October 10, 2002
J.N. 436-01
CENTEX HOMES
2280 Wardlow Circle, Suite 150
Corona, California 92880
Attention: Mr. Steve Alford
Subject: Geotechnical Report of Rough Grading, Deer Hollow Way
(Stations 10+00 through 44+50), Primrose Street (Stations 10+00
through 26+42), Peach Tree Street (Stations 10+00 through 16+50)
and Pechanga Road Debris Basin, Tract 23065, Temecula Area,
Riverside County, California
This report presents a summary of the observation and testing services provided by
Petra Geotechnical, Inc. (Petra) during rough-grading operations to complete the
construction of the road embankment of Deer Hollow Way (Stations 10+00 through
44+50), Primrose Street (Stations 10+00 through 26+42) and Peach Tree Street
(Stations 10+00 through 16+50) within Tract 23065 located in the Temecula area of
Riverside County, California. In addition to the aforementioned road embankments,
a debris basin was constructed along the south side of Pechanga Road, east of the
intersection with Pala Road. This report also documents the overexcavation and
recompaction of the proposed storm-drain alignment, located adjacent to the east side
of Pal a Road (Stations 149+92 through 158+90) and Pechanga Road (Stations 10+00
through 27+50). This remedial grading was done to facilitate the construction of cast-
in-place pipe. Conclusions and recommendations pertaining to the suitability of the
grading for the proposed construction are provided herein.
Preliminary rough-grading within the golf-course/tract interface was performed within
the subject tract in 1989 and 1990, under the purview of Petra; however, a final rough-
grading report of the interface grading was not prepared at that time. Therefore,
PETRA GEOTECHNICAL, INC.
41640 Corning Place . Suite 107 . Murrieta . CA 92562 . Tel: (909) 600-9271 . Fax: {90g} 600-9215
\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CENTEX HOMES
TR 23065-Streets & Debris Basin/Temecula Area
October 10, 2002
J.N.436-01
Page 2
documentation of the previous relevant grading is included with this report. The
balance of rough-grading to complete construction, as well as adjacent slopes and
access streets, was performed during January to July 2002.
REGULATORY COMPLIANCE
Cuts, removal and recompaction of unsuitable low-density surface soils and placement
of compacted fill under the purview of this report have been completed under the
observation of and with selective testing by Petra. The earthwork was perfonned in
accordance with the recommendations presented in previous geotechnical reports by
Petra (see References) and the Grading Code of the County of Riverside.
The completed earthwork has been reviewed and is considered adequate for the
construction now planned. On the basis of our observations, as well as field and
laboratory testing, the recommendations presented in this repOli were prepared in
conformance with generally accepted professional engineering practices and no further
warranty is implied nor made.
SUMMARY OF AS-GRADED SOIL AND GEOLOGIC CONDITIONS
As-Graded Conditions
Remedial grading during the 1989 interface grading generally involved the removal
and recompaction of low-density surficial soils that included alluvial and colluvial
soils subject to hydro collapse or excessive consolidation, as well as near-surface
weathered bedrock materials. As it pertains to the grading addressed in this report, the
removal and recompaction associated with the interface grading was limited to the
northern end of Deer Hollow Way. Remedial grading during the recent phase of rough
grading included Deer Hollow Way, Primrose Street, Peach Tree Street, and the
1..-
~
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CENTEX HOMES
TR 23065-Streets & Debris Basin/Temecula Area
October 10, 2002
J.N.436-01
Page 3
remedial grading for the debris basin and cast-in-place storm-drain construction along
Pechanga Road and Pala Road. The compacted fills range in depth from approximately
3 to 20 feet. A general description of the soil and bedrock materials underlying the
subject tract is provided below.
. Compacted Engineered Fill (map symbol afc) - The compacted-fill soils placed
in 1989 generally consisted of silty sand and sandy silt with variable amount of
clay. The compacted-fill soils placed in 2002 are comprised of onsite-derived soil
and bedrock materials and generally consist of fine- to coarse-grained sand, silty
sand and clayey sand.
. Alluvium (map symbol Oan - The alluvial deposits left in-place below the
compacted fills in local areas of the tract consist of medium dense to dense, fine-
to coarse-grained sand and silty sand with some gravel.
. Pauba Formation Bedrock (Ops) - The Pauba Formation consists of dense, fine-
to coarse-grained sandstone and silty sandstone with occasional gravel and hard
siltstone beds. Bedding within the Pauba Formation is generally massive with
gradational and indistinct contacts.
SUMMARY OF EARTHWORK
OBSERVATIONS AND DENSITY TESTING
Clearing and Grubbing
At the time of grading, a majority of the tract was covered with a light growth of
grasses and weeds. This light vegetation was removed during overexcavation of
existing grades and mixed with the excavated soils in an acceptable manner (i.e., the
resultant blend contained less than 1 percent organic materials). Heavy vegetation that
existed in local areas, as well as some construction debris, were removed from the site.
Ground Preparation
. Road Embankments -- Deer Hollow Way, Primrose Street and Peach Tree Street
removals were initiated approximately 16 feet outside the right-of-way projecting
outward to the bottom of the removal at a 1: 1 (horizontal:vertical [h:v]). An 8-foot
2>
~
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CENTEX HOMES
TR 23065-Streets & Debris Basin/Temecula Area
October 10, 2002
J.N. 436-01
Page 4
minimum thickness fill blanket underlies Deer Hollow Way, Primrose Street and
Peach Tree Street. The south-western corner of Primrose Street and Peach Tree
Street have removals of15 to 20 feet deep at a 1: 1 (h:v) projection from the right-
of-way for the slopes which descend to the storm basin.
. Debris Basin -- The removals for the berm and access road for the debris basin on
the south side of Pechanga Road were approximately 3 to 6 feet below original
grade. The bottom of the debris basin and associated cuts are entirely in alluvial
deposits.
. Pala Road/Pechanga Road Storm Drain -- Removals along the east side of Pala
Road and the north side ofPechanga Road were made in order to accommodate the
cast-in-place storm-drain line. The removals varied between 11 and 20 feet in
depth. The bottom of the removals were 30 feet wide with the temporary
excavation slopes cut at approximately 1:1 (h:v).
Prior to placing fill, exposed bottom surfaces in all removal areas were first observed
and approved by our geologist or senior soil teclmician. Following this approval, the
exposed bottom surfaces were scarified to depths of approximately 6 to 8 inches,
watered or air-dried as necessary to achieve a moisture content equal to or slightly
above or below optimum moisture content and then recompacted in-place to a
minimum relative compaction of90 percent.
Fill Placement and Testing
All fill soils were placed in lifts restricted to approximately 6 to 8 inches in maximum
thickness, watered or air-dried as necessary to achieve near-optimum moisture
conditions and then compacted in-place to a minimum relative compaction of 90
percent based on ASTM Test Method D1557. Compaction was achieved by whee1-
rolling with an 824 rubber-tired dozer and loaded scrapers. The maximum vertical
depth of fill placed within the subject site is approximately 20 feet.
Field density and moisture content tests were performed in accordance with nuclear-
gauge test methods ASTM Test Methods D2922 and D3017. Occasional field density
~
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CENTEX HOMES
TR 23065-Streets & Debris BasinITemecu1a Area
October 10, 2002
J.N.436-01
Page 5
tests were also performed in accordance with the sandcone method ASTM Test
Method D1556. Field density test results are presented on the attached Tables I and
II and approximate test locations are shown on the enclosed Field Density Test
Location/Geotechnical Maps (Plates 1 through 5). Table I presents the results of the
field density tests taken in 1989 and 1990. Table II presents the results of the field
density tests taken in 2002.
Field density tests were taken at vertical intervals of approximately I to 2 feet and the
compacted fills were tested at the time of placement to verify that the specified
moisture content and minimum required relative compaction of90 percent had been
achieved. At least one in-place density test was taken for each 1,000 cubic yards of fill
placed and/or for each 2 feet in vertical height of compacted fill. The actual number
of tests taken per day varied with the project conditions, such as the number of earth-
movers (scrapers) and availability of support equipment. When field density tests
produced results less than the required minimum relative compaction of 90 percent or
if the soils were found to be excessively above or below optimum moisture content,
the approximate limits of the substandard fill were established. The substandard area
was then either removed or reworked in-place.
