HomeMy WebLinkAboutHydrology&Calculations(May23,2000)
I
I
I
I
I I
I I
I
I
I
I
I-
I-
I-
I
I
I
I
I
I
274JI Enrerprise Circle West
Temccub, CA 92590A~3,
Tel. (909) 676-7000
Fax (909) 699-7324
l.~mail: tpc@pe.ner
HYDROLOGY AND HYDRAULIC CALCULATIONS
FOR
TRACT NO. 23209
L~
Won Sang Yoo, R.C.E.
Prepared by:
TRANS-PACIFIC CONSULTANTS, INC.
27431 ENTERPRISE CIRCLE WEST
TEMECULA, CA 92590
Revised
MAY 23,2000
Professional Engineering Services Since 1976
RECEIVED
MAY 31 ZOOO
CIIY Lit- I til'lt:GULA
ENGINEERING DEPARTMENT
\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SUBJECT:
Drainage Study
Hydrology and Hydrualic Calculations
PROJECT:
Tract No. 23209
OBJECTIVE:
DETERMINE ON-SITE AND OFF-SITE
TRIBUTARY FLOWS FOR DESIGN OF ON-
SITE DRAINAGE FACILITIES OF TR. 23209
'),.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
~ /NT~Opu{'TION ;:p
I. RIVERSIDE COUNTY RATIONAL METHOD HYDROLOGY
INSTRUCTIONS
II. DESIGN CHARTS
. STANDARD INTENSITY DURATION CURVES DATA
. HYDROLOGIC SOIL GROUP MAP
III. 10 YEAR DEVELOPMENT STUDY
IV. 100 YEAR DEVELOPMENT STUDY
V. . OFF-SITE FLOW ANA YSYS
'Ex/STfNq Pt..ow ANAt.-r$IS
VI. PIPE CONFULUENCE ANALYSIS
VII. HYDRAULIC CALCULATION
Lines "A, A-I, A-2, L, L-I, L-2, L-3, L-4, L-S, B, B-1, B-2,
C, C-I, D, D-I, D-2, D-3, D-4, D-S, D-6, D-7, D-8, D-9, E, E-I, E-2"
VIII. CATCH BASIN SIZING
IX. HYDROLOGY MAP (ON-SITE & OFF-SITE)
~ EY/>7f^/q. CPNl>:JTION.
'>
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
<<INTRODUCTION>>
This project proposes to divide approximately 73 acres in the City of Temecula. The
subject site is located to the north of Rancho California Road and the east of the
Margarita Road. La Serena Road is proposed to be extended through the middle of the
tract.
1. FLOW ROUTING
The subject site has four off-site upstream drainage basins (Basin "A", Basin "B", Basin
"c" and Basin "D" as shown on the off-site hydrology map). The off-site drainage water
from Basin "A" is picked up by Line "A". The Line "A" is an extension of existing 30"
RCP (Line "A") on the downstream property (Tract 23220). The "Leigh Court Lane" on
TR. 22148 (54" RCP, currently maintained by the Riverside Flood Control District and
Water Conservation District) is also extended to pick-up the off-site flow from the Basin
"B" as well as the on-site flows from this tract. Line "D" and Line "E" also pick-up off-
site flows from Basin "c" and "D", respectively, as well as the on-site drainage water
from this tract. The on-site flow routing for this tract very closely resembles the existing
condition as shown on the on-site hydrology map.
2. HYDROLOGY AND HYDRAULIC STUDY
The hydrology study for this tract was done using the Riverside Flood Control District
and Water Conservation District rational method. The soil type was found on plate C-
1.53 hydrologic soils group map. For the soil-cover type ofthe off-site area, "Fair" type
was used as found from the previously approved studies for TR. 22148. The standard
intensity-duration curves data for Murrieta-Temecula & Rancho California area found on
plate d-4.1 was used for the drainage study. The 10 year storm is contained within the
curb. The flow depth calculation for the 10 year storm is included in the hydrology
study. All flows being intercepted by the catch basins are shown on the hydrology map.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.
'.
I. RIVERSIDE COUNTY RATIONAL METHOD HYDROLOGY
INSTRUCTIONS
..
';.
A..
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.
a
I
I
,INSTRUCTIONS FOR RATIONAL HE:ntOD HYDROLOGY CALCULATIONS
(Based on the Rational Formula, Q - CIA)
1. On map of drainage area, draw drainage system and block off subareas
tributary to it.
2. Dete=ine the initial time of concentration, "T", using Plate D-3.
The initial area should be less than 10 acres, have a flow path of
less than 1,000 feet, and be the most upstream subarea.
3. Using the time of concentration, -dete:r:mine "I", intensity of rain-
fall in inches per hour, from the appropriate intensity-duration
curve for the particular area under study. For areas where stan-
dard curves are available, use Plates 0-4.1 and 0-4.2' to reproduce
the standard curve. For areas where curves have not been published'
by the District, use Plates 0-4.3 through 0-4.7 to develop a suit-
able intensity-duration curve.
4. Oetennine "C", the coefficient of runoff, using the runoff coeffi-
cient curve which co=esponds as closely as possible with the soil,
cover type and developnent of the drainage area. Standard curves
(Plates D-5.l through 0-5.4) have been developed by the Oistrict
for the common case of urban landscaping type cover. Where these
curves are not applicable, =--res may be developed using Plates
0-5.5 through 0-5.8.
5. Detennine "A", the area of the subarea in acres.
6. Canpute Q = CIA for the subarea.
7. Measure the length of flow to the point of inflow of the next sub-
area downstream. Determine the velocity of flow in this reach for
the peak Q in the type of cbnveyance being considered (natural
channel, s~eet, pipe, or open channel), using the tabling aids on
Plates 0-6 'through b-~.
Using the reach length and velocity determined above, caitpute the
travel time, and add this time to the time of concentration for the
previous subarea to dete:r:mine a new time of concentration.
8. Calculate Q for the new subarea, using steps 3 through 6 and the
, new time of concentration. Determine "Q.Ii'"' the peak Q for all sub-
areas tributary to the system to this pomt by adding Q for the
new subarea to the summation of Q for all upstream subareas. Deter-
mine the time 'of concentration for the next subarea downstream using
Step 7. Continue tabling downstream in similar fashion until a
junction with a lateral drain is reached. '
RCFC a wc;o
HYDROLOGY l\jlANUAL
I
RATIONAL METHOD
1"'C:T~llrTln"'c: Mt
"
Start at the upper end of the lateral and table its Q down to the
junction with the main line, using the methods outlined in the
previous steps.
compute the peak Q at the junction. Let QA, 'XA, IA correspond to
the tributary area with the longer time of concentration, and QB,
'I'B, IB co=espond to the tributaJ:Y area with the shorter time of
concentration and Qp, 'Xp co=espond to the peak Q and time of
concentration.
a. If the tributaJ:Y areas have the same time of concentration,
the tributaJ:Y Q I S are added directly to obtain the combined
peak Q.
Qp
=
2A
+
Q:\
'Xp
=
'XA
=
'XB
b. If the tributaJ:Y areas have different times of concentration,
the smaller of the tributary Q's must be co=ected as follows:
(1) The usual case is where the tributary area with the lon-
ger time of concentration has the larger Q. In this case,
the smaller Q'is corrected by a ratio of the intensities
and added to the larger Q to obtain the combined peak Q.
The tabling is then continued downstream using the, longer
time of concentration.
Qp
=
QA
+ ~
IA
IE
Tp
= 'XA
'(2) In some cases, the tributary area with the shorter time
of concentration has the larger Q. In this case, the
smaller Q is co=ected by a ratio of the t~es of concen-
tration and added to the larger Q to obtain the combined
peak Q. The tabling is then continued downsteam using
the shorter time of concentration. '
Qp,=~+QATB
TA
Tp = 'IB
RCFC 8 WCD
;.
HYDROLOGY NJANUAL.
RATIONAL METHOD
INSTRUCTIONS
Co
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
\
II. DESIGN CHARTS
. STANDARD INTENSITY DURATION CURVES DATA
. HYDROLOGIC SOIL GROUP MAP
~;.
1
I
I
AS010HOAH
lvnN vV~
(9 JO 17) 1"17-0 3.L'lf1d
'1.L'l1a S3^~n:)
NOIl'1~na - A.lISN3.lNI "
a~'1aN'1.lS
I
1-
I
a:>M 9 :>.:I:>y
I
I
I
I
I
I
I
I
I
I
I
I
I
I
::0
l>
Z
~
r
r
-
Z
-I
rr1
Z
CJ)
-I
-<
I
z
()
::I:
rr1
CJ)
."
rr1
::0
::I:
o
C
::0
I
I
I
~"
-0:
c>>ca~"'''' 1;IoIJI\lt.. WWWWW NNNNN ----- ----- ~'"
0:.
en UlGUlO,"" OUlOUtO C1too..ruo CD",..",O -oCD...OOU' "WN_O ..oat..,CJI'UI ~~
~ ~- ~
" en" ;;
.. ~
~ ~
. ---- ----- ----- ----- NNtvNN ... ~
. . IO. . . IO... .. . . . . . . . . . IO... . . . IO" . . . . . ~- ... "
"''''0'...... ...caatca..o <0000_ -_NNW .....UlUI "'......CIloO ONWUlC>> ~" '" "
:.. l.oI U1C>> ow 0>0....0.. "'OWO'O ..ca....ooo o..lItwca "'-e>>...'" 1>>_"'01. '" ~ ~
"
... 0:
" ----- ~
----- ----- ___I\IN N",ruNN NNNNW www.... ...- Z
. IO. IO. .. IO. . . IO.. . . IO. IO. . IO. IO. IO. IO. . . IO.. . ~" n
000__ NNW..... VII"", GO... C>>CD.oO- NNW"\II Oi...lIl.o_ "'.....,,:>>... ~" ...
ow...._U'l 0(11Io"'0.0 w....N...w o...Ul""" _.....1'1,I0 OONUlO at.oUl....CD '"
?~
~
H' ..~
-0: 0:
CD at......", CJ'","UI.'" NfI""",N ----- Z", "''''
WWIo,IWW ----- O:~ ~'"
'" U10V'lOUl OlollOUlCl C."'.NCI CD"''''''O .oca...OOUl ......"'_0 .0"'''''''''' ~~ z_
~ ~- n~
0 ",0 ~~
.. z O~
~
. -- ----- ----- ----- _ruNNIV n,
lVi'll"''''''''' ... ~
. . . . . . IO... . IO. IO. IO.. . . IO.. IO. . . IO. . . . . IO. ...- ... ~~
..........lIte>> 1>>.0.00_ __IVNN ww..",,,, CI"~~CIoClo ..,O_NW UlCI"\lII_" ~" '" -~
:.. ""'''''CIo-. ~N~WO ",,~o".o ....,00...,_ CI"_CI"N.., OO.....,..CI" O......N..,. '" ~ ...~
" 0...
.. 0: ",n
" ~ ZO:
----- ----- ----- _NNNN NN"'NN NWW"""", ww....'" ...- Z -~
.... . .... . .... . oo... . .... . .... . .... . ..." n ~~
O"'__N WW"""G" G"...~lIt.ct ,00"'''''''' ....,.G"OO... allO_W" G""'NOO- ." ...
"'_\11"''' OOO"""N ...I\ICIo...CI CIoO'\I'ICI"CD \1'11\10"'.0 ..,_I"ftOCII .0"'''-0 "
~O
-0:
Z'"
CIoCII......OO 0''''''''''''' ""WWWW NNNI\IN ----- ...---- O:~
"' ,,"O,,"OUl OUlOU'lO ca",..NO CII"'''NO .0 CIo...O' \1'1 """N_O .oca....OOUl ~~
~ ...-
0 ",0
.. z z
~ 0
----- '"
. ----- ----- ----- NI'"'''''N ... n
.... . ..oo.oo .. ....... .. ........ .. . . . . .. ....... .. ........ .. ~- ... 0
O'O'~"'~ CIICIICII..o..o 000__ _NNWW ""\11\1'10' O'......CD.a o_w""... ~" '"
. .....oN"~ O.CIoNCIo _wooow ...NO'N..Q NO'OU'lO G"N..o...O' .....,..W... '" ~
.. "
" 0:
" ~
----- ----- ----- ____N N"'NNN NNNNN wwww.. ...- Z
...... .. ....... . ....... .. ........ .. ........ .. ....... .. ....... .. ~" n
000__ "'Ne.,II". I"ftUlU'lCl'~ "'CIo..Q..oO __Nw. "'VlOoCD..o -NUl..._ ~" ...
_......_U1 0""_..0'" -""..0"0 OoNOQIIClo W"'''''NO f>>at CII 0'" 0.0_.00- '"
~o
-0:
Z'"
caCll......OO "'VI..,...... WWWWW NNNNN ----- ----- O:~
'" \,AOUlOIJI OUlOU'lO QIIO'...NO (DO''''NO ..oCD...QIoU'l """"'-0 ..oCII...QIo"" ~~ ..
~ ...- ~
0 "'0 ~
.. z z
...
en
. ----- ----- ----- _NNNN NNNNN WWWW... ... ..
....... .. .. .. .. .. .. ..oo.... .. ........ .. ........ .. ....... .. ....... .. ~- ... >>
CllCllCIo,.,.o 0,0__'" WWW". VlCI"......C11 ..oOO_N W"""QIoClo ON'" CIoN ~" " -
:.. NVlat-U1 OIJl-CIo... 0."'''.0 O'",o.o..Q IJI_CIoU'lW ww......W -"'C>>OW " ~ z
" ..
.. 0: en
" ~
----- ____N IVNN"'N "'NNNW WW""WW w""..... .Ul"""'O' ...- Z
........ .. .. .. .. .. .. ....... .. ....oo.. .. ........ .. ....... .. ....... .. ~" n
WW..UiI Cl"O'...CIoO O_N""W .0'...QII0 _NW."" ...(IIONIJI (11_""0... ~o ...
_Ul_O'W OCltc:...o", o4IUlNO.o o4IONO'W l\lNN.c. Nat...CIIN -UlO'(IIO' '"
~"
-0:
Z"
O:~ ..
~~ ~
~- '"
",0 '"
Z ;;;
... ..
~- ... ~
." '" ~
'" ~ ~
" ...
0: ..
~
...- z
~" n
~" ...
'"
.
.
.
.
I
.
.
.
.
.
.
.
II
-
CIo N...N....
.~"
.'
-
i~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
..
",
III. 10 YEAR DEVELOPMENT STUDY
;.
';.
a..
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: OS/23/00
Version 3.3
I
TR. 23209
10 YR.
I
*********
Hydrology Study Control Information **********
I
RANPAC Engineering Corporation, Temecula, CA - SIN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control , Water Conservation District
1978 hydrology manual
I
Storm event (year) =
10.00 Antecedent Moisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.000 to Point/Station 2.000
**** INITIAL AREA EVALUATION ****
Initial area flow distance = 150.00Q(Ft.)
Top (of initial area) elevation = 1367.800(Ft.)
Bottom (of initial area) elevation = 1365.300(Ft.)
Difference in elevation = 2.500(Ft.)
Slope = 0.01667 s(percent)= 1.67
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 6.563 min.
Rainfall intensity = 2.972 (In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0,835
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.100
Decimal fraction soil group C 0.100
Decimal fraction soil group D 0.800
RI index for soil(AMC 2) = 72.50
Pervious area fraction = 0.500; Impervious fraction 0.500
I
'I
I
I
I
I
~
I
I
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 0.500
1.786(CFS)
0.720(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 2.000 to Point/Station 3.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
I
Top of street segment elevation = 1365.300(Ft.)
End of street segment elevation = 1333.060(Ft.)
Length of street segment = 610.000(Ft.)
Height of curb above gutter flowline = 6.0(ln.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 6.486(CFS)
Depth of flow = 0.336(Ft.), Average velocity = 5.321(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 10.452(Ft.)
Flow velocity = 5.32(Ft/s)
Travel time = 1.91 min. TC = 8.47 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.826
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.100
Decimal fraction soil group C = 0.100
Decimal fraction soil group D = 0.800
RI index for soil(AMC 2) = 72.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 2.582 (In/Hr) for a 10.0 year storm
Subarea runoff = 8. 087 (CFS) for 3.790(Ac.)
Total runoff = 9. 873 (CFS) Total area = 4.510(Ac.)
Street flow at end of street = 9.873(CFS)
Half street flow at end of street = 9. 873 (CFS)
Depth of flow = 0.376(Ft.), Average velocity = 5.869(Ft/s)
Flow width (from curb towards crown)= 12.472(Ft.)
I
I
I
I
'.
I
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 3.100 to Point/Station 3.200
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 750.000(Ft.)
Top (of initial area) elevation = 1361.000(Ft.)
Bottom (of initial area) elevation = 1318.670(Ft,)
Difference in elevation = 42.330(Ft.)
Slope = 0.05644 s(percent)= 5.64
I
~
I
I
I
TC = k(0.390)*[(1ength^3)/(e1evation change)]^0.2
Initial area time of concentration = 9.790 min.
Rainfa11 intensity = 2.385(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.796
Decimal fraction soil group A = 0.000
Decima1 fraction soi1 group B = 0.400
Decima1 fraction soi1 group C = 0.400
Decima1 fraction soi1 group D = 0.200
RI index for soi1(AMC 2) = 65.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initia1 subarea runoff = 5.278(CFS)
Tota1 initia1 stream area = 2.780(Ac.)
Pervious area fraction = 0.500
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 4.000 to Point/Station 5.000
**** INITIAL AREA EVALUATION ****
I
Initia1 area f10w distance = 850.000(Ft.)
Top (of initia1 area) e1evation = 1338.500(Ft.)
Bottom (of initia1 area) e1evation = 1316.910(Ft.)
Difference in elevation = 21.590(Ft.)
Slope = 0.02540 s(percent)= 2.54
TC = k(0.390)*[(1ength^3)/(e1evation change)]^0.2
Initial area time of concentration = 12.074 min.
Rainfa11 intensity = 2. 125 (In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.805
Decima1 fraction soi1 group A = 0.000
Decima1 fraction soi1 group B = 0.200
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.600
RI index for soi1(AMC 2) = 70.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initia1 subarea runoff = 4.241(CFS)
Tota1 initia1 stream area = 2.480(Ac.)
Pervious area fraction = 0.500
I
,I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 6.000 to Point/Station 6.500
**** INITIAL AREA EVALUATION ****
I
Initia1 area flow distance = 440.000(Ft.)
Top (of initial area) elevation = 1330.00Q(Ft.)
Bottom (of initial area) elevation = 1324.530(Ft.)
Difference in elevation = 5.470(Ft.)
S10pe = 0.01243 s(percent)= 1.24
TC = k(0.390)*[(1ength^3)/(e1evation change)]^0.2
Initial area time of concentration = 10.704 min.
Rainfa11 intensity = 2.271(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.758
Decimal fraction soil group A = 0.000
Decima1 fraction soi1 group B = 1.000
Decimal fraction soil group C = 0.000
I
I
I
I
~
I
I
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 1.721(CFS)
Total initial stream area = 1.00Q(Ac.)
Pervious area fraction = 0.500
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 6.600 to Point/Station 7.000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 740.000(Ft.)
Top (of initial area) elevation = 1346.000(Ft.)
Bottom (of initial area) elevation = 1303.750(Ft.)
Difference in elevation = 42.250(Ft.)
Slope = 0.05709 s(percent)= 5.71
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.715 min.
Rainfall intensity = 2.395(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.763
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 5.356(CFS)
Total initial stream area = 2.930(Ac.)
Pervious area fraction = 0.500
I
1
,I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 8.000 to Point/Station 8.100
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 620.000(Ft.)
Top (of initial area) elevation = 1338.390(Ft.)
Bottom (of initial area) elevation = 1299.400(Ft.)
Difference in elevation = 38.990(Ft.)
Slope = 0.06289 s(percent)= 6.29
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 8.878 min.
Rainfall intensity 2.517 (In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.817
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.200
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.600
RI index for soil(AMC 2) = 70.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 4,502 (CFS)
Total initial stream area = 2.190(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
I
\~
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 8.100 to Point/Station 9.000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
I
Top of street segment elevation = 1299.400(Ft.)
End of street segment elevation = 1296.890(Ft.)
Length of street segment = 240.000(Ft.)
Height of curb above gutter flowline = 6.0(ln.)
Width of half street (curb to crown) = 32.000(Ft.)
Distance from crown to crossfa1l grade break = 20.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 12.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000 (Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 4.749(CFS)
Depth of flow = 0.384(Ft.), Average velocity = 2.660(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 12.879(Ft.)
Flow velocity = 2.66(Ft/s)
Travel time = 1.50 min. TC = 10.38 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.760
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group 0 = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 2.309(In/Hr) for a 10.0 year storm
Subarea runoff 0.421(CFS) for 0.240(Ac.)
Total runoff = 4. 923 (CFS) Total area = 2.430(Ac.)
Street flow at end of street = 4. 923 (CFS)
Half street flow at end of street = 4.923(CFS)
Depth of flow = 0.388(Ft.), Average velocity = 2.683(Ft/s)
Flow width (from curb towards crown)= 13.071(Ft.)
I
I
I
I
I
J
I
I,
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 8.100 to Point/Station 9.000
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 2.430(Ac.)
Runoff from this stream = 4.923(CFS)
Time of concentration = 10.38 min.
Rainfall intensity = 2.309(In/Hr)
Program is now starting with Main Stream No. 2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
I
\'\
I
I
Process from Point/Station 25.000 to Point/Station
.... INITIAL AREA EVALUATION ....
9.000
I
Initial area flow distance = 550.000(Ft.)
Top (of initial area) elevation = 1304.500(Ft.)
Bottom (of initial area) elevation = 1296.150(Ft.)
Difference in elevation = 8.350(Ft.)
Slope = 0.01518 s(percent)= 1.52
TC = k(0.390)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 11.245 min.
Rainfall intensity = 2.210 (In/Hr) for a 10,0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.755
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 0.500
A = 0.000
B = 1. 000
C = 0.000
D = 0.000
56.00
0.500; Impervious fraction =
1.002(CFS)
0, 600 (Ac. )
0.500
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 25.000 to Point/Station 9.000
.... CONFLUENCE OF MAIN STREAMS ....
,I.
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.600(Ac.)
Runoff from this stream = 1.002(CFS)
Time of concentration = 11.24 min.
Rainfall intensity = 2.210(In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
4.923
1.002
10.38
11.24
2.309
2.210
or shorter ti.me
of concentration
..
I
Qp=
stream flow has longer
4.923 + sum of
Qa Tb/Ta
1.002' 0.923 =
5.848
0.925
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
4.923 1. 002
Area of streams before confluence:
2.430 0.600
I
Results of confluence:
Total flow rate = 5.848(CFS)
Time of concentration = 10.382 min.
I
I
\,5
I
I
Effective stream area after confluence =
3.030(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 23.000 to Point/Station 24.000
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 5l0.000(Ft.)
Top (of initial area) elevation = l336.000(Ft.)
Bottom (of initial area) elevation = l300.000(Ft.)
Difference in elevation = 36.000(Ft.)
Slope = 0.07059 s(percent)= 7.06
TC = k(0.530).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.903 min.
Rainfall intensity = 2.248(In/Hr) for a 10.0 year storm
UNDEVELOPED (poor cover) subarea
Runoff Coefficient = 0.817
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.300
Decimal fraction soil group C = 0.100
Decimal fraction soil group D = 0.600
RI index for soil(AMC 2) = 85.40
Pervious area fraction = 1.000; Impervious fraction = 0.000
Initial subarea runoff = 4.243(CFS)
Total initial stream area = 2.3l0(Ac.)
Pervious area fraction = 1.000
I
I
I
I
I
J
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 10.000 to Point/Station 10.100
.... INITIAL AREA EVALUATION ....
Initial area flow distance = 320.000(Ft.)
Top (of initial area) elevation = 1324.200(Ft.)
Bottom (of initial area) elevation = 1313.500(Ft.)
Difference in elevation = 10.700(Ft.)
Slope = 0.03344 s(percent)= 3.34
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.732 min.
Rainfall intensity = 2.716(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.775
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 3.514(CFS)
Total initial stream area = 1.670(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 10.100 to Point/Station 11,000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
I
1313.500(Ft.)
Top of street segment elevation =
I
\~
I
I
End of street segment elevation = l299.890(Ft.)
Length of street segment = 560.000(Ft.)
Height of curb above gutter flowline = 6.0(1n.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 6,744(CFS)
Depth of flow = 0.377(Ft.), Average velocity = 3. 987 (Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 12.509(Ft.)
Flow velocity = 3. 99 (Ft/s)
Travel time = 2.34 min. TC = 10.07 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.761
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction 0.500
Rainfall intensity = 2.348 (In/Hr) for a 10.0 year storm
Subarea runoff = 5.487(CFS) for 3.070(Ac.)
Total runoff = 9.001(CFS) Total area = 4.740(Ac.)
Street flow at end of street = 9.001(CFS)
Half street flow at end of street = 9.001(CFS)
Depth of flow = 0.408(Ft.), Average velocity = 4.271(Ft/s)
Flow width (from curb towards crown)= 14.074(Ft.)
I
I
I
I
I
I
I
I
I
1
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 12.000 to Point/Station 12.100
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 260.000(Ft.)
Top (of initial area) elevation = 1324,200(Ft.)
Bottom (of initial area) elevation = 1318.990(Ft.)
Difference in elevation = 5.210(Ft.)
Slope = 0.02004 s(percent)= 2.00
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.883 min.
Rainfall intensity = 2. 687 (In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.800
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.600
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.400
RI index for soil(AMC 2) 63.60
I
I
I
I
~
I
I
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 1.807(CFS)
Total initial stream area = 0.840(Ac.)
Pervious area fraction = 0.500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 12.100 to Point/Station 13.000
uu STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION uu
I
I
I
Top of street segment elevation = 1318.990(Ft.)
End of street segment elevation = 1303.680(Ft.)
Length of street segment = 580.000(Ft.)
Height of curb above gutter flowline = 6.0(10.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 4.861(CFS)
Depth of flow = 0.341(Ft.), Average velocity = 3.812(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 10.718(Ft.)
Flow velocity = 3. 81 (Ft/s)
Travel time = 2.54 min. TC = 10.42 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.767
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.900
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.100
RI index for soil(AMC 2) = 57.90
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 2.305(In/Hr) for a 10.0 year storm
Subarea runoff 5.019(CFS) for 2.840(Ac.)
Total runoff = 6.826 (CFS) Total area = 3.680 (Ac.)
Street flow at end of street = 6.826(CFS)
Half street flow at end of street = 6.826(CFS)
Depth of flow = 0.374(Ft.), Average velocity = 4. 127 (Ft/s)
Flow width (from curb towards crown)= 12.359(Ft.)
I
I
I
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 14.000 to Point/Station 16.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 580.000(Ft.)
Top (of initial area) elevation = 1310.900(Ft.)
Bottom (of initial area) elevation = 1299.280(Ft.)
Difference in elevation = 11.620(Ft.)
I
I
\$
I
I
Slope = 0.02003 s(percent)=
TC = k(0.390).[(length^3)/(elevation
Initial area time of concentration =
Rainfall intensity = 2.252(In/Hr)
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.793
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 65.50
Pervious area fraction = 0.500; Impervious fraction =
Initial subarea runoff = 3. 644 (CFS)
Total initial stream area = 2.040(Ac.)
Pervious area fraction = 0.500
2.00
change)]^0.2
10.866 min.
for a 10.0 year storm
I
I
I
I
0.500
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 14.000 to POint/Station 16.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 2.040(Ac.)
Runoff from this stream = 3.644(CFS)
Time of concentration = 10.87 min.
Rainfall intensity = 2.252(In/Hr)
Program is now starting with Main Stream No. 2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 15.000 to Point/Station 16.000
.... INITIAL AREA EVALUATION ....
Initial area flow distance = 440.000(Ft.)
Top (of initial area) elevation = l306.900(Ft.)
Bottom (of initial area) elevation = l299.280(Ft.)
Difference in elevation = 7.620(Ft.)
Slope = 0.01732 s(percent)= 1.73
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.017 min.
Rainfall intensity = 2.355(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.761
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 1.112(CFS)
Total initial stream area = 0.620(Ac.)
Pervious area fraction = 0.500
I
I
I
J
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 15.000 to Point/Station 16.000
.... CONFLUENCE OF MAIN STREAMS ....
I
~
I
I
I
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.620(Ac.)
Runoff from this stream = 1.112(CFS)
Time of concentration = 10.02 min.
Rainfall intensity = 2.355(In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
3.644 10.87
1.112 10.02
stream flow has longer
3.644 + sum of
Qb Ia/Ib
1.112. 0.956 =
4.707
2.252
2.355
time of concentration
I
1. 063
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
3.644 1.112
Area of streams before confluence:
2.040 0.620
I
I
I
Results of confluence:
Total flow rate =
Time of concentration
Effective stream area
4.707 (CFS)
= 10.866 min.
after confluence
=
2.660 (Ac. )
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 16.000 to Point/Station 18.000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
I
Top of street segment elevation = 1299.280(Ft.)
End of street segment elevation = 1296.890(Ft.)
Length of street segment = 290.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) 34.00Q(Ft.)
Distance from crown to crossfall grade break = 20.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 5,087(CFS)
Depth of flow = 0.405(Ft.), Average velocity = 2.469(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 13.905(Ft.)
I
I
I
I
1.fJ
I
I
I
Flow velocity = 2. 47 (Ft/s)
Travel time = 1.96 min. TC = 12.82 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.748
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 2. 056 (In/Hr) for a 10.0 year storm
Subarea runoff = 0.661(CFS) for 0.430(Ac.)
Total runoff = 5.368 (CFS) Total area = 3.090 (Ac. )
Street flow at end of street = 5.368(CFS)
Half street flow at end of street = 5.368(CFS)
Depth of flow = 0.411(Ft.), Average velocity = 2.501(Ft/s)
Flow width (from curb towards crown)= 14.211(Ft.)
I
J
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 16.000 to Point/Station 18,000
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 3.090(Ac.)
Runoff from this stream = 5.368(CFS)
Time of concentration = 12.82 min.
Rainfall intensity = 2.056(In/Hr)
Program is now starting with Main Stream No. 2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 17.000 to Point/Station 18,000
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 550.000(Ft.)
Top (of initial area) elevation = 1304.500(Ft.)
Bottom (of initial area) elevation = 1296.150(Ft.)
Difference in elevation = 8.350(Ft.)
Slope = 0.01518 s(percent)= 1.52
TC = k(O.390)*[(length^3)/(alavation change)]^O.2
Initial area time of concentration = 11.245 min.
Rainfall intensity 2.210(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.770
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.800
Decimal fraction soil group C = 0,000
Decimal fraction soil group D = 0.200
RI index for soil(AMC 2) = 59.80
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 2. 553 (CFS)
Total initial stream area = 1.500(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
I
I
'2-\
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 17.000 to Point/Station 18.000
*..* CONFLUENCE OF MAIN STREAMS ....
I
I
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.500(Ac.)
Runoff from this stream = 2.553(CFS)
Time of concentration = 11.24 min.
Rainfall intensity = 2.210 (In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
5.368 12.82
2.553 11 .24
stream flow has longer
5.368 + sum of
Qb Ia/Ib
2.553 * 0.930 =
7.744
time of
2.056
2.210
concentration
I
2.375
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
5.368 2,553
Area of streams before confluence:
3.090 1.500
I
I
Results of confluence:
Total flow rate =
Time of concentration
Effective stream area
7.744(CFS)
= 12.824 min.
after confluence
=
4.590(AC.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 19.000 to Point/Station 20.000
**** INITIAL AREA EVALUATION ****
Initial area flow distance = SOO.OOO(Ft.)
Top (of initial area) elevation = 1306.00Q(Ft.)
Bottom (of initial area) elevation = 1303.410(Ft.)
Difference in elevation = 2.590(Ft.)
Slope = 0.00518 s(percent)= 0.52
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 13.421 min.
Rainfall intensity = 2.005(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.746
Decimal fraction soil group A = 0.000
Decimal fraction soil group B 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 2.093(CFS)
I
I
I
I
I
I
;z,1r
I
I
Total initial stream area =
Pervious area fraction = 0.500
1.400(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 21.000 to Point/Station 22,000
**** INITIAL AREA EVALUATION ****
Initial area flow distance = 950.000(Ft.)
Top (of initial area) elevation = 1349.600(Ft.)
Bottom (of initial area) elevation = 1298.480(Ft.)
Difference in elevation = 51.120(Ft.)
Slope = 0.05381 s(percent)= 5.38
TC = k(0.390)*[(length^3)/(e1evation change)]^0.2
Initial area time of concentration = 10.864 min.
Rainfall intensity = 2.253(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.757
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group 0 = 0.000
RI index for soi1(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 9.909(CFS)
Total initial stream area = 5.810(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 31.000 to Point/Station 32.000
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 780.000(Ft.)
Top (of initial area) elevation = 1350.400(Ft.)
Bottom (of initial area) elevation = 1338.930(Ft.)
Difference in elevation = 11.470(Ft.)
Slope = 0.01471 s(percent)= 1.47
TC = k(0.390)*[(length^3)/(e1evation change)]^0.2
Initial area time of ooncentration = 13.014 min.
Rainfall intensity = 2. 040 (In/Hr) for a 10.0
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.792
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soi1(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 0.500
year storm
I
I
A = 0.000
B 0.300
C = 0.300
D = 0.400
67,50
0.500; Impervious fraction =
5.850(CFS)
3.620(Ac.)
0.500
J
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 33.000 to Point/Station 34.000
**** INITIAL AREA EVALUATION ****
I
I
'2-~
I
I
Initial area flow distance = 760.000(Ft.)
Top (of initial area) elevation = 1347.050(Ft.)
Bottom (of initial area) elevation = 1329.600(Ft.)
Difference in elevation = 17.450(Ft.)
Slope = 0.02296 s(percent)= 2.30
TC = k(0.390)'[(length^3)/(e1evation change)]^0.2
Initial area time of concentration = 11.781 min.
Rainfall intensity = 2.154 (In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.788
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.200
RI index for soi1(AMC 2) = 65.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 6. 125 (CFS)
Total initial stream area = 3.610(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 41.000 to Point/Station 41.100
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 320.000(Ft.)
Top (of initial area) elevation = 1323.400(Ft.)
Bottom (of initial area) elevation = 1318.650(Ft.)
Difference in elevation = 4.750(Ft.)
Slope = 0.01484 s(percent)= 1.48
TC = k(0.390)'[(length^3)/(e1evation change)]^0.2
Initial area time of concentration = 9.095 min.
Rainfall intensity = 2.484(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.801
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.500
RI index for soi1(AMC 2) = 65.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 3.401(CFS)
Total initial stream area 1.710(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 41.100 to Point/Station 42,000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
I
I
Top of street segment elevation = 1318.650(Ft.)
End of street segment elevation = 1302.960(Ft.)
Length of street segment = 460.000(Ft.)
Height of curb above gutter flowline = 6.0(ln.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfa11 grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
I
I
~
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 5.8l8(CFS)
Depth of flow = 0.346(Ft.), Average velocity = 4.385(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 10.955(Ft.)
Flow velocity = 4.38(Ft/s)
Travel time = 1.75 min. TC = 10.84 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.777
Decimal fraction soil group A = 0.000
Decimal fraction soil group B 0.600
Decimal fraction soil group C 0.400
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 61.20
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 2.255(In/Hr) for a 10.0 year storm
Subarea runoff = 4.259(CFS) for 2.430(Ac.)
Total runoff = 7.660 (CFS) Total area = 4.140 (Ac. )
Street flow at end of street = 7. 660 (CFS)
Half street flow at end of street = 7.660(CFS)
Depth of flow = 0.373(Ft.), Average velocity = 4.677(Ft/s)
Flow width (from curb towards crown)= 12.294(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 43.000 to Point/Station 43.100
**** INITIAL AREA EVALUATION ****
Initial area flow distance = 260.000(Ft.)
Top (of initial area) elevation = 1324.200(Ft.)
Bottom (of initial area) elevation = 1318.800(Ft.)
Difference in elevation = 5.400(Ft.)
Slope = 0.02077 s(percent)= 2,08
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.827 min.
Rainfall intensity = 2.698(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.825
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.200
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.800
RI index for soil(AMC 2) = 71.20
Pervious area fraction = 0.500; Impervious fraction 0.500
Initial subarea runoff = 1.892(CFS)
Total initial stream area O.850(Ac.)
Pervious area fraction = 0.500
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
~
I
I
Process from Point/Station 43.100 to Point/Station
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
44.000
I
I
Top of street segment elevation = l3l8.800(Ft.)
End of street segment elevation = 1303.710(Ft.)
Length of street segment = 890.000(Ft.)
Height of curb above gutter flowline 6,O(In.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 6.366(CFS)
Depth of flow = 0.390(Ft.), Average velocity = 3,428(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 13.153(Ft.)
Flow velocity = 3. 43 (Ft/s)
Travel time = 4.33 min. TC = 12.15 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.751
Decimal fraction soil group A = 0.000
Decimal fraction soil group B 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 2. 118 (In/Hr) for a 10.0 year storm
Subarea runoff = 6.394(CFS) for 4.020(Ac.)
Total runoff = 8.286(CFS) Total area = 4.870(Ac.)
Street flow at end of street = 8.286(CFS)
Half street flow at end of street = 8.286(CFS)
Depth of flow = 0.419(Ft.), Average velocity = 3.652(Ft/s)
Flow width (from curb towards crown)= 14.637(Ft.)
I
I
I
I
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 45.000 to Point/Station 45.100
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 400.000(Ft.)
Top (of initial area) elevation = 1305.700(Ft.)
Bottom (of initial area) elevation = 1294.210(Ft.)
Difference in elevation = 11,490(Ft.)
Slope = 0.02873 s(percent)= 2.87
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 8.714 min.
Rainfall intensity = 2.543(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.788
Decimal fraction soil group A = 0.000
I
I
I
I
-z,l,
I
I
I
Decimal fraction soil group B = 0.600
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 61.20
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 2.364(CFS)
Total initial stream area = 1.180(Ac.)
Pervious area fraction = 0.500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 45.100 to Point/Station 46.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
I
I
Top of street segment elevation = l294.2l0(Ft.)
End of street segment elevation = l285.750(Ft.)
Length of street segment = 380.000(Ft.)
Height of curb above gutter flowline = 6.0(10.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.00Q(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 3.786(CFS)
Depth of flow = O,326(Ft.), Average velocity = 3.370(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 9.983(Ft.)
Flow velocity = 3.37(Ft/s)
Travel time = 1.88 min. TC = 10.59 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.814
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.200
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.800
RI index for soil(AMC 2) = 71.20
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 2.284(In/Hr) for a 10.0 year storm
Subarea runoff = 2. 640 (CFS) for 1.420(Ac.)
Total runoff = 5.004(CFS) Total area = 2.600(Ac.)
Street flow at end of street = 5.004(CFS)
Half street flow at end of street = 5.004(CFS)
Depth of flow = 0.352(Ft.), Average velocity = 3.594(Ft/s)
Flow width (from curb towards crown)= 11.249(Ft.)
I
I
I
I
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 45.100 to Point/Station 46.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
-z,..'\
I
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 2.600(Ac.)
Runoff from this stream = 5.004(CFS)
Time of concentration = 10.59 min.
Rainfall intensity = 2.284 (In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 46.100 to Point/Station 46.000
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 490.000(Ft.)
Top (of initial area) elevation = 1293.500(Ft.)
Bottom (of initial area) elevation = 1285.750(Ft.)
Difference in elevation = 7.750(Ft.)
Slope = 0.01582 s(percent)= 1.58
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.649 min.
Rainfall intensity = 2.277(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.794
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.000
Decimal fraction soil group D 0.500
RI index for soil(AMC 2) = 65.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 2,658(CFS)
Total initial stream area = 1.470(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 46.100 to Point/Station 46.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.470(Ac.)
Runoff from this stream = 2.658(CFS)
Time of concentration = 10.65 min.
Rainfall intensity = 2.277 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
1
2
Largest
Qp=
5.004 10.59
2.658 10.65
stream flow has longer
5.004 + sum of
Qa Tb/Ta
2.658. 0.995
7.648
2.284
2.277
or shorter time
of concentration
2,644
Qp=
I
I
~
I
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
5.004 2.658
Area of streams before confluence:
2.600 1.470
I
I
Results of confluence:
Total flow rate =
Time of concentration
Effective stream area
7.648 (CFS)
= 10.594 min.
after confluence
=
4.070 (Ac. )
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 47.000 to Point/Station 47.100
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 390.000(Ft.)
Top (of initial area) elevation = l305.400(Ft.)
Bottom (of initial area) elevation = l296.850(Ft.)
Difference in elevation = 8.550(Ft.)
Slope = 0.02192 s(percent)= 2.19
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.106 min.
Rainfall intensity = 2.482(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.774
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.900
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.100
RI index for soil(AMC 2) = 57.90
Pervious area fraction = 0.500; Impervious fraction 0.500
Initial subarea runoff = 2.38l(CFS)
Total initial stream area = 1.240(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 47.100 to Point/Station 48.000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
Top of street segment elevation = l296.850(Ft.)
End of street segment elevation = l283,230(Ft.)
Length of street segment = 680.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break l2.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break =
Manning's N from grade break to crown =
0.0150
0.0150
I
I
I
I
I
I
-z,l\
I
I
Estimated mean flow rate at midpoint of street = 5.002(CFS)
Depth of flow = 0.357(Ft.), Average velocity = 3. 451 (Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 11.501(Ft.)
Flow velocity = 3. 45 (Ft/s)
Travel time = 3.28 min. TC = 12.39 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.787
Decimal fraction soil group A = 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C = 0.000
Decimal fraction soil group D 0.500
RI index for soil(AMC 2) = 65.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 2.096(In/Hr) for a 10.0 year storm
Subarea runoff = 4.502(CFS) for 2.730(Ac.)
Total runoff = 6.884(CFS) Total area = 3.970(Ac,)
Street flow at end of street = 6.884(CFS)
Half street flow at end of street = 6.884(CFS)
Depth of flow = 0.389(Ft.), Average velocity = 3.722 (Ft/s)
Flow width (from curb towards crown)= 13.126(Ft.)
I
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 47.100 to Point/Station 48.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 3.970(Ac.)
Runoff from this stream = 6. 884 (CFS)
Time of concentration = 12.39 min.
