HomeMy WebLinkAboutLD21-2041Permit Number: LD21-2041 LD - Onsite Improvements/ Mass & Rough Grading Issued: 02/06/2025 Expired: 09/24/2025 Job Address: Tract Map 37926 Legal Description: City of Temecula - Land Development Division 41000 Main Street - Temecula, CA 92590 Mailing Address: P.O. Box 9033 Temecula, CA 92589-9033 Phone: (951) 308-6395 Fax: (951) 694-6475 ANY NOTICE OR NOTICES REQUIRED TO BE GIVEN PURSUANT TO THIS PERMIT SHALL BE SERVED ON THE OTHER PARTY BY FIRST CLASS MAIL, POSTAGE PREPAID, AT THE FOLLOWING ADDRESS: Emily Sipes 1770 Iowa Ave, 100 Riverside, CA 92507 (951) 826-2790 Applicant: Contractor: Description of Work: The City Engineer hereby authorizes the Property Owner and Applicant (if different from Property Owner) (hereinafter collectively referred to a "Permittee") to do the following work including backfilling, compaction, surfacing and/or as outlined in the description of work below: Description: Tract Map 37926 Rough Grading for Planning Area 12 (PA12) Separate permits required: 1. Haul route permit for the export of material 2. Encroachment permit for ALL work within the City right-of-way 3. Retaining wall permit Earthwork includes 32,000 CY excavation/32,000 CY embankment/0 CY export. Maximum 2:1 slopes. All grading and improvements shall be as specified on the approved plans and per the preliminary soils report. Perform grading in accordance with approved Grading Plans dated . A pre-grading conference is required 48 hours (minimum) in advance of any work done under this permit with the grading contractor and City Inspector. A pre-grade meeting is required 48 hours prior to any work. Permittee shall contact e-mail LDinspections@TemeculaCA.gov to schedule a meeting. Any field changes to the plan shall be approved by the City Engineer. All required permits and inspections by Building and Safety for walls, etc. shall be completed prior to any releases and/or other permits issued or released. Traffic and dust control shall be reviewed and approved by the inspector. Permitee Date City Engineer or Authorized Representative Date 02/06/2025 Page 1 of 1 P U B L I C W O R K S D E P A R T M E N T ON-SITE CONSTRUCTION SECURITY WORKSHEET (Updated As Of July 1, 2021) Page 1 of 5 P R O J E C T :D A T E : L D NUMBER:P A NO.: 46568 RCE # 2. Show Amounts to the nearest $500.00 (Rounded Up) 21,500.00$ 7,500.00$ -$ April 1, 2022 Engineer's Signature  P L E A S E R E A D I N S T R U C T I O N S B E L O W  3. For construction items not covered by "City of Temecula Construction Security Worksheet," Design Engineer is to provide his opinion of construction cost and use that cost. If City of Temecula Unit Costs are determined to be too low, in the opinion of the Design Engineer, the higher cost as provided by the Design Engineer should be used. 1. Quantities to be taken from improvement plans. Unit costs to be as provided on the "City of Temecula Construction Security Worksheet." 21-2041 6/30/2023 The construction items and their quantities as shown on the attached worksheet are accurate for the construction of the improvements required or implied to fulfill the Conditions of Approval for this project. The mathematical extensions, using the City of Temecula's Unit Costs, are accurate for determining Fees. D E S I G N E N G I N E E R S O P I N I O N O F C O N S T R U C T I O N S E C U R I T Y BARRY J. COWAN TM 37926 Engineer's Name (Typed or printed) P A R C E L / T R A C T M A P : P A R C E L / L O T N O . : 4/1/2022WINGSWEEP PA 12 Date Expiration Date Civil Engineer's Stamp 302,000.00$ On-Site Improvements On-Site Drainage Improvements WQMP Improvements Total Erosion & Sediment Control Improvements 273,000.00$ \\cp.rickeng.com\projects\C_RIV_G\17883\17883-I_PA12\Admin\Estimates\CSW_RG.xls APPROVED BY CITY OF TEMECULA PUBLIC WORKS valerie.ycong 04/25/2022 04/25/2022 04/25/2022 04/25/20 P U B L I C W O R K S D E P A R T M E N T ON-SITE CONSTRUCTION SECURITY WORKSHEET (Updated As Of July 1, 2021) Page 2 of 5 PROJECT DATE 4/1/2022 QUANTITY UNIT ITEM UNIT COST AMOUNT C.Y. Crushed Aggregate Base Material ( ") $ 71.00 $ - TON A.C. Pavement ( " Thickness [4" Minimum]) $ 95.00 $ - S.F. Remove A.C. Pavement $ 1.00 $ - L.F. A.C. Berm (8") $ 10.50 $ - L.F. Remove A.C. Berm $ 3.50 $ - S.F. P.C.C. Cross Gutter and Aprons (Spandrels) $ 10.50 $ - L.F. P.C.C. Curb & Gutter (Type A-6) $ 10.50 $ - L.F. Remove Curb & Gutter $ 18.00 $ - S.F. P.C.C. Sidewalk $ 6.25 $ - S.F. Remove Sidewalk $ 10.00 $ - S.F. P.C.C. Driveway Approach $ 8.25 $ - S.F. 1' Step @ Curb / Maintenance Walk (Median) $ 4.25 $ - L.F. Concrete V-Ditch $ 20.00 $ - EA ADA Access Ramps $ 1,545.00 $ - L.F. Install Barricades $ 103.00 $ - L.F. Remove Barricades $ 10.50 $ - L.F. Utility Trench $ 10.50 $ - EA Under Sidewalk Drain $ 2,000.00 $ - EA Street Lights (including conduit) $ 5,150.00 $ - EA Relocate Power Pole $ 10,000.00 $ - L.F. Relocate Chain Link Fence $ 12.00 $ - L.F. Remove Chain Link Fence $ 8.00 $ - 224 L.F. Remove Concrete V-Ditch $ 15.00 $ 3,360.00 22 C.Y. Concrete Lined J-Ditch $ 600.00 $ 13,200.00 1 C.Y. Concrete Splash Wall $ 600.00 $ 600.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Subtotal: 20% Contingency: TOTAL: $3,555.55 $21,333.31 WINGSWEEP PA 12, TM 37926 O N - S I T E I M P R O V E M E N T S $17,160.00 3.6% CPI Increase per City Resolution 05-101: $617.76 Unit Costs Updated On 7/1/2012 \\cp.rickeng.com\projects\C_RIV_G\17883\17883-I_PA12\Admin\Estimates\CSW_RG.xls P U B L I C W O R K S D E P A R T M E N T ON-SITE CONSTRUCTION SECURITY WORKSHEET (Updated As Of July 1, 2021) Page 3 of 5 PROJECT DATE 4/1/2022 QUANTITY UNIT ITEM UNIT COST AMOUNT L.F. 18" R.C.P. $ 116.00 $ - L.F. 24" R.C.P. $ 136.00 $ - L.F. 30" R.C.P. $ 158.00 $ - L.F. 36" R.C.P. $ 183.00 $ - L.F. 42" R.C.P. $ 210.00 $ - L.F. 48" R.C.P. $ 242.00 $ - L.F. Catch Basins $ 510.00 $ - EA Inlet Type IX & X $ 1,854.00 $ - EA Manhole at Junction $ 4,635.00 $ - EA Manhole No. 1 $ 5,768.00 $ - EA Manhole No. 2 $ 6,695.00 $ - EA Manhole No. 3 $ 5,768.00 $ - EA Manhole No. 4 $ 6,695.00 $ - EA Transition Structure No. 1 $ 15,213.00 $ - EA Transition Structure No. 3 $ 4,867.00 $ - EA Junction Structure No. 1 $ 3,657.00 $ - EA Junction Structure No. 2 $ 4,872.00 $ - EA Junction Structure No. 6 $ 6,087.00 $ - 72 C.Y. Rip Rap $ 52.00 $ 3,744.00 C.Y. Rip Rap (Grouted) $ 86.00 $ - 1 EA CMP Riser $ 1,500.00 $ 1,500.00 26 L.F. 24" CMP Pipe $ 30.00 $ 780.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Subtotal: 20% Contingency: TOTAL: $1,248.17 $7,489.04 WINGSWEEP PA 12, TM 37926 O N - S I T E D R A I N A G E I M P R O V E M E N T S $6,024.00 $216.86 3.6% CPI Increase per City Resolution 05-101: Unit Costs Updated On 7/1/2012 \\cp.rickeng.com\projects\C_RIV_G\17883\17883-I_PA12\Admin\Estimates\CSW_RG.xls P U B L I C W O R K S D E P A R T M E N T ON-SITE CONSTRUCTION SECURITY WORKSHEET (Updated As Of July 1, 2021) Page 4 of 5 PROJECT DATE 4/1/2022 QUANTITY UNIT ITEM UNIT COST AMOUNT CF Bio-Retention (cell or basin) $ 5.00 $ - Cartridges Cartridge Filtration Boxes (per cartridge) $ 3,000.00 $ - EA Catch Basin Baffle Filters $ 3,500.00 $ - EA Catch Basin Debris Baskets $ 1,500.00 $ - SF Conventional Grass-lined swale $ 5.00 $ - CF Gravel Infiltration (trench or basin) $ 6.00 $ - LF Infiltration Chambers/Galleries/Wells $ 175.00 $ - SF Porous Concrete and Asphalt $ 12.00 $ - SF Porous Pavers $ 14.00 $ - EA Proprietary Filtration Planters $ 35,000.00 $ - EA Proprietary Hydrodynamic Separators $ 10,000.00 $ - CF Proprietary Detention/Retention Modular Boxes $ 10.00 $ - EA Proprietary Tree Boxes $ 12,000.00 $ - CF Raised Planter Boxes $ 6.00 $ - CF Sand Filter (trench or basin) $ 4.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Subtotal: 20% Contingency: TOTAL: 3.6% CPI Increase per City Resolution 05-101: $0.00 $0.00 $0.00 WINGSWEEP PA 12, TM 37926 W A T E R Q U A L I T Y M A N A G E M E N T P L A N I M P R O V E M E N T S $0.00 Unit Costs Updated On 7/1/2012 \\cp.rickeng.com\projects\C_RIV_G\17883\17883-I_PA12\Admin\Estimates\CSW_RG.xls P U B L I C W O R K S D E P A R T M E N T ON-SITE CONSTRUCTION SECURITY WORKSHEET (Updated As Of July 1, 2021) Page 5 of 5 PROJECT DATE 4/1/2022 QUANTITY UNIT ITEM UNIT COST AMOUNT EA Concrete Washout (with disposal) $ 3,000.00 $ - CF Desilting Basin $ 1.30 $ - 11,031 LF Fiber Roll $ 6.50 $ 71,701.50 5,101 EA Gravel Bags $ 4.00 $ 20,404.00 LF Hay Bale $ 7.60 $ - 168,942 SF Hydroseeding / Hydro Mulch (with Bonded Fiber matrix) $ 0.15 $ 25,341.30 SF Hydroseeding / Hydro Mulch (without Bonded Fiber matrix) $ 0.10 $ - SF Plastic Liner (visqueen) $ 0.30 $ - 9,073 LF Silt Fence (non-reinforced) $ 7.50 $ 68,047.50 LF Silt Fence (reinforced) $ 10.00 $ - EA Stabilized Construction Entrance (with plates) $ 3,390.00 $ - 2 EA Stabilized Construction Entrance (without plates) $ 2,400.00 $ 4,800.00 SF Straw / Coconut Fiber Mat $ 0.28 $ - SF Pyromat $ 1.00 $ - 364,792 SF Pad Stabalization Soil Binder (per CASQA EC-3) $ 0.08 $ 29,183.36 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Subtotal: 20% Contingency: TOTAL: 3.6% CPI Increase per City Resolution 05-101: $7,901.20 $45,475.77 $272,854.63 WINGSWEEP PA 12, TM 37926 E R O S I O N & S E D I M E N T C O N T R O L I M P R O V E M E N T S $219,477.66 Unit Costs Updated On 7/1/2012 \\cp.rickeng.com\projects\C_RIV_G\17883\17883-I_PA12\Admin\Estimates\CSW_RG.xls FINAL DRAINAGE STUDY FOR WINGSWEEP PROPERTY PLANNING AREA 12 Tract #37926 Job Number 17883-I April 16, 2021 APPROVED BY CITY OF TEMECULA PUBLIC WORKS valerie.caragan 01/22/2025 01/22/2025 01/22/2025 01/22/20 FINAL DRAINAGE STUDY FOR WINGSWEEP PROPERTY PLANNING AREA 12 Tract #37926 Job Number 17883-I ______________________________________ Brendan Hastie, P.E. R.C.E. #65809, Exp. 9/21 Prepared for: Wingsweep Corporation 38445 Overview Rd Temecula, California 92592 Prepared by: Rick Engineering Company Water Resources Division 5620 Friars Road San Diego, California 92110-2596 (619) 291-0707 April 16, 2021 Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 TABLE OF CONTENTS 1.0 INTRODUCTION .................................................................................................................... 