Loading...
HomeMy WebLinkAboutTract Map 3929 Lot 153 Soil & Foundation I I I I I I I I I I I I I I I I I I I SOIL AND FOUNDATION INVESTIGATION PROPOSED SINGLE FAMILY RESIDENCE LOT 153, TRACT 3929 MEADOW VIEW MONTE VERDE ROAD RANCHO CALIFORNIA, CALIFORNIA FOR CRAIG & TEKA DAVIS PROJECT NO. 94-45.PI DATED July 15, 1994 Lakeshore Engineering .; I I I I I I I I I I I I I I I I I I I LAKESHORE Engineering Consulting Civil Engineering and Geologists July 15, 1994 Project No. 94-45.PI Client: Subject: Gentlemen: INTRODUCTION Criag and Teka Davis c/o Mr. Billy Maxwell.Planner 31600 Railroad Canyon Road Canyon Lake, CA 92587 (909) 244-2315 Soil and Foundation Investigation Proposed Single Family Residence Lot 153, Tract 3929 Meadow View Monte Verde Road Rancho California Riverside County, California This report presents the findings and conclusions of a soil and foundation investigation for the proposed development of a single family'residence to be located at the subject site. The purpose of our site investigation was to 1) evaluate the foundation materials, subsurface and general geologic conditions at the site, and 2) provide pertinent foundation recommendations for a proposed single fami ly residential development to be located at the subject site. Our investigation included the following scope of work: 1) Performed two exploratory trenches on the lot to determine subsurface conditions, and collect representative soil samples for laboratory testing (Appendix A). 2) Laboratory testing of a representative soil sample to evaluate the engineering properties. Laboratory test results are presented in Appendix B. 3) Engineering analyses for foundation and necessary earthwork. 4) General geology and seismicity in the area and the preparation of this report. PROPOSED DEVELOPMENT The proposed development will consist of a two story single family residences of conventional construction, with driveway and surrounding landscape areas. Foundation plans were provided by Mr. Billy Maxwell, Planner. 31606 Railroad Canyon Road, #201 . Canyon Lake, CA 92587 . (909) 244-2913 . FAX: (909) 244-2987 t I I I I I I I I I I I I I I I I I I I VICINITY MAP '\ \ LAKESHORE Engineering CRAIG & TEKA DAVIS Lot 153, Tract 3929 Meadow View Monte Verde Road Temecula CA Project No: CONSULTING CIVIL ENGINEERS 94-45 Date i-IS-Qlt 111 IN ~, VI <J Z ~ .. Agure No: 1 I I I I I I I I I I I I I I I I I I I July 15, 1994 Project No: 94-45.PI Page Two SITE INVESTIGATION The site investigation consisted of a visual site reconnaissance, subsurface backhoe exploration and engineering analysis of field data. A description of the field investigation, as well as exploratory trench logs, are presented in Appendix A. Results of the laboratory test data are included in Appendix B. A description of the site and conditions encountered are presented below. SITE DESCRIPTION The subject lot is located approximately 1 1/4 miles due east of the Temecula town center in the Meadow View section. The native terrain here is part of the hog back country that typifies this section of the Temecula area. The topography takes the form of a pronounced series of low broad-backed NE-SW, trending ridges. Relief is less than 100 feet. However, slopes maybe moderately steep and drainages incised. At the site, the area is part of a new upper scale, ranch style residential development. The property itself, is considered gentle hillside, having a raised ridge crest front (Monte Verde Road) sloping down to the rear. Maximum relief at the site is approximately 30 feet. The slope angle is about 20 % to the north at the steepest (between 4/1 and 5/1). A well defined wash cuts the property in the lower north easterly corner. Ground cover, consists of a growth of annual grasses. Trash and debris are scant. SUBSURFACE CONDITIONS A total of two exploratory trenches were performed to a maximum depth of 8 feet. Location of exploratory trenches are shown on the plot plan, figure 1. The subject lot is underlain at a depth of roughly 6 feet by various facies of the sands tone member of the Pleistocene Puaba Formation. In the area of trenches 1 and 2, the proposed construction area, the unit consists of silty Sand and Clay, which is fine grained and dense in the section penetrated by the trenches (depths up to bottom of trench, 7 1/2 ft.). Lower on the slope, a third trench was dug (for septic-leach field study) and the trenching picked up a section, which is coarser and cleaner (medium grained and moderately sorted ). The pauba in this area (sandstone member), as mapped by the C.D.M.G. is described as fl uvial in origin. Di ffering aspects of the unit probabl y may be ascribed to situations in varying parts of this environmental