Loading...
HomeMy WebLinkAboutTract Map 9833-1 Lot 15 Geotechnical Report & Compaction Results I ~, r!..c" ..........,//.. . "" I ~~GEN I I I I I I I I I I I I 1 1 /1 ';1 , .. ., -- ,- -- \. .. ' , COrPoration to OO-I036r€.. . Soil Engineering and Consulting seke!lEnlZ,l{ G;Olot~ ~p~Sling -Inspections- Conslruction Materials Testing . Laboratory Testing . Percolation Testing .G. . II Environmental Site Assessments ENVIRONMENTAL GE RK DEe n 5 2000 CITY 0;:= T~~.~r.-,:,: d...A ENG:?\:=:~~~~('J i. '._'."f. i. '-''>IT GEOTECHNICAL REPORT AND COMPACTION TEST RESULTS ROUGH GRADING OPERATIONS Teschler Residence Assessor's Parcel Number: 926-221-013 Lot 15 otTract 9833-1 37120 Pio Pi co City of Temecula, County of Riverside, California Project Number: T2060-C October 9, 2000 Prepared for: Mike and Sandy Teschler 42200 Danby Street 'Temecula, California 92592 , ' " , j.... '/..... , / - \.r"" / -- \ .. , ,__ ,- -- \.... , - , - \', , ' /" - - I " - \ / \- -- , '/ .......J_~__ :. - _.,~.1 ,.....~,,,..._,,. _....... d' _,." E . !@,p,~~;~f.ircle N rt I IL?6J.5,Qiarige A e EB SITE: Www. N 1 I 1 I I I 1 1 1 I 1 I 1 1 1 1 1 1 I Mike and Sandy Teschler Project Number: T2060-C TABLE OF CONTENTS SECTION NUMBER AND TITLE PAGE 1.0 SITE/PROJECT DESCRIPTION AND LOCATION.......................................................................1 1.1 PROJECT LOCATION .......... ...............................................................................................1 1.2 SITE DESCRiPTION........................... ...... .......... ...... .......... .... ... ................ ..... .... ...... ....... ....1 1.3 PROJECT DESCRiPTION........................................................ .............. ...... .................. .......2 2.0 SCOPE OF WORK .................................................................................................. ............2 2.1 TIME OF GRADING.. ..........................................................................................................2 2.2 CONTRACTOR AND EQUIPMENT ................................................................ ........................2 2.3 GRADING OPERATiONS ........................................ .............. .........................2 3.0 TESTING ...... ............ ...... ... ........................... ............................................. ........................ 3 3.1 FIELD TESTING PROCEDURES ....... ....................................................................................3 3.2 LABORATORY TESTING......................................................................................................3 3.2.1 MOISTURE-DENSITY RELATIONSHIP TEST ....................................................3 3.2.2 EXPANSION INDEX TEST .............................................................................3 4.0 EARTH MATERIALS ............... ...........................:...:............................................................3 5.0 CONCLUSIONS AND RECOMMENDATIONS ............................................................................3 5.0 GENERAL......................... ...,...................................................................................... .....4 6.0 CLOSURE. ................ ................ ................................ ........................................................4 ApPENDIX TEST RESULTS DRAWINGS \ I I I I I 1 1 I I 1 1 I I I 1 1 ., /"C'":~ "c,-~';"'< .."c' ~~GEN COrPoration ~;I -Soil Engineering and Consulling$ervices . EngineeringGeology. Compaction Testing -lnspeclions-ConstructionMaterialsTesling-LaboraloryTeslingePercolationTesting e Geology. WalerResourceSludies . Phasel&IIEllVironmentalSiteAssessments ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK October 9, 2000 Mike and Sandy Teschler 42200 Danby Street Temecula, California 92592 (909) 695-1515 I FAX (909) 694-0126 Regarding: GEOTECHNICAL REPORT AND COMPACTION TEST RESULTS ROUGH GRADING OPERATIONS Teschler Residence Assessor's Parcel Number: 926-221-013 Lot 15 atTract 9833-1 37120 Pia Pica City of Temecula, County of Riverside, California Project Number: T2060-C 2. EnGEN Corporation, Limited Geotechnical Study, Proposed Single Family Residence, 37120 Pio Pico, Lot 15 of Tract 9833-1, City of Temecula, County of Riverside, California, Project Number: T2060-LGS, report dated May 9, 2000. Manning Engineering, Grading Plan Lot 15 of Tract 9833-1, APN 926-221- 013, plan dated April 12, 2000. References: 1. Dear Mr. & Mrs. Teschler: According to your request and signed authorization, EnGEN Corporation has performed field observations, sampling, and in-place density testing at the above referenced site. Submitted, herein, are the test results and the supporting field and laboratory data. 1.0 SITE/PROJECT DESCRIPTION AND LOCATION 1.1 PROJECT LOCATION The subject site consists of approximately 2.7 acres, located at 37120 Pio Pi co in the City of Temecula, County of Riverside, California. 1.2 SITE DESCRIPTION According to the Referenced No. 1 report, this site has been previously graded. Prior to " current grading operations, "topography and surface conditions of the site were gently sloping with surface drainage to the southeast at a gradient of less than 13 percent. , , , ' , < , ' ~ , ' ' ~ - _ J , / , ' , ' '/ " " - } F ,_ _ _ \ / ~ / " .,.,. I _ I ~ ,_ _ _ \ / '- " 'I... ,_ __ \ - 'I '- ",. I _' _ ~ I " /, I _' _ '/"'- ~,/ _~ _ " / I " \ _ _ _ \.-" I." _ _ \ ..-- " , I , ,,_ _ _ \ / "- ,. , -,-" /'~J'- "-/"-_"- , ' - , ' ,. - - I , ' - , ' -,~ ~.(.- J __ I E~~P;J:~'~lrcle N rt I ,;\!i;l.5pt?nge A e Es'SITE: www. N 1 I 1 I 1 I 1 1 1 1 1 I I I 1 1 I 1 1 Mike and Sandy Teschler Project Number: T2060-C October 2000 Page 2 1.3 PROJECT DESCRIPTION It is understood that the subject site is to be developed with a single family residence, and separate detached garage with slab-on-grade concrete floors, supported on conventional continuous and pier footings. The remainder of the site will consist of a driveway and associated hardscape and landscape improvements. 2.0 SCOPE OF WORK 2.1 TIME OF GRADING This report represents geotechnical observations and testing during the construction operations from September 6, 2000 through September 26, 2000. 2.2 CONTRACTOR AND EQUIPMENT The grading operations were performed by S & K Grading through the use of one (1) CAT 613 scraper, one (1 ) CAT D6 dozer, one (1 ) CAT D8 dozer and one (1) water truck. 