Loading...
HomeMy WebLinkAboutGeotechnical Rpt (Rough Grading) I I I I I I I I I I I I I I I I I I I o PETRA OFFICES IN THE COUNTIES OF ORANGE. SAN DIEGO. RIVERSIDE. LOS ANGELES. SAN BERNARDINO October 10, 2002 J.N. 436-01 CENTEX HOMES 2280 Wardlow Circle, Suite 150 Corona, California 92880 Attention: Mr. Steve Alford Subject: Geotechnical Report of Rough Grading, Deer Hollow Way (Stations 10+00 through 44+50), Primrose Street (Stations 10+00 through 26+42), Peach Tree Street (Stations 10+00 through 16+50) and Pechanga Road Debris Basin, Tract 23065, Temecula Area, Riverside County, California This report presents a summary of the observation and testing services provided by Petra Geotechnical, Inc. (Petra) during rough-grading operations to complete the construction of the road embankment of Deer Hollow Way (Stations 10+00 through 44+50), Primrose Street (Stations 10+00 through 26+42) and Peach Tree Street (Stations 10+00 through 16+50) within Tract 23065 located in the Temecula area of Riverside County, California. In addition to the aforementioned road embankments, a debris basin was constructed along the south side of Pechanga Road, east of the intersection with Pala Road. This report also documents the overexcavation and recompaction of the proposed storm-drain alignment, located adjacent to the east side of Pal a Road (Stations 149+92 through 158+90) and Pechanga Road (Stations 10+00 through 27+50). This remedial grading was done to facilitate the construction of cast- in-place pipe. Conclusions and recommendations pertaining to the suitability of the grading for the proposed construction are provided herein. Preliminary rough-grading within the golf-course/tract interface was performed within the subject tract in 1989 and 1990, under the purview of Petra; however, a final rough- grading report of the interface grading was not prepared at that time. Therefore, PETRA GEOTECHNICAL, INC. 41640 Corning Place . Suite 107 . Murrieta . CA 92562 . Tel: (909) 600-9271 . Fax: {90g} 600-9215 \ I I I I I I I I I I I I I I I I I I I CENTEX HOMES TR 23065-Streets & Debris Basin/Temecula Area October 10, 2002 J.N.436-01 Page 2 documentation of the previous relevant grading is included with this report. The balance of rough-grading to complete construction, as well as adjacent slopes and access streets, was performed during January to July 2002. REGULATORY COMPLIANCE Cuts, removal and recompaction of unsuitable low-density surface soils and placement of compacted fill under the purview of this report have been completed under the observation of and with selective testing by Petra. The earthwork was perfonned in accordance with the recommendations presented in previous geotechnical reports by Petra (see References) and the Grading Code of the County of Riverside. The completed earthwork has been reviewed and is considered adequate for the construction now planned. On the basis of our observations, as well as field and laboratory testing, the recommendations presented in this repOli were prepared in conformance with generally accepted professional engineering practices and no further warranty is implied nor made. SUMMARY OF AS-GRADED SOIL AND GEOLOGIC CONDITIONS As-Graded Conditions Remedial grading during the 1989 interface grading generally involved the removal and recompaction of low-density surficial soils that included alluvial and colluvial soils subject to hydro collapse or excessive consolidation, as well as near-surface weathered bedrock materials. As it pertains to the grading addressed in this report, the removal and recompaction associated with the interface grading was limited to the northern end of Deer Hollow Way. Remedial grading during the recent phase of rough grading included Deer Hollow Way, Primrose Street, Peach Tree Street, and the 1..- ~ ~ I I I I I I I I I I I I I I I I I I I CENTEX HOMES TR 23065-Streets & Debris Basin/Temecula Area October 10, 2002 J.N.436-01 Page 3 remedial grading for the debris basin and cast-in-place storm-drain construction along Pechanga Road and Pala Road. The compacted fills range in depth from approximately 3 to 20 feet. A general description of the soil and bedrock materials underlying the subject tract is provided below. . Compacted Engineered Fill (map symbol afc) - The compacted-fill soils placed in 1989 generally consisted of silty sand and sandy silt with variable amount of clay. The compacted-fill soils placed in 2002 are comprised of onsite-derived soil and bedrock materials and generally consist of fine- to coarse-grained sand, silty sand and clayey sand. . Alluvium (map symbol Oan - The alluvial deposits left in-place below the compacted fills in local areas of the tract consist of medium dense to dense, fine- to coarse-grained sand and silty sand with some gravel. . Pauba Formation Bedrock (Ops) - The Pauba Formation consists of dense, fine- to coarse-grained sandstone and silty sandstone with occasional gravel and hard siltstone beds. Bedding within the Pauba Formation is generally massive with gradational and indistinct contacts. SUMMARY OF EARTHWORK OBSERVATIONS AND DENSITY TESTING Clearing and Grubbing At the time of grading, a majority of the tract was covered with a light growth of grasses and weeds. This light vegetation was removed during overexcavation of existing grades and mixed with the excavated soils in an acceptable manner (i.e., the resultant blend contained less than 1 percent organic materials). Heavy vegetation that existed in local areas, as well as some construction debris, were removed from the site. Ground Preparation . Road Embankments -- Deer Hollow Way, Primrose Street and Peach Tree Street removals were initiated approximately 16 feet outside the right-of-way projecting outward to the bottom of the removal at a 1: 1 (horizontal:vertical [h:v]). An 8-foot 2> ~ ~ I I I I I I I I I I I I I I I I I I I CENTEX HOMES TR 23065-Streets & Debris Basin/Temecula Area October 10, 2002 J.N. 436-01 Page 4 minimum thickness fill blanket underlies Deer