setting. The different aspects can be expected to have differing engineering qualities. Excavations should be carefully _ substrate, which appears to be variable rather then uniform. inspected while in progress to identify the character of the 2> GEOLOGIC MAP I I I I I I I I I I I I I I I I I \ \ ,-"" (";Jot',- o,rl LAKESHORE Engineering, CRAIG & TEKA DAVIS Lot 153, Tract 3929 Meadow View Monte Verde Road Temecula CA CONSULTING CIVIL ENGINEERS Project No: 94-45 Date N - o 8 ('ol 11 " A. Figure No: 2 I I I I I I I I I I I I I I I I I I I July 15, 1994 Project No: 94-45.PI Page Three Overlying the Pauba in the area of trenches 1 and 2, the section consists of soils and slope wash material, which is fine-grained (silty sand and clay) and varies in consistency from loose at the surface to medium dense. SEISMICITY The site is located about 1 mile east of the active Wildomar Fault strand of the Elsinore Fault zone. Consequently, the setting is acutely seismic. Most recent considerations (DMG.O.F.92-l) give the Elsinore faul t zone a seismic rating of 7 1/2. Accompany maps prepared for internal use by Caltrans indicate that the site may experience a maximum credible earthquake, which could generate peak accelerations of 0.6.g. Repeatable accelerations may approach 0.40g., therefore. Secondary effects, however, should be mild because of low slope angles and location close to a ridge crest. The properly is transected by a shallow wash which may channel moderate amount of flows during heavy rains. However, at the subject lot location, flow should be minimal because of the small tributary area above (single corner lot above). ~ONCLUSION AND RECOMMENDATION GENERAL From a soil and foundation engineering standpoint, the site will be suitable for the proposed two story single family residential construction, provided the conclusions and recommendations presented in this report are incorporated in the design considerations, project plans and specifications. GRADING AND EARTHWORK General Based upon our site observation, it is our understanding that minimal site grading is proposed. Site grading will be required to provide: 1) a nearly level building pad; 2) suitable foundation conditions to support the proposed residential building; 3) adequate -5 ,. -..-- ... ....-.. - I I I I I I I I I I I I I I I I I I I July 15, 1994 Project No: 94-45.PI Page Four surface gradients for control of water runoff; 4) excavation in native soils and/or compacted fills to accommodate the installation of foundation and utility systems and 5) the preparation of subgrade for proposed driveway. After the areas to be graded have been stripped and cleared of surface vegetation, the on-site soils will be considered satisfactory for reuse in the construction of structural fills. Based on our field trenching and review of laboratory test results, it is our opinion that the surficial soils are loose and considered unsuitable for use as structural support at present. The existing ground should fist be excavated to the depth of the approximately 4 to 5 feet below grade, and the bottom scarified another 12 inches and densified to at least 90 percent of the maximum laboratory dry density as determined by the A.S.T.M. Dl157-78 compaction method. This preparation should extend at least 5 feet beyond the building footprints and/or where the limits of new fills are to be placed. Any surface or subsurface obstructions encountered during grading such as utility/irrigation lines should be removed from any areas to receive fills. No underground obstructions nor facilities should remain in any structural areas which will receive compacted fills, building foundations, concrete slabs and/or pavements. Depressions and/or cavities created as a result of the grading obstruction removal, should be properly backfilled with suitable fill materials and compacted under engineering observation and testing. All imported soils should be approved by the consultant prior to use. Caution should be exercised to prevent mixing of native or imported materials with soil s containing debris and/or organic matter. Any objectionable substance, as determined by the consultant should be stripped and removed from the property of stockpiled for landscaping purposes. All fills should be densified in conformance with the appropriate grading code but shall not be less than 90 percent relative compaction, by mechanical means only. Excavating Condition and RippabiJl!y Excavation of on-site materials should not be difficult to accomplished with standard earthmoving equipment such as a D-4 or 5. The walls of temporary construction trenches should stand near vertical, provided the total depth does not exceed 5 