1 2.0 HYDROLOGY ......................................................................................................................... 4 3.0 HYDRAULICS ......................................................................................................................... 7 4.0 FLOOD CONTROL DETENTION ANALYSIS ..................................................................... 9 5.0 ROUGH GRADING BASIN .................................................................................................. 10 6.0 CONCLUSION ....................................................................................................................... 11 Appendices: Appendix 1: FEMA FIRMette Appendix 2: Hydrologic Backup Information Appendix 3: Drainage Study Map for Wingsweep PA12 (Pre-Project) Appendix 4: Drainage Study Map for Wingsweep PA12 (Post-Project) Appendix 5: Hydrology AES Output (Pre-project & Post-project) Appendix 6: Inlet Sizing Appendix 7: Storm Drain Sizing Appendix 8: Rough Grade Condition CMP Overflow Sizing Appendix 9: Detention Analysis Results Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 1 1.0 INTRODUCTION 1.1 Project Description This drainage study presents hydrologic and hydraulic analyses for the proposed Wingsweep Property Planning Area 12 project (herein referred to as the “project”). The project proposes the development of approximately 15.7 acres north of Nicolas Road, west of Butterfield Sage Road, and south of Roripaugh Valley road. The project consists of 104 residential single-family lots and associated streets. The project is located in the City of Temecula, California (within the Riverside County). Please refer to Figure 1: Vicinity Map located at the end of this section for the project location. 1.2 Drainage Characteristics The pre-project condition of the site consists of undeveloped area which has been previously mass graded (and compacted) by others per Mass Grading Plan number LD04-004GR. The majority of the runoff from the site flows southwesterly towards an existing temporary sediment trap/basin located in the southwest corner prior to discharging to Gertrudis Creek. In the post-project condition, the drainage characteristics from the site (Drainage Basin 1200) will be very similar as compared to the pre-project conditions. Onsite runoff will be collected in a proposed biofiltration basin BMP (replacing the existing sedimentation basin in the southwest corner) prior to discharging to the Santa Gertrudis Creek via an existing storm drain. The biofiltration BMP will provide pollutant control, hydromodification management, and flood control benefits. A pervious slope located onsite along the eastern perimeter of the site have slopes directing runoff away from the site and is designated as a “self-treating” area. Runoff from this area will flow offsite to be collected by an existing storm drain system on Butterfield Stage Road and discharge into the Santa Gertrudis Creek. Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 2 1.3 FEMA Flood Hazard Zone Information The water courses around the project have been identified by the Federal Emergency Management Agency (FEMA) as Zone X. This is an area of ‘Undetermined Flood Hazard’. The project is shown on the FEMA Flood Insurance Rate Map (FIRM) number 06065C2740G, effective August 28, 2008 and labeled as Zone X. No FEMA submittals are anticipated to be required for this project. As a reference, a copy of the FEMA FIRMette is provided in Appendix 1 of this report. The proposed development is anticipated to be outside of the FEMA 100-year floodplain and floodway hazard area (i.e. – Zone A and Zone AE); therefore, the potential risk associated with flooding hazard is anticipated to be very minimal. 1.4 Water Quality and Hydromodification Management A Water Quality Management Plan (WQMP) has been prepared for the project as well. The report is titled, “City of Temecula Water Quality Management Plan (WQMP) for Wingsweep PA12 – Tract # 37926,” dated April 16, 2021, or subsequent versions thereof, prepared by Rick Engineering Company (Job Number 17883-I). The WQMP documents how the project addresses the requirements regarding permanent stormwater quality and hydromodification management, in accordance with the stormwater guidance document titled, “City of Temecula Best Management Practice (BMP) Design Manual,” dated July, 2018. Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 3 Figure 1: Vicinity Map Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 4 2.0 HYDROLOGY Hydrologic calculations were computed in accordance with the Riverside County Flood Control and Water Conservation District - Hydrology Manual, dated April 1978 (manual). The Advanced Engineering Software (AES) 2014 Rational Method Analysis (Version 21.0) program was used to perform the hydrologic analysis in this study. The AES hydrologic model is developed by creating independent node-link models of each interior drainage basin and linking these sub-models together at confluence points. The program has the capability to perform calculations for 15 hydrologic processes. These processes are assigned code numbers that appear in the results. The code numbers and their significances are as follows: Subarea Hydrologic Processes (Codes) Code 0: Enter comment Code 1: Confluence analysis at a node Code 2: Initial subarea analysis Code 3: Pipe/Box/Culvert travel time (computer-estimated size) Code 4: Pipe/Box/Culvert travel time (user-specified size) Code 5: Open channel travel time Code 6: Street flow analysis through a subarea Code 7: User-specified hydrology data at a node Code 8: Addition of the subarea runoff to main-stream Code 9: V-Gutter flow through thru subarea Code 10: Copy main-stream data onto a memory bank Code 11: Confluence a memory bank with the main-stream memory Code 12: Clear a memory bank Code 13: Clear the main-stream Code 14: Copy a memory bank onto the main-stream memory Code 15: Hydrologic data bank storage functions Code 16: User-specified source flow at a node Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 5 In order to perform the hydrologic analysis; base information for the study area is required. This information includes the drainage facility locations and sizes, land uses, flow patterns, drainage basin boundaries, and topographic elevations. Compiled Hydrologic backup is included as Appendix 2 to this report. The hydrologic workmap for this project is included in Appendix 3 to this report. Area Watersheds were delineated to distinguish areas with similar flow characteristics and hydrologic properties as well as to determine peak flows at confluence points, existing and proposed storm drain facilities, and to facilitate hydraulic analyses. Drainage basin boundaries, flow patterns, and topographic elevations are shown on the hydrologic workmap for the proposed condition, included in Appendix 4. Time of Concentration/Intensity The time of concentration was calculated using AES to determine the intensity for the 100-year storm events. The rainfall intensity was calculated in AES using the 10 and 60-minute intensity values for the project site from NOAA Atlas 14 Volume 6. An annotated chart has been included in Appendix 2. Runoff Coefficient The runoff coefficients used for each minor basin were calculated by the AES software based on the user-entered information of the hydrologic soil group and land use for each basin. The land use across the project varies from impervious parking lot and walkways to amended landscape. The percentage of impervious area in each subdrainage area was used to determine the land use entered within AES. Plate D-5.6 was used to equate ranges of imperviousness to AES land-use classifications. Hydrologic soil group data is available for the site through the Natural Resource Conservation Service (NRCS) Web Soil Survey, showing most of the site as Type ‘C’ soil. However, due to the compaction condition resulting from the majority of the site being previously mass graded over a decade ago, the site infiltration capacity was understood to be reduced. Therefore, for the purpose Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 6 of hydrologic modeling, Type ‘D’ soils were used to calculate runoff coefficients. In a similar fashion, where improvements are proposed, the underlying soils are assumed to be Type ‘D’ where improvements are proposed due to the compaction condition and to also provide a more conservative peak flow rate for the purpose of sizing proposed storm drain pipes and structures. 