA E APPENDIX A.6: AREA F APPENDIX A.7: AREA OPEN APPENDIX B: HYDRAULIC STORM DRAIN ANALYSIS APPENDIX B.1: STREET CAPACITY CALCULATIONS APPENDIX B.2: CATCH BASIN FLOW-BY SUMMARY TABLE APPENDIX B.3: CATCH BASIN SIZING CALCULATIONS APPENDIX B.4: DROP INLET CALCULATIONS APPENDIX B.5: STORM DRAIN WSPG CALCULATIONS APPENDIX B.6: DIVERSION STRUCTURE WEIR CALCULATION APPENDIX B.7: BASIN OUTLET STRUCTURE CALCULATION FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx EXCERPTS EXCERPT A: LINE S STORM DRAIN PLANS DWG NO. 7-245 EXCERPT B: PALOMA DEL SOL ALCOBA DRIVE STORM DRAIN TRACT NO. 24185 LINE A STORM DRAIN PLANS DWG NO. 7-263 EXCERPT C: VESTING TENTATIVE TRACT NO. 24185, THE MEADOWS AT RANCHO CALIFORNIA ROAD CORRECTION MAP PA10 EXHIBITS EXHIBIT A: POST-PROJECT CONDITION ONSITE RATIONAL METHOD HYDROLOGY MAP EXHIBIT B: DRAINAGE FACILITIES MAP EXHIBIT C: HYDROLOGIC SOILS MAP EXHIBIT D: RAINFALL MAPS EXHIBIT E: SLOPE OF INTENSITY DURATION CURVES FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx 1 I. INTRODUCTION The Villages at Paseo Del Sol is a Specific Plan (Specific Plan No. 219, Amendment No. 8) which is located in the City of Temecula. This report is specifically for Planning Area 4A of the Specific Plan, also referred to as Tentative Tract Map 36483. Planning area 4A proposes to construct approximately 43 acres of medium- high density residential development. The scope of this report includes: • Determine the peak 100-year peak flow rates for post-project conditions for onsite areas using the Riverside County Flood Control and Water Conservation District (RCFC & WCD) Rational Method. • Determine the required storm drain improvements to flood protect the site. • Preparation of a hydrology and hydraulic report, which consists of hydrological and analytical results and exhibits II. PROJECT SITE AND DRAINAGE OVERVIEW The Villages at Paseo Del Sol – TTM 36483 – Planning Area 4A, is a proposed medium-high density residential development located in the City of Temecula. The project site is roughly bounded by De Portola Road to the north, Butterfield Stage Road to the east, Temecula Parkway to the south, and residential development to the west. The project site has been previously graded, and incorporates fill, earthen drainage ditches, and minor erosion control for the fill area. Currently, the project site discharges into the existing Line “S” Storm Drain system located within Temecula Parkway. The Line “S” Storm Drain is an 84” – 96” MS4 Facility maintained by Riverside County Flood Control and Water Conservation District. The Line “S” Storm Drain discharges directly into the Temecula Creek Channel (see Line “S” storm drain plans in Excerpt “A”). The offsite storm drain improvements have been analyzed as part of a separate report. This report supports the calculations and analyses for the onsite area only. The post-project onsite area will discharge into the proposed Line “A” Storm Drain system, which connects to the existing Line “A” Storm Drain (see Excerpt B) at De Portola Road and traverses the project site to the south. The Line A Storm Drain runoff will flow along an earthen channel and into the existing Line “S” Storm Drain. The project site will construct medium-high density residential homes, a biofiltration basin, a subsurface basin and a modular wetlands for water quality treatment. The project site will also address hydromodifications as required by the Water Quality Management Plan. The water quality treatment has been discussed in the Water Quality Management Plan, and the hydromodification analyses has been included FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx 2 in a separate study. The project did not require a pre-project condition analyses since the project is draining to existing MDP facilities, and have been designed for the ultimate build out of the tributary area. Any minor increase in flow rates will not adversely impact the design of the MDP system. The project is not within a 100-year flood hazard. III. HYDROLOGY ANALYSIS The RCFC & WCD Hydrology Manual (Reference 1) was used to develop the hydrological parameters for the rational method. The calculations were performed using the computer program developed by Civil Cadd/Civil Design. The existing soil types are Soils A and D, and is shown in Exhibit C. Exhibit C is a Hydrologic Soils Map which was obtained from the United States Department of Agriculture, Natural Resources Conservation Service (NRCS) WebSoil Survey. The following rainfall depths (in