feet. Shoring of excavation walls or flattening of slopes is expected to be required, if greater depths are necessary. For deeper cuts, slopes should not be made steeper than 1:1 (H:V) . c. I I I I I I I I I I I I I I I I I I I July 15, 1994 Project No: 94-45.PI Page Five All work associated with trench shoring must conform to the state of California Safety Code. Native organic free soils, may be utilized for trench backfill. Flooding of the trench backfill may be permitted provided both the backfill and the native materials have a minimum sand equivalent of 30 and the required relative compaction can be achieved. Slope Stability vi A review of the site plan prepared by Mr. Billy Maxwell, Planner for the proposed deve 1 opment, indicated that no cut or fill s lopes are proposed. Grading Control All grading and earthwork including trench backfill should be performed under the observation and testing of the Consulting Engineer for proper subgrade preparation, selection of satisfactory materials, placement and compaction of all structural fills. Sufficient notification prior to stripping and earthwork construction is essential in order that the work be adequately observed and tested. In order for us to provide a written opinion as to the adequacy of the soi 1 compaction and trench backfi 11, the entire operation, most importantly at the time of trench backfill, should be performed under our observation and testing. FOUNDATION DESIGN Footings The proposed residential development may be supported on conventional spread footings established in reworked soils. These spread footings may be designed for an allowable bearing value of 1200 pounds per square foot. This design value may be increase by one third, if the Structural Engineer takes into consideration short duration structural loading conditions, such as induced by wind and/or seismic forces. Footings should be founded at least 18 inches below the lowest adjacent ground surface, for two story structures respectively. All continuous foundations should be reinforced with one number 4 bar at top and bottom and also in accordance with the recommendations of the structural Engineer or Architect. 1 I I I I I I I I I I I I I I I I I I I July 15, 1994 Project No: 94-45.PI Page Six Settlement After the rework of on-site soils, total settlement due to structural loads should not be a design factor as they should be less than 3/4 inch. Differential settlement should be within tolerable limits. ~ateral Capacity For design, resistance to lateral loads can be assumed to be provided by friction acting at the based of the foundations and by passive earth pressure and may be combine without reduction. If passive earth pressure is used, it is important that backfill should be placed under engineering observation and testing. A coefficient of friction of 0.25 may be used with the dead load forces. An allowable lateral passive earth pressure of 175 pounds per square foot per foot of depth may be used for the sides of footings poured against undisturbed and/or recompacted soils. The lateral bearing values indicated above are for the total of dead and frequently applied live loads. If the normal code requirements are used for seismic design, the values may be increased by 1/3 for short durations of the loading which include the effect of wind or seismic forces. EXPANSIVE SOILS Based upon our exploratory efforts and testing, the site is underlain by a 4 to 6 feet of moderately (medium) expansive soils. Our laboratory test result of onsite soils indicated expansion index of 60. The expansion potential of building pad subgrade soils should be revaluated near the conclusion of the rework of foundation soils. Concrete Slab - on - Grade The subgrade soils at present are considered to be moderately expansive. The interior building floor slabs may be supported directly on properly prepared subgrade. If a floor covering that could be critically affected by moisture, such as vinyl tile, slabs should be protected by a plastic vapor barrier of six-mil thickness. The sheet should be covered by at least two inch of sand cushion to prevent punctures and aid in concrete cure. Presaturation of subgrade soils to 120 % of optimum to 12 inches in depth is required. .