2.1 Hydrologic Results The discharges resulting from the 100-year storm event have been calculated for the proposed condition of the project site. Hydrologic workmaps for the pre-project and post-project conditions have been prepared and can be found in Appendices 3 and 4. Also, hydrologic calculation backup information has been included in Appendix 2. The AES Rational Method results are provided in Appendix 5 for the pre-project and post-project condition. The hydrologic results for the pre- and post-project conditions can be found in Table 2.1. These results show the project peak flow rates for the storm event before they are detained. Table 2.1 – Hydrologic Summary for PA 12 (100-year Peak Flow Rate) Drainage Basin3 Pre-project1 Post-project1 Tc (minutes) Total Area (Acres) Peak Flow Rate, Q100 (cfs)2 Tc (minutes) Total Area (Acres) Peak Flow Rate, Q100 (cfs)2 1200 16.8 15.5 32.9 9.3 15.4 42.4 Note: 1: Refer to Appendix 2 for supporting information. Runoff coefficient is based on the undeveloped cover and single family residential (1/4-acre), per the 1978 RCFC Hydrology Manual 2: cfs= cubic feet per second. 3: Refer to Appendix 3 and 4 for Drainage Study Maps Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 7 3.0 HYDRAULICS 3.1 Hydraulic Methodology and Criteria The 100-year proposed peak flow rates determined using the Modified Rational Method were used to determine sizes for the on-site storm drain system and open channels/swales (where applicable). Additional hydraulic analyses such as proposed inlet sizing were also prepared as part of final engineering for this project. 3.1.1 Inlet Sizing Inlets were sized based on RCFC&WCD design standards and have been sized for the 100-year storm event. Each inlet was sized to provide 100% capture of the flow draining to the inlet, except where bypass flow occurs, a downstream inlet was sized to capture the bypass flow. Inlets were located such that the flow in the street is contained within the right-of-way for the 100-year storm event. Inlet lengths were verified using the Bentley FlowMaster V8i computer program. Calculations of minimum inlet lengths are included as Appendix 6 to this drainage study. The proposed inlet lengths and locations are shown by the development plans for the project. 3.1.2 Storm Drain Sizing Storm drain pipe sizes were determined based on a normal depth calculation to verify storm drain capacity based on Manning’s equation. Q= (1.486/n) A R 2/3 S ½ Where: Q = Discharge (cfs) n = Manning’s roughness coefficient A = Cross-sectional Area of flow (sq. ft.) R = Hydraulic radius (ft.) (where hydraulic radius is defined as the cross-section area of flow divide by the wetted perimeter, R= A/P) Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 8 S = Slope of pipe (ft./ft.) The Manning’s roughness coefficient “n” of 0.013 was used for the hydraulic calculations. This value is typically used for reinforced concrete pipe (RCP), polyvinyl chloride (PVC) and high- density polyethylene pipe (HDPE). To establish pipe sizes, the pipe sizes were evaluated based on the Rational Method flow rates with a 30% “bump up” sizing factor to account for hydraulic losses within the system. A summary of pipe sizes is included with Appendix 7 for areas of the project that are not being addressed by final engineering plan sets at this time. The AES rational method results located in the Appendix 5 of this report may be referenced for further information concerning pipe flow rates. 3.1.3 Overflow Inlet Sizing The proposed water quality BMP overflow inlets will be sized for the peak runoff flows produced by the 100-year storm event. The details will be refined further, and the sizing calculation will be provided during final engineering based on the weir or orifice equation with an assumed clogging factor of 50%. 3.1.4 Energy Dissipater Design Runoff from the Drainage Basin 1200 will be conveyed to the proposed BMP and outlet to an existing storm drain system and outfall into the Santa Gertrudis Creek (that was designed and constructed per another plan set); therefore, no energy dissipation design for the storm drain outfall is anticipated for this project, other than the BMP energy dissipation design, which will be provide during the final engineering. Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 9 4.0 FLOOD CONTROL DETENTION ANALYSIS As described in the introduction of this report, the project proposes one (1) BMP (basin) within Drainage Basin 3300. In order to mitigate for anticipated increased runoff due to the proposed development, a flood control detention analysis has been conducted for the 100 year 24 hour storm event in accordance with County of Riverside requirements. Based on the additional volume provided within the BMP, it is anticipated that the post-project un-detained peak flow rate will be mitigated to the pre-project peak flow rate level (equal or less); therefore, an adverse impact to the downstream storm drain system is not anticipated. The following values were calculated utilizing Hydrologic Modeling System (HEC-HMS) following guidance supplied by Riverside County Flood Control (RCFC). Supporting calculations are included with Appendix 9 of this report. For information regarding the Hydromodification Detention Analysis conducted for the project, accomplishing detention of up to the 10-year design storm, please refer to the Project Water Quality Management Plan. Table 4.1 – Detention Summary for the 100-year Storm Event Discharging to SGC Storm Event: 100 Year, 24 Hour Pre-Project Peak Flowrate1,2 (cfs) Undetained Post-Project Peak Flowrate1,2 (cfs) Detained Post- Project Peak Flowrate1,2 (cfs) PA 12 (Drainage Area 1200) 7.8 8.8 6.7 Note: 1: Calculated utilizing HEC-HMS per RCFC Guidance. Refer to Appendix 9 for supporting information. 2: cfs= cubic feet per second. Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 10 5.0 ROUGH GRADING BASIN The permanent biofiltration basin has not been specifically designed to serve as a temporary Sediment Basins or Sediment Trap; however, it is located at the low point on the site and may be useful to serve as temporary sediment/storm water collection area during grading of the site. If this area is used as part of the temporary erosion and sediment control BMP measures, it is important that it is excavated and restored to the design subgrade elevations prior to installation of permanent storm water BMP components. The principal outlet for the basin should be selected to convey 100% of the 100-year, 6-hour peak runoff from the drainage area in a mass graded condition assuming the basin is full, and no incidental detention is provided. The 100-year, 6-hour peak runoff from the drainage area in a mass graded condition is determined using a runoff coefficient of 0.70 and assuming a Time of Concentration (Tc) of 10 minutes. The temporary rough-graded basin will utilize a 48-inch (minimum) corrugated metal pipe (CMP) riser for the principal outlet. Since the type of outflow through a riser (weir flow or orifice flow) and the weir coefficient for weir flow vary depending on the amount of head (water depth) over the riser crest elevation, a spreadsheet was utilized to calculate weir flow and orifice flow at incremental depths above the riser crest. Weir coefficients were obtained from Figure 9-57, Relationship of Circular Crest Coefficient C0 to H0/Rs for Different Approach Depths (aerated nappe) [where H0 is head and Rs is the radius of the riser], from the Design of Small Dams (United States Department of the Interior Bureau of Reclamation, 1987). The total depth of the basin should be equal to the addition of the riser height, the head above the riser crest elevation required to convey 100% of the 100-year, 6-hour peak runoff from the drainage areas in a mass graded condition, and one foot (min.) of freeboard. Refer to Appendix 8 for a summary of the sizing calculations. Prepared by: BH:JR:vs:k/files/Report/17883-I.002 Rick Engineering Company – Water Resources Division 4-16-21 11 6.0 CONCLUSION This drainage study presents the hydrologic and hydraulic analyses for the Wingsweep Property Planning Area 12. Hydrologic calculations were computed in accordance with the Riverside County Flood Control and Water Conservation District - Hydrology Manual, dated April 1978 (manual). The Advanced Engineering Software (AES) 2014 Rational Method Analysis (Version 21.0) program was used for the rational method modeling in this study. The discharges for the 100- year storm event have been calculated for proposed condition project site and storm drain sizes have been determined based on the 100-year peak flow rates. It is understood that the current drainage pattern is generally consistent with the drainage pattern that existed prior to mass- grading. In order to determine the detention volume required to reduce the post-project peak discharge rates back to the pre-project peak discharge rates at the discharge point, a detention analysis has been included with this drainage study. Post-project flows will be treated per regional requirements. Please refer to the Water Quality Management Plan (WQMP) for the project titled, “Water Quality Management Plan for Wingsweep Property Planning Area 12 – Tract # 37926,” dated April 16, 2021 (and any revisions thereafter), prepared by Rick Engineering Company (Job Number 17883I), for more information on water quality and hydromodification detention. Appendix 1 FEMA FIRMette Note: A copy of the FEMA FIRMette is provided in this Appendix for as a reference; however, it is important to note that the project is outside of the 100-year FEMA floodplain/floodway limits USGS The National Map: Orthoimagery. Data refreshed April, 2019. National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250Feet Ü 117°6'19.05"W 33°33'4.53"N 117°5'41.59"W 33°32'34.54"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOODHAZARD AR EAS Without Base Flood Elevation (BFE)Zone A, V, A99With BFE or Depth Zone AE, AO, AH, VE, AR Regulator y Floodway 0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mile Zone X Future Conditions 