Rainfall intensity = 2.096(In/Hr)
Program is now starting with Main Stream No. 2
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 47.200 to Point/Station 48.000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 490.000(Ft.l
Top (of initial area) elevation = 1290.800(Ft.)
Bottom (of initial area) elevation = 1283.230(Ft.)
Difference in elevation = 7.570(Ft.)
Slope = 0.01545 s(percent)= 1.54
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.699 min.
Rainfall intensity = 2.272 (In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.758
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 2.428(CFS)
I
I
I
I
I
30
I
I
Total initial stream area =
Pervious area fraction = 0.500
1.410(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Precess from Point/Station 47.200 to Point/Station 48.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.410(Ac.)
Runoff from this stream = 2. 428 (CFS)
Time of concentration = 10.70 min.
Rainfall intensity = 2.272 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In~~
I
1
2
Largest
~=
6.884 12.39
2.428 10.70
stream flow has longer
6.884 + sum of
Qb Ia/Ib
2.428. 0.923 =
9.123
time of
2.096
2,272
concentration
I
2.240
~=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
6.884 2.428
Area of streams before confluence:
3,970 1.410
I
I
Results of confluence:
Total flow rate =
Time of concentration
Effective stream area
9.123(CFS)
= 12.389 min.
after confluence
=
5.380(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 49.000 to POint/Station 49.100
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 250.000(Ft.)
Top (of initial area) elevation = 1321.200(Ft.)
Bottom (of initial area) elevation = 1313.390(Ft.)
Difference in elevation = 7.810(Ft.)
Slope = 0.03124 s(percent)= 3.12
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.101 min.
Rainfall intensity = 2.846(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.801
Decimal fraction soil group A
Decimal fraction soil group B =
Decimal fraction soil group C =
0.000
0.500
0.500
I
I
I
I
~
I
I
I
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 62.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 1.938(CFS)
Total initial stream area = 0.850(Ac.)
Pervious area fraction = 0.500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 49.100 to Point/Station 49,200
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
I
Top of street segment elevation = l3l3.390(Ft.)
End of street segment elevation = l300.920(Ft.)
Length of street segment = 350.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = l2.000(Ft,)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 3.7l7(CFS)
Depth of flow = 0.305(Ft.), Average velocity = 4. 027 (Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 8.925(Ft.)
Flow velocity = 4.03(Ft/s)
Travel time = 1.45 min, TC = 8.55 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.811
Decimal fraction soil group A 0.000
Decimal fraction soil group B = 0.100
Decimal fraction soil group C = 0.900
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) = 67.70
Pervious area fraction = 0.500; Impervious fraction 0.500
Rainfall intensity = 2. 570 (In/Hr) for a 10.0 year storm
Subarea runoff = 3.250(CFS) for 1.560(Ac.)
Total runoff = 5. 188 (CFS) Total area = 2.4l0(Ac.)
Street flow at end of street = 5.l88(CFS)
Half street flow at end of street = 5.l88(CFS)
Depth of flow = 0.333(Ft.), Average velocity = 4. 342 (Ft/s)
Flow width (from curb towards crown)= 10.335(Ft.)
I
I
I
I
I
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 49.300 to POint/Station 49.400
.... INITIAL AREA EVALUATION ....
Initial area flow distance = 520.000(Ft.)
Top (of initial area) elevation = l32l.200(Ft.)
I
I
.-z.,.-z,..
I
I
I
Bottom (of initial area) elevation = 1301.000(Ft.)
Difference in elevation = 20.200(Ft.)
Slope = 0.03885 s(percent)= 3,88
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.112 min.
Rainfall intensity = 2.481(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.822
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 72.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 2.979(CFS)
Total initial stream area = 1.460(Ac.)
Pervious area fraction = 0.500
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 50.100 to Point/Station 50.000
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 620,OOO(Ft.)
Top (of initial area) elevation = 1315.600(Ft.)
Bottom (of initial area) elevation = 1292.800(Ft.)
Difference in elevation = 22.800(Ft.)
Slope = 0.03677 s(percent)= 3.68
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.884 min.
Rainfall intensity = 2.373(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.819
Decimal fraction soil group A = 0.000
Decimal fraction soil group B 0.000
Decimal fraction soil group C = 0.500
Decimal fraction soil group D 0.500
RI index for soil(AMC 2) = 72.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 3. 110 (CFS)
Total initial stream area = 1.600(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 51.000 to Point/Station 51.100
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 340.000(Ft.)
Top (of initial area) elevation = 1315.600(Ft.)
Bottom (of initial area) elevation = 1303.940(Ft.)
Difference in elevation = 11.660(Ft.)
Slope = 0.03429 s(percent)= 3.43
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.882 min.
Rainfall intensity = 2.687(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.827
I
I
I
~?
I
I
I
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 72.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 2.623(CFS)
Total initial stream area = 1.180(Ac.)
Pervious area fraction = 0.500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 51.100 to Point/Station 52.000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
I
I
Top of street segment elevation = l303.940(Ft.)
End of street segment elevation = l290.730(Ft.)
Length of street segment = 530.000(Ft.)
Height of curb above gutter flowline = 6.0(Io.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = l2.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 5.2l3(CFS)
Depth of flow = 0.350(Ft.), Average velocity = 3,789(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 11.176(Ft.)
Flow velocity = 3.79(Ft/s)
Travel time = 2.33 min. TC = 10.21 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.796
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C 0.000
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 65.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 2,330(In/Hr) for a 10.0 year storm
Subarea runoff = 4.32l(CFS) for 2.330(Ac.)
Total runoff = 6. 944 (CFS) Total area = 3.5l0(Ac.)
Street flow at end of street = 6.944(CFS)
Half street flow at end of street = 6. 944 (CFS)
Depth of flow = 0.379(Ft.), Average velocity = 4.054(Ft/s)
Flow width (from curb towards crown)= l2.595(Ft.)
I
I
I
I
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 53.000 to POint/Station 54.000
.... INITIAL AREA EVALUATION ....
I
I
;A
I
I
Initial area flow distance = 745.000(Ft.)
Top (of initial area) elevation = 1295.100(Ft.)
Bottom (of initial area) elevation = 1279.060(Ft.)
Difference in elevation = 16.040(Ft.)
Slope = 0.02153 s(percent)= 2.15
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 11.839 min.
Rainfall intensity = 2. 149 (In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.802
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 1.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 69.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 3.894(CFS)
Total initial stream area = 2.260(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 55.000 to Point/Station 56.000
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 330.000(Ft.)
Top (of initial area) elevation = 1289.290(Ft.)
Bottom (of initial area) elevation = 1279.070(Ft.)
Difference in elevation = 10.220(Ft.)
Slope = 0.03097 s(percent)= 3.10
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.948 min.
Rainfall intensity = 2. 675 (In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.778
Decimal fraction soil group A = 0.000
Decimal fraction soil group B 0.900
Decimal fraction soil group C = 0.100
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 57.30
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 4,288(CFS)
Total initial stream area = 2.060(Ac,)
Pervious area fraction = 0.500
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 57.000 to Point/Station 58.000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 640.000(Ft.)
Top (of initial area) elevation = 1293.010(Ft.)
Bottom (of initial area) elevation = 1282.260(Ft.)
Difference in elevation = 10.750(Ft.)
Slope = 0.01680 s(percent)= 1.68
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 11.708 min.
I
I
??~
I
I
I
Rainfall intensity = 2.162 (In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.763
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.800
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 58.60
Pervious area fraction = 0.500; Impervious fraction 0.500
Initial subarea runoff = 2.2ll(CFS)
Total initial stream area = 1.340(Ac.)
Pervious area fraction = 0.500
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 65.000 to Point/Station 66.000
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 280.000(Ft.)
Top (of initial area) elevation = l306.000(Ft.)
Bottom (of initial area) elevation = l304.000(Ft.)
Difference in elevation = 2.000(Ft.)
Slope = 0.00714 s(percent)= 0.71
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.981 min.
Rainfall intensity = 2.360(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.762
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction
Initial subarea runoff = 1.222 (CFS)
Total initial stream area 0.680(Ac.)
Pervious area fraction = 0.500
,9/p Of f1()[}'r
Mope.. b6 "-' 70
bx'CUJf?;!:f) fi20H
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++~~~~);+
Process from Point/Station 66.000 to Point/Station 67.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
I
I
I
I
I
I
I
Top of street segment elevation = l304.000(Ft.)
End of street segment elevation = l289.650(Ft.)
Length of street segment 850.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 43.000(Ft.)
Distance from crown to crossfall grade break = 9.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = l2.000(Ft.)
Slope from curb to property line (v/hz) 0,025
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
I
I
I
I
1>CA.
I
I
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 3.164(CFS)
Depth of flow = 0.323(Ft.), Average velocity = 2. 907 (Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 9.806(Ft.)
Flow velocity = 2.91(Ft/s)
Travel time = 4.87 min. TC = 14.85 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.771
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.600
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.400
RI index for soil(AMC 2) = 63.60
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 1.897(In/Hr) for a 10.0 year storm
Subarea runoff = 3. 158 (CFS) for 2.160(Ac.)
Total runoff = 4.380 (CFS) Total area = 2.840 (Ac. )
Street flow at end of street = 4.380(CFS)
Half street flow at end of street = 4.380(CFS)
Depth of flow = 0.352(Ft.), Average velocity = 3.134(Ft/s)
Flow width (from curb towards crown)= 11.274(Ft.)
I
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 68.000 to Point/Station 69.000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 510.000(Ft.)
Top (of initial area) elevation = 1289.600(Ft.)
Bottom (of initial area) elevation = 1284.410(Ft.)
Difference in elevation = 5.190(Ft.)
Slope = 0.01018 s(percent)= 1.02
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 11.819 min.
Rainfall intensity = 2.151(In/Hr) for a 10,0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.753
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 1. 117 (CFS)
Total initial stream area = 0.690(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 68.000 to Point/Station 69,000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 0.690(Ac.)
Runoff from this stream = 1.117(CFS)
I
o;it
I
I
I
Time of concentration =
Rainfall intensity =
Program is now starting
11.82 min.
2.151 (In/Hr)
with Main Stream No. 2
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 70.000 to Point/Station 69.000
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 995.000(Ft.)
Top (of initial area) elevation = 1306.500(Ft,)
Bottom (of initial area) elevation = 1284.410(Ft.)
Difference in elevation = 22.090(Ft.)
Slope = 0.02220 s(percent)= 2.22
TC = k(0.390)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 13.211 min.
Rainfall intensity = 2.023(In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.746
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 1.933(CFS)
Total initial stream area = 1.280(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 70.000 to Point/Station 69.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.280(Ac.)
Runoff from this stream = 1. 933 (CFS)
Time of concentration = 13.21 min.
Rainfall intensity = 2. 023 (In/Hr)
Summary of stream data:
I
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
Qp=
1.117 11.82
1. 933 13.21
stream flow has longer
1.933 + sum of
Qb Ia/Ib
1.117' 0.941 =
2.983
2.151
2.023
time of concentration
I
1
2
Largest
Qp=
I
1.050
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
1.117 1.933
Area of streams before confluence:
I
I
"3>'
I
I
0.690
1. 280
I
Results of confluence:
Total flow rate = 2.983(CFS)
Time of concentration = 13.211 min.
Effective stream area after confluence =
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the
1. 970 (Ac.)
84.40 (Ac.)
I
I
same area.
Area averaged pervious area fraction(Ap) = 0.514
Area averaged RI index number = 63.4
I
I
I
I
I
I
I
I
I
...,
. \
I
I
I
I
I
3t\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.,
"
IV. 100 YEAR DEVELOPMENT STUDY
..
';.
b.s)
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
I
TR. 23209
100 YR. DEV.
I
*********
Hydrology Study Control Information **********
I
RANPAC Engineering Corporation, Temecula, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) = 100.00 Antecedent Moisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr,)
I
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 1.000 to Point/Station 2.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 150.000(Ft.)
Top (of initial area) elevation = 1367.800(Ft.)
Bottom (of initial area) elevation = 1365.300(Ft.)
Difference in elevation = 2.500(Ft.)
Slope = 0.01667 s(percent)= 1.67
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 6.563 min.
Rainfall intensity = 4.390(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.854
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.100
Decimal fraction soil group C = 0.100
Decimal fraction soil group 0 = 0.800
RI index for soil(AMC 2) = 72.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
I
I
I
I
I
~
I
I
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 0.500
2.698 (CFS)
0.720(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 2.000 to Point/Station 3.000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
I
Top of street segment elevation = 1365.300(Ft.)
End of street segment elevation = 1333.060(Ft.)
Length of street segment = 610.000(Ft.)
Height of curb above gutter flowline = 6.0(ln.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 9.799(CFS)
Depth of flow = 0.375(Ft.), Average velocity = 5.859(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 12.433(Ft.)
Flow velocity = 5.86(Ft/s)
Travel time = 1.74 min. TC = 8.30 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.848
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.100
Decimal fraction soil group C = 0.100
Decimal fraction soil group D = 0.800
RI index for soil(AMC 2) = 72.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 3. 859 (In/Hr) for a 100.0 year storm
Subarea runoff = 12.400(CFS) for 3,790(Ac,)
Total runoff = 15. 098 (CFS) Total area = 4.510(Ac.)
Street flow at end of street = 15.09B(CFS)
Half street flow at end of street = 15.09B(CFS)
Depth of flow = O,423(Ft.), Average velocity = 6.496(Ft/s)
Flow width (from curb towards crown)= 14.B24(Ft.)
I
I
I
I
.
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 3.100 to Point/Station 3.200
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 750.000(Ft,)
Top (of initial area) elevation = 1361.000(Ft.)
Bottom (of initial area) elevation = 131B,670(Ft,)
Difference in elevation = 42.330(Ft.)
Slope = 0.05644 s(percent)= 5.64
I
I
A.~
I
I
I
TC = k(0.390)*[(length^3)/(elevation change))^0.2
Initial area time of concentration = 9.790 min.
Rainfall intensity 3.524 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.824
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.200
RI index for soil(AMC 2) = 65.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 8. 070 (CFS)
Total initial stream area = 2.780(Ac.)
Pervious area fraction = 0.500
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 4.000 to Point/Station 5.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 850.000(Ft.)
Top (of initial area) elevation = 1338.500(Ft.)
Bottom (of initial area) elevation = 1316.910(Ft.)
Difference in elevation = 21.590(Ft.)
Slope = 0.02540 s(percent)= 2.54
TC = k(0.390)*[(length^3)/(elevation change))^0.2
Initial area time of concentration = 12.074 min.
Rainfall intensity = 3.140(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.831
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.200
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.600
RI index for soil(AMC 2) = 70.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 6.468(CFS)
Total initial stream area = 2.480(Ac.)
Pervious area fraction = 0.500
I
.
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 6.000 to Point/Station 6.500
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 440.000(Ft.)
Top (of initial area) elevation = 1330.000(Ft.)
Bottom (of initial area) elevation = 1324.530(Ft.)
Difference in elevation = 5.470(Ft.)
Slope = 0.01243 s(percent)= 1.24
TC = k(0.390).[(length^3)/(elevation change))^0.2
Initial area time of concentration = 10.704 min.
Rainfall intensity = 3. 355 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.793
Decimal fraction soil group A =
Decimal fraction soil group B =
Decimal fraction soil group C
0.000
1.000
0.000
I
I
I
I
~
I
I
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 2. 660 (CFS)
Total initial stream area = l.OOO(Ac.)
Pervious area fraction = 0.500
I
.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 6.600 to Point/Station 7.000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 740.000(Ft.)
Top (of initial area) elevation = l346.000(Ft.)
Bottom (of initial area) elevation = l303.750(Ft.)
Difference in elevation = 42.250(Ft.)
Slope = 0.05709 s(percent)= 5.71
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.715 min.
Rainfall intensity = 3.539(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.797
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 8.266(CFS)
Total initial stream area = 2.930(Ac.)
Pervious area fraction = 0.500
.
I
I
.
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 8.000 to Point/Station 8.100
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 620.000(Ft.)
Top (of initial area) elevation = 1338.390(Ft.)
Bottom (of initial area) elevation = 1299.400(Ft.)
Difference in elevation = 38.990(Ft.)
Slope = 0.06289 s(percent)= 6.29
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 8.878 min.
Rainfall intensity = 3. 718 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.840
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.200
Decimal fraction soil group C 0.200
Decimal fraction soil group D 0.600
RI index for soil(AMC 2) = 70.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 6.841(CFS)
Total initial stream area = 2.190(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
I
M
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 8.100 to Point/Station 9,000
uu STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION uu
I
I
Top of street segment elevation = 1299.400(Ft.)
End of street segment elevation = 1296.890(Ft.)
Length of street segment = 240.000(Ft.)
Height of curb above gutter flowline = 6.0(ln.)
Width of half street (curb to crown) = 32.000(Ft.)
Distance from crown to crossfall grade break = 20.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 12.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 7.216(CFS)
Depth of flow = 0.432(Ft.), Average velocity = 2.940(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 15.256(Ft.)
Flow velocity = 2.94(Ft/s)
Travel time = 1.36 min. TC = 10.24 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.795
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 3. 438 (In/Hr) for a 100.0 year storm
Subarea runoff = O,656(CFS) for 0.240(Ac.)
Total runoff = 7.497(CFS) Total area = 2.430(Ac.)
Street flow at end of street = 7,497(CFS)
Half street flow at end of street = 7.497(CFS)
Depth of flow = 0.436(Ft.), Average velocity = 2.967(Ft/s)
Flow width (from curb towards crown)= 15.491(Ft.)
I
I
I
I
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 8.100 to Point/Station 9.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 2.430(Ac.)
Runoff from this stream = 7.497(CFS)
Time of concentration = 10.24 min.
Rainfall intensity = 3.438(In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
I
A,<S
--------------
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Process from Point/Station 25.000 to Point/Station
**** INITIAL AREA EVALUATION ****
9.000
Initial area flow distance = 550.000(Ft.)
Top (of initial area) elevation = l304.500(Ft.)
Bottom (of initial area) elevation = l296.l50(Ft.)
Difference in elevation = 8.350(Ft.)
Slope = 0.01518 s(percent)= 1.52
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 11.245 min.
Rainfall intensity 3.265(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.791
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 1.549(CFS)
Total initial stream area = 0.600(Ac.)
Pervious area fraction = 0.500
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 25.000 to Point/Station 9.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.600(Ac.)
Runoff from this stream = 1.549(CFS)
Time of concentration = 11.24 min.
Rainfall intensity = 3.265(In/Hr)
Summary of stream data:
Stream Flow rate TC
No. (CFS) (min)
1 7.497 10.24
2 1. 549 11.24
Largest stream fJ.ow has J.onger
Qp= 7.497 + sum of
Qa Tb/Ta
1. 549 * 0.911 =
Qp= 8.907
Rainfall Intensity
(In/Hr)
3.438
3.265
or shorter time of concentration
1. 410
Total of 2 main streams to confluence:
Flow rates before confluence point:
7.497 1.549
Area of streams before confJ.uence:
2.430 0.600
ResuJ.ts of confJ.uence:
Total flow rate = 8. 907 (CFS)
Time of concentration = 10.238 min.
~<b
I
I
Effective stream area after confluence =
3.030 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 23.000 to Point/Station 24.000
**** INITIAL AREA EVALUATION ****
I
I
I
Initial area flow distance = 5l0.000(Ft.)
Top (of initial area) elevation = l336.000(Ft.)
Bottom (of initial area) elevation = l300.000(Ft.)
Difference in elevation = 36.000(Ft.)
Slope = 0.07059 s(percent)= 7.06
TC = k(0.530)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.903 min.
Rainfall intensity = 3.321 (In/Hr) for a 100.0 year storm
UNDEVELOPED (poor cover) subarea
Runoff Coefficient = 0.842
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.300
Decimal fraction soil group C = 0.100
Decimal fraction soil group D = 0.600
RI index for soil(AMC 2) = 85.40
Pervious area fraction = 1.000; Impervious fraction = 0.000
Initial subarea runoff = 6.461(CFS)
Total initial stream area = 2.310(Ac.)
Pervious area fraction = 1.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 10.000 to Point/Station 10.100
*u* INITIAL AREA EVALUATION uu
I
I
Initial area flow distance = 320.000(Ft.)
Top (of initial area) elevation = 1324.200(Ft.)
Bottom (of initial area) elevation = 1313.500(Ft.)
Difference in elevation = 10.700(Ft.)
Slope = 0.03344 s(percent)= 3.34
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.732 min.
Rainfall intensity = 4.012(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.807
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 5.406(CFS)
Total initial stream area = 1.670(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 10.100 to Point/Station 11.000
*u* STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION uu
I
Top of street segment elevation =
1313.500 (Ft. )
I
f0
'.
I
I
End of street segment elevat~on = l299.890(Ft.)
Length of street segment = 560.000(Ft.)
Height of curb above gutter flowline = 6.0(ln.)
W~dth of half street (curb to crown) = 20.000(Ft.)
D~stance from crown to crossfall grade break 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow ~s on [1] s~de(s) of the street
D~stance from curb to property l~ne = 10.000(Ft.)
Slope from curb to property l~ne (v/hz) = 0.020
Gutter w~dth = 2.000(Ft.)
Gutter h~ke from flowl~ne = 2.000(In.)
Mann~ng's N ~n gutter = 0.0150
Mann~ng's N from gutter to grade break = 0.0150
Mann~ng's N from grade break to crown = 0.0150
Est~mated mean flow rate at m~dpo~nt of street = 10. 375 (CFS)
Depth of flow = 0.425(Ft.), Average veloc~ty = 4.419(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow w~dth = 14.903(Ft.)
Flow veloc~ty = 4.42(Ft/s)
Travel time = 2.11 min. TC = 9.84 min.
Add~ng area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coeff~c~ent = 0.797
Dec~mal fract~on so~l group A = 0.000
Dec~mal fract~on so~l group B = 1.000
Dec~mal fract~on so~l group C 0.000
Dec~mal fract~on so~l group D = 0.000
RI ~ndex for so~l(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction 0.500
Ra~nfall ~ntens~ty = 3.513 (In/Hr) for a 100.0 year storm
Subarea runoff = 8.592(CFS) for 3.070(Ac.)
Total runoff = 13. 998 (CFS) Total area = 4.740(Ac.)
Street flow at end of street = 13. 998 (CFS)
Half street flow at end of street = 13. 998 (CFS)
Depth of flow = 0.462(Ft.), Average veloc~ty = 4.752(Ft/s)
Flow w~dth (from curb towards crown)= 16.791(Ft.)
I
I
I
I
I
.
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 12.000 to Point/Station 12.100
.... INITIAL AREA EVALUATION ....
.
I
I
I
In~t~al area flow distance = 260.000(Ft.)
Top (of ~n~t~al area) elevat~on = 1324.200(Ft.)
Bottom (of ~n~t~al area) elevat~on = 1318.990(Ft.)
D~fference ~n elevat~on = 5.210(Ft.)
Slope = 0.02004 s(percent)= 2.00
TC = k(0.390).[(length^3)/(elevat~on change)]^0.2
Initial area time of concentration = 7.883 min.
Ra~nfall ~ntens~ty = 3. 970 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.827
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI ~ndex for so~l(AMC 2) =
A 0.000
B = 0.600
C = 0.000
D = 0.400
63.60
I
I
~
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 2. 759 (CFS)
Total initial stream area = 0.840(Ac.)
Pervious area fraction = 0.500
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 12.100 to Point/Station 13,000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
Top of street segment elevation = 1318.990(Ft.)
End of street segment elevation = 1303.680(Ft.)
Length of street segment = 580.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 7. 423 (CFS)
Depth of flow = 0.383(Ft.), Average velocity = 4.209(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 12.794(Ft.)
Flow velocity = 4.21(Ft/s)
Travel time = 2.30 min. TC = 10.18 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.801
Decimal fraction soil group A = 0,000
Decimal fraction soil group B = 0.900
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.100
RI index for soil(AMC 2) = 57.90
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 3.449(In/Hr) for a 100.0 year storm
Subarea runoff 7.848(CFS) for 2.840(Ac.)
Total runoff = 10. 607 (CFS) Total area = 3.680(Ac.)
Street flow at end of street = 10. 607 (CFS)
Half street flow at end of street = 10.607 (CFS)
Depth of flow = 0.422(Ft.), Average velocity = 4.584(Ft/s)
Flow width (from curb towards crown)= 14.789(Ft.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 14.000 to Point/Station 16.000
.... INITIAL AREA EVALUATION ....
Initial area flow distance = 580.000(Ft.)
Top (of initial area) elevation = 1310,900(Ft,)
Bottom (of initial area) elevation = 1299.280(Ft.)
Difference in elevation = 11.620(Ft.)
~~
I
I
Q
I
Slope = 0.02003 s(percent)= 2.00
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.866 min.
Rainfall intensity = 3.327 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.822
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C 0.000
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 65.50
Pervious area fraction = 0.500; Impervious fraction 0.500
Initial subarea runoff = 5.576(CFS)
Total initial stream area = 2.040(Ac.)
Pervious area fraction = 0.500
I
I
I
I,
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 14.000 to Point/Station 16.000
**** CONFLUENCE OF MAIN STREAMS ****
I
I
.1
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 2.040(Ac.)
Runoff from this stream = 5.576(CFS)
Time of concentration = 10.87 min.
Rainfall intensity = 3. 327 (In/Hr)
Program is now starting with Main Stream No. 2
I,
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 15.000 to Point/Station 16.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 440.000(Ft.)
Top (of initial area) elevation = l306.900(Ft.)
Bottom (of initial area) elevation = l299.280(Ft.)
Difference in elevation = 7.620(Ft.)
Slope = 0.01732 s(percent)= 1.73
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.017 min.
Rainfall intensity = 3.479(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.796
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 1.717(CFS)
Total initial stream area = 0.620(Ac.)
Pervious area fraction = 0.500
I
,I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 15.000 to Point/Station 16,000
**** CONFLUENCE OF MAIN STREAMS ****
I
I
60
I
I
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.620(Ac.)
Runoff from this stream = 1.7l7(CFS)
Time of concentration = 10.02 min.
Rainfall intensity = 3.479(In/Hr)
Summary of stream data:
I
I
Stream
No,
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
~=
5.576 10.87
1.717 10.02
stream flow has longer
5.576 + sum of
Qb Ia/Ib
1.717 * 0.956 =
7.218
3.327
3.479
time of concentration
I
I
1.642
~=
I
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
5.576 1.717
Area of streams before confluence:
2.040 0.620
I
I
I
Results of confluence:
Total flow rate =
Time of concentration
Effective stream area
7.218(CFS)
10.866 min.
after confluence
=
2.660(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 16.000 to Point/Station 18,000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
I
t
Top of street segment elevation = 1299.280(Ft.)
End of street segment elevation = 1296.890(Ft.)
Length of street segment = 290,OOO(Ft.)
Height of curb above gutter flowline = 6.Q(In.)
Width of half street (curb to crown) = 34.000(Ft.)
Distance from crown to crossfall grade break = 20.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.00Q(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0,0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 7.802(CFS)
Depth of flow = 0.457(Ft.), Average velocity = 2.738(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 16.502(Ft.)
I
I
I
I
~\
I
I
I
I,
I
I
Flow velocity = 2.74(Ft/s)
Travel time = 1.77 min. TC = 12.63 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.785
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 3. 063 (In/Hr) for a 100.0 year storm
Subarea runoff = 1.034(CFS) for 0.430(Ac.)
Total runoff = 8.252(CFS) Total area = 3.090(Ac,)
Street flow at end of street = 8.252 (CFS)
Half street flow at end of street = 8.252 (CFS)
Depth of flow = 0.464(Ft.), Average velocity = 2.775(Ft/s)
Flow width (from curb towards crown)= 16.873(Ft.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 16.000 to Point/Station 18.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 3.090(Ac.)
Runoff from this stream = 8.252(CFS)
Time of concentration = 12.63 min.
Rainfall intensity = 3,063(In/Hr)
Program is now starting with Main Stream No. 2
I
,I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 17.000 to Point/Station 18.000
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 550.000(Ft.)
Top (of initial area) elevation = 1304.500(Ft.)
Bottom (of initial area) elevation = 1296.150(Ft.)
Difference in elevation = 8.350(Ft,)
Slope = 0.01518 s(percent)= 1.52
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 11.245 min.
Rainfall intensity = 3.265(In/Hr) for a 100,0
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.803
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 0.500
year storm
I
,I
A = 0.000
B = 0.800
C = 0.000
DO.200
59.80
0.500; Impervious fraction =
3. 933 (CFS)
1. 500 (Ac. )
0.500
I
.
51/
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 17.000 to Point/Station 18.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.500(Ac.)
Runoff from this stream = 3.933(CFS)
Time of concentration = 11.24 min.
Rainfall intensity = 3.265(In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
t
1
2
Largest
~=
8.252 12,63
3.933 11.24
stream flow has longer
8.252 + sum of
Qb Ia/Ib
3.933 * 0.938 =
11.942
3.063
3.265
time of concentration
3.690
~=
I
J
Total of 2 main streams to confluence:
Flow rates before confluence point:
8.252 3.933
Area of streams before confluence:
3.090 1.500
I
Results of confluence:
Total flow rate = 11,942(CFS)
Time of concentration = 12.632 min.
Effective stream area after confluence =
4.590(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 19.000 to Point/Station 20.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = 1306.000(Ft.)
Bottom (of initial area) elevation = 1303.410(Ft.)
Difference in elevation = 2.590(Ft.)
Slope = 0.00518 s(percent)= 0.52
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 13.421 min.
Rainfall intensity = 2,962(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.782
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soi1(AMC 2) = 56.00
Pervious area fraction 0.500; Impervious fraction = 0.500
Initial subarea runoff = 3.245(CFS)
I
I
I
.
I
S3
I
I
I
Total initial stream area =
Pervious area fraction = 0.500
1.400(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 21.000 to Point/Station 22.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 950.000(Ft.)
Top (of initial area) elevation = 1349.600(Ft.)
Bottom (of initial area) elevation = 1298.480(Ft.)
Difference in elevation = 51,120(Ft.)
Slope = 0.05381 s(percent)= 5.38
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.864 min.
Rainfall intensity = 3.328(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.792
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 15.317 (CFS)
Total initial stream area = 5.810(Ac.)
Pervious area fraction = 0.500
I
I
j
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 31.000 to Point/Station 32.000
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 780.000(Ft.)
Top (of initial area) elevation = 1350.400(Ft.)
Bottom (of initial area) elevation = 1338.930(Ft.)
Difference in elevation = 11.470(Ft.)
Slope = 0.01471 s(percent)= 1.47
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 13.014 min.
Rainfall intensity = 3.013(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.821
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 0.500
A = 0.000
B = 0,300
C = 0.300
D = 0.400
67.50
0.500; Impervious fraction =
8. 954 (CFS)
3.620(Ac.)
0.500
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 33,000 to Point/Station 34,000
**** INITIAL AREA EVALUATION ****
I
I
~
I
I
I
t
I
Initial area flow distance = 760.000(Ft.)
Top (of initial area) elevation = l347.050(Ft.)
Bottom (of initial area) elevation = l329,600(Ft.)
Difference in elevation = 17.450(Ft.)
Slope = 0.02296 s(percent)= 2.30
TC = k(0.390)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 11.781 min.
Rainfall intensity = 3. 183 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.817
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.200
RI index for soil(AMC 2) = 65.00
Pervious area fraction = 0.500; Impervious fraction 0.500
Initial subarea runoff = 9.388(CFS)
Total initial stream area = 3.6l0(Ac.)
Pervious area fraction = 0.500
t
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 41.000 to Point/Station 41.100
.... INITIAL AREA EVALUATION ....
I
J
I
Initial area flow distance = 320.000(Ft.)
Top (of initial area) elevation = l323.400(Ft,)
Bottom (of initial area) elevation = 1318.650(Ft,)
Difference in elevation = 4.750(Ft.)
Slope = 0.01484 s(percent)= 1.48
TC = k(0.390)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.095 min.
Rainfall intensity = 3. 669 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.828
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C 0.000
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 65.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 5.l93(CFS)
Total initial stream area = 1.710 (Ac.)
Pervious area fraction = 0.500
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 41.100 to Point/Station 42,000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
I
Top of street segment elevation = 1318.650(Ft.)
End of street segment elevation = 1302.960(Ft.)
Length of street segment = 460.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0,020
I
I
I
5i
I
I
I
I
I
"I
I
Street flow ~s on [lJ s~de(s) of the street
D~stance from curb to property l~ne = 10.000(Ft.)
Slope from curb to property l~ne (v/hz) = 0.020
Gutter w~dth = 2.000(Ft.)
Gutter h~ke from flowl~ne = 2.000(In.)
Mann~ng's N ~n gutter = 0.0150
Mann~ng's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Est~mated mean flow rate at m~dpo~nt of street = 8. 883 (CFS)
Depth of flow = 0.388(Ft.), Average veloc~ty = 4.844(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow w~dth = l3.066(Ft.)
Flow veloc~ty = 4. 84 (Ft/s)
Travel t~me = 1.58 m~n. TC = 10.68 m~n.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coeff~c~ent = 0.810
Decimal fraction soil group A = 0.000
Dec~mal fract~on so~l group B = 0.600
Dec~mal fract~on so~l group C = 0.400
Dec~mal fract~on so~l group D = 0.000
RI ~ndex for so~l(AMC 2) = 61.20
Pervious area fraction = 0.500; Impervious fraction = 0.500
Ra~nfall ~ntens~ty 3. 359 (In/Hr) for a 100.0 year storm
Subarea runoff = 6. 608 (CFS) for 2.430(Ac.)
Total runoff = 11. 802 (CFS) Total area = 4,140 (Ac.)
Street flow at end of street = 11. 802 (CFS)
Half street flow at end of street = 11.802(CFS)
Depth of flow = 0.420(Ft.), Average veloc~ty = 5.l84(Ft/s)
Flow w~dth (from curb towards crown)= l4.662(Ft.)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Po~nt/Stat~on 43.000 to Po~nt/Stat~on 43.100
**** INITIAL AREA EVALUATION ****
I;
I
I
In~t~al area flow d~stance = 260.000(Ft.)
Top (of ~n~t~al area) elevat~on = l324.200(Ft.)
Bottom (of ~n~t~al area) elevat~on = l3l8.800(Ft.)
Difference in elevation = 5.400(Ft.)
Slope = 0.02077 s(percent)= 2.08
TC = k(O.390)*[(length^3)/(elevation change)]^O.2
Initial area time of concentration = 7.827 min.
Ra~nfall ~ntens~ty = 3. 985 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coeffic~ent = 0.846
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI ~ndex for so~l(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area
Pervious area fraction = 0.500
A = 0.000
B = 0.200
C = 0.000
D = 0.800
71.20
0.500; Imperv~ous fract~on =
2.867(CFS)
0.850(Ac.)
0.500
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
I
5(..,
I
I
~
I
Process from Point/Station 43.100 to Point/Station
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
44,000
I
Top of street segment elevation = 1318.800(Ft.)
End of street segment elevation = 1303.710(Ft.)
Length of street segment 890.000(Ft.)
Height of curb above gutter flowline = 6.0(10.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 9.647(CFS)
Depth of flow = 0.438(Ft.), Average velocity = 3.788(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 15.556(Ft.)
Flow velocity = 3.79(Ft/s)
Travel time = 3.92 min. TC = 11.74 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.789
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 3.188(In/Hr) for a 100.0 year storm
Subarea runoff = 10.109(CFS) for 4.020(Ac.)
Total runoff = 12. 976 (CFS) Total area = 4,870(Ac.)
Street flow at end of street = 12.976(CFS)
Half street flow at end of street = 12.976(CFS)
Depth of flow = 0.477(Ft.), Average velocity = 4. 071 (Ft/s)
Flow width (from curb towards crown)= 17.496(Ft.)
I
I
I
1
I
I
.1
I
t
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 45.000 to Point/Station 45.100
**** INITIAL AREA EVALUATION ****
I
I
a
Initial area flow distance = 400.000(Ft.)
Top (of initial area) elevation = 1305.700(Ft.)
Bottom (of initial area) elevation = 1294.210(Ft.)
Difference in elevation = 11.490(Ft.)
Slope = 0.02873 s(percent)= 2.87
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 8.714 min.
Rainfall intensity = 3.757 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.817
Decimal fraction soil group A = 0.000
I
I
51
I
I
I
l
Decimal fraction soil group B 0.600
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 61,20
Pervious area fraction = 0.500; Impervious fraction
Initial subarea runoff = 3. 623 (CFS)
Total initial stream area = l.180(Ac.)
Pervious area fraction = 0.500
0.500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 45.100 to Point/Station 46.000
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
I
Top of street segment elevation = 1294.210(Ft.)
End of street segment elevation = 1285.750(Ft.)
Length of street segment = 380.000(Ft.)
Height of curb above gutter flowline = 6.0(10.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [lJ side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 5. 803 (CFS)
Depth of flow = 0.366(Ft.). Average velocity = 3.721(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 11.970(Ft.)
Flow velocity = 3.72(Ft/s)
Travel time = 1.70 min. TC = 10.42 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.838
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.200
Decimal fraction soil group C = 0.000
Decimal fraction soil group D 0.800
RI index for soil(AMC 2) = 71.20
Pervious area fraction = 0.500; Impervious fraction 0.500
Rainfall intensity = 3.406(In/Hr) for a 100.0 year storm
Subarea runoff = 4. 055 (CFS) for 1.420(Ac.)
Total runoff = 7.678 (CFS) Total area = 2.600 (Ac. )
Street flow at end of street = 7. 678 (CFS)
Half street flow at end of street = 7. 678 (CFS)
Depth of flow = 0.395(Ft.), Average velocity = 3.977(Ft/s)
Flow width (from curb towards crown)= 13.431(Ft.)
1
I
I
,I
J
j
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 45.100 to Point/Station 46,000
**** CONFLUENCE OF MAIN STREAMS ****
I
I
5b
I
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 2.600(Ac.)
Runoff from this stream = 7. 678 (CFS)
Time of concentration = 10.42 min.
Rainfall intensity = 3. 406 (In/Hr)
Program is now starting with Main Stream NO. 2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 46.100 to Point/Station 46.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 490.000(Ft.)
Top (of initial area) elevation = 1293.500(Ft.)
Bottom (of initial area) elevation = 1285.750(Ft,)
Difference in elevation = 7.750(Ft.)
Slope = 0.01582 s(percent)= 1.58
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.649 min.
Rainfall intensity = 3.364(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.822
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 65.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 4.067(CFS)
Total initial stream area = 1.470(Ac.)
Pervious area fraction = 0.500
1
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 46.100 to Point/Station 46.000
**** CONFLUENCE OF MAIN STREAMS ****
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.470(Ac.)
Runoff from this stream = 4.067(CFS)
Time of concentration = 10.65 min.
Rainfall intensity = 3.364 (In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(fu~~
I
a
1
2
Largest
~=
7.678 10.42
4.067 10.65
stream flow has longer
7.678 + sum of
~ ~/~
4.067 * 0,978 =
11.656
3.406
3.364
or shorter time
of concentration
3.978
~=
I
I
~
I
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
7.678 4.067
Area of streams before confluence:
2.600 1.470
I
I
I
Results of confluence:
Total flow rate = 11.656(CFS)
Time of concentration = 10.416 min.
Effective stream area after confluence =
4.070(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 47.000 to Point/Station 47.100
.... INITIAL AREA EVALUATION ....
I
I
I
Initial area flow distance = 390.000(Ft.)
Top (of initial area) elevation = 1305.400(Ft.)
Bottom (of initial area) elevation = 1296.850(Ft.)
Difference in elevation = 8.550(Ft.)
Slope = 0.02192 s(percent)= 2.19
TC = k(0.390)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.106 min.
Rainfall intensity = 3. 667 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.806
Decimal fraction soil group A 0.000
Decimal fraction soil group B = 0.900
Decimal fraction soil group C 0.000
Deoimal fraction soil group D = 0.100
RI index for soil(AMC 2) = 57.90
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 3.664(CFS)
Total initial stream area = 1.240(Ac.)
Pervious area fraction = 0.500
I
I
J
J
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 47.100 to Point/Station 48.000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
I
Top of street segment elevation = 1296.850(Ft.)
End of street segment elevation = 1283.230(Ft.)
Length of street segment = 680.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = 12.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break =
Manning's N from grade break to crown =
0.0150
0.0150
I
I
I
I
I
~
I
I
I
Estimated mean flow rate at midpoint of street = 7. 698 (CFS)
Depth of flow = 0.401(Ft,), Average velocity = 3. 822 (Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 13.738(Ft.)
Flow velocity = 3.82(Ft/s)
Travel time = 2.97 min. TC = 12.07 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.818
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 65.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 3. 140 (In/Hr) for a 100.0 year storm
Subarea runoff = 7.011(CFS) for 2.730(Ac.)
Total runoff = 10. 675 (CFS) Total area = 3.970(Ac.)
Street flow at end of street = 10. 675 (CFS)
Half street flow at end of street = 10. 675 (CFS)
Depth of flow = 0.440(Ft.), Average velocity = 4. 135 (Ft/s)
Flow width (from curb towards crown)= 15.668(Ft.)
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 47.100 to Point/Station 48.000
**** CONFLUENCE OF MAIN STREAMS ****
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 3.970(Ac.)
Runoff from this stream = 10.675(CFS)
Time of concentration = 12.07 min.
Rainfall intensity = 3. 140 (In/Hr)
Program is now starting with Main Stream No.2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 47.200 to Point/Station 48.000
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 490.000(Ft.)
Top (of initial area) elevation = 1290.80Q(Ft.)
Bottom (of initial area) elevation = 1283.230(Ft.)
Difference in elevation = 7.570(Ft.)
Slope = 0.01545 s(percent)= 1.54
TC = k(0.390)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 10.699 min.
Rainfall intensity = 3.356(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.793
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 3. 752 (CFS)
'I
I
I
I
I
~
I
I
Total initial stream area =
Pervious area fraction = 0.500
1. 410 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 47.200 to Point/Station 48.000
**** CONFLUENCE OF MAIN STREAMS ****
I
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.410(Ac.)
Runoff from this stream = 3.752 (CFS)
Time of concentration = 10.70 min.
Rainfall intensity = 3.356(In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
10.675 12.07
3.752 10.70
stream flow has longer
10.675 + sum of
Qb Ia/Ib
3.752 * 0.936 =
14.186
time of
3.140
3.356
concentration
I
3.511
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
10.675 3.752
Area of streams before confluence:
3.970 1.410
I
I
Results of confluence:
Total flow rate = 14. 186 (CFS)
Time of concentration 12.071 min.