~ I I I I I I I I I I I I I I I I I I I July 15, 1994 Project No. 94-45 Page Seven The concrete floor slabs should be at least 4 inches thick nominal and reinforced with at 1 east 6" x 6" / no. 10 - 10 we lded wire mesh. Concrete driveway, sidewalk, fire pit and patio slabs should also be reinforced as suggested above and the bottom cushioned with 6 inches of rocks or granular sand. :Retaininq walls No retaining walls are proposed at this time. DRAINAGE Posi ti ve drainage should be provided around the perimeter of all structures to minimize water infiltrating into the underlying soils. Finish subgrade adjacent to exterior footings should be sloped down and away to facilitate surface drainage. All drainage should be directed off-site via non-erosive devices. Care should be taken to preserve existing native drainage. The homeowner should be made aware of the potential problems which may develop when drainage is altered through construction of retaining walls. patios and pools. Ponded water, leaking irrigation systems, overwatering or other conditions which could lead to ground saturation must be avoided. FOOTING EXCAVATION All footing excavations should be inspected and approved by the Soils Consultant prior to placement of forms, reinforcement, or concrete. Materials generated from the footing excavations should not be spread on slab-on-grade areas, provided they are compacted and tested. <\ I I I I I I I I I I I I I I I I I I I July IS, 1994 Project No. 94-45.PI Page Eight GENERAL INFORMATION The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and practices in the fields of soil mechanics and foundation engineering. This warranty is in lieu of all other warranties, either expressed or implied. We sincerely appreciate the opportunity to be of service. If you have any questions concerning this report or require further information and services, please contact this office at your convenience Respectfully Submitted, ENCLOSURES: PLOT PLAN IN POCKET APPENDIX A - EXPLORATION APPENDIX B - LABORATORY TESTING Lakeshore Engineering \0 I I I I I I I I I I I I- I I I I I LAKESHORE I Engineering I TOPOGRAPHIC MAP -- ! , I - RE'C'" / /@/,' .,-~... '[',.' \,l. . --;---.. _'""~' .~., . 1-- -.... ~ . ", ........-- - j~,-j .. ,/ , // CRAIG & TEKA DAVIS l.ot'153, Tract 3929 Meadow View Monte Verde Road Temecula CA Project No: 94-45 Date 7-15 -'1'+ CONSULTING CIVIL ENGINEERS ~N '<I:: ~ CI Z . \\ Figure No: 3 I I I I I I I I I I I I I I I I I I I APPENDIX A FIELD EXPLORATION Field exploration was performed by using a backhoe. The soils were continuously logged by our field personnel and classified by visual examination in accordance with the Unified Classification System. Our trench logs and/or boring logs are attached for review. To evaluate the compaction characteristics of the fill material, field density tests were performed. Also, representative bulk samples were recovered and shipped to the laboratory in polythelene bags for laboratory testing. \~ I I I I I I I I I I I I I I I TRENCH LOG Logged By 15 >_ Date "j- Y-;-~ Equipment ~.4/5 ~/4e ThI&IOOlllrepreiCnlationo(tu'~Ur1ace,&OUandgrOundtllilercunditiol"lSalthetimll alJd place 01 llxcavalion, with the passage ollbnll or al i1ny olher location there may be consequential change& If1 condiUonli. Trench Number ~I .>: Ol .0 :J :J co >- co '" . ~u:: 0_ 5 10 /- "I.:. kJ.- '7.Y/ 6N~1 ~4/'- 15 20 Surface Elevation: Trench Orientation: /f//t? /~ Trench Dimensions: 5'1< g' ,K ,;!&/ Groundwater Depth: Logged By: Date /I> ,4;:./e Trench Number 5 fA Z .r:-L- ?/l'\ 8':3 10 ;;;;/, Pfl/ _//' ~ tb/pJ~ ~L /'-. 15 20 ,:0 LAKESHORE Engineering CONSULTING ENGINEERS AND GEOLOGIST ~R.1\lG, >t TEKA DA\JlS. MONTE.. \iE.u:.E.. ~h. RANc..b\O C.AuF. Fig. No. A-I PROJ. NO. f1--1~ I I I I ~ ~ CD >- CD I I I I I I I I I I I I I I I TRENCH LOG N&'>'w Logged By: F.-",. Date7-'1-'i'-j Equipment: IJAC'(HoC Thislogl,alepreaelltiitionolsubliudaclI,llO"andgrolllJdwalercondilkll1&atlheI imeandplaceolexcavation. wilhthe piI6lage of time or at any other Iocatlonthefe maybccolllllquenllafcllanges jncond~lons. Trench Number S'/,,\ 51<.:01 SAND 1o<./\(:E" CL.fH /)(Zow,\).S H C rVt'i Fo"'; ~rlAlrJf:D , , I vI{ ~ Lbo) Ii." R. 0 is AN (I B IV\S.S. SILrJ JANOS A-TJ j) CLldP/ t;llrJD.5 a,<t.v:.b.:HSI-l Gi!./l.YJ ,..Iv,'; OI$flr-JcrLl U\'IEF(E:O "I~ F.Nt.i?- LAIJEK.5 b r SA-Nj) 51LT'! 5A'KD ~ELLv"; .51\ B!:o\'\JJi~H.ceA,/ F"vr; bR.Al/v!;:/) -n 1".:DlIJIM C RA-IIJE D ,.-e 15"" (40 €~WiolD WATE~ ~ e:,fle..KFIL.L~ Sur/ace Elevation: Trench Orientation: Trench Dimensions: Groundwater Depth: Logged By: Date Trench Number Equipment: 5 10 15 20 \"\ LAKESHORE Engineering CONSULTING ENGINEERS AND GEOLOGIST cRAIG DAJLS c/o BILL'i 1V1)~)(wfLL MOlOCvJ '<J lEW Ai7i'J qLI-OI2-15_~ Fig. No, ~ PROJ, NO. CJ'j~o<-l<;,," I I I I I I I I I I I I I I I I I I I APPENDIX B LABORATORY TESTING MOISTURE DENSITY RELATIONSHIP Moisture - density information usually provides a gross indication of the soil consistency and can delineate local variations at the time of investigation and provide a correlation between soils found on this site. The dry unite weight and field moisture content were determined for selected samples, and