1% AnnualChance Flood Hazard Zone XArea with Reduced Flood Risk due toLevee. See Notes.Zone X Area with Flood Risk due to Levee Zone D NO SCREE N Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culver t, or Storm SewerLevee, Dike, or Floodwall Cross Sections with 1% Annual Chance17.5 Water Surface ElevationCoastal Transect Coastal Transect BaselineProfile BaselineHydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of StudyJurisdiction Boundar y Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from theauthoritative NFHL web ser vices provided by FEMA. This mapwas exported on 4/28/2020 at 8:57:30 PM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time. This map image is void if the one or more of the following mapelements do not appear: basemap imagery, flood zone labels,legend, scale bar, map creation date, community identifiers,FIRM panel number, and FIRM effective date. Map images forunmapped and unmodernized areas cannot be used forregulatory purposes. Legend OTHER AREAS OFFLOOD HAZARD OTHER AREAS GENERALSTRUCTURES OTHERFEATURES MAP PANELS 8 1:6,000 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative proper ty location. Appendix 2 Hydrologic Backup Information Includes: 1. Rainfall Intensity NOAA Atlas 14 2. Hydrologic Soils 3. Land Use Lot Fit Study Map 4/24/2020 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=33.5462&lon=-117.1019&data=intensity&units=english&series=pds 1/6 NOAA Atlas 14, Volume 6, Version 2 Location name: Temecula, California, USA* Latitude: 33.5462°, Longitude: -117.1019° Elevation: 1198.39 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Sarah Dietz, Sarah Heim, Lillian Hiner, Kazungu Maitaria, Deborah Martin, Sandra Pavlovic, Ishani Roy, Carl Trypaluk, Dale Unruh, Fenglin Yan, Michael Yekta, Tan Zhao, Geoffrey Bonnin, Daniel Brewer, Li-Chuan Chen, Tye Parzybok, John Yarchoan NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 1.31 (1.09‑1.57) 1.74 (1.45‑2.09) 2.33 (1.94‑2.81) 2.83 (2.34‑3.44) 3.54 (2.83‑4.48) 4.12 (3.22‑5.32) 4.73 (3.60‑6.26) 5.38 (3.98‑7.34) 6.30 (4.46‑8.99) 7.04 (4.81‑10.4) 10-min 0.936 (0.786‑1.13) 1.24 (1.04‑1.50) 1.67 (1.39‑2.02) 2.03 (1.68‑2.47) 2.54 (2.03‑3.21) 2.95 (2.31‑3.82) 3.39 (2.58‑4.49) 3.86 (2.85‑5.26) 4.52 (3.20‑6.44) 5.05 (3.45‑7.47) 15-min 0.756 (0.632‑0.908) 1.00 (0.840‑1.21) 1.34 (1.12‑1.62) 1.64 (1.36‑1.99) 2.05 (1.64‑2.59) 2.38 (1.86‑3.08) 2.73 (2.08‑3.62) 3.11 (2.30‑4.24) 3.64 (2.58‑5.20) 4.07 (2.78‑6.02) 30-min 0.582 (0.488‑0.700) 0.774 (0.648‑0.932) 1.04 (0.866‑1.25) 1.26 (1.04‑1.54) 1.58 (1.26‑1.99) 1.84 (1.44‑2.37) 2.11 (1.61‑2.79) 2.40 (1.77‑3.27) 2.81 (1.99‑4.01) 3.14 (2.14‑4.65) 60-min 0.444 (0.373‑0.534) 0.590 (0.494‑0.711) 0.790 (0.661‑0.955) 0.961 (0.796‑1.17) 1.20 (0.963‑1.52) 1.40 (1.09‑1.81) 1.61 (1.22‑2.13) 1.83 (1.35‑2.50) 2.14 (1.52‑3.05) 2.39 (1.63‑3.54) 2-hr 0.320 (0.269‑0.386) 0.422 (0.354‑0.509) 0.559 (0.467‑0.676) 0.673 (0.558‑0.820) 0.832 (0.666‑1.05) 0.959 (0.750‑1.24) 1.09 (0.830‑1.44) 1.23 (0.908‑1.68) 1.42 (1.00‑2.02) 1.57 (1.07‑2.32) 3-hr 0.261 (0.219‑0.315) 0.343 (0.288‑0.414) 0.453 (0.378‑0.547) 0.543 (0.450‑0.662) 0.669 (0.535‑0.845) 0.767 (0.600‑0.991) 0.869 (0.662‑1.15) 0.975 (0.722‑1.33) 1.12 (0.794‑1.60) 1.24 (0.844‑1.83) 6-hr 0.187 (0.157‑0.225) 0.245 (0.205‑0.295) 0.321 (0.269‑0.389) 0.385 (0.319‑0.469) 0.472 (0.377‑0.596) 0.539 (0.422‑0.696) 0.608 (0.463‑0.806) 0.680 (0.503‑0.929) 0.778 (0.551‑1.11) 0.855 (0.583‑1.26) 12-hr 0.123 (0.104‑0.149) 0.162 (0.136‑0.196) 0.213 (0.178‑0.258) 0.255 (0.212‑0.311) 0.313 (0.250‑0.395) 0.357 (0.280‑0.462) 0.403 (0.307‑0.534) 0.450 (0.333‑0.614) 0.514 (0.364‑0.733) 0.564 (0.385‑0.834) 24-hr 0.080 (0.071‑0.092) 0.106 (0.094‑0.123) 0.141 (0.124‑0.164) 0.170 (0.148‑0.198) 0.209 (0.177‑0.252) 0.240 (0.199‑0.295) 0.271 (0.220‑0.341) 0.304 (0.240‑0.393) 0.348 (0.264‑0.469) 0.383 (0.281‑0.533) 2-day 0.047 (0.042‑0.055) 0.064 (0.057‑0.074) 0.087 (0.077‑0.101) 0.106 (0.093‑0.124) 0.134 (0.113‑0.161) 0.155 (0.129‑0.191) 0.178 (0.144‑0.224) 0.201 (0.159‑0.261) 0.235 (0.178‑0.316) 0.262 (0.192‑0.364) 3-day 0.033 (0.029‑0.038) 0.046 (0.040‑0.053) 0.063 (0.056‑0.073) 0.078 (0.068‑0.091) 0.099 (0.084‑0.120) 0.117 (0.097‑0.143) 0.135 (0.109‑0.170) 0.155 (0.122‑0.200) 0.183 (0.139‑0.246) 0.206 (0.151‑0.287) 4-day 0.027 (0.024‑0.031) 0.037 (0.033‑0.043) 0.052 (0.046‑0.060) 0.065 (0.057‑0.076) 0.083 (0.070‑0.100) 0.098 (0.081‑0.121) 0.114 (0.093‑0.144) 0.132 (0.104‑0.170) 0.157 (0.119‑0.211) 0.178 (0.130‑0.247) 4/24/2020 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=33.5462&lon=-117.1019&data=intensity&units=english&series=pds 2/6 7-day 0.018 (0.016‑0.020) 0.025 (0.022‑0.029) 0.035 (0.031‑0.041) 0.044 (0.038‑0.051) 0.056 (0.048‑0.068) 0.067 (0.056‑0.082) 0.078 (0.063‑0.099) 0.091 (0.072‑0.117) 0.109 (0.083‑0.146) 0.124 (0.091‑0.172) 10-day 0.013 (0.012‑0.015) 0.019 (0.017‑0.022) 0.027 (0.023‑0.031) 0.033 (0.029‑0.039) 0.043 (0.037‑0.052) 0.052 (0.043‑0.063) 0.060 (0.049‑0.076) 0.070 (0.055‑0.091) 0.084 (0.064‑0.114) 0.096 (0.071‑0.134) 20-day 0.008 (0.007‑0.009) 0.012 (0.010‑0.014) 0.017 (0.015‑0.019) 0.021 (0.019‑0.025) 0.028 (0.024‑0.033) 0.033 (0.028‑0.041) 0.039 (0.032‑0.049) 0.046 (0.036‑0.059) 0.055 (0.042‑0.074) 0.063 (0.047‑0.088) 30-day 0.006 (0.006‑0.007) 0.009 (0.008‑0.011) 0.013 (0.012‑0.016) 0.017 (0.015‑0.020) 0.022 (0.019‑0.027) 0.027 (0.022‑0.033) 0.032 (0.026‑0.040) 0.037 (0.029‑0.048) 0.045 (0.034‑0.060) 0.052 (0.038‑0.072) 45-day 0.005 (0.004‑0.006) 0.007 (0.006‑0.008) 0.010 (0.009‑0.012) 0.013 (0.012‑0.016) 0.018 (0.015‑0.021) 0.021 (0.017‑0.026) 0.025 (0.020‑0.031) 0.029 (0.023‑0.038) 0.036 (0.027‑0.048) 0.041 (0.030‑0.057) 60-day 0.004 (0.004‑0.005) 0.006 (0.006‑0.007) 0.009 (0.008‑0.011) 0.012 (0.010‑0.013) 0.015 (0.013‑0.018) 0.018 (0.015‑0.022) 0.021 (0.017‑0.027) 0.025 (0.020‑0.033) 0.031 (0.023‑0.041) 0.035 (0.026‑0.049) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical 4/24/2020 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=33.5462&lon=-117.1019&data=intensity&units=english&series=pds 3/6 Back to Top Maps & aerials Small scale terrain 4/24/2020 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=33.5462&lon=-117.1019&data=intensity&units=english&series=pds 4/6 Large scale terrain Large scale map + – 3km 2mi + – 60km 30mi 4/24/2020 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=33.5462&lon=-117.1019&data=intensity&units=english&series=pds 5/6 Large scale aerial Back to Top + – 100m 300ft + – 100km 60mi 4/24/2020 Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=33.5462&lon=-117.1019&data=intensity&units=english&series=pds 6/6 US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer Hydrologic Soil Group—Western Riverside Area, California (Wingsweep Development) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/8/2019 Page 1 of 4 37 1 1 5 0 0 37 1 1 6 0 0 37 1 1 7 0 0 37 1 1 8 0 0 37 1 1 9 0 0 37 1 2 0 0 0 37 1 2 1 0 0 37 1 2 2 0 0 37 1 2 3 0 0 37 1 2 4 0 0 37 1 2 5 0 0 37 1 2 6 0 0 37 1 2 7 0 0 37 1 1 5 0 0 37 1 1 6 0 0 37 1 1 7 0 0 37 1 1 8 0 0 37 1 1 9 0 0 37 1 2 0 0 0 37 1 2 1 0 0 37 1 2 2 0 0 37 1 2 3 0 0 37 1 2 4 0 0 37 1 2 5 0 0 37 1 2 6 0 0 37 1 2 7 0 0 490200 490300 490400 490500 490600 490700 490800 490900 491000 491100 490200 490300 490400 490500 490600 490700 490800 490900 491000 491100 33° 33' 16'' N 11 7 ° 6 ' 2 2 ' ' W 33° 33' 16'' N 11 7 ° 5 ' 4 3 ' ' W 33° 32' 33'' N 11 7 ° 6 ' 2 2 ' ' W 33° 32' 33'' N 11 7 ° 5 ' 4 3 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 300 600 1200 1800 Feet 0 50 100 200 300 Meters Map Scale: 1:6,470 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Western Riverside Area, California Survey Area Data: Version 11, Sep 12, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 24, 2015—Feb 26, 2015 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Western Riverside Area, California (Wingsweep Development) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/8/2019 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AtC2 Arlington and Greenfield fine sandy loams, 2 to 8 percent slopes , eroded C 0.8 0.5% AtD2 Arlington and Greenfield fine sandy loams, 8 to 15 percent slopes, eroded C 12.4 7.0% GyA Greenfield sandy loam, 0 to 2 percent slopes A 6.7 3.8% GzG Gullied land 5.9 3.3% HcA Hanford coarse sandy loam, 0 to 2 percent slopes A 2.4 1.4% HcC Hanford coarse sandy loam, 2 to 8 percent slopes A 31.8 18.0% HgA Hanford fine sandy loam, 0 to 2 percent slopes A 1.3 0.7% RaB2 Ramona sandy loam, 2 to 5 percent slopes, eroded C 5.8 3.3% RaC2 Ramona sandy loam, 5 to 8 percent slopes, eroded C 14.1 8.0% RaD2 Ramona sandy loam, 8 to 15 percent slopes, eroded C 5.5 3.1% RaE3 Ramona sandy loam, 15 to 25 percent slopes, severely eroded C 22.9 12.9% RmE3 Ramona and Buren sandy loams, 15 to 25 percent slopes, severely eroded C 15.7 8.9% RnE3 Ramona and Buren loams, 5 to 25 percent slopes, severely eroded C 0.5 0.3% RsC Riverwash 0.2 0.1% RuF Rough broken land 45.9 26.0% TvC Tujunga loamy sand, channeled, 0 to 8 percent slopes A 4.9 2.7% Totals for Area of Interest 176.7 100.0% Hydrologic Soil Group—Western Riverside Area, California Wingsweep Development Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/8/2019 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Western Riverside Area, California Wingsweep Development Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/8/2019 Page 4 of 4 Note: The hydrologic soil group is shown as Type 'C" per the Natural Resource Conservation Service (NRCS) Web Soil Survey. However, due to the compaction condition resulting from the majority of the site being previously mass graded over a decade ago, the site infiltration capacity was