Loading...
HomeMy WebLinkAboutTract Map 21674-3 Lot 1-43 Geotechnical Report• PACIFIC SOILS ENGINEERING, INC. L.A. COUNTY OFFICE 1402 W:240tb Street 7370 OPPORTUNITY ROAD, SUITE "N", SAN DIEGO- CALIFORNIA 92111 Harbor City, CA 90710-1307 TELEPHONE: (619) 560.1713 (213) 325-7272 or 775-6771 ORANGE COUNTY OFFICE 17909 Fitch Irvine, CA 92714-6097 (714)863-9118 Gentlemen: This report presents geotechnical data and testing results per- taining to the completion of earthwork for tract 21674-1, lots 1 0 through 43, inclusive, Kaiser Parkway (station 192+53 to 207+65), Rancho Vista Road (station 148+15 to 150+68) and a portion of tract 21675, located in the Rancho California community, County of Riverside, California. This grading was conducted from September, 1988 through January, 1989. Data developed during this phase of project grading is summa- rized in the text of this report, on the enclosed 40 -scale grad- ing plans (sheets 1, 5 and 13 of.15), prepared by Robert Bein, Mesa Homes 28765 Single Oak Drive - Suite 100 Temecula, CA. 92390-0295 May 4, 1989 Work Order 400095G Log No. 470423 Attention: Mr. Bill Richardson, • Vice President, Construction Subject: Project Grading Report for Tract 21674-3, Lots 1 thru 43, inclusive, Kaiser Parkway (Sta.192+53 to 207+65), Rancho Vista Road (Sta.148+15 to • 150+68) and a Portion of Tract 21675, Rancho California, in the County of Riverside, California Reference: Geotechnical Grading Plan Review, Tract 21674-1,2 and 3 (Margarita • Village), dated June 18, 1987 by Pacific Soils Engineering,Inc. (W. O. 400095) Gentlemen: This report presents geotechnical data and testing results per- taining to the completion of earthwork for tract 21674-1, lots 1 0 through 43, inclusive, Kaiser Parkway (station 192+53 to 207+65), Rancho Vista Road (station 148+15 to 150+68) and a portion of tract 21675, located in the Rancho California community, County of Riverside, California. This grading was conducted from September, 1988 through January, 1989. Data developed during this phase of project grading is summa- rized in the text of this report, on the enclosed 40 -scale grad- ing plans (sheets 1, 5 and 13 of.15), prepared by Robert Bein, • U Work Order 400095G Page 2 May 4, 1989 William Frost and Associates, Table I and Table II. Also pre- sented herein are the foundation and slab design recommendations based upon field and laboratory testing of as -graded soil conditions. • All cuts, fills and processing of original ground covered by this report have been completed under our observation and/or accepted by this firm and are in compliance with the County of Riverside grading code criteria. • Compacted fills were placed on tract 21675 for support of Kaiser Parkway (station 192+53 to 207+65) and Rancho Vista Road (station 148+75 to 150+68). Cleanouts of alluvial soils were • conducted prior to the placement of compacted fill. At the time grading is complete in tract 21675, a project grading report will be submitted for this tract. • Completed work has been reviewed and is considered suitable for. the construction now planned. All slopes are considered sur- ficially and grossly stable and should remain so under normal conditions. owing to the granular nature of the on-site mater- ials, graded slopes will be subject to ravelling and a fairly high erosion potential. Landscaping of all graded slopes should be accomplished as soon as possible as well as establishing and maintaining drainage berms and swales for long term slope pro- tection. • • PACIFIC SOILS ENGINEERING. INC. �/' • Work Order 400095G Page 3 May 4, 1989 • ENGINEERING GEOLOGY • Surficial Units Surficial units encountered during grading include soil, alluvium and minor colluvium. The soil consists