2.3 GRADING OPERATIONS Grading within the subject site consisted of a cut/fill operation. Grasses and weeds were removed prior to fill placement. Fill material was generated from the existing driveway area and western building pad p.o~rtions of :he site, and used to bring the proposed driveway and eastern building pad portions of the site to finish grade elevation. Removal of alluvium, slopewash, etc., was performed to a depth of 3 to 6-feet below original elevation. Bottoms were observed, probed and found to be into competent soil by a representative of this firm. Keying and benching into competent soil was observed during the grading operations. Overexcavation was performed in the cut portion of the building pads to a depth of 3-feet below finish grade elevation and to a distance of 5-feet outside the proposed structure. The exposed bottoms were scarified and moisture conditioned to a depth of 12-inches then compacted to 90 percent. Fill was placed in lens thicknesses of 6 to 8-inches, thoroughly moisture conditioned to near optimum moisture content, then compacted to a minimum of 90 percent relative compaction. Moisture conditioning of the on-site soils was performed during the compaction process, through the use of a water truck. The pad area was generally graded to the elevations noted on the Grading Plan. However, the actual pad location, dimensions, elevations, slope locations and inclinations, etc. were surveyed and staked by others and should be verified by the Project Civil Engineer. EnGEN Corporation .3 I 1 I I I 1 I I 1 1 I I 1 I 1 1 I 1 1 Mike and Sandy Teschler Project Number: T2060-C October 2000 Page 3 3.0 TESTING 3.1 FIELD TESTING PROCEDURES Field in-place density and moisture content testing were performed in general accordance with ASTM-D-2922-81 (90) and ASTM-D-3017-88 procedures for determining in-place density and moisture content, respectively, using nuclear gauge equipment. Relative compaction test results were within the 90 percent required for all material tested, which is an indication that the remainder of the fill placed has been properly compacted. Test results are presented in the Appendix of this report. Fill depths and test locations were determined from review of the referenced grading plans. 3.2 LABORATORY TESTING The following laboratory tests were performed as part of our services during the grading of the subject site. The test results are presented in the Appendix of this report. 3.2.1 Moisture-Density Relationship Test Maximum dry density - optimum moisture cOntent relationship tests were conducted on samples of the materials used as fill. The tests were performed in general accordance with ASTM D1557-91 procedures. The test results are presented in the Appendix (Summary of Optimum Moisture ContenfrMaximurrl Dry Density Relationship Test Results). 3.2.2 Expansion Index Test A soil sample was obtained for expansion potential testing from the building pad area upon completion of rough grading of the subject site. The expansion test procedure utilized was the Uniform Building Code Test Designation 18-2. The material tested consisted of brown silty sand, which has an Expansion Index of 1. This soil is classified as having a very low expansion potential. The results are presented in the Appendix (Summary of Expansion Index Test Results). 4.0 EARTH MATERIALS The natural earth materials encountered on-site generally consisted of brown silty sand. 5.0 CONCLUSIONS AND RECOMMENDATIONS No conditions were encountered which would cause a change in the previously provided design and construction recommendations. As a result, design and construction should adhere to the recommendations provided in the Referenced No. 1 Limited Geotechnical Study. EnGEN Corporation ~ 1 I I I 1 1 1 I 1 I I 1 I I 1 I I 1 1 Mike and Sandy Tesch/er Project Number: T2060-C October 2000 Page 4 5.0 GENERAL Based on the observations and tests performed during grading, the subject site, in