understood to be reduced. Therefore, for the purpose of hydrologic modeling, Type ‘D’ soils were used to calculate runoff coefficients. This would also result in a more conservative peak flow rate. NOTES: WS PAD RIDGE LINE GF=PE 20'X20' MIN GARAGE E W S LEGEND: E TRACT 37926, PA 12 13. MIN REAR YARD SETBACK: 10' 12. MIN INTERIOR SIDE YARD SETBACK: 5' 11. MIN CORNER SIDE YARD SETBACK: 15' 10. MIN SIDE ENTRY GARAGE SETBACK: 10' 9. MIN FRONT GARAGE SETBACK: 18' 8. MIN FRONT HOUSE SETBACK: 10' 7. MIN LOT DEPTH: 75' 6. MIN LOT WIDTH AT FRONT SETBACK: 40' 5. MIN LOT WIDTH: 40' 4. MIN LOT FRONTAGE AT FLAG: 20' 3. MIN LOT FRONTAGE AT PL: 25' 2. MAX LOT COVERAGE: 65% 1. MIN LOT SIZE: 3,000 SF AT LOT LINES AS PRACTICAL. TO BE LOCATED STREET LIGHTS, TRANSFORMERS, FIRE HYDRANTS P/L. SIDE YARD RETAINING WALLS - 2-FEET MAX AT MIN 1 STREET TREES PER LOT. SETBACK ENCROACHMENTS. REVIEW SP ZONING ORDINANCE FOR ALLOWED MAY NOT ENCROACH INTO FMZ SETBACKS HOMES ADJACENT TO FUEL MANAGEMENT ZONES WATER LATERAL SEWER LATERAL SWALE PAD LIMITS LOT LINE PUE STREET LIGHT GAS SERVICE ELECTRICAL/ ROUGH GRADE PAD LINE PUBLIC RIGHT-OF-WAY 5' SIDEWALK CURB LINE STREET GRADE HP RECOMENDATION GEOTECHNICAL AS-GRADED *MAY VARY PER FF ELEV = 100.67 PAD ELEV = 100.00 1 % M I N S W A L E 1 % M I N S W A L E MIN 5' MIN 5' M I N 5 ' 2 % M A X 1 2 % M A X 5 ' 5 ' 1 8 ' M I N 1 0 ' M I N 3 ' M I N 30' MAX WIDTH 1 % 40' 7 5 'A A B B 3' MIN 3' MIN SHEET 1 OF 2 SCALE:DATE:1"=20' \\cp.rickeng.com\projects\C_RIV_G\17883\17883-I_PA12\Civil\Exhibits\17883I_exh001_PadCriteria01.dgn c Ric k En g in e e rin g C o m p a n y 2 0 2 1 PA 12 - TR 37926 TYPICAL PAD DETAIL 4/14/21 JN 17883-I SECTIONB-B SECTIONA-A 5' MIN VARIES SHEET 2 OF 2 FL 1% MIN SLOPE GB PAD-0.3' MIN EL 0.5' BERM* PLPL VARIES 0.5'* 2:1 MAX 20% MAX SLOPE 5% MIN SLOPE FL 1% MIN SLOPE SLOPE PER PLAN 2:1 MAX 0.5'* SLOPE TOE OF 5'5' MINMIN 3' MIN 5' PREFERRED FINISH PAD GRADE SEE PLAN LOT WIDTH VARIES SEE DETAILS THIS SHEET FOR BERM PLACEMENT. BE REMOVED WITH PRECISE GRADING. * - 0.5' BERMS ARE TEMPORARY AND TO 2:1 M A X2:1 M AX PAD ELEVATION FINISH FLOOR 2% FENCE PL R/W PAD LINE ROUGH GRADE 75'5'5' 5' N.T.S. N.T.S. SEE DETAILS THIS SHEET FOR BERM PLACEMENT. BE REMOVED WITH PRECISE GRADING. * - 0.5' BERMS ARE TEMPORARY AND TO SCALE:DATE:1"=20' \\cp.rickeng.com\projects\C_RIV_G\17883\17883-I_PA12\Civil\Exhibits\17883I_exh001_PadCriteria02.dgn c Ric k En g in e e rin g C o m p a n y 2 0 2 1 PA 12 - TR 37926 TYPICAL PAD DETAIL 4/14/21 JN 17883-I Appendix 3 Pre-project Condition Hydrology Workmap 1 2 1 5 23 X1192.6 X1192.7 X1193.2 X1193.7 X1194.1 X1194.6 1195 1 1 9 5 119 5 119 5 X1195.4 X1195.7 X1196.6 X 1196.6 X1196.8 X1197.1 X1197.3 X1197.6 X1197.6 X1197.6 X1197.7 9 1197.66 X1197.9 X1198.4 X1198.9 X1199.1 X X1199.4 X1199.4 X 1199.5 X MHX X1199.6 12 0 0 1 2 0 0 12 0 0 1200 12051200 12 0 0 1200 12 0 0 1200 12 0 0 1200 1200 X X1200.3 X1200.6 X 1200.7 X X1201.2 1201.5 X 1201.6 X1201.8 X1201.8 X1202.2 X X 1202.4 X1203.3 X1203.3 X1203.5 X1203.5 X 1203.5 X1203.8 X1203.9 X 1204.1 X X 1204.4 X1204.4 X1204.5 X X X1204.7 X X1204.9 12 0 5 1205 12 0 5 1205 1 2 0 5 1 2 0 5 12 0 5 1205 1205 1205 1205 1205 1205 1205 1205 1205 1 2 0 5 1205.2 X X1205.3 X X 1205.5 X X1205.6 X X X1205.7 X1205.8 X X ASPH MHX X1206.1 X1206.2 X X1206.4 X X1206.6 X X 1206.6 X1206.6 X X1206.7 X1206.7 X X X X 1206.9 X X X1207.2 X1207.3 X X1207.4 X X1207.4 X1207.4 P BX 1207.6 X X 1207.6 X 1207.6 MHX X ASPH X X1208.2 X1208.3 X X1208.4 MHX X1208.5 X1208.5 X1208.5 X1208.6 X1208.6 X PB X X1209.2 X1209.4 X1209.5 X1209.5 X PBX X X 1210 1210 1210 12 10 12 10 12 10 1210 12 10 12 10 12 10 X1210.1 X1210.4 X1210.5 X X1210.7 PBX X 1211.2 X1211.3 X X1211.4 X1211.4 MHX X1211.5 X MHX X1211.6 X1211.6 X1211.6 P B X X1211.7 MHX X1211.7 X X1211.7 P B X X X X X X X MHX P B X X P B X X MHX X X P BX X X PBX X1212.2 X X P B X CONC X MHX P B X 12 12 X 1 2 1 2 X X 1212.4 X1212.5 X X1212.5 X1212.5 X1212.5 X1212.7 X X X1212.8 CONC ASPH X X X X ASPH X1213.2 X X1213.2 X X1213.3 X1213.3 X1213.3 X MHX X1213.4 X1213.4 X X X1213.5 X X X1213.5 X X1213.7 X1213.7 X X X X X X X X1214.2 X X X P B X X X X1215.0 1215 1215 12 15 1215 12 15 1215 12 15 1215 1215 12 15 P B X X1215.1 X1215.2 X1215.3 X1215.4 X1215.4 X1215.7 X1215.7 X1215.7 X X X1215.9 X1216.2 X1216.3 X1216.3 X1216.3 X1216.3 X1216.4 X1216.6 X1216.8 PBX X 1217.1 X X1217.2 P B X X1217.9 X1218.3 X1218.3 X1218.5 X1218.5 X1218.6 X1218.6 MHX X1218.7 X1218.8 X1218.9 X1218.9 X1219.0 X1219.1 X1219.3 X1219.4 X1219.4 X1219.5 X1219.6 X1219.7 X1219.7 X1219.9 12 2 0 1220 1220 12 2 0 12 2 0 12 2 0 12 2 0 1220 12 10 1 2 2 0 1220 12 2 0 1220 12 2 0 X X1220.3 X1220.5 PBX X1220.8 X1221.1 X1221.3 X1221.3 PB X X1221.5 X1221.7 X1222.0 X X X1222.1 X1222.4 X1223.5 X1223.9 X1224.2 X X1224.7 X 12 2 5 12 2 5 1225 122 5 12 2 5 12 2 5 12 2 5 12 2 5 12 2 0 1220 1220 1225 1230 1235 1235 1235 12 2 5 12 2 5 1225 122512 2 5 X1225.6 PBX X X1226.1 X1226.1 X1226.1 X X1226.2 X X1227.3 X1227.6X ASPH X1227.9X1228.0 X1228.1 X PB X X1228.2 X1228.3 X X1228.3 X1229.2 X1229.3 X1229.4 X 1229.4 X1229.6 X 12 3 0 12 3 0 1230 1230 12 3 0 1230 1230 12 3 0 12 3 0 12 3 0 12 3 0 1230 1230 1230 X1230.4 X 1230.4 X 1230.6 CONC X X1231.1 X1231.2 X1231.4 X1231.7 X 1231.8 X 1232.3 PB X X MHX X1232.9X1233.1 X X1233.9 X1234.1 X1234.3 X X1234.7 X1234.8 X1234.9 X 12 3 5 12 3 5 1 2 3 5 1235 12 3 5 1235 12 3 5 12 3 5 12 3 5 12 3 5 1235 1235 X X MHX X1235.6 X1236.0 X1236.2 X1236.3 X X1236.7 X1237.3 X1237.7 X X X1238.3 X X1238.5 X1238.5 X X1238.7 X X X X 1240 12 4 0 12 4 0 1 2 4 0 1240 1240 1240 12 4 0 12 4 0 1240 1240 X X X1240.1 X1240.2 X1240.4 X1240.4 X1240.6 X1240.7 X X1240.9 X1240.9 X X X1241.5 X X1241.6 X1241.6 X1241.7 PBX X X X1242.4 X1242.4 X X1242.5 X X X1242.8 X1242.8 X1243.1 X X1243.2 P B X X1243.2 X1243.4X1244.2 X1244.3 X1244.5 X1244.7 X1244.8 X1244.8 X1244.9 12 4 5 12 4 5 12 4 5 12 4 5 1245 12 4 5 1245 1245 X1245.2 X X1245.2 X ASPH X1245.7 X1246.3 X PBX X1246.6 X X 1247.3 X X PBX PB X X1249.6 X1249.6 X ASPH 1250 1250 12 5 0 1250 1250 12 5 0 X 1250.1 X1250.3 X1250.3 X X1250.6 MHX X1251.6 X1251.6 X1251.8 X1252.2 PB X PBX 1255 1255 1255 1255 X 1260 1260 1260 PBX 13 1262.38 X 1263.1 MHX X 1265 1265 1265 12 6 5 PBX 1270 1270 12 7 0 12 7 0 MHX X 1275 1275 1275 X X1278.7 X1279.9 1280 1280 1280 1280 MHX X 1282.6 X 1283.6 X1284.6 1285 X1285.5 X1285.7 X1285.7 X1286.1 X1288.6 B U T T E R F IE LD S T AGE R D RORIPAUGH VALLEY RD 1210 1215 1220 12 15 1215 PA 12 REC. 4-21-2006 DOC NO.006-290818 OF DEDICATION PER IRREVOCABLE OFFER 15.4 AC. 0.1 AC. P O U R R O Y R O A D RORIPAUGH VALLEY ROAD BU T T E R F IE LD S TA G E RO A D NI C O L AS R O A D BASIN 1200 LCa = 718 ft. Tc = 16.8 MIN. A = 15.5 ACRES Q100 = 32.9 CFS BASIN 1200: L = 1369 ft. L = 82 ft. 1200 1201 1250 2 4 - MA R - 2 0 2 1 1 1 : 0 3 \ \ c p . r i c k e n g . c o m \ p r o j e c t s \ C _ R I V _ G \ 1 7 8 8 3 \ 1 7 8 8 3 - I _ P A 1 2 \ Wa t e r R e s \ S D C o r p S t d s 2 0 0 5 . d s c r i p t \ \ c p . r i c k e n g . c o m \ p r o j e c t s \ C _ R I V _ G \ 1 7 8 8 3 \ 1 7 8 8 3 - I _ P A 1 2 \ Wa t e r R e s \ 1 7 8 8 3 I _ P A 1 2 d r n _ p r e 0 1 . d g n NOT FOR CONSTRUCTION - EXHIBIT FOR DRAINAGE STUDY ONLY (PRE-PROJECT) J-17883-I 60 0 60 SCALE: 1" = 60' 120 c 2 0 2 0 Ric k E n g in e e rin g C o m p a n y PLANNING AREA 12 WINGSWEEP PROPERTY FOR DRAINAGE STUDY MAP LEGENDLEGEND SUB BASIN DRAINAGE BOUNDARY XXXXX XX.X AC. BOUNDARY MAJOR DRAINAGE BASIN DRAINAGE AREA DRAINAGE NODE ID POINT OF INTEREST (POI) FLOW PATH PROPOSED INLET LOCATION BASIN BOUNDARY CENTROID OF MAJOR DRAINAGE April 16, 2021J-17883-I Appendix 4 Post-project Condition Hydrology Workmap PA 12 1 2 1 5 23 1195 1 1 9 5 119 5 119 5 9 1197.66 X X MHX 12 0 0 1 2 0 0 12 0 0 1200 12051200 12 0 0 1200 12 0 0 1200 12 0 0 1200 1200 X X X X X 12 0 5 1205 12 0 5 1205 1 2 0 5 1 2 0 5 12 0 5 1205 1205 1205 1205 1205 1205 1205 1205 1205 1 2 0 5 X X X X X X X ASPH MHX X X X X X X X X X X X P BX X MHX X ASPH X X MHX X PB X X PBX X X 1210 1210 1210 12 10 12 10 12 10 1210 12 10 12 10 12 10 X PBX X MHX X MHX P B X MHX X P B X X X X X X X MHX P B X X P B X X MHX X X P BX X X PBX X X P B X CONC X MHX P B X 12 12 X 1 2 1 2 X X X X CONC ASPH X X X X ASPH X X X MHX X X X X X X X X X X X X X X X P B X X X 1215 1215 12 15 1215 12 15 1215 12 15 1215 1215 12 15 P B X X X PBX X P B X MHX 12 2 0 1220 1220 12 2 0 12 2 0 12 2 0 12 2 0 1220 12 10 1 2 2 0 1220 12 2 0 1220 12 2 0 X PBX PB X X X X X 12 2 5 12 2 5 1225 122 5 12 2 5 12 2 5 12 2 5 12 2 5 12 2 0 1220 1220 1225 1230 1235 1235 1235 12 2 5 12 2 5 1225 122512 2 5 PBX X X X X ASPH X PB X X X 12 3 0 12 3 0 1230 1230 12 3 0 1230 1230 12 3 0 12 3 0 12 3 0 12 3 0 1230 1230 1230 CONC X PB X X MHX X X X 12 3 5 12 3 5 1 2 3 5 1235 12 3 5 1235 12 3 5 12 3 5 12 3 5 12 3 5 1235 1235 X X MHX X X X X X X X X X 1240 12 4 0 12 4 0 1 2 4 0 1240 1240 1240 12 4 0 12 4 0 1240 1240 X X X X X X PBX X X X X X X P B X 12 4 5 12 4 5 12 4 5 12 4 5 1245 12 4 5 1245 1245 X X ASPH X PBX X X X PBX PB X X ASPH 1250 1250 12 5 0 1250 1250 12 5 0 X MHX PB X PBX 1255 1255 1255 1255 X 1260 1260 1260 PBX 13 1262.38 MHX X 1265 1265 1265 12 6 5 PBX 1270 1270 12 7 0 12 7 0 MHX X 1275 1275 1275 X 1280 1280 1280 1280 MHX 1285 B U T T E R F IE LD S T AGE R D RORIPAUGH VALLEY RD 1210 1215 1220 12 15 1215 REC. 4-21-2006 DOC NO.006-290818 OF DEDICATION PER IRREVOCABLE OFFER P O U R R O Y R O A D RORIPAUGH VALLEY ROAD BU T T E R F IE LD S TA G E RO A D NI C O L AS R O A D BASIN 1200 0.1 AC. 1.2 AC. 1230 1210 1211 1201 1205 1220 1254 1231 1235 1246 1253 1255 1240 1241 1244 2.0 AC. 1.7 AC 0.5 AC 0.3 AC 1.1 AC 1.1 AC 0.1 AC. 0.8 AC. 0.7 AC 0.8 AC 0.1 AC 1200 1203 1215 1216 1208 L = 1373 ft. Delta H = 37 