inches) were utilized in the hydrology analyses, which were obtained from the RCFC & WCD Hydrology Manual's lsohyetal Maps: Table 1: Rainfall Data Storm Event 1-Hour Duration 2-Year 0.55 100-Year 1.30 The slope value used for the rational method value is 0.55. The rainfall maps have been included Exhibit D, and the slope of intensity duration curves have been included as Exhibit E . The onsite watershed areas have been designated as areas A and B. Area A is tributary to the Line A1 and A2 systems, and Area B is the area tributary to the Line B systems. The onsite area was analyzed as condominium development, since this project site is medium-high density residential. The average lot size ranges from 5,200 sq. ft. to 7,000 sq. ft., which is smaller than the smallest lots for single family residential (1/4 acre residential). Therefore, the next higher impervious cover is associated with condominiums, per the RCFC&WCD Hydrology Manual. Area A hydrology model was broken into two separate watershed areas based on the flows tributary to the diversion structure and Node 114 as shown on Exhibit A Post-Project Hydrology Map and Exhibit B Drainage Facilities Map. The second hydrology model incorporates a command defined as a user defined condition to input the runoff that by-passes the diversion structure at Node 114. This was done in order to hydraulically assess the diversion structure, and then provide a representation of the flow through the diversion structure that flows directly into the FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx 3 Line A1 storm drain system downstream of the diversion structure. Both hydrology models have been included in Appendix A. The Line A flows have been summarized in Table 2 below. Table 2: Line A Flow Rate Summary Storm Drain System Added Flow Rate (CFS) Total Flow Rate (CFS) Line A Upstream End 295.8 295.8 Line B – Reach 1 11.6 307.4 Lateral A 8.9 316.3 Areas C through E are the offsite street areas. Butterfield Stage Road and De Portola Road are tributary to existing catch basins, and Temecula Parkway flows continue to the south west to a catch basin approximately 280 feet downstream of the project site. The existing catch basins have all been sized for the ultimate tributary flow rate. Please note that the Open Space hydrology in Appendix A.7 utilizes user defined nodes to account for the confluence and travel time of offsite flows as they comingle with onsite flows prior to entering the Line E/Line S storm drain system. Since the flows tributary to the open space area that arrive through Line A, with a total inflow of 316.3 ft3/s , include an offsite area that is not explicitly part of this study, the onsite area B, and part of the onsite area A , it is difficult to characterize the tributary area for the user defined node in the hydrology program CivilD. This is because the runoff from the part of onsite Area A that is tributary to the Later al A is not fully captured. The user defined node, therefore, conservatively models the tributary area as 141.76 ac. This is the sum of the tributary area to the Line A system which includes 124 ac of tributary area from offsite area to the north (Tract No. 24185, see Excerpt C), 3.91 ac from onsite area B, and 13.85 ac from onsite area A. Note that not all of the runoff generated by the 13.85 ac of area A is captured by Line A due to the diversion structure diverting flows past Line A. The rational method hydrology calculations have been included in Appendix A, and the rational method hydrology map has been included as Exhibit A. IV. HYDRAULIC ANALYSIS The proposed project will incorporate subsurface storm drain to convey the flows generated from the onsite area. During final engineering, the storm drain systems that are shown on Exhibit B were analyzed using the Water Surface Pressure Gradient Program and downstream water surface elevations obtained from the Line A system. The catch basins were sized using normal depth calculations, and detailed FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx 4 catch basin flow by analyses were calculated to determine the intercepted flows and corresponding pipe flow rates. Street capacity calculations were performed to assess the flooding within the streets, and ensure that the flows meet the following street design criteria: • 10-year storm event flows shall be contained within the top of curb elevation • 100-year storm event flows shall be contained within the right-of-way elevation The street design criteria controlled