the results are shown on the log of boring sheets. MAXIMUM DENSITY - OPTIMUM MOISTURE TESTS A selected soil sample was tested in the laboratory to determine maximum dry density and optimum moisture content using the A.S.T.M. D1557-78 compaction test method. This test procedure uses a 10 pound hammer falling a height of 18 inches on each of five layers to a 1/30 cubic foot cylinder. The results of the tests are presented below: Trench Depth Soil No. (Ft. ) Description ------ ----- ----------- T-l 0-3 Silty SAND and CLAYS Optimum Moisture Content (% of Dry wt.) Maximum Dry Density (P.C.F) 126.0 11.0 EXPANSION INDEX TEST A representative soil sample was collected in the field and tested in the laboratory in accordance with the A.SC.E. Expansion Index Test Method as specified by U.B.C. The degree of expansion potential was evaluated from measured soil volume changes obtained during soil moisture alterations. The results of the test are presented below: Trench Depth Soil Expansion Expansion No. (Ft. ) Description Index Potential ------ ----- ----------- ----------- ---------- T-l 3 Silty SAND 60 MEDIUM and CLAYS - \";;1 ~~ .4 l..(Z,A -r, D~ ~~' MAP ~~ .' - "'-b~-- i ~ .- _._~~ ~ '-1~1o.1 ft. . I . .. , . - ~ -.. tsI ~ -...... Lqr 1M J TfZ ~~) ^^~i ~(GV,,1 -~~ltii ~e ~ ~ec.uL,~~ ~1.-1F; __~A\Ml,~ ..J.tJ ~ ~ ; .' " ' f Vi' ~pOJl '1'---1 APPaox. LOCATIOIIO. BXPLORATORY TUIICII,I,.G 80TB : PI'aL:O I IVBST I GAT I O. WdlFORII8D BY LAXBSHORE (",,^ '-, ...I....I.S,aBPORT DATDJULY 1'." 1994, (P. . . 94--45 ) , . \ \ /\ /' ;" ------- --.- --- \ \. \ \ . , , ~... l / J--- ..~- .- ..~.~ ~ ----.. ~ \ ----_._---- I \ ~\. ~ --.,-:;:::::::::::.... '(-.-- --_. . \ // \ , 1 .. ----.--- . . , -'--- --~-- ---- . ~/. \ \ \ \, \ ' \1 \ \ \ \ \ \ \ \. \ i I I f I , ~' ~ " ,I / \ /' .---' .~-- . -,""'- ~ -," ". /" ,/' / -~ "'. \ a ,,/ ,\ ~ l I } I ~ i , I , . I I j i ; l I I I ( , I f I I , I , ) ./ I I ( , / , I' ........ ,..~ .~.?J ....-.-- ".- - ~.._. .- .-tt" , ______-; 1&0 \ \ \ " . . \ ~ '\..-- --' \ \ \ . r f~'7 - - ,..- ," -"! CJ " . \ \ \ \-' ---- -- - ~. -- --J -- , /- ? f,. _ \ \~ ~---;:..:.-- \ - - -' ~. ?fX) , I I I , , \ \ ---'-- ~ ,,'. ..---~ '0 ""'" .~......,.- A ,. c'rz:- /J A T ~ ra.-..,6.. ~ T-2 1:.. / ,I I ./' ~~ ," . / ,\~u / 1\ / ,,\CI) . / '" / /// ,;,{C "A ( ""-,- " .... " ......-..... - -~...-- ... . --~ -- -- --..-.... . I / . , t .' ! i ! I :' I f ' ,~ ji I '1')1 , t I! f I J. ~ - , 4". J' ,I: .',l /// '.... -,.- C,:)t.JV I' ~ : '- J' . . I It. f /' 1'\ I' " ! /' /. 'i ..- ~i, :'..f' :I~i ~---: I i ~ -------- /' r ~~ ~ '. ~--------- /, _ ---~ \ .---......-J,.' I ...--.:'" .-. . -, ./ , I i I : '1 I .: I . /,/ (f Ii . I "- " :' . F / II ',,- , ' # : I .!~r - .---- - . - . - .. --- -' -.-'- -tt';----- ! / i / I i ( I ,I I ' ~ CJ u,... . --.,CIl:lo "'- ... -, .. T--l ..... W<'~~ IJ.. ~ ~e:-~;~JCe" .... ~ ---~ r,~ ~ 1.I~.7'? '7'~~ , ..~. ~ .~f--~~'------ _ _w._ , ........ . ",,:-'" , "'-- ~_ . yJt.. ..A- " ~ . " ~.- . ~ ~~--- -- .-- .- . - -.. ...--_. -- --..-...- - - -...... --~-- .. .- -....--- .---.-.. .. .- --~- . --,------ ~....._'-...._~ " .' .... ,j'\ '~ ."'- ~ ~.....................'1IlI" . ------ _.. .:b,~ ~o~!~ ............ ........-~.......... - ..." .... ""...... '- ---- -- .........- ~----. -- , I / Z- ~z; .::0," . - ... ........ ....-... " -.-...-. ._"~, --- -_. = =::::::=:= ~'~~~r=__ , . ...... ~.:.;- I , __. "---' .............; -- '. ~ -.------- --.~.,-:..:.::.- ..~,',.,~,..-F.,l ,'~ U . -- - t r ~.~. -..-..i .- . . '.~~__ 1/;,' s 1 ~CI .. G?._' ~ -- -. -.. "'~. -. "- ./ l" , -<.". lJIl (f " (1.-/ t r1 ~ w'" f",' ; J.:..t _.~~-- ~~ I ....,. '4// ~.:,t "'~, J/!}' " J i I ! ! I I ---I I I I / J I f "'-{'- - I J I I I -I I - '-J - , j jlj J c) i .] I .. l!,J '" J[ , J'. 1 , \i\ '- ,iX ~'l1.1 ,f : I t. ~ ,." / , " : " :'~~~,: .... .'. , ".:* .~.~. tr 'If .: , "- ---- '~ --'r i \ I va Z o ! > III * )II( 'f I ; .. eft ..J C > o c t c &t .... z ~ o c w w Z - .., z w ;' .j -.., I I , IE . ; III · 2 i '2 u ~ ,. , i ,< ..I.., . D. c" · f: ..I · I -' ~~ III w. ~.: :~, :II . I . )(~' c" C '1 I &i . .. ... I ~ i i I ; .' ,'l~ > f.;~~. ! . , / ,/ ,I / -., .. 'r.... ' '1 .-' 1. ' , I, \!' --- .) .~ 0 ~1 \U J.. ~~ V\ :!- , .-:r ~J ~ 'i. -~ ~ ~~ ' . : I ;t ~ ~~~ z . ... . i ... c : : I i tn3' i ' I. -'\ I \.:!I _~"I~~~ ~ ....', / '~ '. l~,~'" ~~,. ~~j!,Y "t", "J ,\=. j ~~~~~ ~"- ~~. ~'# ;:-. " I,_~_~; '- :~.ti~)t~Jk"" - , " · , '. \;;. . ..~. ~ '~~4 ;;, ~~ J" ' .-.-;:-- :Y... \I' ... .. ":...~~... . .'_ 'III ;;. :>,.,,,, lQI;.I' ____ .: ."........ ... '" ("I,.,." ~ .,"'- . ',' 'to / L ,-- -r-- .,. O'l, sr .:r "~L ~'~~~~"_'~'. ... - - - - -- - '- -..;:r.. - - ....)- - .. - - - C - - - - - ~' I., ,\ ,; rl'Sl;- Y .' \ ~ 'II,' . l 'l ~:!i" I ~' .,J;' .y".. \ "'" ~ b . . S' _.. .