Visual classification of earth materials in tl1e field was the basis for determining which
maximum dry density value was applicable for a given density test. Single-point
checks were performed to supplement visual classification.
Fill Slopes
No fill slopes were constructed for the road embankments in excess of approximately
3 feet in height.
?
~
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CENTEX HOMES
TR 23065-Streets & Debris Basin/Temecula Area
October la, 2002
J.N.436-01
Page 6
Cut Slopes
No permanent cut slopes were constructed during grading for the road embankments.
FilI-Over-Cut Slopes
A fill-over-cut slope was constructed within the Pechanga Road debris basin at a
gradient of 4:1 (h:v). This slope attains a maximum height of approximately 14 feet.
LABORATORY TESTING
Maximum Dry Density
Maximum dry density and optimum moisture content for each change in soil type
observed during grading were determined in our laboratory in accordance with ASTM
Test Method D1557. Pertinent test values are summarized in Table III.
RECOMMENDATIONS
Utility Trenches
All utility-trench backfill within the street right-of-ways, utility easements and under
sidewalks, as well as within or in proximity to slopes should be compacted to a
minimum relative density of 90 percent. Where onsite soils are utilized as backfill,
mechanical compaction will be required. Density testing, along with probing, should
be performed by the project soils engineer or his representative, to verify proper
compaction.
For deep trenches with vertical walls, backfill should be placed in approximately 1- to
2-foot thick maximum lifts and then mechanically compacted with a hydra-hammer,
pneumatic tampers or similar equipment. For deep trenches with sloped-walls, backfill
~
~
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CENTEX HOMES
TR 23065-Streets & Debris Basin/Temecula Area
October 10, 2002
J.N. 436-01
Page 7
materials should be placed in approximately 8- to 12-inch thick maximum lifts and
then compacted by rolling with a sheepsfoot tamper or similar equipment.
As an alternative for shallow trenches where pipe may be damaged by mechanical
compaction equipment imported clean sand having a sand equivalent value of 30 or
greater may be utilized and jetted or flooded into place. No specific relative
compaction will be required; however, observation, probing and, if deemed necessary,
testing should be performed.
To avoid point-loads and subsequent distress to clay, cement or plastic pipe, imported
sand bedding should be placed at least I foot above all pipe in areas where excavated
trench materials contain significant cobbles. Sand-bedding materials should be
thoroughly jetted prior to placement of backfill.
Pavement Design
It is Petra's understanding that the design of the pavement sections will be provided
by the County of Riverside.
Pavement Construction
As with the pavement design, we understand that observation and testing for the
preparation ofthe pavement sub grade and placement of aggregate base and asphaltic
concrete will be provided by the County of Riverside.
'1
~
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CENTEX HOMES
TR 23065-Streets & Debris Basin/Temecula Area
October 10, 2002
J.N.436-01
Page 8
This opportunity to be of service is sincerely appreciated. If you have any questions,
please contact this office.
Respectfully submitted,
GAlTLJ/GR W /keb
Attachments: Table I -Field Density Test Results (1989)
Table II -Field Density Test Results (2002)
Table III - Laboratory Maximum Dry Density
References
Plates 1 through 5 - Geotechnical Maps with Density Test Locations
(in pocket)
Distribution: (1) Addressee
(3) Centex Homes
Attention:. Ms. Kim Moring
(1) The Garret Group LLC
Attention: Mr. John Leway
(2) Riverside County Building and Safety
Attention: Mr. Mack Hakakian
g
~
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE I
FIELD DENSITY TEST RESULTS
1989
_ PETRA
<\
I
I
........~~w .......ii...1I!~..ii............................................................[!i~~W...................... ...........................................~l1iig'j ii....Mo.ts~ .DENSITM/ .com. iii..i...SOIU...i/
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLEr
Field Density Test Results
06/15/89 lA Fairview Ave/Slope 1169.0 8.9 117.5 90 17
06/12/89 2A Fairview Ave/Slope 1175.0 10.3 118.0 91 17
06/22/89 3A Fairview Ave/Slope 1180.0 13.3 119.2 90 16
06/22/89 4A Fairview Ave/Slope 1179.0 10.0 124.6 94 16
06/22/89 5A Fairview Ave/Slope 1180.0 10.6 121.6 94 17
06/22/89 6A Fairview Ave/Slope 1180.0 11.6 120.0 92 17
PETRA GEOTECHNICAL, INC.
J.N. 436-01
\t)
1989
TABLE-I 1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE II
FIELD DENSITY TEST RESULTS
2002
e PETRA
\A.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE II
Field Density Test Results
12/18/01 1001 Deer Hollow Wy/Sta 14+30 1131.0 9.4 120.2 90 3A
12/18/01 1002 Deer Hollow Wy/Sta 14+75 1131.0 10.9 125.6 94 3A
12/18/0 1 1003 Deer Hollow Wy/Sta 12+00 1129.0 10.1 119.4 91 4
12/18/01 1004 Deer Hollow Wy/Sta 11 +60 1128.0 9.1 122.0 93 4
12/18/01 1005 Deer Hollow Wy/Sta 17+80 1132.0 8.3 119.3 91 4
12/18/01 1006 Deer Hollow Wy/Sta 16+20 1131. 0 7.1 115.2 88 I
12/18/01 1007 RTNo.1006 8.6 117.6 90 1
12/18/01 1008 Deer Hollow Wy/Sta 11+40 1133.0 9.3 117.7 90 1
12/18/01 1009 Deer Hollow Wy/Sta 10+80 1135.0 10.1 119.3 91 4
12/18/01 1010 Deer Hollow Wy/Sta 14+91 1136.0 9.6 117.7 90 I
12/18/01 1011 Deer Hollow Wy/Sta 17+30 1138.0 9.9 113.7 87 1
12/18/01 1012 Deer Hollow Wy/Sta 18+35 1133.0 10.4 118.0 90 4
12/18/01 1013 RTNo. lOll 9.8 119.1 91 1
12/19/01 1014 Deer Hollow Wy/Sta 13+00 1138.0 11.3 118.9 91 1
12/19101 1015 Deer Hollow Wy/Sta 10+75 1135.0 9.2 121.5 93 1
12/19/01 1016 Deer Hollow Wy/Sta 12+60 1137.0 12.5 117.6 90 1
12/19/01 1017 Deer Hollow Wy/Sta 13+50 1138.0 11.9 118.1 90 4
12/19/01 1018 Deer Hollow Wy/Sta 15+40 1140.0 11.6 120.5 92 1
12/19/01 1019 Deer Hollow Wy/Sta 14+00 1139.0 12.9 117.7 90 1
12/19/01 1020 Deer Hollow Wy/Sta 15+50 1140.0 8.6 117.5 90 I
12/19/01 1021 Deer Hollow Wy/Sta 15+20 1138.0 10.3 117.9 90 1
12/19/01 1022 Deer Hollow Wy/Sta 18+61 1136.8 5.9 112.9 86 4
12/19/01 1023 Deer Hollow Wy/Sta 20+ 1 0 1134.8 6.3 110.3 84 4
12/19/01 1024 RT No. 1022 8.6 118.3 90 4
12/19/01 1025 RTNo.1023 8.4 119.4 91 4
12/20/01 1026 Deer Hollow Wy/Sta 22+00 1137.0 11.9 117.6 90 1
12/20/01 1027 Deer Hollow Wy/Sta 21 +30 1135.0 12.2 117.9 90 1
12/20/0 1 1028 Deer Hollow Wy/Sta 20+50 1135.0 9.2 117.6 90 I
12/20/01 1029 DeerHollowWy/Sta 18+10 1140.0 11.7 117.7 90 1
12/20/01 1030 Deer Hollow Wy/Sta 22+50 1141.0 7.9 124.3 93 3A
12/20/01 1031 Deer Hollow Wy/Sta 23+40 1137.0 8.8 121.6 91 3A
12/20/01 1032 Deer Hollow Wy/Sta 22+55 1140.0 8.1 120.4 90 3A.
