GEOTECHNICAL REPORT AND COMPACTION TEST RESULTS
ROUGH GRADING OPERATIONS
Beazley Residence
Assessor's Parcel Number: 919-302-005
Lot 522 otTract 3883
Avenida Buena Suerte
City of Temecula, County of Riverside, California
Project Number: T2182-C
I
I
February 28, 2001
I
I
I
I
.
I
I
1
Prepared for:
.
Mr. Robert W. Beazley
. '.. 42961 EI Domino Place
l:emecula, California 92592
,
/
/1</
j-/
- .
'\ /
,
,..
,
I, ,
........~".
!?E.~'
-
..
" " ,,~/" ~,,'- /" ~ / " ~ / " /, " " I _" L, / .... ~, I _.... 'I.... ,.- / " _
.' \ - - - \ / 1...- \ _ _ _ \.... I" \ __ / I __ ,_ ~.. \ '- ~ I \. _ _ _ \...."" I __ ,_ _ _ \...- '- " , , \ - _ _ \.,. '- , I
- ,,- ...:' -/ /, - "- " -/ - _" - ,," ---'._~ /, ~ ,;_,:_=-1_,-_;:"
" __ I ~"/ \_- I ~ , \ / '-- I ' '._- : / --;;o...L~-~ '- ,_.......! -.)...----
J-~~J...2_/ ' J :..J-!-~lr' ~_:...._--;~ .2......:...:" ,1/ I ~~. ~:;
COR ATE_O.fEICL'!1607 E terprise CircleN rt "Suite_LTemacula; CA'92590"phone:(909) 296;2230. fax:J909) 296-2237
'~~_.'~ __~_~ _ '-:::~ ,-"-.,." -'~-"'-C:'
ORANGE COUNTY 0 n61S"Orange A e1. ue, Santa Ana, CA 92707' phone: (714) 546-4051' fax: 17141546,4052
B SITE: www.en e corp:com- E-MAIL: engencbrp@emgentorp.com
. ' _ -, r,'O--""?"-<'~~;'T""':~~W-';O.i:':;;';';.,,......._."-C<,.....:-.,c
.
1
.
I
.
.
I
I
I
1
.
I
I
I
I
I
I
I
I
Mr, Robert W. Beazley
Project Number: T2182-C
TABLE OF CONTENTS
SECTION NUMBER AND TITLE
1.0
1.1
1.2
1.3
2.0
2,1
2.2
2.3
3.0
3.1
3.2
4.0
5.0
5.1
6.0
PAGE
SITE/PROJECT DESCRIPTION AND LOCATION......................................................................1
PROJECT LOCATION ...................
.......... .....,.......................1
..................... .....................1
................. ..........................2
SITE DESCRIPTION .........................................
PROJECT DESCRIPTION ............................
SCOPE OF WORK .......................................... ..... ........... ........ .................... ... .......... .... ... ....2
TIME OF GRADING.............................................................................................................2
CONTRACTOR AND EQUIPMENT..........................................................................................2
GRADING OPERATIONS........................................................................................... ..........2
TESTING ....... .... ...... ...... ................................................................ ... ......... ... .....................3
FIELD TESTING PROCEDURES............................................................................................3
LABORATORY TESTING...................................................................................................... 3
3.2.1 MOISTURE-DENSITY RELATIONSHIP TEST....................................................3
3.2.2 EXPANSION INDEX TEST .............................................................................3
3.2.3 SOLUBLE SULFATE TEST ............................................................................3
EARTH MATERIALS ............................................ ........... ........ .............................. ..............4
CONCLUSIONS AND RECOMMENDATIONS ........................ ........ ........................ ... .................4
GENERAL .....................................................................................................,...,..............4
CLOSURE .. ... .... ... ... ...................................... ..................... ... ........ ... ...... ... ... ... .......... .... ....4
ApPENDIX
TEST RESULTS
DRAWINGS
EnGEN Corporation
I
1
.
1
.
.
I
.
1
I
I
.
.
I
I
I
F
/f"
cl'
'::1,
u~;c:
"~I
':,....
-
./'
.w~GEN
Coq~oration
-Soil EngineeringandConsultin1l5ervices-EnllineeringGeology-C ompactionTesting
elnspeclions-ConstructionMaterialsTesling -LaboraloryTesling. Percolation Testinll
. Geology.WalsrResourceSludies . Phase I & II Environmental Site Assessments
ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NEIWORK
February 28, 2001
Mr. Robert W. Beazley
42961 EI Domino Place
Temecula, California 92592
(909) 676-3256
Regarding:
GEOTECHNICAL REPORT AND COMPACTION TEST RESULTS
ROUGH GRADING OPERATIONS
Beazley Residence
Assessor's Parcel Number: 919-302-005
Lot 522 atTract 3883
Avenida Buena Suerte
City of Temecula, County of Riverside, California
Project Number: T2182-C
References: 1.