Effective stream area after confluence =
5.380 (Ac. )
I,
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 49.000 to Point/Station 49.100
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 250.000(Ft.)
Top (of initial area) elevation = l32l.200(Ft.)
Bottom (of initial area) elevation = 1313,390(Ft.)
Difference in elevation = 7.810(Ft.)
Slope = 0.03124 s(percent)= 3.12
TC = k(0.390)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.101 min.
Rainfall intensity = 4.204 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.828
Decimal fraction soil group A =
Decimal fraction soil group B
Decimal fraction soil group C
0.000
0.500
0,500
-I'
I
I
I
~~
I
I
I
Bottom (of initial area) elevation = 1301.000(Ft,)
Difference in elevation = 20.200(Ft.)
Slope = 0,03885 s(percent)= 3.88
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.112 min.
Rainfall intensity = 3.666(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.844
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 72.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 4.518(CFS)
Total initial stream area = 1.460(Ac.)
Pervious area fraction = 0.500
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 50.100 to Point/Station 50.000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 620.000(Ft.)
Top (of initial area) elevation = 1315.600(Ft.)
Bottom (of initial area) elevation = 1292.800(Ft.)
Difference in elevation = 22.800(Ft,)
Slope = 0.03677 s(percent)= 3.68
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.884 min.
Rainfall intensity = 3.505(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.842
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 72.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 4.722(CFS)
Total initial stream area 1.600(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 51.000 to Point/Station 51.100
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 340.000(Ft.)
Top (of initial area) elevation = 1315.600(Ft.)
Bottom (of initial area) elevation = 1303,940(Ft.)
Difference in elevation = 11.660(Ft.)
Slope = 0.03429 s(percent)= 3.43
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.882 min.
Rainfall intensity = 3.970(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.848
I
I
I
"k-
I
I
I
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 72 .00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 3. 973 (CFS)
Total initial stream area = 1.180 (Ac.)
Pervious area fraction = 0.500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 51.100 to Point/Station 52.000
uu STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION u**
I
I
Top of street segment elevation = l303.940(Ft.)
End of street segment elevation = l290.730(Ft.)
Length of street segment = 530.000(Ft.)
Height of curb above gutter flowline = 6.0(ln.)
Width of half street (curb to crown) = 20.000(Ft.)
Distance from crown to crossfall grade break = l2.000(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
Slope from grade break to crown (v/hz) = 0.020
Street flow is on [1] side(s) of the street
Distance from curb to property line = 10.000(Ft.)
Slope from curb to property line (v/hz) = 0.020
Gutter width = 2.000(Ft.)
Gutter hike from flowline = 2.000(In.)
Manning's N in gutter = 0.0150
Manning's N from gutter to grade break = 0.0150
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 7. 895 (CFS)
Depth of flow = 0.392(Ft.), Average velocity = 4.179(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 13.276(Ft.)
Flow velocity = 4. 18 (Ft/s)
Travel time = 2.11 min. TC = 10.00 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.825
Decimal fraction soil group A 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 65.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 3.484 (In/Hr) for a 100.0 year storm
Subarea runoff = 6. 692 (CFS) for 2.330(Ac.)
Total runoff = 10. 665 (CFS) Total area = 3.510(Ac.)
Street flow at end of street = 10. 665 (CFS)
Half street flow at end of street = 10. 665 (CFS)
Depth of flow = 0.427(Ft.), Average velocity = 4.492(Ft/s)
Flow width (from curb towards crown)= 14.993(Ft.)
I
I
I
I
I
I
a
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 53.000 to POint/Station 54.000
**** INITIAL AREA EVALUATION ****
I
I
~.;
I
I
I
I
Initial area flow distance = 745.000(Ft.)
Top (of initial area) elevation = 1295.100(Ft.)
Bottom (of initial area) elevation = 1279.060(Ft.)
Difference in elevation = 16.040(Ft.)
Slope = 0.02153 s(percent)= 2.15
TC = k(0.390)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 11.839 min.
Rainfall intensity = 3.174 (In/Hr) for a 100.0
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.829
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 0.500
year storm
I
A = 0.000
B = 0.000
C = 1.000
D = 0.000
69.00
0.500; Impervious fraction =
5. 943 (CFS)
2.260(Ac.)
0.500
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 55.000 to Point/Station 56.000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 330.000(Ft.)
Top (of initial area) elevation = 1289.290(Ft.)
Bottom (of initial area) elevation = 1279.070(Ft.)
Difference in elevation = 10.220(Ft.)
Slope = 0.03097 s(percent)= 3.10
TC = k(0.390)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.948 min.
Rainfall intensity = 3.952 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.810
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 0.500
A = 0.000
B = 0.900
C = 0.100
D = 0.000
57.30
0.500; Impervious fraction =
6.590(CFS)
2.060(Ac.)
0.500
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 57.000 to Point/Station 58.000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 640.000(Ft.)
Top (of initial area) elevation = 1293.010(Ft.)
Bottom (of initial area) elevation = 1282.260(Ft.)
Difference in elevation = 10.750(Ft.)
Slope = 0.01680 s(percent)= 1.68
TC = k(0.390)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 11.708 min.
I
I
~
I
I
I
Rainfa~~ intensity 3.~93(In/Hr) for a 100,0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.797
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.800
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 58.60
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 3.413(CFS)
Total initia~ stream area = l.340(Ac.)
Pervious area fraction = 0.500
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 65.000 to Point/Station 66,000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 280.000(Ft.)
Top (of initial area) elevation = 1306.000(Ft.)
Bottom (of initial area) elevation = 1304.000(Ft.)
Difference in elevation = 2.000(Ft.)
Slope = 0.00714 s(percent)= 0.71
TC = k(0.390).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 9.981 min.
Rainfall intensity = 3.487(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.796
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
~;~~~~r::~:~e::~~~=r:a O'50~:8~~!~~~:::.~raction = Ao.500 A/~~
Pervious area fraction = 0.500
'C3Y C:WI?8?
of Srup(
6"6 - 70
F;;:on
I
I
I
I
I
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++~+~~t:+
Process from Point/Station 66.000 to Point/Station 67.000
.... STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ....
I
I
Top of street segment elevation = 1304.000(Ft.)
End of street segment elevation = 1289.650(Ft.)
Length of street segment = 850.000(Ft.)
Height of curb above gutter flowline = 6.0(In.)
Width of ha~f street (curb to crown) = 43.000(Ft.)
Distance from crown to crossfall grade break = 9,OOO(Ft.)
Slope from gutter to grade break (v/hz) = 0.020
S~ope from grade break to crown (v/hz) = 0.020
Street f~ow is on [1] side(s) of the street
Distance from curb to property line = 12.000(Ft.)
Slope from curb to property line (v/hz) = 0.025
Gutter width = 2.000(Ft.)
Gutter hike from f~ow~ine = 2.000(In.)
Manning's N in gutter = 0.0150
Manning'S N from gutter to grade break 0.0150
I
I
I
I
~1-
I
I
I
Manning's N from grade break to crown = 0.0150
Estimated mean flow rate at midpoint of street = 4.885(CFS)
Depth of flow = 0.363(Ft.), Average velocity = 3.2l5(Ft/s)
Streetflow hydraulics at midpoint of street travel:
Halfstreet flow width = 11.80l(Ft.)
Flow velocity = 3.2l(Ft/s)
Travel time = 4.41 min. TC = 14.39 min.
Adding area flow to street
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.805
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.600
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.400
RI index for soil(AMC 2) = 63.60
Pervious area fraction = 0.500; Impervious fraction = 0.500
Rainfall intensity = 2.851 (In/Hr) for a 100.0 year storm
Subarea runoff = 4.958(CFS) for 2.l60(Ac.)
Total runoff = 6. 845 (CFS) Total area = 2.840(Ac.)
Street flow at end of street = 6. 845 (CFS)
Half street flow at end of street = 6. 845 (CFS)
Depth of flow = 0.398(Ft.), Average velocity = 3.482 (Ft/s)
Flow width (from curb towards crown)= l3.56l(Ft.)
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 68.000 to Point/Station 69.000
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 5l0.000(Ft.)
Top (of initial area) elevation = l289.600(Ft.)
Bottom (of initial area) elevation = l284.4l0(Ft.)
Difference in elevation = 5.l90(Ft.)
Slope = 0.01018 s(percent)= 1.02
TC = k(0.390)*((length^3)/(elevation change)]^0.2
Initial area time of concentration = 11.819 min.
Rainfall intensity = 3.l77(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.788
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 1. 728 (CFS)
Total initial stream area = 0.690(Ac.)
Pervious area fraction = 0.500
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 68.000 to Point/Station 69.000
**** CONFLUENCE OF MAIN STREAMS ****
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = O,690(Ac.)
Runoff from this stream = 1.728(CFS)
I
~
I
I
Time of concentration =
Rainfall intensity =
Program is now starting
11.82 min.
3.177 (In/Hr)
with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 70.000 to Point/Station 69.000
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 995.000(Ft.)
Top (of initial area) elevation = 1306.500(Ft.)
Bottom (of initial area) elevation = 1284.410(Ft.)
Difference in elevation = 22.090(Ft.)
Slope = 0.02220 s(percent)= 2.22
TC = k(0.390).[(length^3)/(e1evation change)]^0.2
Initial area time of concentration = 13.211 min.
Rainfall intensity = 2. 988 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.783
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
Initial subarea runoff = 2.996(CFS)
Total initial stream area = 1.280(Ac.)
Pervious area fraction = 0.500
I
I'
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 70.000 to Point/Station 69.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.280(Ac.)
Runoff from this stream = 2.996(CFS)
Time of concentration = 13.21 min.
Rainfall intensity = 2. 988 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
1. 728 11.82
2.996 13.21
stream flow has longer
2.996 + sum of
Qb Ia/Ib
1.728. 0.941 =
4.621
3.177
2.988
time of concentration
I
1. 626
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
1.728 2.996
Area of streams before confluence:
I
,I
CA
I
I
0.690
1. 280
I
Results of confluence:
Total flow rate = 4.621ICFS)
Time of concentration = 13.211 min.
Effective stream area after confluence =
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the
I
I
Area averaged pervious area fraction(Ap) =
Area averaged RI index number = 63.4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1.970 lAc.)
84.70 lAc.)
same area.
0.514
"10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
"
.
"
V. OFF-SITE FLOW ANA YSYS (100 YEAR STORM)
f4
to YE-A-R SToRM
\,.
&:
bflSTrtJ~ 'FU?W AfJ!rt..::{C;;{ ~
;.
;.
'\\
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
I
BASIN "A"
OFFSITE ANALYSIS
100 YR.
I
*********
Hydrology Study Control Information **********
I
RANPAC Engineering Corporation, Temecula, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) = 100.00 Antecedent Moisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.l)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 101.000 to Point/Station 102.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = l396.000(Ft.)
Bottom (of initial area) elevation = l378.000(Ft.)
Difference in elevation = l8.000(Ft.)
Slope = 0.03600 s(percent)= 3.60
TC = k(0.7l0)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 16.580 min.
Rainfall intensity = 2. 637 (In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.764
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
I
I
I
I
I
"1"V-
I
I
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 1.000
3.023(CFS)
1. 500 (Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station ~. 000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION .... 104-
Top of natural channel elevation = 1378.000(Ft.)
End of natural channel elevation = 1349.000(Ft.)
Length of natural channel = 1100.000(Ft.)
Estimated mean flow rate at midpoint of channel =
16.426(CFS)
I
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 4.62(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0264
Corrected/adjusted channel slope = 0.0264
Travel time = 3.97 min. TC = 20.55 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.750
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 2.343(In/Hr) for a 100.0
Subarea runoff = 23.378(CFS) for 13.300(Ac.)
Total runoff = 26.401 (CFS) Total area =
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
= 0.000
year storm
I
I
14.800 (Ac.)
14.80 (Ac.)
I
I
Area averaged pervious area fraction(Ap) = 1.000
Area averaged RI index number = 74.0
I
I
I
I
I
""1'1;.
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: OS/24/00
Version 3.3
I
BASIN "A"
OFFSITE ANALYSIS
10 YR.
I
*********
Hydrology Study Control Information **********
I
RANPAC Engineering Corporation, Temecula, CA - SIN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) =
10.00 Antecedent Moisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 101.000 to Point/Station 102.000
***. INITIAL AREA EVALUATION ****
I
Initial area flow distance = 500,OOO(Ft.)
Top (of initial area) elevation = 1396.000(Ft.)
Bottom (of initial area) elevation = 1378.000(Ft.)
Difference in elevation = 18.000(Ft.)
Slope = 0.03600 s(percent)= 3.60
TC = k(0.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 16.580 min.
Rainfall intensity = 1. 785 (In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.713
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
I
I
I
I
I
lit
I
I
Initial subarea runoff =
Total initial stream area
Pervious area fraction = 1.000
1. 909 (CFS)
1.500 (Ac. )
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station ~.OOO
*..* NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION .... 104-
I
Top of natural channel elevation = 1378.000(Ft.)
End of natural channel elevation = 1349.000(Ft.)
Length of natural channel = 1100.000(Ft.)
Estimated mean flow rate at midpoint of channel = 10.373(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 4. 10 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0264
Corrected/adjusted channel slope = 0.0264
Travel time = 4.48 min. TC = 21.06 min.
I
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.693
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.565(In/Hr) for a 10.0
Subarea runoff = 14.421 (CFS) for 13.300(Ac.)
Total runoff = 16.330(CFS) Total area =
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
= 0.000
year storm
I
I
14.800 (Ac.)
14.80 (Ac,)
I
I
Area averaged pervious area fraction(Ap) = 1.000
Area averaged RI index number = 74.0
I
I
I
I
I
,-6"
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
------------------------------------------------------------------------
I
BASIN "B"
OFFSITE ANALYSIS
100 YR.
I
------------------------------------------------------------------------
*********
Hydrology Study Control Information .*********
I
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecula, CA - SiN 560
------------------------------------------------------------------------
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) = 100.00 Antecedent Moisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = 1432.000(Ft.)
Bottom (of initial area) elevation = 1418.000(Ft.)
Difference in elevation = 14.000(Ft.)
Slope = 0.02800 s(percent)= 2.80
TC = k(0.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.435 min.
Rainfall intensity = 2.565(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.761
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
I
I
I
I
I
."
I
I
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 1.000
5.466(CFS)
2.800(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = 1418.000(Ft.)
End of natural channel elevation = 1397.000(Ft.)
Length of natural channel = 990.000(Ft.)
Estimated mean flow rate at midpoint of channel =
15.228 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 4. 06 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0212
Corrected/adjusted channel slope = 0.0212
Travel time = 4.07 min. TC = 21.50 min.
I
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.747
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Rainfall intensity = 2.286(In/Hr) for a 100.0 year storm
Subarea runoff = 17. 075 (CFS) for 10.000(Ac.)
Total runoff = 22.541(CFS) Total area = 12.800(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203.000 to Point/Station 204.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION .***
I
Top of natural channel elevation = 1397.000(Ft.)
End of natural channel elevation = 1358.000(Ft.)
Length of natural channel = 2100.000(Ft.)
Estimated mean flow rate at midpoint of channel =
58.555(CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^,352) (slope^0.5)
Velocity using mean channel flow = 5.52(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0186
Corrected/adjusted channel slope = 0.0186
I
I
\"1
I
I
Travel time =
6.34 mi.n.
TC
27.84 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.739
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.300
RI index for soi1(AMC 2) = 75.50
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1. 983 (In/Hr) for a 100.0
Subarea runoff = 59. 927 (CFS) for 40.900(Ac.)
Total runoff = 82.468(CFS) Total area =
= 0.000
year storm
I
I
53.700 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 205.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
I
Top of natural channel elevation = 1358.000(Ft.)
End of natural channel elevation = 1324.000(Ft.)
Length of natural channel = 1800.000(Ft.)
Estimated mean flow rate at midpoint of channel =
115.333 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 6. 81 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0189
Corrected/adjusted channel slope = 0.0189
Travel time = 4.41 min. TC = 32.24 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.761
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.200
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.600
RI index for soi1(AMC 2) = 80.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.829(In/Hr) for a 100.0
Subarea runoff = 59. 602 (CFS) for 42.800(Ac.)
Total runoff = 142. 070 (CFS) Total area =
= 0.000
year storm
I
I
I
96.500 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 205.000 to Point/Station ~.OOO
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION .... /0:'
I
Top of natural channel elevation =
End of natural channel elevation
1324.000 (Ft.)
1293.700 (Ft.)
I
\a,
I
I
Length of natural channel = l700.000(Ft.)
Estimated mean flow rate at midpoint of channel
170.926 (CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velooity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 7.46(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0178
Corrected/adjusted channel slope = 0.0178
Travel time = 3.80 min. TC = 36.04 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.758
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.100
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 80.50
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.721 (In/Hr) for a 100.0
Subarea runoff = 51. 108 (CFS) for 39.200(Ac.)
Total runoff = 193.l78(CFS) Total area =
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
= 0.000
year storm
I
I
135.700 (Ac. )
135.70 (Ac.)
I
I
Area averaged pervious area fraction(Ap) = 1.000
Area averaged RI index number = 78.2
I
I
.
I
I
I
I
I
1\
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: OS/24/00
Version 3.3
------------------------------------------------------------------------
I
BASIN liB"
OFFSITE ANALYSIS
10 YR.
I
------------------------------------------------------------------------
*********
Hydrology Study Control Information .***..****
I
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecula, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) =
10.00 Antecedent Moisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ MUrrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
.... INITIAL AREA EVALUATION ....
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = 1432.000(Ft.)
Bottom (of initial area) elevation = 1418.000(Ft.)
Difference in elevation = 14.000(Ft.)
Slope = 0.02800 s(percent)= 2.80
TC = k(0.710).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.435 min.
Rainfall intensity = 1.737 (In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.709
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
I
I
I
I
I
I
~
I
I
I
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 1.000
3.446(CFS)
2.800(Ac.)
I
++++++++++++++++++++++~+++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = l4l8.000(Ft.)
End of natural channel elevation = l397.000(Ft.)
Length of natural channel = 990,OOO(Ft.)
Estimated mean flow rate at midpoint of channel = 9.60l(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 3. 60 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0212
Corrected/adjusted channel slope = 0.0212
Travel time = 4.58 min. TC = 22.01 min.
I
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.689
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.527 (In/Hr) for a 10.0
Subarea runoff = 10.52l(CFS) for 10.000(Ac.)
Total runoff = 13. 967 (CFS) Total area =
= 0.000
year storm
I
I
12.800 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203,000 to Point/Station 204.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = l397.000(Ft.)
End of natural channel elevation = l358.000(Ft.)
Length of natural channel = 2100.000(Ft.)
Estimated mean flow rate at midpoint of channel =
36.282 (CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 4.81(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0186
Corrected/adjusted channel slope = 0,0186
I
I
~\
I
I
Travel time =
7.27 min.
TC =
29.29 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.676
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.300
RI index for soil(AMC 2) = 75.50
Pervious area fraction = 1.000; Impervious fraction = 0.000
Rainfall intensity = 1.306(In/Hr) for a 10.0 year storm
Subarea runoff = 36.096(CFS) for 40.900(Ac.)
Total runoff = 50.063(CFS) Total area = 53.700(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 205,000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = 1358.000(Ft.)
End of natural channel elevation = 1324.000(Ft.)
Length of natural channel = 1800.000(Ft.)
Estimated mean flow rate at midpoint of channel = 70.014(CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 5,87(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0189
Corrected/adjusted channel slope = 0.0189
Travel time = 5.11 min. TC = 34.40 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.704
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.200
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.600
RI index for soil(AMC 2) = 80.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.195(In/Hr) for a 10.0
Subarea runoff = 35. 992 (CFS) for 42.800(Ac.)
Total runoff = 86.055(CFS) Total area =
= 0.000
year storm
I
I
I
96.500 (Ac. )
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 205.000 to Point/Station 206.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation =
End of natural channel elevation =
1324.000 (Ft.)
1293.700 (Ft.)
I
~z,.
I
I
Length of natural channel = 1700.000(Ft.)
Estimated mean flow rate at midpoint of channel =
103.533(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 6.40(Ft/s)
I
I
Correction to map slope used cn extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0178
Corrected/adjusted channel slope = 0.0178
Travel time = 4.42 min. TC = 38.82 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.698
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.100
Decimal fraction soil group C = 0.400
Decimal fraotion soil group D = 0.500
RI index for soil(AMC 2) = 80.50
Pervious area fraction = 1.000; Impervious fraction =
Rainfall intensity = 1.118(In/Hr) for a 10.0
Subarea runoff = 30. 604 (CFS) for 39.200(Ac.)
Total runoff = 116. 659 (CFS) Total area =
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
0.000
I
J
year storm
135.700 (Ac.)
135.70 (Ac.)
I
I
Area averaged pervious area fraction(Ap) = 1.000
Area averaged RI index number = 78.2
I
I
I
I
I
I
I
I
~~
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
------------------------------------------------------------------------
I
BASIN "e"
OFFSITE ANALSYS
100 YR.
I
------------------------------------------------------------------------
*********
Hydrology Study Control Information **********
I
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecu1a, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) = 100.00 Antecedent Moisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 301.000 to Point/Station 302.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = 1425.000(Ft.)
Bottom (of initial area) elevation = 1416.000(Ft.)
Difference in elevation = 9.000(Ft.)
Slope = 0.01800 s(percent)= 1.80
TC = k(0.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.045 min.
Rainfall intensity = 2.444(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.755
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
I
I
I
I
I
~~
I
I
I
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 1.000
3,137(CFS)
1. 700 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 302.000 to Point/Station 303.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = 1416.000(Ft.)
End of natural channel elevation = 1398.000(Ft.)
Length of natural channel = 800.000(Ft.)
Estimated mean flow rate at midpoint of channel =
11.627 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 3. 90 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0225
Corrected/adjusted channel slope = 0.0225
Travel time = 3,42 min. TC = 22.47 min.
I
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.744
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Rainfall intensity = 2.231(In/Hr) for a 100.0 year storm
Subarea runoff = 15.270(CFS) for 9.200(Ac.)
Total runoff = 18.407(CFS) Total area = 10.900(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.000 to Point/Station 303.100
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
I
Top of natural channel elevation = 1396.000(Ft.)
End of natural channel elevation = 1347.000(Ft.)
Length of natural channel 1400.000(Ft.)
Estimated mean flow rate at midpoint of channel =
30.144(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 6.27(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0350
Corrected/adjusted channel slope = 0.0350
I
I
/'
~
I
I
Travel time =
3.72 min.
TC
26.19 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.761
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.300
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.400
RI index for soil(AMC 2) = 78.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Rainfall intensity = 2. 051 (In/Hr) for a 100.0 year storm
Subarea runoff = 2l.683(CFS) for l3.900(Ac.)
Total runoff = 40. 090 (CFS) Total area = 24.800(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.000 to Point/Station 303,100
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 24.800(Ac.)
Runoff from this stream = 40.090(CFS)
Time of concentration = 26.19 min.
Rainfall intensity = 2.05l(In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 301.000 to Point/Station 304.000
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = l425.000(Ft.)
Bottom (of initial area) elevation = l420.000(Ft.)
Difference in elevation = 5.000(Ft.)
Slope = 0.01000 s(percent)= 1.00
TC = k(0.7l0)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 21.421 min.
Rainfall intensity = 2.291(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.747
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Initial subarea runoff = 3.423(CFS)
Total initial stream area = 2.000(Ac.)
Pervious area fraction = 1.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 304.000 to Point/Station 305.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
I
~
I
I
I
Top of natural channel elevation = l420.000(Ft.)
End of natural channel elevation = l387.000(Ft.)
Length of natural channel = 700.000(Ft.)
Estimated mean flow rate at midpoint of channel =
10.612 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q'.352) (slope'0.5)
Velocity using mean channel flow = 5.5l(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0471
Corrected/adjusted channel slope = 0.0471
Travel time = 2.12 min. TC = 23.54 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.734
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.600
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.000
RI index for soi1(AMC 2) = 73.00
Pervious area fraction = 1.000i Impervious fraction = 0.000
Rainfall intensity = 2. 175 (In/Hr) for a 100.0 year storm
Subarea runoff = 13.403(CFS) for 8.400(Ac.)
Total runoff = 16.826(CFS) Total area = 10.400(Ac.)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 305.000 to Point/Station 303.100
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
I
Top of natural channel elevation = 1387.000(Ft.)
End of natural channel elevation = 1347.000(Ft.)
Length of natural channel = 1500.000(Ft.)
Estimated mean flow rate at midpoint of channel =
28. 475 (CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q'.352) (slope'0.5)
Velocity using mean channel flow = 5.39(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0267
Corrected/adjusted channel slope = 0.0267
Travel time = 4.64 min. TC = 28.18 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coe,fficient = O. 698
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.900
I
I
<e, '\
-----
I
I
I
.
I
I
I
.
I
.i
.
I
j
I
,I
I
I
.
I
Decimal fraction soil group C = 0.100
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 70.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Rainfall intensity = 1. 970 (In/Hr) for a 100.0 year storm
Subarea runoff = 19.791(CFS) for 14.400(Ac.)
Total runoff = 36. 618 (CFS) Total area = 24.800(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 305.000 to Point/Station 303.100
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 24.800(Ac.)
Runoff from this stream = 36. 618 (CFS)
Time of concentration = 28.18 min.
Rainfall intensity = 1. 970 (In/Hr)
Summary of stream data:
Stream
No,
Flow rate
(CFS)
Rainfall Intensity
(In/Hr)
TC
(min)
1
2
Largest
Qp=
40.090 26.19
36.618 28.18
stream flow has longer
40.090 + sum of
Qa Tb/Ta
36.618. 0.929 =
74.122
2.051
1.970
or shorter time
of concentration
34.031
Qp=
Total of 2 main streams to confluence:
Flow rates before confluence point:
40.090 36.618
Area of streams before confluence:
24.800 24.800
Results of confluence:
Total flow rate = 74.122(CFS)
Time of concentration = 26.187 min.
Effective stream area after confluence =
49.600 (Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.100 to Point/Station 303.200
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
Top of natural channel elevation = 1347.000(Ft.)
End of natural channel elevation = 1328.000(Ft.)
Length of natural channel = 600.000(Ft.)
Estimated mean flow rate at midpoint of channel =
83.910(CFS)
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O,5)
<8%
I
I
Velocity using mean channel flow =
8.02(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0,0317
Corrected/adjusted channel slope = 0.0317
Travel time = 1,25 min. TC = 27.43 min,
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.747
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.300
RI index for soi1(AMC 2) = 76.50
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1. 999 (In/Hr) for a 100.0
Subarea runoff = 19.563(CFS) for 13.100(Ac.)
Total runoff = 93. 684 (CFS) Total area =
= 0.000
year storm
I
I
,I
62.700 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.200 to Point/Station 303.300
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
Top of natural channel elevation = 1328.000(Ft.)
End of natural channel elevation = 1306.000(Ft.)
Length of natural channel = 1000.000(Ft.)
Estimated mean flow rate at midpoint of channel =
110.270 (CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 7.25(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0220
Corrected/adjusted channel slope = 0.0220
Travel time = 2.30 min. TC = 29.73 min.
I
t
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.734
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soi1(AMC 2)
Pervious area fraction =
Rainfall intensity =
Subarea runoff =
Total runoff =
A 0.000
B = 0.500
C = 0.200
D = 0.300
75.50
1.000; Impervious fraction
1. 913 (In/Hr) for a 100.0
31. 165 (CFS) for 22.200(Ac.)
124.849(CFS) Total area =
= 0,000
year storm
'I
I
84.900 (Ac.)
I
I
~
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.300 to Point/Station 64.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
Top of natural channel elevation = 1306.000(Ft.)
End of natural channel elevation = 1272.500(Ft.)
Length of natural channel 1050.000(Ft.)
Estimated mean flow rate at midpoint of channel =
148.011 (CFS)
I
I
I
Natural valley channel type used
L,A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 9.55(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0319
Corrected/adjusted channel slope = 0.0319
Travel time = 1.83 min. TC = 31.57 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.737
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.300
RI index for soil(AMC 2) = 76.50
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.851 (In/Hr) for a 100.0
Subarea runoff = 42. 962 (CFS) for 31.500(Ac.)
Total runoff = 167.811(CFS) Total area =
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
= 0.000
year s term
I
I
116.400(Ac.)
116.40 (Ac.)
I
I
Area averaged pervious area fraction(Ap) = 1.000
Area averaged RI index number = 75.2
I
I
I
I
,I
I
~o
I
I
I
I
Riverside County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: OS/24/00
Version 3.3
BASIN "en
OFFSITE ANALYSIS
10 YR.
I
*********
Hydrology Study Control Information **********
I
RANPAC Engineering Corporation, Temecula, CA - SiN 560
I
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) =
10.00 Antecedent Moisture Condition = 2
I
,I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 301.000 to Point/Station 302.000
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = 1425.000(Ft.)
Bottom (Of initial area) elevation = 1416.000(Ft.)
Difference in elevation = 9.000(Ft.)
Slope = 0.01800 s(percent)= 1.80
TC = k(0.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.045 min.
Rainfall intensity = 1.654 (In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.701
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
I
l
I
I
r:v..
I
I
I
I
Initial subarea runoff =
Total initial stream area
Pervious area fraction = 1.000
1.972 (CFS)
1.700(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 302.000 to Point/Station 303.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
I
Top of natural channel elevation = l4l6.000(Ft.)
End of natural channel elevation = l39B.000(Ft.)
Length of natural channel = BOO.OOO(Ft.)
Estimated mean flow rate at midpoint of channel = 7.309(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 3.47(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0225
Corrected/adjusted channel slope = 0.0225
Travel time = 3.85 min. TC = 22.89 min.
I
t
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.685
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity =
Subarea runoff =
Total runoff =
A = 0.000
B = 0.500
C = 0.500
D = 0.000
74,00
1.000; Impervious fraction =
1.495(In/Hr) for a 10.0
9.425(CFS) for 9.200(Ac.)
11.39B(CFS) Total area =
0.000
year storm
10. 900 (Ac. )
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.000 to Point/Station 303.100
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
,I
Top of natural channel elevation = l396,OOO(Ft.)
End of natural channel elevation = l347.000(Ft.)
Length of natural channel l400.000(Ft.)
Estimated mean flow rate at midpoint of channel =
lB.665(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O,5)
Velocity using mean channel flow = 5.50(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0350
Corrected/adjusted channel slope = 0.0350
I
I
~~
I
I
I
I
Travel time =
4.24 min.
TC =
27.13 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.705
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.300
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.400
RI index for soil(AMC 2) = 78.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Rainfall intensity 1.362 (In/Hr) for a 10.0 year storm
Subarea runoff = 13.347 (CFS) for 13.900(Ac.)
Total runoff = 24.745(CFS) Total area = 24.800(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.000 to Point/Station 303.100
.... CONFLUENCE OF MAIN STREAMS ....
I.
I
"
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 24.800(Ac.)
Runoff from this stream = 24.745(CFS)
Time of concentration = 27.13 min.
Rainfall intensity = 1.362 (In/Hr)
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 301.000 to Point/Station 304,000
.... INITIAL AREA EVALUATION ....
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = 1425.000(Ft.)
Bottom (of initial area) elevation = 1420.000(Ft.)
Difference in elevation = 5.000(Ft.)
Slope = 0.01000 s(percent)= 1.00
TC = k(0.710)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 21.421 min.
Rainfall intensity = 1.551(In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.691
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Initial subarea runoff = 2.143(CFS)
Total initial stream area = 2.000(Ac.)
Pervious area fraction = 1.000
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 304.000 to Point/Station 305.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
I
'\:>
I
I
I
I
Top of natural channel elevation = 1420.000(Ft.)
End of natural channel elevation = 1387.000(Ft.)
Length of natural channel = 700.000(Ft.)
Estimated mean flow rate at midpoint of channel = 6.645(CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 4. 90 (Ft/s)
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0,0471
Corrected/adjusted channel slope = 0.0471
Travel time = 2.38 min. TC = 23.80 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.673
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.600
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 73.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.463(In/Hr) for a 10.0
Subarea runoff = 8.274(CFS) for 8.400(Ac.)
Total runoff = 10. 418 (CFS) Total area =
= 0.000
year storm
I'
,.
I
I
I
10.400(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 305.000 to Point/Station 303.100
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
Top of natural channel elevation = 1387.000(Ft.)
End of natural channel elevation = 1347.000(Ft.)
Length of natural channel = 1500.000(Ft.)
Estimated mean flow rate at midpoint of channel = 17. 630 (CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 4.73(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope 0.0267
Corrected/adjusted channel slope = 0.0267
Travel time = 5.29 min. TC = 29.09 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.627
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.900
I
I
C\~
I
I
I
I
Decimal fraction soil group C = 0.100
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 70.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.311(In/Hr) for a 10.0
Subarea runoff = 11.827(CFS) for 14.400(Ac.)
Total runoff = 22.245(CFS) Total area =
0.000
year storm
24.800 (Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 305.000 to Point/Station 303,100
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 24.800(Ac.)
Runoff from this stream = 22.245(CFS)
Time of concentration = 29.09 min.
Rainfall intensity = 1.311 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
,I
I
1
2
Largest
Qp=
24.745 27.13
22.245 29.09
stream flow has longer
24.745 + sum of
Qa Tb/Ta
22.245 * 0.933 =
45.495
1. 362
1.311
or shorter time
of concentration
20.750
Qp=
I'
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
24.745 22.245
Area of streams before confluence:
24.800 24.800
I
i
Results of confluence:
Total flow rate = 45. 495 (CFS)
Time of concentration 27.132 min.
Effective stream area after confluence =
49.600 (Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.100 to Point/Station 303.200
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
Top of natural channel elevation = 1347.000(Ft.)
End of natural channel elevation = 1328.000(Ft.)
Length of natural channel = 600.000(Ft.)
Estimated mean flow rate at midpoint of channel =
51. 503 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
I
/I
~'?
I
I
Velocity using mean channel flow =
6. 95 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0317
Corrected/adjusted channel slope = 0.0317
Travel time = 1.44 min. TC = 28.57 min.
J
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.687
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.300
RI index for soi1(AMC 2) = 76.50
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.323(In/Hr) for a 10.0
Subarea runoff = 11.916(CFS) for 13.100(Ac,)
Total runoff = 57.411 (CFS) Total area =
= 0.000
year storm
I
I
I
62.700 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.200 to Point/Station 303.300
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
,.
I
Top of natural channel elevation = 1328.000(Ft.)
End of natural channel elevation = 1306.000(Ft.)
Length of natural channel = 1000.000(Ft.)
Estimated mean flow rate at midpoint of channel = 67.575(CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 6.27(Ft/s)
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0220
Corrected/adjusted channel slope = 0.0220
Travel time = 2.66 min. TC = 31.23 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.670
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.300
RI index for soil(AMC 2) = 75.50
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.260(In/Hr) for a 10,0
Subarea runoff = 18.744 (CFS) for 22.200(Ac.)
Total runoff = 76,155(CFS) Total area =
0.000
year storm
I
I
I
84,900 (Ac. )
I
I
~lo
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.300 to Point/Station 64.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
I
Top of natural channel elevation = l306.000(Ft,)
End of natural channel elevation = l272.500(Ft.)
Length of natural channel = 1050.000(Ft.)
Estimated mean flow rate at midpoint of channel =
90.282(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 8.22(Ft/s)
I
,
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0319
Corrected/adjusted channel slope = 0.0319
Travel time = 2.13 min. TC = 33.36 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.673
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.300
RI index for soil(AMC 2) = 76.50
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.2l5(In/Hr) for a 10.0
Subarea runoff = 25.770(CFS) for 3l.500(Ac.)
Total runoff = 101. 925 (CFS) Total area =
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
= 0.000
year storm
I
I
I
116.400(Ac.)
116.40 (Ac.)
Area averaged pervious area fraction(Ap) = 1.000
Area averaged RI index number = 75.2
I
I
I
I
I
I
<t\
I
I
Riverside County Rational Hydrology Program
I
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
------------------------------------------------------------------------
BASIN "D"
OFFSITE ANALYSIS
100 YR.
I
------------------------------------------------------------------------
*********
Hydrology Study Control Information **********
I
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecula, CA - SiN 560
------------------------------------------------------------------------
I
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) = 100.00 Antecedent Moisture Condition = 2
I
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
1
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 401.000 to Point/Station 402.000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance - 600.000(Ft.)
Top (of initial area) elevation = 1416,OOO(Ft.)
Bottom (of initial area) elevation = 1392.000(Ft.)
Difference in elevation = 24.000(Ft.)
Slope = 0.04000 s(percent)= 4.00
TC = k(0.710)'[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.463 min.
Rainfall intensity = 2. 563 (In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.761
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
I
I
I
I
q~
I
I
I
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 1.000
5. 071 (CFS)
2.600 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 402.000 to Point/Station 403.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
Top of natural channel elevation = l392.000(Ft.)
End of natural channel elevation = 1348.000(Ft.)
Length of natural channel = 900.000(Ft.)
Estimated mean flow rate at midpoint of channel =
14.920(CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 6.13(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0489
Corrected/adjusted channel slope = 0.0489
Travel time = 2.45 min. TC = 19.91 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.746
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.600
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 73.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Rainfall intensity = 2. 385 (In/Hr) for a 100.0 year storm
Subarea runoff = 17.962(CFS) for 10.100(Ac.)
Total runoff = 23. 033 (CFS) Total area = 12.700(Ac.)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 403.000 to Point/Station 406.000
**.. NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **..
I
Top of natural channel elevation = 1348.000(Ft.)
End of natural channel elevation = 1292.000(Ft.)
Length of natural channel = 1400.000(Ft.)
Estimated mean flow rate at midpoint of channel =
40.081(CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 7.27(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0400
Corrected/adjusted channel slope = 0.0400
I
I
ql\
I
I
Travel time =
3.21 min.
TC =
23.12 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.742
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 2.196(In/Hr) for a 100.0
Subarea runoff = 30. 630 (CFS) for 18.800(Ac.)
Total runoff = 53.664 (CFS) Total area =
0.000
year storm
I
I
31.500 (Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 403.000 to Point/Station 406.000
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 3l.500(Ac.)
Runoff from this stream = 53. 664 (CFS)
Time of concentration = 23.12 min.
Rainfall intensity = 2. 196 (In/Hr)
Program is now starting with Main Stream No. 2
1
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 401.000 to Point/Station 404.000
.... INITIAL AREA EVALUATION ....
I
I
Initial area flow distance = 700.000(Ft.)
Top (of initial area) elevation = 1416.000(Ft.)
Bottom (of initial area) elevation = 1372.000(Ft.)
Difference in elevation = 44.000(Ft.)
Slope = 0.06286 s(percent)= 6.29
TC = k(0.710).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 16.968 min.
Rainfall intensity = 2.604(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.763
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group 0 = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
Initial subarea runoff = 15.294(CFS)
Total initial stream area = 7.700(Ac.)
Pervious area fraction = 1.000
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 404.000 to Point/Station 405.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
\OJ
I
I
Top of natural channel elevation = 1372.000(Ft.)
End of natural channel elevation = 1327.000(Ft.)
Length of natural channel = 1000.000(Ft.)
Estimated mean flow rate at midpoint of channel = 30.488(CFS)
I
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 7.14(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0450
Corrected/adjusted channel slope = 0.0450
Travel time = 2.34 min. TC = 19.30 min.
I
I
I
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.735
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.800
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 71.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 2.426(In/Hr) for a 100.0
Subarea runoff = 27.277(CFS) for 15.300(Ac.)
Total runoff = 42.571 (CFS) Total area =
= 0.000
year storm
23.000(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 405.000 to Point/Station 406.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = 1327.000(Ft.)
End of natural channel elevation = 1292.000(Ft.)
Length of natural channel = 1500.000(Ft.)
Estimated mean flow rate at midpoint of channel = 56. 082 (CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 6.11(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0233
Corrected/adjusted channel slope = 0.0233
Travel time = 4.09 min. TC = 23.39 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.748
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
I
I
\D\
I
I
Decimal fraction soil group C = 0.600
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Rainfall intensity = 2.182 (In/Hr) for a 100.0 year storm
Subarea runoff = 23.824(CFS) for 14.600(Ac.)
Total runoff = 66.395(CFS) Total area = 37.600(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 405.000 to Point/Station 406.000
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 37.600(Ac.)
Runoff from this stream = 66.395(CFS)
Time of concentration = 23.39 min.
Rainfall intensity = 2. 182 (In/Hr)
Summary of stream data:
I
I
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
Qp=
53.664 23.12
66.395 23.39
stream flow has longer
66.395 + sum of
Qb Ia/Ib
53.664. 0.994 =
119.714
2.196
2.182
time of concentration
I
1
2
Largest
Qp=
53.319
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
53.664 66.395
Area of streams before confluence:
31.500 37.600
I
I
Results of confluence:
Total flow rate = 119.714(CFS)
Time of concentration = 23.394 min.
Effective stream area after confluence =
69.100 (Ac. )
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 406.000 to Point/Station 62.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = 1292.000(Ft.)
End of natural channel elevation = 1260.500(Ft.)
Length of natural channel = 930.000(Ft.)
Estimated mean flow rate at midpoint of channel =
132.101(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
I
I
\~/v
I
I
Velocity using mean channel flow =
9.50(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0339
corrected/adjusted channel slope = 0.0339
Travel time = 1.63 min. TC = 25.02 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.743
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
Decimal fraction soil group C = 0.600
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 2.103(In/Hr) for a 100.0
Subarea runoff = 22.342(CFS) for 14.300(Ac.)
Total runoff = 142. 056 (CFS) Total area =
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
= 0.000
year storm
I
I
I
83.400(Ac.)
83.40 (Ac.)
I
Area averaged pervious area fraction(Ap) = 1.000
Area averaged RI index number = 73.7
I
I
I
I
I
I
I
I
I
I
vi:>
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
------------------------------------------------------------------------
I
BASIN "D"
OFFSITE ANALYSIS
10 YR.
I
------------------------------------------------------------------------
*********
Hydrology Study Control Information **********
I
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecula, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) =
10.00 Antecedent Moisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Mllrrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 401.000 to Point/Station 402.000
.... INITIAL AREA EVALUATION ....