12/20/01 1033 Deer Hollow Wy/Sta 19+25 1142.0 7.9 121.5 93 1
12/20/01 1034 Deer Hollow Wy/Sta 26+05 1139.0 9.4 121.6 91 3A
12/20/01 1035 Deer Hollow Wy/Sta 27+40 1138.0 8.6 122.9 92 3A
12/20/01 1036 Deer Hollow Wy/Sta 25+ 1 0 1142.0 8.1 118.1 90 4
12/20/01 1037 Deer Hollow Wy/Sta 25+50 1144.0 7.7 120.4 91 3
12/26/01 1038 Deer Hollow Wy/Sta 30+00 1140.0 11.6 118.9 91 1
12/26/01 1039 Deer Hollow Wy/Sta 28+25 1141.0 12.1 117.7 90 1
12/26/01 1040 Deer Hollow Wy/Sta 25+90 1145.0 12.4 117.6 90 1
12/26/01 1041 Deer Hollow Wy/Sta 27+ 1 0 1143.0 13.0 120.3 92 1
12/26/01 1042 Deer Hollow Wy/Sta 27+85 1145.0 9.8 121.6 93 1
PETRA GEOTECHNICAL, INC. . Sandcone OCTOBER 2002 '<~
J.N. 436-01 .. Numbers out of sequence TABLE-II 1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE II
Field Density Test Results
W~$tf!ll~'ll!ll~~~.BM;.~.Q!~;l;~!i~4~~!!j.i~..~~I~;~Q~i
ij)l&i\it ./i.il\lO/i....... ...i.....i.nCOIl1A1J)OI\,n...i. iiii....../i1...O:t) ............1 I Iii i(!l1iJ ....1.......1/1...(ii~,9..... ................{{?(@.......i..............jMtpiii...
12/26/01
12/26/01
12/26/01
12/26/01
12/26/01
12/26/01
12/26/01
12/27/01
12/27/01
12/27/01
12/27/01
12/27/01
12/27/01
12/27/01
12/27/01
12/27/01
12/27/01
12/28/01
12/28/01
12/28/01
12/28/0 1
12/28/01
12/28/01
01/03/02
01/03/02
01/03/02
01/03/02
01/03/02
01/03/02
01/03/02
01/03/02
01/03/02
01/03/02
01/03/02
01/03/02
01/03/02
01/03/02
01/04/02
01/04/02
01/04/02
01/04/02
01/04/02
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
Ion
Deer Hollow Wy/Sta 29+20
Deer Hollow Wy/Sta 23+50
Deer Hollow Wy/Sta 25+50
Deer Hollow Wy/Sta 29+70
Deer Hollow Wy/Sta 28+25
Deer Hollow Wy/Sta 30+30
RTNo.1044
Deer Hollow Wy/Sta 23+00
Deer Hollow Wy/Sta 21 +80
Deer Hollow Wy/Sta 20+75
Deer Hollow Wy/Sta 19+50
Deer Hollow Wy/Sta 18+60
Deer Hollow Wy/Sta 17+75
Deer Hollow Wy/Sta 15+75
Deer Hollow Wy/Sta 13+50
Deer Hollow Wy/Sta 11 +30
Deer Hollow Wy/Sta 12+40
Deer Hollow Wy/Sta 26+ 10
Deer Hollow Wy/Sta 27+05
Deer Hollow Wy/Sta 27+75
Deer Hollow Wy/Sta 29+05
Deer Hollow Wy/Sta 30+50
Deer Hollow Wy/Sta 27+05
Peach Tree St/Sta 11+20
Peach Tree St/Sta 12+20
Peach Tree St/Sta 13+80
Primrose St/Sta 11+95
Primrose St/Sta13+80
Primrose St/Sta 13+62
Primrose St/Sta 14+70
Primrose St/Sta 14+65
Primrose St/Sta 15+00
Primrose St/Sta 15+00
Primrose St/Sta 13+20
Primrose St/Sta 13+25
Primrose St/Sta 11 +85
Primrose St/Sta 11+75
Primrose St/Sta 14+25
Primrose St/Sta 14+35
Primrose St/Sta 13+01
Primrose St/Sta 13+00 .
Primrose St/Sta 13+20
1
1
1
I
1
1
1
3A
4
3A
4
1
1
3A
I
4
4
1
4
4
1
1
2
1
4
4
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
OCTOBER 2002 \3-
TABLE-II 2
1145.0 10.7 119.2 91
1144.0 13.9 110.9 85
1144.0 9.7 119.1 91
1146.0 11.8 121.5 93
1146.0 13.1 118.9 91
1147.0 8.9 119.0 91
9.9 117.7 90
1144.0 9.1 121.7 91
1144.0 9.6 122.2 93
1143.0 9.4 125.7 94
1142.0 10.6 119.4 91
ll42.0 9.5 118.8 91
1142.0 9.1 118.9 91
1141.0 10.4 126.9 95
1140.0 ll.l 121.4 93
1140.0 12.6 120.9 91
1139.0 9.4 120.7 91
1146.0 10.6 117.6 90
1146.0 9.4 122.0 93
1148.0 8.9 119.5 91
1148.0 10.1 120.2 92
1145.0 9.8 120.4 91
1144.0 9.4 118.5 91
1145.0 10.1 117.6 90
l141.0 9.2 118.3 90
1154.0 8.4 120.8 91
1150.0 12.8 119.9 92
1149.0 9.4 117.0 90
1148.0 15.9 118.8 91
1147.0 12.3 119.7 92
1149.0 14.7 118.4 91
1148.0 10.5 118.6 91
1150.0 13.5 117.3 90*
1151.0 10.4 118.0 91
1152.0 10.7 117.1 90
1152.0 9.9 119.8 91
1153.0 9.4 117.5 90
1155.0 7.1 121.7 94
1153.0 8.5 127.9 98*
1155.0 7.1 119.8 91*
1154.0 7.3 118.4 91
1154.0 8.3 122.7 95
PETRA GEOTECHNICAL, INC.
J.N.436-01
. Sandcone
.. Numbers out of sequence
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE II
Field Density Test Results
!..........~~~~...ililf.............. .........................................................~~.~~............................... ...............................~rfl ~l;................................M..........................O.....................Is......(.........o.....".....~..........)............................................i..........................................b...................~.................~......p.........cF........^.~......l\Y.........................................................................................c.............................O....i............"...1\1.............).. p...................;................~Q~~.........