of a dark to medium brown sandy clay to clayey sand. This unit was stripped from or benched into Pauba Formation prior to fill placement. The alluvial/colluvial soils consist of light to medium brown • silty to clayey sand. In shallow drainages, these materials were removed to Pauba sandstone. Bedrock Unit • Bedrock underlying tract 21674-3 consist of a light brown to red -brown clayey sandstone assigned to the Pauba Formation. The Pauba Formation is generally massive and flat -lying. Infrequent pale gray to brown sand lenses and brown micaceous silt beds • occur within the bedrock sequence. The sands and micaceous silt beds and lenses are not cohesive. As -built contacts of sand and silty sand beds in large cut slopes are shown on the accompany- ing grading plans. • Faulting Faults and shears were not found during grading of Tract 21674-3. • Subdrains Subdrains were not recommended in the referenced preliminary report (Reference ), nor were deemed necessary during project • grading. This is due to the granular nature of on-site geologic units. PACIFIC SOILS ENGINEERING. INC. • • Work Order 400095G May 4, 1989 Page 4 Corrective Grading Corrective grading such as buttress or stabilization fills were not required. The cut slopes on the south side of Paseo de Las Olas (sheet 5 r of 15) exposed intervals of sand which may be subject to ravelling and erosion unless properly landscaped to protect the slopes. It is recommended that the landscaping procedures described in the referenced grading plan review be implemented • as soon as possible and maintained to prevent and minimize slope maintenance. Conclusions • From an engineering geologic viewpoint, lots 1 through 43, inclusive, of tract 21674-3, Kaiser Parkway (station 192+53 to 201+65) and Rancho Vista Road (station 148+75 to 150+68) are suitable for the intended use. • C 0 • I PACIFIC SOILS ENGINEERING, INC. • • U Work Order 400095G May 4, 1989 A. PROJECT GRADING SOIL ENGINEERING Page 5 • 1. Compaction test results are presented in Table I and approxi- mate locations of tests are shown on the accompanying 40 - scale plans by Robert Bein, William Frost and Associates (sheets 5 and 13 of 15). • 2. Cleanouts were accomplished to bedrock or native soils deem- ed competent for support of fill. • Prior to placement of compacted fill the exposed compacted fill surface was scarified, watered as necessary and compact- ed in-place, to project specifications. • 3. Fill consisting of the soil types indicated in.Table I was then placed in thin lifts, watered as necessary and compact- ed in-place to a minimum of 90 percent of the laboratory standard (ASTM:D 1557) utilizing self-propelled rubber - tired compactors, sheepsfoot compactors and heavy earth moving equipment. Each fill lift was treated in a like • manner. 4. Fill placed on slope gradients steeper than 5 -horizontal to 1 -vertical was keyed and benched into bedrock. The upper soils were stripped off or benched out on the shallower slopes in such a manner that all compacted fill is in con- tact with intact bedrock an0or competent materials. PACIFIC SOILS ENGINEERING. INC. 16 • Work Order 400095G May 4, 1989 • Page 6 5. All removals, excavations, cleanouts and processing in pre- paring fill areas were observed by this firm's representa- tive prior to placement of any fill. Based on those observa- tions, all fills are deemed to be supported by bedrock or competent material. • 6. Compaction tests were taken for each one (1) to two (2) feet of placed fill. The maximum vertical depth of fill placed at this time is on the order of twenty-eight (28) feet on • lots 35, 36 and 37. The approximate depth of fill on individual lots is summarized in Table II. 7. The cut portion of transitional lots within structural areas • was overexcavated to a minimum depth of 36 -inches and replac- ed as compacted fill. This occurred on lots 1 through 3, 10, 12 through 15 and 41 and 42. • 8. The fill slopes were over -built approximately four.