EnGEN Corporation, Limited Geotechnical Study, Proposed Single Family
Residence, Lot 522, Tract 3883, City of Temecula, County of Riverside,
California, Project Number: T2182-LGS, report dated October 2,2000.
Gunvant Thakkar, Grading Plan Lot 522 of Tract 3883, APN 919-302-005,
plans dated August 9, 1999,
2,
Dear Mr. Beazley:
According to your request and signed authorization, EnGEN Corporation has performed field
observations, sampling, and in-place density testing at the above referenced site, Submitted, herein,
are the test results and the supporting field and laboratory data.
1.0 SITEIPROJECT DESCRIPTION AND LOCATION
1.1 PROJECT LOCATION
The subject site consists of approximately .5 acres, located north of the intersection of Del
Rey Road and Avenida Buena Suerte, in the City of Temecula, County of Riverside,
California,
1.2 SITE DESCRIPTION
Prior to grading operations, topography and surface conditions of the site were
sloping with surface dr~ina~to the northeast at a gradient of less than 10 percent.
gently
. /.... I" , / '- I "- '" "- I ~ / / , , F _ ' / ,,-! '/ " " / _" _ " "I _" _
__ \. - - - \ / I / ,_ _ _ \..- \. _ _.. \ I __ \ _ _ _ \ '- / / _ \ ..- " ' ,_ _ _ \ __ ... , " - _ _ \..-.... - I
\ "\~_-I " - \ ~ \~_-: ,- ":: ~ ~/ \~_-; ': ~ \ r~ \~--i ~_~_~~-'!-!"~-:;'~~' _:,.~) ::..).~--~~. _. ..' '.-=:_- ,;-,.~_:'~-,~.-=-' "-
I I' I ~ I, \ ~: \ I ~ I ___~v,.;:_J_ :.....4-... \. ___' _ I:
~....__..i__ \ ..1 -,~'---1r _ t _:1 !l " !:
. COR ATIi.QmcE4j'e07 E terprise circie"N rt .S.~lteJ--Teinecula; CA'92590. phone:(~09) 29(J:2230. fax: (909) 296-2237
~~ 'ORANGE COUNTY'O' I b615' O;;~ge A~e u';,Sa~t~Ana, CA 92707.phone: (714) 546-4051 . fax: (714) 546,4052,
B SITE: www~en e corp.com . E-MAIL: engencorp@engencorjJ.com . . .
_,~,~",~'i.~:;~~~~'i"~'c~1;,,.'''''-"--':''';-CW'
--_.----~.~-._---,..
z..
I
1
1
I
1
1
I
.
1
I
.
I
.
.
I
1
I
I
.
Mr. Robert w. Beazley
Project Number: T2182-C
February 2001
Page 2
1.3 PROJECT DESCRIPTION
It is understood that the subject site is to be developed with a single family residence as
well as a separate garage structure with slab-an-grade concrete floors supported on
conventional continuous and pier footings with associated driveway and landscaping areas.
2.0 SCOPE OF WORK
2.1 TIME OF GRADING
This report represents geotechnical observations and testing during the construction
operations from February 5, 2001 to February 22, 2001.
2.2 CONTRACTOR AND EQUIPMENT
The grading operations were performed by PDQ Equipment through the use of one (1)
CAT 623 scraper, one (1) D4 dozer, and one (1) water truck.
2.3 GRADING OPERATIONS
Grading within the subject site consisted of a cutlfill operation, Grasses and weeds were
removed prior to fill placement Fill material was generated from the rear cut portions of
the site, and used to bring the fill slope and building pad portions of the site to finish grade
elevation. Removal of alluvium, slopewash, etc., was performed to a depth of 3-feet below
original elevation. Bottoms were observed, probed and found to be into competent bedrock
by a representative of this firm. Keying and benching through the existing undocumented
fill and into competent bedrock was observed during the grading operations. Over-
excavation was performed in the cut portion of the building pads to a depth of 3 to 4-feet
below finish grade elevation and to a distance of 5 to 10-feet outside the proposed
structure. The exposed bottoms were scarified and moisture conditioned to a depth of 12-
inches then compacted to 90 percent. Fill was placed in lens thicknesses of 6 to 8-inches,
thoroughly moisture conditioned to near optimum moisture content, then compacted to a
minimum of 90 percent relative compaction. Moisture conditioning of the on-site soils was
performed during the compaction process, through the use of a water truck. The pad areas
were generally graded to the elevations noted on the Grading Plan. However, the actual
pad locations, dimensions, elevations, slope locations and inclinations, etc. were surveyed
and staked by others and should be verified by the Project Civil Engineer.