~ '" / :..tJj..';'" \~,. . "" ,. '~-'r. Li:'I ~,.../ ' / ,:,1 I .\ ~ V ~_ - ~r ;-' """H. ~ ~ ,.. /" ,)16\ I." ~. ,~'~ ~ l.;)~ ~_..p/ ~/'\~ t. r. :...~ __\'.~ "IJ, . I q -'" '. \ ., .~ . "(0...... 'O(~: ' ..,",'~ ,.--;- "J _ _ t~:,- _ _~., _ _ ~~.': ~~~~ _ _ l. ,.- c - - - - - - - - - - - - - ,. - · ,\', . ,~ .._D~i T E,.,I; ~ A' \ '\ ',> ~ i:: ~>~ .> r -.. \.", ,', ~.' l ,"~""" . ~ ~;-: .....' ".. ........---:--- , . . , ./". .\ ~ ' ~~, \ , ".., V ~ y :e.:,~. ---.,-. , .~) . ! ,.-;,. ~ '\ ~ .-- .~-f!1 ,..~'.... ,... .. " <<h --'- ~y .T, Y""~ ....1 " ".-:..... ",') ,~.. ,. ,oJ'~' .' . A_ I ""';.'f .~.' . ' - . , .. '.':' .- ~ .;..L--: /.- , . _._.;: _ _ ~ .}!:.. ~,:-"_ ~.,-1'... --~---~ - ."... - . --- - - .'~ . ~.,.-, ,", . ''',- - -- -.. ....,. ~. \\"" . ~*/ . ';'- .----~.:. ~.. . ;~-:~:~ . .~^. ~/ .~. . ....1 I., ~. :~_ ..~,.~ '~-~ . ...' \ .~ ~;y....',: ---(0: "\;:\~~~ ,. ~\" - ~ " i'/ ~.. ~"-7 '..... I ,j,,( - ,/ . ,- "j I .;"" / - "...,..\,~..,' ~', ~ ~ ,to' ~:.~. I _I ... ~ ,;,,~, _ \ '.. ~ Ii , /' - -- - - t"~ -~;. - - - =....> - - - - _.' - -, _ - _~, ~ \_~: . ~_ ~__ " .' :, . ~~ -.\ f'," . ,~J- ' ;. , ~ - :7~.'~, .... . ~ .- -t ~ ,'- . '" \ f,.:J - - ~ '. 'l:~' \ \, -. , .. -, ' \::v-- "".. '."l., ~ -\"1 ~ \.. ~ ~ J -. - J - j' - ~\ - f ....,..~~-: ;,~) ".~I" \'-~ i ~, ~ ' .. .' :~~ li. R/ j,{ E'II5T1U6 to" lORB FAtE - ( J [SAULJ SAM VELOCITY Rl17f/CER ') T . Jr "'i: __,~ ~ ~ ~ \~ ~ )01:\ ~ ~ ~ ~~ ~ ~~~ \) ~ ~ 4J ~ ~ ~ .....- EROS/illJ ~f}AJrRIJL FROM R/IJ TIJ EXI..STIAlb LLJPB u,r:s. VICINITY MAP (NO SCALE) ,.., 1 f~:; ';J ! r ~p '~:OBAb5 - / ~ ..~ J.J" _t '101 \ ~~ . ~ ~~It~' ~y , ~ ~ ~ ()D,. D"E.'~~ - .~ ' p. ~ .;. f ~ '-' \ 1.-\. /)~. \ \'). , f1' . '!1 V\-, fl\~o. ______ Z v ~\ ",,:t..C ~ ~:.:f..tJ e-1"J'l-{ \... ::------:: ' ---, _ - .) -.. ,C; <( /~ c;.t:-"\...~ .:I" cJ' '\lP- , ' ~ -:1 '" ' f' J1 ~ ..-, -,--- - -- "~L'- ~LoPE- : N ~ " ~~~J'~ ~:~~ - :V>0 Ls:tTo'O:I) _ "', / D.io~ ~~ 117<< ;~~r ," 't I; ~1 J/ ..' >~ . ~ \-./ ~ .~ ~ I y " . <~" .".v I ~- ^ -~. - - . - \" t i 1:---1, I", r7K-'S~AL~ I" "'....-t7: ~~' I -21' ':- I , I, J' 11 \ ,. ~ J~ ~.I. ~ , ~ I 51' -, ':- l ~ I u.I-~ _~ 1:, ~ < 1 .,Q. I'lLL PAD El-E'II. Ilq.2.5U'."- t; it E JJ .......... ~ F.F. ELEV. ....- _I .. ~ i, / . :;n' r I' _ zs' ~ .~ ~I()'! ...J ~ :' ~I:"..:<t j ._!> t,A~ .~~t-'~r;0 //";,. ,. " I' ~ l - l ~ lF~..&t..a _ . b.. - ----".., r--......J I. .... L FOaL", II'll.." ' ~ .., l't ~.., ~ ..~, . I' 1." EI~! , .', ~ ~~'#. \ I '" --,of ~ ~.:. NA.1~ ~. 't..~/' .\-6 ~''''. ".1 ~ : '~ . /' ~ "'9'"' 11+' ~ '10' V. L~ . - - -".- ~., S\.O .. . - \, . _ ~~, - . - _ _ . ~- ~..,E.; ~ . ~ ~.. '.:.\\~ ~~ -' - . . - 11..lo/, . - ':' . - . e.l\>" 1\-t1U'- ~ /'. ' ~ ' · . ~ ~:rD e. ~ (.1"1.') " . - - .; -01t\d~_., ~c... ~&bl'A _ _ _ - -, ' / -- - O~...... ~ - - - - - Ji}.~ - - c;..",O _- . ~ -- .' ~ ~. . ... ' · -' - '. . - ~~. I · ~ " Nfl . '. FU..I'-s. (j.I~ -.' -&! . V; _ _ / - -' -rw,..~ 1"L"~________ '. .z.,.1~ _ fj~~ - - - r-F~ '1.~ " 'I' (O'1'7J~'!~ O'O'E~ -' .J .' ~ CAru &.ox.. ~ '3~.' .... .. {o-,,' -; 0' ...., 0'7'2' to , ;54J/O BAl:.!l ""'" >'!":. ~ - L/t~c:An;l .\J ~_. (E '", 7 ",.., o'n ~t1 - 'TYPo) ~ ~ /' ~~~ -.> - ~1 \ ~.", 7 110' S'1 O."'....Q &-{.... . . ~ V " S;: (O-! 9 J 1,1;' ~ 0'''''' to ~Il'" '^ ~~.. /' . ~__ W~ 1 '~ . '''~--sr-~\(~'O-5') ~'.s, O'Q1+-C7 o ~l ,~~ '- a~~ iOX N.l ----- ...-.~"L<i' ~~ 1\.... ') CM:~Te\ ~ . lnf17 l -&', . -;r1V:l 77"7 . r - - -.:s " 0 . 00.. C7 V~\..O\ - .~;:/- ... ~ 0,. ~ -9 ~ l ~". 3Ir>>'\ 3lNa'4.l~') I J', t. ~"- f!.. - ~ r <1 .. 0 -. <l -~ r ~ ~ ~ . Jf I I I ~ - a ~1 0 (P\,l, J."~ .'01+\ ~~ (0' ".. -; I' .1J. "0 +1 ... 9..... ') _ IS! ~L ~O..' ~-I), . ~ ~7 p,.."LJfrt.~!.... ~ ~~'z~Qo~~~~~1.+ v::'Y i ~ ~ ~ \J ~ ~~ ~ ~ ~ I! ,5AAJD BA65 t:..O/l1.rDUR5 ~I..I._ - \ ER05/IJ/IJ e.OIJTRIJL FOR OPIVEJ..I,4 Y N.r. 5. SU4LE 5AAJDBA6 VELO~/TY REDLlt.ER5 M.T:S. ,~ \ ~- ,. \. .. 'I; ,~\ _ _ d I '~ -~ ,., ~ I (j 1I1 - - ...., - LurJl~l '-J EJ(l5T. IR.E.~JO ENl:.E.. - - '-.J '.J --- uJ ':1. "<t ~ ( 11.3_J ............ " - ....... I:. 11'*'0) j~ ...... ~ I I ~Z.l ;v II) ~ " ~ll Jll Q,. L Il~) . ~ /;J'V J! <l '! "'Y .,:) ~ '" f-~~ 0 . VI x '../ ~ ,-" 4., ~ L \I 't'- ) L\\",6) - ~A ~ ~ I 2 ~ ~ ~ ~ L\\SO) -- '\. '? ~ .~ \..--0 L\\S1.)- ~fi> '\ :< (,t--~ ~~~ ~ c:> <'s r ..:)' .. ~ LUS') - - Lit S' ) l n~&) - - - ( ,,",) - - l Jt6.L)- ~ L'~ - -- ~~, - - - ~ - ~,-,. ~ \'>~ - ~~-- LIl'-L\.. ~- - ,~ -....... ~ L II , a) ~J ~~ ........\. . t Jl-" - \19 ~7 .~ ~ T--E------V EROE : R 0 A D,I MOM!: ~ti ~ N ~ ~ ~ " - ~. jJ PE.t\JlA fl'. -:: .- -. Undergrowtd s-Ytce Alert ~ . \ ~ ~ \!j ,-, ~ '-.J !A ~ a " ~ ..., ~ ~ " lJ J < ~ v1 ~ , tt "2 <J ~ \J W V1 j - ~. .r.-..... ,Cfrl~ · NOtE', '5E.'