the location in which catch basins were required. For locations other than low points, catch basins were provided when the above mentioned street criteria was exceeded. Due to the street section being a 60’ width right-of-way to right-of-way, the centerline depth is 0.55 feet above the gutter flow line, and the top of curb is 0.50 feet above the gutter flow line, therefore the 10 -year flows will be contained within one side of the street. Rating tables for the street capacity calculations for various slopes have been included in Appendix B. Once the location of the catch basins were determined, the catch basin sizing calculations were performed, and a spreadsheet summarizing the intercepted vs. by- pass flows was prepared. The street capacity and catch basin sizing calculations have been included in Appendix B . Table 3 provides a summary of the catch basin interception and bypass flow rates. Table 3: Catch Basin Summary Table Catch Basin Q Hydrology (CFS) Upstream Bypass CB1 Q Total (CFS) Q Intercepted (CFS) Q Bypass (CFS) 15 5.47 N/A 5.47 4.66 0.81 1 11.30 CB 15 12.11 8.112 4.00 2 3.13 CB 1 7.13 6.36 0.77 3 5.30 CB 2 6.07 5.65 0.42 4 6.26 N/A 6.26 5.77 0.49 5 5.51 CB 3, 7 6.92 6.92 0 6 3.69 CB 4 4.18 4.18 0 7 5.23 N/A 5.23 4.24 0.99 8 4.98 N/A 4.98 3.77 1.21 9 7.15 N/A 7.15 5.89 1.26 10 2.41 CB 8, 9 4.88 4.88 0 11 14.06 N/A 14.06 13.22 0.84 12 2.23 N/A 2.23 2.23 0 13 4.43 CB 16 5.12 5.12 0 14 2.31 CB 19 2.54 2.54 0 FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx 5 16 3.14 N/A 3.14 2.45 0.69 17 0.27 CB 11 1.11 0.78 0.333 18 1.17 CB 12 1.17 0.80 0.374 19 2.15 N/A 2.15 1.92 0.23 1. The “Upstream Bypass CB” column provides the bypass flows the current catch basin receives. For example, CB 1 receives the bypass flows from CB 15. 2. The half street capacity at Catch Basin #1 is 8.11 ft3/s, therefore an additional 4 ft3/s will overtop the centerline to Catch Basin #2. 3-4. The bypass flows from CB 17 and CB 18 go offsite. Approved through discussions with City. A more in depth catch basin flow by summary table has been provided in Appendix B. The downstream water surface elevation within bioretention basin A was obtained from a weir equation that utilized a 16 foot weir with a flow line elevation of 1103.00 (which was obtained from the storm drain improvement plans). The Technical Memorandum: SWMM Modeling for Hydromodification Compliance of: Villas at Paseo del Sol, Temecula, CA, prepared by REC Consultants, has be en included as an attachment to the Water Quality Management Plan. The SWMM modelled a basin that had a bottom elevation of 1101 and a weir of 1104. The final design implemented the same design and storage volume, with the exception that the basin bottom elevation is 1100. This revision occurred during the final engineering process as part of finalizing the grading of the project site. This required the basin outlet structure to lower the weir to elevation 1103 to ensure compliance with the SWMM Model. Please note Table 4 provides the design summary between the SWMM Model and the final engineering design. Table A – Design Parameter Comparison Comparison Location SWMM Model Final Engineering Basin Bottom Area 21,534 ft2 21,778 ft2 Basin Bottom Elevation 1101 ft 1100 ft Outlet Weir Elevation 1104 ft 1103 ft Basin Side Slopes 3:1 3:1 Available Depth 5 ft 5 ft Based on the final engineering design, the water quality basins is consistent with the SWMM model. The 100 year flow rate into the basin is 67.1 ft3/s which results in a maximum 100- year water surface elevation over the 16 foot long weir of 1104.25. Due to the elevations of the storm drain and the design constraints, Line A1 had to FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx 6 incorporate a reinforced concrete box system for Line A1. This was due to cover issues and crossing the main Line A system that convey the offsite flows through the project. The flow rates within the systems were based upon the hydrology flow rates for the mainlines (systems with more than one reach) and the intercepted flow rates for the laterals (one reach systems). The elevations of the site and the requirement for the crossing of Line A resulted in the design of a diversion structure that would allow for flow rate less than the 10 year to flow to the biofiltration basin, and for flows in excess to pass to Lateral A and discharge directly into the Line A system. To determine that the 10 year flow rate, which is equal to 21.2 ft3/s at Node 114, would flow into the system an iterative