Hollow Way, Primrose Street and Peach Tree Street. The south-western corner of Primrose Street and Peach Tree Street have removals of15 to 20 feet deep at a 1: 1 (h:v) projection from the right- of-way for the slopes which descend to the storm basin. . Debris Basin -- The removals for the berm and access road for the debris basin on the south side of Pechanga Road were approximately 3 to 6 feet below original grade. The bottom of the debris basin and associated cuts are entirely in alluvial deposits. . Pala Road/Pechanga Road Storm Drain -- Removals along the east side of Pala Road and the north side ofPechanga Road were made in order to accommodate the cast-in-place storm-drain line. The removals varied between 11 and 20 feet in depth. The bottom of the removals were 30 feet wide with the temporary excavation slopes cut at approximately 1:1 (h:v). Prior to placing fill, exposed bottom surfaces in all removal areas were first observed and approved by our geologist or senior soil teclmician. Following this approval, the exposed bottom surfaces were scarified to depths of approximately 6 to 8 inches, watered or air-dried as necessary to achieve a moisture content equal to or slightly above or below optimum moisture content and then recompacted in-place to a minimum relative compaction of90 percent. Fill Placement and Testing All fill soils were placed in lifts restricted to approximately 6 to 8 inches in maximum thickness, watered or air-dried as necessary to achieve near-optimum moisture conditions and then compacted in-place to a minimum relative compaction of 90 percent based on ASTM Test Method D1557. Compaction was achieved by whee1- rolling with an 824 rubber-tired dozer and loaded scrapers. The maximum vertical depth of fill placed within the subject site is approximately 20 feet. Field density and moisture content tests were performed in accordance with nuclear- gauge test methods ASTM Test Methods D2922 and D3017. Occasional field density ~ ~ I I I I I I I I I I I I I I I I I I I CENTEX HOMES TR 23065-Streets & Debris BasinITemecu1a Area October 10, 2002 J.N.436-01 Page 5 tests were also performed in accordance with the sandcone method ASTM Test Method D1556. Field density test results are presented on the attached Tables I and II and approximate test locations are shown on the enclosed Field Density Test Location/Geotechnical Maps (Plates 1 through 5). Table I presents the results of the field density tests taken in 1989 and 1990. Table II presents the results of the field density tests taken in 2002. Field density tests were taken at vertical intervals of approximately I to 2 feet and the compacted fills were tested at the time of placement to verify that the specified moisture content and minimum required relative compaction of90 percent had been achieved. At least one in-place density test was taken for each 1,000 cubic yards of fill placed and/or for each 2 feet in vertical height of compacted fill. The actual number of tests taken per day varied with the project conditions, such as the number of earth- movers (scrapers) and availability of support equipment. When field density tests produced results less than the required minimum relative compaction of 90 percent or if the soils were found to be excessively above or below optimum moisture content, the approximate limits of the substandard fill were established. The substandard area was then either removed or reworked in-place. Visual classification of earth materials in tl1e field was the basis for determining which maximum dry density value was applicable for a given density test. Single-point checks were performed to supplement visual classification. Fill Slopes No fill slopes were constructed for the road embankments in excess of approximately 3 feet in height. ? ~ ~ I I I I I I I I I I I I I I I I I I I CENTEX HOMES TR 23065-Streets & Debris Basin/Temecula Area October la, 2002 J.N.436-01 Page 6 Cut Slopes No permanent cut slopes were constructed during grading for the road embankments. FilI-Over-Cut Slopes A fill-over-cut slope was constructed within the Pechanga Road debris basin at a gradient of 4:1 (h:v). This slope attains a maximum height of approximately 14 feet. LABORATORY TESTING Maximum Dry Density Maximum dry density and optimum moisture content for each change in soil type observed during grading were determined in our laboratory in accordance with ASTM Test Method D1557. Pertinent test values are summarized in Table III. RECOMMENDATIONS Utility Trenches All utility-trench backfill within the street right-of-ways, utility easements and under sidewalks, as well as within or in proximity to slopes should be compacted to a minimum relative density of 90 percent. Where onsite soils are utilized as backfill, mechanical compaction will be required. Density testing, along with probing, should be performed by the project soils engineer or his representative, to verify proper compaction. For deep trenches with vertical walls, backfill should be placed in approximately 1- to 2-foot thick maximum lifts and then mechanically compacted with a hydra-hammer, pneumatic tampers or similar equipment. For deep trenches with sloped-walls, backfill ~ ~ ~ I I I I I I I I I I I I I I I I I I I CENTEX HOMES TR 23065-Streets & Debris Basin/Temecula Area October 10, 2002 J.N. 436-01 Page 7 materials should be placed in approximately 8- to 12-inch thick maximum lifts and then compacted by rolling with a sheepsfoot tamper or similar equipment. As an alternative for shallow trenches where pipe may be damaged by mechanical compaction equipment imported clean sand having a sand equivalent value of 30 or greater may be utilized and jetted or flooded into place. No specific relative compaction will be required; however, observation, probing and, if deemed necessary, testing should be performed. To avoid point-loads and subsequent distress to clay, cement or plastic pipe, imported sand bedding should be placed at least I foot above all pipe in areas where excavated trench