Initial area flow distance = 600.000(Ft.)
Top (of initial area) elevation = 1416.000(Ft.)
Bottom (of initial area) elevation = 1392.000(Ft.)
Difference in elevation = 24.000(Ft.)
Slope = 0.04000 s(percent)= 4.00
TC = k(0.710).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.463 min.
Rainfall intensity = 1. 735 (In/Hr) for a 10.0
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.709
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
year storm
I
I
I
I
A = 0.000
B = 0.500
CO.500
D = 0.000
74.00
1.000; Impervious
fraction =
0.000
I
I
\d>'-.
I
I
Initial subarea runoff =
Total initial stream area =
Pervious area fraction = 1.000
3.197 (CFS)
2. 600 (Ac. )
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 402.000 to Point/Station 403.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = 1392.000(Ft.)
End of natural channel elevation = 1348.000(Ft.)
Length of natural channel = 900.000(Ft.)
Estimated mean flow rate at midpoint of channel =
9.406(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 5.44(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0489
Corrected/adjusted channel slope = 0.0489
Travel time = 2.76 min. TC = 20.22 min.
I
I
I
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.688
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.600
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 73.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Rainfall intensity = 1. 601 (In/Hr) for a 10.0 year storm
Subarea runoff = 11.123(CFS) for 10.100(Ac.)
Total runoff = 14.320(CFS) Total area = 12.700(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 403.000 to Point/Station 406.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = 1348.000(Ft.)
End of natural channel elevation = 1292.000(Ft.)
Length of natural channel = 1400.000(Ft.)
Estimated mean flow rate at midpoint of channel =
24.919(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 6.36(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfa11s (Plate D-6.2)
Normal channel slope = 0.0400
Corrected/adjusted channel slope = 0.0400
I
/'
\O~
I
I
Travel time =
3.67 min.
TC =
23.89 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.681
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.460(In/Hr) for a 10.0
Subarea runoff = 18.709(CFS) for 18.800(Ac.)
Total runoff = 33.029(CFS) Total area =
= 0.000
year storm
I
I
31.500 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 403.000 to Point/Station 406.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 31.500(Ac.)
Runoff from this stream = 33.029(CFS)
Time of concentration = 23.89 min.
Rainfall intensity = 1. 460 (In/Hr)
Program is now starting with Main Stream No.2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 401.000 to Point/Station 404.000
.... INITIAL AREA EVALUATION ....
I
Initial area flow distance = 700.000(Ft.)
Top (of initial area) elevation = 1416.000(Ft.)
Bottom (of initial area) elevation = 1372.000(Ft.)
Difference in elevation = 44.000(Ft.)
Slope = 0.06286 s(percent)= 6.29
TC = k(0.710).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 16.968 min.
Rainfall intensity = 1. 763 (In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.711
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Initial subarea runoff = 9. 650 (CFS)
Total initial stream area = 7.700(Ac.)
Pervious area fraction = 1.000
I
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 404.000 to Point/Station 405.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
,riD
I
I
Top of natural channel elevation = 1372.000(Ft.)
End of natural channel elevation = 1327.000(Ft.)
Length of natural channel = 1000.000(Ft.)
Estimated mean flow rate at midpoint of channel =
19.238(CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 6.29(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0450
Corrected/adjusted channel slope = 0.0450
Travel time = 2.65 min. TC = 19.62 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.674
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.800
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 71.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
Rainfall intensity = 1.627 (In/Hr) for a 10.0 year storm
Subarea runoff = 16.791(CFS) for 15.300(Ac.)
Total runoff = 26.442 (CFS) Total area = 23.000(Ac.)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 405.000 to Point/Station 406.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = 1327.000(Ft.)
End of natural channel elevation = 1292.000(Ft.)
Length of natural channel = 1500.000(Ft.)
Estimated mean flow rate at midpoint of channel = 34.834(CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 5.33(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0233
Corrected/adjusted channel slope = 0.0233
Travel time = 4.69 min. TC = 24.30 min.
I
I
Adding area flow to channel
'UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.688
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
I
I
\0\
I
I
I
Decimal fraction soil group C = 0.600
Decimal fraction soil group 0 = 0.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.447(In/Hr) for a 10.0
Subarea runoff = 14.540(CFS) for 14.600(Ac.)
Total runoff = 40. 982 (CFS) Total area =
= 0.000
year storm
I
37.600 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 405.000 to Point/Station 406.000
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 37.600(Ac.)
Runoff from this stream = 40. 982 (CFS)
Time of concentration = 24.30 min.
Rainfall intensity = 1.447(In/Hr)
Summary of stream data:
,I
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
33.029 23.89
40.982 24.30
stream flow has longer
40.982 + sum of
Qb Ia/Ib
33.029. 0.991 =
73.697
time of
1. 460
1. 447
concentration
I
32.715
I
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
33.029 40.982
Area of streams before confluence:
31.500 37.600
I
I
Results of confluence:
Total flow rate = 73.697(CFS)
Time of concentration = 24.305 min.
Effective stream area after confluence =
69.100 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 406.000 to POint/Station 62.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
I
Top of natural channel elevation = 1292.000(Ft.)
End of natural channel elevation = 1260.500(Ft.)
Length of natural channel = 930.000(Ft.)
Estimated mean flow rate at midpoint of channel =
81. 323 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
I
\0%
I
I
Ve~ocity using mean channel flow =
8.21 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0339
Corrected/adjusted channel slope = 0.0339
Travel time = 1.89 min. TC = 26.19 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.682
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
Decimal fraction soil group C = 0.600
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1.388(In/Hr) for a 10.0
Subarea runoff = 13.534 (CFS) for 14.300(Ac.)
Total runoff = 87.232(CFS) Total area =
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
= 0.000
year storm
I
I
I
83.400 (Ac.)
83.40 (Ac.)
I
Area averaged pervious area fraction(AP) = 1.000
Area averaged RI index number = 73.7
I
I
I
I
I
I
I
I
I
I
\00...
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (0) 1992
Rational Hydrology Study Date: 02/10/00
Version 3.3
------------------------------------------------------------------------
I
BASIN "A"
100 YR.
EXISTING CONDITION
------------------------------------------------------------------------
*********
Hydrology Study Control Information **********
I
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecula, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control , Water Conservation District
1978 hydrology manual
storm event (year) = 100.00 Antecedent Moisture Condition 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco J area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from point/Station 101.000 to Point/Station 102.000
**** INITIAL AREA EVALUATION ****
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = 1396.000(Ft.)
Bottom (of initial area) elevation = 1378.000(Ft.)
Difference in elevation = 18.000(Ft.)
Slope = 0.03600 s(percent)= 3.60
TC = k(O.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 16.580 min.
Rainfall intensity = 2.637(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.764
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area
Pervious area fraction = 1.000
A 0.000
B 0.500
C 0.500
DO.OOO
74.00
1.000; Impervious fraction
3.023(CFS)
1.500 (Ac. )
0.000
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 102.000 to Point/Station 501.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
Top of natural channel elevation = 1378.000(Ft.)
End of natural channel elevation = 1346.000(Ft.)
Length of natural channel 1200.000(Ft.)
Estimated mean flow rate at midpoint of channel =
15.822(CFS)
I
,'-.0
I
I
I
Natural valley channel type used
L,A. County flood control district formula for channel velocity:
Velocity = (7 + B(q^.352) (slope^O.5)
Velocity using mean channel flow = 4. 60 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0267
Corrected/adjusted channel slope = 0.0267
Travel time = 4.35 min. TC = 20.93 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.749
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for sOil(AMC 2) 74.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Rainfall intensity 2.320{In/Hr) for a 100.0 year storm
Subarea runoff 22.063(CFS) for 12.700(AC.)
Total runoff = 25.086(CFS) Total area = l4.200(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 501.000 to Point/Station 502.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
TOp of natural channel elevation = 1346.000(Ft.)
End of natural channel elevation = 1294.000(Ft.)
Length of natural channel 900.000(Ft.)
Estimated mean flow rate at midpoint of channel = 37.452(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 8.57{Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0578
Corrected/adjusted channel slope = 0.0578
Travel time = 1.75 min. TC = 22.68 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.763
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.350
Decimal fraction soil group C 0.350
Decimal fraction soil group D 0.300
RI index for soil (AMC 2) 77.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity 2. 220 (In/Hr) for a 100.0
Subarea runoff = 23.714(CFS) for 14.000{Ac.)
Total runoff = 48.799(CFS) Total area
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
0.000
year storm
I
I
28.200 lAc.)
28.20 (Ac.)
I
I
Area averaged pervious area fraction(Ap)
Area averaged RI index number: 75.5
1.000
I
I
,,\\
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (e) 1992
Rational Hydrology Study Date: 02/10/00
Version 3.3
------------------------------------------------------------------------
I
BASIN "A"
10 YR.
EXISTING CONDITION
*********
Hydrology Study Control Information **********
I
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecula, CA - SIN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) =
10.00 Antecedent Moisture Condition
2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 101.000 to Point/Station 102.000
*... INITIAL AREA EVALUATION ..*.
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = 1396.000(Ft.)
Bottom (of initial area) elevation = 1378.000(Ft.)
Difference in elevation = 18.000(Ft.)
Slope = 0.03600 s(percent)= 3.60
TC = k(0.710).[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 16.580 min.
Rainfall intensity = 1.78S(In/Hr} for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.713
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for soil (AMe 2) 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
Initial subarea runoff = 1.909(CFS)
Total initial stream area 1.500(Ac.)
Pervious area fraction = 1.000
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Paint/Station 102.000 to Point/Station 501.000
..*. NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
I
Top of natural channel elevation = 1378.000(Ft.)
End of natural channel elevation = 1346.000(Ft.)
Length of natural channel 1200.000(Ft.)
Estimated mean flow rate at midpoint of channel =
9.991 (CFS)
I
,\,,1/
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (s!ope^O.5)
Velocity using mean channel flow = 4.08(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0267
Corrected/adjusted channel slope"" 0.0267
Travel time "" 4.90 min. TC = 21.48 min.
I
Add1ng area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.691
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2}
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.500
C 0.500
D 0.000
74.00
1.000; Impervious fraction
1.548{In/Hr) for a 10.0
13.585(CFS) for 12.700(AC.)
15.494(CFS) Total area =
0.000
year storm
I
I
14.200 (Ac. )
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 501.000 to Point/station 502.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1346.000(Ft.)
End of natural channel elevation = 1294.000(Ft.)
Length of natural channel 900.000(Ft.)
Estimated mean flow rate at midpoint of channel = 23.132(CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Veloci ty = (7 + 8 (q^. 352) (slope^O. 5)
Velocity using mean channel flow = 7.49(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0578
Corrected/adjusted channel slope = 0.0578
Travel time = 2.00 min. TC = 23.48 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.709
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.350
Decimal fraction 90il group C 0.350
Decimal fraction soil group D 0.300
RI index for soi1(AMC 2) 77.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity 1.474 (In/Hr) for a 10.0
Subarea runoff = 14. 624 (CFS) for 14.000(Ac.)
Total runoff = 30.118(CFS) Total area
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
0.000
year storm
I
28.200 (AC. )
28.20 (Ac.)
I
I
Area averaged pervious area fraction(Ap)
Area averaged RI index number = 75.5
1. 000
I
I
"\\"7
I
I
Riverside County Rational Hydrology Program
I
CIVILCADC/CIVILDESIGN Engineering Software, (e) 1992
Rational Hydrology study Date: 02/10/00
Version 3.3
I
BASIN "B"
100 YR.
EXISTING CONDITION
*********
Hydrology Study Control Information *********.
I
RANPAC Engineering Corporation, Temecu!a, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) = 100.00 Antecedent Moisture Condition 2
I
Standard intensity-duration curves data (Plate 0-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
**** INITIAL AREA EVALUATION ****
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = 1432.000(Ft.)
Bottom (of initial area) elevation = 1418.000(Ft.)
Difference in elevation = 14.000(Ft.)
Slope = 0.02800 s(percent)= 2.80
TC = k(0.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.435 min.
Rainfall intensity = 2.565(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.761
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area
Pervious area fraction = 1.000
A 0.000
B 0.500
C 0.500
D 0.000
74.00
1.000; Impervious fraction
5.466 (CFS)
2.800 (Ac.)
0.000
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
Top of natural channel elevation = l418.000(Ft.)
End of natural channel elevation = 1397.000(Ft.)
Length of natural channel 990.000(Ft.)
Estimated mean flow rate at midpoint of channel =
15.22B(CFS)
I
~t>...
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity"" (7 + 8(q....352) (sIope^O.5)
Velocity using mean channel flow"" 4.06(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0212
Corrected/adjusted channel slope = 0.0212
Travel time = 4.07 min. TC = 21.50 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.747
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 74.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Rainfall intensity 2.2B6(In/Hr) for a 100.0 year storm
Subarea runoff 17.075(CFS) for 10.000(Ac.l
Total runoff = 22.541(CFS) Total area = 12.800(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203.000 to Point/station 204.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1397.000(Ft.)
End of natural channel elevation = 1358.000(Ft.)
Length of natural channel 2100.000(Ft.)
Estimated mean flow rate at midpoint of channel = 58. 555 (CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 5.52(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0186
Corrected/adjusted channel slope = 0.0186
Travel time = 6.34 min. TC= 27.84 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.739
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.500
C 0.200
DO.300
75.50
1.000; Impervious fraction
1.983(In/Hr) for a 100.0
59. 927 (CFS) for 40.900(Ac.)
82.468(CFS) Total area =
0.000
year storm
I
53.700 lAc.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 204.000 to Point/Station 205.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
TOp of natural channel elevation = 1358.000(Ft.)
End of natural channel elevation = 1324.000(Ft.)
Length of natural channel IBOO.OOO(Ft.)
Estimated mean flow rate at midpoint of channel =
115.333(CFS)
I
\\6
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity::: (7 + 8(q".352) (slope"O.5)
Velocity using mean channel flow = 6.81(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0189
Corrected/adjusted channel slope = 0.0189
Travel time = 4.41 min. TC = 32.24 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.761
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.200
Decimal fraction soil group C 0.200
Decimal fraction soil group D 0.600
RI index for soil(AMC 2) 80.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Rainfall intensity = 1. 829 (In/Hr) for a 100.0 year storm
Subarea runoff 59.602(CFS) for 42.800(AC.)
Total runoff = 142.070(CFS) Total area = 96.500(AC.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from pOint/Station 205.000 to pOint/Station 503.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1324.000(Ft.)
End of natural channel elevation = l293.000(Ft.)
Length of natural channel l8S0.000(Ft.)
Estimated mean flow rate at midpoint of channel =
l67.025(CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 7.l8(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0168
Corrected/adjusted channel slope = 0.0168
Travel time = 4.29 min. TC = 36.54 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.757
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.100
Decimal fraction soil group C 0.400
Decimal fraction soil group D 0.500
RI index for soil(AMC 2) 80.50
Pervious area fraction = 1.000; Impervious fraction 0.000
Rainfall intensity c 1.708(In/Hr) for a 100.0 year storm
Subarea runoff 43.815(CFS) for 33.900CAc.)
Total runoff = 185.886(CFS) Total area = l30.400(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 503.000 to POint/Station 504.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
TOp of natural channel elevation = l293.000(Ft.)
End of natural channel elevation = l278.000{Ft.)
Length of natural channel 800.000(Pt.)
Estimated mean flow rate at midpoint of channel =
195.864 (CFS)
I
Natural valley channel type used
I
\\~
I
I
L.A. County flood control district formula for channel velocity:
Velocity"" (7 + 8 (q". 352) (slope^O. 5)
Velocity using mean channel flow = 7.98(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.01B8
Corrected/adjusted channel slope = 0.018e
Travel time = 1.67 min. TC = 38.21 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.750
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for 80il (AMe 2)
Pervious area fraction =
Rainfall intensity =
Subarea runoff
Total runoff =
A 0.000
B 0.200
C 0.200
D 0.600
80.00
1.000; Impervious fraction
1. 666 (In/Hr) for a 100.0
17.495(CFS) for 14.000(Ac.)
203.380(CFS) Total area =
0.000
year storm
I
I
144.400(AC.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 503.000 to Point/Station 504.000
**** CONFLUENCE OF MAIN STREAMS ****
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 144.400(Ac.)
Runoff from this stream 203.380(CFS)
Time of concentration = 38.21 min.
Rainfall intensity = 1. 666 (In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 504.100 to Point/Station 504.200
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 550.000(Ft.)
Top (of initial area) elevation = 1365.000(Ft.)
Bottom (of initial area) elevation = 1320.000(Ft.)
Difference in elevation = 45.000(Ft.)
Slope = 0.08182 s(percent)= 8.18
TC = k(0.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 14.616 min.
Rainfall intensity = 2.827(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.743
Decimal fraction soil group A 0.000
Decimal fraction soil group B 1.000
Decimal fraction soil group C 0,000
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 69.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Initial subarea runoff = 6.717(CFS)
Total initial stream area 3.200(AC.)
Pervious area fraction = 1.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 504.200 to Point/Station 504.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
TOp of natural channel elevation = l320.000(Ft.)
End of natural channel elevation = l278.000(Ft.)
Length of natural channel 950.000(Ft.)
Estimated mean flow rate at midpoint of channel =
16.058 (CFS)
I
~~
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 5.94(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0442
Corrected/adjusted channel slope = 0.0442
Travel time = 2.66 min. TC = 17.28 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.730
Decimal fraction soil group
Decimal fraction 80il group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
BLOOD
C 0.000
D 0.000
69.00
1.000; Impervious fraction
2.578(In/Hr) for a 100.0
16.755{CFS) for 8.900(AC.)
23.472(CFS) Total area =
0.000
year storm
I
I
12.100(AC.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 504.100 to POint/Station 504.000
***. CONFLUENCE OF MAIN STREAMS .**.
I
The following data inside Main stream is listed:
In Main Stream number: 2
Stream flow area = 12.100(Ac.)
Runoff from this stream 23. 472 (CFS)
Time of concentration = 17.28 min.
Rainfall intensity = 2.578(In/Hr)
summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
203.380 38.21
23.472 17.28
stream flow has longer
203.380 + sum of
Qb Ia/Ib
23.472. 0.646
218.552
1.666
2.578
time of concentration
I
15.171
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
203.380 23.472
Area of streams before confluence:
144.400 12.100
I
Results of confluence:
Total flow rate = 218.552{CFS)
Time of concentration 38.210 min.
Effective stream area after confluence
156.500{Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 504.000 to Point/Station 505.000
.*.* NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **.*
I
TOp of natural channel elevation = 1278.000(Ft.)
End of natural channel elevation = 1272.000{Ft.)
Length of natural channel 250.000(Ft.)
I
"\.\~
I
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
velocity"" (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 3.60(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0212
Corrected/adjusted channel slope = 0.0212
Travel time = 4.58 min. TC = 22.01 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.689
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
R1 index for soil(AMC 2) 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
Rainfall intensity 1.527(In/Hr) for a 10.0 year storm
Subarea runoff 10.521(CFS) for 10.000(AC.)
Total runoff = 13. 967 (CFS) Total area = l2.800(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 203.000 to Point/Station 204.000
u** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
Top of natural channel elevation = 1397.000(Ft.)
End of natural channel elevation = 1358.000(Ft.)
Length of natural channel 2100.000(Ft.)
Estimated mean flow rate at midpoint of channel = 36.282(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 4.8l(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0186
Corrected/adjusted channel slope = 0.0186
Travel time = 7.27 min. TC = 29.29 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.676
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.500
C 0.200
D 0.300
75.50
1.000; Impervious fraction
1. 306 (In/Hr) for a 10.0
36.096(CFS) for 40.900(Ac.)
50.063(CFS) Total area =
0.000
year storm
I
I
53.700 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/station 204.000 to Point/Station 205.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
Top of natural channel elevation = 1358.000(Ft.)
End of natural channel elevation = 1324.000(Ft.)
Length of natural channel lBOO.OOO(Ft.)
Estimated mean flow rate at midpoint of channel =
70.014(CFS)
I
\.\0...
I
I
Estimated mean flow rate at midpoint of channel
223.090 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O.5)
velocity using mean channel flow = 9.40(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0240
Corrected/adjusted channel slope = 0.0240
Travel time = 0.44 min. TC = 38.65 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.722
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.000
Decimal fraction soil group 0 0.500
RI index for soil(AMC 2) 76.50
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity = 1. 656 (In/Hr) for a 100.0
Subarea runoff = 7.765(CFS) for 6.500(Ac.)
Total runoff = 226.317 (CFS) Total area
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
0.000
year storm
I
I
I
163.000 (Ac.)
163.00 (Ac.)
I
Area averaged pervious area fraction(Ap)
Area averaged RI index number = 77.5
1. 000
I
I
I
I
I
I
I
I
I
I
\w
I
I
Riverside County Rational Hydrology Program
I
CIVILCADO!CIVILDESIGN Engineering Software, (e) 1992
Rational Hydrology Study Date: 02/10/00
Version 3.3
BASIN liB"
10 YR.
EXISTING CONDITION
I
*********
Hydrology Study Control Information **********
I
RANPAC Engineering Corporation, Temecula, CA - SIN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
storm event (year) =
10.00 Antecedent Moisture Condition
2
I
Standard intensity-duration curves data (Plate D-4.1)
For the ( MUrrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 201.000 to Point/Station 202.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = SOO.OOO(Ft.)
Top (of initial area) elevation = 1432.000(Ft.)
Bottom (of initial area) elevation = 1418.000(Ft.)
Difference in elevation = 14.000(Ft.)
Slope = 0.02800 s(percent)= 2.80
TC = k(0.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.435 min.
Rainfall intensity = 1.737(In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.709
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 74.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Initial subarea runoff = 3.446(CFS)
Total initial stream area 2.800(Ac.)
Pervious area fraction = 1.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 202.000 to Point/Station 203.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
Top of natural channel elevation = 1418.000(Ft.)
End of natural channel elevation = 1397.000(Ft.)
Length of natural channel 990.000(Ft.)
Estimated mean flow rate at midpoint of channel =
9.601(CFS)
I
\V'-
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 5.87{Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0189
Corrected/adjusted channel slope = 0.0189
Travel time = 5.11 min. TC = 34.40 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.704
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.200
C 0.200
D 0.600
80.00
1.000; Impervious fraction
1.19S(In/Hr) for a 10.0
35.992(CFS) for 42.800(Ac.)
86. 055 (CFS) Total area =
0.000
year storm
I
I
96.500(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 205.000 to Point/Station 503.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1324.000(Ft.)
End of natural channel elevation = 1293.000(Ft.)
Length of natural channel 1850.000(Ft.)
Estimated mean flow rate at ~dpoint of channel =
101.170 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Veloci ty = (7 + 8 (q^. 352) (slope^O. 5)
Velocity using mean channel flow = 6.17(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0168
Corrected/adjusted channel slope = 0.0168
Travel time = 5.00 min. TC = 39.40 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.697
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.100
Decimal fraction soil group C 0.400
Decimal fraction soil group D 0.500
RI index for soil(AMC 2) 80.50
Pervious area fraction = 1.000; Impervious fraction 0.000
Rainfall intensity = 1.109(In/Hr) for a 10.0 year storm
Subarea runoff 26.205(CFS) for 33.900CAc.l
Total runoff = 112.260(CFS) Total area = 130.400(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 503.000 to Point/station 504.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
TOp of natural channel elevation = 1293.000(Ft.)
End of natural channel elevation = 127B.OOO(Ft.)
Length of natural channel BOO.OOO(Ft.)
Estimated mean flow rate at midpoint of channel =
118.286 (CFS)
I
Natural valley channel type used
I
\V'
I
I
L.A. County flood control district formula for channel velocity:
Velocity"" (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 6.84(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0188
Corrected/adjusted channel slope"" 0.0188
Travel time "" 1.95 min. TC "" 41.35 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient"" 0.688
Decimal fraction Boil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2}
Pervious area fraction =
Rainfall intensity =
Subarea runoff
Total runoff =
A 0.000
B 0.200
C 0.200
DO.600
80.00
1.000; Impervious fraction
1. 080 (In/Hr) for a 10.0
lO.398(CFS) for 14.000(AC.)
122. 658 (CFS) Total area =
0.000
year storm
I
I
144.400(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 503.000 to Point/Station 504.000
**** CONFLUENCE OF MAIN STREAMS ****
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 144.400(Ac.)
Runoff from this stream 122.658(CFS)
Time of concentration = 41.35 min.
Rainfall intensity = 1.080(In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 504.100 to Point/Station 504.200
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 550.000(Ft.)
Top (of initial area) elevation = 1365.000(Ft.)
Bottom (of initial area) elevation = 1320.000(Ft.)
Difference in elevation = 45.000(Ft.)
Slope = 0.08182 s(percent)= 8.18
TC = k(0.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 14.616 min.
Rainfall intensity = 1.913(In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.685
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area
Pervious area fraction = 1.000
A 0,000
B 1. 000
C 0.000
DO.OOO
69.00
1.000; Impervious fraction
4.197 (CFS)
3.200 (Ac.)
0.000
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 504.200 to Point/Station 504.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1320.000(Ft.)
End of natural channel elevation = 1278.000(Ft.)
Length of natural channel 950.000(Ft.)
Estimated mean flow rate at midpoint of channel =
10.033 (CFS)
I
\ 1J.;>
I
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity: (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 5.26(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0442
Corrected/adjusted channel slope = 0.0442
Travel time = 3.01 min. TC = 17.63 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.668
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 1. 000
C 0.000
D 0.000
69.00
1.000i Impervious fraction
1.726(In/Hr) for a 10.0
10.264(CFS) for 8.900(Ae.)
14.461(CFS) Total area =
0.000
year storm
I
I
12.100 (Ae. )
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 504.100 to pOint/Station 504.000
**** CONFLUENCE OF MAIN STREAMS ****
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 12.100(Ae.)
Runoff from this stream 14.461(CFS)
Time of concentration = 17.63 min.
Ra~nfa11 intensity = 1.726(rn/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
122.658 41.35
14.461 17.63
stream flow has longer
122.658 + sum of
Qb Ia/Ib
14.461 * 0.626
131.705
1. 080
1. 726
time of concentration
I
9.048
Qp=
I
Total of 2 main streams to conf1uence:
Flow rates before confluence point:
122.658 14.461
Area of streams before confluence:
144.400 12.100
I
Results of confluence:
Total flow rate = 131.705(CFS)
Time of concentration 41.350 min.
Effective stream area after confluence
156.500(AC.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 504.000 to Point/Station 505.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
Top of natural channel elevation = 1278.000(Ft.)
End of natural channel elevation = 1272.000(Ft.)
Length of natural channel 250.000(Ft.)
I
I
,,1.A.
~,
I
I
Estimated mean flow rate at midpoint of channel
134.441 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q"'.352) (slope^O.5)
Velocity using mean channel flow = 8.04(Ft/S)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate C-6.2)
Normal channel slope = 0.0240
Corrected/adjusted channel slope = 0.0240
Travel time = 0.52 min. TC = 41.87 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.651
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.000
Decimal fraction soil group D 0.500
RI index for soil(AMC 2} 76.50
Pervious area fraction = 1.000i Impervious fraction
Rainfall intensity = 1.073(In/Hr) for a 10.0
Subarea runoff = 4.541(CFS) for 6.500(Ac.)
Total runoff = l36.246(CFS) Total area
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
0.000
year storm
I
I
163.000 (Ac.)
163.00 lAC.)
I
Area averaged pervious area fraction(Ap)
Area averaged RI index number = 77.5
1.000
I
I
I
I
I
I
I
I
I
I
,
\1,;""
I
I
Riverside County Rational Hydrology program
I
CIVILCADD!CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 02/10/00
Version 3.3
I
BASIN "e"
100 YR.
EXISTING CONDITION
....**..****
Hydrology study Control Information **********
I
RANPAC Engineering Corporation, Temecula, CA - SIN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) = 100.00 Antecedent Moisture Condition 2
I
standard intensity-duration curves data (Plate 0-4.1)
For the r Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 301.000 to POint/Station 302.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 500.000(Ft.)
TOp (of initial area) elevation = 1425.000(Ft.)
Bottom (of initial area) elevation = 1416.000(Ft.)
Difference in elevation = 9.000(Ft.)
Slope = 0.01800 s(percent)= 1.80
TC = k(0.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 19.045 min.
Rainfall intensity = 2.444(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.755
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
Initial subarea runoff = 3.l37(CFS)
Total initial stream area 1.700(Ac.)
Pervious area fraction = 1.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 302.000 to Point/Station 303.000
* ** * NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ** **
I
I
TOp of natural channel elevation = l4l6.QOQ(Ft.)
End of natural channel elevation = 13gB.aOO(Ft.)
Length of natural channel BOO.aOO(Ft.)
Estimated mean flow rate at midpoint of channel =
11.627 (CFS)
I
\~
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 3.90(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0225
Corrected/adjusted channel slope = 0.0225
Travel time = 3.42 min. TC = 22.47 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.744
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.500
C 0.500
D 0.000
74.00
1.000; Impervious fraction
2.231 (In/Hr) for a 100.0
15.270(CFS) for 9.200(Ac.)
18.407 (CFS) Total area =
0.000
year storm
I
I
10.900 (AC.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.000 to Point/Station 303.100
u** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION *u*
I
I
Top of natural channel elevation _ 1396.000(Ft.)
End of natural channel elevation = 1347.000(Ft.)
Length of natural channel 1400.000(Ft.)
Estimated mean flow rate at midpoint of channel =
30.144 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 6.27(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0350
Corrected/adjusted channel slope = 0.0350
Travel time = 3.72 min. TC = 26.19 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.761
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.300
C 0.300
DO.400
78.00
1.000; Impervious fraction
2.051CIn/Hr) for a 100.0
21.683(CFS) for 13.900CAc.)
40.090(CFS) Total area =
0.000
year storm.
I
I
24.800 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Paint/Station 303.000 to Paint/Station 303.100
**** CONFLUENCE OF MAIN STREAMS ****
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 24.80Q(Ac.)
Runoff from this stream 40.090(CFS)
Time of concentration = 26.19 min.
I
\,1.,:\
I
I
Rainfall intensity = 2.051(In/Hr)
Program is now starting with Main Stream No. 2
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 301.000 to POint/Station 304.000
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 500.00Q(Ft.)
Top (of initial area) elevation = 1425.00Q(Ft.)
Bottom (of initial area) elevation = 1420.00Q(Ft.)
Difference in elevation = 5.00Q(Ft.)
Slope = 0.01000 s(percent)= 1.00
TC = k(O.710)*[(length^3)f(elevation change)]^O.2
Initial area time of concentration = 21.421 min.
Rainfall intensity = 2.291(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.747
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 74.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Initial subarea runoff = 3.423(CFS)
Total initial stream area 2.000(Ac.)
Pervious area fraction = 1.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 304.000 to Point/Station 305.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
,I
Top of natural channel elevation = 1420.000(Ft.)
End of natural channel elevation = 1387.000(Ft.)
Length of natural channel 700.000(Ft.)
Estimated mean flow rate at midpoint of channel = 10.612(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8 (q....352) (slope"'0.5)
Velocity using mean channel flow = 5.51(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0471
Corrected/adjusted channel slope = 0.0471
Travel time = 2.12 min. TC = 23.54 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.734
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.600
Decimal fraction soil group C 0.400
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 73.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Rainfall intensity 2. 175 (In/Hr) for a 100.0 year storm
Subarea runoff 13.403(CFS) for 8.400(Ac.)
Total runoff = 16.826(CFS) Total area = 10.400(AC.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 305.000 to Point/Station 303.100
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
TOp of natural channel elevation = 1387.000(Ft.)
End of natural channel elevation = 1347.000(Ft.)
Length of natural channel ISOO.OOO(Ft.)
I
,,1J>
I
I
Estimated mean flow rate at midpoint of channel 28.475 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8 (q....352) (slope^O.5)
velocity using mean channel flow = 5.39(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0267
Corrected/adjusted channel slope = 0.0267
Travel time = 4.64 min. TC c 28.18 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.698
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.900
C 0.100
D 0.000
70.00
1.000; Impervious fraction
1.970 (In/Hr) for a 100.0
19.791(CFS) for 14.400(Ac.)
36.618(CFS) Total area =
0.000
year storm
I
I
24.800(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/station 305.000 to Point/Station 303.100
**** CONFLUENCE OF MAIN STREAMS ****
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 24.800(AC.)
Runoff from this stream 36.618(CFS)
Time of concentration = 28.18 min.
Rainfall intensity = l.970(In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
1
2
Largest
Qp=
40.090 26.19
36.618 28.18
stream flow has longer
40.090 + sum of
Qa Tb/Ta
36.618 * 0.929
74 .122
2.051
1.970
or shorter time
of concentration
34.031
Qp=
I
I
Total of 2 ma~n streams to confluence:
Flow rates befOre confluence point:
40.090 36.618
Area of streams before confluence:
24.800 24.800
I
Results of confluence:
Total flow rate = 74.l22(CFS)
Time of concentration 26.187 min.
Effective stream area after confluence
49.600 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.100 to Point/Station 303.200
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
1347.000 (Ft.)
1328.000 (Ft. )
I
Top of natural channel elevation
End of natural channel elevation
I
,.", a...
I
I
Length of natural channel 600.00Q(Ft.)
Estimated mean flow rate at midpoint of channel 83. 910 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (s!ope^O.5)
velocity using mean channel flow = B.02(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0317
Corrected/adjusted channel slope = 0.0317
Travel time = 1.25 min. TC = 27.43 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.747
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.400
C 0.300
D 0.300
76.50
1.000; Impervious fraction
1. 999 (In/Hr) for a 100.0
19.563(CFS) for 13.100(Ac.)
93.684 (CFS) Total area =
0.000
year storm
I
I
62.700 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.200 to Point/Station 303.300
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
Top of natural channel elevation = 1328.000(Ft.)
End of natural channel elevation = 1306.000(Ft.)
Length of natural channel 1000.000(Ft.)
Estimated mean flow rate at midpoint of channel -
110.270 (CFS)
"
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 7.25(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0220
Corrected/adjusted channel slope = 0.0220
Travel time = 2.30 min. TC = 29.73 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.734
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity =
Subarea runoff
Total runoff =
A 0.000
B 0.500
C 0.200
D 0.300
75.50
1.000; Impervious fraction
1. 913 (In/Hr) for a 100.0
31.165 (CFS) for 22.200(Ac.)
124.849(CFS) Total area =
0.000
year storm
I
I
84.900 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 303.300 to Point/Station 506.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1306.000(Ft.)
End of natural channel elevation = l272.000(Ft.)
Length of natural channel 900.000(Ft.)
I
\o/l
I
I
Estimated mean flow rate at midpoint of channel =
144.555(CFS)
I
Natural valley channel type used
L.A. County flood control ~strict formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = lO.32(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0378
Corrected/adjusted channel slope = 0.0378
Travel time = 1.45 min. TC = 31.19 min.
I
i
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.738
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity =
Subarea runoff
Total runoff =
A 0.000
B 0.400
C 0.300
D 0.300
76.50
1.000i Impervious fraction
1.863 (In/Hr) for a 100.0
36. 839 (CFS) for 26.800(Ac.)
161. 689 (CFS) Total area =
0.000
year storm
I
I
111.700 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 506.000 to POint/Station 509.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1272.000CFt.)
End of natural channel elevation = 1252.000(Ft.)
Length of natural channel 800.000(Ft.)
Estimated mean flow rate at midpoint of channel =
172.762 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 8.86(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0250
Corrected/adjusted channel slope = 0.0250
Travel time = 1.50 min. TC = 32.69 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.746
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.300
Decimal fraction soil group C 0.300
Decimal fraction soil group D 0.400
RI index for soil (AMC 2) 78.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Rainfall intensity = 1.815(In/Hr) for a 100.0 year storm
Subarea runoff 20.709(CFS) for 15.300(Ac.)
Total runoff = 182.397 (CFS) Total area = 127.000(Ac.)
I
1-
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 506.000 to POint/Station 509.000
**** CONFLUENCE OF MAIN STREAMS ****
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area 127.000(Ac.)
Runoff from this stream = 182.397 (CFS)
I
\.~
I
I
Time of concentration =
Rainfall intensity m
Program is now starting
32.69 min.
1.815 (In/Hr)
with Main Stream No. 2
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 507.000 to Point/Station 507.100
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 650.000(Ft.)
Top (of initial area) elevation = 1365.00Q(Ft,)
Bottom (of initial area) elevation = 1320.00Q(Ft.)
Difference in elevation = 45.000(Ft.)
Slope = 0.06923 s(percent)= 6.92
TC = k(O.710)*[(length^3)/(elevation change)]^O.2
Initial area time of concentration = 16.157 min.
Rainfall intensity = 2. 675 (In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.800
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.000
Decimal fraction soil group C 0.800
Decimal fraction soil group D 0.200
RI index for soil(AMC 2) 80.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Initial subarea runoff = 7.064(CFS)
Total initial stream area 3.300(Ac.)
Pervious area fraction = 1.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 507.100 to pOint/Station 508.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1320.000(Ft.)
End of natural channel elevation = 1281.000(Ft.)
Length of natural channel 1150.000(Ft.}
Estimated mean flow rate at midpoint of channel = 19.802 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 5.06(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0287
Corrected/adjusted channel slope = 0.0287
Travel time = 3.79 min. TC = 19.94 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.729
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.900
Decimal fraction soil group C 0.000
Decimal fraction soil group D 0.100
RI index for soil (AMC 2) 70.50
Pervious area fraction = 1.000i Impervious fraction 0.000
Rainfall intensity 2.383(In/Hr) for a 100.0 year storm
Subarea runoff 20.675(CFS) for 11.900(Ac.)
Total runoff = 27.740(CFS) Total area = 15.200(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 507.000 to Point/Station 508.000
**** CONFLUENCE OF MINOR STREAMS ****
I
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 15.200(Ac.)
I
\..~ 'I/"
I
I
Runoff from this stream
Time of concentration
Rainfall intensity =
27.74Q(CFS)
19.94 min.
2.383 Un/Hr)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 0.508 to Point/Station 508.000
**** USER DEFINED FLOW INFORMATION AT A POINT ****
I
I
Rainfall intensity 2.894(InJHr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.780
Decimal fraction soil group A 0.000
Decimal fraction soil group B 1.000
Decimal fraction soil group C 0.000
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 56.00
Pervious area fraction = 0.500; Impervious fraction 0.500
USer specified values are as follows:
TC = 14.00 min. Rain intensity = 2.89{In/Hr)
Total area = 6.00 (AC.) Total runoff z:: 16.00 (CFS)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from pOint/Station 0.508 to Point/Station 508.000
**** CONFLUENCE OF MINOR STREAMS ****
I
I
Along Main Stream number: 2 in normal stream number 2
stream flow area = 6.000(AC.)
Runoff from this stream 16.000(CFS)
Time of concentration = 14.00 min.
Rainfall intensity = 2.894(In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
27.740 19.94
16.000 14.00
stream flow has longer
27.740 + sum of
Qb Ia/Ib
16.000 * 0.823
40.910
2.383
2.894
time of concentration
I
13.170
Qp=
I
Total of 2 streams to confluence:
Flow rates before confluence point:
27.740 16.000
Area of streams before confluence:
15.200 6.000
Results of confluence:
Total flow rate =
Time of concentration
Effective stream area
40.9101CFSI
19.943 min.
after confluence
21. 200 (AC.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/station 508.000 to Point/Station 509.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1287.000(Ft.)
End of natural channel elevation = 1252.000(Ft.)
Length of natural channel 450.000(Ft.)
Estimated mean flow rate at midpoint of channel = 42. 647 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = lO.31(Ft/s)
I
I
\,~?J
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0778
Corrected/adjusted channel slope = 0.0778
Travel time = 0.73 min. TC = 20.67 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.766
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil qroup
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.500
C 0.000
DO.500
76.50
1.000; Impervious fraction
2.336(InfHr) for a 100.0
3.220(CFS) for 1.800(Ac.)
44. 130 (CFS) Total area =
0.000
year storm
I
I
23.000(AC.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 508.000 to Point/Station 509.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 23.000{Ac.)
Runoff from this stream 44.130(CFS)
Time of concentration = 20.67 min.
Rainfall intensity = 2.336(In/Hr)
summary of stream data:
I
I
.1
stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
182.397 32.69
44.130 20.67
stream flow has longer
182.397 + sum of
Qb Ia/Ib
44.130 * 0.777
216.693
1. 815
2.336
time of concentration
34.295
I
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
182.397 44.130
Area of streams before confluence:
127.000 23.000
I
Results of confluence:
Total flow rate = 216. 693 (CFS)
Time of concentration = 32.692 min.
Effective stream area after confluence
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the
150.000 (Ac.)
150.00 CAe.)
I
same area.
I
Area averaged pervious area fraction(Ap)
Area averaged RI index number = 74.4
0.980
I
I
I
\~b...
I
I
Riverside County Rational Hydrology Program
I
CIVILCADO/CIVILDESIGN Engineering Software, (e) 1992
Rational Hydrology Study Date: 02/10/00
Version 3.3
I
BASIN "e"
10 YR.
EXISTING CONDITION
------------------------------------------------------------------------
*.*******
Hydrology Study Control Information **.*******
I
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecula, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
Storm event (year) =
10.00 Antecedent Moisture Condition
2
I
I
Standard intensity-duration curves data (Plate 0-4.1)
For the [ Murrieta,TmC,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 301.000 to POint/Station 302.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 500.000(Ft.)
Top (of initial area) elevation = 1425.000(Ft.)
Bottom (of initial area) elevation = 1416.000(Ft.)
Difference in elevation = 9.000(Ft.)
Slope = 0.01800 s(percent)= 1.80
TC = k(0.710)*[(length^3l/(elevation change)]^O.2
Initial area time of concentration = 19.045 min.
Rainfall intensity = 1.654(In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.701
Decimal fraction 90il group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area
Pervious area fraction = 1.000
A 0.000
B 0.500
C 0.500
D 0.000
74.00
1.000; Impervious fraction
1.972 (CFS)
1. 700(Ac.)
0.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 302.000 to Point/Station 303.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
Top of natural channel elevation = 1416.000(Ft.)
End of natural channel elevation = 1398.00Q(Ft.)
Length of natural channel 800.00Q(Ft.)