(4±) feet during rough grading operations. Upon mass grading completion, the slopes were trimmed back to the compacted core to achieve design grade. • Finish slope surfaces have been probed and/or tested and the slopes are considered to satisfy the project requirements and grading codes of the County of Riverside. All slopes • should be planted as soon as practical and maintained for proper growth. Landscaping and irrigation management are important elements in the long term performance of the slopes. • PACIFIC SOILS ENGINEERING. INC. 0 • • Work Order 400095G May 4, 1989 Page 7 9. Cut slopes were examined by an engineering geologist and are considered grossly and surficially stable. B. PROPOSED DEVELOPMENT • The subject tract is scheduled for construction of forty- two (42) one and two-story single family dwelling units, which will be constructed utilizing wood frame and slab -on -grade construction techniques. Conventional spread • and continuous footings are to be utilized. It is anticipated that lot 43 will be used as a "tot lot". 0 • • • • • C. DESIGN RECOMMENDATIONS Material encountered in cut and utilized for compacted fill ranged from very low to medium in expansion potential. An evaluation of the post -grading soil conditions was conducted to classify materials per ASTM:D 442 and to determine the expansive index per UBC Standard No. 29-2. That evaluation revealed predominately very low to low expansive materials exposed at the surface of each building lot. Laboratory test data is presented in Table A. TABLE A Lot Hydrometer Analysis No. (%Sand,%Silt,%Clay) Very Low 1-4 76 14 10 5-9 70 21 9 10 87 9 4 11-17 79 14 7 18-23 71 23 6 24 73 14 13 Expansion Expansion Index Potential (UBC Table 29-C) 5 Very Low 21 Very Low 2 Very Low 14 Very Low 29 Low 17 Very Low PACIFIC SOILS ENGINEERING, INC. 1 • • • • Work Order 400095G May 4, 1989 TABLE A cont. Umm 25-31 76 18 6 9 Very Low 32-37 84 11 5 4 Very Low 38 62 22 16 39 Low 39-43 79 17 4 5 Very Low Based on this data, the following design is presented: 1. Foundations may be designed based upon the following values: • Allowable Bearing: 2000 lbs./sq.ft. Lateral Bearing: 250 lbs./sq.ft. at a depth of 12 -inches plus 150 lbs./sq.ft. for each additional • 12 -inches embedment to a maximum of 2000 lbs./sq.£t. Coefficient of Lateral Sliding: 0.40 • The above values may be increased as allowed by code to resist transient loading conditions, such as wind or seismic. 2. VERY LOW TO LOW EXPANSION POTENTIAL - LOTS 1-43,inclusive a) Footing Depth (Minimum): Exterior One -Story - 12 -inches below lowest adja- cent finished grade. Two -Story - 18 -inches below lowest adja- cent finished grade. Interior One & Two -Story - 12 -inches below lowest adja- cent finished grade. b) Footing Reinforcement: All continuous; two No.4 re- •bars,one on top, one on bottom. L PACIFIC SOILS ENGINEERING. INC. • • • • • Work Order 400095G May 4, 1989 C) Slab Reinforcement: Page 9 Living Areas 6"x 611,No.10 by No.10 welded wire mesh OR No.3 rebars spaced at 21 - inches on center. "Fibermesh" . concrete additive may be used in lieu of the wire mesh or rebars to control thermal cracking and shrinkage. d) Subgrade Moisture: No special requirement except moisture conditioning may be necessary if pads are not built upon within two (2) month of grading. • • PACIFIC SOILS ENGINEERING. INC. Continuous footings shall have a minimum width of 12 -inches for one-story and 15 -inches for two-story. All slabs shall have