materials contain significant cobbles. Sand-bedding materials should be thoroughly jetted prior to placement of backfill. Pavement Design It is Petra's understanding that the design of the pavement sections will be provided by the County of Riverside. Pavement Construction As with the pavement design, we understand that observation and testing for the preparation ofthe pavement sub grade and placement of aggregate base and asphaltic concrete will be provided by the County of Riverside. '1 ~ ~ I I I I I I I I I I I I I I I I I I I CENTEX HOMES TR 23065-Streets & Debris Basin/Temecula Area October 10, 2002 J.N.436-01 Page 8 This opportunity to be of service is sincerely appreciated. If you have any questions, please contact this office. Respectfully submitted, GAlTLJ/GR W /keb Attachments: Table I -Field Density Test Results (1989) Table II -Field Density Test Results (2002) Table III - Laboratory Maximum Dry Density References Plates 1 through 5 - Geotechnical Maps with Density Test Locations (in pocket) Distribution: (1) Addressee (3) Centex Homes Attention:. Ms. Kim Moring (1) The Garret Group LLC Attention: Mr. John Leway (2) Riverside County Building and Safety Attention: Mr. Mack Hakakian g ~ ~ I I I I I I I I I I I I I I I I I I I TABLE I FIELD DENSITY TEST RESULTS 1989 _ PETRA <\ I I ........~~w .......ii...1I!~..ii............................................................[!i~~W...................... ...........................................~l1iig'j ii....Mo.ts~ .DENSITM/ .com. iii..i...SOIU...i/ I I I I I I I I I I I I I I I I TABLEr Field Density Test Results 06/15/89 lA Fairview Ave/Slope 1169.0 8.9 117.5 90 17 06/12/89 2A Fairview Ave/Slope 1175.0 10.3 118.0 91 17 06/22/89 3A Fairview Ave/Slope 1180.0 13.3 119.2 90 16 06/22/89 4A Fairview Ave/Slope 1179.0 10.0 124.6 94 16 06/22/89 5A Fairview Ave/Slope 1180.0 10.6 121.6 94 17 06/22/89 6A Fairview Ave/Slope 1180.0 11.6 120.0 92 17 PETRA GEOTECHNICAL, INC. J.N. 436-01 \t) 1989 TABLE-I 1 I I I I I I I I I I I I I I I I I I I TABLE II FIELD DENSITY TEST RESULTS 2002 e PETRA \A. I I I I I I I I I I I I I I I I I I I TABLE II Field Density Test Results 12/18/01 1001 Deer Hollow Wy/Sta 14+30 1131.0 9.4 120.2 90 3A 12/18/01 1002 Deer Hollow Wy/Sta 14+75 1131.0 10.9 125.6 94 3A 12/18/0 1 1003 Deer Hollow Wy/Sta 12+00 1129.0 10.1 119.4 91 4 12/18/01 1004 Deer Hollow Wy/Sta 11 +60 1128.0 9.1 122.0 93 4 12/18/01 1005 Deer Hollow Wy/Sta 17+80 1132.0 8.3 119.3 91 4 12/18/01 1006 Deer Hollow Wy/Sta 16+20 1131. 0 7.1 115.2 88 I 12/18/01 1007 RTNo.1006 8.6 117.6 90 1 12/18/01 1008 Deer Hollow Wy/Sta 11+40 1133.0 9.3 117.7 90 1 12/18/01 1009 Deer Hollow Wy/Sta 10+80 1135.0 10.1 119.3 91 4 12/18/01 1010 Deer Hollow Wy/Sta 14+91 1136.0 9.6 117.7 90 I 12/18/01 1011 Deer Hollow Wy/Sta 17+30 1138.0 9.9 113.7 87 1 12/18/01 1012 Deer Hollow Wy/Sta 18+35 1133.0 10.4 118.0 90 4 12/18/01 1013 RTNo. lOll 9.8 119.1 91 1 12/19/01 1014 Deer Hollow Wy/Sta 13+00 1138.0 11.3 118.9 91 1 12/19101 1015 Deer Hollow Wy/Sta 10+75 1135.0 9.2 121.5 93 1 12/19/01 1016 Deer Hollow Wy/Sta 12+60 1137.0 12.5 117.6 90 1 12/19/01 1017 Deer Hollow Wy/Sta 13+50 1138.0 11.9 118.1 90 4 12/19/01 1018 Deer Hollow Wy/Sta 15+40 1140.0 11.6 120.5 92 1 12/19/01 1019 Deer Hollow Wy/Sta 14+00 1139.0 12.9 117.7 90 1 12/19/01 1020 Deer Hollow Wy/Sta 15+50 1140.0 8.6 117.5 90 I 12/19/01 1021 Deer Hollow Wy/Sta 15+20 1138.0 10.3 117.9 90 1 12/19/01 1022 Deer Hollow Wy/Sta 18+61 1136.8 5.9 112.9 86 4 12/19/01 1023 Deer Hollow Wy/Sta 20+ 1 0 1134.8 6.3 110.3 84 4 12/19/01 1024 RT No. 1022 8.6 118.3 90 4 12/19/01 1025 RTNo.1023 8.4 119.4 91 4 12/20/01 1026 Deer Hollow Wy/Sta 22+00 1137.0 11.9 117.6 90 1 12/20/01 1027 Deer Hollow Wy/Sta 21 +30 1135.0 12.2 117.9 90 1 12/20/0 1 1028 Deer Hollow Wy/Sta 20+50 1135.0 9.2 117.6 90 I 12/20/01 1029 DeerHollowWy/Sta 18+10 1140.0 11.7 117.7 90 1 12/20/01 1030 Deer Hollow Wy/Sta 22+50 1141.0 7.9 124.3 93 3A 12/20/01 1031 Deer Hollow Wy/Sta 23+40 1137.0 8.8 121.6 91 3A 12/20/01 1032 Deer Hollow Wy/Sta 22+55 1140.0 8.1 120.4 90 3A. 12/20/01 1033 Deer Hollow Wy/Sta 19+25 1142.0 7.9 121.5 93 1 12/20/01 1034 Deer Hollow Wy/Sta 26+05 1139.0 9.4 121.6 91 3A 12/20/01 1035 Deer Hollow Wy/Sta 27+40 1138.0 8.6 122.9 92 3A 12/20/01 1036 Deer Hollow Wy/Sta 25+ 1 0 1142.0 8.1 118.1 90 4 12/20/01 1037 Deer Hollow Wy/Sta 25+50 1144.0 7.7 120.4 91 3 12/26/01 1038 Deer Hollow Wy/Sta 30+00 1140.0 11.6 118.9 91 1 12/26/01 1039 Deer Hollow Wy/Sta 28+25 1141.0 12.1 117.7 90 1 12/26/01 1040 Deer Hollow Wy/Sta 25+90 1145.0 12.4 117.6 90 1 12/26/01 1041 Deer Hollow Wy/Sta 27+ 1 0 1143.0 13.0 120.3 92 1 12/26/01 1042 Deer Hollow Wy/Sta 27+85 1145.0 9.8 121.6 93 1 PETRA GEOTECHNICAL, INC. . Sandcone OCTOBER 2002 '<~ J.N. 436-01 .. Numbers out of sequence TABLE-II 1 I I I I I I I I I I I I I I I I I I I TABLE II Field Density Test Results W~$tf!ll~'ll!ll~~~.BM;.~.Q!~;l;~!i~4~~!!j.i~..~~I~;~Q~i ij)l&i\it ./i.il\lO/i....... ...i.....i.nCOIl1A1J)OI\,n...i. iiii....../i1...O:t) ............1 I Iii i(!l1iJ ....1.......1/1...(ii~,9..... ................{{?(@.......i..............jMtpiii... 12/26/01 12/26/01 12/26/01 12/26/01 12/26/01 12/26/01 12/26/01 12/27/01 12/27/01 12/27/01 12/27/01 12/27/01 12/27/01 12/27/01 12/27/01 12/27/01 12/27/01 12/28/01 12/28/01 12/28/01 12/28/0 1 12/28/01 12/28/01 01/03/02 01/03/02 01/03/02 01/03/02 01/03/02 01/03/02 01/03/02 01/03/02 01/03/02 01/03/02 01/03/02 01/03/02 01/03/02 01/03/02 01/04/02 01/04/02 01/04/02 01/04/02 01/04/02 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 Ion Deer Hollow Wy/Sta 29+20 Deer Hollow Wy/Sta 23+50 Deer Hollow Wy/Sta 25+50 Deer Hollow Wy/Sta 29+70 Deer Hollow Wy/Sta 28+25 Deer Hollow Wy/Sta 30+30 RTNo.1044 Deer Hollow Wy/Sta 23+00 Deer Hollow Wy/Sta 21 +80 Deer Hollow Wy/Sta 20+75 Deer Hollow Wy/Sta 19+50 Deer Hollow Wy/Sta 18+60 Deer Hollow Wy/Sta 17+75 Deer Hollow Wy/Sta 15+75 Deer Hollow Wy/Sta 13+50 Deer Hollow Wy/Sta 11 +30 Deer Hollow Wy/Sta 12+40 Deer Hollow Wy/Sta 26+ 10 Deer Hollow Wy/Sta 27+05 Deer Hollow Wy/Sta 27+75 Deer Hollow Wy/Sta 