the areas noted as test locations, has been completed in accordance with the Referenced No. 1 report, the project plans and the Grading Code of the City of Temecula. The graded site, in the areas noted as graded, is determined to be adequate for the support of a typical residential development. Any subsequent grading for development of the subject property should be performed under engineering observation and testing performed by EnGEN Corporation. Subsequent grading includes, but is not limited to, any additional fill placement and excavation of temporary and permanent cut and fill slopes. In addition, EnGEN Corporation should observe all foundation excavations. Observations should be made prior to installation of concrete forms andlor reinforcing steel so as to verify andlor modify, if necessary, the conclusions and recommendations in this report. Observations of overexcavation cuts, fill placement, finish grading, utility or other trench backfill, pavement subgrade and base course, retaining wall backfill, slab presaturation, or other earth work completed for the development of subject. site should be performed by EnGEN Corporation. If any of the observations and testing to verify site geotechnical conditions are not performed by EnGEN Corporation, liability for the safety and performance of the development is limited to the actual portions of the project observed and/or tested by EnGEN Corporation. 6.0 CLOSURE This report has been prepared for use by the parties or project named or described above. It mayor may not contain sufficient information for other parties or purposes. The findings and recommendations expressed in this report are based on field and laboratory testing performed during the rough grading operation and on generally accepted engineering practices and principles. No further warranties are implied or expressed beyond the direct representations of this report. EnGEN Corporation -:s- I 1 1 1 I I 1 1 I 1 I I I I 1 1 1 1 1 Mike and Sandy Teschler Project Number: T2060-C October 2000 Page 5 Thank you for the opportunity to provide these services. If you should have any questions regarding this report, please do not hesitate to contact this office at your convenience. Respectfully submitted, 2~;~ Supervising Technician SRW/OB:rr Distribution: (4) Addressee FilE: EnGEN/ReportinglT2060-C Teschler, Rough Grading .'~ Os orn ratene, 162 Princip Geotechnical Engineer Expi s 09-30-01 EnGEN Corporation " I 1 1 1 I 1 1 1 1 1 I I I I 1 1 I I 1 Mike and Sandy Teschler Project Number: T2060-C Appendix Page 1 APPENDIX: TEST RESULTS .'- EnGEN Corporation 1 I 1 1 I 1 1 I 1 1 1 1 1 I I 1 1 1 1 I Mike and Sandy Teschler Project Number: T2060-C Appendix Page 2 FIELD TEST RESULTS (Summary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) (5. G.) = Subgrade / (F. G.) = Finish Grade Test Depth Soil Max Moisture Dry Relative Required Test Date Test Locations Elevation Type Density Content Density Compaction Compaction No. (2000) (FT) (PCF) ('!o) (PCF) ('!o) ('!o) *A 09-07 Driveway Bottom 1098 A1 125.9 4.6 112.9 89.7% 85.0% *B 09-07 Driveway Bottom 1098 A1 125.9 7.5 112.9 89.7% 85.0% 1 09-07 Driveway 1102 A1 125.9 7.2 118.7 94.3% 90.0% 2 09-07 Driveway 1102 A1 125.9 7.9 118.9 94.4% 90.0% 3 09-07 Driveway 1104 A1 125.9 14.4 118.5 94.1% 90.0% 4 09-07 Driveway 1104 A1 125.9 13.9 117.9 93.6% 90.0% 5 09-08 Driveway 1106 A1 125.9 8.7 114.8 91.2% 90.0% 6 09-08 Driveway 1106 A1 125.9 8.9 115.3 91.6% 90.0% 7 