Estimated mean flow rate at midpoint of channel =
7.309 (CFS)
I
r
'\~~
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity; (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 3.47(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0225
Corrected/adjusted channel slope = 0.0225
Travel time = 3.85 min. TC = 22.89 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.685
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for sOil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.500
C 0.500
D 0.000
74.00
1.000; Impervious fraction
1. 495 (In/Hr) for a 10.0
9.425(CFS) for 9.200(Ac.)
11.398(CFS) Total area =
0.000
year storm
I
10.900(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 303.000 to Point/Station 303.100
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
I
TOp of natural channel elevation = 1396.000(Ft.)
End of natural channel elevation = 1347.000(Ft.)
Length of natural channel 1400.000(Ft.}
Estimated mean flow rate at midpoint of channel = 18. 665 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Veloci ty = (7 + 8 (q^. 352) (slope^O. 5)
Velocity using mean channel flow = 5.50(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0350
Corrected/adjusted channel slope = 0.0350
Travel time = 4.24 min. TC = 27.13 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.705
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.300
Decimal fraction soil group C 0.300
Decimal fraction soil group D 0.400
RI index for soil (AMC 2) 78.00
Pervious area fraction = 1.000; Impervious fraction 0.000
Rainfall intensity l.362(In/Hr) for a 10.0 year storm
Subarea runoff l3.347(CFS) for 13.900(Ac.)
Total runoff = 24.745(CFS) Total area = 24.800(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.000 to Point/Station 303.100
**** CONFLUENCE OF MAIN STREAMS ****
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 24.800(Ac.)
Runoff from this stream 24.745(CFS)
Time of concentration = 27.13 min.
I
,?/.1
I
I
Rainfall intensity = 1.362{In/Hr)
Program is now starting with Main Stream No. 2
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 301.000 to Point/Station 304.000
***. INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = soa.aOO(Ft.)
Top (of initial area) elevation = 1425.000(Ft.)
Bottom (of initial area) elevation = 1420.000(Ft.}
Difference in elevation = 5.QOO(Ft.)
Slope = 0.01000 s(percent)= 1.00
TC = k(O.710)*[(length^3)/(elevation change)]^O.2
Initial area time of concentration = 21.421 min.
Rainfall intensity = 1.551 (In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.691
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 74.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Initial subarea runoff = 2.143(CFS)
Total initial stream area 2.000(Ac.)
Pervious area fraction = 1.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 304.000 to POint/Station 305.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1420.000(Ft.)
End of natural channel elevation = 1387.000(Ft.)
Length of natural channel 700.000(Ft.)
Estimated mean flow rate at midpoint of channel = 6.645 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 4. 90 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0471
Corrected/adjusted channel slope = 0.0471
Travel time = 2.38 min. TC = 23.80 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.673
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.600
C 0.400
D 0.000
73.00
1.000i Impervious fraction
1.463(In/Hr} for a 10.0
8.274(CFS) for B.400(Ac.)
10.418(CFS) Total area =
0.000
year storm
I
I
10.400 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 305.000 to Point/Station 303.100
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
TOp of natural channel elevation = l387.000(Ft.)
End of natural channel elevation = 1347.000(Ft.)
Length of natural channel 1500.000(Ft.)
I
\~'\
I
I
Esti.m.ated mean flow rate at midpoint of channel 17.630 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 4.73(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0267
Corrected/adjusted channel slope = 0.0267
Travel time = 5.29 min. TC = 29.09 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.627
Decimal fraction soil group
Decimal fraction Boil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil (AMe 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.900
C 0.100
D 0.000
70.00
1.000i Impervious fraction
1. 311 (In/Hr) for a 10.0
11.827(CFS) for 14.400(Ac.)
22.245(CFS) Total area =
0.000
year storm
I
I
24.800(AC.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Paint/Station 305.000 to Point/Station 303.100
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 24.800(Ac.l
Runoff from this stream 22.245(CFS)
Time of concentration = 29.09 min.
Rainfall intensity = 1.311 (In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp~
24.745 27.13
22.245 29.09
stream flow has longer
24.745 + sum of
Qa Tb/Ta
22.245. 0.933
45.495
1.362
1.311
or shorter time
of concentration
I
20.750
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
24.745 22.245
Area of streams before confluence:
24.800 24.800
I
I
Results of confluence:
Total flow rate = 45.495(CFS)
Time of concentration 27.132 min.
Effective stream area after confluence
49.600 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Paint/Station 303.100 to Point/Station 303.200
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
TOp of natural channel elevation
End of natural channel elevation
1347.000(Ft.)
1328.000 (Ft. )
I
\~
I
I
Length of natural channel 600.000(Ft.)
Estimated mean flow rate at midpoint of channel 51. 503 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
velocity = (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 6. 95 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0317
Corrected/adjusted channel slope = 0.0317
Travel time = 1.44 min. TC = 28.57 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.687
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.400
C 0.300
D 0.300
76.50
1.000i Impervious fraction
1. 323 (In/Hr) for a 10.0
11.916(CFSl for 13.100(Ac.)
57.411(CFSl Total area =
0.000
year storm
I
I
62.700(AC.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.200 to Point/Station 303.300
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1328.000(Ft.)
End of natural channel elevation = 1306.000(Ft.)
Length of natural channel 1000.000(Ft.)
Estimated mean flow rate at midpoint of channel =
67.575(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 6.27(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0220
Corrected/adjusted channel slope = 0.0220
Travel time = 2.66 min. TC = 31.23 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.670
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.200
Decimal fraction soil group D 0.300
RI index for soil(AHC 2) 75.50
Pervious area fraction = 1.000i Impervious fraction 0.000
Rainfall intensity 1.260(In/Hr) for a 10.0 year storm
Subarea runoff 18.744(CFS) for 22.200(Ac.)
Total runoff = 76.155(CFS) Total area = 84.900CAc.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 303.300 to Point/Station 506.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1306.000(Ft.)
End of natural channel elevation = 1272.000(Ft.)
Length of natural channel 900.000(Ft.)
I
\.'Pa....
I
I
Estimated mean flow rate at midpoint of channel 88.174(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = B.88{Ft/s}
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0378
Corrected/adjusted channel slope = 0.0378
Travel time = 1.69 min. TC = 32.92 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.674
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction Boil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.400
C 0.300
D 0.300
76.50
1.000i Impervious fraction
1.224(In/Hr) for a 10.0
22.126{CFS) for 26.BOO(Ac.)
9B.2B1(CFS) Total area:
0.000
year storm
I
I
I
111.700 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 506.000 to Point/Station 509.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation: 1272.000{Ft.)
End of natural channel elevation: 1252.000(Ft.)
Length of natural channel BOO.OOO(Ft.)
Estimated mean flow rate at midpoint of channel :
105.012 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity: (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow: 7.62(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope: 0.0250
Corrected/adjusted channel slope: 0.0250
Travel time: 1.75 min. TC: 34.67 ~n.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient: 0.684
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction :
Rainfall intensity:
Subarea runoff
Total runoff :
A 0.000
B 0.300
C 0.300
D 0.400
7B.00
1.000; Impervious fraction
1.190 (In/Hr) for a 10.0
12.449(CFS) for 15.300(Ac.)
110.730(CFS) Total area:
0.000
year storm
I
I
127.000 lAc.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 506.000 to POint/Station 509.000
**** CONFLUENCE OF MAIN STREAMS ****
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area 127.000(Ac.)
Runoff from this stream: 110.730(CFS)
I
\hfJ
I
I
Time of concentration =
Rainfall intensity =
Program is now starting
34.67 min.
1.190 (In/Hr)
with Main Stream No. 2
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 507.000 to Point/Station 507.100
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = 650.00Q(Ft.)
Top (of initial area) elevation = 1365.QOQ(Ft.)
Bottom (of initial area) elevation = 1320.QOQ(Ft.)
Difference in elevation = 45.00Q(Ft.)
Slope = 0.06923 s(percent)= 6.92
TC = k(O.710)*[(length^3)/(elevation change)]^O.2
Initial area time of concentration = 16.157 min.
Rainfall intensity = I.all(In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.760
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for sOil(AMC 2)
Pervious area fraction =
Initial subarea runoff =
Total initial stream area
Pervious area fraction = 1.000
A 0.000
B 0.000
C 0.800
D 0.200
80.00
1.000i Impervious fraction
4.542 (CFS)
3.300 (Ac.)
0.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 507.100 to Point/Station 508.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1320.000(Ft.)
End of natural channel elevation = 1287.000(Ft.)
Length of natural channel 1150.000(Ft.)
Estimated mean flow rate at midpoint of channel = 12.73l(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Veloci ty = (7 + 8 (q^. 352) (slope^O. 5)
Velocity using mean channel flow = 4.50(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0287
Corrected/adjusted channel slope = 0.0287
Travel time = 4.26 min. TC = 20.41 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.666
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.900
Decimal fraction soil group C 0.000
Decimal fraction soil group D 0.100
RI index for soil(AMC 2) 70.50
Pervious area fraction = 1.000; Impervious fraction 0.000
Rainfall intensity 1.592(In/Hr) for a 10.0 year storm
Subarea runoff 12.629(CFS) for 11.900(Ac.)
Total runoff = 17.170(CFS) Total area = 15.200(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 507.000 to Point/Station 508.000
**** CONFLUENCE OF MINOR STREAMS ****
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 15.200(Ac.)
I
I
\A,\
I
I
Runoff from this stream
Time of concentration
Rainfall intensity =
17.170{CFS}
20.41 min.
1.592 (In/Hr)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 0.508 to POint/Station 508.000
**** USER DEFINED FLOW INFORMATION AT A POINT ****
I
I
Rainfall intensity 1. 959 (In/Hr) for a 10.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.743
Decimal fraction soil group A 0.000
Decimal fraction soil group B 1.000
Decimal fraction soil group C 0.000
Decimal fraction soil group D 0.000
RI index for sOil(AMC 2) 56.00
Pervious area fraction = 0.500; Impervious fraction 0.500
User specified values are as follows:
TC = 14.00 min. Rain intensity = 1. 96 (In/Hr)
Total area = 6.00(Ac.) Total runoff = 16.00(CFS)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.508 to POint/Station 508.000
**** CONFLUENCE OF MINOR STREAMS ****
I
I
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 6.000(Ac.)
Runoff from this stream 16.000(CFS)
Time of concentration = 14.00 min.
Rainfall intensity = 1. 959 (In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
17.170 20.41
16.000 14.00
stream flow has longer
17.170 + sum of
Qb Ia/Ib
16.000 * 0.813
30.174
1. 592
1. 959
time of concentration
I
13.003
Qp=
I
Total of 2 streams to confluence:
Flow rates before confluence point:
17.170 16.000
Area of streams before confluence:
15.200 6.000
Results of confluence:
Total flow rate = 30.174(CFS)
Time of concentration 20.413 min.
Effective stream area after confluence
21.200(AC.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 508.000 to POint/Station 509.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation = 1287.000(Ft.)
End of natural channel elevation = 1252.00Q(Ft.)
Length of natural channel 450.000(Ft.)
Estimated mean flow rate at midpoint of channel = 31.455(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 9.46(Ft/s)
I
I
\6.,,1,
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope: 0.0778
Corrected/adjusted channel slope = 0.0778
Travel time = 0.79 min. TC = 21.21 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.713
Decimal fraction 80il group A 0.000
Decimal fraction 80il group B 0.500
Decimal fraction soil group C 0.000
Decimal fraction soil group D 0.500
R1 index for sOil(AMC 2) 76.50
Pervious area fraction = 1.000i Impervious fraction 0.000
Rainfall intensity 1. 559 (In/Hr) for a 10.0 year storm
Subarea runoff 2.001(CFS} for 1.800(Ac.)
Total runoff = 32.174(CFS) Total area = 23.000(Ac.}
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 508.000 to POint/Station 509.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 23.000(Ac.)
Runoff from this stream 32.174 (CFS)
Time of concentration = 21.21 min.
Rainfall intensity = 1.559(In/Hr)
Summary of stream data:
I
I
stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
1
2
Largest
Qp=
110.730 34.67
32.174 21.21
stream flow has longer
110.730 + sum of
Qb Ia/Ib
32.174 * 0.763
135.282
1.190
1. 559
time of concentration
24.551
I
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
110.730 32.174
Area of streams before confluence:
127.000 23.000
I
Results of confluence:
Total flow rate = 135.282 (CFS)
Time of concentration = 34.670 min.
Effective stream area after confluence
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the
150.000 (Ac.)
150.00 (Ac.)
I
same area.
I
Area averaged pervious area fraction(Ap)
Area averaged RI index number = 74.4
0.980
I
I
I
~
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
------------------------------------------------------------------------
I
BASIN "0"
100 YR.
EXISTING CONDITION
------------------------------------------------------------------------
*********
Hydrology Study Control Information **********
I
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecula, CA - SIN 560
------------------------------------------------------------------------
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
storm event (year) = 100.00 Antecedent Moisture Condition
2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Paint/Station 401.000 to Point/Station 402.000
**.* INITIAL AREA EVALUATION **.*
I
Initial area flow distance = 600.000(Ft.)
Top (of initial area) elevation - 14l6.000(Ft.)
Bottom (of initial area) elevation = 1392.000(Ft.)
Difference in elevation a 24.000(Ft.)
Slope = 0.04000 s(percent)= 4.00
TC = k(0.710).((length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.463 min.
Rainfall intensity = 2.563(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient - 0.761
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 74.00
Pervious area fraction a 1.000i Impervious fraction 0.000
Initial subarea runoff = 5.071 (CFS)
Total initial stream area 2.600(Ac.)
Pervious area fraction = 1.000
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 402.000 to POint/Station 403.000
*.*. NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION .*..
I
Top of natural channel elevation = 1392.000(Ft.)
End of natural channel elevation = l348.000(Ft.)
Length of natural channel 900.000(Ft.)
Estimated mean flow rate at midpoint of channel =
14.920 (CFS)
I
,'*-
I
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 6. 13 (Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0489
Corrected/adjusted channel slope = 0.0489
Travel time = 2.45 min. TC = 19.91 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.746
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.600
Decimal fraction 80il group C 0.400
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 73.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity 2.385(In/Hr} for a 100.0
Subarea runoff 17. 962 (CFS) for 10.100(Ac.)
Total runoff"" 23.033(CFS) Total area =
0.000
year storm
I
I
12.700(AC.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Po~nt/Stat~on 403.000 to POint/Station 406.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
TOp of natural channel elevation ~ 1348.000(Ft.)
End of natural channel elevation = 1292.000(Ft.)
Length of natural channel 1400.000(Ft.)
Estimated mean flow rate at midpoint of channel = 40.081 (CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 7.27(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0400
Corrected/adjusted channel slope = 0.0400
Travel time = 3.21 min. TC = 23.12 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.742
I
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B = 0.500
C 0.500
o 0.000
74.00
1.000: Impervious fraction
2.196(In/Hr) for a 100.0
30.630(CFS) for 18.800(AC.)
53.664 (CFS) Total area =
0.000
year storm
I
31.500 (Ac. )
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 403.000 to Point/Station 406.000
**** CONFLUENCE OF MAIN STREAMS ****
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 31.500(Ac.)
Runoff from this stream 53. 664 (CFS)
Time of concentration = 23.12 min.
I
r
\t>?
I
I
Rainfall intensity = 2. 196 (In/Hr)
Program is now starting with Main Stream No. 2
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 401.000 to Point/Station 404.000
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance = ?Oo.aOOePt.)
TOp (of initial area) elevation = 1416.00QCFt.)
Bottom (of initial area) elevation = 1372.000(Ft.)
Difference in elevation = 44.00Q(Ft.)
Slope = 0.06286 s(percent)= 6.29
TC = k(O.710)*[(length^3)/(elevation change)J^O.2
Initial area time of concentration = 16.968 min.
Rainfall intensity = 2.604 (In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.763
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
Initial subarea runoff = 15.294 (CFS)
Total initial stream area 7.700(AC.)
Pervious area fraction = 1.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 404.000 to POint/Station 405.000
* * * * NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION * * * *
Top of natural channel elevation = 1372.000(Ft.)
End of natural channel elevation = 1327.000(Ft.)
Length of natural channel 1000.000(Ft.)
Estimated mean flow rate at midpoint of channel = 30.488 (CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow"'" 7 .14 (Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope"'" 0.0450
Corrected/adjusted channel slope = 0.0450
Travel time = 2.34 min. TC = 19.30 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.735
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.800
Decimal fraction soil group C 0.200
Decimal fraction soil group 0 0.000
RI index for soil(AMC 2) 71.00
Pervious area fraction = 1.000; Impervious fraction 0.000
Rainfall intensity 2. 426 (In/Hr) for a 100.0 year storm
Subarea runoff 27.277(CFS) for 15.300(Ac.)
Total runoff"'" 42.571(CFS) Total area = 23.000(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 405.000 to Point/Station 406.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
Top of natural channel elevation = 1327.000(Ft.)
End of natural channel elevation"'" 1292.000(Ft.)
Length of natural channel 1500.000(Ft.)
I
I
'\~
I
I
Estimated mean flow rate at midpoint of channel = 56.082 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^O.5)
Velocity using mean channel flow = 6.11(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope - 0.0233
Corrected/adjusted channel slope = 0.0233
Travel time = 4.09 min. TC = 23.39 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.748
Decimal fraction soil group
Decimal fraction 80il group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2}
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =:
A 0.000
B 0.400
C 0.600
o 0.000
75.00
1.000; Impervious fraction
2.182(In/Hr) for a 100.0
23.B24(CFS) for 14.600(Ac.)
66.395(CFS) Total area =
0.000
year storm
I
I
I
37.600 (Ac. )
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 405.000 to Point/Station 406.000
**** CONFLUENCE OF MAIN ST~S ****
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 37.600(Ac.)
Runoff from this stream 66.395(CFS)
Time of concentration = 23.39 min.
Rainfall intensity = 2.182 (In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(tn/Hr)
I
1
2
Largest
Qp=
53.664 23.12
66.395 23.39
stream flow has longer
66.395 + sum of
Qb Ia/lb
53.664 * 0.994
119.714
2.196
2.182
time of concentration
I
53.319
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
53.664 66.395
Area of streams before confluence:
31.500 37.600
I
I
Results of conf~uence:
Total flow rate = 119.714(CFS)
Time of concentration 23.394 min.
Effect~ve stream area after confluence
69.100(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 406.000 to Paint/Station 510.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
I
Top of natural channel elevation
End of natural channel elevation
1292.000 (Ft.)
1260.000 (Ft.)
I
\ A.,'\
I
I
Length of natural channel 900.000CFt.)
Estimated mean flow rate at midpoint of channel
132.0151CFSI
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + B(q^.352) (slope^O.5)
Velocity using mean channel flow = 9.73(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0356
Corrected/adjusted channel slope = 0.0356
Travel time = 1.54 min. TC = 24.93 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient m 0.743
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.400
Decimal fraction soil group C 0.600
Decimal fraction soil group D 0.000
R1 index for sOil(AMC 2) 75.00
Pervious area fraction = 1.000i Impervious fraction 0.000
Rainfall intensity = 2.107(In/Hr) for a 100.0 year storm
Subarea runoff 22.238(CFS) for 14.200(Ac.)
Total runoff = 141.952(CFS) Total area = 83.300(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 510.000 to Point/Station 511.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = 1260.000(Ft.)
End of natural channel elevation = 1252.000(Ft.)
Length of natural channel 300.000(Ft.)
Estimated mean flow rate at midpoint of channel =
146.042 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 8.69(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0267
Corrected/adjusted channel slope = 0.0267
Travel time = 0.58 min. TC = 25.51 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.749
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.300
Decimal fraction soil group C 0.700
Decimal fraction soil group D 0.000
RI index for sOil(AMC 2) 76.00
Pervious area fraction = 1.000i Impervious fraction
Rainfall intensity = 2.081(In/Hr) for a 100.0
Subarea runoff = 7.476(CFS) for 4.800(Ac.)
Total runoff - 149.428 (CFS) Total area
End of computations, total study area =
The following figures may
he used for a unit hydrograph study of the same area.
0.000
year storm
I
I
88.100 (Ae. )
88.10 lAc.)
I
Area averaged pervious area fraetion(Ap)
Area averaged RI index number = 73.8
1. 000
I
I
\.~9!.
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
------------------------------------------------------------------------
I
BASIN "0"
10 YR.
EXISTING CONDITION
------------------------------------------------------------------------
*********
Hydrology Study Control Information **********
I
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecula, CA - SIN 560
------------------------------------------------------------------------
I
Rational Method Hydrology Program hased on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) =
10.00 Antecedent MOisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity - 0.880 (in./hr.)
100 year storm 10 minute intensity 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
Storm event year = 10.0
Calculated rainfall intensity data:
1 hour intensity = 0.880 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 401.000 to Point/Station 402.000
**** INITIAL AREA EVALUATION ****
I
Initial area flow distance = 600.000(Ft.)
TOp (of initial area) elevation = 1416.000(Ft.)
Bottom (of initial area) elevation = 1392.000(Ft.)
Difference in elevation = 24.000(Ft.)
Slope = 0.04000 s(percent)= 4.00
TC = k(0.710)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 17.463 min.
Rainfall intensity = 1. 735 (In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.709
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
R1 index for soil(AMC 2) 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
Initial subarea runoff = 3.197(CFS)
Total initial stream area 2.600(Ac.)
Pervious area fraction = 1.000
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 402.000 to POint/Station 403.000
* * * * NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION * * * *
I
Top of natural channel elevation = 1392.000(Ft.)
End of natural channel elevation = 134B.OOO(Ft.)
Length of natural channel 900.000(Ft.)
Estimated mean flow rate at midpoint of channel =
9.406 (CFS)
I
,\A.O-....
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + B(q~.352) (slope^O.5)
Velocity using mean channel flow = 5.44(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0489
Corrected/adjusted channel slope = 0.0489
Travel time = 2.76 min. TC = 20.22 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.688
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AHC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff =
A 0.000
B 0.600
C 0.400
D 0.000
73.00
1.000; Impervious fraction
1.601 (In/Hr) for a 10.0
11. 123 (CFS) for 10.100(Ac.)
14.320 (CFS) Total area =
0.000
year storm
I
12.700{AC.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Paint/Station 403.000 to Point/Station 406.000
* * * * NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION * * * *
I
I
Top of natural channel elevation = 1348.000{Ft.)
End of natural channel elevation = 1292.000(Ft.)
Length of natural channel 1400.000(Ft.)
Estimated mean flow rate at midpoint of channel = 24.919(CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + B{q^.352) (slope^0.5)
Velocity using mean channel flow = 6.36{Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0400
Corrected/adjusted channel slope = 0.0400
Travel time = 3.67 min. TC = 23.B9 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.681
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 74.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity 1.460{In/Hr) for a 10.0
Subarea runoff 1B.709(CFS) for 1B.BOO(Ac.)
Total runoff = 33.029(CFS) Total area =
0.000
year storm
I
I
31.500 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 403.000 to POint/Station 406.000
**** CONFLUENCE OF MAIN STREAMS ****
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 31.500(Ac.)
Runoff from this stream 33.029(CFS)
Time of concentration = 23.89 min.
I
\~
I
I
Rainfall intensity = 1.460(In/Hr)
Program is now starting with Main Stream No. 2
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 401.000 to POint/Station 404.000
**** INITIAL AREA EVALUATION ****
I
I
Initial area flow distance - 700.aOO(Ft.)
Top (of initial area) elevation = 1416.00Q(Ft.)
Bottom (of initial area) elevation = 1372.000(Ft,)
Difference in elevation = 44.000(Ft,)
Slope = 0.06286 s(percent)= 6.29
TC = k(O.710)*{(length^3)/(elevation change)]^o.2
Initial area time of concentration = 16.968 min.
Rainfall intensity = 1.763(In/Hr) for a 10.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.711
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C 0.500
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
Initial subarea runoff = 9. 650 (CFS)
Total initial stream area 7.700(Ac.)
Pervious area fraction = 1.000
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 404.000 to POint/Station 405.000
.**. NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ....
I
Top of natural channel elevation = 1372.000(Ft.)
End of natural channel elevation = 1327.000(Ft.)
Length of natural channel = 1000.000(Ft.)
Estimated mean flow rate at midpoint of channel _ 19.238 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + e (q".352) (slope"0.5)
Velocity using mean channel flow = 6.29(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0450
Corrected/adjusted channel slope = 0.0450
Travel time = 2.65 min. TC = 19.62 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.674
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.800
Decimal fraction soil group C 0.200
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 71.00
Pervious area fraction = 1.000; Impervious fraction 0.000
Rainfall intensity 1. 627 (In/Hr) for a 10.0 year storm
Subarea runoff 16.79l(CFS) for 15.300(Ac.)
Total runoff = 26.442 (CFS) Total area = 23.000(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 405.000 to Point/Station 406.000
.... NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION .**.
I
Top of natural channel elevation = 1327.000(Ft.)
End of natural channel elevation = 1292.000(Ft.)
Length of natural channel 1500.000(Ft.)
I
\~\
I
I
Estimated mean flow rate at midpoint of channel = 34.834(CFS}
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(qA.352) {slopeAO.5}
Velocity using mean channel flow = 5.33(Ft/s)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0233
Corrected/adjusted channel slope = 0.0233
Travel time = 4.69 min. TC = 24.30 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.688
Oecimal fraction 80il group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff ...
A 0.000
B 0.400
C 0.600
D 0.000
75.00
1.000; Impervious fraction
1.447(In/Hr) for a 10.0
14.540(CFS) for 14.600(Ac.)
40.982 (CFS) Total area ~
0.000
year storm
I
I
37.600 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/station 405.000 to Point/Station 406.000
*.** CONFLUENCE OF MAIN STREAMS *.*.
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 37.600(Ac.)
Runoff from this stream 40. 982 (CFS)
Time of concentration = 24.30 min.
Rainfall intensity = 1.447 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
1
2
Largest
Qp-
33.029 23.89
40.982 24.30
stream flow has longer
40.982 + sum of
Qb Ia/Ib
33.029 . 0.991 =
73.697
1. 460
1.447
time of concentration
32.715
Qp~
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
33.029 40.982
Area of streams before confluence:
31.500 37.600
I
I
Results of confluence:
Total flow rate = 73.697(CFS)
Time of concentration 24.305 min.
Effective stream area after confluence
69.100 (AC. )
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 406.000 to Point/Station 510.000
................ NATURAL CHANNEL TJ:ME + SUBAREA FLOW ADDITION ................
I
Top of natural channel elevation
End of natural channel elevation
1292.000 (Ft.)
1260.000 (Ft.)
I
\'6V
I
I
Length of natural channel 900.000 (Ft.)
Estimated mean flow rate at midpoint of channel 81.270 (CFS)
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (1 + B(q^.352) (slope^O.5)
Velocity using mean channel flow = 8.41(Ft/S)
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate 0-6.2)
Normal channel slope = 0.0356
Corrected/adjusted channel slope = 0.0356
Travel time = 1.78 min. TC = 26.09 min.
I
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.682
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
Decimal fraction soil group
RI index for soil(AMC 2)
Pervious area fraction =
Rainfall intensity
Subarea runoff
Total runoff ..
A 0.000
B 0.400
C 0.600
D 0.000
75.00
1.000; Impervious fraction
1.391(In/Hr) for a 10.0
13.476(CFS) for 14.200(Ac.)
87.174 (CFS) Total area =
0.000
year storm
I
I
83.300(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from pOint/Station 510.000 to Point/Station 511.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
Top of natural channel elevation = 1260.000(Ft.)
End of natural channel elevation = 1252.000(Ft.)
Length of natural channel 300.000(Ft.)
Estimated mean flow rate at midpoint of channel - 99.685 (CFS)
I
I
Natural valley channel type used
L.A. County flood control district formula for channel velocity:
Velocity = (7 + 8(q^.352) (slope^0.5)
Velocity using mean channel flow = 7.50(Ft/s)
I
I
Correction to map slope used on extremely rugged channels with
drops and waterfalls (Plate D-6.2)
Normal channel slope = 0.0267
Corrected/adjusted channel slope = 0.0267
Travel time = 0.67 min. TC = 26.75 min.
I
Adding area flow to channel
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.689
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.300
Decimal fraction soil group C 0.700
Decimal fraction soil group D 0.000
RI index for soil(AMC 2) 76.00
Pervious area fraction = 1.000; Impervious fraction
Rainfall intensity 1.372(In/Hr) for a 10.0
Subarea runoff = 4.536(CFS) for 4.800(Ac.)
Total runoff.. 91.710 (CFS) Total area
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the same area.
0.000
year storm
I
I
88.100 (Ae.)
BB .10 (Ac.)
I
Area averaged pervious area fraction(Ap)
Area averaged Rt index number = 73.8
1.000
I
I
\9>
I
"
I ..
.
I
I
I VI. PIPE CONFULUENCE ANALYSIS
I
I
I
I
I
I
I
I
I
I
I
I
I
I ". ..f.b...
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
I
LINE "All, LINE "A-i" 1 LINE "A-2"
LINE "A-3", LINE "A-4"
I
*********
Hydrology Study Control Information **********
I
RANPAC Engineering Corporation, Temecula, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) = 100.00 Antecedent MOisture Condition
2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.104 to Point/Station 104.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
Rainfall intensity = 2.344(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.750
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction 0.000
User specified values are as follows:
TC = 20.55 min. Rain intensity = 2.34(In/Hr)
Total area = 14.80(Ac.) Total runoff = 26.40(CFS)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 104.100
I
\-sS
I
I
I
**** PIPEFLOW TRAVEL TIME (User specified size) ....
Upstream point/station elevation = 1344.13(Ft.)
Downstream point/station elevation = 1316.23(Ft.)
Pipe length = 169.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 26. 400 (CFS)
Given pipe size = 30.00(In.)
Calculated individual pipe flow = 26.400(CFS)
Normal flow depth in pipe = 8.07(In.)
Flow top width inside pipe = 26.61(In.)
Critical Depth = 21.02(In.)
Pipe flow velocity = 24.81(Ft/s)
Travel time through pipe = 0.11 min.
Time of concentration (TC) = 20.66 min.
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.000 to Point/Station 104.100'
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 14.800(Ac.)
Runoff from this stream = 26.400(CFS)
Time of concentration = 20.66 min.
Rainfall intensity = 2. 336 (In/Hr)
Program is now starting with Main Stream No.2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.650 to Point/Station 6.500
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
Rainfall intensity = 3.356(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.793
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 10.70 min. Rain intensity = 3.36(In/Hr)
Total area = 1.00(Ac.) Total runoff = 2.66(CFS)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 6.500 to Point/Station 104.100
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
I
Upstream point/station elevation = 1321.03(Ft.)
Downstream point/station elevation = 1316.23(Ft.)
Pipe length 10.43(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 2. 660 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 2.660(CFS)
Normal flow depth in pipe = 2.38(In.)
I
~
I
I
Flow top width inside pipe = 12.19(In.)
Critical Depth = 7.41(In.)
Pipe flow velocity = 19.26(Ft/s)
Travel time through pipe = 0.01 min.
Time of concentration (TC) = 10.71 min.
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 6.500 to Point/Station 104.100
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.000(Ac.)
Runoff from this stream = 2.660(CFS)
Time of concentration = 10.71 min.
Rainfall intensity = 3.354 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(C~)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
~=
26.400 20.66
2.660 10.71
stream flow has longer
26.400 + sum of
Qb Ia/Ib
2.660. 0.697 =
28.253
2.336
3.354
time of concentration
I
1.853
~=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
26.400 2.660
Area of streams before confluence:
14.800 1.000
I
I
Results of confluence:
Total flow rate = 28.253(CFS)
Time of concentration = 20.664 min.
Effective stream area after confluence =
15.800(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.100 to Point/Station 105.000
.*.* PIPEFLOW TRAVEL TIME (User specified size) ****
Upstream point/station elevation = 1316.23(Ft.)
Downstream point/station elevation = 1311.90(Ft.)
Pipe length = 675.10(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 28.253(CFS)
Given pipe size = 30.00(In.)
Calculated individual pipe flow = 28.253(CFS)
Normal flow depth in pipe = 21.45(In.)
Flow top width inside pipe = 27.09(In.)
Critical Depth = 21.75(In.)
Pipe f~ow velocity = 7.53(Ft/s)
I
I
I
I
~
I
I
Travel time through pipe =
Time of concentration (TC) =
1.50 min.
22.16 min.
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 104.100 to Point/Station 105.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 15.800(Ac.)
Runoff from this stream = 28.253(CFS)
Time of concentration = 22.16 min.
Rainfall intensity = 2.248(In/Hr)
Program is now starting with Main Stream No. 2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.320 to Point/Station 32.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
Rainfall intensity = 3.014 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.821
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.300
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.400
RI index for soil(AMC 2) = 67.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 13.01 min. Rain intensity = 3.01(In/Hr)
Total area = 3.62(Ac.) Total runoff = 8. 95 (CFS)
I
'.
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 32.000 to Point/Station 105.000
**** PIPEFLOW TRAVEL TIME (User specified size) ****
.
Upstream point/station elevation = 1329.43(Ft.)
Downstream point/station elevation 1311.90(Ft.)
Pipe length = 23.64(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 8. 950 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 8. 950 (CFS)
Normal flow depth in pipe = 3.83(In.)
Flow top width inside pipe = 14.73(In.)
Critical Depth = 13.88(In.)
Pipe flow velocity = 32.64(Ft/s)
Travel time through pipe = 0.01 min.
Time of concentration (Te) = 13.02 min.
'I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 32.000 to Point/Station 105.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
I
'v116
.'
I
In Main Stream number: 2
Stream flow area = 3.620(Ac.)
Runoff from this stream = 8. 950 (CFS)
Time of concentration = 13.02 min.
Rainfall intensity = 3.012(In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
1
2
Largest
Qp=
28.253 22.16
8.950 13.02
stream flow has longer
28.253 + sum of
Qb Ia/Ib
8.950. 0.746 =
34.934
time of
2.248
3.012
concentration
6.681
I
I
Qp=
Total of 2 main streams to confluence:
Flow rates before confluence point:
28.253 8.950
Area of streams before confluence:
15.800 3.620
I
Results of confluence:
Total flow rate = 34.934 (CFS)
Time of concentration = 22.159 min.
Effective stream area after confluence =
19.420(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 105.100
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
I
Upstream point/station elevation = 1311.90(Ft.)
Downstream point/station elevation = 1311.77(Ft.)
Pipe length = 26.45(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 34.934 (CFS)
Given pipe size = 30.00(In.)
NOTE: Normal flow is pressure flow in user
The approximate hydraulic grade line above
1.241(Ft.) at the headworks or inlet
Pipe friction loss = 0.192(Ft.)
Minor friction loss = 1.180 (Ft.)
Pipe flow velocity = 7.12(Ft/s)
Travel time through pipe = 0.06 min.
Time of concentration (TC) = 22.22 min.
selected pipe size.
the pipe invert is
of the pipe (s)
K-factor =
1.50
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.000 to Point/Station 105.100
.... CONFLUENCE OF MAIN STREAMS ....
.
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 19.420(Ac.)
I
",.rtA
I
I
Runoff from this stream = 34. 934 (CFS)
Time of concentration = 22.22 min.
Rainfall intensity = 2.245(In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.300 to Point/Station 3.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
Rainfall intensity = 3. 859 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.848
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.100
Decimal fraction soil group C = 0.100
Decimal fraction soil group D = 0.800
RI index for soil(AMC 2) = 72.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 8.30 min. Rain intensity = 3.86(In/Hr)
Total area = 4.50(Ac.) Total runoff = 15.10(CFS)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 3.000 to Point/Station 105.100
**** PIPEFLOW TRAVEL TIME (User specified size) ****
I
Upstream point/station elevation = 1327.06(Ft.)
Downstream point/station elevation = 1311.77(Ft.)
Pipe length = 521.66(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 15.100(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 15. 100 (CFS)
Normal flow depth in pipe = 12.63(In.)
Flow top width inside pipe = 16.47(In.)
Critical Depth = 16.89(In.)
Pipe flow velocity = 11.40(Ft/s)
Travel time through pipe = 0.76 min.
Time of concentration (TC) = 9.06 min.
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 3.000 to Point/Station 105.100
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 4.500(Ac.)
Runoff from this stream = 15. 100 (CFS)
Time of concentration = 9.06 min.
Rainfall intensity = 3. 677 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
\~e
I
I
I
1 34.934 22.22 2.245
2 15.100 9.06 3.677
Largest stream flow has longer time of concentration
Qp= 34.934 + sum of
Qb Ia/Ib
15.100 . 0.611 = 9.220
Qp= 44.155
I
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
34.934 15.100
Area of streams before confluence:
19.420 4.500
II
Results of confluence:
Total flow rate = 44.155(CFS)
Time of concentration = 22.221 min.
Effective stream area after confluence =
23. 920 (Ac. )
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.100 to Point/Station 106.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1311.77(Ft.)
Downstream point/station elevation = 1310.33(Ft.)
Pipe length = 287.04(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 44.155(CFS)
Given pipe size = 30.00(In.)
NOTE: Normal flow is pressure flow in user
The approximate hydraulic grade line above
3.770(Ft.) at the headworks or inlet
Pipe friction loss = 3.325(Ft.)
Minor friction loss = 1.885(Ft.)
Pipe flow velocity = 9. 00 (Ft/s)
Travel time through pipe = 0.53 min.
Time of concentration (TC) = 22.75 min.
selected pipe size.
the pipe invert is
of the pipe(s)
,I
K-factor =
1.50
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 105.100 to Point/Station 106.000
**** CONFLUENCE OF MAIN STREAMS ***.
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 23.920(Ac.)
Runoff from this stream = 44.155(CFS)
Time of concentration = 22.75 min.
Rainfall intensity = 2.216(In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.340 to Point/Station 34.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
3. 183 (In/Hr) for a
100.0 year storm
Rainfall intensity =
I
\<&>\
I
I
I
I
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.817
Decimal fraction soil group A = 0.000
Decimal fraction soil group B 0.400
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.200
RI index for soil(AMC 2) = 65.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 11.78 min. Rain intensity = 3.18(In/Hr)
Total area = 3.61(Ac.) Total runoff = 9.40(CFS)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 34.000 to Point/Station 106.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
,I
Upstream point/station elevation = 1319.16(Ft.)
Downstream point/station elevation = 1310.33(Ft.)
Pipe length = 6.34(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 9.400(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 9.400(CFS)
Normal flow depth in pipe = 3.35(In.)
Flow top width inside pipe = 14.02(In.)
Critical Depth = 14.22(In.)
Pipe flow velocity = 41. 36 (Ft/s)
Travel time through pipe = 0.00 min.
Time of concentration (TC) = 11.78 min.
I'
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 34.000 to Point/Station 106.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 3.610(Ac.)
Runoff from this stream = 9.400(CFS)
Time of concentration = 11.78 min.
Rainfall intensity = 3.182 (In/Hr)
Summary of stream data:
I,
I
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
1
2
Largest
Qp=
44.155 22.75
9.400 11.78
stream flow has longer
44.155 + sum of
Qb Ia/Ib
9.400. 0.696 =
50.700
2.216
3.182
time of concentration
6.546
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
44.155 9.400
I
,f;-
I
I
J
Area of streams before confluence:
23.920 3.610
I
Results of confluence:
Total flow rate = 50.700(CFS)
Time of concentration = 22.752 min.
Effective stream area after confluence =
27.530(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 106.000 to Point/Station 107.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
Upstream point/station elevation = 1310.33(Ft.)
Downstream point/station elevation = 1293.97(Ft.)
Pipe length = 278.16(Ft.) Manning'S N = 0.013
No. of pipes = 1 Required pipe flow = 50.700(CFS)
Given pipe size = 30.00(In.)
Calculated individual pipe flow = 50.700(CFS)
Normal flow depth in pipe = 15.16(In.)
Flow top width inside pipe = 30.00(In.)
Critical Depth = 27.68(In.)
Pipe flow velocity = 20.36(Ft/s)
Travel time through pipe = 0.23 min.
Time of concentration (TC) = 22.98 min.
End of computations, total study area = 27.53 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
I
J
I
,
I
Area averaged pervious area fraction(Ap) = 0.769
Area averaged RI index number = 71.1
I
I
I
I
I
I
I
I
~
J
I
Riverside County Rational Hydrology Program
J
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
------------------------------------------------------------------------
I
LINE "L, L-l, L-2, L-3, L-4"
LINE "B, B-1, B-2"
LINE lie, C-l"
.
------------------------------------------------------------------------
*********
Hydrology Study Control Information **********
.
------------------------------------------------------------------------
RANPAC Engineering Corporation, Temecula, CA - SiN 560
------------------------------------------------------------------------
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
,I,
Storm event (year) = 100.00 Antecedent Moisture Condition = 2
i
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
.
I
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
l
l
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.103 to Point/Station 103.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
~~
Rainfall intensity = 1.721 (In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.739
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.300
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.400
RI index for soil(AMC 2) = 78.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
User specified values are as follows:
TC = 36.04 min. Rain intensity = 1.72 (In/Hr)
Total area = 135.70(Ac.) Total runoff = 193. 18 (CFS)
l
l
-"':
t
l
l
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 110.000
~~
L:
\(}.
I
I
.... PIPEFLOW TRAVEL TIME (User specified size) ....
Upstream point/station elevation = 1293.70(Ft.)
Downstream point/station elevation = 1291.84(Ft.)
Pipe length = 165.50(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 193.180(CFS)
Given pipe size = 54.00(In.)
Calculated individual pipe flow = 193.180(CFS)
Normal flow depth in pipe = 41.06(In.)
Flow top width inside pipe = 46.10(In.)
Critical Depth = 47.88(In.)
Pipe flow velocity = 14. 88 (Ft/s)
Travel time through pipe = 0.19 min.
Time of concentration (TC) = 36.23 min.
I
I
I
I
I
j
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 103.000 to Point/Station 110.000
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 135.700(Ac.)
Runoff from this stream = 193.180(CFS)
Time of concentration = 36.23 min.
Rainfall intensity = 1. 716 (In/Hr)
Program is now starting with Main Stream No. 2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.700 to POint/Station 7.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
Rainfall intensity = 2.948(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.800
Decimal fraction soil group A 0.000
Decimal fraction soil group B = 0.600
Decimal fraction soil group C 0.400
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 61.20
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 13.54 min. Rain intensity = 2. 95 (In/Hr)
Total area = 3.93(Ac.) Total runoff = 9.61(CFS)
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 7.000 to Point/Station 110.000
**** PIPEFLOW TRAVEL TIME (User specified size) ****
I
I
Upstream pOint/station elevation = 1298.25(Ft.)