..n.A)j!)]\(OiiitiO.it.iMll'tONif.j, J/ _ Of" _ L g ~ " _l\YJfE.J
2
3
3
3
3
3
3
3
1
4
1
1
I
2
3
3
1
3
3
3
1
1
1
1
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
1
OCTOBER 2002 ~
TABLE-II 3
01/04/02 1093 Primrose St/Sta 13+20 1155.0 11.0 117.9 90
01/10/02 1094 Retention basin l150.0 12.4 124.9 94*
01/10/02 1095 Retention basin 1153.0 11.7 122.3 92
01/10/02 1096 Retention basin 1152.0 12.1 123.7 93
01/10/02 1097 Retention basin 1149.0 10.6 124.2 94
01/10/02 1098 Retention basin 1146.0 11.1 126.4 95
01/10/02 1099 Retention basin 1153.0 10.4 127.7 96
01/10/02 1100 Retention basin 1151.0 9.7 123.0 93
01/03/02 1105 Peach Tree St/Sta 11+ 1 0 1146.0 12.4 117.6 90
01/03/02 1108 Peach Tree St/Sta 10+50 1149.0 9.6 120.8 92
01/03/02 1109 Peach Tree St/Sta 13+ I 0 1150.0 10.8 118.8 91
01/03/02 1121 Peach Tree St/Sta 13+40 1156.0 12.1 118.7 91
01/03/02 1122 Deer Hollow Wy//Sta 35+00 1152.0 11.4 118.6 91
01/04/02 1141 Deer Hollow Wy/Sta 36+40 1150.0 11.5 119.6 92
01/07/02 1150 Deer Hollow Wy/Sta 39+25 1145.0 6.4 124.3 95
01/07/02 1151 Deer Hollow Wy/Sta 36+60 1140.0 6.1 120.7 91*
01/07/02 1169 Pala Rd/ClP Sta 16+50 1130.0 8.5 118.2 91
01/07/02 1170 Pal a RdlCIP Sta 12+50 1129.0 9.5 122.0 93
01/07/02 1171 Pal a Rd/CIP Sta 12+50 1131.0 5.4 119.4 90
01/07/02 1172 Pala RdlCIP Sta 14+50 1130.0 5.7 119.4 90
01/07/02 1173 Pala RdlCIP Sta 15+50 1133.0 6.2 117.2 90
01/07/02 1174 Pal a Rd/ClP Sta 13+25 1131.0 6.0 117.4 90
01/07/02 1180 Deer Hollow Wy/Sta 35+80 1140.0 11.2 120.4 92
01/07/02 1181 Deer Hollow Wy/Sta 38+00 1149.0 9.8 118.9 91*
01/08/02 1206 Pal a RdI Sta 16+75 1134.0 8.5 120.6 91
01/08/02 1207 Pal a Rd/ Sta 16+00 1136.0 8.6 124.3 94
01/08/02 1208 Pala RdI Sta 14+25 1134.0 8.5 120.4 91
01/08/02 1209 Pala RdI Sta 14+25 1136.0 9.7 120.8 91
01/08/02 1210 Pal a Rd/ Sta 12+20 1130.0 8.4 118.8 90
01/08/02 1211 Pala Rd/ Sta 12+75 1133.0 9.3 120.7 91
01/08/02 1212 Pal a Rd/ Sta 15+60 1138.0 8.3 121.1 91
01/08/02 1213 Pala Rd/ Sta 12+75 1136.0 9.6 121.7 92
01/08/02 1214 Pala Rd/ Sta 13+50 1138.0 8.2 121.3 92
01/08/02 1215 Pal a Rd/ Sta 14+80 1139.0 9.6 121.3 92
01/08/02 1216 Pala RdI Sta 16+80 1143.0 9.2 118.7 90
. 01/08/02 1217 Pala RdI Sta 13+50 1140.0 8.7 122.8 93
01/08/02 1221 Primrose St/Sta 11+50 1152.0 10.4 123.4 93
01/08/02 1222 Primrose St/Sta 12+75 1153.0 8.8 120.6 91
01/08/02 1223 Primrose St/Sta 14+40 1155.0 9.6 122.4 92
01/08/02 1224 Primrose St/Sta 15+50 1153.0 11.2 122.1 92
01/09/02 1238 Deer Hollow Wy/Sta 38+60 1153.0 8.2 122.2 92
01/09/02 1248 Deer Hollow Ave/Sta 35+50 1146.0 10.1 119.7 90
PETRA GEOTECHNICAL, INC.
J.N. 436-01
. Sandcone
.. Numbers out of sequence
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE II
Field Density Test Results
....".....--.--......,..,.....-..."."......
I Ii....i$ClJlVlI
...-.-_..............-.......-.-.-.-,-,-...-.....,-_.,.....-,-.-.-,'.,,-.,.".
...__._d.__...........__._............_..
...----......-......-..-.-.--.---.-..--.-.....
................(jjf....
.....,_..,_........_.,...,...._..,_,., _n._,_'
).'..........i.'i.. ,t..))
~g~~......p~$~~...I...@gM:~}I..,$gmI
i','...ii(o/<iliiI...'..'.....ii(Q~fj .....ii.,.(f)'J}'I .'."~$Ii
'R~IIIIIIIII~lll
01/09/02 1249 Deer Hollow Ave/Sta 38+00 1145.0 10.6 119.4 90 3
01/08/02 1250 Primrose St/Sta 10+50 1152.0 13.9 118.3 90 10
01/08/02 1251 Primrose St/Sta 12+25 1154.0 13.8 122.2 93 10
01/08/02 1252 Primrose St/Sta 13+50 1156.0 13.6 118.2 90 10
01/08/02 1253 Primrose St/Sta 11 +50 1158.0 13.6 118.2 90 10
01/09/02 1254 Primrose St/Sta 18+50 1153.0 10.5 125.8 96 3
01/09/02 1255 . Primrose St/Sta 17+00 1154.0 11.9 124.5 95 3
01/09/02 1256 Primrose St/Sta 17+00 1156.0 10.4 125.8 96 3
01/09/02 1257 Primrose St/Sta 16+00 1151.0 12.7 119.1 90 3
01/09/02 1258 . Primrose St/Sta 16+50 1158.0 11.7 119.9 90 3
01/09/02 1259 Retention Basin 1152.0 11.5 121.4 92 3
01/09/02 1260 Retention Basin 1147.0 12.4 119.2 90 3
01/09/02 1261 Retention Basin 1154.0 11.9 120.0 91 3
01/09/02 1262 Retention Basin 1155.0 11.2 120.7 91 3
01/09/02 1263 Retention Basin 1154.0 10.8 124.7 94 3
01/09/02 1264 Retention Basin 1153.0 11.2 121.6 92 3
01/09/02 1265 Retention Basin 1150.0 12.2 121.0 91 3
01/09/02 1266 Retention Basin 1152.0 11.6 122.3 92 3
01/09/02 1267 Retention Basin 1154.0 10.9 121.4 92 3
01/09/02 1268 Retention Basin 1156.0 9.4 123.6 93 3
01/09/02 1269 Retention Basin 1158.0 10.2 120.8 91 3
01/09/02 1270 Retention Basin 1156.0 11.1 119.3 90 3
01/09/02 1271 Retention Basin 1152.0 10.8 119.8 90 3
01/09/02 1272 Retention Basin 1154.0 10.5 121.6 92 3
01/09/02 1273 Retention Basin 1156.0 9.6 123.7 93 3
01/09/02 1274 Retention Basin 1158.0 8.9 124.6 94 3
01/09/02 1275 Deer Hollow Wy/Sta 40+ 10 1147.0 9.1 120.8 91 3
01/09/02 1276 Retention Basin access road l157.0 7.9 l23.6 93 3
01/09/02 1277 Retention Basin access road 1159.0 8.0 124.8 94 3
01/09/02 1278 Retention Basin access road 1161.0 9.4 123.4 93 3
01/09/02 1279 Retention Basin access road 1165.0 10.6 120.7 91 3
01/09/02 1280 Retention Basin access road 1164.0 7.6 121.9 92 3
01/09/02 1281 Retention Basin access road 1166.0 8.0 120.8 91 3
01/09/02 1282 Retention Basin access road 1167.0 8.4 122.4 92 3
01/09/02 1283 Retention Basin access road 1163.0 9.4 122.1 92 3
01/09/02 1** Deer Hollow Wy/Sta 36+40 1142.0 7.9 119.4 90 3
01/09/02 2** Deer Hollow Wy/Sta 37+35 1142.0 8.1 120.8 91 3
01/09/02 4** Deer Hollow Wy/Sta 39+40 1146.0 7.8 117.9 90* 4
01/09/02 5** Deer Hollow Wy/Sta 40+70 1147.0 8.3 119.9 92 4