a thickness of four (4) inches. If exterior footings adjacent to drainage swales are to exist within three (3) feet horizontally of the swale, the footing should be em- bedded sufficiently to assure embedment below Swale bottom is maintained. Footings adjacent to slopes should be embedd- ed sufficiently that at least five (5) feet is provided hori- zontally from the bottom edge of footing to face of slope. • 3. Under -Slab Treatment A 10 -mil polyvinyl membrane (minimum) should be placed below all slabs -on -grade within living areas. This membrane should be covered with a minimum of two (2) inches of sand to protect it and to aid in curing of the concrete. • • PACIFIC SOILS ENGINEERING. INC. • • Work Order 400095G Page 10 May 4, 1989 4. Garages a) All garage slabs shall have a minimum thickness of four (4) inches and need not be underlain with any sand or polyvinyl membrane. These slabs should contain control joints at approximately ten (10) foot spacing. b) Footing embedment, footing reinforcement and subgrade moisture shall be as recommended in Section C-2. 5. Retaining Wall Design Retaining walls or other structural walls shall be designed with the following: a) Cantilevered retaining walls with a level backfill should be designed with an equivalent fluid pressure of 32 lbs./cu.ft. Retaining walls with 2 -horizontal to 1 -vertical slope superjacent to them should utilize an equivalent fluid pressure of 53 lbs./cu.ft. • b) Foundations for retaining walls may be designed in accordance with recommendations of Paragraph C-1. n C) Retaining walls should be backfilled with free draining materials (SE > 30) to within 18 -inches of grade, and compacted to project specifications. Native soils should be utilized in the upper 18 -inches. Drainage should be provided to all walls. d) All footing excavations for retaining walls should be observed by the project soil engineer or his repre- sentative. PACIFIC SOILS ENGINEERING, INC. \0 0 Work Order 400095G May 4, 1989 • Page 11 6. Exterior Slabs and Walkways • a) It is suggested that the subgrade below sidewalks, driveways, patios, etc. should be moisture conditioned 24 hours prior to concrete placement. • b) Weakened plane joints should be considered for walkways at approximately eight (8) to ten (10) foot intervals. Other exterior slabs should be designed to withstand shrinkage of concrete. • C) The "Fibermesh" concrete additive may be considered for exterior concrete work. 0 D. OTHER DESIGN AND CONSTRUCTION CONSIDERATIONS 1 1. Positive drainage away from structures shall be provided and maintained. 2.' Utility trench backfill shall be accomplished in accordance with the prevailing criteria of the County of Riverside. 3. Seismic design should be based upon current and applicable building code requirements. 4. Chemical analysis testing has been conducted on selected samples of on-site soils. Laboratory tests indicates the on-site soils show no appreciable amounts of soluble sulfates and the use of sulfate resistant concrete is not required. PACIFIC SOILS ENGINEERING, INC. Work Order 400095G May 4, 1989 • Page 12 • This report presents information and data relative to the mass grading and placement of compacted fill at the subject site. A representative(s) of this firm conducted periodic tests and observed during the progress of the construction in an effort to determine whether compliance with the project drawings, specifications and Building Code were being obtained. The • presence of our personnel during the work progress did not involve any direct and technical advice and suggestions were provided to the owner and/or his designated representative based upon the results of the tests -and observations. Completed work under the purview of this report is considered suitable for the intended use. Conditions of the reference reports remain applicable unless specifically superceded herein. • • • • • • Respectfully submitted, PACIFIC SOILS ENGINEERING, INC M ff Engineer 44�- By 4)X('fi •R BERT S. MCELWA N, Staff Geologist Executive Vice President Reviewed by: A. HANSON, C.E.G.990 ,tration Exp: 6-30-90 Dist: (12) Addressee (1) RBF, Rancho California, Attn: Mr. Mike Tyleman JAC/RPK/RSM/JAH:kr/G011 PACIFIC SOILS ENGINEERINGINC. �OED Gf P- 144s 0 q sO 4 N0. 