Downstream point/station elevation = 1291.84(Ft.)
Pipe length = 57.61(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 9. 610 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 9. 610 (CFS)
Normal flow depth in pipe = 6.45(In.)
~
I
I
I
Flow top width inside pipe = 17.26(In.)
Critical Depth = 14.36(In.)
Pipe flow velocity = 16.91(Ft/s)
Travel time through pipe = 0.06 min.
Time of concentration (TC) = 13.60 min.
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 7.000 to Point/Station 110.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
1
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 3.930(Ac.)
Runoff from this stream = 9. 610 (CFS)
Time of concentration = 13.60 min.
Rainfall intensity = 2. 941 (In/Hr)
Program is now starting with Main Stream No. 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.200 to Point/Station 20.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
I
Rainfall intensity = 2.963(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.782
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 13.42 min. Rain intensity = 2.96(In/Hr)
Total area = 1.40(Ac.) Total runoff = 3.25(CFS)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 20.000 to Point/Station 110.000
**** PIPEFLOW TRAVEL TIME (User specified size) ***.
Upstream point/station elevation = 1298.25(Ft.)
Downstream point/station elevation = 1291.84(Ft.)
Pipe length = 46.76(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 3.250(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 3.250(CFS)
Normal flow depth in pipe = 3.52(In.)
Flow top width inside pipe = 14.28(In.)
Critical Depth = 8.24(In.)
Pipe flow velocity = 13.35(Ft/s)
Travel time through pipe = 0.06 min.
Time of concentration (TC) = 13.48 min.
I
I
I
-
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 20.000 to Point/Station 110.000
~
I
I
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 3
Stream flow area = 1.400(Ac.)
Runoff from this stream = 3.250(CFS)
Time of concentration = 13.48 min.
Rainfall intensity = 2. 955 (In/Hr)
Summary of stream data:
I
I
,
,I
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
1
2
3
Largest
Qp=
193.180 36.23
9.610 13.60
3.250 13.48
stream flow has longer
193.180 + sum of
Qb Ia/Ib
9.610. 0.583 =
Qb Ia/Ib
3.250. 0.581 =
200.673
1. 716
2.941
2.955
time of concentration
5.606
1.887
Qp=
I
Total of 3 main streams to confluence:
Flow rates before confluence point:
193.180 9.610 3.250
Area of streams before confluence:
135.700 3.930 1.400
I
I
I
Results of confluence:
Total flow rate = 200. 673 (CFS)
Time of concentration = 36.225 min.
Effective stream area after confluence =
141.030 (Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 110.000 to POint/Station 109.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
Upstream point/station elevation = 1292.66(Ft.)
Downstream point/station elevation = 1282.25(Ft.)
Pipe length = 745.53(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 200. 673 (CFS)
Given pipe size = 54.00(In.)
Calculated individual pipe flow = 200.673(CFS)
Normal flow depth in pipe = 38.72(In.)
Flow top width inside pipe = 48.65(In.)
Critical Depth = 48.47(In.)
Pipe flow velocity = 16.44(Ft/s)
Travel time through pipe = 0.76 min.
Time of concentration (TC) = 36.98 min.
I,
1
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 110.000 to Point/Station 109.000
I
\~\.
I
I
I
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 141.030(Ac.)
Runoff from this stream = 200.673(CFS)
Time of concentration = 36.98 min.
Rainfall intensity = 1.696(In/Hr)
Program is now starting with Main Stream No. 2
I
I
J
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.320 to Point/Station 3.200
.... USER DEFINED FLOW INFORMATION AT A POINT ....
Rainfall intensity = 3.524(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.824
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.400
Decimal fraction soil group C = 0.400
Decimal fraction soil group D = 0.200
RI index for soil(AMC 2) = 65.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 9.79 min. Rain intensity = 3.52 (In/Hr)
Total area = 2.78(Ac.) Total runoff = 8.07(CFS)
1
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 3.200 to Point/Station 108.000
**** PIPEFLOW TRAVEL TIME (User specified size) ***.
Upstream point/station elevation = 1308.17(Ft.)
Downstream point/station elevation = 1302.44(Ft.)
Pipe length = 46.58(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 8.070(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 8. 070 (CFS)
Normal flow depth in pipe = 5.72(In.)
Flow top width inside pipe = 16.77(In.)
Critical Depth = l3.20(In.)
Pipe flow velocity = 16.70(Ft/s)
Travel time through pipe = 0.05 min.
Time of concentration (TC) = 9.84 min.
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 3.200 to Point/Station. 108.000
.... CONFLUENCE OF MINOR STREAMS ....
I
I
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 2.780(Ac.)
Runoff from this stream = 8.070(CFS)
Time of concentration 9.84 min.
Rainfall intensity = 3.515(In/Hr)
I
I
\(/6
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.500 to Point/Station 5.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
Rainfall intensity = 3. 140 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.831
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.200
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.600
RI index for soil(AMC 2) = 70.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 12.07 min. Rain intensity = 3.14 (In/Hr)
Total area = 2.48(Ac.) Total runoff = 6.47(CFS)
I
1
J
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 5.000 to Point/Station 108.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
Upstream point/station elevation = 1306.61(Ft.)
Downstream point/station elevation = 1302.27(Ft.)
Pipe length = 33.98(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 6.470(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 6.470(CFS)
Normal flow depth in pipe = 5.06(In.)
Flow top width inside pipe = 16.18(In.)
Critical Depth = 11.80(In.)
Pipe flow velocity = 15.90(Ft/s)
Travel time through pipe = 0.04 min.
Time of concentration (TC) = 12.11 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 5.000 to Point/Station 108.000
.... CONFLUENCE OF MINOR STREAMS ....
I
I
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 2.480(Ac.)
Runoff from this stream = 6. 470 (CFS)
Time of concentration = 12.11 min.
Rainfall intensity = 3. 135 (In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
1
2
Largest
Qp=
8.070 9.84
6.470 12.11
stream flow has longer
8.070 + sum of
Qa Tb/Ta
6.470. 0.813 =
13.327
3.515
3.135
or shorter time
of concentration
5.257
I
Qp=
I
\1; C\.
I
I
I
I
Total of 2 streams to confluence:
Flow rates before confluence point:
8.070 6.470
Area of streams before confluence:
2.780 2.480
Results of confluence:
Total flow rate = 13.327 (CFS)
Time of concentration = 9.836 min.
Effective stream area after confluence =
5.260(Ac.)
I
1
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 108.000 to Point/Station 109.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
Upstream point/station elevation = 1302.27(Ft.)
Downstream point/station elevation = 1282.29(Ft.)
Pipe length = 294.60(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 13.327(CFS)
Given pipe size = 24.00(In.)
Calculated individual pipe flow = 13.327(CFS)
Normal flow depth in pipe = 7.76(In.)
Flow top width inside pipe = 22.45(In.)
Critical Depth = 15.77(In.)
Pipe flow velocity = 15.16(Ft/s)
Travel time through pipe = 0.32 min.
Time of concentration (TC) = 10.16 min.
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 108.000 to Point/Station 109.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 5.260(Ac.)
Runoff from this stream = 13.327(CFS)
Time of concentration = 10.16 min.
Rainfall intensity = 3.452 (In/Hr)
Program is now starting with Main Stream No. 3
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.110 to Point/Station 11.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
Rainfall intensity = 3.514 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.797
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction 0.500
User specified values are as follows:
TC = 9.84 min. Rain intensity = 3.51 (In/Hr)
I
I
I
I
\~
I
I
Total area =
4.74(AC.) Total runoff =
13. 99 (CFS)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 11.000 to Point/Station 111.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1293.65(Ft.)
Downstream point/station elevation = 1286.50(Ft.)
Pipe length = 36.94(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 13. 990 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 13. 990 (CFS)
Normal flow depth in pipe = 6.79(In.)
Flow top width inside pipe = 17.45(In.)
Critical Depth = 16.58(In.)
Pipe flow velocity = 22. 91 (Ft/s)
Travel time through pipe = 0.03 min.
Time of concentration (TC) = 9.87 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 11.000 to Point/Station 111.000
.... CONFLUENCE OF MINOR STREAMS ....
I
I
Along Main Stream number: 3 in normal stream number 1
Stream flow area = 4.740 (Ac.)
Runoff from this stream = 13. 990 (CFS)
Time of concentration = 9.87 min.
Rainfall intensity = 3.509(In/Hr)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.130 to Point/Station 13.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
Rainfall intensity = 3. 449 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.807
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.800
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.200
RI index for soil(AMC 2) = 59.80
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 10.18 min. Rain intensity = 3.45(In/Hr)
Total area = 3.68(Ac.) Total runoff = 10. 61 (CFS)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 13.000 to Point/Station 111.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1298.31(Ft.)
Downstream point/station elevation 1286.50(Ft.)
Pipe length = 292.03(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 10. 610 (CFS)
I
\"\\
I
I
Given pipe size = 24.00(In.)
Calculated individual pipe flow = 10. 610 (CFS)
Normal flow depth in pipe = 7.89(In.)
Flow top width inside pipe = 22.55(In.)
Critical Depth = 14.01(In.)
Pipe flow velocity = 11.81(Ft/s)
Travel time through pipe = 0.41 min.
Time of concentration (Te) = 10.59 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 13.000 to Point/Station 111.000
.... CONFLUENCE OF MINOR STREAMS ....
J
I
Along Main Stream number: 3 in normal stream number 2
Stream flow area = 3.680(Ac.)
Runoff from this stream = 10. 610 (CFS)
Time of concentration = 10.59 min.
Rainfall intensity = 3.374 (In/Hr)
Summary of stream data:
J
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
~=
13.990 9.87
10.610 10.59
stream flow has longer
13.990 + sum of
~ ~ft
10.610. 0.932 =
23.873
3.509
3.374
or shorter time
of concentration
9.883
I
~=
I
I
Total of 2 streams to confluence:
Flow rates before confluence point:
13.990 10.610
Area of streams before confluence:
4.740 3.680
Results of confluence:
Total flow rate = 23. 873 (CFS)
Time of concentration = 9.867 min.
Effective stream area after confluence =
8.420(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 111.000 to Point/Station 109.000
**** PIPEFLOW TRAVEL TIME (User specified size) ****
I
Upstream point/station elevation = 1286.50(Ft.)
Downstream point/station elevation = 1282.29(Ft.)
Pipe length = 77.50(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 23.873(CFS)
Given pipe size = 24.00(In.)
Calculated individual pipe flow = 23.873(CFS)
Normal flow depth in pipe = 11.32(In.)
Flow top width inside pipe = 23.96(In.)
Critical Depth = 20.78(In.)
Pipe flow velocity = 16.36(Ft/s)
I
I
I
I
~
I
t
Travel time through pipe
Time of concentration (TC) =
0.08 min.
9.95 min.
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 111.000 to Point/Station 109.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 3
Stream flow area = 8.420(Ac.)
Runoff from this stream = 23.873(CFS)
Time of concentration = 9.95 min.
Rainfall intensity = 3. 493 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
3
Largest
~=
200.673 36.98
13.327 10.16
23.873 9.95
stream flow has longer
200.673 + sum of
Qb Ia/Ib
13.327. 0.491 =
Qb Ia/Ib
23.873. 0.486 =
218.815
time of
1.696
3.452
3.493
concentration
J
6.549
I
11.594
~=
I
Total of 3 main streams to confluence:
Flow rates before confluence point:
200.673 13.327 23.873
Area of streams before confluence:
141.030 5.260 8.420
I
I
Results of confluence:
Total flow rate = 218.815(CFS)
Time of concentration = 36.981 min.
Effective stream area after confluence =
154.7l0(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 109.000 to Point/Station 112.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1282.25(Ft.)
Downstream point/station elevation = 1277.24(Ft.)
Pipe length 245.19(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 218.815(CFS)
Given pipe size = 54.00(In.)
Calculated individual pipe flow = 218. 815 (CFS)
Normal flow depth in pipe = 35.81(In.)
Flow top width inside pipe = 51.04(In.)
Critica~ Depth = 49.74(In.)
Pipe flow velocity = 19.54(Ft/s)
I
I
I
~
,-/
I
I
Travel time through pipe =
Time of concentration (TC) =
0.21 min.
37.19 min.
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 109.000 to Point/Station 112.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 154.710(Ac.)
Runoff from this stream = 218.815(CFS)
Time of concentration = 37.19 min.
Rainfall intensity = 1. 691 (In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.240 to Point/Station 24.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
,I
I
Rainfall intensity = 3.322 (In/Hr) for a 100.0 year storm
UNDEVELOPED (poor cover) subarea
Runoff Coefficient = 0.842
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.300
Decimal fraction soil group C = 0.100
Decimal fraction soil group D = 0.600
RI index for soil(AMC 2) = 85.40
Pervious area fraction = 1.000; Impervious fraction = 0.000
User specified values are as follows:
TC = 10.90 min. Rain intensity = 3.32(In/Hr)
Total area = 2.31(Ac.) Total runoff = 6.46(CFS)
,I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 24.000 to Point/Station 9.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
Upstream point/station elevation = 1291.10(Ft.)
Downstream point/station elevation = 1289.48(Ft.)
Pipe length = 36.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow 6. 460 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 6.460(CFS)
Normal flow depth in pipe = 6.64(In.)
Flow top width inside pipe = 17.37(In.)
Critical Depth = 11.80(In.)
Pipe f~ow velocity = 10.92(Ft/s)
Travel time through pipe = 0.05 min.
Time of concentration (TC) = 10.95 min.
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 24.000 to Point/Station 9.000
.... CONFLUENCE OF MINOR STREAMS ....
~ong Main Stream number: 2 in normal stream number 1
I
I
.....~
I
I
Stream flow area =
Runoff from this stream
Time of concentration =
Rainfall intensity =
2.310(Ac.)
= 6.460(CFS)
10.95 min.
3.312(In/Hr)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.900 to Point/Station 9.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
Rainfall intensity = 3.462 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.816
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 62.50
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 10.11 min. Rain intensity = 3.46(In/Hr)
Total area = 3.03(Ac.) Total runoff = 8.90(CFS)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.900 to Point/Station 9.000
.... CONFLUENCE OF MINOR STREAMS ....
I
~ong Main Stream number: 2 in normal stream number 2
Stream flow area = 3.030(Ac.)
Runoff from this stream = 8.900(CFS)
Time of concentration = 10.11 min.
Rainfall intensity = 3.462(In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
1
2
Largest
Qp=
6.460 10.95
8.900 10.11
stream flow has longer
8.900 + sum of
Qa Tb/Ta
6.460. 0.923 =
14.862
3.312
3.462
or shorter time
of concentration
5.962
Qp=
I
Total of 2 streams to confluence:
Flow rates before confluence point:
6.460 8.900
Area of streams before confluence:
2.310 3.030
Results of confluence:
Total flow rate = 14.862(CFS)
Time of concentration = 10.110 min.
Effective stream area after confluence =
5.340 (Ac. )
I
I
I
I
,t\:{
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 9.000 to Point/Station 112.000
***. PIPEFLOW TRAVEL TIME (User specified size) .***
I
Upstream point/station elevation = 1289.80(Ft.)
Downstream point/station elevation = 1277.29(Ft.)
Pipe length = 55.73(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 14.862(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 14.862(CFS)
Normal flow depth in pipe = 6.74(In.)
Flow top width inside pipe = 17.43(In.)
Critical Depth = 16.83(In.)
Pipe flow velocity = 24.59(Ft/s)
Travel time through pipe = 0.04 min.
Time of concentration (TC) = 10.15 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 9.000 to Point/Station 112.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 5.340(Ac.)
Runoff from this stream = 14.862(CFS)
Time of concentration = 10.15 min.
Rainfall intensity = 3.455(In/Hr)
Program is now starting with Main Stream No. 3
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from POint/Station 0.180 to Point/Station 18.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
Rainfall intensity = 3. 086 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.795
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.800
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 58.60
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 12.46 min. Rain intensity = 3.09(In/Hr)
Total area = 4.59(Ac.) Total runoff = 11. 98 (CFS)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 18.000 to Point/Station 112.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
Upstream point/station elevation = 1290.40(Ft.)
Downstream point/station elevation = 1277.29(Ft.)
Pipe length 59.35(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 11. 980 (CFS)
Given pipe size = 18.00(ln.)
I
I
~
I
I
I
Calculated individual pipe
Normal flow depth in pipe =
Flow top width inside pipe =
Critical Depth = 15.76(In.)
Pipe flow velocity = 23.04(Ft/s)
Travel time through pipe = 0.04 min.
Time of concentration (TC) = 12.50 min.
flow = 11.980(CFS)
6.04(In.)
17.00(In.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 18.000 to Point/Station 112.000
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 3
Stream flow area = 4.590(Ac.)
Runoff from this stream = 11.980(CFS)
Time of concentration = 12.50 min.
Rainfall intensity = 3. 080 (In/Hr)
Summary of stream data:
I
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
3
Largest
~=
218.815 37.19
14.862 10.15
11.980 12.50
stream flow has longer
218.815 + sum of
Qb Ia/Ib
14.862. 0.490 =
Qb Ia/Ib
11.980. 0.549
232.668
1.691
3.455
3.080
time of concentration
I
I
7.275
6.578
~=
I
I
Total of 3 main streams to confluence:
Flow rates before confluence point:
218.815 14.862 11.980
Area of streams before confluence:
154.710 5.340 4.590
I
Results of confluence:
Total flow rate = 232. 668 (CFS)
Time of concentration = 37.190 min.
Effective stream area after confluence
164.640(Ac.)
I
,
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 112.000 to Point/Station 113.000
**** PIPEFLOW TRAVEL TIME (User specified size) ****
I
Upstream point/station elevation = 1277.29(Ft.)
Downstream point/station elevation = 1273.01(Ft.)
Pipe length 103.01(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 232. 668 (CFS)
Given pipe size = 54.00(In.)
I
~
I
I
flow 232. 668 (CFS)
29.53(In.)
53. 76(In.)
Calculated individual pipe
Normal flow depth in pipe =
Flow top width inside pipe =
Critical Depth = 50.54(In.)
Pipe flow velocity = 26. 14 (Ft/s)
Travel time through pipe = 0.07 min.
Time of concentration (TC) = 37.26 min.
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the
same area.
I
I
I
Area averaged pervious area fraction(Ap) = 0.919
Area averaged RI index number = 75.3
I
I
J
I
I
I
I
I
I
I
I
I
I
I
164.64 (Ac.)
\~
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
RationaL Hydrology Study Date: 05/18/00
Version 3.3
I
LINES "D, 0-1, D-2, D-3, 0-4"
LINES "0-5, 0-6, 0-7, 0-8, 0-9"
I
*********
Hydrology Study Control Information **********
I
RANPAC Engineering Corporation, Temecula, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) = 100.00 Antecedent Moisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.640 to Point/Station 64.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
Rainfall intensity = 1.851(In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.726
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.200
RI index for soil(AMC 2) = 75.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
User specified values are as follows:
TC = 31.57 min. Rain intensity = 1. 85 (In/Hr)
TotaL area = 116.40(Ac.) Total runoff = 167.81(CFS)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 64.000 to Point/Station 126.000
I
\~
I
I
**** PIPEFLOW TRAVEL TIME (User specified size) ***.
Upstream point/station elevation = 1272.50(Ft.)
Downstream point/station elevation = 1265.03(Ft.)
Pipe length = 198.72(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 167. 810 (CFS)
Given pipe size = 54.00(In.)
Calculated individual pipe flow = 167.810(CFS)
Normal flow depth in pipe = 25.08(In.)
Flow top width inside pipe = 53.86(In.)
Critical Depth = 45.31(In.)
Pipe flow velocity = 23.21(Ft/s)
Travel time through pipe = 0.14 min.
Time of concentration (TC) = 31.71 min.
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 64.000 to Point/Station 126.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 116.400(Ac.)
Runoff from this stream = 167.810(CFS)
Time of concentration = 31.71 min.
Rainfall intensity = 1. 846 (In/Hr)
Program is now starting with Main Stream No. 2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.492 to Point/Station 49.200
.... USER DEFINED FLOW INFORMATION AT A POINT ....
Rainfall intensity = 3.828(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.815
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.700
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 59.90
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 8.42 min. Rain intensity = 3. 83 (In/Hr)
Total area = 2.41(Ac.) Total runoff = 7.95(CFS)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 49.200 to Point/Station 126.100
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1293.50(Ft.)
Downstream point/station elevation = 1290.40(Ft.)
Pipe length = 28.46(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 7. 950 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 7.950(CFS)
Normal f~ow depth in pipe = 5.86(In.)
I
I
~
I
I
Flow top width inside pipe = 16.87(In.)
Critical Depth = 13.11(In.)
Pipe flow velocity = 15.92(Ft/s)
Travel time through pipe = 0.03 min.
Time of concentration (TC) = 8.45 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 49.200 to Point/Station 126.100
.... CONFLUENCE OF MINOR STREAMS ....
.
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 2.410(Ac.)
Runoff from this stream = 7.950(CFS)
Time of concentration = 8.45 min.
Rainfall intensity = 3.821 (In/Hr)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.494 to Point/Station 49.400
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
Rainfall intensity = 3.666(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.812
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.700
Decimal fraction soil group C = 0.300
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 59.90
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 9.11 min. Rain intensity = 3. 67 (In/Hr)
Total area = 1.46(Ac.) Total runoff = 4.52(CFS)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 49.400 to Point/Station 126.100
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
Upstream point/station elevation = 1293.50(Ft.)
Downstream point/station elevation = l290.40(Ft.)
Pipe length = 29.21(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 4. 520 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 4.520(CFS)
Normal flow depth in pipe = 4.42(In.)
Flow top width inside pipe = 15.49(In.)
Critical Depth = 9.80(In.)
Pipe flow velocity = 13.43(Ft/s)
Travel time through pipe = 0.04 min.
Time of concentration (TC) = 9.15 min.
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 49.400 to Point/Station 126.100
.... CONFLUENCE OF MINOR STREAMS ....
I
I
*
I
I
~ong Main Stream number: 2 in normal stream number 2
Stream flow area = 1.460(Ac.)
Runoff from this stream = 4.520(CFS)
Time of concentration = 9.15 min.
Rainfall intensity = 3. 658 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
7.950 8.45
4.520 9.15
stream flow has longer
7.950 + sum of
Qa Tb/Ta
4.520. 0.924 =
12.126
3.821
3.658
or shorter time
of concentration
I
4.176
I
Qp=
I
Total of 2 streams to confluence:
Flow rates before confluence point:
7.950 4.520
Area of streams before confluence:
2.410 1.460
Results of confluence:
Total flow rate = 12. 126 (CFS)
Time of concentration = 8.450 min.
Effective stream area after confluence =
3.870 (Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 126.100 to Point/Station 126.000
**** PIPE FLOW TRAVEL TIME (User specified size) .***
Upstream point/station elevation = 1290.40(Ft.)
Downstream point/station elevation = 1266.88(Ft.)
Pipe length = 193.56(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow 12.126(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 12.126(CFS)
Normal flow depth in pipe = 7.13(In.)
Flow top width inside pipe = l7.6l(In.)
Critical Depth = 15.82(In.)
Pipe flow velocity = 18. 60 (Ft/s)
Travel time through pipe = 0.17 min.
Time of concentration (TC) = 8.62 min.
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 126.100 to Point/Station 126.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 3.870(Ac.)
Runoff from this stream 12. 126 (CFS)
Time of concentration = 8.62 min.
Rainfall intensity = 3.778(In/Hr)
I
I
\r{Y
I
I
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
1
2
Largest
Qp=
167.810 31.71
12.126 8.62
stream flow has longer
167.810 + sum of
Qb Ia/Ib
12.126. 0.489 =
173.734
time of
1. 846
3.778
concentration
5.924
Qp=
I
I
Total of 2 main streams to confluenoe:
Flow rates before confluence point:
167.810 12.126
Area of streams before confluence:
116.400 3.870
I
Results of confluence:
Total flow rate = 173.734 (CFS)
Time of concentration = 31.713 min.
Effective stream area after confluence =
120.270(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 126.000 to Point/Station 120.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
Upstream point/station elevation = 1266.88(Ft.)
Downstream point/station elevation = 1265.50(Ft.)
Pipe length = 48.79(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 173.734(CFS)
Given pipe size = 54.00(In.)
Calculated individual pipe flow = 173.734(CFS)
Normal flow depth in pipe = 27.80(In.)
Flow top width inside pipe = 53.98(In.)
Critical Depth = 45.94(In.)
Pipe flow velocity = 21.05(Ft/s)
Travel time through pipe = 0.04 min.
Time of concentration (TC) = 31.75 min.
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 126.000 to Point/Station 120.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 120.270(Ac.)
Runoff from this stream = 173.734(CFS)
Time of concentration = 31.75 min.
Rainfall intensity = 1.845(In/Hr)
Program is now starting with Main Stream No. 2
I
I
I
\~
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.500 to Point/Station 50.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
Rainfall intensity = 3.506(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.842
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 72.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 9.88 min. Rain intensity = 3. 51 (In/Hr)
Total area = 1.60(Ac.) Total runoff = 4.72(CFS)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 50.000 to Point/Station 120.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1286.30(Ft.)
Downstream point/station elevation = 1265.50(Ft.)
Pipe length = 19.80(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 4.720(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 4.720(CFS)
Normal flow depth in pipe = 2.57(In.)
Flow top width inside pipe = 12.59(In.)
Critica~ Depth = 10.03(In.)
Pipe flow velocity = 30.53(Ft/s)
Travel time through pipe = 0.01 min.
Time of concentration (TC) = 9.89 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 50.000 to Point/Station 120.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 1.60Q(Ac.)
Runoff from this stream = 4. 720 (CFS)
Time of concentration = 9.89 min.
Rainfall intensity = 3.504(In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(C~)
TC
(min)
Rainfall Intensity.
(In/Hr)
I
I
1
2
Largest
~=
173.734 31.75
4.720 9.89
stream flow has longer
173.734 + sum of
Qb Ia/Ib
4.720. 0.527 =
1.845
3.504
time of concentration
I
2.485
I
~
I
I
~=
176.220
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
173.734 4.720
Area of streams before confluence:
120.270 1.600
I
I
Results of confluence:
Total flow rate = 176.220(CFS)
Time of concentration = 31.751 min.
Effective stream area after confluence =
121.870(Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 120.000 to Point/Station 121.000
**** PIPEFLOW TRAVEL TIME (User specified size) ****
I
Upstream point/station elevation = 1265.50(Ft.)
Downstream point/station elevation = 1259.85(Ft.)
Pipe length = 200.71(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 176.220(CFS)
Given pipe size = 54.00(In.)
Calculated individual pipe flow = 176.220(CFS)
Normal flow depth in pipe = 28.08(In.)
Flow top width inside pipe = 53.96(In.)
Critical Depth = 46.24(In.)
Pipe flow velocity = 21.09(Ft/s)
Travel time through pipe = 0.16 min.
Time of concentration (Te) = 31.91 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 120.000 to POint/Station 121.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 121.870(Ac.)
Runoff from this stream = 176.220(CFS)
Time of concentration = 31.91 min.
Rainfall intensity = 1. 840 (In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.520 to Point/Station 52.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
Rainfall intensity 3. 483 (In/Hr) for a
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.832
Decimal fraction soil group A 0.000
Decimal fraction soil group B 0.300
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.500
RI index for soil(AMC 2) = 68.10
100.0 year storm
I
I
~
I
I
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 10.00 min. Rain intensity = 3. 48 (In/Hr)
Total area = 3.51(Ac.) Total runoff = 10. 67 (CFS)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 52.000 to Point/Station 121.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1283.40(Ft.)
Downstream point/station elevation = 1259.85(Ft.)
Pipe length = 19.80(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 10. 670 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 10. 670 (CFS)
Normal flow depth in pipe = 3.71(In.)
Flow top width inside pipe = 14.57(In.)
Critical Depth = 15.05(In.)
Pipe flow velocity = 40. 60 (Ft/s)
Travel time through pipe = 0.01 min.
Time of concentration (TC) = 10.01 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 52.000 to Point/Station 121.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 3.510(Ac.)
Runoff from this stream = 10.670(CFS)
Time of concentration = 10.01 min.
Rainfall intensity = 3.481 (In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
~=
176.220 31.91
10.670 10.01
stream flow has longer
176.220 + sum of
Qb Ia/Ib
10.670. 0.528 =
181.859
1.840
3.481
time of concentration
I
5.639
I
~=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
176.220 10.670
Area of streams before confluence:
121.870 3.510
I
Results of confluence:
TotaL fLow rate = 181. 859 (CFS)
Time of concentration = 31.910 min.
I
I
*
I
I
Effective stream area after confluence
125.380(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 121.000 to Point/Station 122.000
.... PIPE FLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1259.85(Ft.)
Downstream point/station elevation = 1253.12(Ft.)
Pipe length = 315.50(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 181.859(CFS)
Given pipe size = 54.00(In.)
Calculated individual pipe flow = 181.859(CFS)
Normal flow depth in pipe = 31.17(In.)
Flow top width inside pipe = 53.35(In.)
Critical Depth = 46.79(In.)
Pipe flow velocity = 19. 11 (Ft/s)
Travel time through pipe = 0.28 min.
Time of concentration (TC) = 32.19 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 121.000 to Point/Station 122.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 125.380(Ac.)
Runoff from this stream = 181. 859 (CFS)
Time of concentration = 32.19 min.
Rainfall intensity = 1.831 (In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.460 to Point/Station 46.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
Rainfall intensity = 3.405(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.821
Decimal fraction soil group A = 0.000
Decimal fraction soil group B 0.500
Decimal fraction soil group C = 0.100
Decimal fraction soil group D = 0.400
RI index for soil(AMC 2) = 64.90
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 10.42 min. Rain intensity = 3.40(In/Hr)
Total area = 4.07(Ac.) Total runoff = 11.66(CFS)
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 46.000 to Point/Station 122.000
**** PIPEFLOW TRAVEL TIME (User specified size) ****
Upstream point/station elevation =
Downstream point/station elevation =
1279.25(Ft.)
1253.12(Ft.)
I
I
~
I
I
I
Pipe length = 31.77(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 11.660(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 11.660(CFS)
Normal flow depth in pipe = 4.25(In.)
Flow top width inside pipe = 15.29(In.)
Critical Depth = 15.60(In.)
Pipe flow velocity = 36.57(Ft/s)
Travel time through pipe = 0.01 min.
Time of concentration (TC) = 10.43 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 46.000 to Point/Station 122.000
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 4.070(Ac.)
Runoff from this stream = 11.660(CFS)
Time of concentration = 10.43 min.
Rainfall intensity = 3.402 (In/Hr)
Summary of stream data:
I
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
1
2
Largest
Qp=
181.859 32.19
11. 660 10.43
stream flow has longer
181.859 + sum of
Qb Ia/Ib
11.660. 0.538
188.134
1.831
3.402
time of concentration
6.275
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
181.859 11.660
Area of streams before confluence:
125.380 4.070
I
I
Results of confluence:
Total flow rate = 188.134(CFS)
Time of concentration = 32.185 min.
Effective stream area after confluence =
129.450 (Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 122.000 to Point/Station 117.000
**** PIPEFLOW TRAVEL TIME (User specified size) ****
Upstream point/station elevation = 1253.12(Ft.)
Downstream point/station elevation = 1250.87(Ft.)
Pipe length = 61.62(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 188.134(CFS)
Given pipe size = 54.00(In.)
I
I
I
\r#>
I
I
I
Calculated individual pipe
Normal flow depth in pipe =
Flow top width inside pipe =
Critical Depth = 47.38(In.)
Pipe flow velocity = 23.64(Ft/s)
Travel time through pipe = 0.04 min.
Time of concentration (TC) = 32.23 min.
flow = 188. 134 (CFS)
27.02(In.)
54.00(In.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 122.000 to Point/Station 117.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 129.450(Ac.)
Runoff from this stream = 188.134 (CFS)
Time of concentration = 32.23 min.
Rainfall intensity = 1. 830 (In/Hr)
Program is now starting with Main Stream No. 2
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.420 to Point/Station 42.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
Rainfall intensity = 3.359(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.819
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.200
Decimal fraction soil group D = 0.300
RI index for soil(AMC 2) = 64.30
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 10.68 min. Rain intensity = 3.36(In/Hr)
Total area = 4.14(Ac.) Total runoff = 11.80(CFS)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 42.000 to Point/Station 114.000
**** PIPEFLOW TRAVEL TrME (User specified size) ****
I
I
Upstream point/station elevation = 1306.50(Ft.)
Downstream point/station elevation = 1289.50(Ft.)
Pipe length = 19.99(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 11. 800 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 11. 800 (CFS)
Normal flow depth in pipe = 4.24(In.)
Flow top width inside pipe = 15.28(In.)
Critical Depth = 15.68(In.)
Pipe flow velocity = 37.13(Ft/s)
Travel time through pipe = 0.01 min.
Time of concentration (Te) = 10.69 min.
I
I
I
I
~
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 42.000 to Point/Station 114.000
.... CONFLUENCE OF MINOR STREAMS ....
I
I
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 4.140(Ac.)
Runoff from this stream = 11. 800 (CFS)
Time of concentration = 10.69 min.
Rainfall intensity = 3.357(In/Hr)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.440 to Point/Station 44.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
Rainfall intensity = 3.189(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.795
Decimal fraction soil group A 0.000
Decimal fraction soil group B = 0.900
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.100
RI index for soil(AMC 2) = 57.90
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 11.74 min. Rain intensity = 3.19(In/Hr)
Total area = 4.87(Ac.) Total runoff = 12.98(CFS)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 44.000 to Point/Station 114.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
Upstream point/station elevation = 1307.10(Ft.)
Downstream point/station elevation = 1289.50(Ft.)
Pipe length 38.80(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 12. 980 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 12.980(CFS)
Normal flow depth in pipe = 5.22(In.)
Flow top width inside pipe = 16.34(In.)
Critical Depth = l6.2l(In.)
Pipe flow velocity = 30.50(Ft/s)
Travel time through pipe = 0.02 min.
Time of concentration (TC) = 11.76 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 44.000 to Point/Station. 114.000
.... CONFLUENCE OF MINOR STREAMS ....
I
I
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 4.870(Ac.)
Runoff from this stream 12. 980 (CFS)
Time of concentration = 11.76 min.
Rainfall intensity = 3.186(In/Hr)
Summary of stream data:
I
I
~
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(~n~
I
I
1
2
Largest
~=
11.800 10.69
12.980 11.76
stream flow has longer
12.980 + sum of
Qb Ia/Ib
11.800. 0.949 =
24.176
time of
3.357
3.186
concentration
I
11.196
~=
I
Total of 2 streams to confluence:
Flow rates before confluence point:
11.800 12.980
Area of streams before confluence:
4.140 4.870
Results of confluence:
Total flow rate = 24. 176 (CFS)
Time of concentration = 11.761 min.
Effective stream area after confluence =
9.010(Ac.)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 114.000 to Point/Station 116.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
Upstream point/station elevation = 1289.50(Ft.)
Downstream point/station elevation = 1273.71(Ft.)
Pipe length = 327.02(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 24.176(CFS)
Given pipe size = 24.00(In.)
Calculated individual pipe flow = 24. 176 (CFS)
Normal flow depth in pipe = 11.81(In.)
Flow top width inside pipe = 24.00(In.)
Critical Depth = 20.87(In.)
Pipe flow velocity = 15. 72 (Ft/s)
Travel time through pipe = 0.35 min.
Time of concentration (TC) = 12.11 min.
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 114.000 to Point/Station 116.000
.... CONFLUENCE OF MINOR STREAMS ....
I
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 9.010(Ac.)
Runoff from this stream = 24.176(CFS)
Time of concentration = 12.11 min.
Rainfall intensity = 3.135(In/Hr)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.115 to Point/Station 115.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
Rainfall intensity = 2.894 (In/Hr) for a
SINGLE FAMILY (1/4 Acre Lot)
100.0 year storm
I
I
~
I
I
I
Runoff Coefficient = 0.780
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 56.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 14.00 min. Rain intensity = 2.89(In/Hr)
Total area = 6.00 (Ac. ) Total runoff = 16.00 (CFS)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 115.000 to Point/Station 116.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
Upstream point/station elevation = 1287.10(Ft.)
Downstream point/station elevation = 1273.71(Ft.)
Pipe length = 120.37(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 16. 000 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 16. 000 (CFS)
Normal flow depth in pipe = 8.54(In.)
Flow top width inside pipe = 17.98(In.)
Critical Depth = 17.09(In.)
Pipe flow velocity = 19.38(Ft/s)
Travel time through pipe = 0.10 min.
Time of concentration (TC) = 14.10 min.
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 115.000 to Point/Station 116.000
.... CONFLUENCE OF MINOR STREAMS ....
I
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 6.000(Ac.)
Runoff from this stream = 16.000(CFS)
Time of concentration = 14.10 min.
Rainfall intensity = 2. 883 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
24.176 12.11
16.000 14.10
stream flow has longer
24.176 + sum of
Qa Tb/Ta
16.000. 0.859 =
37.912
3.135
2.883
or shorter time
of concentration
I
13.736
Qp=
I
Total of 2 streams to confluence:
Flow rates before confluence point:
24.176 16.000
Area of streams before confluence:
9.010 6.000
I
I
\~
I
I
Results of confluence:
Total flow rate = 37.912(CFS)
Time of concentration = 12.108 min.
Effective stream area after confluence =
15.010 (Ac.)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 116.000 to Point/Station 117.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1273.71(Ft.)
Downstream point/station elevation = 1250.87(Ft.)
Pipe length = 418.55(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 37. 912 (CFS)
Given pipe size = 24.00(In.)
Calculated individual pipe flow = 37. 912 (CFS)
Normal flow depth in pipe = 15.05(In.)
Flow top width inside pipe = 23.21(In.)
Critical depth could not be calculated.
Pipe flow velocity = 18.30(Ft/s)
Travel time through pipe = 0.38 min.
Time of concentration (TC) = 12.49 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 116.000 to Point/Station 117.000
.... CONFLUENCE OF MAIN STREAMS ....
I
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 15.010(Ac.)
Runoff from this stream = 37. 912 (CFS)
Time of concentration = 12.49 min.
Rainfall intensity = 3.082 (In/Hr)
Summary of stream data:
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
188.134 32.23
37.912 12.49
stream flow has longer
188.134 + sum of
Qb Ia/Ib
37.912. 0.594 =
210.642
1.830
3.082
time of concentration
I
22.508
I
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
188.134 37.912
Area of streams before confluence:
129.450 15.010
I
Results of confluence:
Total flow rate = 210.642 (CFS)
Time of concentration = 32.229 min.
I
I
\o..~
I
I
Effective stream area after confluence =
144.460(Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 117.000 to Point/Station 118.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1250.87(Ft.)
Downstream point/station elevation = 1249.70(Ft.)
Pipe length = 143.84(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 210. 642 (CFS)
Given pipe size = 54.00(In.)
NOTE: Normal flow is pressure flow in user
The approximate hydraulic grade line above
4.566(Ft.) at the headworks or inlet
Pipe friction loss = 1.650(Ft.)
Minor friction loss = 4.086(Ft.)
Critical depth could not be calculated.
Pipe flow velocity = 13.24(Ft/s)
Travel time through pipe = 0.18 min.
Time of concentration (TC) = 32.41 min.
selected pipe size.
the pipe invert is
of the pipe(s)
I
K-factor =
1.50
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 117.000 to Point/Station 118.000
.... CONFLUENCE OF MAIN STREAMS ....
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 144.460(Ac.)
Runoff from this stream = 210.642(CFS)
Time of concentration = 32.41 min.
Rainfall intensity = 1.824(In/Hr)
Program is now starting with Main Stream No. 2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.480 to Point/Station 48.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
Rainfall intensity = 3. 140 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.800
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.800
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.200
RI index for soil(AMC 2) = 59.80
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 12.07 min. Rain intensity = 3. 14 (In/Hr)
Total area = 5.38(Ac.) Total runoff = 14.18(CFS)
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 48.000 to Point/Station 118.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
\0#\
I
I
I
Upstream point/station elevation = 1273.00(Ft.)
Downstream point/station elevation = 1249.71(Ft.)
Pipe length = 13.88(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 14. 180 (CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 14.180(CFS)
Normal flow depth in pipe = 3.93(In.)
Flow top width inside pipe = 14.87(In.)
Critical Depth = 16.64(In.)
Pipe flow velocity = 49. 85 (Ft/s)
Travel time through pipe = 0.00 min.
Time of concentration (TC) = 12.07 min.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 48.000 to Point/Station 118.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 5.380(Ac.)
Runoff from this stream = 14. 180 (CFS)
Time of concentration = 12.07 min.
Rainfall intensity = 3.140(In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
I
I
1
2
Largest
Qp=
210.642 32.41
14.180 12.07
stream flow has longer
210.642 + sum of
Qb Ia/Ib
14.180. 0.581 =
218.880
1. 824
3.140
time of concentration
I
8.238
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
210.642 14.180
Area of streams before confluence:
144.460 5.380
I
I
Results of confluence:
Total flow rate = 218. 880 (CFS)
Time of concentration = 32.410 min.
Effective stream area after confluence =
149.840 (Ac.)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 118.000 to Point/Station 119.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1249.71(Ft.)
Downstream point/station elevation = 1249.19(Ft.)
Pipe length = 59.43(Ft.) Manning's N = 0.013
I
\06
I
I
No. of pipes = 1 Required pipe flow =
Given pipe size = 54.00(In.)
NOTE: Normal flow is pressure flow in user
The approximate hydraulic grade line above
4.628(Ft.) at the headworks or inlet
Pipe friction loss = 0.736(Ft.)
Minor friction loss = 4.412(Ft.)
Pipe flow velocity = 13.76(Ft/s)
Travel time through pipe = 0.07 min.
Time of concentration (TC) = 32.48 min.
End of computations, total study area =
The following figures may
be used for a unit hydrograph study of the
I
I
I
I
Area averaged pervious area fraction(Ap) =
Area averaged RI index number = 72.0
I
I
I
I
I
I
I
I
I
I
I
I
I
218. 880 (CFS)
selected pipe size.
the pipe invert is
of the pipe(s)
K-factor =
1.50
149.84 (Ac.)
same area.