01/09/02 9** Deer Hollow Wy/Sta 38+ 10 1150.0 8.3 118.5 90 4
01/09/02 13** Deer Hollow Wy/Sta 35+90 1148.0 11.6 120.7 91 3
01/09/02 16** Deer Hollow Wy/Sta 37+35 1149.0 12.4 119.9 92 1
PETRA GEOTECHNICAL, INC. . Sandcone OCTOBER 2002 \-5
J.N. 436-01 .. Numbers out of sequence TABLE-II 4
I
I Field Density Test Results
TABLE II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
01/09/02 19** Deer Hollow Wy/Sta 36;+50 1150.0 9.1 117.7 90* 1
01/09/02 22** Deer Hollow Wy/Sta 38+95 1150.0 14.1 117.3 90 1
01/11/02 33** Deer Hollow Wy/Sta 37+70 1149.0 11.1 119.0 90 3
01/14/02 48** Deer Hollow Wy/Sta 37+60 1156.0 11.1 122.1 92 3
Ol1l5/02 1284 Deer Hollow Wy/Sta 41+00 1150.0 6.9 124.1 93 4
01/15/02 1285 Deer Hollow Wy/Sta 39+90 1153.0 7.1 122.9 92* 4
01/16/02 1286 Deer Hollow Wy/Sta 4+a50 1155.0 7.7 120.9 91 3A
01116/02 1287 Deer Hollow Wy/Sta 40+ 70 1156.0 7.8 120.7 90 3A
01/16/02 1288 Deer Hollow Wy/Sta 40+75 1158.0 9.8 121.9 91 3A
01/16/02 1289 Deer Hollow Wy/Sta 425 1157.0 10.1 121.3 91 3A
.01/17/02 1290 Deer Hollow Wy/Sta 40+20 1159.0 9.1 122.7 92 3A
01/17/02 1291 Deer Hollow Wy/Sta 42+75 1159.0 10.1 119.9 90 3
01/17/02 1292 Deer Hollow Wy/Sta 43+40 1157.0 9.7 120.3 91 3
01/18/02 1293 Deer Hollow Wy/Sta 43+25 1159.0 9.9 121.7 91 3A
01118/02 1294 Deer Hollow Wy/Sta 42+40 1160.0 10.3 122.3 92 3A
01/18/02 1295 Deer Hollow Wy/Sta 40+20 1161.0 10.0 121.9 91 3A
01/15/02 71** Deer Hollow Wy/Sta 41+25 1150.0 9.1 122.3 92 3
01/15/02 80** Deer Hollow Wy/Sta 33+00 1138.0 8.1 119.3 90 3
01115/02 81** Deer Hollow Wy/Sta 33+75 1136.0 7.4 122.0 92 3
01115/02 82** Deer Hollow Wy/Sta 35+00 1140.0 7.3 120.1 90 5
01/15/02 88** Deer Hollow Wy/Sta 34+50 1141.0 7.9 120.4 90 5
01/17/02 129** Deer Hollow Wy/Sta 32+60 1143.0 10.1 121.9 91 3A
01/17/02 135** Deer Hollow Wy/Sta 32+60 1146.0 9.3 117.9 89 3
01/17/02 138** RT No. 135 10.1 120.3 91 3
01/17/02 194** Deer Hollow Wy/Sta 33+65 1146.0 9.1 122.0 91 3A
01/17/02 195** Deer Hollow Wy/Sta 33+00 1144.0 8.7 118.1 91 2
01/17/02 196** Deer Hollow Wy/Sta 42+40 1156.0 8.9 121.0 91 3A
01/17/02 197** Deer Hollow Wy/Sta 41 +50 1155.0 10.0 117.9 91 2
01117/02 198** Deer Hollow Wy/Sta 41 +00 1156.0 9.9 118.3 91 2
01/18/02 205** Deer Hollow Wy/Sta 33+40 1148.0 10.0 121.5 91 3A
01/18/02 206** Deer Hollow Wy/Sta 34+00 1150.0 9.7 122.7 92 3A
01/21/02 1296 Deer Hollow Wy/Sta 43+85 1162.0 9.3 119.9 90 3
01/21/02 1297 Deer Hollow Wy/Sta 42+80 1164.0 8.9 121.3 92 3
01/21/02 1298 Deer Hollow Wy/Sta 42+ 1 0 1164.0 10.1 121.5 92* 3
01/21/02 1299 Deer Hollow Wy/Sta 39+80 1156.0 10.3 120.1 91 3
01/21/02 1300 Deer Hollow Wy/Sta 39+80 1159.0 10.3 120.3 91 3
01/21/02 1301 Deer Hollow Wy/Sta 39+80 1161.0 9.7 121.9 92 3
01/21/02 1302 Deer Hollow Wy/Sta 43+ 10 1164.0 9.5 117.7 91 2
01/21/02 1303 Deer Hollow Wy/Sta 39+65 1156.0 9.1 118.3 91 2
01/21/02 1304 Deer Hollow Wy/Sta 38+30 1156.0 10.7 120.5 91 3
01/21/02 1305 Deer Hollow Wy/Sta 37+50 1157.0 10.3 117.5 90 2
01/22/02 1306 Deer Hollow Wy/Sta 43+60 1166.0 10.3 116.4 93 7
PETRA GEOTECHNICAL, INC. . Sandcone OCTOBER 2002 \c",
J.N.436-01 .. Numbers out of sequence TABLE-II 5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
01/22/02
01/22/02
01/22/02
01/22/02
01/22/02
01/22102
01/22/02
01/22/02
01/22/02
01/23/02
01/23/02
01/23/02
01/23/02
01/24/02
02/19/02
02/19/02
02/19/02
02/19/02
02/19102
02/19/02
02/19/02
02/19102
02/19/02
02/19102
02/19/02
02/19/02
02/19/02
02/19/02
02/19/02
02/19/02
02/20102
02/20/02
02/20/02
02/20/02
02/20/02
02/20/02
02/20/02
02/20/02
02/20/02
02/20102
02/20/02
02/20/02
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
TABLE II
Field Density Test Results
Deer Hollow Wy/Sta 42+55
Deer Hollow Wy/Sta 41 +90
Deer Hollow Wy/Sta 41+30
Deer Hollow Wy/Sta 37+90
Deer Hollow Wy/Sta 40+90
Deer Hollow Wy/Sta 42+50
Deer Hollow Wy/Sta 43+50
Deer Hollow Wy/Sta 41 +50
Deer Hollow Wy/Sta 38+40
Deer Hollow Wy/Sta 39+00
Deer Hollow Wy/Sta 40+00
Deer Hollow Wy/Sta 42+40
Deer Hollow Wy/Sta 40+65
Deer Hollow Wy/Sta 40+60
Pechanga RdlSta 11+75
Pechanga RdlSta II +80
Pechanga Rd/Sta 12+90
Pechanga Rd/Sta 12+85
Pala Rd/Sta 151+00
Pala RdlSta 154+ 1 0
Pechanga RdlSta 11 +40
RTNo.138l
Pechanga RdlSta 15+90
Pechanga RdlSta 15+95
Pechanga Rd/Sta 14+35
Pechanga RdlSta 14+40
RTNo.1384
RTNo.1386
Pechanga RdlSta 15+30
Pechanga RdlSta 13+60
Pechanga RdlSta 15+45
Pechanga Rd/Sta 13+70
Pechanga Rd/Sta 15+20
RTNo.1392
Pechanga RdlSta 12+60
Pechanga RdlSta 12+65
Pechanga RdlSta 17+30
Pechanga RdlSta 17+35
Pechanga RdlSta 18+75
Pechanga RdlSta 18+80
Pechanga RdlSta 13+75
Pechanga RdlSta 13+80
1167.0 11.1 114.0 91 7
1167.0 10.7 113.6 91 7
1165.0 12.5 114.7 91' 7
1160.0 9.9 117.7 91 2
1167.0 8.7 118.0 91 2
1169.0 8.7 120.1 91 3
1168.0 8.9 121.7 92 3
1168.0 9.1 119.9 90 3
1169.0 9.7 121.0 91 3
1159.0 9.9 118.1 90 1
1159.0 10.3 119.0 91 1
1169.0 9.7 122.5 92 5
1169.0 10.5 118.3 91 1
1169.0 10.7 118.1 92 9
1043.0 10.4 119.7 91 4
1044.0 7.1 118.4 90 4
1038.0 8.2 120.0 92 4
1040.0 8.3 122.7 92 5
1036.0 8.6 121.8 92 5
1043.0 8.5 119.2 91 4
1045.0 6.5 116.2 88 4
1045.0 8.2 118.9 91 4
1036.0 7.0 118.3 90 4
1038.0 5.0 113.5 86 4
1035.0 7.8 119.5 91 4
1037.0 3.8 114.3 87 4
1036.0 7.2 118.8 91 4
1037.0 8.2 119.2 91 4
1043.0 9.8 118.0 90' 4
1041.0 6.1 121.5 93' 4
1045.0 6.2 121.4 91 5
1043.0 8.8 115.9 87 5
1044.0 8.6 121.4 91 5
9.4 121.1 91 5
1042.0 9.1 119.2 91 4
1044.0 8.7 118.3 90 4
10 3 6.0 7.7 120.5 92 4
1038.0 7.0 119.4 91 4
1038.0 8.6 120.1 92 4
1040.0 8.1 119.0 91 4
1045.0 7.9 118.3 90' 4
1046.0 7.5 120.0 92' 4
PETRA GEOTECHNICAL, INC.