9900 NI CERTIFIED m ENGINEERING GEOLOGIST 'T OF F OF c w "' • Work Order 400095G May 4, 1989 11 • TABLE I TEST TYPE All tests by Campbell Pacific Nuclear Test Gauge per ASTM:D 2922, unless otherwise noted by: • SC - Indicates test by Sand Cone*Method per ASTM:D 1556. • PACIFIC SOILS ENGINEERING. INC. \2✓ SOIL TYPE Laboratory Maximum Density per ASTM:D 1557-70 (All Soil Types). • Opt. Maximum Moist. Dry Density Soil Type and Classification (_ (lbs./cu.ft.) AA - Light Brown Silty Sand 8.0 121.6 • BB - Brown Clayey Sand 8.5 130.6 CC - Medium Brown Clayey Sand 8.7 128.3 DD - Tan -Brown Clayey Sand 14.8 109.7 EE - Light Brown Silty Sand 8.4 127.3 • FF - Brown Sand 9.5 116.3 GG - Light Brown Silty Sand 10.8 119.5 HH - Light Brown Sandy Silt 12.6 114.7 II - Brown Silty Sand 9.2 125.5 • LEGEND Non -Designated Test - Test in compacted fill. Test Location - See enclosed grading plans (sheets 5 and 13 of • 15) Elevation - Actual field elevation (F.G. - Finish Grade). R1, R2, etc. - Indicates retest of previously failing test. S - Indicates test in slope. • TEST TYPE All tests by Campbell Pacific Nuclear Test Gauge per ASTM:D 2922, unless otherwise noted by: • SC - Indicates test by Sand Cone*Method per ASTM:D 1556. • PACIFIC SOILS ENGINEERING. INC. \2✓ • Work Order 400095G May 4, 1989 0 0 TABLE I TRACT 21674-3 0 L PACIFIC SOILS ENGINEERING. INC. Ox Date of Test Test Elev. Moist.Cont. Test No Location (ft.) %(field) Dry Density (lbs./cu.ft.) Relative % Comp. Soil Test Type Type 9-27-88 Kaiser Parkway 219 198+00 1224.0 12.9 116.6 91 CC 220 200+00 1224.0 13.6 118.3 92 CC 9-28-88 Kaiser Parkway 224 194+80 1234.0 8.9 117.1 90 BB Sc 225 199+00 1226.0 12.9 121.0 93 BB 226 201+00 1226.0 13.1 120.7 92 BB 227 194+60 1236.0 10.8 116.9 91 CC . 228 194+90 1238.0 10.5 119.3 91 BB 229 195+10 1240.0 10.6 110.7 91 AA 230 201+00 1226.0 11.1 124.0 95 BB 10-5-88 Kaiser Parkway 350 St.194+50 1236.0 8.8 118.1 90 BB 351 St.194+85 1238.0 9.6 119.6 92 BB 352 St.194+50 1240.0 9.1 117.1 90 BB 353 St.194+10 1242.0 11.8 120.3 92 CC 354 St.195+15 1244.0 10.0 118.0 90 CC 355 St.194+10 1246.0 9.8 120.7 94 CC 356 St.194+60 1248.0 7.8 117.2 91 CC 357 St.193+90 1250.0 8.8 119.1 93 CC 10-7-88 Kaiser Parkway 372 St.194+38 1252.0 7.1 120.9 93 BB 373 St.193+30 1254.0 10.7 118.0 90 BB 0 L PACIFIC SOILS ENGINEERING. INC. Ox • Work Order 400095G May 4, 1989 u • TABLE I cont. 11 PACIFIC SOILS ENGINEERING. INC. 10-10-88 Kaiser Parkway 385 St.194+90 1242.0 11.1 118.8 95 II 386 St.196+90 1249.0 8.9 121.1 96 II • 387 St.196+60 1251.0 10.1 119.7 92 BB Rancho Vista Road 388 St.149+90 1252.0 7.5 118.9 91 BB 389 St.149+80 1254.0 11.3 120.0 92 BB 390 St.148+80 1252.0 12.8 119.7 92 BB 391 St.149+40 1254.0 11.9 119.3 91 BB • 10-11-88 Rancho Vista Road 422 St.149+60 1254.0 9.5 120.6 92 BB 423 St.148+70 1246.0 10.7 121.9 93 BB Kaiser Parkway 424 St.195+55 1246.0 12.0 116.3 91 cc • 425 St.193+55 1254.0 11.3 119.6 92 BB 426 St.194+40 1256.0 9.5 113.3 90 II 427 St.196+85 1253.0 9.0 117.8 92 cc 428 St.196+65 1255.0 11.1 122.2 94 BB 10-12-88 Kaiser Parkway 441 St.197+70 1228.0 11.3 114.7 90 EE 442 St.199+00 1228.0 10.2 114.5 90 EE 443 St.200+50 1228.0 10.6 115.0 90 EE 444 Adj.KaiserPky 1228.0 12.0 115.9 91 EE 445 