\'lL ~'i~'EW\A DE~bl\.l SUoWN H'UEO~ IS APrf<<juE~ AND LON~"'t~L\L-\EjJ pet...- SE:f~E Calt TOll FREE 1.800 422-4133 I ~ <1 '" ,... a - TWO WORKING DAYS BEfORE YOU DIG CONSTRUCTION RECORD DATE BY RE VISIONS ACC'D BENCH MARt< \E Al \ L Al l ~ COfttrec tor Horllon tai ~ ~tor SEE NOTE ABOVE I' · Z Q' ~- V~r tlCQl ... c..-. ~__-THFT .- CONTOURS .. Dt'slQnpd By ~-l ElM E R 5.liI1ll_L! (5.1l.ili PROPOSED ~ BEDRuOM RESIDENCE ',EPTIC TANK SIZE OF 1200 GAL. REOUIRED LJESIGN kAlE Of oU MiN. /lUU LJAL. trrlliti4f r' L t\ U ~\ I I EACH LINE REO.; 28~ LINEAL r r, ^ 5 fT, WIUF 'WIIH .5 fOur RULK BurfOf1 P L U S 1 U 0 t t \ PAN ~ l U j,j ,~ ~ t A , I EFERENCE REPORT; SE'WALJE DIjPuSAL FEA~ibILllr Kt~Ukf LLJT 1)5, IK, )IJ'!lj MLAl)uw ~ll'f1 ~r~lA ~l t j N T EVE k 0 t. R 0 AD, R I v t R S 1 LJ t 1/ U U N T y, LA A ' P . N. lj ~ 1 - 1 ~ 0 - U 1 1 I ~ I P 0 R r 0 ATE D J U L'( 1 4 I 1 'J':1l1 (t-), N. S it 045P) /40 r E : SEPTIC SYSfEM UESIGtJ -ldUWN HlktlJN I~ LUr~..llulKtD APPRuvlD u( ENVIROMENTAL HEALTH AND TO BE CONSfRUCfED PER SEPARATE PERMIT. JQURCE Of TOPO; lAKlSttUHl ENGINEt.RING lu~O ~U~vt'( VAIt. AUGUS r 29-, 1994 I SCAl E 1" - 20' ANU 2' CUN r aUkS H AN C H U l A LIt. W A I E R U 1 ~ I HIe I HAP N U . 1 'J 1 100 SCALE ORrHO PHoro MAP, 5 FOOT CONTOUHS. (~'lU M4) l~fERlNC[B~CHnAHK: RtF. NO. f-j-~l RIVERSIDE CUUNr~ DlSIGNAfION 4.3 MILES S.E. Of TEHECULA ESTABLISHED - RIVERSIDE COUNTY SURVEY, APRIL b, 1~81 ElEVAIION l089.859 (DATE 9-13-82) l (6AL_ Df.S.CRIP I IOtt~ Lor 1~) TRAcr 592"L IN THE COUNTY Of RIVEHSIUE, CA. A.P.N. ~2l-120 011 29760 MONTE VlkUl HOAD TEHECUlA, .RIVERSIDE COUNIY, CA Yl~Yl ~l IE A1H1RfSS: CLIENT; CHAIt) ANU ltKA DAVI~ 31362 CORTE TUNAS, ItMElUlA~ LA ljl~ljl ('J09) b<<J9-l~lb PLAN PREPARED BY: LAKtSHUHl ENGINElHINli j1606 RAILROAD CANYON RUAD, CANYON LAKE, CA ~258/ (90~) 244-2~15 fAX. (YUYJ L44-2Y~/ SOIL l:.t~\.I I NU R: LAKlSHOHl ENGINEERING 31606 RAILROAD CANTON RUAD, CANYON LAKE, CA 9258/ SUiL AND tuuNUArIuN iN~t~' 10AII0N HEPUHf DAfEU JULY 15, 1994, (P.N. 94-04S.PI) (RE\,'l<;lOtJ SEP1. :'1.'l't.) SUiL RleUKl: F.G. t . f . F.L. tI.P. F.S. P/l - -- LlJiEml_ INDICArlS f IN15HtU liHAOE tLtVAt tuN INDICATES FINISHED FLOOR E.LEVATION INDICAIES FLO~ LINE ELEVAIIUN INDICATES HIGH POINT ELEVATION INDICATES fINISHlD SURfACE ELEVATION INDICATES PROPERTY lINE INDICATES EXISfING GRADE ELEVAIIUN. INDICATES EXISTING CONTOUR LINES (tI'-&) ---..r-- INDI~ArES PROPOSED FINISHED CONIUUH LiNt --. --...INDICATES DIRFcrrON Of FLOW (SWALl) II--"-HINDiCAIES rkANSllluNAl CUI/t-1Ll tiNt ~ ~ANDBA6 VELOC.ITY JeEDUlER JJOT€'. bRAVE'L BA6S ARE E'AJt.tJJJR.J&E'LJ t)VER THE . USe PF ~AAl[)BAb5 AVD HAY BE EE~l//REO !Ai AREA5 HH/~fI APE PAfflt.lllARY $EJ/S/T/VE ro 5EOIHEA/T DEPOS1TJIJA!. <(~OfESS/~~ ~<\) x.. ~ y 0 '1t< ~ ~~ Q~ CI) ~ - ~ <.!>~ I (11 W (T1 0:: #37442 ;u * * <P".x ,~ -</~ C IV \ ~ ~~ ~ OFCAL\~O lSIIMJED EARTttWORl.. QUANU_Ill5. tCUlU~_YAlWS) cb CUTS: 4-21.0. tILLS: I"PORT: EXPORT: U 1..1.0 cP. DRJu"WA~ ~u1\; <. \0 O~\"E\U~ FIW: ~ 10 - F'.;:j . Drnwn By Ol\. ' ~ ~- ~ C her kpr) By ~ ~ : 'i M M ~ ".: H [J B '( - Plans Prflparpd ~JndE'r <:;uppr''/'<;Ion Of 81 !oIl" 't-, Fe.~ ~oN6.. R,C.E, No. 31&t'+z.. . A( i f P' ~:' A '( DA r ~ Do te p~rNf.lPAI. fN<JINf f~, . UR l I r v [Nf.JINf f f;l ~M6~.b A. LAS.E'1 ....1880 :3' 311' I.. ~ l /Ilplr~s E )(pW".~ b ~~O l" R C [ No : 14. 19. 20. 21. 22. CITY OF TEMECULA EROSION CONTROL NOTES 1 . Erosion control is required for grading operation during the rainy season from October 15 to April 15. Approved plan is required for all rough grading. 2. In case of emergency, call of (RESPONSIBLE PERSON) (FIRM) at (24 HOUR PHONE NUMBER) 3. The E1esillA Civil 15RlliReer will 81lf.Jer"ile erosion control '"or''' en~ ~ns"re th"~ :;:r is in eCG9rdance with the appr9ved plan {if required by the Oepartmen f Public \"1 . 4. Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of temporary devices when rain is imminent. 5. Devices shall not be moved or modified without the approval of the Department of Public Works. 6. All removable protective devices shown shall be in place at the end of each working day when the five (5) day rain probability forecast exceeds forty (40) percent. 1 ~ ! 7. After a rainstorm, all silt and debris shall be removed from check berms, silt fences, and desilting basins, etc. 8. Graged areas 8rg~nd the tract perimeter must drain au'a',' from the face 9f slope at the conGIt:Jsi9n 9f e8Gh ~lorkiR6 say. 9. Tf:le Develspcr sRall BO rcspeAsi13le aREi st.l'all take AeGeSSar~; preealiti9AS te pre"/eAt Ju::.Blic trespass 9r:et9 arIas U(here impoYRded 'Alater creates a ha2ardous conditioFl. 