0.888
,ofq
I
I
Riverside County Rational Hydrology Program
I
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1992
Rational Hydrology Study Date: 05/18/00
Version 3.3
I
LINES nE, E-l, E-2"
I
I
*********
Hydrology Study Control Information **********
RANPAC Engineering Corporation, Temecula, CA - SiN 560
I
Rational Method Hydrology Program based on
Riverside County Flood Control & Water Conservation District
1978 hydrology manual
I
Storm event (year) = 100.00 Antecedent Moisture Condition = 2
I
Standard intensity-duration curves data (Plate D-4.1)
For the [ Murrieta,Tmc,Rnch CaNorco ] area used.
10 year storm 10 minute intensity = 2.360 (in./hr.)
10 year storm 60 minute intensity = 0.880 (in./hr.)
100 year storm 10 minute intensity = 3.480 (in./hr.)
100 year storm 60 minute intensity = 1.300 (in./hr.)
I
I
Storm event year = 100.0
Calculated rainfall intensity data:
1 hour intensity = 1.300 (in./hr.)
Slope of intensity duration curve = 0.5500
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.620 to Point/Station 62.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
Rainfall intensity = 2. 103 (In/Hr) for a 100.0 year storm
UNDEVELOPED (fair cover) subarea
Runoff Coefficient = 0.736
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.500
Decimal fraction soil group C = 0.500
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 74.00
Pervious area fraction = 1.000; Impervious fraction = 0.000
User specified values are as follows:
TC = 25.02 min. Rain intensity = 2.10(In/Hr)
Total area = 83.40(Ac.) Total runoff = 142.06(CFS)
I
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 62.000 to Point/Station 124.000
I
\0..\
I
I
**** PIPEFLOW TRAVEL TIME (User specified size) ****
I
Upstream point/station elevation = 1260.50(Ft.)
Downstream point/station elevation = 1252.69(Ft.)
Pipe length = 232.22(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 142. 060 (CFS)
Given pipe size = 54.00(In.)
Calculated individual pipe flow = 142. 060 (CFS)
Normal flow depth in pipe = 23.55(In.)
Flow top width inside pipe = 53.56(In.)
Critical Depth = 42.06 (In.)
Pipe flow velocity = 21.33(Ft/s)
Travel time through pipe = 0.18 min.
Time of concentration (TC) = 25.20 min.
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 62.000 to Point/Station 124.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 83.400(Ac.)
Runoff from this stream = 142.060(CFS)
Time of concentration = 25.20 min.
Rainfall intensity = 2.095(In/Hr)
Program is now starting with Main Stream No. 2
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 0.540 to Point/Station 54.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
Rainfall intensity = 3.174(In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coefficient = 0.829
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 1.000
Decimal fraction soil group D = 0.000
RI index for soil(AMC 2) = 69.00
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 11.84 min. Rain intensity = 3. 17 (In/Hr)
Total area = 2.26(Ac.) Total runoff = 5. 94 (CFS)
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 54.000 to Point/Station 123.000
.... PIPEFLOW TRAVEL TIME (User specified size) ....
I
I
Upstream point/station elevation = 1277.38(Ft.)
Downstream point/station elevation = 1264.36(Ft.)
Pipe length = 41.96(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 5.940(CFS)
Given pipe size = 18.00(In.)
Calculated individual pipe flow = 5. 940 (CFS)
Normal flow depth in pipe = 3.87(In.)
I
I
\o.fb
I
I
Flow top w~dth ~ns~de p~pe 14.79(In.)
Cr~t~cal Depth = 11.29(In.)
P~pe flow veloc~ty = 21.27(Ft/s)
Travel time through pipe = 0.03 min.
Time of concentration (TC) = 11.87 min.
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Po~nt/Stat~on 54.000 to Po~nt/Stat~on 123.000
.... CONFLUENCE OF MINOR STREAMS ....
I
,I
Along Main Stream number: 2 in normal stream number 1
Stream flow area = 2.260(Ac.)
Runoff from th~s stream = 5.940(CFS)
Time of concentration = 11.87 min.
Ra~nfall ~ntens~ty = 3. 169 (In/Hr)
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Po~nt/Stat~on 0.560 to Po~nt/Stat~on 56.000
.... USER DEFINED FLOW INFORMATION AT A POINT ....
I
I
Ra~nfall ~ntens~ty = 3. 951 (In/Hr) for a 100.0 year storm
SINGLE FAMILY (1/4 Acre Lot)
Runoff Coeff~c~ent = 0.810
Decimal fraction soil group A = 0.000
Dec~mal fract~on so~l group B = 0.900
Dec~mal fract~on so~l group C = 0.100
Decimal fraction soil group D = 0.000
RI ~ndex for so~l(AMC 2) = 57.30
Pervious area fraction = 0.500; Impervious fraction = 0.500
User specified values are as follows:
TC = 7.95 m~n. Ra~n ~ntens~ty = 3. 95 (In/Hr)
Total area = 2.06(Ac.) Total runoff = 6.59(CFS)
I
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Po~nt/Stat~on 56.000 to Po~nt/Stat~on 123.000
.... PIPEFLOW TRAVEL TIME (User spec~f~ed s~ze) ....
I
Upstream po~nt/stat~on elevat~on = 1273.38(Ft.)
Downstream po~nt/stat~on elevat~on = 1264.32(Ft.)
P~pe length 43.07(Ft.) Mann~ng's N = 0.013
No. of pipes = 1 Required pipe flow = 6.590(CFSl
G~ven p~pe s~ze = 18.00(In.)
Calculated individual pipe flow = 6.590(CFS)
Normal flow depth in p~pe = 4.50(In.)
Flow top w~dth ~ns~de pipe = 15.59(In.)
Cr~t~cal Depth = 11.91(In.)
P~pe flow veloc~ty = 19.10(Ft/s)
Travel time through pipe = 0.04 min.
Time of concentrat~on (TCl = 7.99 m~n.
I
I
-
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Po~nt/Stat~on 56.000 to Po~nt/Stat~on 123.000
.... CONFLUENCE OF MINOR STREAMS ....
I
I
\~
I
I
Along Main Stream number: 2 in normal stream number 2
Stream flow area = 2.060(Ac.)
Runoff from th~s stream = 6.590(CFS)
Time of concentration = 7.99 min.
Ra~nfall ~ntens~ty = 3. 941 (In/Hr)
Summary of stream data:
I
I
Stream
No.
Flow rate
(CFS)
TC
(m~n)
Ra~nfall Intens~ty
(In/Hr)
I
1
2
Largest
Qp=
5.940 11.87
6.590 7.99
stream flow has longer
6.590 + sum of
Qa Tb/Ta
5.940' 0.673 =
10.586
3.169
3.941
or shorter time
of concentration
I
3.996
I
I
Qp=
I
,I
Total of 2 streams to confluence:
Flow rates before confluence point:
5.940 6.590
Area of streams before confluence:
2.260 2.060
Results of confluence:
Total flow rate = 10.586(CFS)
Time of concentration = 7.988 min.
Effective stream area after confluence =
4.320 (Ac. )
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Po~nt/Stat~on 123.000 to Po~nt/Stat~on 124.000
.... PIPEFLOW TRAVEL TIME (User spec~f~ed size) ....
I
I
Upstream po~nt/station elevat~on = 1264.69(Ft.)
Downstream po~nt/stat~on elevat~on = 1252.69(Ft.)
P~pe length = 55.02(Ft.) Mann~ng's N = 0.013
No. of p~pes = 1 Requ~red p~pe flow = 10.586(CFS)
G~ven p~pe s~ze = 18.00(In.)
Calculated ~nd~v~dual p~pe flow = 10.586(CFS)
Normal flow depth ~n p~pe = 5.68(In.)
Flow top w~dth ~ns~de p~pe = 16.73(In.)
Cr~t~cal Depth = 15.00(In.)
P~pe flow veloc~ty = 22.14(Ft/s)
Travel t~me through p~pe = 0.04 min.
T~me of concentrat~on (TC) = 8.03 m~n.
I
I
I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Po~nt/Stat~on 123.000 to Po~nt/Stat~on 124.000
.... CONFLUENCE OF MAIN STREAMS ....
I
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 4.320(Ac.)
Runoff from th~s stream = 10.586(CFS)
Time of concentration = 8.03 min.
Ra~nfall ~ntens~ty = 3. 930 (In/Hr)
I
I
1-~
I
I
I
Summary of stream data:
Stream
No.
Flow rate
(CFS)
TC
(m~n)
Rainfall Intensity
(In/Hr)
I
1
2
Largest
Qp=
142.060 25.20
10.586 8.03
stream flow has longer
142.060 + sum of
Qb Ia/Ib
10.586' 0.533 =
147.703
2.095
3.930
time of concentration
I
I
5.643
Qp=
I
Total of 2 main streams to confluence:
Flow rates before confluence point:
142.060 10.586
Area of streams before confluence:
83.400 4.320
I
Results of confluence:
Total flow rate = 147.703(CFS)
Time of concentration = 25.201 min.
Effective stream area after confluence =
87.720(Ac.)
I
,I
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Po~nt/Stat~on 124.000 to Point/Stat~on 125.000
.*** PIPEFLOW TRAVEL TIME (User specified size) ****
1
Upstream po~nt/stat~on elevat~on = 1252.69(Ft.)
Downstream po~nt/stat~on elevat~on = 1251.91(Ft.)
P~pe length = 155.57(Ft.) Mann~ng's N = 0.013
No. of p~pes = 1 Required p~pe flow = 147.703(CFS)
G~ven p~pe s~ze = 54.00(In.)
Calculated ~nd~v~dual p~pe flow = 147.703(CFS)
Normal flow depth ~n p~pe = 48.00(In.)
Flow top w~dth ~ns~de p~pe = 33.94(In.)
Cr~t~cal Depth = 42.82(In.)
P~pe flow veloc~ty = 9.88(Ft/s)
Travel time through pipe = 0.26 min.
Time of concentration (TC) 25.46 min.
End of computations, total study area = 87.72 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
I
I
I
I
t
I
Area averaged perv~ous area fract~on(Ap) = 0.975
Area averaged RI ~ndex number = 73.5
I
I
1,.f.>\
I
I
I
I
I
..
I
I
I
.1
I
I
I
I
I
I
I
I
I
.
"
VII. HYDRAULIC CALCULATION
Lines "A, A-I, A-2, L, L-l, L-2, L-3, L-4, L-5, B, B-1, B-2,
C, C-l, D, D-l, D-2, D-3, D-4, D-5, D-6, D-7, D-8, D-9, E, E-l, E-2"
~ A-~, C)-Iv
~
~
1,1>1;--
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
I
I
I
I
CARD SECT
cOOt NO
w S P G N
WATER SURFACE
HE IGBT 1 BASE
DIAMETER WIDTH
- EDIT LISTING - Verl10n 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR INV Y(l) Y(2) Y(3) T(4)
DROP
CHN NO OF AVE PIER
TYPE PIER/PIP WIDTH
CD
CD
CD
.
.
.
2.50
1.50
3.00
o
o
D
1
2
,
o
w S P G N
WATER SURFACE PROFILE TITLE CARD LISTING
HEADING LINE NO IS
LINE- "A"
HEADING LINE NO 2 IS
HEADING LINE NO 3 IS
o
w S P G N
ELEMENT CARD
.
LISTING
ELEMENT NO
WATER SURFACE
SYSTEM OUTLET .
uts DATA STATION
1347.10
.
SECT
1
IS A
PROFILE -
.
INVERT
1292.33
.
ELEMENT NO
2 IS A REACH
u/a DATA
SECT
1
STATION INVERT
1675.141293.97
ELEMENT NO
3 IS A REACH
U/S DATA STATION INVERT
1710.47 1296.80
SECT
1
ELEMENT NO IS A REACH
U/S DATA STATION INVERT SECT
1874.69 1309.93 1
ELEMENT NO 5 IS A REACH
U/B DATA STATION INVERT SECT
1947.45 1310.29 1
ELEMENT NO
6 IS A REACH
U/S DATA
STATION INVERT SECT
1953.30 1310.32 1
ELEMENT NO
7 IS A JUNCTION
U/B DATA
STATION INVERT SECT IAT-1 IAT-2
1954.55 1310.33 1 2 0
ELEMENT NO
8 IS A JU:A.CH
u/a DATA
STATION INVERT SECT
2060.12 1310.85 1
ELEMENT NO 9 IS A REACH
U/S DATA
STATION INVERT SECT
2106.26 1311.09 1
ELEMENT NO 10 IS A REACH
U/S DATA
STATION
2238.34
.
INVERT SECT
1311.75 1
.
ELEMENT NO 11 IS A JUNCTION
O/S DATA
STATION INVERT SECT IAT-1 IAT-2
2240.34 1311.77 1 2 0
o
W S P G N
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO 12 IS A REACH 11
U/S DATA STATION INVERT SECT N
2252.75 1311.82 1 .013
ELEMENT NO 13 IS A REACH
U/S DATA STATION INVERT SECT
2266.791311.89 1
ELEMENT NO 14 IS A JUNCTION
U/S DATA STATION INVERT SECT IAT-1 IAT-2 N
2267.95 1311.90 1 2 0 .013
ELEMENT NO 15 IS A REACH
U/S DATA STATION INVERT SECT
2288.09 1312.00 1
ELEMENT NO 16 IS A REACH
U/S DATA STATION INVERT SECT
2560.25 1313.37 1
ELEMENT NO 17 IS A REACH
U/S DATA STATION INVERT SECT
2619.86 1313.66 1
ELEMENT NO 18 IS A REACH
U/S DATA STATION INVERT SECT
2722.54 1314.17 1
ELEMENT NO 19 IS A REACH 11
U/S DATA STATION INVERT SECT
2796.90 1314.54 1
ELEMENT NO 20 IS A REACH
u/s DATA STATION INVERT SECT
2846.651314.79 1
ELEMENT NO 21 IS A REACH
U/S DATA STATION INVERT SECT
2941.89 1315.27 1
ELEMENT NO 22 IS A JUNCTION
U/S DATA STATION INVERT SECT IAT-1 LAT-2 N
2943.39 1315.27 1 2 0 .013
N
.013
N
.013
N
.013
N
.013
N
.013
N
.013
03
6.55
04
.00
Date: 5-18-2000
TIS) Yl6) T(7)
iii S ELEV
1294.93
RADIUS
.000
ANGLE
.000
Time: 4:1755
PAGE 1
T(9) Y(9) T(10)
PAGE NO
PAGE NO
ANG PT
.000
ANG PT
.000
ANG PT
.000
ANG PT
.000
ANC..,
.000
O'
.00
INVERT-3 INVERT-4 PHI 3 PHI 4
1312.75 .0045.00 .00
RADIUS ANGLE
.000 .000
RADIUS ANGLE
25.643 45.000
RADIUS ANGLE
.000 .000
RADIUS ANGLE
306.315 -11.150
RADIUS ANGLE
90.052 65.330
RADIUS ANGLE
.000 .000
RADIUS ANGLE
90.034 31.660
RAD IUS ANGLE
.000 .000
INVERT-3 INVERT-4 PHI 3
1316.23 .00 40.00
RAD IUS ANGLE
.000 .000
-WARNING
-WARNING
THE ABCVE ELEMENT CONTAINED AN INVERT ELEV WHICH WAS NOT GlU'.ATER THAN THE PREVIOOS INVERT ELEV
THE ABOVE ELEMENT CONTAINED AN INVERT ELEV WHICH WAS NOT GlU'.ATER THAN THE PREVIOUS INVERT ELEV
RADIUS
22.504
ANGLE
99.950
N
.013
N
.013
N
.013
N
.013
03
9.22
N
.013
03
, "
.
.013
.
.013
.
.013
.
.013
.
.013
N
.013
N
.013
03
1 "
RAD IUS ANGLE
.000 .000
RAD IUS ANGLE
45.069 92.500
RADIUS ANGLE
.000 .000
RADIUS ANGLE
.000 .000
RADIUS ANGLE
144.460 19.300
RADIUS ANGLE
197.588 39.300
.
ANC ..,
.000
ANG PT
.000
ANG PT
.000
INVERT-3 INVERT-4 PHI 3 PHI 4
1312.07 .00 45.00 .00
RADIUS ANGLE
.000 .000
RADIUS ANGLE
.000 .000
RAD IUS ANGLE
17.876 45.000
PAGE NO
ANG PT
.000
ANG PT
.000
Q4 INVERT-3 INVERT-4 PHI 3 PHI 4
.00 1313.13 .00 45.00 .00
RADIUS ANGLE
.000 .000
O'
.00
ANG PT
.000
ANG PT
.000
ANG PT
.000
ANG PT
.000
ANG ..,
.000
ANG PT
.000
ANG PT
.000
PHI 4
.00
2
MAN H
o
MAN H
o
MAN H
1
MAN .
o
MAN .
o
MAN H
o
MAN H
o
MAN H
1
3
MAN H
o
MAN H
o
MAN H
o
MAN H
D
MAN H
1
MAN H
o
MAN H
o
MAN H
o
MAN H
o
<z,J>?
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
o
w S P G N
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO 23 IS A REACN
U/S DATA STATION INVERT SECT N
2957.35 1315.34 1 .013
ELEMENT NO 24 IS A REACH
UIS DATA STATION INVERT SECT N
3003.23 1315.57 1 .013
ELEMENT NO 25 IS A REACH
u/s DATA STATION INVERT SECT N
3007.23 1316.43 1 .013
ELEMENT NO " IS A REACH .
U!S DATA STATION INVERT SECT N
3030.46 1318.50 1 .013
ELEMENT NO 27 IS A REACN
lJ/s DATA STATION INVERT SECT N
3110.94 1344.13 1 .013
ELEMENT NO 2H IS A lIALI. ENTRANCE
UIS DATA STATION INVERT SECT FP
3110.94 1344.13 3 .500
ELEMENT NO 2H IS A SYSTEM HEADWORKS
ulS DATA STATION INVERT SECT
3110.94 1344.13 3
PAGE NO
RADIUS ANGU ANG PT MAN H
.000 .000 .000 0
RADIUS ANGU ANG PT MAN H
43.165 60.900 .000 0
RAn IUS ANGU ANG PT MAN H
.000 .000 .000 0
RADIUS ANGU ANG PT MAN H
83.186 -16.000 .000 0
RADIUS ANGU ANG PT MAN H
88.252 -52.250 .000 0
W S ELEV
1344 .13
<uA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
J
I
WARNING NO.2"" - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HOW!CDS, W. S. ELEV _ INV + DC
o W S P G N - CIVILDESIGN Vers 7.1 PAGE
For: RANPAC Inc., T_cula, california - SiN 560
WATER SURFACE PROFILE LISTING O~t.: 5-18-2000 Time: 4:18:
**********.*******............,,***..................**.*****...............**"...................****........**......**.............
I Invert I Depth I Water I Q I Vel Vel I Enerqy I Super I Critical I Flow ToplHeight/lBa"e Wtl tHo Wth
Station I tlev 11FT} I nav I (CFS) I IFPS) Head I Ord.El.1 Elav I Depth I Width lOia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -j- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- J-
L/Elem I Ch Slope I I I I SF Ave I HF 15E Dpth I Froude N I Norm Op I "N" I I ZR I Type Ch
..**.....1........1........1.......""1""""""""..1..............1................1..................1..............1................1................1..............1............1.....1........
I I I I I 1 I 1 I I I I I
1347.10 1292.33 2500 1294830 50.7 1033 1.656 1296.486 .00 2.309 .00 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -!- -1- -1- -1- -1- -1- 1-
328 04 .00500 .015279 5.01 2 50 .000 2 500 .013 .00 PIPE
I 1 I I
167514 1293.97 5872 1299.842 50.7 10.33 1.656 1301.498 .00 2308 .00 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
10.22 .08010 .015279 .16 .00 .000 .156 .013 .00 PIPE
I I I I
1685.36 1294.79 5.304 1300.093 50.7 10.33 1.656 1301.750 .00 2.308 .00 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
HYDRAULIC JUMP
I I I
1695.36 129479 1.179 1295.968 50.7 22.27 7.704 1303.672 250 2308 2.50 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
25.11 .08010 .073618 1.85 2.50 4.111 1.156 .013 .00 PIPE
I 1 1 I
1710.47 1296.80 1.190 1297.990 SO 7 22.01 7.524 1305 514 .00 2.308 2.50 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
8.93 .07995 .071884 .64 1.19 4.039 1.156 .013 .00 PIPE
I I I I
1719.40 1297.51 1.194 1298.709 50.7 21.89 7.439 1306148 .00 2.308 2.50 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
48.90 .07995 .067065 3.28 1.19 4.005 1.156 .013 .00 PIPE
I I I 1
1768.31 1301.42 1.240 1302.664 50.7 20.87 6.763 1309.427 .00 2.309 2.50 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -j- -1- -1- -1- -1- -1- 1-
27.19 .07995 .059060 1.61 1.24 3.731 1.156 .013 .00 PIPE
1 1 1 I
1795.48 1303.60 1.287 1304.884 50.7 19.90 6.149 1311.032 .00 2.308 2.50 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
19.23 .07995 .052039 .95 1.29 3.473 1.156 .013 .00 PIPE
I 1 1 I
1813 72 1305.05 .337 1306392 50 7 18 97 5.589 1311.981 .00 2.308 2.49 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
13 39 .07995 .045896 .61 1.34 3.230 1.156 .013 .00 PIPE
o W S P G N - CIVILDESIGN Vera 7.1 PAGE 2
For: RANPAC Inc., Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date; 5-19-2000 Time; 4;18;
................................................................................................................................................
1 Invert I Depth I Water I Q I Vel Vel 1 Enerqy I SUp8r lCritical1Flow ToplHei9ht/IBaae Wtl IHo Wth
Station I Elev I (FT) 1 Elev I (CFS) I IFPS) Head 1 Grd.El.J Elev I Depth I width 10ia.-FTlor I.O.J ZL IPrs/Pip
-1- -1- -1- -J- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/E1em ICh Slope I I J 1 SF Avel HF ISE DpthlFroude HIHorm Dp I "H" I I ZR lType Ch
................1................1.............1..............1........"...".1"..........1..........1"........1.......1............1...........1..........1.......1.....1.......
I 1 I 1 I 1 1 I 1 I I
1827.11 1306.13 1.389 1307.515 50.7 18.09 5.081 1312.596 .00 2.308 2.48 2.50
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1-
10.32 .07995 .040513 .42 1.39 3.001 1.156 .013
I
42 1306.95
-1- -1-
9.18 .07995
I
444 1308.395
-1- -1-
I
4.6a 1313
-1- -1-
.035814
1837
507 17.25
-1-
I
60 1307.60
-J- -1-
6 63 .07995
I
1.5031309.
-I-
I
.565 1309
-1-
I
4.1991313.307
-1- -1- -1-
.031709 .21
1845
101
-1-
507 16.44
-1-
I
1852231308.13
-1- -1-
5.44 .07995
I
3.919 1313.517
-1- -1- -1-
.028108 .15
'"
-1-
507 15.68
-1-
I
1857.67 1308.57
-1- -1-
.46 .07995
I
.13 1308.93
-1- -1-
365 .07995
I
630 1310.199
-1- -1-
I
3.470 1313
-1- -1-
.024962
50.7 14.95
-1-
I
700 1310
-1-
I
3.1551313
-1- -1-
.022231
1862
507 14.25
-J-
'"
-1-
781
-1-
.08
I
1865 79 1309.22
-1- -1-
2.97 .07995
I
1868.76 1309.46
-1- -1-
2.38 .07995
I
1.776 1310
-1-
I
2.868 1313
-1- -1-
.019864
50 7 13 59
-1-
'"
-1-
."
-1-
.06
I
1.8581311.314
-1- -1-
I
2.607 1313
-1- -1-
.0178a
50.7 12.96
-1-
921
-J-
.0<
I
1871.14 1309
-J-
I
947 1311.594
-1- -1-
'"
-1-
I
2.370 1313
-1-
507 12.36
-1- -1-
65
-J-
014
-I-
."
.00
-I-
.44
2 308
-1-
2.786
2.47
-I-
1.156
.00
-I-
1.50
2.308
-J-
2 582
2.45
-J-
1.156
.00
-1-
1.57
2 308
-I-
2.390
2.42
-J-
1.156
670
-J-
.11
.00
-1-
1.63
2.309
-1-
2.208
2.38
-1-
1.156
.00
-1-
.70
.308
-1-
2 034
2.33
-1-
1.156
.00
-J-
78
2 308
-1-
1.867
2.27
-1-
1.156
.00
-J-
"
2 308
-J-
706
2.18
-J-
1.156
.00
-1-
2.308
-J-
208
-J-
2.50
-I-
.013
2.50
-1-
.013
2.50
-J-
.013
2.S0
-J-
.013
2.50
-1-
.013
2.50
-1-
.013
2.50
-1-
.013
2 SO
-J-
.00
-1-
.00 .00
-I-
.00
.00 .00
-1-
.00
-1-
.00
-1-
.00
.00
-J-
.00
-1-
.00
-J-
.00
-I-
.00
.00
o
1-
PIPE
I
.0
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
.0
zPo
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1.81
.07995
.016080 .03 1.95
'liSP G N - CIVILDESIGN Vera 7.1
For: RANPAC Inc., T_cula, California - SIN 560
WATER SURFACE PROFILE LISTING
o
1.548
1.156 .013 .00 PIPE
PAGE 3
DatAl: 5-18-2000 1'i_: 4:18:
***********"...."."."********"."*,,.............,,*,,.,,*****"...........*******************".""......................."*,,...............
I Invert t Depth I Water I Q I Vel Vel I Energy 1 Su~r lCriticallFlow Top[Heiqht/lBaae Wtl INo Wth
Station I Elev I CFT) I Elev I (eFS) I (FPSJ Head I Grd.!:l. I Elev I Depth I Width IOia.-FTlor 1.0. r ZL IPra/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -[- -1- -1- 1-
L!Elem leh Slope I I I I SF Ave] HF lSI: DpthlFroude NINorm Op I "N" I I ZR lTypC1 eh
....."...1**..."..,........1.****"...1.........1.***".*1********1*********1*******1********1********1*******1*******1*****1*******
1 1 I 1 1 1 I I I I I 1 I
1872.95 1309.79 2.047 1311.838 50.7 11.78 2.155 1313993 .00 .308 1.93 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -l- -1- -1- 1-
1.22 .07995 .014660 .02 2.05 .389 1.156 .013 .00 PIPE
I I I 1
1874.17 1309.89 2.163 1312 052 50 7 11 23 1.959 1314.011 .00 2.308 1.71 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- !-
.52 .07995 .013638 .01 2.16 1.217 1.156 .013 .00 PIPE
I I I 1
1874.69 1309.93 2.308 1312.238 507 10.71 1.780 1314018 .11 2.308 1.33 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
7.70 .00495 .013854 .11 2.41 000 2500 .013 .00 PIPE
I I 1 I
1882.39 1309.97 2.500 1312.468 50.7 10.33 1.656 1314125 2.50 2308 .00 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
65.06 .00495 .014871 .97 2.50 .000 2.500 .013 .00 PIPE
I 1 1 I
1947.45 1310.29 3490 1313.780 50.7 10.33 1.656 1315.436 .00 2.308 .00 2.50 .00 .00 0 .0
-1- -1- -1- -1- -!- -1- -1- -1- -1- -1- -1- -1- -1- 1-
5.85 .00511 .015279 .09 3.49 .000 2.500 .013 .00 PIPE
" ,
1953 30 1310.32 3.549 1313.869 50.7 10.33 1.656 1315.526 .00 2 308 .00 2.50 .00 .00 0 .0
-1- -1- -1- -t- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
JUNCT STR .00801 l...ttJe- "A-I" .013432 .02 3.55 .000 .013 .00 PIPE
1 J I 1 1 I
1954.55 1310.33 4.248 1314.578 44.2 8.99 1.256 1315.834 .00 2.210 .00 2.50 .00 .00 0 .0
-1- -J- -1- -1- -1- -[- -[- -[- -1- -1- -1- -[- -1- [-
105 57 .00493 .011586 1.22 4.25 .000 2.500 .013 .00 PIPE
I 1 1 I
2060 12 1310.85 951 1315.801 44.2 8.99 1.256 1317.057 .00 2.210 .00 2.50 .00 .00 0 .0
-[- -1- -1- -1- -[- -1- -1- -[- -[- -[- -1- -[- -1- 1-
46.14 .00520 .011586 .53 .00 .000 2.500 .013 .00 PIPE
[I 1 I
2106.26 1311.09 5.359 1316.449 44.2 8.99 1.256 1317 705 .00 2.210 .00 2.50 .00 .00 0 .0
-1- -1- -[- -1- -[- -1- -[- -1- -1- -1- -1- -1- -[- 1-
132.08 .00500 .011586 1.53 .00 .000 2 500 .013 .00 PIPE
o W S P G N - CIVILOESIGN Vera 7.1 PAGE
For; RANPAC Inc., Ternecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-18-2000 Time: 4:18:
**************.....*.*.**.........................................................................................................
1 Invert 1 Depth I Water 1 Q 1 Vel Vel 1 Energy 1 Super ICritical[Flow ToplHeiqht/1Base Wtl INo Wth
Station I Uev I (FT) I Elev 1 {CFSJ I (FPS) Head 1 Grd.El.1 Elev 1 Depth I Width IOia.-FTlor 1.0.1 ZL lPn/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/E1em I Ch Slope J I I 1 SF Ave I HF I SE Dpth I Froude N I Norm Dp I "N" I I ZR I Type Ch
.****..**1**......,........1.........1.........1....***1********1*********1*******1********1********1*******1**.."'..1"'.***1*******
,
2238341311.75
-1- -1-
JUNCT STR .01001
,
2240.34 1311.77
-I- -1-
12.41 .00402
,
2252.75 1311.82
-1- -1-
1404 .00499
,
6.4561318.206
-1- -1-
1..1r-lE:, "A-?"
, 7,
7.1791318.949
-I- -I-
,
220 1319.039
-1- -1-
,
2266 79 1311.89 7.362 1319.252
-1- -1- -1- -1-
JUNCT STR .00863 WNt;. fIA-2"
I 1 I 1
2267.95 1311.90 7.790 1319.690
-1- -1- -1- -1-
20.14 .00496
,
2288.09 1312.00
-1- -1-
272.16 .00503
,
2560 25 1313.37
-1- -1-
59 61 .00487
,
2619 86 1313.66
-1- -1-
102.68 .00497
,
2722.54 1314.17
-1- -1-
,
7.859 1319 859
-1- -1-
,
.780 1321.150
-1- -1-
,
.834 1321.494
-1- -1-
,
899 1322.069
-1- -1-
44 .2
-,-
,
8.99 1.256 1319.462
-1- -1- -1-
.009419 .02
,
7.12 .786 1319.736
-I- -I- -I-
.007252 .09
,
7.12 .786 1319.826
-1- -1- -1-
.007252 .10
,
.12 .786 1320
-1- -1-
.005998
34.9
-I-
34.9
-,-
34.9
-I-
28.3
-,-
,
5.76 .514 1320
-1- -1-
.004744
2B.3
-I-
,
576 .514 1320.373
-[- -1- -1-
.004744 1.29
"3
-I-
,
5 76 .514 1321
-1- -1-
.004744
28.3
-I-
,
5.76 .514 1322
-1- -1-
.004744
28.3
-I-
,
5 76 .514 1322.583
-1- -1- -1-
OJ,
-I-
.01
205
-,-
.10
00'
-I-
..,
.00
-I-
6.46
.00
-I-
7.18
.00
-,-
7.86
'"
-I-
."
.00
-I-
.00
.00
-I-
.00
.00
-I-
.00
.00
-I-
.00
.00
-I-
.00
.00
-,-
2.210
-,-
.000
2 007
-I-
.000
2.007
-I-
.000
2.007
-I-
.000
.812
-,-
.000
1.812
-I-
.000
1.812
-I-
.000
Bl2
-I-
.000
Bl2
-,-
.00
-,-
2.50
-,-
.013
.00
-I-
2 500
2.50
-I-
.013
.00
-,-
2.500
2.50
-I-
.013
.00
-,-
2.50
-,-
.013
.00
-,-
2.000
2.50
-,-
.013
.00
-,-
1.986
2.50
-,-
.013
.00
-I-
2.021
2.50
-I-
.013
.00
-I-
2 000
2.50
-I-
.013
.00
-,-
2.50
-I-
.00 .00
-I-
.00
o
,-
PIPE
,
.0
.00 .00
-I-
.00
o
1-
PIPE
,
.0
.00 .00
-I-
o
,-
pm
,
.0
.00
.00 .00
-,-
.00
o
,-
PIPE
,
.0
.00 .00
-,-
.00
o
,-
PIPE
,
.0
.00 .00
-,-
.00
o
,-
PIPE
,
.0
.00 .00
-I-
.00
o
,-
pm
,
.0
.00 .00
-,-
o
,-
PIPE
,
.0
.00
.00 .00
-I-
o
,-
.0
tp1.
I
I
I
I
I
I
I
I.
I
I
I
I
I
I
I
I
I
I
I
74.36
.00499
o
.004744 .35 7.90
W S P G N - CrvlLOESIGN Vera 7.1
For: RANPAC Inc., T8lMlcula, California - SIN 560
WATER SURFACE PROFILE LISTING
,000
1.998 .013 .00 PIPE
PAGE
Date: 5-18-2000 Time: 4:18:
..."'..........-.."'.."''''''''''.-.-..''''''''''''.'''.'''..'''.''''''.......'''''''''."'''''''........................................................*********........
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeiqht/tBasB Wtl tHo Wth
Shtion I Elev 11FT} I &lev I (CFS) I (FPS) H.ad. I Grd.El.l Elev I Oepth I Width IOia.-FTlor 1.0.1 ZL lPn/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -j- -1- -j- -1- 1-
L/Elem ICh Slope I I I I SF Ave I HF 1St DpthjFrouo:te N1Norm Op I "N" I I ZR IType en
.........1........1......**1.........1.........1*.*****1********1*********1*******1********1********1*******1*******1*****1*******
I
2H6.90 1314.54
-1- -1-
49.75 .00502
I
2846651314.79
-1- -1-
95 24 .00504
I
7 882 1322
-1-
422
-I-
I
7.929 1322.719
-1- -1-
I
2941.89 1315.27 7.901 1323.171
-1- -1- -1- -1-
JUNeT OTR ....00 l-Il'if 4p,.~tt'
I I J I
2943.38 1315.27 8 028 1323.298
-1- -1- -1- -1-
13.97 .00501
I
2957.35 1315.34
-1- -1-
45.88 .00501
I
3003.23 1315.57
-1- -1-
4.00 .21503
I
3007.231316.43
-1- -1-
22.36 .08911
I
3029.59 1318.42
-1- -1-
HYDRAULIC JUMP
I
3029.59 1318 42
-1- -1-
.87 .08911
o
I
8.016 1323.356
-1- -1-
I
8 050 1323.620
-1- -1-
I
7.207 1323.637
-1- -1-
I
5 343 1323.765
-1- -I-
I
.593 1319.015
-1- -1-
For; RANPAC Inc.,
283
-I-
I
5 76 .514 1322
-1- -1-
.004744
I
28.3 5 76 .514 1323.233
-1- -1- -1- -1-
.004744 .45
28.3
-1-
26 4
-I-
I
.514 1323
-1- -1-
.004443
5.76
685
-I-
..,
I
.449 1323.747
-1- -1- -1-
.004143 .06
sse
I
26 4 5 38 .449 1323.805
-1- -1- -1- -1-
.004143 .19
936
-1-
.24
...
-I-
...
1.812
-1-
.000
1.812
-I-
.000
1.812
-I-
.000
1.751
-I-
.000
1.751
-I-
.000
1.751
-I-
.000
1.751
-1-
.000
1.751
-1-
1.751
-I-
8.067
...
-I-
.988
...
-1-
1.985
...
-I-
1.871
...
-I-
.870
...
-I-
.629
...
-I-
.788
2.50
-1-
.013
2.50
-I-
.013
...
-1-
2.50
-I-
.013
.00 .00
-I-
...
.00 .00
-I-
.00 .00
-I-
.00 .00
-I-
.00 .00
-1-
.00 .00
-I-
...
.00 .00
-I-
...
.
1-
PIPE
I
..
2.50
-I-
.013
2.50
-I-
.013
2.50
-I-
.013
2.50
-I-
.013
2.50
-1-
.013
.00 .00 0
-1- 1-
.00 PIPE
PAGE
...
.
1-
PIPE
I
..
26.4
-I-
I
5 38 .449 1324
-1- -1-
.004143
.069
-1-
..2
I
26 4 5 38 .449 1324.086
-1- -1- -1- -1-
.004143 .09
...
-I-
793
...
-1-
7.90
...
-1-
8.03
...
-I-
...
...
-1-
8.05
I
26.4 5.38 .449 1324.214 .00
-1- -1- -1- -1- -1-
...
-I-
...
26.4 29.63
-1-
...
.
1-
PIPE
I
..
...
.
1-
PIPE
I
..
I
13.632 1332.647
-1- -1- -1-
.274136 .24
W S P G N - CIVlLOESIGN Vera 7.1
Tamecu1a, California - SIN 560
WATER SURFACE PROFILE LISTING
.70
-I-
1.29
...
.
1-
PIPE
I
..
.
1-
PIPE
I
..
.
1-
PIPE
I
..
.00 2.50 .00 .00 0
-1- -1- -1- 1-
2.14
-I-
.570
2.17
-I-
.570
2.19
-I-
.570
2.22
-1-
.570
2.24
-1-
.570
2.26
-1-
.570
2.29
-I-
.570
2.31
-1-
2.50
-1-
.013
2.50
-1-
.013
2.50
-I-
.013
2.50
-1-
.013
2.50
-I-
.013
2.50
-I-
.013
2.50
-1-
.013
2.50
-1-
...
-1-
.00 .00
-1-
...
-I-
...
-I-
.00 .00
-I-
.00 .00
-I-
...
...
-1-
...
-1-
..
..
Date: 5-18-2000 Time: 4:18:
6
**********************************************************************************************************************************
I
.607 1324
-I-
.862
-I-
1 Invert I Depth 1 Water I Q I Vel Vel 1 Energy 1 Super ICritica11F1ow ToplHeiqht/lBase Wtl INO Wth
Station t E1ev 11FT) 1 Elev I (CFS) I {FPS} Head 1 Grd.E1.[ E1ev [Depth [Width IDia.-FTlor 1.0.1 ZL lPn/Pip
-1- -1- -1- -1- -1- -1- -!- -1- -1- -[- -[- -1- -1- 1-
L/Elem [Ch Slope I I I , SF Ave I HF I SE Opth I Froude N I Norm Op 1 "N" 1 [ZR t Type Ch
*********[********1********1*********1*********1*******1********1*********1*******1********1********1*******1*******1*****1*******
1 I 1 1 1 1 I I I I I
3030 46 1318.50 .591 1319091 264 2979 13.778 1332.869 .66 1.751 2.12 2.50 .00 .00
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1-
18 07 .31846 .261812 4.73 25 8.127 .570 .013
I
304853 1324.25
-1- -1-
13.15 .31846
I
3061.681328.44
-1- -1-
8.92 .31846
I
3070.60 1331.28
-1- -1-
6.62 .31846
I
3077 22 1333.39
-1- -1-
5.19 .31846
I
3082.41 1335.05
-1- -1-
4.20 .31846
I
3086.62 1336.38
-1- -1-
348 .31846
I
3090 09 1337.49
-1- -1-
2.93 .31846
3093
I
02 1338
-I-
I
.6281329
-I-
'69
-I-
I
.649 1331.932
-1- -1-
I
.672 1334
-1-
.064
-I-
I
.695 1335.741
-1- -I-
I
.719 1337.103
-1- -1-
I
.744 1338.235
-1- -J-
42
-I-
I
.770 1339.194
-1- -1-
264 2865
-I-
264 27.32
-I-
26.4 26.04
-1-
264 24.83
-I-
26.4 23.68
-I-
26.4 22 58
-1-
264 21.52
-I-
I
12.7451337.607
-1- -1- -1-
.231921 3.05
I
11.5861340.655
-1- -1- -1-
.202790 1.81
I
10.533 1342.465
-1- -1- -1-
.177376 1.17
I
9.5751343
-1- -1-
.155218
E4'
-I-
.01
I
8.705 1344
-1- -1-
.135795
.446
-1-
.57
I
7.9141345.016
-1- -1- -1-
.118840 .41
I
7.1941345.429
-J- -)- -)-
.104031 .30
264 20.52
-1- -1-
I
6.540 1345.734
-1- -1-
.62
-I-
1.23
.57
-I-
1.20
.52
-1-
1.17
.48
-1-
1.15
.44
-1-
1.14
.41
-I-
1.13
.37
-I-
1.12
.34
-I-
7Sl
-I-
701
1.751
-1-
7.211
1.751
-1-
6.750
1.751
-1-
6.319
1.751
-I-
5.914
7Sl
-I-
S 535
7Sl
-I-
5.179
1.751
-I-
2.13
-1-
.788
...
.
1-
PIPE
I
..
...
.00
.
1-
PIPE
I
..
...
.
1-
PIPE
I
..
...
...
.
1-
PIPE
I
..
...
...
.
1-
PIPE
I
..
...
.
1-
PIPE
I
..
.
1-
PIPE
I
..
...
...
.
1-
PIPE
I
..
...
.
1-
..
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
2.50
.31846
o
,091089 .23 1.11
W S P G N - CrvILDESIGN Vera 7.1
For: RANPAC Inc., Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING
4.845
.570 .013 .00 PIPE
PAGE ,
Date: 5-19-2000 Time: 4:18:
.............**************.*******.*******.........*.***.***.*****.....***..........********..........***........***............**..
I Invert I Depth t Water I Q I Vel Vel I Energy t Super ICriticaltFlow ToplHeiqht/18as8 Wt! IRa wth
Station I Elev 1 IFTI I Uev 1 (CFS) I (FPS) Head r Grd.El.1 Elev I Depth I Width fDia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -[- -1- -1- 1-
L/Elem len Sloper I I I SF Avel HF ISE OpthlFroude NINorm Op I "N" 1 I ZR IType eh
...*****.1.******.1...***.*1*****....1.....****1..............1................1..................1..............1................1................1..............1..............1.........1...........