II 1228.0 8.0 115.5 91 EE 10-13-88 Kaiser Parkway 452 Sta.201+35 1230.0 11.4 111.5 92 AA 453 Sta.199+36 1232.0 15.8 114.0 91 II 454 Sta.197+30 1234.0 9.8 112.9 90 II 455 Adj.KaiserPky 1230.0 8.4 111.6 92 AA 456 11 1229.0 13.7 109.5 90 AA • 457 Sta.199+60 1236.0 12.9 112.9 90 II 458 Sta.198+25 1238.0 9.9 113.3 90 II 459 Sta.195+15 1258.0 10.6 114.9 92 II 460 Sta.193+75 1260.0 9.7 112.9 90 II 11 PACIFIC SOILS ENGINEERING. INC. • • PACIFIC SOILS ENGINEERING, INC. \(O Work Order 400095G May 4, 1989 TABLE I cont. • 10-14-88 482 Adj.KaiserPky 1242.0 12.1 114.3 91 II 483 II 1244.0 10.0 116.1 93 II 484 It 1246.0 11.9 117.8 94 II 487 II 1248.0 13.0 114.2 91 II 10-17-88 506 Adj.KaiserPky 1250.0 12.3 112.6 92 AA 507 II 1245.0 13.6 109.2 90 AA • 10-18-88 520 Adj.KaiserPky 1256.0 11.7 112.3 92 AA 526 Lot 26 1189.0 11.0 115.1 92 II 527 Lot 28 1190.0 8.9 111.1 91 AA 528 Lot 30 1194.0 9.4 108.2 90 FF 529 Lot 32 1194.0 10.7 114.7 91 II 530 Lot 34 1194.0 9.4 117.3 93 II 531 Lot 36 1194.0 8.1 118.4 94 II 10-20-88 566 Lot 25 1196.0 13.3 111.1 91 AA 567 Lot 27 1198.0 12.8 109.7 90 AA 568 Lot 29 1196.0 11.0 108.5 89 AA 569 Lot 31 1198.0 11.8 103.9 86 AA 570 Lot 33 1192.0 9.3 109.9 90 AA 571 Lot 35 1194.0 10.0 112.6 93 AA 572 Lot 37 1191.0 10.5 112.2 92 AA Corte Encinas 575 Sta.15+70 1203.0 9.6 110.1 91 AA 576 Sta.14+30 1201.0 12.0 111.1 91 AA 577 Sta.13+12 1201.0 15.4 109.6 90 AA 578 Sta.12+09 1197.0 14.1 110.7 91 AA 579 Sta.10+75 1198.0 13.7 110.1 91 AA • 596 Adj.KaiserPky 1258.0 14.7 111.9 94 FF • PACIFIC SOILS ENGINEERING, INC. \(O • Work Order 400095G May 4, 1989 • TABLE I cont. • 10-21-88 568R1 Lot 29 1196.0 12.2 112.6 93 AA 569R1 Lot 31 1198.0 13.5 110.4 91 AA 609 Adj.KaiserPky 1234.0 10.1 113.8 94 FF 610 to 1236.0 10.5 109.0 91 FF 611 " 1234.0 14.9 107.1 90 FF •_ 612 " 1236.0 9.4 110.0 92 FF 613 If 1238.0 8.9 109.4 92 FF 614 of 1238.0 15.3 111.5 93 FF 615 of 1240.0 15.5 109.7 91 FF 616 It 1242.0 14.5 112.0 94 FF 617 to 1235.0 11.0 113.0 95 FF 10-26-88 650 Adj.KaiserPky 1270.0 7.6 113.2 90 II 651 to 1272.0 8.5 114.0 91 II 652 " 1275.0 9.1 113.7 91 II 653 of 1254.0 11.7 114.6 91 II • 654 It 1256.0 10.9 113.9 91 II 655 to 1258.0 12.2 116.6 93 II Kaiser Parkway 666 Sta.193+50 1262.0 12.3 103.7 90 HH 667 Sta.194+00 1264.0 12.6 104.9 91 HH 668 Sta.194+50 1266.0 11.7 103.9 91 HH • 669 Sta-.195+00 1268.0 12.9 104.1 91 HH 10-27-88- 674 Adj.KaiserPky 1258.0 11.5 116.1 92 II 675 of 1260.0 12.2 117.1 93 II • 10-28-88 718 Adj.KaiserPky 1254.0 11.0 120.8 94 cc 719 of 1256.0 9.7 120.0 94 cc 720 If 1254.0 12.2 117.0 91 cc 721 " 1256.0 11.6 120.7 94 cc 722 " 1254.0 12.6 111.3 92 AA • 723 " 1256.0 12.1 115.6 92 II 724 " 1256.0 10.2 113.9 91 II Sc • \1 PACIFIC SOILS ENGINEERING. INC. 11 Work Order 400095G May 4, 1989 TABLE I cont. • PACIFIC SOILS ENGINEERING. INC. `b 10-28-88 cont. 726 Adj.KaiserPky 1258.0 12.9 116.6 93 II 727 of 1256.0 13.1 119.2 95 II 728 If 1264.0 17.0 104.8 91 HH 729 of 1266.0 13.0 105.7 92 HH 730 if 1262.0 14.2 105.0 92 HH 731 11 1264.0 13.2 104.0 91 HH SC 10-31-88 Rancho Vista Road 732 Sta.149+50 1271.0 9.1 108.1 90 FF 733 Sta.149+50 1273.0 8.9 109.7 92 FF 743 Adj.KaiserPky 1258.0 9.5 113.0 95 GG 744 " 1258.0 10.7 110.8 93 GG 745 to 1260.0 10.5 110.9 93 GG 746 if 1262.0 10.0 113.0 94 GG 747 It 1255.0 10.7 110.4 93 GG 748 to 1262.0 11.2 110.3 93 GG 11-1-88 770 Adj.KaiserPky 1262.0 11.1 114.7 94 AA 771 " 1263.0 12.0 113.5 95 AA 772 " 1263.0 8.1 115.3 95 AA SC 773 " 1264.0 8.5 114.9 95 AA 774 " 1262.0 7.2 111.8 92 AA 775 " 1264.0 8.2 114.3 94 AA 776 " 1259.0 10.2 116.5 96 AA 777 " 1263.0 9.5 111.1 92. AA 11-8-88 857 Lot 43 1210.0 10.2 108.2 91 FF 858 Lot 42 1224.0 8.3 107.8 90 FF 859 Lot 11 1195.0 9.2 111.1 93 FF Paseo de Las Olas 860 Sta.20+60 1202.0 10.6 110.0 92 FF 11-9-88 876 