10. OesiltiAg 1388ins ere te ge Q9R8trWGte9 a8 gradiRg of indi"idual grading areas are complete per roygh gradiRQ plan. 11. The Department of Public Works reserves the right to make changes or modifications to this plan as deemed necessary. 12. Information on this plan is for erosion control only. All other information is subject to change. 13. Temporary erosion protection is required for manufactured slopes prior to permanent planting. Areas shall De maintained in such a stati that fire access shall maintained at all times (including access to ncighB0riAt) prst9srtiss). 15. struction or disturbance of natural drainage courses or existing storm drain inlets occur dunn ining season, unless adequate temporary/permanent dr .... acilities have been approved a,.~ ~ . ~ lied to carry surface water to tho est practical street, storm drain or natural water course. 16. The Developer shall conduct . ....,.. _rations in such a ma '" un at storm runoff will be contained within th . ct or channeled into the storm drain system mL' .L serves the runoff arCUlI.,- ~..orm runoff from one area shall not be allowed to divert to another rurnH.i 17. Conformance with the requirements of this plan shall in no way relieve the Developer from his responsibilities to this site and adjacent properties. Temporary erosion control shall consist of, but not be limited to, constructing such facilities and taking such measures as are necessary to prevent, control and abate water, mud and erosion damage to public and private property 8S a result of the construction of this project. 18. Slopes constructed prior to October 1 shall be treated for erosion control prior to October 15. Slopes constructed after October 1 shall be treated for erosion control as the construction of slope progresses in increments of 25 feet or less measured vertically. Fill areas while being brought up to grade and during periods of completion prior to finaJ grade, shall be protected by various measures to eliminate erosion and the sittation of downstream facilities and adjacent areas. These measures may include, but shall not be limited to: temporary downdrains, either in the form of pipes or paved ditches with protected outfall areas; graded berms around areas to eliminate erosion of fill slopes by surface runoff; confined ponding areas to desitt runoff; temporary check dams in toe of slope ditches to desilt runoff; protection such as sand bags around inlets which have not been brought up to grade; and earth berms and appropriate grading to direct drainage away from the edge of the top of slopes shaH be constructed and maintained on those fill areas where earthwork operations are not in progress. :r 9JJ 91 Q~t ,br9\f.' dit~he&, '.'bere req' aired on the plen. ,t-,ell be con,t'. acted prior to exsgg9ing twel':. (1 2) f88t 91 G~tme.8Yr.9 vertiGal'y. Clearing and grubbing should be limited to areas that will receive immediate grading. Erosion control measures will be required to protect areas which have been cleared and grubbed prior to grading operation, and which are subject to runoff during the period from of the rainy season. These measures may include but shan not be limited to: graded ditches; brush barriers and silt fences. Care shall be exercised to preserve vegetation beyond limits of grading. The De"art",eRt af Puhlie Warks' apprevsl af plSAS dess Ast 'elie"/e the De.Jels'8r fre", respeAsillility far ,tile 119rrellt~~ of errw ,RCl Qmi8.iI~A di.G~'er.d duriAg ::.~~~~5' ~~: requelt, the reqUIred plan re\.(lllonsshall be promptly submitted to the D r- P b 't\.(erl<s far apprO\lal. P~!YATB ENGI~EER '_~, _~~T !gg PIQ_~Q~TM~TOR The.ttx1stence and location ot any underground util1tie::l or :itructures shown on thesa plans are obtained by a sdarch of dvailable r~cord~. To the b.st of our knowledge there are no, existing utilities except thos~ 3hown on this plan. The Contractor is required to tdk~ <ill precc1utlonary measures to protect the utilities shown and any other 11nes or structures not shown on the.. plans, and is responsible for the protection of, and dny dam.ge to the.. 11ne. or structure.. Contractor agree. that he shall as.u.. sole and complete responsibility for the job slt. conditions during the course of construction of this Project including safety of all persons and property: that this requirement shall apply continuously and not be limited to nor.al working hours: and that the Contractor shall defend, indemnify and hold the Owner and the Engineer harMle.. frOM any and all liability, real or alleged, 1n connection with the perforaance of work on thia Project, acceptinq for liability aristng fro. the ~ole negligence of the Own~r or the Engineer. CITY OF TEMECULA - iQI ~ DlPARTMENf JF PuBLIC 'wORKS Dr 0 wIng No. EROSION CONTROL PLAN LOT 153 TRACT 3929 Sh~~t l of' ....... .............. -