J.N.436-01
* Sandcone
** Numbers out of sequence
OCTOBER 2002
TABLE-II 6
,,1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE II
Field Density Test Results
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/21/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/22/02
02/25/02
1403
1404
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
1444
Pechanga Rd/Sta 17+35
Pechanga Rd/Sta 17+40
Pechanga Rd/Sta 14+50
Pechanga Rd/Sta 14+55
RTNo.1403
RTNo.1404
RTNo.1405
RT No. 1406
Pechanga Rd/Sta 16+40
Pechanga Rd/Sta 16+45
Pechanga Rd/Sta 14+75
Pechanga Rd/Sta l4+80
Pechanga Rd/Sta 17+00
Pechanga Rd/Sta 17+05
RTNo.14l5
RTNo.1416
Pechanga Rd/Sta 19+00
Pechanga Rd/Sta 19+05
Pechanga Rd/Sta 18+00
Pechanga Rd/Sta 20+50
Pechanga Rd/Sta 20+55
Pechanga Rd/Sta 21 +40
Pechanga Rd/Sta 21 +00
Pechanga Rd/Sta 21+05
RT NO. 1425
RTNo.1426
Pechanga Rd/Sta 22+00
Pechanga Rd/Sta 22+05
Pechanga Rd/Sta 18+40
Pechanga Rd/Sta 18+45
Pechanga Rd/Sta 22+45
Pechanga Rd/Sta 22+50
Pechanga Rd/Sta 19+50
Pechanga Rd/Sta 19+55
Pechanga Rd/Sta 24+00
Pechanga Rd/Sta 24+05
Pechanga Rd/Sta 27+03
Pechanga Rd/Sta 27+08
Pechanga Rd/Sta 17+ 15
Pechanga Rd/Sta 19+00
Pechanga Rd/Sta 19+05
Pechanga Rd/Sta 20+25
1047.0
1048.0
1046.0
1047.0
1050.0
1051.0
1048.0
1049.0
1050.0
1051.0
1044.0
1045.0
1049.0
1040.0
1041.0
1044.0
1047.0
1046.0
1045.0
1047.0
1048.0
1046.0
1052.0
1054.0
1050.0
1051.0
1052.0
1053.0
1049.0
1050.0
1050.0
1050.0
1051.0
1052.0
4.9 112.1 86 4
6.4 111.8 85 4
6.2 114.3 87 4
6.3 111.6 85 4
8.2 118.7 9l 4
7.9 118.4 90 4
6.8 120.3 92 4
8.0 119.5 91 4
8.7 121.3 91 5
9.0 119.8 90 5
8.1 118.4 90 4
7.8 119.9 92 4
6.0 118.8 89 5
6.2 119.0 89 5
8.2 120.0 90 5
7.9 121.8 92 5
8.2 119.0 91 4
8.6 119.2 91 4
9.0 l18.3 90 4
7.8 118.6 91 4
7.4 118.1 90' 4
8.2 118.5 90* 4
7.4 116.0 89 4
6.8 116.1 88 4
8.2 120.8 92 4
8.7 118.7 91 4
6.7 120.1 92 4
9.2 118.2 90 4
8.2 124.3 94 5
7.4 121.8 92 5
10.1 120.3 92 4
10.0 119.5 91 4
10.1 118.0 90* 4
9.6 120.9 92* 4
10.1 120.3 91 5
9.6 122.0 92 5
6.7 117.4 89' 4
5.6 116.7 89* 4
8.8 118.3 90* 4
8.5 126.3 95 5
8.6 123.4 93 5
10.2 124.9 94 5
PETRA GEOTECHNICAL, INC.
J.N. 436-01
* Sandcone
** Numbers out of sequence
OCTOBER 2002 \%
TABLE-II 7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE II
Field Density Test Results
.....................................D...rr.............~.............~...........T.....E...........~~:11................................................................................................................................L..............o...............T.m..........~.................~........:11..........~...................N......................................... ......................................................................................................................................)!]......................LE.....~.~...t..})..~...........;.I.II~(....~~)II....................~.......r.........(~...p........~.....h.~....i.t~Iml~o.....)...~;.........................~@I........
"'T .....I...IIY()iI..I OCia."."", If. ~ ..................'0...... ~~ ~ll.............W(' ... ................/I;\:':,,"'.}....
02/25/02
02/25/02
02/25/02
02/25/02
02/25/02
02/25/02
02/25/02
02/25/02
02/25/02
02/25/02
02/25/02
02/25/02
02/25/02
02/25/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/26/02
02/27/02
02/27/02
02/27/02
02/27/02
02/27/02
02/27/02
1445
1446
1447
1448
1449
1476
1477
1478
1479
1480
1481
1482
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
1526
1527
1528
1529
1530
1531
1532
1533
1534
1535
1536
1537
Pechanga Rd/Sta 20+30
Pechanga Rd/Sta 22+20
Pechanga Rd/Sta 22+25
RTNo.1439
RT No. 1440
Pechanga Rd/Sta 25+00
Pechanga Rd/Sta 25+05
Pechanga Rd/Sta 26+50
Pechanga Rd/Sta 26+55
Pechanga Rd/Sta 24+25
Pechanga Rd/Sta 24+30
Pechanga Rd/Sta 23+25
Pechanga Rd/Sta 25+75
Pechanga Rd/Sta 25+80
Pechanga Rd/Sta 18+00
Pechanga Rd/Sta 18+05
Pechanga Rd/Sta 21 +50
Pechanga Rd/Sta 21 +55
Pechanga Rd/Sta 22+75
Pechanga Rd/Sta 22+80
Pechanga Rd/Sta 25+30
Pechanga Rd/Sta 25+35
Pechanga Rd/Sta 19+50
Pechanga Rd/Sta 19+55
Pechanga Rd/Sta 24+50
Pechanga Rd/Sta 24+55
Pechanga Rd/Sta 26+90
Pechanga Rd/Sta 26+95
RTNo.1497
RT No. 1498
Pechanga Rd/Sta 23+00
Pechanga Rd/Sta 23+05
Pechanga Rd/Sta 20+00
Pechanga Rd/Sta 20+05
Pechanga Rd/Sta 13+00
Pechanga Rd/Sta 13+05
Pechanga Rd/Sta 18+50
Pechanga Rd/Sta 18+55
Pechanga Rd/Sta 27+50
Pechanga Rd/Sta 27+55
Pechanga Rd/Sta 12+00
Pechanga Rd/Sta 12+05
1053.0
1052.0
1053.0
1051.0
1052.0
1054.0
1055.0
15058.0
1060.0
1061.0
1058.0
1060.0
1050.0
1051.0
1051.0
1056.0
1058.0
1059.0
1060.0
1061.0
1053.0
1054.0
1061.0
1062.0
1064.0
1065.0
1064.0
1065.0
1063.0
1062.0
1057.0
1056.0
1045.0
1046.0
1056.0
1057.0
1067.0
1068.0
1048.0
1049.0
10.4 124.4 93 5
9.2 123.5 93 5
9.0 122.8 92 5
8.8 118.3 90 4
8.0 119.8 92 4
8.5 125.7 95 5
8.1 124.6 94 5
7.9 123.5 93 5
8.5 124.6 94 5
11.6 118.6 91 4
8.0 120.0 92 4
9.9 119.7 91 4
9.2 118.4 90 4
11.3 119.3 91 4
7.4 125.1 94 5
8.1 122.9 92 5
8.4 128.2 96 5
8.7 123.6 93 5
8.0 119.4 91 4
8.0 119.0 91 4
7.6 118.8 91 4
8.4 119.2 91 4
7.7 124.9 94 5
8.0 123.1 93 5
10.0 118.4 90 4
9.8 118.2 90 4
4.9 116.7 89 4
4.8 115.7 88 4
8.6 118.8 91 4
9.2 120.4 92 4
9.0 118.0 90 4
9.2 119.3 91 4
8.7 119.3 91 4
8.6 118.3 90 4
8.0 120.3 92. 4
8.7 118.4 90. 4
9.2 123.3 94 5
8.4 126.4 95 5
8.3 119.5 91 4
8.7 118.4 90 4
6.9 118.3 90 4
7.2 121.3 93 4
OCTOBER 2002
TABLE-II 8
PETRA GEOTECHNICAL, INC.