calculation process was used with the WSPG program. The analysis used the 100 year flow rate. The iteration process was performed by balancing the flow rate with the weir elevation to ensure that 21.2 ft3/s would flow through Line A1. Based on the 100 year hydraulic analyses, it was determined that a flow rate of 23 ft 3/s would flow through Line A1 if the baffle wall inside the diversion structure was place at elevation 1104.70, see Figure below. Figure A – Diversion Structure The design in Figure A ensures that the 10 year flow rate of 21.6 ft 3/s always flows to the basin in order to meet the hydromodification criteria. The total flow rate at the diversion structure (Node 114) which excludes the flows by-passing catch basins #3 and #4 is 31.93 ft3/s. The top of weir elevation was designed to be equivalent to the WSE for the flow rate of 23.0 ft3/s. This allows flows exceeding 23.0 ft3/s to overtop the weir. This total flow rate overtopping the weir would be 8.93 ft3/s (31.93 ft3/s minus FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx 7 23.00 ft3/s). Using an 8 foot weir length, the resulting ponded depth o ver the weir is 0.52 feet. The weir invert elevation is 1104.70, resulting in a water surface elevation of 1105.22. As previously stated, the 23.00 ft3/s was added to the flow rates within the pipe downstream of the diversion structure directly. The Lateral A bypass storm drain was designed to convey 8.93 ft3/s into Line A. The Line A water surface elevation at downstream end of Lateral A is 1098.15. This will not impact the operation of the diversion weir since the water surface elevation is well below the weir elevation of 1104.70. Therefore, the diversion structure will function in the 100-year condition. The downstream water surface ele vation for the Line B system was also obtained from the Line A improvement plans . The water surface elevation at the Line B junction is 1102.91. In addition to assessing the onsite storm drain, the proposed Line A storm drain was analyzed to determine the hydraulic impacts to the system upstream of DePortola Road. The downstream control for Line A was determined by hydraulically modeling the open space channel between the Line S headwall and the Line A outlet. The open space was modeled as a trapezoidal channel with 2.5:1 side slopes. Figure 2 provides the cross sections used for the hydraulic model along with the hydrology which yielded a total flow rate of 329.3 CFS through the channel. The open channel flow enters Line S and confluences with Line C for a total of 382.7 CFS. This flow rate is less than the design flow rate of 395.8 CFS per Dwg No. 7-245. The Line S water surface elevation of 1099.37 was utilized as the downstream control for the hydraulic model. The downstream control of 1099.37 in the open space model was computed by modeling the water surface elevation in Line S. This WSPG model is called Line E since the alignment Line S is referred to as both Line E and Line S in various storm drain plans. Note that the alignment is called Line S in the RCFC&WCD Storm Drain plans. The model of Line S/Line E resulted in the downstream control for the open space area of 1099.37 (see WSPG output). This model is based on the known flowrate and geometry of Line S/Line E. The downstream control in the Line E WSPG is derived from the documented Water Surface Elevation in the RCFC&WCD storm drain plans. Sheet 4 of the RCFC&WCD plans (Excerpt A; DWG 7 -245) show a downstream WSE of 1095.42 at Station 40+74.37. The WSPG model relabels Station 40+74.32 as 10+00.00. This point was picked as the downstream control since this is the station at which the proposed Storm Drain improvement plans begin for Line S/Line E. As a result, the model calculated a water surface elevation of 1099.406 for the open channel which was then used as the downstream co ntrol for the Line A hydraulic model. The Line A hydraulic model was extended beyond Station 19+43.60 shown on the plans to assess impacts to the existing storm drain system. Based on the final engineering plans Station 19+43.60 is equal to Station 25+00 .00 and Station FINAL HYDROLOGY AND HYDRAULICS STUDY FOR THE VILLAGES AT PASEO DEL SOL TTM 36483 – PLANNING AREA 4 CITY OF TEMECULA, CALIFORNIA O:\298.01.21\Engineering\Hydrology_Plan\Reports\PA 4 Final Hydro Report.docx 8 19+58.22 is equal to Station 25+14.16 as shown on the Line A Plans per Dwg No. 7 - 263, included as Excerpt B. An EQ card was used for the hydraulic model at Station 19+43.60 so that