ft. LCa = 686 ft. 1.0 AC 1204 1207 1206 1209 1218 1212 1210 1.0 AC 1232 1234 1233 1.5 AC 1.4 AC 1242 1245 1243 1251 1248 1247 1250 Tc = 9.3 MIN. A = 15.4 ACRES Q100 = 42.4 CFS BASIN 1200: 1252 S T R E E T "D " STREET "C" S T R E E T "F " S T R E E T " G" S T R E E T "E " STREET "H" S T R E E T "B " S A N T A G E R T R U D IS C R E E K 1 6 - A P R - 2 0 2 1 1 1 : 1 1 C : \ R I C K \ P r o j e c t s \ C _ R I V _ G \ 1 7 8 8 3 \ 1 7 8 8 3 - I _ P A 1 2 \ Wa t e r R e s \ S D C o r p S t d s 2 0 0 5 . d s c r i p t C : \ R I C K \ P r o j e c t s \ C _ R I V _ G \ 1 7 8 8 3 \ 1 7 8 8 3 - I _ P A 1 2 \ Wa t e r R e s \ 1 7 8 8 3 I _ P A 1 2 d r n _ p o s t 0 1 . d g n NOT FOR CONSTRUCTION - EXHIBIT FOR DRAINAGE STUDY ONLY (POST-PROJECT) J-17883-I 60 0 60 SCALE: 1" = 60' 120 c 2 0 2 0 Ric k E n g in e e rin g C o m p a n y PLANNING AREA 12 WINGSWEEP PROPERTY FOR DRAINAGE STUDY MAP LEGENDLEGEND SUB BASIN DRAINAGE BOUNDARY XXXXX XX.X AC. BOUNDARY MAJOR DRAINAGE BASIN DRAINAGE AREA DRAINAGE NODE ID POINT OF INTEREST (POI) FLOW PATH BASIN BOUNDARY CENTROID OF MAJOR DRAINAGE April 16, 2021J-17883-I Appendix 5 Hydrology AES Output (Pre-project & Post-project) P1200E00.RES ____________________________________________________________________________ **************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT (RCFC&WCD) 1978 HYDROLOGY MANUAL (c) Copyright 1982-2014 Advanced Engineering Software (aes) (Rational Tabling Version 21.0) Release Date: 06/01/2014 License ID 1261 Analysis prepared by: RICK ENGINEERING COMPANY 5620 Friars Road San Diego, California 92110 619-291-0707 Fax 619-291-4165 ************************** DESCRIPTION OF STUDY ************************** * WINGSWEEP PA 12 (FINAL ENGINEERING); J-17883-I * * 100-YEAR EXISTING CONDITIONS * * BASIN 1200 * ************************************************************************** FILE NAME: P1200E00.RAT TIME/DATE OF STUDY: 09:46 04/08/2021 ---------------------------------------------------------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: ---------------------------------------------------------------------------- USER SPECIFIED STORM EVENT(YEAR) = 100.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.90 10-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.030 10-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 0.961 100-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 3.390 100-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.610 SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = 0.4173643 SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = 0.4155667 COMPUTED RAINFALL INTENSITY DATA: STORM EVENT = 100.00 1-HOUR INTENSITY(INCH/HOUR) = 1.610 SLOPE OF INTENSITY DURATION CURVE = 0.4156 RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: COMPUTE CONFLUENCE VALUES ACCORDING TO RCFC&WCD HYDROLOGY MANUAL AND IGNORE OTHER CONFLUENCE COMBINATIONS FOR DOWNSTREAM ANALYSES *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) === ===== ========= ================= ====== ===== ====== ===== ======= 1 20.0 15.0 0.018/0.018/0.020 0.50 2.00 0.0100 0.125 0.0150 1 P1200E00.RES 2 16.0 10.0 0.018/0.018/0.020 0.50 2.00 0.0100 0.125 0.0150 3 25.0 20.0 0.018/0.018/0.020 0.50 2.00 0.0100 0.125 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS: 1. Relative Flow-Depth = 0.10 FEET as (Maximum Allowable Street Flow Depth) - (Top-of-Curb) 2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* **************************************************************************** FLOW PROCESS FROM NODE 1200.00 TO NODE 1201.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS: UNDEVELOPED WITH FAIR COVER TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH(FEET) = 82.00 UPSTREAM ELEVATION(FEET) = 1244.00 DOWNSTREAM ELEVATION(FEET) = 1243.00 ELEVATION DIFFERENCE(FEET) = 1.00 TC = 0.709*[( 82.00**3)/( 1.00)]**.2 = 9.981 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.393 USER-SPECIFIED RUNOFF COEFFICIENT = .7958 SOIL CLASSIFICATION IS "D" SUBAREA RUNOFF(CFS) = 0.27 TOTAL AREA(ACRES) = 0.10 TOTAL RUNOFF(CFS) = 0.27 **************************************************************************** FLOW PROCESS FROM NODE 1201.00 TO NODE 1255.00 IS CODE = 51 ---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<< >>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1243.00 DOWNSTREAM(FEET) = 1213.00 CHANNEL LENGTH THRU SUBAREA(FEET) = 1287.00 CHANNEL SLOPE = 0.0233 CHANNEL BASE(FEET) = 16.00 "Z" FACTOR = 7.000 MANNING'S FACTOR = 0.030 MAXIMUM DEPTH(FEET) = 5.00 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.734 USER-SPECIFIED RUNOFF COEFFICIENT = .7741 SOIL CLASSIFICATION IS "D" TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 16.78 TRAVEL TIME THRU SUBAREA BASED ON VELOCITY(FEET/SEC.) = 3.15 AVERAGE FLOW DEPTH(FEET) = 0.29 TRAVEL TIME(MIN.) = 6.80 Tc(MIN.) = 16.78 SUBAREA AREA(ACRES) = 15.40 SUBAREA RUNOFF(CFS) = 32.59 TOTAL AREA(ACRES) = 15.5 PEAK FLOW RATE(CFS) = 32.86 2 P1200E00.RES END OF SUBAREA CHANNEL FLOW HYDRAULICS: DEPTH(FEET) = 0.44 FLOW VELOCITY(FEET/SEC.) = 3.94 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1255.00 = 1369.00 FEET. ============================================================================ END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 15.5 TC(MIN.) = 16.78 PEAK FLOW RATE(CFS) = 32.86 ============================================================================ ============================================================================ END OF RATIONAL METHOD ANALYSIS 3 P1200P00.RES ____________________________________________________________________________ **************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT (RCFC&WCD) 1978 HYDROLOGY MANUAL (c) Copyright 1982-2014 Advanced Engineering Software (aes) (Rational Tabling Version 21.0) Release Date: 06/01/2014 License ID 1261 Analysis prepared by: RICK ENGINEERING COMPANY 5620 Friars Road San Diego, California 92110 619-291-0707 Fax 619-291-4165 ************************** DESCRIPTION OF STUDY ************************** * WINGSWEEP PA 12 (FINAL ENGINEERING); J-17883-I * * 100-YEAR PROPOSED CONDITIONS * * BASIN 1200 * ************************************************************************** FILE NAME: P1200P00.RAT TIME/DATE OF STUDY: 09:40 04/08/2021 ---------------------------------------------------------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: ---------------------------------------------------------------------------- USER SPECIFIED STORM EVENT(YEAR) = 100.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.90 10-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.030 10-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 0.961 100-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 3.390 100-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.610 SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = 0.4173643 SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = 0.4155667 COMPUTED RAINFALL INTENSITY DATA: STORM EVENT = 100.00 1-HOUR INTENSITY(INCH/HOUR) = 1.610 SLOPE OF INTENSITY DURATION CURVE = 0.4156 RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: COMPUTE CONFLUENCE VALUES ACCORDING TO RCFC&WCD HYDROLOGY MANUAL AND IGNORE OTHER CONFLUENCE COMBINATIONS FOR DOWNSTREAM ANALYSES *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) === ===== ========= ================= ====== ===== ====== ===== ======= 1 20.0 15.0 0.018/0.018/0.020 0.50 2.00 0.0100 0.125 0.0150 1 P1200P00.RES 2 16.0 10.0 0.018/0.018/0.020 0.50 2.00 0.0100 0.125 0.0150 3 25.0 20.0 0.018/0.018/0.020 0.50 2.00 0.0100 0.125 0.0150 GLOBAL STREET FLOW-DEPTH CONSTRAINTS: 1. Relative Flow-Depth = 0.10 FEET as (Maximum Allowable Street Flow Depth) - (Top-of-Curb) 2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* **************************************************************************** FLOW PROCESS FROM NODE 1200.00 TO NODE 1201.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS SINGLE FAMILY (1/4 ACRE) TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH(FEET) = 123.00 UPSTREAM ELEVATION(FEET) = 1252.00 DOWNSTREAM ELEVATION(FEET) = 1246.50 ELEVATION DIFFERENCE(FEET) = 5.50 TC = 0.393*[( 123.00**3)/( 5.50)]**.2 = 5.010 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.518 USER-SPECIFIED RUNOFF COEFFICIENT = .8597 SOIL CLASSIFICATION IS "D" SUBAREA RUNOFF(CFS) = 0.39 TOTAL AREA(ACRES) = 0.10 TOTAL RUNOFF(CFS) = 0.39 **************************************************************************** FLOW PROCESS FROM NODE 1201.00 TO NODE 1203.00 IS CODE = 62 ---------------------------------------------------------------------------- >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>(STREET TABLE SECTION # 1 USED)<<<<< ============================================================================ UPSTREAM ELEVATION(FEET) = 1246.50 DOWNSTREAM ELEVATION(FEET) = 1238.00 STREET LENGTH(FEET) = 334.00 CURB HEIGHT(INCHES) = 6.0 STREET HALFWIDTH(FEET) = 20.00 DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 15.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.018 OUTSIDE STREET CROSSFALL(DECIMAL) = 0.018 SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1 STREET PARKWAY CROSSFALL(DECIMAL) = 0.020 Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0150 Manning's FRICTION FACTOR for Back-of-Walk Flow Section = 0.0200 2 P1200P00.RES **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 2.09 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW: STREET FLOW DEPTH(FEET) = 0.24 HALFSTREET FLOOD WIDTH(FEET) = 8.08 AVERAGE FLOW VELOCITY(FEET/SEC.) = 3.02 PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 0.74 STREET FLOW TRAVEL TIME(MIN.) = 1.84 Tc(MIN.) = 6.85 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.966 USER-SPECIFIED RUNOFF COEFFICIENT = .8547 SOIL CLASSIFICATION IS "D" SUBAREA AREA(ACRES) = 1.00 SUBAREA RUNOFF(CFS) = 3.39 TOTAL AREA(ACRES) = 1.1 PEAK FLOW RATE(CFS) = 3.78 END OF SUBAREA STREET FLOW HYDRAULICS: DEPTH(FEET) = 0.29 HALFSTREET FLOOD WIDTH(FEET) = 10.54 FLOW VELOCITY(FEET/SEC.) = 3.43 DEPTH*VELOCITY(FT*FT/SEC.) = 0.99 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1203.00 = 457.