Lot 43 1214.0 8.9 106.4 91 GG 877 Lot 43 1218.0 7.6 112.6 93 AA 878 Lot 43 1222.0 16.3 108.5 93 GG 879 Lot 43 1224.0 14.0 105.1 90 GG 880 Lot 42 1226.0 11.0 104.8 90 GG 881 Lot 42 1228.0 13.9 105.9 91 GG 882 Lot 42 1208.0 .7.1 113.7 93 II • PACIFIC SOILS ENGINEERING. INC. `b • Work Order 400095G May 4, 1989 0 TABLE I cont. • 11-9-88 cont. 883 Lot 43 1213.0 9.2 112.9 93 II 891 Lot 39 1202.0 9.2 112.9 97 GG 892 Lot 40 1206.0 9.8 108.8 94 GG 893 Lot 41 1210.0 11.6 107.2 92 GG 894 Lot 40 1209.0 11.3 110.2 95 GG • 896 Lot 42 1232.0 11.5 109.0 94 HH 897 Lot 43 1222.0 6.7 107.5 92 HH 898 Lot 43 1226.0 7.4 108.7 93 HH 899 Lot 40 1212.0 11.7 107.1 92 HH 900 Lot 41 1213.5 10.4 113.5 93 AA 901 Lot 39 1209.0 9.1 112.5 97 HH • 11-10-88 902 Lot 42 1234.0 12.2 107.6 90 FF 903 Lot 43 1230.0 13.3 112.2 94 FF 904 Lot 32 1203.0 13.2 112.2 94 FF 905 Lot 32 1194.0 12.8 110.2 92 FF • 906 Lot 30 1200.0 13.8 111.7 93 FF 907 Lot 42 1236.0 10.2 112.6 94 FF 908 Lot 43 1234.0 12.8 111.9 94 FF 909 Lot 38 1204.0 16.0 110.1 92 FF 910 Lot 11 1206.0 14.8 112.0 94 FF 911 Lot 42 1217.0 17.3 109.9 92 FF • 912 Lot 42 1238.0 12.3 111.1 93 FF 913 Lot 43 1236.0 12.6 113.6 95 FF 914 Lot 43 1240.0 13.0 111.7 93 FF. 915 Lot 42 1242.0 916 Lot 42 1244.0 12.6 115.5 92 II 917 Lot 43 1246.0 13.0 117.3 93 II • 918 Lot 43 1248.0 11.9 116.0 92 II 11-16-88 951 Lot 24 1203.0 6.3 110.7 93 FF 952 Lot 24 1203.0 7.7 113.2 95 FF 953 Lot 25 1203.0 7.5 116.0 97 FF • 954 Lot 26 1205.0 12.3 109.3 92 FF 955 Lot 29 1204.0 10.8 105.9 87 FF 956 Lot 29 1206.0 10.9 111.8 93 FF 957 Lot 32 1205.0 10.7 111.4 93 FF 958. Lot 36 1205.0 14.9 104.8 88 FF 959 Lot 36 1206.0 20.5 102.9 86 FF •_ 960 Lot 11 1208.0 f9.7 101.4 85 FF 961 Lot 13 1199.0 8.7 107.5 90 FF 962 Lot 17 1203.0 8.1 109.6 92 FF 963 Lot 20 1205.0 10.4 107.9 90 FF 960R1 Lot 11 1208.0 9.3 110.7 91 FF Sc Sc • PACIFIC SOILS ENGINEERING, INC. \� • Work Order 400095G May 4, 1989 • TABLE I cont. 11=17-88 972 Lot 25 1205.0 15.7 106.9 93 HH 973 Lot 25 1207.0 14.5 106.0 92 HH 974 Lot 25 1209.0 17.1 103.9 91 HH 975 Lot 25 1211.0 14.2 105.0 92 HH 976 Lot 24 1205.0 17.0 100.4 92 DD 977 Lot 24 1207.0 16.6 104.1 91 HH 983 Lot 3 1219.0 21.5 103.3 90 HH 984 Lot 3 1221.0 20.1 104.8 91 HH Corte Encinas 985 Sta.16+00 1205.0 20.0 104.0 91 HH 986 Sta.16+00 1207.0 16.9 107.2 93 HH 987 Lot 26 1208.0 17.7 105.0 92 HH 988 Lot 26 1210.0 16.8 104.1 91 HH 11-18-88 998 Lot 24 1207.0 13.0 111.1 91 AA SC 999 Lot 25 1211.0 14.3 110.1 91 AA 1000 Lot 23 1209.0 12.7 109.6 90 AA Corte Encinas 1001 Sta.16+50 1209.0 15.0 110.9 91 AA 1002 Lot 26 1212.0 14.1 112.7 93 AA 1012 Lot 25 1213.0 19.2 101.1 92 DD 1013 Lot 25 1215.0 13.0 106.6 93 DD 1014 Lot 24 1209.0 12.5 104.6 91 HH 1015 Lot 24 1211.0 9.7 108.0 94 HH 1016 Lot 24 1214.0 12.6 105.1 92 HH 11-21-88 955R1 Lot 29 1204.0 7.4 107.0 90 FF 958R1 Lot 36 1205.0 16.5 108.8 91 FF 959R1 Lot 36 1206.0 14.2 109.9 92 FF 1029 Lot 23 1211.0 7.7 105.7 92 HH 1030 Lot 22 1213.0 9.2 105.8 92 HH Corte Encinas 1031 Sta.16+30 1209.0 21.5 104.1 91 HH SC 1032 Sta.15+35 1211.0 13.4 110.0 96 HH 1033 Lot 26 1212.0 18.7 105.9 92 HH 1034 Lot 27 1212.0 17.1 106.1 93 HH 1038 Lot 4 1212.0 24.1 103.1 90 HH 1039 Lot 5 1214.0 23.6 104.2 91 HH 1040 Lot 21 1208.0 24.5 104.9 91 HH 1041 Lot 20 1209.0 21.9 105.0 92 HH 1042 Lot 27 1213.0 15.3 105.5 92 HH 1043 Lot 28 1213.0 22.3 104.4 91 HH • PACIFIC SOILS ENGINEERING. INC. (/' C Work Order 400095G May 4, 1989 TABLE I cont. •_ 11-23-88 1066 Lot 28 1214.0 17.5 106.9 92 GG 1067 Lot 30 1212.0 16.3 107.9 93 GG 1068 Lot 32 1210.0 18.1 109.3 _. 