EnGEN Corporation 3
I
1
.
1
I
.
.
.
1
1
.
.
.
I
1
.
1
I
1
Mr. Robert W. Beazley
Project Number: T2182-C
Februaf'J 2001
Page 3
3.0 TESTING
3.1 FIELD TESTING PROCEDURES
Field in-place density and moisture content testing were performed in general accordance
with ASTM-D-2922-81 (90) and ASTM-D-3017-88 procedures for determining in-place
density and moisture content, respectively, using nuclear gauge equipment. Relative
compaction test results were within the 90 percent required for all material tested, which is
an indication that the remainder of the fill placed has been properly compacted. Test
results are presented in the Appendix of this report. Fill depths and test locations (by
station numbers when applicable) were determined from review of the referenced grading
plans.
3.2 LABORATORY TESTING
The following laboratory tests were performed as part of our services during the grading of
the subject site. The test results are presented in the Appendix of this report.
3.2,1 Moisture-Density Relationship Test
Maximum dry density - optimum moisture content relationship tests were conducted on
samples of the materials used as fill. The tests were performed in general accordance with
ASTM D1557-91 procedures. The test results are presented in the Appendix (Summary of
Optimum Moisture Content I Maximum Dry Density Relationship Test Results).
3,2,2 Expansion Index Test
A soil sample was obtained for expansion potential testing from the building pad area upon
completion of rough grading of the subject site. The expansion test procedure utilized was
the Uniform Building Code Test Designation 18-2, The material tested consisted of brown
silty sand with percentages of clay, which has an Expansion Index of 11. This soil is
classified as having a very low expansion potential. The results are presented in the
Appendix (Summary of Expansion Index Test Results),
3.2.3 Soluble Sulfate Test
Soil samples were obtained for soluble sulfate testing from the building pad areas upon
completion of grading of the subject site, The concentration of soluble sulfate was
determined in general accordance with California Test Method 417 procedures. The test
results indicate a low percentage of water soluble sulfates (0.0022% by weight), as a result
no sulfate resistant concretes are necessary, The test results are presented in the
Appendix (Summary of Soluble Sulfate Test Results).
EnGEN Corporation ~
I
I
I
I
1
1
I
I
I
I
1
I
I
I
I
I
I
I
I
Mr, Robert W, Beazley
Project Number: T2182-C
February 2001
Page 4
4.0 EARTH MATERIALS
The natural earth materials encountered on-site generally consisted of brown silty coarse
sands with percentages of clay,
5.0 CONCLUSIONS AND RECOMMENDATIONS
No conditions were encountered which would cause a change in the previously provided
design and construction recommendations. As a result, design and construction should
adhere to the recommendations provided in the Referenced No. 1 Limited Geotechnical
Study.
5.1 GENERAL
Based on the observations and tests performed during grading, the subject site, in the
areas noted as test locations, has been completed in accordance with the Referenced No,
1 report, the project plans and the Grading Code of the City of Temecula. The graded site,
in the areas noted as graded, is determined to be adequate for the support of a typical
residential development. Any subsequent grading for development of the subject property
should be performed under engineering observation and testing performed by EnGEN
Corporation. Subsequent grading includes, but is not limited to, any additional fill
placement and excavation of temporary and permanent cut and fill slopes. In addition,
EnGEN Corporation should observe all foundation excavations. Observations should be
made prior to installation of concrete forms and/or reinforcing steel so as to verify and/or
modify, if necessary, the conclusions and recommendations in this report. Observations of
overexcavation cuts, fill placement, finish grading, utility or other trench backfill, pavement
subgrade and base course, retaining wall backfill, slab presaturation, or other earth work
completed for the development of subject site should be performed by EnGEN
Corporation. If any of the observations and testing to verify site geotechnical conditions
are not performed by EnGEN Corporation, liability for the safety and performance of the
development is limited to the actual portions of the project observed and/or tested by
EnGEN Corporation.
6.0 CLOSURE
This report has been prepared for use by the parties or project named or described above.