J.N.436-01
. Sandcone
.. Numbers out of sequence
\~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE II
Field Density Test Results
............ ~E.i...~~............lIl....................................................................................~~......~. 11................................... ............................................................I..~.........~;.............~I~~~~.i. r.I;~!FiI~Ir~i~11
...D.'''1E.. ........NO... .... ........ ..... .. ............ry"'.,.,.ON.. ..... ... . .. .....r~t) ... .......... .(ff~J..(pc.f:I... ..................{~/^~. .............""'-"'.......
..::::::::::;"..:~::.I.:::,..:::.:.: .::.'0':_;_:.:':: ". '. . ,:.:';::: <':-:<:::_::':;":,:;:,"',""::_'::::::::::::':::::':pV:~~:":~:-,_"_:,,,:>:: ::'-:'.:,::.::,-",:,-:-;::,;:'::"'."::-:":":'-..;.,c..:, :1:1_., _ ':0:'_:':::::::::'::':;';:):';:::::;:: -({.4-; ::::: ,:,-,:..;.,-.,:.,-".,.....:.,..-..._.; ......:: _:;,::; ;":;":'::':":""::': ::.-(i>;- ,:; .;.;,.,:..:;::..::<.:;:,)~;;:;f;':~~:;::::'::;:""
02/27/02 1538 Pala Rd/Sta 155+20 1045.0 6.8 119.2 91 4
02/27/02 1539 Pala Rd/Sta 155+25 1047.0 7.0 120.9 92 4
02/27/02 1540 Pala Rd/Sta 152+30 1040.0 8.6 118.8 91 4
02/27/02 1541 Pala Rd/Sta 152+35 1042.0 9.0 120.4 92 4
02/27/02 1542 Pechanga Rd/Sta 16+80 1054.0 8.9 123.8 93 5
02/27/02 1543 Pechanga Rd/Sta 16+85 1056.0 9.6 125.1 94 5
02/28/02 1544 Peach Tree St/Sta 11 +45 1050.0 5.9 116.2 88 4
02/28/02 1545 Peach Tree St/Sta 11 +50 1051.0 4.6 115.0 88 4
02/28/02 1546 Deer Hollow Wy/Sta 33+80 1042.0 6.6 112.2 86 4
02/28/02 1547 Deer Hollow Wy/Sta 33+85 1041.0 5.8 114.2 87 4
02/28/02 1548 Deer Hollow Wy/Sta 33+20 1043.0 6.2 115.0 89 4
02/28/02 1549 Deer Hollow Wy/Sta 33+25 1044.0 6.7 113.8 87 4
02/28/02 1550 RT No. 1544 8.3 120.2 92 4
02/28/02 1551 RT No. 1545 9.6 120.8 92 4
02/28/02 1552 RT No. 1546 8.4 120.0 92 4
02/28/02 1553 RT No. 1547 7.9 119.5 91 4
02/28/02 1554 RT No. 1548 9.2 120.6 92 4
02/28/02 1555 RT No. 1549 8.7 119.6 91 4
02/28/02 1556 Peach Tree St/Sta 12+70 1050.0 8.5 120.3 92 4
02/28/02 1557 Peach Tree St/Sta 12+75 1051.0 5.9 116.2 88 4
02/28/02 1558 Peach Tree St/Sta 12+75 1050.0 6.3 112.6 86 4
02/28/02 1559 Peach Tree St/Sta 12+90 1051.0 9.0 113.0 86 4
02/28/02 1560 Peach Tree St/Sta 13+50 9.6 109.9 84 4
02/28/02 1561 RT No. 1557 8.3 118.5 90* 4
02/28/02 1562 RTNo.1558 9.8 118.9 91 4
02/28/02 1563 RT No. 1559 7.7 119.1 91 4
02/28/02 1564 RTNo.1560 9.3 117.8 90 4
02/28/02 1565 Deer Hollow Wy/Sta 36+00 1049.0 8.2 119.8 92 4
02/28/02 1566 Deer Hollow Wy/Sta 42+ 1 0 1177.0 10.0 117.8 90 4
02/28/02 1567 Deer Hollow Wy/Sta 39+00 1160.0 11.8 122.1 92 3
03/0 1/02 1568 Deer Hollow Wy/Sta 32+40 1045.0 11.4 116.9 90 4
03/01/02 1569 Deer Hollow Wy/Sta 34+ 1 0 1046.0 8.0 122.2 94 2
03/01/02 1570 Deer Hollow Wy/Sta 32+75 1047.0 10.5 117.7 90 4
03/0 1 /02 1571 Deer Hollow Wy/Sta 33+75 1048.0 9.2 122.0 93 4
03/01/02 1572 Deer Hollow Wy/Sta 33+50 1049.0 10.3 121.7 93* 4
03/01/02 1573 Deer Hollow Wy/Sta 32+50 1050.0 9.1 128.6 97' 3
03/01/02 1574 Deer Hollow Wy/Sta 32+75 1048.0 7.8 127.9 96' 3
03/01/02 1575 Deer Hollow Wy/Sta 33+50 1049.0 11.0 118.6 91' 4
03/01/02 1576 Deer Hollow Wy/Sta 34+30 1051.0 12.0 117.6 90' 4
03/01/02 1577 Deer Hollow Wy/Sta 34+25 1051.0 9.1 122.0 93* 4
03/01/02 1578 Deer Hollow Wy/Sta 34+25 1053.0 10.9 120.9 93* 4
03/01/02 1579 Deer Hollow Wy/Sta 34+00 1053.0 8.8 127.1 97' 3
PETRA GEOTECHNICAL, INC. . Sandcone OCTOBER 2002 1.0
J.N. 436-01 .. Numbers out of sequence TABLE-II 9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE II
Field Density Test Results
t...........iFEST ...................iFEli... .......................................................................m~~m.............. ...............................................................................................................................................................................................E..............................LE.......(........tJ........I....'...~......................i............................................M.........................................()..............................I......iS.....w....u.....JJURE..i...,................................................................................................................................1)...................................E............................'..~......p......S..c......"'..I.........TY..... .............................................................................0...........................0.....{..........o.....IY.M.....~........... p..........................'.......... ........~Q~........