94 GG 1069 Lot 34 1208.0 18.7 106.6 92 GG 1070 Lot 36 1206.0 15.3 112.8 90 II • 1071 Lot 38 1206.0 13.0 115.9 92 II 1072 Lot 22 1215.0 9.1 116.5 93 II 1073 Lot 20 1210.0 12.9 114.1 91 II 1074 Lot 18 1208.0 14.1 112.0 92 AA 1075 Lot 16 1206.0 9.7 115.1 92 II 1076 Lot 14 1206.0 9.1 119.5 95 II • 1077 Lot 12 1206.0 9.7 118.9 95 II 11-28-88 1078 Lot 38 1208.0 10.3 116.3 93 II SC 1079 Lot 36 1212.0 6.9 114.7 91 II 1080 Lot 34 1212.0 11.2 116.6 - 93 II • 1081 Lot 32 1212.0 13.0 115.9_ 92 II 1082 Lot 30 1212.0 9.1 117.1 93 II 1083 Lot 28 1216.0 7.2 119.0 1: 95 II 1084 Lot 26 1214.0 8.8 118.9 = 95 II 11-29-88 • 1097 Lot 21 1211.0 9.2 109.6 9.2 FF 1098 Lot 19 1211.0 9.0 110.3 92 FF 1099 Lot 17 1209.0 9.1 116.0 92 II 1100 Lot 15 1207.0 11.0 119.8 95 II 1101 Lot 13 1205.0 9.9 116.8 93 II 1102 Lot 20 1213.0 13.0 117.9 94 II •_ 1103 Lot 18 1213.0 11.9 118.7 95 II 1104 Lot 16 1211.0 10.1 116.9 93 II 1105 Lot 6 1214.0 9.0 116.5 93 II 1106 Lot 7 1214.0 10.6 117.8 94 II 1107 Lot 8 1215.0 11.8 107.9 90 FF 1108 Lot 9 1215.0 12.9 111.0 93 FF • 1111 Lot 3 1222.0 8.7 116.3 93 II 1112 Lot 5 1216.0 7.0 114.9 92 II 1113 Lot 7 1218.0 16.1 117.8 94 II 1114 Lot 9 1217.0 15.2 118.1 94 II 1115 Lot 19 1215.0 10.2 110.6 91 AA SC 1116 Lot 17 1215.0 11.3 109.1 90 AA SC •_ 1117 Lot 15 1213.0 10.9 111.5 92 AA 1118 Lot 13 1211.0 9.9 112.1 92 AA • PACIFIC SOILS ENGINEERING, INC. SIN • Work Order 400095G May 4, 1989 TABLE I cont. 0 11-30-88 0 PACIFIC SOILS ENGINEERING. INC. by 1119 Lot 2 1226.0 16.0 102.3 93 DD 1120 Lot 4 1228.0 17.3 102.2 93 DD 1121 Lot 6 1230.0 16.9 103.1 94 DD 1122 Lot 7 1230.0 17.8 102.7 94 DD 1123 Lot 9 1230.0 16.3 103.3 94 DD 1124 Lot 10 1224.0 14.9 104.0 91 HH 1125 Lot 3 1227.0 17.7 105.1 92 HH 1126 Lot 5 1232.0 19.4 102.6 94 DD 1131 Lot 8 1230.0 17.0 101.7 93 DD 1132 Lot 9 1230.0 17.0 102.0 93 DD 1133 Lot 10 1226.0 16.7 102.1 93 DD 12-1-88 1148 Lot 9 1132.0 11.2 112.3 92 AA 1149 Lot 5 1134.0 9.0 111.5 92 AA 1150 Lot 3 1133.0 12.0 114.6 91 II 1151 Lot 7 1136.0 7.1 114.3 94 AA 1157 Lot 2 1227.0 9.1 106.2 91 GG 1-28-89 1367 Lot 37 F.G. 10.5 119.9 96 II 1368 Lot 34 F.G. 8.6 116.0 92 II 1369 Lot 31 F.G. 10.5 109.8 90 AA 1370 Lot 28 F.G. 10.6 109.6 90 AA 1371 Lot 25 F.G. 8.3 117.0 93 II 1372 Lot 23 F.G. 10.2 110.8 91 AA 1373 Lot 21 F.G. 11.9 116.4 93 II 1374 Lot 19 F.G. 13.9 110.7 91 AA 1-31-89 1375 Lot 1 F.G. 9.3 115.4 92 II 1376 Lot 2 F.G. 9.2 113.4 90 II 1377 Lot 3 F.G. 7.3 117.3 93 II 1378 Lot 4 F.G. 6.9 113.2 90 II 1379 Lot 5 F.G. 8.5 112.8 90 II 1380 Lot 6 F.G. 9.7 116.0 92 II 1381 Lot 7 F.G. 7.3 109.1 90 AA 1382 Lot 8 F.G. 7.5 113.5 90 II 1383 Lot 9 F.G. 10.0 114.4 91 II 1384 Lot 10 F.G. 7.0 120.5 96 II 1385 Lot 11 F.G. 13.0 105.1 90 GG 1386 Lot 13 F.G. 15.1 112.9 90 II 1387 Lot 15 F.G. 12.1 110.5 91 AA 1388 Lot 17 F.G. 11.5 119.9 92 BB 0 PACIFIC SOILS ENGINEERING. INC. by • Work Order 400095G May 4, 1989 • 2-31-89 cont. 17.9 14005 Lot 25 14015 Lot 24 14075 Lot 42 14085 Lot 43 1409S Lot 9 • 1410S Lot 20 1411S Lot 22 s L� TABLE I cont. 1202.0 17.9 1215.0 18.4 1240.0 8.9 1235.0 8.1 1220.0 7.8 1232.0 10.0 1230.0 8.4 105.9 91 GG 105.7 91 GG 111.3 92 AA 118.6 91 BB 110.4 91 AA 109.9 90 AA 117.9 92 cc PACIFIC SOILS ENGINEERING. INC. • Work Order 400095G May 4, 1989 0 40 TABLE II DEPTH OF FILL 0 • 0 *Cut/Fill Transition Lots, overexcavated a minimum of 3.0 ft. and brought to final grade with compacted fill. PACIFIC SOILS ENGINEERING, INC. Za Lot Approx. Lot Approx. No: Depth of Fill (ft.) No. Depth of Fill (ft.) 1* 5.0 23 16.5 2* 17.0 24 19.0 3* 17.0 25 25.0 4 20.0 26 25.0 5 25.5 27 24.5 6 22.5 28 26.0 7 21.0 29 25.5 8 21.5 30 25.5 9 21.0 31 25.0 10* 17.0 32 25.0 11 18.5 33 25.,0, 12* 19.0 34 26.5 13* 17.0 35 28.0 14* 14.5 36 28.0 15* 12.5 37 28.0 16 13.0 38 17 12.0 39 16.0 S 18 17.0 40 17.5 19 17.5 41* 12.5 20 14.0 42* 10.0 21 13.0 43 13.0 22. 13.0 0 • 0 *Cut/Fill Transition Lots, overexcavated a minimum of 3.0 ft. and brought to final grade with compacted fill. PACIFIC SOILS ENGINEERING, INC. Za