09-08 Driveway 1108 A1 125.9 7.8 113.9 90.5% 90.0% 8 09-08 Driveway 1108 A1 125.9 7.2 114.7 91.1% 90.0% 9 09-09 Driveway F.G. A1 125.9 7.6 115.0 91.3% 90.0% 10 09-14 Driveway 1107 A1 125.9 8.0 115.5 91.7% 90.0% 11 09-14 Driveway 1107 A1 125.9 8.8 ' 115.5 91.7% 90.0% 12 09-14 Driveway 1109 A1 125.9 7.0 114.2 90.7% 90.0% 13 09-14 Driveway 1109 A1 125.9 8.2 115.2 91.5% 90.0% 14 09-14 Turn Around 1107 A1 125.9 9.5 118.6 94.2% 90.0% 15 09-14 Turn Around 1107 A1 125.9 8.7 119.6 95.0% 90.0% *C 09-14 Keyway Bottom 1111 A1 125.9 5.1 108.7 86.3% 85.0% 16 09-14 Keyway Fill 1113 A1 125.9 8.8 116.7 92.7% 90.0% 17 09-14 Keyway Fill 1113 A1 125.9 8.6 114.2 90.7% 90.0% 18 09-15 Fill Slope 1115 A1 125.9 8.7 115.0 91.3% 90.0% 19 09-15 Fill Slope 1115 A1 125.9 8.6 114.3 90.8% 90.0% 20 09-18 Fill Slope 1112 A1 125.9 11.6 114.2 90.7% 90.0% 21 09-18 Fill Slope 1110 A1 125.9 9.3 114.1 90.6% 90.0% 22 09-19 Fill Slope 1117 A1 125.9 12.5 115.6 91.8% 90.0% 23 09-19 Fill Slope 1117 A1 125.9 13.7 114.9 91.3% 90.0% 24 09-19 Fill Slope 1119 A1 125.9 12.2 116.2 92.3% 90.0% 25 09-19 Fill Slope 1120 A1 125.9 11.9 114.8 91.2% 90.0% 26 09-19 Fill Slope 1120 A1 125.9 8.6 120.7 95.9% 90.0% 27 09-19 Fill Stope 1122 A1 125.9 8.0 119.2 94.7% 90.0% 28 09-19 Fill Slope 1124 A1 125.9 10.2 115.4 91.7% 90.0% 29 09-19 Fill Slope 1124 A1 125.9 6.5 114.6 91.0% 90.0% 30 09-19 Fill Slope 1124 A1 125.9 10.0 122.1 97.0% 90.0% *Indicates undisturbed bottom tests. EnGEN Corporation g 1 1 1 1 I 1 I 1 1 I 1 1 1 I 1 1 1 1 1 Mike and Sandy Teschler Project Number: T2060-C Appendix Page 3 FIELD TEST RESULTS (Summary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) (5. G.) = 5ubgrade / (F. G.) = Finish Grade Test De pth Soil Max Moisture Dry Relative Required Test Date Test Locations Elevation Type Density Content Density Compaction Compaction No. (2000) (FT) (PCF) (%) (PCF) (%) (%) 31 09-19 Fill Slope 1126 A1 125.9 10.4 117.3 93.2% 90.0% 32 09-25 House Pad Over-x 1128 A1 125.9 7.9 114.9 91.3% 90.0% 33 09-25 House Pad Over-x 1128 A1 125.9 7.9 115.1 91.4% 90.0% 34 09-25 Garage Pad Area 1108 A1 125.9 6.9 117.6 93.4% 90.0% 35 09-25 House Pad Over.X 1128 A1 125.9 7.7 115.9 92.1% 90.0% 36 09..25 House Pad Over-X 1128 A1 125.9 8.9 116.3 92.4% 90.0% 37 09-25 House Pad Over-X 1128 A1 125.9 5.6 114.3 90.8% 90.0% 38 09-25 House Pad Over.X 1128 A1 125.9 5.8 117.1 93.0% 90.0% 39 09-26 House Pad Over-X F.G. A1 125.9 7.5 114.6 91.0% 90.0% 40 09-26 House Pad Over-X F.G. A1 125.9 6.5 114.9 91.3% 90.0% 41 09-26 Finish Slope Tests 1124 A1 125.9 7.2 115.2 91.5% 90.0% 42 09-26 Finish Slope Tests 1120 A1 125.9 6.9 115.4 91.7% 90.0% 43 09-26 Finish Slope Tests 1170 A1 125.9 5.6 113.9 90.5% 90.0% 'Indicates undisturbed bottom tests. EnGEN Corporation '\ I I 1 I 1 I 1 1 1 1 1 I 1 1 1 I 1 I 1 Mike and Sandy Teschler Project Number: T2060-C Appendix Page 4 SUMMARY OF OPTIMUM MOISTURE CONTENT MAXIMUM DRY DENSITY RELATIONSHIP TEST RESULTS ASTM D1557-91 Maximum Optimum Soil Description (USCS Symbol) Soil Type Dry Density Moisture (PCF) Content (%) Silty Sand, Brown (SM) A1 125.9 8.4 Silty Sand, Brown (SM) A2 129.2 8.3 SUMMARY OF EXPANSION INDEX TEST RESULTS USC 18-2 Dry Moisture Moisture Soil Condition Condition Expansion Depth (FT) Density Type .'~ (pef) Before Test After Test Index (%) (%) E-1 -1 119.4 7.6% 12.8% 1 EnGEN Corporation \0 I I I I I I I I I I I 1 1 I I I 1 I I Mike and Sandy Teschler Project Number: T2060-C Appendix Page 5 APPENDIX: DRAWINGS .'- EnGEN Corporation \ 1