29+05 Deer Hollow Wy/Sta 30+50 Deer Hollow Wy/Sta 27+05 Peach Tree St/Sta 11+20 Peach Tree St/Sta 12+20 Peach Tree St/Sta 13+80 Primrose St/Sta 11+95 Primrose St/Sta13+80 Primrose St/Sta 13+62 Primrose St/Sta 14+70 Primrose St/Sta 14+65 Primrose St/Sta 15+00 Primrose St/Sta 15+00 Primrose St/Sta 13+20 Primrose St/Sta 13+25 Primrose St/Sta 11 +85 Primrose St/Sta 11+75 Primrose St/Sta 14+25 Primrose St/Sta 14+35 Primrose St/Sta 13+01 Primrose St/Sta 13+00 . Primrose St/Sta 13+20 1 1 1 I 1 1 1 3A 4 3A 4 1 1 3A I 4 4 1 4 4 1 1 2 1 4 4 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 OCTOBER 2002 \3- TABLE-II 2 1145.0 10.7 119.2 91 1144.0 13.9 110.9 85 1144.0 9.7 119.1 91 1146.0 11.8 121.5 93 1146.0 13.1 118.9 91 1147.0 8.9 119.0 91 9.9 117.7 90 1144.0 9.1 121.7 91 1144.0 9.6 122.2 93 1143.0 9.4 125.7 94 1142.0 10.6 119.4 91 ll42.0 9.5 118.8 91 1142.0 9.1 118.9 91 1141.0 10.4 126.9 95 1140.0 ll.l 121.4 93 1140.0 12.6 120.9 91 1139.0 9.4 120.7 91 1146.0 10.6 117.6 90 1146.0 9.4 122.0 93 1148.0 8.9 119.5 91 1148.0 10.1 120.2 92 1145.0 9.8 120.4 91 1144.0 9.4 118.5 91 1145.0 10.1 117.6 90 l141.0 9.2 118.3 90 1154.0 8.4 120.8 91 1150.0 12.8 119.9 92 1149.0 9.4 117.0 90 1148.0 15.9 118.8 91 1147.0 12.3 119.7 92 1149.0 14.7 118.4 91 1148.0 10.5 118.6 91 1150.0 13.5 117.3 90* 1151.0 10.4 118.0 91 1152.0 10.7 117.1 90 1152.0 9.9 119.8 91 1153.0 9.4 117.5 90 1155.0 7.1 121.7 94 1153.0 8.5 127.9 98* 1155.0 7.1 119.8 91* 1154.0 7.3 118.4 91 1154.0 8.3 122.7 95 PETRA GEOTECHNICAL, INC. J.N.436-01 . Sandcone .. Numbers out of sequence I I I I I I I I I I I I I I I I I I I TABLE II Field Density Test Results !..........~~~~...ililf.............. .........................................................~~.~~............................... ...............................~rfl ~l;................................M..........................O.....................Is......(.........o.....".....~..........)............................................i..........................................b...................~.................~......p.........cF........^.~......l\Y.........................................................................................c.............................O....i............"...1\1.............).. p...................;................~Q~~......... ..n.A)j!)]\(OiiitiO.it.iMll'tONif.j, J/ _ Of" _ L g ~ " _l\YJfE.J 2 3 3 3 3 3 3 3 1 4 1 1 I 2 3 3 1 3 3 3 1 1 1 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 1 OCTOBER 2002 ~ TABLE-II 3 01/04/02 1093 Primrose St/Sta 13+20 1155.0 11.0 117.9 90 01/10/02 1094 Retention basin l150.0 12.4 124.9 94* 01/10/02 1095 Retention basin 1153.0 11.7 122.3 92 01/10/02 1096 Retention basin 1152.0 12.1 123.7 93 01/10/02 1097 Retention basin 1149.0 10.6 124.2 94 01/10/02 1098 Retention basin 1146.0 11.1 126.4 95 01/10/02 1099 Retention basin 1153.0 10.4 127.7 96 01/10/02 1100 Retention basin 1151.0 9.7 123.0 93 01/03/02 1105 Peach Tree St/Sta 11+ 1 0 1146.0 12.4 117.6 90 01/03/02 1108 Peach Tree St/Sta 10+50 1149.0 9.6 120.8 92 01/03/02 1109 Peach Tree St/Sta 13+ I 0 1150.0 10.8 118.8 91 01/03/02 1121 Peach Tree St/Sta 13+40 1156.0 12.1 118.7 91 01/03/02 1122 Deer Hollow Wy//Sta 35+00 1152.0 11.4 118.6 91 01/04/02 1141 Deer Hollow Wy/Sta 36+40 1150.0 11.5 119.6 92 01/07/02 1150 Deer Hollow Wy/Sta 39+25 1145.0 6.4 124.3 95 01/07/02 1151 Deer Hollow Wy/Sta 36+60 1140.0 6.1 120.7 91* 01/07/02 1169 Pala Rd/ClP Sta 16+50 1130.0 8.5 118.2 91 01/07/02 1170 Pal a RdlCIP Sta 12+50 1129.0 9.5 122.0 93 01/07/02 1171 Pal a Rd/CIP Sta 12+50 1131.0 5.4 119.4 90 01/07/02 1172 Pala RdlCIP Sta 14+50 1130.0 5.7 119.4 90 01/07/02 1173 Pala RdlCIP Sta 15+50 1133.0 6.2 117.2 90 01/07/02 1174 Pal a Rd/ClP Sta 13+25 1131.0 6.0 117.4 90 01/07/02 1180 Deer Hollow Wy/Sta 35+80 1140.0 11.2 120.4 92 01/07/02 1181 Deer Hollow Wy/Sta 38+00 1149.0 9.8 118.9 91* 01/08/02 1206 Pal a RdI Sta 16+75 1134.0 8.5 120.6 91 01/08/02 1207 Pal a Rd/ Sta 16+00 1136.0 8.6 124.3 94 01/08/02 1208 Pala RdI Sta 14+25 1134.0 8.5 120.4 91 01/08/02 1209 Pala RdI Sta 14+25 1136.0 9.7 120.8 91 01/08/02 1210 Pal a Rd/ Sta 12+20 1130.0 8.4 118.8 90 01/08/02 1211 Pala Rd/ Sta 12+75 1133.0 9.3 120.7 91 01/08/02 1212 Pal a Rd/ Sta 15+60 1138.0 8.3 121.1 91 01/08/02 1213 Pala Rd/ Sta 12+75 1136.0 9.6 121.7 92 01/08/02 1214 Pala Rd/ Sta 13+50 1138.0 8.2 121.3 92 01/08/02 1215 Pal a Rd/ Sta 14+80 1139.0 9.6 121.3 92 01/08/02 1216 Pala RdI Sta 16+80 1143.0 9.2 118.7 90 . 01/08/02 1217 Pala RdI Sta 13+50 1140.0 8.7 122.8 93 01/08/02 1221 Primrose St/Sta 11+50 1152.0 10.4 123.4 93 01/08/02 1222 Primrose St/Sta 12+75 1153.0 8.8 120.6 91 01/08/02 1223 Primrose St/Sta 14+40 1155.0 9.6 122.4 92 01/08/02 1224 Primrose St/Sta 15+50 1153.0 11.2 122.1 92 01/09/02 1238 Deer Hollow Wy/Sta 38+60 1153.0 8.2 122.2 92 01/09/02 1248 Deer Hollow Ave/Sta 35+50 1146.0 10.1 119.7 90 PETRA GEOTECHNICAL, INC. J.N. 436-01 . Sandcone .. Numbers out of sequence I I I I I I I I I I I I I I I I I I I TABLE II Field Density Test Results ....".....--.--......,..,.....-..."."...... I Ii....i$ClJlVlI ...-.-_..............-.......-.-.-.-,-,-...-.....,-_.,.....-,-.-.-,'.,,-.,.". ...__._d.__...........__._............_.. ...----......-......-..-.-.--.---.-..--.-..... ................(jjf.... .....,_..,_........_.,...,...._..,_,., _n._,_' ).'..........i.'i.. ,t..)) ~g~~......p~$~~...I...@gM:~}I..,$gmI i','...ii(o/<iliiI...'..'.....ii(Q~fj .....ii.,.(f)'J}'I .'."