the WSPG stationing matched the Line A as -built plans per Dwg No. 7-263. The hydraulic model resulted in a water surface elevation of 1102.05 at Station 25+14.16 which is equivalent to 1102.05 water surface elevation of the Line A as-built plans at the same location. The street capacity calculations, catch basin sizing calculations, catch basin flow-by summary table, and storm drain sizing calculations have been included in Appendix B. The Drainage Facilities Map has been included as Exhibit B. V. CONCLUSIONS The hydrology and hydraulic analyses performed for the Villages at Paseo Del Sol – TTM 36483 – Planning Area 4A provide results that demonstrate that the storm drain will provide the required flood protection for the site and meet the street flooding criteria. The following can be concluded: 1. The proposed Line A Storm Drain will convey the offsite flows through the project site without impacting the existing storm drain. The results indicate that the pre-project and post-project have the same water surface elevation of 1102.05 at Station 25+14.16. 2. The Line A1 system and the Diversion Structure can convey the 10 year flow through the downstream system to ensure project is meeting the hydromodification criteria. 3. The proposed water quality basin will treat runoff emanating from the project site. Additionally, a 16 feet weir has been placed in the basin to ensure that project is consistent with the SWMM Model. 4. The proposed storm drain systems will adequately convey the proposed 100 - year flow rates. VI. REFERENCES 1. Riverside County Flood Control and Water Conservation District Hydrology Manual, April 1978. 2. Los Angeles County Flood Control Design Manual, March 1982 FIGURES FIGURE 1: VICINITY MAP 41660 IVY STREET, SUITE A MURRIETA, CA 92562 PH. 951.304.9552 FAX 951.304.3568 Engineering & Consulting, Inc. FIGURE 2: Open Space Hydrology and Hydraulics Map OPEN SPACE/DRAINAGE CHANNEL W.Q. BASIN OPEN SPACE/DRAINAGE CHANNEL 19 20 21 22 23242526 27 28 29 65 57 55 54 53 52 51 30 31 32 33 34 35 36 38 39 40 41 42434445 46 47 48 49 50 838488899091 99 121 92 122 82 6968 67 168 167 164 15 3 152 151 150 148 147 146 145 149 166 858687 56 189 179 37 169 939495969798 175 182 TR A C T N O . 2 4 1 8 2 - 2 165 66 NOT A PART OPEN SPACE/DRAINAGE CHANNEL W.Q. BASIN OPEN SPACE/DRAINAGE CHANNEL 19 20 21 22 23242526 27 28 29 65 57 55 54 53 52 51 30 31 32 33 34 35 36 38 39 40 41 42434445 46 47 48 49 50 838488899091 99 121 92 122 82 6968 67 168 167 164 15 3 152 151 150 148 147 146 145 149 166 858687 56 189 179 37 169 939495969798 175 182 TR A C T N O . 2 4 1 8 2 - 2 165 66 NOT A PART 41660 IVY STREET, SUITE A MURRIETA, CA 92562 PH. 951.304.9552 FAX 951.304.3568 Engineering & Consulting, Inc. APPENDICES APPENDIX A: POST-PROJECT CONDITION ONSITE RATIONAL METHOD HYDROLOGY ANALYSIS APPENDIX A.1: AREA A 100-YEAR 1 Riverside County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2001 Version 6.4 Rational Hydrology Study Date: 03/02/22 File:ARA1100.out ------------------------------------------------------------------------ 298.01.21 100-YEAR RATIONAL TABLING METHOD POST PROJECT CONDITION FOR AREA A1 ARA1100.RRV ------------------------------------------------------------------------ ********* Hydrology Study Control Information ********** English (in-lb) Units used in input data file ------------------------------------------------------------------------ TRI-8 Builders - S/N 615 ------------------------------------------------------------------------ Rational Method Hydrology Program based on Riverside County Flood Control & Water Conservation District 1978 hydrology manual Storm event (year) = 100.00 Antecedent Moisture Condition = 2 2 year, 1 hour precipitation = 0.550(In.) 100 year, 1 hour precipitation = 1.300(In.) Storm event year = 100.0 Calculated rainfall intensity data: 1 hour intensity = 1.300(In/Hr) Slope of intensity duration curve = 0.5500 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 101.000 to Point/Station 102.000 **** INITIAL AREA EVALUATION **** ______________________________________________________________________ Initial area flow distance = 728.000(Ft.) Top (of initial area) elevation = 1121.700(Ft.) Bottom (of initial area) elevation = 1114.100(Ft.) Difference in elevation = 7.600(Ft.) Slope = 0.01044 s(percent)= 1.04 TC = k(0.370)*[(length^3)/(elevation change)]^0.2 Initial area time of concentration = 12.862 min. Rainfall intensity = 3.033(In/Hr) for a 100.0 year storm CONDOMINIUM subarea type Runoff Coefficient = 0.860 