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1203.00 TO NODE 1203.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) = 6.85 RAINFALL INTENSITY(INCH/HR) = 3.97 TOTAL STREAM AREA(ACRES) = 1.10 PEAK FLOW RATE(CFS) AT CONFLUENCE = 3.78 **************************************************************************** FLOW PROCESS FROM NODE 1210.00 TO NODE 1211.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS: UNDEVELOPED WITH FAIR COVER TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH(FEET) = 100.00 UPSTREAM ELEVATION(FEET) = 1277.00 DOWNSTREAM ELEVATION(FEET) = 1250.00 ELEVATION DIFFERENCE(FEET) = 27.00 TC = 0.709*[( 100.00**3)/( 27.00)]**.2 = 5.816 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.246 USER-SPECIFIED RUNOFF COEFFICIENT = .8147 SOIL CLASSIFICATION IS "D" SUBAREA RUNOFF(CFS) = 1.04 TOTAL AREA(ACRES) = 0.30 TOTAL RUNOFF(CFS) = 1.04 3 P1200P00.RES **************************************************************************** FLOW PROCESS FROM NODE 1211.00 TO NODE 1203.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1247.00 DOWNSTREAM(FEET) = 1235.00 FLOW LENGTH(FEET) = 98.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 2.1 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) = 8.79 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 1.04 PIPE TRAVEL TIME(MIN.) = 0.19 Tc(MIN.) = 6.00 LONGEST FLOWPATH FROM NODE 1210.00 TO NODE 1203.00 = 198.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1203.00 TO NODE 1203.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 6.00 RAINFALL INTENSITY(INCH/HR) = 4.19 TOTAL STREAM AREA(ACRES) = 0.30 PEAK FLOW RATE(CFS) AT CONFLUENCE = 1.04 ** CONFLUENCE DATA ** STREAM RUNOFF Tc INTENSITY AREA NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE) 1 3.78 6.85 3.966 1.10 2 1.04 6.00 4.191 0.30 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN.) (INCH/HOUR) 4 P1200P00.RES 1 4.35 6.00 4.191 2 4.76 6.85 3.966 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 4.76 Tc(MIN.) = 6.85 TOTAL AREA(ACRES) = 1.4 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1203.00 = 457.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1203.00 TO NODE 1208.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1235.00 DOWNSTREAM(FEET) = 1224.40 FLOW LENGTH(FEET) = 303.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 6.2 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) = 8.82 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 4.76 PIPE TRAVEL TIME(MIN.) = 0.57 Tc(MIN.) = 7.43 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1208.00 = 760.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1208.00 TO NODE 1208.00 IS CODE = 10 ---------------------------------------------------------------------------- >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 1 <<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 1204.00 TO NODE 1205.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS SINGLE FAMILY (1/4 ACRE) TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH(FEET) = 310.00 UPSTREAM ELEVATION(FEET) = 1238.00 DOWNSTREAM ELEVATION(FEET) = 1227.50 ELEVATION DIFFERENCE(FEET) = 10.50 TC = 0.393*[( 310.00**3)/( 10.50)]**.2 = 7.665 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.786 USER-SPECIFIED RUNOFF COEFFICIENT = .8527 SOIL CLASSIFICATION IS "D" SUBAREA RUNOFF(CFS) = 3.55 TOTAL AREA(ACRES) = 1.10 TOTAL RUNOFF(CFS) = 3.55 5 P1200P00.RES **************************************************************************** FLOW PROCESS FROM NODE 1205.00 TO NODE 1205.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) = 7.67 RAINFALL INTENSITY(INCH/HR) = 3.79 TOTAL STREAM AREA(ACRES) = 1.10 PEAK FLOW RATE(CFS) AT CONFLUENCE = 3.55 **************************************************************************** FLOW PROCESS FROM NODE 1215.00 TO NODE 1216.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS: UNDEVELOPED WITH FAIR COVER TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH(FEET) = 340.00 UPSTREAM ELEVATION(FEET) = 1280.00 DOWNSTREAM ELEVATION(FEET) = 1240.00 ELEVATION DIFFERENCE(FEET) = 40.00 TC = 0.709*[( 340.00**3)/( 40.00)]**.2 = 11.204 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.234 USER-SPECIFIED RUNOFF COEFFICIENT = .7912 SOIL CLASSIFICATION IS "D" SUBAREA RUNOFF(CFS) = 1.28 TOTAL AREA(ACRES) = 0.50 TOTAL RUNOFF(CFS) = 1.28 **************************************************************************** FLOW PROCESS FROM NODE 1216.00 TO NODE 1205.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1237.00 DOWNSTREAM(FEET) = 1225.50 FLOW LENGTH(FEET) = 99.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 2.4 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) = 9.21 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 1.28 PIPE TRAVEL TIME(MIN.) = 0.18 Tc(MIN.) = 11.38 LONGEST FLOWPATH FROM NODE 1215.00 TO NODE 1205.00 = 439.00 FEET. 6 P1200P00.RES **************************************************************************** FLOW PROCESS FROM NODE 1205.00 TO NODE 1205.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 11.38 RAINFALL INTENSITY(INCH/HR) = 3.21 TOTAL STREAM AREA(ACRES) = 0.50 PEAK FLOW RATE(CFS) AT CONFLUENCE = 1.28 ** CONFLUENCE DATA ** STREAM RUNOFF Tc INTENSITY AREA NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE) 1 3.55 7.67 3.786 1.10 2 1.28 11.38 3.212 0.50 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN.) (INCH/HOUR) 1 4.41 7.67 3.786 2 4.29 11.38 3.212 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 4.41 Tc(MIN.) = 7.67 TOTAL AREA(ACRES) = 1.6 LONGEST FLOWPATH FROM NODE 1215.00 TO NODE 1205.00 = 439.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1205.00 TO NODE 1208.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1225.50 DOWNSTREAM(FEET) = 1224.40 FLOW LENGTH(FEET) = 17.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 7 P1200P00.RES DEPTH OF FLOW IN 18.0 INCH PIPE IS 5.1 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) = 10.80 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 4.41 PIPE TRAVEL TIME(MIN.) = 0.03 Tc(MIN.) = 7.69 LONGEST FLOWPATH FROM NODE 1215.00 TO NODE 1208.00 = 456.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1208.00 TO NODE 1208.00 IS CODE = 11 ---------------------------------------------------------------------------- >>>>>CONFLUENCE MEMORY BANK # 1 WITH THE MAIN-STREAM MEMORY<<<<< ============================================================================ ** MAIN STREAM CONFLUENCE DATA ** STREAM RUNOFF Tc INTENSITY AREA NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE) 1 4.41 7.69 3.781 1.60 LONGEST FLOWPATH FROM NODE 1215.00 TO NODE 1208.00 = 456.00 FEET. ** MEMORY BANK # 1 CONFLUENCE DATA ** STREAM RUNOFF Tc INTENSITY AREA NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE) 1 4.76 7.43 3.836 1.40 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1208.00 = 760.00 FEET. *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN.) (INCH/HOUR) 1 9.02 7.43 3.836 2 9.10 7.69 3.781 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 9.02 Tc(MIN.) = 7.43 TOTAL AREA(ACRES) = 3.0 **************************************************************************** FLOW PROCESS FROM NODE 1208.00 TO NODE 1208.00 IS CODE = 12 ---------------------------------------------------------------------------- >>>>>CLEAR MEMORY BANK # 1 <<<<< ============================================================================ **************************************************************************** 8 P1200P00.RES FLOW PROCESS FROM NODE 1208.00 TO NODE 1208.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) = 7.43 RAINFALL INTENSITY(INCH/HR) = 3.84 TOTAL STREAM AREA(ACRES) = 3.00 PEAK FLOW RATE(CFS) AT CONFLUENCE = 9.02 **************************************************************************** FLOW PROCESS FROM NODE 1206.00 TO NODE 1207.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS SINGLE FAMILY (1/4 ACRE) TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH(FEET) = 385.00 UPSTREAM ELEVATION(FEET) = 1242.00 DOWNSTREAM ELEVATION(FEET) = 1227.50 ELEVATION DIFFERENCE(FEET) = 14.50 TC = 0.393*[( 385.00**3)/( 14.50)]**.2 = 8.184 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.684 USER-SPECIFIED RUNOFF COEFFICIENT = .8516 SOIL CLASSIFICATION IS "D" SUBAREA RUNOFF(CFS) = 2.51 TOTAL AREA(ACRES) = 0.80 TOTAL RUNOFF(CFS) = 2.51 **************************************************************************** FLOW PROCESS FROM NODE 1207.00 TO NODE 1208.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1225.50 DOWNSTREAM(FEET) = 1224.40 FLOW LENGTH(FEET) = 32.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 4.5 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) = 7.35 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 2.51 PIPE TRAVEL TIME(MIN.) = 0.07 Tc(MIN.) = 8.26 LONGEST FLOWPATH FROM NODE 1206.00 TO NODE 1208.00 = 417.