~$Ii 'R~IIIIIIIII~lll 01/09/02 1249 Deer Hollow Ave/Sta 38+00 1145.0 10.6 119.4 90 3 01/08/02 1250 Primrose St/Sta 10+50 1152.0 13.9 118.3 90 10 01/08/02 1251 Primrose St/Sta 12+25 1154.0 13.8 122.2 93 10 01/08/02 1252 Primrose St/Sta 13+50 1156.0 13.6 118.2 90 10 01/08/02 1253 Primrose St/Sta 11 +50 1158.0 13.6 118.2 90 10 01/09/02 1254 Primrose St/Sta 18+50 1153.0 10.5 125.8 96 3 01/09/02 1255 . Primrose St/Sta 17+00 1154.0 11.9 124.5 95 3 01/09/02 1256 Primrose St/Sta 17+00 1156.0 10.4 125.8 96 3 01/09/02 1257 Primrose St/Sta 16+00 1151.0 12.7 119.1 90 3 01/09/02 1258 . Primrose St/Sta 16+50 1158.0 11.7 119.9 90 3 01/09/02 1259 Retention Basin 1152.0 11.5 121.4 92 3 01/09/02 1260 Retention Basin 1147.0 12.4 119.2 90 3 01/09/02 1261 Retention Basin 1154.0 11.9 120.0 91 3 01/09/02 1262 Retention Basin 1155.0 11.2 120.7 91 3 01/09/02 1263 Retention Basin 1154.0 10.8 124.7 94 3 01/09/02 1264 Retention Basin 1153.0 11.2 121.6 92 3 01/09/02 1265 Retention Basin 1150.0 12.2 121.0 91 3 01/09/02 1266 Retention Basin 1152.0 11.6 122.3 92 3 01/09/02 1267 Retention Basin 1154.0 10.9 121.4 92 3 01/09/02 1268 Retention Basin 1156.0 9.4 123.6 93 3 01/09/02 1269 Retention Basin 1158.0 10.2 120.8 91 3 01/09/02 1270 Retention Basin 1156.0 11.1 119.3 90 3 01/09/02 1271 Retention Basin 1152.0 10.8 119.8 90 3 01/09/02 1272 Retention Basin 1154.0 10.5 121.6 92 3 01/09/02 1273 Retention Basin 1156.0 9.6 123.7 93 3 01/09/02 1274 Retention Basin 1158.0 8.9 124.6 94 3 01/09/02 1275 Deer Hollow Wy/Sta 40+ 10 1147.0 9.1 120.8 91 3 01/09/02 1276 Retention Basin access road l157.0 7.9 l23.6 93 3 01/09/02 1277 Retention Basin access road 1159.0 8.0 124.8 94 3 01/09/02 1278 Retention Basin access road 1161.0 9.4 123.4 93 3 01/09/02 1279 Retention Basin access road 1165.0 10.6 120.7 91 3 01/09/02 1280 Retention Basin access road 1164.0 7.6 121.9 92 3 01/09/02 1281 Retention Basin access road 1166.0 8.0 120.8 91 3 01/09/02 1282 Retention Basin access road 1167.0 8.4 122.4 92 3 01/09/02 1283 Retention Basin access road 1163.0 9.4 122.1 92 3 01/09/02 1** Deer Hollow Wy/Sta 36+40 1142.0 7.9 119.4 90 3 01/09/02 2** Deer Hollow Wy/Sta 37+35 1142.0 8.1 120.8 91 3 01/09/02 4** Deer Hollow Wy/Sta 39+40 1146.0 7.8 117.9 90* 4 01/09/02 5** Deer Hollow Wy/Sta 40+70 1147.0 8.3 119.9 92 4 01/09/02 9** Deer Hollow Wy/Sta 38+ 10 1150.0 8.3 118.5 90 4 01/09/02 13** Deer Hollow Wy/Sta 35+90 1148.0 11.6 120.7 91 3 01/09/02 16** Deer Hollow Wy/Sta 37+35 1149.0 12.4 119.9 92 1 PETRA GEOTECHNICAL, INC. . Sandcone OCTOBER 2002 \-5 J.N. 436-01 .. Numbers out of sequence TABLE-II 4 I I Field Density Test Results TABLE II I I I I I I I I I I I I I I I I 01/09/02 19** Deer Hollow Wy/Sta 36;+50 1150.0 9.1 117.7 90* 1 01/09/02 22** Deer Hollow Wy/Sta 38+95 1150.0 14.1 117.3 90 1 01/11/02 33** Deer Hollow Wy/Sta 37+70 1149.0 11.1 119.0 90 3 01/14/02 48** Deer Hollow Wy/Sta 37+60 1156.0 11.1 122.1 92 3 Ol1l5/02 1284 Deer Hollow Wy/Sta 41+00 1150.0 6.9 124.1 93 4 01/15/02 1285 Deer Hollow Wy/Sta 39+90 1153.0 7.1 122.9 92* 4 01/16/02 1286 Deer Hollow Wy/Sta 4+a50 1155.0 7.7 120.9 91 3A 01116/02 1287 Deer Hollow Wy/Sta 40+ 70 1156.0 7.8 120.7 90 3A 01/16/02 1288 Deer Hollow Wy/Sta 40+75 1158.0 9.8 121.9 91 3A 01/16/02 1289 Deer Hollow Wy/Sta 425 1157.0 10.1 121.3 91 3A .01/17/02 1290 Deer Hollow Wy/Sta 40+20 1159.0 9.1 122.7 92 3A 01/17/02 1291 Deer Hollow Wy/Sta 42+75 1159.0 10.1 119.9 90 3 01/17/02 1292 Deer Hollow Wy/Sta 43+40 1157.0 9.7 120.3 91 3 01/18/02 1293 Deer Hollow Wy/Sta 43+25 1159.0 9.9 121.7 91 3A 01118/02 1294 Deer Hollow Wy/Sta 42+40 1160.0 10.3 122.3 92 3A 01/18/02 1295 Deer Hollow Wy/Sta 40+20 1161.0 10.0 121.9 91 3A 01/15/02 71** Deer Hollow Wy/Sta 41+25 1150.0 9.1 122.3 92 3 01/15/02 80** Deer Hollow Wy/Sta 33+00 1138.0 8.1 119.3 90 3 01115/02 81** Deer Hollow Wy/Sta 33+75 1136.0 7.4 122.0 92 3 01115/02 82** Deer Hollow Wy/Sta 35+00 1140.0 7.3 120.1 90 5 01/15/02 88** Deer Hollow Wy/Sta 34+50 1141.0 7.9 120.4 90 5 01/17/02 129** Deer Hollow Wy/Sta 32+60 1143.0 10.1 121.9 91 3A 01/17/02 135** Deer Hollow Wy/Sta 32+60 1146.0 9.3 117.9 89 3 01/17/02 138** RT No. 135 10.1 120.3 91 3 01/17/02 194** Deer Hollow Wy/Sta 33+65 1146.0 9.1 122.0 91 3A 01/17/02 195** Deer Hollow Wy/Sta 33+00 1144.0 8.7 118.1 91 2 01/17/02 196** Deer Hollow Wy/Sta 42+40 1156.0 8.9 121.0 91 3A 01/17/02 197** Deer Hollow Wy/Sta 41 +50 1155.0 10.0 117.9 91 2 01117/02 198** Deer Hollow Wy/Sta 41 +00 1156.0 9.9 118.3 91 2 01/18/02 205** Deer Hollow Wy/Sta 33+40 1148.0 10.0 121.5 91 3A 01/18/02 206** Deer Hollow Wy/Sta 34+00 1150.0 9.7 122.7 92 3A 01/21/02 1296 Deer Hollow Wy/Sta 43+85 1162.0 9.3 119.9 90 3 01/21/02 1297 Deer Hollow Wy/Sta 42+80 1164.0 8.9 121.3 92 3 01/21/02 1298 Deer Hollow Wy/Sta 42+ 1 0 1164.0 10.1 121.5 92* 3 01/21/02 1299 Deer Hollow Wy/Sta 39+80 1156.0 10.3 120.1 91 3 01/21/02 1300 Deer Hollow Wy/Sta 39+80 1159.0 10.3 120.3 91 3 01/21/02 1301 Deer Hollow Wy/Sta 39+80 1161.0 9.7 121.9 92 3 01/21/02 1302 Deer Hollow Wy/Sta 43+ 10 1164.0 9.5 117.7 91 2 01/21/02 1303 Deer Hollow Wy/Sta 39+65 1156.0 9.1 118.3 91 2 01/21/02 1304 Deer Hollow Wy/Sta 38+30 1156.0 10.7 120.5 91 3 01/21/02 1305 Deer Hollow Wy/Sta 37+50 1157.0 10.3 117.5 90 2 01/22/02 1306 Deer Hollow Wy/Sta 43+60 1166.0 10.3 116.4 93 7 PETRA GEOTECHNICAL, INC. . Sandcone OCTOBER 2002 \c", J.N.436-01 .. Numbers out of sequence TABLE-II 5 I I I I I I I I I I I I I I I I I I 01/22/02 01/22/02 01/22/02 01/22/02 01/22/02 01/22102 01/22/02 01/22/02 01/22/02 01/23/02 01/23/02 01/23/02 01/23/02 01/24/02 02/19/02 02/19/02 02/19/02 02/19/02 02/19102 02/19/02 02/19/02 02/19102 02/19/02 02/19102 02/19/02 02/19/02 02/19/02 02/19/02 02/19/02 02/19/02 02/20102 02/20/02 02/20/02 02/20/02 02/20/02 02/20/02 02/20/02 02/20/02 02/20/02 02/20102 02/20/02 02/20/02 1307 1308 1309 1310 1311 1312 1313 1314 1315 1316 1317 1318 1319 1320 1375 1376 1377 1378 1379 1380 1381 1382 1383 1384 1385 1386 1387 1388 1389 1390 1391 1392 1393 1394 1395 1396 1397 1398 1399 1400 1401 1402 TABLE II Field Density Test Results Deer Hollow Wy/Sta 42+55 Deer Hollow Wy/Sta 41 +90 Deer Hollow Wy/Sta 41+30 Deer Hollow Wy/Sta 37+90 Deer Hollow Wy/Sta 40+90 Deer Hollow Wy/Sta 42+50 Deer Hollow Wy/Sta 43+50 Deer Hollow Wy/Sta 41 +50 Deer Hollow Wy/Sta 38+40 Deer Hollow Wy/Sta 39+00 Deer Hollow Wy/Sta 40+00 Deer Hollow Wy/Sta 42+40 Deer Hollow Wy/Sta 40+65 Deer Hollow Wy/Sta 40+60 Pechanga RdlSta 11+75 Pechanga RdlSta II +80 Pechanga Rd/Sta 12+90 Pechanga Rd/Sta 12+85 Pala Rd/Sta 151+00 Pala RdlSta 154+ 1 0 Pechanga RdlSta 11 +40 RTNo.138l Pechanga RdlSta 15+90 Pechanga RdlSta 15+95 Pechanga Rd/Sta 14+35 Pechanga RdlSta 14+40 RTNo.1384 RTNo.1386 Pechanga RdlSta 15+30 Pechanga RdlSta 