It mayor may not contain sufficient information for other parties or purposes. The findings
and recommendations expressed in this report are based on field and laboratory testing
performed during the rough grading operation and on generally accepted engineering
EnGEN Corporation :::;
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
1
I
Mr. Robert W. Beazley
Project Number: T2182-C
February 2001
Page 5
practices and principles, No further warranties are implied or expressed beyond the direct
representations of this report.
Thank you for the opportunity to provide these services. If you should have any questions
regarding this report, please do not hesitate to contact this office at your convenience,
Respectfully submitted,
Z~~
Supervising Technician
SRW/OB:rr
Distribution: (4) Addressee
FILE: EnGEN/ReportingfT2182-C RobertW. Beazley, Rough Grading
~;,,, E162
Prin . al G technical Engineer
Expires 09-30-01
EnGEN Corporation '-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
I
I
Mr, Robert Beazley
Project Number: T2182-C
Appendix Page 1
APPENDIX:
TEST RESULTS
EnGEN Corporation 1
I
I
Mr. Robert Beazley
Project Number: T2182-C
Appendix Page 2
FIELD TEST RESULTS
(Summary of Field In-Place Density Test Results)
(Nuclear Gauge Test Method)
I (S. G.) = Subgrade / (F, G.) = Finish Grade
Test Depth Soil Max Moisture Dry Relative Required
I Test Date Test Locations Elevation Type Density Content Density Compaction Compaction
No. (2000) (FT) (PCF) (%) (PCF) (%) (%)
I 1 02-05 NE Keyway 1233 A1 129,6 11.4 122.7 94,7% 90.0%
2 02-06 NE Keyway 1235 A1 129.6 10.2 116.6 90,0% 90.0%
3 02-06 House Pad NE Fill Slope 1237 A1 129,6 9.8 118.7 91.6% 90.0%
I A 02-06 House Pad Bottom of Transition 1228.5 A1 129,6 7.9 110.4 85.2% NA
4 02-06 House Pad NE Fill Slope 1239 A1 129,6 12.2 116.6 90.0% 90,0%
I 5 02-06 House Pad NE Fill Slope 1240 A1 129.6 11.1 118.6 91.5% 90.0%
B 02-08 House Pad Bottom of Transition 1238.5 A1 129,6 9.4 110.4 85.2% NA
C 02-12 Bottom of Garage Keyway 1235 A1 129.6 7.9 110.4 85.2% NA
I 6 02-16 Garage Keyway 1237 A1 129.6 12.2 113.3 87.4% 90.0%
7 02-16 Retest of #6 1237 A1 129.6 11.4 116.8 90.1% 90.0%
I 8 02-16 Garage Pad 1239 A1 129.6 12.0 117.6 90.7% 90.0%
9 02-19 Garage Pad 1241 A1 129.6 10.2 119.0 91,8% 90.0%
10 02-19 House Pad Transition Area 1240 A1 129.6 9.1 116.6 90,0% 90.0%
I 11 02-19 House Pad 1241 A1 129.6 9.4 116.7 90,0% 90.0%
12 02-19 Garage Pad 1241 A1 129.6 11.1 127.2 98.1% 90.0%
I 13 02-22 House Pad Transition Area 1241,5 A1 129.6 12.9 119.2 92.0% 90,0%
I
I
I
I
I
I
I
I
EnGEN Corporation 8
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
1
I
I
I
Mr. Robert Beazley
Project Number: T2182-C
Appendix Page 3
SUMMARY OF OPTIMUM MOISTURE CONTENT
MAXIMUM DRY DENSITY RELATIONSHIP TEST RESULTS
ASTM 01557-91
Maximum Optimum
Soil Description (USCS Symbol) Soil Type Dry Density Moisture
(PC F) Content (%)
Silty Coarse Sand with Clay, Brown (SM) A1 129.6 8.4
SUMMARY OF EXPANSION INDEX TEST RESULTS
UBC 18-2
Dry Moisture Moisture
Soil Condition Condition Expansion
Depth (FT) Density
Type Before Test After Test Index
(pcf) 1%1 1%1
E-1 -1 120.6 8.8% 14.0% 11
SUMMARY OF SOLUBLE SULFATE TEST RESULTS
Soil Location % By Weight
Type
E-1 Building Pad Area 0.0022
EnGEN Corporation <<=t
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Mr. Robert Beazley
Project Number: T2182-C
Appendix Page 4
APPENDIX:
DRAWINGS
EnGEN Corporation \(:)