Di\.ii'EN()it..$OOATION'. _ t .. ~'hl L 11 x 'h~13jjf&t
03/01/02 1580 Deer Hollow Wy/Sta 36+60 1050.0 9.6 121.7 91' 3
03/01/02 1581 Deer Hollow Wy/Sta 38+00 1053.0 9.7 121.8 9l 6
03/01/02 1582 Deer Hollow Wy/Sta 40+50 1062.0 10.1 118.4 90 3
03/01/02 1583 Deer Hollow Wy/Sta 37+50 1052.0 10.6 119.4 90 3
03/01/02 1584 Deer Hollow Wy/Sta 41 +25 1064.0 10.1 122.4 90 3
03/01/02 1585 Deer Hollow Wy/Sta 37+50 1054.0 9.6 119.7 92 3
02/13/02 1586 Pala Rd/Sta 152+25 1122.0 11.3 119.7 95 9
02/13/02 1587 Pal a Rd/Sta 153+25 1123.0 10.3 111.0 86 9
02/13/02 1588 RTNo.1587 9.0 120.4 92 4
02/13/02 1589 Pala Rd/Sta 154+50 1124.0 7.0 120.9 92 4
02/13/02 1590 Pala Rd/Sta 152+00 1125.0 7.7 121.3 93' 4
02/13/02 1591 Pala Rd/Sta 153+00 1126.0 6.9 118.4 90 1
02/13/02 1592 Pal a Rd/Sta 154+00 1127.0 9.1 118.3 90 1
02/13/02 1593 Pal a Rd/Sta 154+75 1128.0 9.9 118.1 90 1
02/14/02 1594 Pal a Rd/Sta 154+00 1129.0 10.3 119.0 88 1
02/14/02 1595 RT No. 1594 1139.0 13.1 121.2 91 5
02/14/02 1596 Pala Rd/Sta 155+00 1130.0 13.0 122.3 92 5
02/14/02 1597 Pala Rd/Sta 152+50 1131.0 12.4 123.4 92 5
02/14/02 1598 Pal a Rd/Sta 153+00 1132.0 13.2 125.5 94 5
02/14/02 1599 Pala Rd/Sta 154+90 1133.0 12.6 124.3 93' 5
02/14/02 1600 Pala Rd/Sta 155+00 1134.0 12.4 122.7 92 5
02/14/02 1601 Pala Rd/Sta 154+25 1135.0 12.6 121.0 91 5
02/14/02 1602 Pechanga Rd/Sta 11 +00 1136.0 11.7 120A 93 1
02/14/02 1603 Pechanga Rd/Sta 11+75 1126.0 6.8 119.2 91 1
02/14/02 1604 Pechanga Rd/Sta 11+25 1127.0 11.3 116.4 89 1
02/14/02 1605 RTNo.1604 11.4 123.2 92 5
02/15/02 1606 Pechanga Rd/Sta 11+75 1128.0 12.0 122.0 91 5
02/15/02 1607 Pal a Rd/Sta 154+50 1137.0 11.8 125.0 94 5
02115/02 1608 Pechanga Rd/Sta 10+50 1133.0 12.1 127.4 95 5
02/15/02 1609 Pechanga Rd/Sta 11+50 1129.0 13.4 128.4 96 5
02/15/02 1610 Pechanga Rd/Sta 11+25 1130.0 11.3 121.5 91 5
03/08/02 1611 Pechanga Rd/Sta 152+20 1137.0 12.9 124.7 93 5
03/08/02 1612 Pal a Rd/Sta 153+00s 1138.0 11.7 122.6 92 5
03/08/02 1613 Pal a Rd/Sta 155+20 1139.0 13.6 123.4 92 5
03/08/02 1614 Pechanga Rd/Sta 11 +50 1131.0 10.9 125.5 94 5
03/08/02 1615 Pechanga Rd/Sta 11 +00 1132.0 9.4 119.6 90 5
03/12/02 1631 Primrose St/Sta 26+00 1160.0 7.0 119.5 92 1
03/12/02 l632 Primrose St/Sta 25+25 1162.0 15.0 108.0 93 11
03/12/02 1633 Primrose St/Sta 25+25 1163.0 10.8 118.8 90 1
03/12/02 1634 Primrose St/Sta 25+50 1164.0 14.6 107.9 93 11
03/12/02 1635 Primrose St/Sta 24+00 1165.0 6.9 119.0 91 1
03/12/02 1636 Primrose St/Sta 24+50 1166.0 14.4 107.8 93 11
PETRA GEOTECHNICAL, INC. . Sandcone OCTOBER 2002 ~~
J.N. 436-01 .. Numbers out of sequence T ABLE-II 1 0
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE II
Field Density Test Results
03/12/02
03/12/02
03/12/02
03/12/02
03/12/02
03/13/02
03/13/02
03/13/02
03/13/02
03/13/02
03/13/02
03/13/02
03/13/02
03/13/02
03/13/02
1637
1638
1639
1640
1641
1642
1643
1644
1645
1646
1647
1648
1649
1650
1651
Primrose St/Sta 24+75
Primrose St/Sta 24+75
Primrose St/Sta 25+00
Primrose St/Sta 23+00
Primrose St/Sta 18+75
Primrose St/Sta 20+50
Primrose St/Sta 22+00
Primrose St/Sta 23+00
Primrose St/Sta 21+00
Primrose St/Sta 22+00
Primrose St/Sta 20+ 75
Primrose St/Sta 21+25
Primrose St/Sta 19+50
Primrose St/Sta 20+00
Primrose St/Sta 21+00
1168.0 11.8 117.1 90 1
1165.0 7.6 117.6 90 1
1166.0 9.9 122.8 92 5
1157.0 11.7 116.9 90 1
ll54.0 10.1 117.6 90 4
1156.0 11.0 115.9 90 9
1157.0 10.9 116.9 91 9
1158.0 6.1 115.9 90 9
1157.0 10.7 119.9 92 1
1155.0 11.0 119.9 92 1
1156.0 9.9 122.1 94 1
1157.0 10.2 121.2 93 1
1158.0 8.2 118.1 91 1
1159.0 9.5 117.2 90 1
1160.0 7.6 117.6 90 1
PETRA GEOTECHNICAL, INC.
J.N. 436-01
* Sandcone
** Numbers out of sequence
OCTOBER 2002
TABLE-II 11
~p
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE III
LABORATORY MAXIMUM DRY DENSITY
o PETRA
z:P
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE III
Laboratorv Maximum Drv Densitv I
From 1989 to 1990 ROUQh GradiuQ
16 Orange brown Silty SAND
17 Dark brown Sil SAND
11.0 132.5
8.0 130.0
From 2002 Final ROUQh GradinQ
I Yellow brown Silty SAND with Gravel 9.5 130.5
2 Brown Silty SAND 8.0 130.0
3 Olive brown Silty SAND, micaceous 8.5 132.5
3A Medium brown Silty medium-grained SAND 8.4 133.5
4 Reddish brown Silty SAND 8.5 131.0
5 Light brown Silty fine- to medium-grained SAND 8.5 133.0
6 Medium brown Silty SAND 8.5 131.5
7 Yellow brown Silty SAND 10.5 125.5
9 Reddish brown Clayey SAND 9.5 129.0
10 Light yellow brown Silty SAND 8.5 131.0
11 Li ht ellow CIa e SILT 12.5 116.5
(I) PER ASTM TEST METHOD Dl55?
PETRA GEOTECHNICAL, INC
J.N. 436-01
OCTOBER 2002
Plate A-I
1A
I
I
I
I
I REFERENCES
I
I
I
I
I
I
I
I
I
I
I o PETRA
I
I
I ~
I
I
REFERENCES
I
Blake, T.F., 1998/1999, "UBCSEIS" Version 1.03, A Computer Program for the Estimation of Uniform Building Code
Coefficients Using 3-D Pault Sources.
I
International Conference of Building Officials, 1997, "Uniform Building Code," Volume 2, Structural Engineering
Design Provisions, dated April 1997 .
I
Earth Research Associates, Inc., 1987, Evaluation of Faulting and Liquefaction Potential, Portion bf Wolf Valley
Project, Rancho California, County of Riverside, California;jor Great American Development, J.N.298-87,
dated November 20, 1987.
I
, 1988, Preliminary Soils Engineering and Engineering Geologic Investigation, Red Hawk Project, Rancho
California Area, County of Riverside, California; for Great American Development, LN. 298-87, dated
February 2, 1988.
I
I
Petra Geotechnical, Inc., 1989, Supplemental Soils Engineering and Engineering Geologic Investigation, Portion of
Redhawk Project, Vesting Tentative Tract Map Nos. 23064,23065,23066 and 23067, Rancho Califomia,
County of Riverside, Califomia, Volumes I and lI:for Great American Development, J.N. 298-87, dated
May 8, 1989.
I
I
, 2001a, Updated Preliminary Geotechnical Investigation, Tract 23065 Phases 3 through 7 and Final, Redhawk
Development, Temecula Area, Riverside County, Califomia;jor The Garrett Group, LLC, J.N. 165-0 I, dated
April II, 2001 .
I
, 2001b, Geotechnical Investigation, Proposed Water-Quality Basin and Levee, Redhawk Development,
Southeast of Pal. and Pechanga Roads, Temecula Area, Riverside County, California;jor The Garrett Group,
LLC" J.N. 165-01, dated July 12,2001.
I
I
, 200 I c, Response to Riverside County Building and Safety Department Geotechnical Report Review Sheet,
dated July 31,2001 and Grading Plan Review Report for Tract 23065-2, Temecula Area, Riverside County,
Califomia;jor The Garrett Group, LLC" J.N. 165-01, dated September 2],2001.
I
, 2001d, Response to Building and Safety Department Geotechnical Riverside Review Sheet, dated October 22,
2001, Tract 23065-2, Temecula Area, Riverside County, Califomia;jor The Garrett Group, LLC, , LN. 165-01,
dated November 2, 2001.
I
I
I
OCTOBER 2002
I
PETRA GEOTECHNICAL, INC.
J.N.436-01
I
7.f,
I
RECEIVED I
OCT 1 3 2004
CITY OF TEMECULA I
INEEAING DEPARTMeNT
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I