13+60 Pechanga RdlSta 15+45 Pechanga Rd/Sta 13+70 Pechanga Rd/Sta 15+20 RTNo.1392 Pechanga RdlSta 12+60 Pechanga RdlSta 12+65 Pechanga RdlSta 17+30 Pechanga RdlSta 17+35 Pechanga RdlSta 18+75 Pechanga RdlSta 18+80 Pechanga RdlSta 13+75 Pechanga RdlSta 13+80 1167.0 11.1 114.0 91 7 1167.0 10.7 113.6 91 7 1165.0 12.5 114.7 91' 7 1160.0 9.9 117.7 91 2 1167.0 8.7 118.0 91 2 1169.0 8.7 120.1 91 3 1168.0 8.9 121.7 92 3 1168.0 9.1 119.9 90 3 1169.0 9.7 121.0 91 3 1159.0 9.9 118.1 90 1 1159.0 10.3 119.0 91 1 1169.0 9.7 122.5 92 5 1169.0 10.5 118.3 91 1 1169.0 10.7 118.1 92 9 1043.0 10.4 119.7 91 4 1044.0 7.1 118.4 90 4 1038.0 8.2 120.0 92 4 1040.0 8.3 122.7 92 5 1036.0 8.6 121.8 92 5 1043.0 8.5 119.2 91 4 1045.0 6.5 116.2 88 4 1045.0 8.2 118.9 91 4 1036.0 7.0 118.3 90 4 1038.0 5.0 113.5 86 4 1035.0 7.8 119.5 91 4 1037.0 3.8 114.3 87 4 1036.0 7.2 118.8 91 4 1037.0 8.2 119.2 91 4 1043.0 9.8 118.0 90' 4 1041.0 6.1 121.5 93' 4 1045.0 6.2 121.4 91 5 1043.0 8.8 115.9 87 5 1044.0 8.6 121.4 91 5 9.4 121.1 91 5 1042.0 9.1 119.2 91 4 1044.0 8.7 118.3 90 4 10 3 6.0 7.7 120.5 92 4 1038.0 7.0 119.4 91 4 1038.0 8.6 120.1 92 4 1040.0 8.1 119.0 91 4 1045.0 7.9 118.3 90' 4 1046.0 7.5 120.0 92' 4 PETRA GEOTECHNICAL, INC. J.N.436-01 * Sandcone ** Numbers out of sequence OCTOBER 2002 TABLE-II 6 ,,1 I I I I I I I I I I I I I I I I I I I TABLE II Field Density Test Results 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/21/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/22/02 02/25/02 1403 1404 1405 1406 1407 1408 1409 1410 1411 1412 1413 1414 1415 1416 1417 1418 1419 1420 1421 1422 1423 1424 1425 1426 1427 1428 1429 1430 1431 1432 1433 1434 1435 1436 1437 1438 1439 1440 1441 1442 1443 1444 Pechanga Rd/Sta 17+35 Pechanga Rd/Sta 17+40 Pechanga Rd/Sta 14+50 Pechanga Rd/Sta 14+55 RTNo.1403 RTNo.1404 RTNo.1405 RT No. 1406 Pechanga Rd/Sta 16+40 Pechanga Rd/Sta 16+45 Pechanga Rd/Sta 14+75 Pechanga Rd/Sta l4+80 Pechanga Rd/Sta 17+00 Pechanga Rd/Sta 17+05 RTNo.14l5 RTNo.1416 Pechanga Rd/Sta 19+00 Pechanga Rd/Sta 19+05 Pechanga Rd/Sta 18+00 Pechanga Rd/Sta 20+50 Pechanga Rd/Sta 20+55 Pechanga Rd/Sta 21 +40 Pechanga Rd/Sta 21 +00 Pechanga Rd/Sta 21+05 RT NO. 1425 RTNo.1426 Pechanga Rd/Sta 22+00 Pechanga Rd/Sta 22+05 Pechanga Rd/Sta 18+40 Pechanga Rd/Sta 18+45 Pechanga Rd/Sta 22+45 Pechanga Rd/Sta 22+50 Pechanga Rd/Sta 19+50 Pechanga Rd/Sta 19+55 Pechanga Rd/Sta 24+00 Pechanga Rd/Sta 24+05 Pechanga Rd/Sta 27+03 Pechanga Rd/Sta 27+08 Pechanga Rd/Sta 17+ 15 Pechanga Rd/Sta 19+00 Pechanga Rd/Sta 19+05 Pechanga Rd/Sta 20+25 1047.0 1048.0 1046.0 1047.0 1050.0 1051.0 1048.0 1049.0 1050.0 1051.0 1044.0 1045.0 1049.0 1040.0 1041.0 1044.0 1047.0 1046.0 1045.0 1047.0 1048.0 1046.0 1052.0 1054.0 1050.0 1051.0 1052.0 1053.0 1049.0 1050.0 1050.0 1050.0 1051.0 1052.0 4.9 112.1 86 4 6.4 111.8 85 4 6.2 114.3 87 4 6.3 111.6 85 4 8.2 118.7 9l 4 7.9 118.4 90 4 6.8 120.3 92 4 8.0 119.5 91 4 8.7 121.3 91 5 9.0 119.8 90 5 8.1 118.4 90 4 7.8 119.9 92 4 6.0 118.8 89 5 6.2 119.0 89 5 8.2 120.0 90 5 7.9 121.8 92 5 8.2 119.0 91 4 8.6 119.2 91 4 9.0 l18.3 90 4 7.8 118.6 91 4 7.4 118.1 90' 4 8.2 118.5 90* 4 7.4 116.0 89 4 6.8 116.1 88 4 8.2 120.8 92 4 8.7 118.7 91 4 6.7 120.1 92 4 9.2 118.2 90 4 8.2 124.3 94 5 7.4 121.8 92 5 10.1 120.3 92 4 10.0 119.5 91 4 10.1 118.0 90* 4 9.6 120.9 92* 4 10.1 120.3 91 5 9.6 122.0 92 5 6.7 117.4 89' 4 5.6 116.7 89* 4 8.8 118.3 90* 4 8.5 126.3 95 5 8.6 123.4 93 5 10.2 124.9 94 5 PETRA GEOTECHNICAL, INC. J.N. 436-01 * Sandcone ** Numbers out of sequence OCTOBER 2002 \% TABLE-II 7 I I I I I I I I I I I I I I I I I I I TABLE II Field Density Test Results .....................................D...rr.............~.............~...........T.....E...........~~:11................................................................................................................................L..............o...............T.m..........~.................~........:11..........~...................N......................................... ......................................................................................................................................)!]......................LE.....~.~...t..})..~...........;.I.II~(....~~)II....................~.......r.........(~...p........~.....h.~....i.t~Iml~o.....)...~;.........................~@I........ "'T .....I...IIY()iI..I OCia."."", If. ~ ..................'0...... ~~ ~ll.............W(' ... ................/I;\:':,,"'.}.... 02/25/02 02/25/02 02/25/02 02/25/02 02/25/02 02/25/02 02/25/02 02/25/02 02/25/02 02/25/02 02/25/02 02/25/02 02/25/02 02/25/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/26/02 02/27/02 02/27/02 02/27/02 02/27/02 02/27/02 02/27/02 1445 1446 1447 1448 1449 1476 1477 1478 1479 1480 1481 1482 1483 1484 1485 1486 1487 1488 1489 1490 1491 1492 1493 1494 1495 1496 1497 1498 1499 1500 1526 1527 1528 1529 1530 1531 1532 1533 1534 1535 1536 1537 Pechanga Rd/Sta 20+30 Pechanga Rd/Sta 22+20 Pechanga Rd/Sta 22+25 RTNo.1439 RT No. 1440 Pechanga Rd/Sta 25+00 Pechanga Rd/Sta 25+05 Pechanga Rd/Sta 26+50 Pechanga Rd/Sta 26+55 Pechanga Rd/Sta 24+25 Pechanga Rd/Sta 24+30 Pechanga Rd/Sta 23+25 Pechanga Rd/Sta 25+75 Pechanga Rd/Sta 25+80 Pechanga Rd/Sta 18+00 Pechanga Rd/Sta 18+05 Pechanga Rd/Sta 21 +50 Pechanga Rd/Sta 21 +55 Pechanga Rd/Sta 22+75 Pechanga Rd/Sta 22+80 Pechanga Rd/Sta 25+30 Pechanga Rd/Sta 25+35 Pechanga Rd/Sta 19+50 Pechanga Rd/Sta 19+55 Pechanga Rd/Sta 24+50 Pechanga Rd/Sta 24+55 Pechanga Rd/Sta 26+90 Pechanga Rd/Sta 26+95 RTNo.1497 RT No. 1498 Pechanga Rd/Sta 23+00 Pechanga Rd/Sta 23+05 Pechanga Rd/Sta 20+00 Pechanga Rd/Sta 20+05 Pechanga Rd/Sta 13+00 Pechanga Rd/Sta 13+05 Pechanga Rd/Sta 18+50 Pechanga Rd/Sta 18+55 Pechanga Rd/Sta 27+50 Pechanga Rd/Sta 27+55 Pechanga Rd/Sta 12+00 Pechanga Rd/Sta 12+05 1053.0 1052.0 1053.0 1051.0 1052.0 1054.0 1055.0 15058.0 1060.0 1061.0 1058.0 1060.0 1050.0 1051.0 1051.0 1056.0 1058.0 1059.0 1060.0 1061.0 1053.0 1054.0 1061.0 1062.0 1064.0 1065.0 1064.0 1065.0 1063.0 1062.0 1057.0 1056.0 1045.0 1046.0 1056.0 1057.0 1067.0 1068.0 1048.0 1049.0 10.4 124.4 93 5 9.2 123.5 93 5 9.0 122.8 92 5 8.8 118.3 90 4 8.0 119.8 92 4 8.5 125.7 95 5 8.1 124.6 94 5 7.9 123.5 93 5 8.5 124.6 94 5 11.6 118.6 91 4 8.0 120.0 92 4 9.9 119.7 91 4 9.2 118.4 90 4 11.3 119.3 91 4 7.4 125.1 94 5 8.1 122.9 92 5 8.4 128.2 96 5 8.7 123.6 93 5 8.0 119.4 91 4 8.0 119.0 91 4 7.6 118.8 91 4 8.4 119.2 91 4 7.7 124.9 94 5 8.0 123.1 93 5 10.0 118.4 90 4 9.8 118.2 90 4 4.9 116.7 89 4 4.8 115.7 88 4 8.6 118.8 91 4 9.2 120.4 92 4 9.0 118.0 90 4 9.2 119.3 91 4 8.7 119.3 91 4 8.6 118.3 90 4 8.0 120.3 92. 