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 2) = 75.00 Pervious area fraction = 0.350; Impervious fraction = 0.650 Initial subarea runoff = 5.345(CFS) Total initial stream area = 2.050(Ac.) Pervious area fraction = 0.350 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 102.000 to Point/Station 103.000 **** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION **** ______________________________________________________________________ Top of street segment elevation = 1114.100(Ft.) End of street segment elevation = 1109.100(Ft.) Length of street segment = 413.000(Ft.) Height of curb above gutter flowline = 6.0(In.) Width of half street (curb to crown) = 22.000(Ft.) Distance from crown to crossfall grade break = 18.000(Ft.) Slope from gutter to grade break (v/hz) = 0.083 Slope from grade break to crown (v/hz) = 0.020 Street flow is on [1] side(s) of the street Distance from curb to property line = 10.000(Ft.) Slope from curb to property line (v/hz) = 0.020 Gutter width = 2.000(Ft.) Gutter hike from flowline = 2.000(In.) Manning's N in gutter = 0.0150 Manning's N from gutter to grade break = 0.0150 Manning's N from grade break to crown = 0.0150 Estimated mean flow rate at midpoint of street = 8.604(CFS) Depth of flow = 0.548(Ft.), Average velocity = 3.146(Ft/s) Warning: depth of flow exceeds top of curb Distance that curb overflow reaches into property = 2.38(Ft.) Streetflow hydraulics at midpoint of street travel: Halfstreet flow width = 14.743(Ft.) Flow velocity = 3.15(Ft/s) Travel time = 2.19 min. TC = 15.05 min. Adding area flow to street CONDOMINIUM subarea type Runoff Coefficient = 0.857 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 2) = 75.00 Pervious area fraction = 0.350; Impervious fraction = 0.650 Rainfall intensity = 2.782(In/Hr) for a 100.0 year storm Subarea runoff = 5.957(CFS) for 2.500(Ac.) Total runoff = 11.301(CFS) Total area = 4.550(Ac.) Street flow at end of street = 11.301(CFS) Half street flow at end of street = 11.301(CFS) Depth of flow = 0.587(Ft.), Average velocity = 3.235(Ft/s) Warning: depth of flow exceeds top of curb Distance that curb overflow reaches into property = 4.36(Ft.) Flow width (from curb towards crown)= 16.729(Ft.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 106.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 1104.000(Ft.) Downstream point/station elevation = 1103.200(Ft.) Pipe length = 31.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 11.301(CFS) Nearest computed pipe diameter = 18.00(In.) 3 Calculated individual pipe flow = 11.301(CFS) Normal flow depth in pipe = 10.78(In.) Flow top width inside pipe = 17.64(In.) Critical Depth = 15.40(In.) Pipe flow velocity = 10.23(Ft/s) Travel time through pipe = 0.05 min. Time of concentration (TC) = 15.10 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 103.000 to Point/Station 106.000 **** CONFLUENCE OF MAIN STREAMS **** ______________________________________________________________________ The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area = 4.550(Ac.) Runoff from this stream = 11.301(CFS) Time of concentration = 15.10 min. Rainfall intensity = 2.776(In/Hr) Program is now starting with Main Stream No. 2 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 104.000 to Point/Station 105.000 **** INITIAL AREA EVALUATION **** ______________________________________________________________________ Initial area flow distance = 774.000(Ft.) Top (of initial area) elevation = 1119.300(Ft.) Bottom (of initial area) elevation = 1009.600(Ft.) Difference in elevation = 109.700(Ft.) Slope = 0.14173 s(percent)= 14.17 TC = k(0.370)*[(length^3)/(elevation change)]^0.2 Initial area time of concentration = 7.824 min. Rainfall intensity = 3.986(In/Hr) for a 100.0 year storm CONDOMINIUM subarea type Runoff Coefficient = 0.868 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 RI index for soil(AMC 2) = 75.00 Pervious area fraction = 0.350; Impervious fraction = 0.650 Initial subarea runoff = 5.469(CFS) Total initial stream area = 1.580(Ac.) Pervious area fraction = 0.350 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 105.000 to Point/Station 106.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 1103.700(Ft.) Downstream point/station elevation = 1103.200(Ft.) Pipe length = 134.00(Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 5.469(CFS) Nearest computed pipe diameter = 18.00(In.) Calculated individual pipe flow = 5.469(CFS) Normal flow depth in pipe = 12.77(In.) Flow top width inside pipe = 16.34(In.)