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1208.00 TO NODE 1208.00 IS CODE = 1 9 P1200P00.RES ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 8.26 RAINFALL INTENSITY(INCH/HR) = 3.67 TOTAL STREAM AREA(ACRES) = 0.80 PEAK FLOW RATE(CFS) AT CONFLUENCE = 2.51 ** CONFLUENCE DATA ** STREAM RUNOFF Tc INTENSITY AREA NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE) 1 9.02 7.43 3.836 3.00 2 2.51 8.26 3.671 0.80 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN.) (INCH/HOUR) 1 11.28 7.43 3.836 2 11.14 8.26 3.671 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 11.28 Tc(MIN.) = 7.43 TOTAL AREA(ACRES) = 3.8 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1208.00 = 760.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1208.00 TO NODE 1218.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1224.40 DOWNSTREAM(FEET) = 1209.50 FLOW LENGTH(FEET) = 426.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 10.1 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) = 11.10 10 P1200P00.RES ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 11.28 PIPE TRAVEL TIME(MIN.) = 0.64 Tc(MIN.) = 8.07 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1218.00 = 1186.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1218.00 TO NODE 1218.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) = 8.07 RAINFALL INTENSITY(INCH/HR) = 3.71 TOTAL STREAM AREA(ACRES) = 3.80 PEAK FLOW RATE(CFS) AT CONFLUENCE = 11.28 **************************************************************************** FLOW PROCESS FROM NODE 1209.00 TO NODE 1210.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS SINGLE FAMILY (1/4 ACRE) TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH(FEET) = 428.00 UPSTREAM ELEVATION(FEET) = 1227.50 DOWNSTREAM ELEVATION(FEET) = 1215.00 ELEVATION DIFFERENCE(FEET) = 12.50 TC = 0.393*[( 428.00**3)/( 12.50)]**.2 = 8.983 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.544 USER-SPECIFIED RUNOFF COEFFICIENT = .8499 SOIL CLASSIFICATION IS "D" SUBAREA RUNOFF(CFS) = 3.31 TOTAL AREA(ACRES) = 1.10 TOTAL RUNOFF(CFS) = 3.31 **************************************************************************** FLOW PROCESS FROM NODE 1210.00 TO NODE 1218.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1212.00 DOWNSTREAM(FEET) = 1209.50 FLOW LENGTH(FEET) = 16.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 3.5 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) = 13.60 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 11 P1200P00.RES PIPE-FLOW(CFS) = 3.31 PIPE TRAVEL TIME(MIN.) = 0.02 Tc(MIN.) = 9.00 LONGEST FLOWPATH FROM NODE 1209.00 TO NODE 1218.00 = 444.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1218.00 TO NODE 1218.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 9.00 RAINFALL INTENSITY(INCH/HR) = 3.54 TOTAL STREAM AREA(ACRES) = 1.10 PEAK FLOW RATE(CFS) AT CONFLUENCE = 3.31 ** CONFLUENCE DATA ** STREAM RUNOFF Tc INTENSITY AREA NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE) 1 11.28 8.07 3.707 3.80 2 3.31 9.00 3.541 1.10 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN.) (INCH/HOUR) 1 14.25 8.07 3.707 2 14.09 9.00 3.541 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 14.25 Tc(MIN.) = 8.07 TOTAL AREA(ACRES) = 4.9 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1218.00 = 1186.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1218.00 TO NODE 1218.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ 12 P1200P00.RES TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) = 8.07 RAINFALL INTENSITY(INCH/HR) = 3.71 TOTAL STREAM AREA(ACRES) = 4.90 PEAK FLOW RATE(CFS) AT CONFLUENCE = 14.25 **************************************************************************** FLOW PROCESS FROM NODE 1211.00 TO NODE 1212.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS SINGLE FAMILY (1/4 ACRE) TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH(FEET) = 401.00 UPSTREAM ELEVATION(FEET) = 1227.50 DOWNSTREAM ELEVATION(FEET) = 1215.00 ELEVATION DIFFERENCE(FEET) = 12.50 TC = 0.393*[( 401.00**3)/( 12.50)]**.2 = 8.639 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.603 USER-SPECIFIED RUNOFF COEFFICIENT = .8506 SOIL CLASSIFICATION IS "D" SUBAREA RUNOFF(CFS) = 3.06 TOTAL AREA(ACRES) = 1.00 TOTAL RUNOFF(CFS) = 3.06 **************************************************************************** FLOW PROCESS FROM NODE 1212.00 TO NODE 1218.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1212.00 DOWNSTREAM(FEET) = 1209.50 FLOW LENGTH(FEET) = 29.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 3.9 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) = 10.78 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 3.06 PIPE TRAVEL TIME(MIN.) = 0.04 Tc(MIN.) = 8.68 LONGEST FLOWPATH FROM NODE 1211.00 TO NODE 1218.00 = 430.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1218.00 TO NODE 1218.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ 13 P1200P00.RES TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 8.68 RAINFALL INTENSITY(INCH/HR) = 3.59 TOTAL STREAM AREA(ACRES) = 1.00 PEAK FLOW RATE(CFS) AT CONFLUENCE = 3.06 ** CONFLUENCE DATA ** STREAM RUNOFF Tc INTENSITY AREA NUMBER (CFS) (MIN.) (INCH/HOUR) (ACRE) 1 14.25 8.07 3.707 4.90 2 3.06 8.68 3.595 1.00 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN.) (INCH/HOUR) 1 17.09 8.07 3.707 2 16.88 8.68 3.595 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 17.09 Tc(MIN.) = 8.07 TOTAL AREA(ACRES) = 5.9 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1218.00 = 1186.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1218.00 TO NODE 1220.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1209.50 DOWNSTREAM(FEET) = 1205.40 FLOW LENGTH(FEET) = 74.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 18.0 INCH PIPE IS 11.4 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) = 14.55 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 17.09 PIPE TRAVEL TIME(MIN.) = 0.08 Tc(MIN.) = 8.15 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1220.00 = 1260.00 FEET. 14 P1200P00.RES **************************************************************************** FLOW PROCESS FROM NODE 1220.00 TO NODE 1254.00 IS CODE = 51 ---------------------------------------------------------------------------- >>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<< >>>>>TRAVELTIME THRU SUBAREA (EXISTING ELEMENT)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1205.40 DOWNSTREAM(FEET) = 1205.00 CHANNEL LENGTH THRU SUBAREA(FEET) = 90.00 CHANNEL SLOPE = 0.0044 CHANNEL BASE(FEET) = 120.00 "Z" FACTOR = 3.000 MANNING'S FACTOR = 0.030 MAXIMUM DEPTH(FEET) = 2.00 CHANNEL FLOW THRU SUBAREA(CFS) = 17.09 FLOW VELOCITY(FEET/SEC.) = 0.95 FLOW DEPTH(FEET) = 0.15 TRAVEL TIME(MIN.) = 1.58 Tc(MIN.) = 9.73 LONGEST FLOWPATH FROM NODE 1200.00 TO NODE 1254.00 = 1350.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1254.00 TO NODE 1254.00 IS CODE = 10 ---------------------------------------------------------------------------- >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 1 <<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 1230.00 TO NODE 1231.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS SINGLE FAMILY (1/4 ACRE) TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH(FEET) = 122.00 UPSTREAM ELEVATION(FEET) = 1252.00 DOWNSTREAM ELEVATION(FEET) = 1246.00 ELEVATION DIFFERENCE(FEET) = 6.00 TC = 0.393*[( 122.00**3)/( 6.00)]**.2 = 4.899 COMPUTED TIME OF CONCENTRATION INCREASED TO 5 MIN. 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.522 USER-SPECIFIED RUNOFF COEFFICIENT = .8597 SOIL CLASSIFICATION IS "D" SUBAREA RUNOFF(CFS) = 0.39 TOTAL AREA(ACRES) = 0.10 TOTAL RUNOFF(CFS) = 0.39 **************************************************************************** FLOW PROCESS FROM NODE 1231.00 TO NODE 1232.00 IS CODE = 62 ---------------------------------------------------------------------------- >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>(STREET TABLE SECTION # 1 USED)<<<<< ============================================================================ UPSTREAM ELEVATION(FEET) = 1246.00 DOWNSTREAM ELEVATION(FEET) = 1219.00 15 P1200P00.RES STREET LENGTH(FEET) = 674.00 CURB HEIGHT(INCHES) = 6.0 STREET HALFWIDTH(FEET) = 20.00 DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 15.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.018 OUTSIDE STREET CROSSFALL(DECIMAL) = 0.018 SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1 STREET PARKWAY CROSSFALL(DECIMAL) = 0.020 Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) = 0.0150 Manning's FRICTION FACTOR for Back-of-Walk Flow Section = 0.0200 **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 3.62 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW: STREET FLOW DEPTH(FEET) = 0.27 HALFSTREET FLOOD WIDTH(FEET) = 9.37 AVERAGE FLOW VELOCITY(FEET/SEC.) = 4.05 PRODUCT OF DEPTH&VELOCITY(FT*FT/SEC.) = 1.08 STREET FLOW TRAVEL TIME(MIN.) = 2.77 Tc(MIN.) = 7.77 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.764 USER-SPECIFIED RUNOFF COEFFICIENT = .8525 SOIL CLASSIFICATION IS "D" SUBAREA AREA(ACRES) = 2.00 SUBAREA RUNOFF(CFS) = 6.42 TOTAL AREA(ACRES) = 2.1 PEAK FLOW RATE(CFS) = 6.81 END OF SUBAREA STREET FLOW HYDRAULICS: DEPTH(FEET) = 0.32 HALFSTREET FLOOD WIDTH(FEET) = 12.24 FLOW VELOCITY(FEET/SEC.) = 4.71 DEPTH*VELOCITY(FT*FT/SEC.) = 1.50 LONGEST FLOWPATH FROM NODE 1230.00 TO NODE 1232.00 = 796.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1232.00 TO NODE 1235.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM(FEET) = 1216.00 DOWNSTREAM(FEET) = 1214.00 FLOW LENGTH(FEET) = 54.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 7.4 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) = 9.97 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 6.81 PIPE TRAVEL TIME(MIN.) = 0.09 Tc(MIN.) = 7.86 LONGEST FLOWPATH FROM NODE 1230.00 TO NODE 1235.00 = 850.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 1235.00 TO NODE 1235.00 IS CODE = 1 16