4 8.7 118.4 90. 4 9.2 123.3 94 5 8.4 126.4 95 5 8.3 119.5 91 4 8.7 118.4 90 4 6.9 118.3 90 4 7.2 121.3 93 4 OCTOBER 2002 TABLE-II 8 PETRA GEOTECHNICAL, INC. J.N.436-01 . Sandcone .. Numbers out of sequence \~ I I I I I I I I I I I I I I I I I I I TABLE II Field Density Test Results ............ ~E.i...~~............lIl....................................................................................~~......~. 11................................... ............................................................I..~.........~;.............~I~~~~.i. r.I;~!FiI~Ir~i~11 ...D.'''1E.. ........NO... .... ........ ..... .. ............ry"'.,.,.ON.. ..... ... . .. .....r~t) ... .......... .(ff~J..(pc.f:I... ..................{~/^~. .............""'-"'....... ..::::::::::;"..:~::.I.:::,..:::.:.: .::.'0':_;_:.:':: ". '. . ,:.:';::: <':-:<:::_::':;":,:;:,"',""::_'::::::::::::':::::':pV:~~:":~:-,_"_:,,,:>:: ::'-:'.:,::.::,-",:,-:-;::,;:'::"'."::-:":":'-..;.,c..:, :1:1_., _ ':0:'_:':::::::::'::':;';:):';:::::;:: -({.4-; ::::: ,:,-,:..;.,-.,:.,-".,.....:.,..-..._.; ......:: _:;,::; ;":;":'::':":""::': ::.-(i>;- ,:; .;.;,.,:..:;::..::<.:;:,)~;;:;f;':~~:;::::'::;:"" 02/27/02 1538 Pala Rd/Sta 155+20 1045.0 6.8 119.2 91 4 02/27/02 1539 Pala Rd/Sta 155+25 1047.0 7.0 120.9 92 4 02/27/02 1540 Pala Rd/Sta 152+30 1040.0 8.6 118.8 91 4 02/27/02 1541 Pala Rd/Sta 152+35 1042.0 9.0 120.4 92 4 02/27/02 1542 Pechanga Rd/Sta 16+80 1054.0 8.9 123.8 93 5 02/27/02 1543 Pechanga Rd/Sta 16+85 1056.0 9.6 125.1 94 5 02/28/02 1544 Peach Tree St/Sta 11 +45 1050.0 5.9 116.2 88 4 02/28/02 1545 Peach Tree St/Sta 11 +50 1051.0 4.6 115.0 88 4 02/28/02 1546 Deer Hollow Wy/Sta 33+80 1042.0 6.6 112.2 86 4 02/28/02 1547 Deer Hollow Wy/Sta 33+85 1041.0 5.8 114.2 87 4 02/28/02 1548 Deer Hollow Wy/Sta 33+20 1043.0 6.2 115.0 89 4 02/28/02 1549 Deer Hollow Wy/Sta 33+25 1044.0 6.7 113.8 87 4 02/28/02 1550 RT No. 1544 8.3 120.2 92 4 02/28/02 1551 RT No. 1545 9.6 120.8 92 4 02/28/02 1552 RT No. 1546 8.4 120.0 92 4 02/28/02 1553 RT No. 1547 7.9 119.5 91 4 02/28/02 1554 RT No. 1548 9.2 120.6 92 4 02/28/02 1555 RT No. 1549 8.7 119.6 91 4 02/28/02 1556 Peach Tree St/Sta 12+70 1050.0 8.5 120.3 92 4 02/28/02 1557 Peach Tree St/Sta 12+75 1051.0 5.9 116.2 88 4 02/28/02 1558 Peach Tree St/Sta 12+75 1050.0 6.3 112.6 86 4 02/28/02 1559 Peach Tree St/Sta 12+90 1051.0 9.0 113.0 86 4 02/28/02 1560 Peach Tree St/Sta 13+50 9.6 109.9 84 4 02/28/02 1561 RT No. 1557 8.3 118.5 90* 4 02/28/02 1562 RTNo.1558 9.8 118.9 91 4 02/28/02 1563 RT No. 1559 7.7 119.1 91 4 02/28/02 1564 RTNo.1560 9.3 117.8 90 4 02/28/02 1565 Deer Hollow Wy/Sta 36+00 1049.0 8.2 119.8 92 4 02/28/02 1566 Deer Hollow Wy/Sta 42+ 1 0 1177.0 10.0 117.8 90 4 02/28/02 1567 Deer Hollow Wy/Sta 39+00 1160.0 11.8 122.1 92 3 03/0 1/02 1568 Deer Hollow Wy/Sta 32+40 1045.0 11.4 116.9 90 4 03/01/02 1569 Deer Hollow Wy/Sta 34+ 1 0 1046.0 8.0 122.2 94 2 03/01/02 1570 Deer Hollow Wy/Sta 32+75 1047.0 10.5 117.7 90 4 03/0 1 /02 1571 Deer Hollow Wy/Sta 33+75 1048.0 9.2 122.0 93 4 03/01/02 1572 Deer Hollow Wy/Sta 33+50 1049.0 10.3 121.7 93* 4 03/01/02 1573 Deer Hollow Wy/Sta 32+50 1050.0 9.1 128.6 97' 3 03/01/02 1574 Deer Hollow Wy/Sta 32+75 1048.0 7.8 127.9 96' 3 03/01/02 1575 Deer Hollow Wy/Sta 33+50 1049.0 11.0 118.6 91' 4 03/01/02 1576 Deer Hollow Wy/Sta 34+30 1051.0 12.0 117.6 90' 4 03/01/02 1577 Deer Hollow Wy/Sta 34+25 1051.0 9.1 122.0 93* 4 03/01/02 1578 Deer Hollow Wy/Sta 34+25 1053.0 10.9 120.9 93* 4 03/01/02 1579 Deer Hollow Wy/Sta 34+00 1053.0 8.8 127.1 97' 3 PETRA GEOTECHNICAL, INC. . Sandcone OCTOBER 2002 1.0 J.N. 436-01 .. Numbers out of sequence TABLE-II 9 I I I I I I I I I I I I I I I I I I I TABLE II Field Density Test Results t...........iFEST ...................iFEli... .......................................................................m~~m.............. ...............................................................................................................................................................................................E..............................LE.......(........tJ........I....'...~......................i............................................M.........................................()..............................I......iS.....w....u.....JJURE..i...,................................................................................................................................1)...................................E............................'..~......p......S..c......"'..I.........TY..... .............................................................................0...........................0.....{..........o.....IY.M.....~........... p..........................'.......... ........~Q~........ Di\.ii'EN()it..$OOATION'. _ t .. ~'hl L 11 x 'h~13jjf&t 03/01/02 1580 Deer Hollow Wy/Sta 36+60 1050.0 9.6 121.7 91' 3 03/01/02 1581 Deer Hollow Wy/Sta 38+00 1053.0 9.7 121.8 9l 6 03/01/02 1582 Deer Hollow Wy/Sta 40+50 1062.0 10.1 118.4 90 3 03/01/02 1583 Deer Hollow Wy/Sta 37+50 1052.0 10.6 119.4 90 3 03/01/02 1584 Deer Hollow Wy/Sta 41 +25 1064.0 10.1 122.4 90 3 03/01/02 1585 Deer Hollow Wy/Sta 37+50 1054.0 9.6 119.7 92 3 02/13/02 1586 Pala Rd/Sta 152+25 1122.0 11.3 119.7 95 9 02/13/02 1587 Pal a Rd/Sta 153+25 1123.0 10.3 111.0 86 9 02/13/02 1588 RTNo.1587 9.0 120.4 92 4 02/13/02 1589 Pala Rd/Sta 154+50 1124.0 7.0 120.9 92 4 02/13/02 1590 Pala Rd/Sta 152+00 1125.0 7.7 121.3 93' 4 02/13/02 1591 Pala Rd/Sta 153+00 1126.0 6.9 118.4 90 1 02/13/02 1592 Pal a Rd/Sta 154+00 1127.0 9.1 118.3 90 1 02/13/02 1593 Pal a Rd/Sta 154+75 1128.0 9.9 118.1 90 1 02/14/02 1594 Pal a Rd/Sta 154+00 1129.0 10.3 119.0 88 1 02/14/02 1595 RT No. 1594 1139.0 13.1 121.2 91 5 02/14/02 1596 Pala Rd/Sta 155+00 1130.0 13.0 122.3 92 5 02/14/02 1597 Pala Rd/Sta 152+50 1131.0 12.4 123.4 92 5 02/14/02 1598 Pal a Rd/Sta 153+00 1132.0 13.2 125.5 94 5 02/14/02 1599 Pala Rd/Sta 154+90 1133.0 12.6 124.3 93' 5 02/14/02 1600 Pala Rd/Sta 155+00 1134.0 12.4 122.7 92 5 02/14/02 1601 Pala Rd/Sta 154+25 1135.0 12.6 121.0 91 5 02/14/02 1602 Pechanga Rd/Sta 11 +00 1136.0 11.7 120A 93 1 02/14/02 1603 Pechanga Rd/Sta 11+75 1126.0 6.8 119.2 91 1 02/14/02 1604 Pechanga Rd/Sta 11+25 1127.0 11.3 116.4 89 1 02/14/02 1605 RTNo.1604 11.4 123.2 92 5 02/15/02 1606 Pechanga Rd/Sta 11+75 1128.0 12.0 122.0 91 5 02/15/02 1607 Pal a Rd/Sta 154+50 1137.0 11.8 125.0 94 5 02115/02 1608 Pechanga Rd/Sta 10+50 1133.0 12.1 127.4 95 5 02/15/02 1609 Pechanga Rd/Sta 11+50 1129.0 13.4 128.4 96 5 02/15/02 1610 Pechanga Rd/Sta 11+25 1130.0 11.3 121.5 91 5 03/08/02 1611 Pechanga Rd/Sta 152+20 1137.0 12.9 124.7 93 5 03/08/02 1612 Pal a Rd/Sta 153+00s 1138.0 11.7 122.6 92 5 03/08/02 1613 Pal a Rd/Sta 155+20 1139.0 13.6 123.4 92 5 03/08/02 1614 Pechanga Rd/Sta 11 +50 1131.0 10.9 125.5 94 5 03/08/02 1615 Pechanga Rd/Sta 11 +00 1132.0 9.4 119.6 90 5 03/12/02 1631 Primrose St/Sta 26+00 1160.0 7.0 119.5 92 1 03/12/02 l632 Primrose St/Sta 25+25 1162.0 15.0 108.0 93 11 03/12/02 1633 Primrose St/Sta 25+25 1163.0 10.8 118.8 90 1 03/12/02 1634 Primrose St/Sta 25+50 1164.0 14.6 107.9 93 11 03/12/02 1635 Primrose St/Sta 24+00 1165.0 6.9 119.0 91 1 03/12/02 1636 Primrose St/Sta 24+50 1166.0 14.4 107.8 93 11 PETRA GEOTECHNICAL, INC. . Sandcone OCTOBER 2002 ~~ J.N. 436-01 .. Numbers out of sequence T ABLE-II 1 0 I I I I I I I I I I I I I I I I I I I TABLE II Field Density Test Results 03/12/02 03/12/02 03/12/02 03/12/02 03/12/02 03/13/02 03/13/02 03/13/02 03/13/02 03/13/02 03/13/02 03/13/02 03/13/02 03/13/02 03/13/02 1637 1638 1639 1640 1641 1642 1643 1644 1645 1646 1647 1648 1649 1650 1651 Primrose St/Sta 24+75 Primrose St/Sta 24+75 Primrose St/Sta 25+00 Primrose St/Sta 23+00 Primrose St/Sta 18+75 Primrose St/Sta 20+50 Primrose St/Sta 22+00 Primrose St/Sta 23+00 Primrose St/Sta 21+00 Primrose St/Sta 22+00 Primrose St/Sta 20+ 75 Primrose St/Sta 21+25 Primrose St/Sta 19+50 Primrose St/Sta 20+00 Primrose St/Sta 21+00 1168.0 11.8 117.1 90 1 1165.0 7.6 117.6 90 1 1166.0 9.9 122.8 92 5 1157.0 11.7 116.9 90 1 ll54.0 10.1 117.6 90 4 1156.0 11.0 115.9 90 9 1157.0 10.9 116.9 91 9 1158.0 6.1 115.9 90 9 1157.0 10.7 119.9 92 1 1155.0 11.0 119.9 92 1 1156.0 9.9 122.1 94 1 1157.0 10.2 121.2 93 1 1158.0 8.2 118.1 91 1 1159.0 9.5 117.2 90 1 1160.0 7.6 117.6 90 1 PETRA GEOTECHNICAL, INC. J.N. 436-01 * Sandcone ** Numbers out of sequence OCTOBER 2002 TABLE-II 11 ~p I I I I I I I I I I I I I I I I I I I TABLE III LABORATORY MAXIMUM DRY DENSITY o PETRA z:P I I I I I I I I I I I I I I I I I I I TABLE III Laboratorv Maximum Drv Densitv I From 1989 to 1990 ROUQh GradiuQ 16 Orange brown Silty SAND 17 Dark brown Sil SAND 11.0 132.5 8.0 130.0 From 2002 Final ROUQh GradinQ I Yellow brown Silty SAND with Gravel 9.5 130.5 2 Brown Silty SAND 8.0 130.0 3 Olive brown Silty SAND, micaceous 8.5 132.5 3A Medium brown Silty medium-grained SAND 8.4 133.5 4 Reddish brown Silty SAND 8.5 131.0 5 Light brown Silty fine- to medium-grained SAND 8.5 133.0 6 Medium brown Silty SAND 8.5 131.5 7 Yellow brown Silty SAND 10.5 125.5 9 Reddish brown Clayey SAND 9.5 129.0 10 Light yellow brown Silty SAND 8.5 131.0 11 Li ht ellow CIa e SILT 12.5 116.5 (I) PER ASTM TEST METHOD Dl55? PETRA GEOTECHNICAL, INC J.N. 436-01 OCTOBER 2002 Plate A-I 1A I I I I I REFERENCES I I I I I I I I I I I o PETRA I I I ~ I I REFERENCES I Blake, T.F., 1998/1999, "UBCSEIS" Version 1.03, A Computer Program for the Estimation of Uniform Building Code Coefficients Using 3-D Pault Sources. I International Conference of Building Officials, 1997, "Uniform Building Code," Volume 2, Structural Engineering Design Provisions, dated April 1997 . I Earth Research Associates, Inc., 1987, Evaluation of Faulting and Liquefaction Potential, Portion bf Wolf Valley Project, Rancho California, County of Riverside, California;jor Great American Development, J.N.298-87, dated November 20, 1987. I , 1988, Preliminary Soils Engineering and Engineering Geologic Investigation, Red Hawk Project, Rancho California Area, County of Riverside, California; for Great American Development, LN. 298-87, dated February 2, 1988. I I Petra Geotechnical, Inc., 1989, Supplemental Soils Engineering and Engineering Geologic Investigation, Portion of Redhawk Project, Vesting Tentative Tract Map Nos. 23064,23065,23066 and 23067, Rancho Califomia, County of Riverside, Califomia, Volumes I and lI:for Great American Development, J.N. 298-87, dated May 8, 1989. I I , 2001a, Updated Preliminary Geotechnical Investigation, Tract 23065 Phases 3 through 7 and Final, Redhawk Development, Temecula Area, Riverside County, Califomia;jor The Garrett Group, LLC, J.N. 165-0 I, dated April II, 2001 . I , 2001b, Geotechnical Investigation, Proposed Water-Quality Basin and Levee, Redhawk Development, Southeast of Pal. and Pechanga Roads, Temecula Area, Riverside County, California;jor The Garrett Group, LLC" J.N. 165-01, dated July 12,2001. I I , 200 I c, Response to Riverside County Building and Safety Department Geotechnical Report Review Sheet, dated July 31,2001 and Grading Plan Review Report for Tract 23065-2, Temecula Area, Riverside County, Califomia;jor The Garrett Group, LLC" J.N. 165-01, dated September 2],2001. I , 2001d, Response to Building and Safety Department Geotechnical Riverside Review Sheet, dated October 22, 2001, Tract 23065-2, Temecula Area, Riverside County, Califomia;jor The Garrett Group, LLC, , LN. 165-01, dated November 2, 2001. I I I OCTOBER 2002 I PETRA GEOTECHNICAL, INC. J.N.436-01 I 7.f, I RECEIVED I OCT 1 3 2004 CITY OF TEMECULA I INEEAING DEPARTMeNT I I I I I I I I I I I I I I I I