1 I I I I I I I 1 I
3095.52 1339.22 .797 1340.016 264 1957 5.946 1345.962 .31 1.751 2.33 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -J- -J- -1- -1- -1- -j- -1- -J- 1-
2 15 .31846 .079774 .17 loll .532 .570 .013 .00 PIPE
I I 1 1
3097 67 1339.90 .825 1340 728 26.4 18.66 5.405 1346 133 .29 .751 2.35 2.50 .00 .00 0 .0
-1- -J- -1- -1- -1- -1- -1- -1- -1- -1- -1- -j- -1- t-
1.86 .31846 .069907 .13 1.11 238 .570 .013 .00 PIPE
I I I I
3099.52 1340.49 .855 1341.349 26.4 17.79 4.914 1346263 .26 1.751 2.37 2.50 .00 .00 0 .0
-j- -1- -1- -1- -1- -1- -1- -J- -1- -J- -1- -1- -1- 1-
1.62 .31846 .061274 .10 1.12 3.963 .570 .013 .00 PIPE
I I J I
3101.14 1341.01 .885 1341.895 264 1696 4.467 1346.362 .24 751 2.39 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.41 .31846 .053709 .08 .13 3 705 .570 .013 .00 PIPE
I I I I
3102.55 1341.46 .917 1342.377 264 16 17 4.061 1346.438 .22 751 2.41 2.50 .00 .00 0 .0
-1- -!- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
24 .31846 .047104 .06 14 3.462 .570 .013 .00 PIPE
I I I I
3103.79 1341.85 .950 1342.804 26 4 15 42 3.692 1346 496 .20 1.751 2.43 2.50 .00 .00 0 .0
-J- -1- -1- -J- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1.09 .31846 .041315 .04 .15 3 235 .570 .013 .00 PIPE
1 I I I
3104.88 1342.20 .984 1343.185 26.4 14.70 3.356 1346.541 .19 .751 2.44 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -J- 1-
.9S .31846 .036252 .03 1.17 3.022 .570 .013 .00 PIPE
I I I I
3105.84 1342.50 1.020 1343 525 26 4 14.02 3.051 1346 576 .17 751 2.46 2.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -J- -1- -1- -1- -J- -1- -1- j-
.84 .31846 .031824 .03 19 2 822 .570 .013 .00 PIPE
1 J I 1
310667 1342.77 1.057 1343829 26.4 13.36 2.774 1346.602 .16 .751 2.47 2.50 .00 .00 0 .0
-1- -1- -1- -J- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.73 .31846 .027947 .02 1.21 2.634 .570 .013 .00 PIPE
o W S P G N - CIVILDESIGN Vers 7.1 PAGE 8
For: RANPAC Inc. Temecula, California - S/N 560
WATER SURFACE PROFILE LISTING Date: 5-18-2000 Time: 4:18:
.............................................................................................................................................
I Invert I Depth I Water I Q , Vel Vel J Enerqy J Super ICritica1lFlow TopJHeiqht/lBa.se Wtt jNo Wth
Station I Elev 11FT) I Elev J (CFS) I (FPS) Head j Grd.El.1 Elev 1 Depth 1 Width 10ia.-FTlor 1.0.1 ZL lPrlll/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -J- -1- -1- 1-
L/E18l'l1 ICh Slope I I I I SF Avel HF ISE OpthlFroude NINorm Op I "N" J I ZR IType Ch
................1.............1...........1.........1.........1..........1.............1.........1.......1.............1........1.......,.........1..........1............
I
3107.41 1343.01
-1- -1-
.64 .31846
I
3108 05 1343.21
-1- -1-
.56 .31846
1
3108.61 1343.39
-1- -1-
.48 .31846
I
3109 09 1343.54
-1- -1-
.42 .31846
I
3109.51 1343.67
-1- -1-
.35 .31846
I
3109.861343.79
-1- -j-
.30 .31846
I
3110.16 1343.88
-J- -1-
.25 .31846
I
3110.41 1343.96
-1- -J-
.20 .31846
I
3110.60134402
-1- -1-
I
1.0961344.101
-1- -1-
I
1.137 1344.346
-1- -1-
1
1.179 1344.567
-1- -1-
I
224 1344.766
-J- -1-
I
1.270 1344.945
-1- -I-
I
.319 1345 106
-1- -I-
I
.371 1345 253
-1- -1-
I
.4251345385
-1- -1-
I
1.482 1345.504
-1- -1-
I
26 4 12 74 2.521 1346
-1- -1- -1-
.024561
'"
-I-
.02
I
2.292 1346.639
-1- -1- -1-
.021592 .01
26.4 12.15
-1-
1
26.4 11.58 2.084 1346
-1- -1- -1-
.018994
651
-I-
.01
I
264 11 05 1.8941346
-1- -1- -1-
.016720
."
-I-
.01
I
26 4 10.53 1.722 1346.667
-1- -1- -1- -1-
.014726 .01
I
26 4 10 04 1.566 1346.672
-1- -1- -1- -1-
.012986 .00
26 .
-I-
I
57 1.423 1346
-1- -1-
.011463
".
-1-
.00
26.
-I-
I
9.13 1.294 1346
-1- -1-
.010126
'"
-I-
.00
1
26 4 8 70 1.176 1346.681
-!- -1- -1- -1-
.n
-I-
1.27
.12
-1-
1.30
.11
-1-
1.33
.10
-I-
.J;
.0'
-1-
.41
.08
-I-
.45
.07
-1-
1.50
.0;
-1-
.14
-I-
24
.751
-I-
2457
2.48
-I-
.570
2.50
-I-
.013
m
-1-
2.292
2.49
-I-
.570
2.50
-I-
.013
.751
-I-
2 137
2.50
-1-
.570
2.50
-1-
.013
m
-I-
'"
2.50
-I-
.570
2.50
-I-
.013
.751
-I-
.853
2.50
-I-
.570
2.50
-I-
.013
.751
-I-
. 724
2.50
-1-
.570
2.50
-I-
.013
.751
-1-
1.603
2.49
-I-
.570
2.50
-1-
.013
1.751
-I-
1.489
2.48
-I-
.570
2.50
-1-
.013
m
-1-
2.46
-1-
2.50
-I-
.00 .00
-1-
.00
o
1-
PIPE
I
.0
.00 .00
-1-
.00
o
1-
pm
1
.0
.00 .00
-I-
.00
o
1-
pm
I
.0
.00 .00
-1-
.00
o
1-
PIPE
I
.0
.00 .00
-1-
.00
o
1-
PIPE
I
.0
.00 .00
-I-
.00
o
1-
pm
I
.0
.00 .00
-1-
.00
o
1-
PIPE
I
.0
.00 .00
-I-
.00
o
1-
PIPE
I
.0
.00 .00
-I-
o
1-
.0
<vA
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.15
.31846
.008959 .00
w S P G N - CIVILDESIGN Ven
Temeeula, California - SIN
WATER SURFACE PROFILE
1.55
1.380
.570
.013
.00 PIPE
PAC<
,
o
7.1
'60
LISTING
For: RANPAC Inc.,
Oat.: 5-18-2000
Time: 4;18:
********"".,,,..........................................................................................****......**...................
1 Invert I Depth I Water I Q I V.l V.l I Energy I Super ICritiealtFlow ToplHeiqht/IBase Wtt INo Wth
Station I Elev I (FT) I El~ 1 (CFS) 1 IFPS) Head I Grd.E1.1 Elev I Depth I Width IDia.-FTlor I.D.! 'L I Prs/Pip
-I- -1- -I- -I- -I- -I- -I- -1- -I- -I- -1- -1- -I- I-
L/E1em teh Slope I I I I SF Ave I HF IS' Dpth 1 Froude N I Norm Dp I "N" I I ,. IType eh
...***.**1*****.."1******..1.**......1.........1.......1**......1.......**1**.****1........1........1.**....1.......1.....1.......
I I 1
3110.15 1344.01 1.543 1345 613 2E . . 30 1.069 1346.682 .0' 1.751 2.43 2.50 .00 .00 0 .0
-I- -I- -I- -I- -I- -I- -1- -I- -I- -1- -1- -I- -I- I-
.11 .31846 .007939 .00 .'0 .278 .570 .013 .00 PIPE
I I I I
3110 86 1344 .10 '07 1345.711 2E . " .972 1346.683 .0' m 2.40 2.50 .00 .00 0 .0
-1- -1- -I- -I- -1- -I- -1- -1- -I- -1- -I- -1- -I- 1-
.0' .31846 .007047 .00 1.66 1.182 .570 .013 .00 PIPE
I I 1 I
3110 " 1344 .12 67' 1345 BOO 2E . 7.54 .884 1346 '83 .05 1.751 2.35 2.50 .00 .00 0 .0
-I- -1- -I- -1- -I- -I- -I- -I- -1- -I- -1- -1- -I- I-
.02 .31846 .006267 .00 1.72 1.090 .570 .013 .00 PIPE
I 1 I I
3110.94 1344 .13 .751 1345.881 26.4 7.19 .802 1346 683 .04 m , " 2.50 .00 .00 0 .0
-I- -I- -1- -I- -I- -I- -I- -1- -I- -I- -I- -1- -I- 1-
,AU. ENTRANCE
I I I
3110.94 1344.13 , 474 1346 60. 26.4 4.23 .278 1346.882 .01 1.659 , " 3 00 .00 .00 0 .0
-I- -I- -1- -I- -I- -I- -1- -I- -I- -1- -I- -I- -I- 1-
0
~\,o
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD
CODE
w S P G 101
WATER SURFACE
HEIGHT 1 BlI.SE
DIAMETER WIDTH
- EDIT LISTING - Version 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR INV 'ill) Yl21 Y(3) Y(41
DROP
Oate: 5-19-2000 Time: 9:32:33
PAC>: 1
Y(S) Y(6) 't(7) YISl V(91 YUO)
SECT
NO
CHN NO OF AVE PIER
TYPE PIER/PIP WIDTH
CO 1 4 0 1.50
CO , , 0 .00 11.00 7.00 .00 .00 .00
0 WSPGN PAGE NO
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING LINE NO IS
LINE "A-I"
HEADING LINE NO , IS
HEADING LINE NO , IS b\J.S.E +=1~DI'-1
0 WSPGN l-IN E- "A" PAGE NO ,
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO I IS A sYSTEM OUTLET .
u/S DATA STATION INVERT SECT W S ELEV
1001.77 1312.75 1 1314.58
ELEMENT NO , IS A REACH .
u/S DATA STATION INVERT SECT N RADIUS ANCLE ANG PT MAN H
1006.34 1319.16 1 .013 .000 .000 .000 0
ELEMENT NO , IS A WALL ENTRANCE
U/S DATA STATION INVERT SECT FP
1006.34 1319.16 , .500
ELEMENT NO 4 IS A SYSTEM HEADWORKS
U!S DATA STATION INVERT SECT W S ELEV
1006.34 1319.16 , 1319.16
1.,~
I
I
WARNING NO. 2 ** - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN KOWJ<DS, W. S. ELEV _ INV + DC
o W S P G N - CIVILDESIGN Vera 7.1 PAGE
For: RANPAC Inc., T81118cula, California - SIN 560
WATER SURFACE PROFILE LISTING Oat.: 5-19-2000 Time: 9:32:39
I
LINE "A-l"
I
."''''.......****.....**..*****..************..***.**************...**...***.****.......**.............***...........................
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeiqht/IBase Ntl rNo Wth
Station I Elev I (FT) I Elev I (CFS) f (FPS) Head I Grd.El.1 Elev I Depth I Width IDia.-FTlor 1.0.1 ZL IPr8/Pip
-1- -1- -1- -1- -1- -1- -1- -l- -1- -1- -1- -1- -1- 1-
L/Elem I ell. Slope I I I I SF Ave I HF I BE Opth t Froude N' Norm Op I "N" I I ZR I Type ell.
.........].......*1........1*********1*********1*******1********1*********1*******1********1********1.......1....**.1.....1.......
I
I I
1001.77 1312.75
-1- -1-
.50 1.40263
I
1002.27 1313.45
-1- -J-
.48 1.40263
I
1002.75 1314.13
-1- -1-
.43 1.40263
I
1003 18 1314.73
-1- -1-
.38 1.40263
I
1003.56 1315.27
-1- -J-
.34 1.40263
I
1003 91 1315.75
-1- -1-
.301.40263
I
1004.21 1316.17
-1- -1-
.271.40263
I
1004.48 1316.55
-1- -1-
.24 1.40263
I
1004.73 1316.90
-1- -1-
.22 1.40263
I
I
I
I
I
o
I
I
.4421313.192
-1- -1-
I
.4561313908
-1- -1-
I
.472 1314.602
-1- -f-
I
.488 1315.221
-1- -I-
I
.506 1315.774
-1- -1-
I
.524 1316 270
-1- -1-
I
.542 1316 716
-1- -I-
I
.562 1317.111
-1- -1-
I
.5821317.478
-1- -1-
For: RANPAC Inc.,
LINE "A-I"
I
9.4 21.62 7.257 1320
-1- -1- -1-
.210915
...
-1-
.11
.00
-I-
...
.185
-1-
6 757
1.37
-1-
.279
1.38
-I-
.279
1.39
-1-
.279
1.41
-I-
.279
1.42
-1-
.279
1.43
-I-
.279
1.44
-I-
.279
1.45
-1-
.279
1.46
-I-
.279
1.50
-1-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
.00 .00
-I-
.00
.00 .00
-1-
.00 .00
-1-
.00
.00 .00
-1-
.00 .00
-I-
.00 .00
-I-
.00 .00
-I-
.00 .00
-1-
.00
.00 .00 0
-1- f-
.00 PIPE
PAGE
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
I
9.4 20 68 6.641 1320.550
-J- -1- -1- -J-
.185546 .09
I
9.4 19.72 6.037 1320
-f- -1- -1-
.162422
I
9.4 18.80 5.488 1320
-1- -1- -1-
.142280
639
-I-
.07
'00
-1-
.05
.00
-I-
.46
185
-I-
6.350
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
I
9.4 1793 4.989 1320.763
-1- -1- -1- -J-
.124746 .04
I
9.4 17.09 4.536 1320.806
-1- -1- -1- -1-
.109289 .03
I
94 16 30 4.124 1320.839
-1- -1- -1- -1-
.095804 .03
I
9.4 15.54 3.749 1320
-1- -1- -1-
.084046
86'
-1-
.02
.00
-1-
.47
1.185
-1-
5.940
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
I
3.408 1320.886
-1- -1- -1-
.073721 .02
w 5 P G N - CIVILOESIGN Vera 7.1
T8IlI8cu1a, California - SIN 560
WATER SURFACE PROFILE LISTING
94 1481
-1-
.00
-I-
...
1.185
-1-
5.555
.00
o
1-
PIPE
I
.0
o
1-
PIPE
I
.0
.00
-I-
.51
185
-I-
S 195
.0
Date: 5-19-2000 Time: 9:32 39
2
..........................................................................................................................*........
.00
-1-
.52
1.185
-1-
.857
I
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeiqht/IBase Wtl INo Wth
Station f E1ev I (FT) I Elev I (CFSI I (FPSI Head I Grd.El.1 Elev I Depth I Width IDia.-FTlor 1.0.1 ZL IPre/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- J-
L/E1em ICh Slope I J I I SF Ave I HF ISE opthlFroude NINorm Dp I "N" I 1 ZR]Type Ch
.........I........I........J.........I.........I.......1........1.........1.......1....*..*1........1.......1.......1.....'.......
I
I
1004.94 1317.20
-1- -J-
.19 1.40263
I
1005.14 1317.47
-1- -1-
.17 1.40263
I
1005.31 1317.72
-1- -1-
.15 1.40263
I
1005.46 1317.93
-1- -1-
.14 1.40263
I
1005601318.12
-f- -1-
.12 1.40263
I
1005 72 1318.30
-1- -1-
.11 1.40263
I
1005 83 1318.45
-1- -1-
.09 1.40263
I
1005 93 1318.58
-!- -t-
.081.40263
I
1006.01 1318 70
-1- -1-
I
I
I
I
I
I
I
.603 1311
-I-
I
.625 1318
-I-
80.
-I-
00.
-I-
I
.648 1318.364
-1- -1-
I
.6721318.604
-1- -1-
I
.697 1318 822
-1- -1-
I
.723 1319 019
-1- -1-
I
.151 1319 197
-1- -1-
I
.780 1319359
-1- -1-
I
.810 1319 506
-1- -1-
I
3.098 1320.902
-1- -1- -1-
.064702 .01
9.4 14.13
-I-
I
2.816 1320.914
-1- -1- -1-
.056816 .01
9 4 13.47
-I-
9.4 1284
-I-
I
2.5601320.924
-1- -1- -1-
.049916 .01
I
4 12.24 2.328 1320
-1- -1- -1-
.043874
I
4 11.67 2.116 1320
-1- -1- -1-
.038581
."
-1-
.01
."
-I-
.00
I
9 4 11 13 1.924 1320.942
-1- -1- -1- -1-
.033958 .00
I
94 1061 1.749 1320
-1- -J- -J-
.029919
I
9.4 10 12 1.590 1320
-f- -1- -1-
.026370
.46
-1-
.00
".
-1-
.00
I
9 4 9.65 1.445 1320.951
-1- -1- -1- -1-
.00
-I-
.54
.185
-I-
.539
.00
-1-
.56
1.185
-1-
242
.00
-I-
.58
185
-I-
3.963
.00
-I-
.60
185
-1-
3 701
.00
-I-
..3
1.185
-I-
3.455
.00
-I-
.65
1.185
-I-
3 224
.00
-1-
.67
.185
-I-
3 008
.00
-1-
.70
1.185
-1-
2.804
.00
-I-
.72
1.185
-1-
2.613
.00
-I-
.7S
1.185
-1-
2.434
.00
-I-
.78
1.185
-1-
2.265
.00
-I-
1.185
-I-
1.47
-1-
.279
1.48
-I-
.279
1.49
-1-
.279
1.49
-I-
.279
1.50
-1-
.279
1.50
-I-
.279
1.50
-1-
.279
1.50
-1-
.279
1.50
-I-
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
.SO
-I-
.00 .00
-I-
.00
.00 .00
-I-
.00 .00
-1-
.00 .00
-1-
.00
.00 .00
-1-
.00 .00
-I-
.00 .00
-1-
.00 .00
-1-
.00 .00
-I-
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
o
1-
.0
-z.\~
I
I
I
.0' 1.40263 .023262 .00 ." 2.106 .279 .013 .00 PIPE
0 WSPGN - CIVILDESIGN VerB U PAGE 3
For: RANPAC Inc. , Temecula, California - sl. 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 9:32 "
LINE "A-I"
**************'**************......****..******.**..****..*******.********************.***...*****........*.........**............****.
I Invert I Depth I Water I Q I vol Vol I Enerqy I Super ICriticall Flow Top!Height/ I Bue loft I tHo Wth
Stati.on I Elev I (FT) I Elev I (CFSI I (FPS) Head I Grd.E1.1 Elev I Depth I Width IOia.-FTlor 1.0.1 ZL lPn/Pip
-1- -1- -!- -!- -1- -1- -1- -1- -1- -1- -1- -!- -I- I-
L/El... leh Slope I I I I SF Ave! HF '"' OpthlFroucie NINonn Dp I "N" I I ZR I Type Ch
....**...1........1...*****1.**.**..*1.....**.*1*****.*I........I.........,....**.I******.*l********I..*****1***...*1*****1*******
I I I I I I I
1006.08 1318.80 .842 1319.639 ... 9.20 1.314 1320.953 .00 1.185 1.49 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -I- -I- I-
.06 1.40263 .020549 .00 .84 1.957 .279 .013 .00 PIPE
I I I I
1006 14 1318.88 .876 1319 "0 . . , " 1.194 1320.954 .00 1.18S 1.48 1.50 .00 .00 0 .0
-1- -1- -1- -1- -!- -1- -1- -!- -1- -1- -1- -1- -I- 1-
.05 1.40263 .018169 .00 .BB 1.815 .279 .013 .00 PIPE
I I I I
1006 20 1318.96 .911 1319 '59 ... 8.36 1.086 1320.955 .00 1.185 1.46 1.50 .00 .00 0 .0
-1- -1- -1- -1- -I- -I- -1- -!- -1- -1- -1- -1- -I- I-
.04 1.40263 .016086 .00 .., 1.682 .279 .013 .00 PIPE
I I I I
1006.24 1319.02 .949 1319. .59 ... 7.97 .9B7 1320.956 .00 1.185 1.45 1.50 .00 .00 0 .0
-1- -!- -!- -1- -1- -1- -1- -1- -1- -1- -I- -1- -I- 1-
.0' 1.40263 .014270 .00 .95 556 .279 .013 .00 PIPE
I I I I
1006.28 1319.07 .989 1320 059 . . , 60 .897 1320 ." .00 185 1.42 1.50 .00 .00 0 .0
-1- -1- -1- -1- -!- -1- -1- -1- -1- -1- -1- -1- -I- I-
.03 1.40263 .012684 .00 ... .437 .279 .013 .00 PIPE
I I I I
1006 30 1319.11 1.032 1320. 141 . . 7.25 .B16 1320 '" .00 .185 1.39 1.50 .00 .00 0 .0
-1- -I- -1- -1- -1- -1- -1- -1- -1- -1- -I- -I- -I- I-
.02 1.40263 .011303 .00 03 322 .279 .013 .00 PIPE
I I I I
1006 32 1319.14 .078 1320 2IS . . 6 9I .742 1320 '" .00 1.185 1.35 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -I- I-
.01 1.40263 .010105 .00 1.08 1.213 .279 .013 .00 PIPE
I I I I
1006.34 1319.15 128 1320 283 ... 59 .674 1320 957 .00 1.185 1.30 1.50 .00 .00 0 .0
-!- -1- -1- -1- -1- -1- -1- -1- -1- -I- -1- -1- -I- I-
.00 1.40263 .009073 .00 1.13 1.107 .279 .013 .00 PIPE
I I I I
1006 34 1319.16 1.185 1320 345 . . 6.28 .612 1320.957 .00 .185 1.22 1.50 .00 .00 0 .0
-I- -1- -!- -1- -1- -1- -1- -1- -!- -1- -1- -!- -I- I-
WALL ENTRANCE
0 W S P G . - CIVILDESIGN Vera U PAGE
For: RANPAC Inc:. Temec:ula, California - sl. 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 9:32 39
LINE "A-I"
I
I
I
I
I
I
I
I
**********************************************************************************************************************************
I
1 Invert 1 Oepth I Water 1 Q 1 Vel Vel 1 Energy 1 Super ICritic:allFlow ToplHeiqht/lBase Wtl IHo Wth
Station 1 Elev 1 (FT) 1 Elev 1 (CFS) 1 (FPSI Head 1 Grd.E1.1 Elev J Oepth 1 Width 10ia.-FTlor 1.0.1 ZL rPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -J- -1- 1-
L/Elem 1 Ch Slope 1 1 J 1 SF Ave 1 HF J SE Dpth 1 Froude N 1 Norm Dp 1 "N" 1 1 ZR r Type Ch
*********I********I********I*********J*********I*******1********1*********1*******1********1********1*******1*******1*****1*******
1 1 1 1 1 1 I 1 1
1006 34 1319 16 2 231 1321 391 9 4 .60 .006 1321.397 .00 .383 00 11.00 7.00 .00 0 .0
-1- -)- -1- -1- -1- -1- -J- -f- -1- -1- -1- -1- -1- 1-
I
o
I
I
I
I
I
I
1,.\~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CAAC
CODE
SECT CRN NO OF AVE PIER
NO TYPE PIER/PIP WIDTH
WSPGN
WATER SURFACE
HEIGHT 1 B1>.SE
DIAMETER WIOTH
_ EDIT LISTING - Version 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR INV 'ill) Y(2) 'i(3) Y(4)
DROP
Date: 5-21-2000 Time: 5:45 32
PAGE 1
Y(5) YIS} Y(7) YjBl '{(g) 'i(IOl
CD 1 4 D 1.50
CD 2 3 0 .00 10.00 7.00 .00 .00 .00
0 W S P G N
WATER SURF"'" PROFILE - TITLE CARD LISTING
HEADING L1NE NO 1 15
LINE "A-2"
HEADING LINE NO 2 15
HEADING LINE NO 3 IS
0 WSPGN
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO I IS A SYSTEM OUTLET . .
U/S DAtA STATION INVERT SECT
1001.72 1313.13 1
ELEMENT NO 2 IS A REACH
u/a DATA STATION INVERT SECT N
1023.64 1329.34 1 .013
ELEMENT NO 3 ISA NALL ENTRANCE
U!S DATA STATION INVERT SECT FP
1023.64 1329.34 2 .500
ELEMENT NO 4 IS A SYSTEM HEADWORKS
u/a DATA STATION INVERT SECT
1023.64 1329.34 2
PAGE NO
- LDO"""
\.J S. C. T ~ , ,
L-1'-lE "A"
PAGE NO 2
ANG PT
.000
MAN H
o
RADIUS ANGLE
.000 .000
W S ELEV
1329.34
1,\"'-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
WARNING NO. 2 ** _ WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWJ<DS, W. S. ELEV ... IN\' + DC
o W 5 P G N - CIVILDESIGN VerI 7.1 PAGE
For: RANPAC Inc" T_cula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-21-2000 Time: 5:45 36
LINE "A-2"
....***.....**..****....**......**.......***..****.****....****......**........**....**.......**....****........**..................
j Invert I Depth I water r Q I Vel Vel 1 Energy! Super ICriticaljFlow TopIHaight/!Base Wtl INo Wth
Station I tlev I (FT) I Elev I ICFS) I (FPS) Head I Grd.El. I tlev I Depth I width IOia.-FTlor 1.0. I ZL IPrs/Pip
_1_ _1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slope I I I I SF Avel HF ISE DpthlFroude NINorm Op I "N" I I ZR IType Ch
...**....1.**.....1................1..................1..................1..............1................1..................1..............1................1................1..............1..............1..........1..............
1 I I I I I I I !
1001.72 1313.13 560 1319.690 8.9 504 .394 1320.084 .00 1.154 .00 1.50 .00 .00 0 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -)- -1- -1- 1-
3.29 .73950 .007179 .02 6.56 .000 .318 .013 .00 PIPE
1 I I I
1005.01 1315 56 152 1319 712 8.9 5 04 .394 1320.106 .00 1.154 .00 .50 .00 .00 0 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
HYDRAULIC JUMP
I I I
1005 01 1315 56 .365 1315 925 9 26 75 11 114 1327 038 .00 1.154 1.29 50 .00 .00 0 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
259 .73950 .398543 1.03 ,37 9.274 .318 .013 .00 PIPE
I I 1 I
1007.60 1317.48 .377 1317.854 8.9 25.51 10.102 1327.956 .00 154 1.30 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
2.31 .73950 .348345 .81 .38 8 681 .318 .013 .00 PIPE
1 I 1 \
1009 91 1319.19 .390 1319 578 8.9 24 32 9.184 1328 762 .00 1.154 1.32 1.50 .00 .00 0 .0
_1_ _1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
89 .73950 .304858 .58 .39 8 127 .318 .013 .00 PIPE
I I I I
1011 80 1320.58 .404 1320 989 8 9 23.19 8.349 1329 338 .00 1.154 1.33 1.50 .00 .00 0 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1.58 .73950 .266862 .42 .40 7.609 .318 .013 .00 PIPE
I I I I
1013.38 1321.75 .418 1322.169 8.9 22.11 7.590 1329759 .00 1.154 1.35 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1.34 .73950 .233426 .31 .42 7.122 .318 .013 .00 PIPE
I 1 I )
1014.71 1322.74 .432 1323.170 8 9 21.08 6.900 1330 070 .00 1.154 1.36 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -j- 1-
1.14 .73950 .204196 .23 .43 6 664 .318 .013 .00 PIPE
I I I I
1015 86 1323.58 .447 1324.031 9 20.10 6.273 1330 304 .00 1.154 1.37 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.99 .73950 .178799 .18 .45 235 .318 .013 .00 PIPE
o W S P G N - CIVILDESIGN Vers 7.1 PAGE 2
For: RANPAC Inc. Temecula, California - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-21-2000 Time: 5:45 36
LINE "A-2"
........................................**................**......*****.******..................**..**........................***....**........................*********........************..**....*............*
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICritieallFlow ToplHeight/IBase Wtl INo Wth
Station I Elev I (FT) I Elev I (CFSI I (FPSI Head I Grd.E!.1 Elev I Depth I Width IDia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -!- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slope) I I I SF Avel HF ISE OpthlFroude NINorm Op I "N" I I ZR IType Ch
****""***1 *****...... 1"""*****1 *............**!*****..*....\..***** *1..**..........1....*******1**..........1............**1******.*1*******1**..........1*........1..*****
I I I 1 I I I I
1016.84 1324.32 .463 1324778 8.9 19.16 5.702 1330.481 .00 .154
-j- -1- -1- -1- -1- -1- -1- -\- -1- -1-
.B6 .73950 .156581 .13 .46 5 834
I
1017.71 1324.95
-1- -1-
.75 .73950
1018
I
46 1325.51
-1- -1-
.66 .73950
1019
I
121326.00
-1- -1-
.59 .73950
I
71 1326.43
-1- -1-
.52 .73950
I
1020.23 1326.82
-1- -1-
.46 .73950
1019
1020
I
69 1327.16
-1- -1-
.41 .73950
I
1021.091327.46
-1- -1-
.36 .73950
I
.451327.72
-1- -1-
1021
I
.479 1325.432
-1- -1-
,
.496 1326.006
-1- -I-
I
.514 1326
-I-
51.
-I-
I
.532 1326
-I-
9"
-I-
I
.551 1327
-I-
367
-1-
I
.571 1327
-I-
.726
-I-
I
.591 1328
-I-
048
-1-
I
.613 1328
-I-
m
-I-
1.39
-I-
.31B
1.50
-1-
.013
I
5.184 1330.615
-1- -1- -1-
.137122 .10
1.40
-I-
.318
1.50
-I-
.013
.00
-I-
.48
154
-I-
5.456
89 18.27
-1-
I
4.713 1330
-1- -1-
.120177
1.154
-I-
5 103
1.41
-I-
.318
1.50
-1-
.013
719
-I-
.08
.00
-1-
.50
8 9 17 42
-I-
I
4.284 1330.799
-1- -1- -1-
.105330 .06
.154
-I-
.772
1.42
-I-
.318
1.50
-1-
.013
.00
-I-
.51
9 16.61
-I-
89 1584
-1-
I
3.895 1330
-1- -1-
.092310
.00
-1-
.53
154
-I-
460
1.44
-I-
.318
1.50
-1-
.013
860
-I-
.os
I
3.541 1330
-1- -1-
.080954
.154
-I-
.169
1.45
-1-
.318
1.50
-I-
.013
908
-1-
.04
.00
-I-
.55
9 1510
-I-
I
3.219 1330.945
-1- -1- -1-
.070994 .03
1.46
-I-
.318
1.50
-I-
.013
.00
-I-
.57
1.154
-1-
3.895
8 9 14 40
-I-
I
2.9261330
-1- -1-
.062290
1.154
-I-
3.638
1.47
-I-
.318
1.50
-1-
.013
974
-1-
.02
.00
-1-
.59
9 1373
-I-
9 13.09
-1- -1-
I
2 660 1330.997
-1- -1-
.154
-I-
47
-I-
.50
-I-
.00
-1-
.00 .00
-I-
.00
o
1-
PIPE
I
.0
.00
-I-
o
1-
'IPE
I
.0
.00
.00
.00
-I-
.00
.00
o
1-
PIPE
I
.0
.00
-I-
.00
.00
o
1-
PIPE
I
.0
.00
-I-
.00
.00
o
1-
PIPE
I
.0
.00
-I-
.0
.00
o
1-
PlPE
I
.00
.00
-I-
o
1-
PIPE
I
.0
.00
.00
.00
-I-
.00
.00
o
1-
PlPE
I
.0
.00
-1-
o
1-
.0
.00
~~
I
I
.32
.73950
o
I
I
I
I
1022.06 1328.17
-1- -1-
.25 .73950
I
I
31 1328.36
-1- -1-
.22 .73950
1022
1022
I
53 1328.52
-1- -J-
.20 .73950
I
1022
I
73 1328.67
-1- -1-
.17 .73950
I
I
901328.79
-1- -1-
.15 .73950
1022
1023
I
OS 1328.90
-1- -f-
.13 .73950
I
I
18 1329.00
-1- -1-
.11 .73950
I
1023.291329.08
-1- -1-
.09 .73950
1023
I
o
I
.054689 .02 .61
W 5 P G N - CIVILOESIGN Vers 7.1
For: RANPAC Inc., Temecula, California - 5/N 560
WATER SURFACE PROFILE LISTING
LINE "A-2"
I
.6591328
-I-
I
.683 1329
-I-
8"
-1-
040
-I-
I
.709 13251.230
-1- -1-
I
.736 1329
-1-
401
-I-
I
.764 1329.557
-1- -1-
I
.7931329
-I-
I
.824 1329
-I-
I
.857 1329
-1-
LINE "A-2"
'"
-1-
82.
-I-
939
-1-
For; RANPAC Inc.
8 9 11.90
-I-
8.9 11 35
-I-
8.9 10.82
-I-
8.9 10.31
-1-
8.'
-I-
8.'
-I-
8.'
-I-
I
2.1991331
-1- -1-
.042215
"8
-I-
.01
I
1.999 1331.039
-1- -1- -1-
.037113 .01
I
1.817 1331.047
-[- -1- -1-
.032662 .01
I
1.652 1331.053
-J- -1- -1-
.028756 .00
. 83
I
1.502 1331.058
-1- -1- -1-
.025327 .00
I
1.3651331
-1- -1-
.022327
. 38
062
-I-
.00
8.94
I
1.241 1331.065
-1- -1- -1-
.019710 .00
I
1.128 1331 067
-1- -1- -1-
.017416 .00
W S P G N - CIVILDESIGN Vera
Temecu1a, California - SIN
WATER SURFACE PROFILE
.
-1-
52
.00
-I-
.66
.00
-I-
."
.00
-I-
. 71
.00
-I-
. 74
.00
-I-
.76
.00
-1-
.19
.00
-I-
.82
.00
-I-
.86
7.1
560
LISTING
3.397
.154'
-1-
2 959
1.154
-1-
2.759
1.154
-I-
2.572
154
-I-
2 396
1.154
-I-
2.231
1.154
-I-
2.075
1.154
-I-
1.929
1.154
-1-
1.791
.318 .013 .00 PIPE
p^", 3
Date: 5-21-2000 Time: 5:45 36
1.49
-I-
.318
1.49
-1-
.318
1.50
-1-
.318
1.50
-I-
.318
1.50
-1-
.318
1.50
-I-
.318
1.49
-I-
.318
1.48
-I-
.318
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-I-
.013
Date: 5-21-2000
.00
-I-
.00
-I-
.00
-I-
.00
-I-
.00
-I-
.00
.00
-I-
.00
-1-
.00
-1-
.00
o
1-
PIPE
I
.0
*****"''''************'''''''''***********************'''************"'*"'''''''*'''**''''******''''''*'''''''''**",..''''''''''''''**********''*''*'''******"*""''''*******''*''''''*''
I Invert I Depth I Water I Q I Vel Vel I Energy I S~per ICriticallFlow ToplHeiqht/IBaae Wtl INo Wth
Station 1 Elev I (FT) I E1ev I (CFS) I IFPS) Head I Grd.El.1 Elev I Depth I Width 10ia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slopel I I I SF Avel HF ISE OpthlFroudll NINorm Op I "N" I 1 ZR IType Ch
,,********1****"''''**1**.****'''1****....*1****.....1*****..1********1*.....***1*******1..******1*****"**1"'******1**"**"'*1*****1**"**.*
I I I I 1 I I 1 I I ! 1
1021.77 1327.96 .635 1328596 9 12.48 2.418 1331014 .00 154 1.48 1.50 .00 .00
_1_ -j- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1-
.28 .73950 .046035 .01 .64 3 171 .316 .013
.00
.00
o
1-
PIPE
I
.0
.00
.0
.00
o
1-
PIPE
I
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
.0
o
1-
PIPE
I
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00 0
1-
.00 PIPE
p^",
.0
Time: 5:45:36
"'**.****.**.******....************"''''''''''''''''''''''*'''*************"'*"'''''''*'''****************************''*'''**.'''*********"''''''''''******************
I Invert I Depth I Water 1 Q I Vel Vel I Energy I Super I Critical I Flow ToplHeiqht/IBaae Wtl INo Wth
Station I Elev 11FT) I Elev I (CFS) I (FPS) Head I Grd.El.1 Elev I Depth I Width 10ia.-FTlor 1.0.\ ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/E1em ICh Slope 1 I 1 I SF Ave I HF ISE DpthlFroude NINorm Dp I "N" I I ZR IType Ch
.*.******1********1********1*********1******.**1*******I********\**...****I*******I********I********!*******1*******\*****1*******
I I \ I
1023 39 1329.15 .891 1330 043 9 13 1.026 1331.069 .00
-1- -1- -1- -1- -1- -1- -1- -1- -1-
.OB .73950 .015409 .00 .89
I
I
I
1023.46 1329.21
-1- -1-
.06 .73950
I
I
53 1329.26
-1- -1-
.05 .73950
I
58 1329.29
-1- -1-
.04 .73950
1023
1023
I
I
61 1329.32
-1- -1-
.02 .73950
I
1023.63 1329.33
-1- -]-
.01 .73950
1023
I
I
64 1329.34
-1- -1-
ENTRANCE
I
641329.34
-1- -1-
1023
I
WALL
1023
o
I
I
I
.928 1330.137
-1- -1-
I
.967 1330
-I-
223
-1-
I
.008 1330.301
-1- -1-
I
1.052 1330
-1-
I
100 1330
-I-
371
-I-
.35
-I-
I
.154 1330.494
-1- -1-
I
2.122 1331
-I-
.462
-I-
8 .
-I-
8 .
-I-
8 .
-I-
8 ,
-1-
8 .
-1-
.
-I-
I
.932 1331
-1- -1-
.013660
75
I
.848 1331
-1- -1-
.012127
.3'
7.04
I
.771 1331
-1- -1-
.010788
I
.701 1331
-1- -1-
.009626
, 72
I
.6371331
-1- -1-
.008619
6.40
'10
-I-
I
.5781331
-1-
.
-1-
I
.0061331
-I-
.GO
-I-
070
-I-
.00
.071
-1-
.00
.071
-1-
.00
072
-I-
.00
.072
-1-
.00
072
-1-
.468
-1-
.00
-I-
..3
.00
-I-
.97
.00
-1-
.01
.00
-I-
05
.00
-1-
.10
.00
-I-
.00
-I-
.154
-I-
'"
154
-I-
538
154
-I-
1.421
.154
-I-
.311
.154
-1-
205
.154
-1-
.103
154
-I-
.369
-I-
1.47
-I-
.318
1.46
-I-
.318
1.44
-I-
.318
1.41
-I-
.318
1.37
-1-.
.318
1.33
-I-
.318
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.013
"
-1-
.50
-1-
7.00 10 00
-1- -1-
.00
-1-
.00
.00
-I-
.00
-1-
.00
-I-
.00
.00
-I-
.00
-I-
.00
-1-
700
-I-
.00
.0
o
1-
pm
I
.00
.00
o
1-
pm
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
pm
I
.0
.00
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
.0
.00
o
1-
.0
1>~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CA1U>
CODE
w S P G N
WATER SURFACE
HEIGHT 1 BASE
DIAMETER WIDTH
Date: 5-19-2000 Time: 3:42:23
PAGE I
YeS) Y (6) Y (7) Y Ie) Y (9) Y (lO)
- EDIT LISTING - Version 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR INV YIlI '1(21 '1(3) '1(4)
DROP
SECT
NO
CHN NO OF AVE PIER
TYPE PIER/PIP WIDTH
CD I . 0 1.50
CD 2 3 0 .00 6.50 28.00 .00 .00 .00
0 WSPGN PAGE NO
WATER SURFACE PROFILE - TITLE CAP.O LISTING
HEADING LINE NO "
LINE "A-3"
HEADING LINE NO 2 IS
HEADING LINE NO 3 IS ()!,S,c. Aa::>1-'1 (,INE- '/"\"
0 W5PGN PAGE NO 2
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO I IS A SYSTEM OUTLET
U/S DATA STATION INVERT SECT
1002.83 1312.07 I
ELEMENT NO 2 IS A REACH
U!S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1011.22 1312.31 I .013 .000 .000 .000 0
ELEMENT NO 3 IS A ReACH
!J/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1066.30 1313.89 I .013 89.910 35.100 .000 0
ELEMENT NO IS A REACH .
u/s DATA STATION INVERT StCT N RADIUS ANGLE ANG PT MAN H
1470.51 1325.51 I .013 302.344 -76.600 .000 I
ELEMENT NO 5 IS A REACH
u/s DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1521.66 1328.56 I .013 45.018 65.100 .000 0
ELEMENT NO 6 IS' WALL ENTRANCE
u/s DATA STATION INVERT SECT FP
1521.66 1328.56 2 .500
ELEMENT NO 7 IS A SYSTEM HEADWORKS
u/s DATA STATION INVERT SECT W S ELEV
1521.66 1328.56 2 1327.06
1-\1..
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
U WARNING NO. 2 U - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDW!(DS, W S. ELEV _ INV + DC
o W S P G N - CIVILDESIGN Veri 7.1 PAGE
For: RANPAC Inc., Temecula, California - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 3:42 28
LINE "A-3"
************...*...*****......********.*******..**.....***.*****************.**.****.*************..***....."...*****...**.*******
I Invert I Depth I Water I 0 I Vol Vol I Enerw I Super ICriticallFlow TopIHeight/1Bas. Wtl tNo Wth
Station I El~ I (FTI I El~ I (eFS) I (FPS) Head I Grd.El.l Elev I Depth I Width 10ia.-FTlor 1.0.1 ZL lPn/Pip
-I- -1- -1- -1- -1- -I- -I- -1- -I- -I- -1- -I- -I- I-
L/Elem lCh Slope I I I I SF Ave I HF ISE DpthlFroude MINarm Dp I "N" I I ZR I Type en
....*****1***..****1*******.1..*****."1....*****1***.***1********1*********1*..*.*.'********1********1*******1*******1*****1*******
I I I I
1002 " 1312.0'7 6.880 1318 950 15.1 8.54 1.134 1320 084 .00 1.408 .00 1.50 .00 .00 0 .0
-I- -I- -I- -I- -1- -1- -I- -I- -I- -I- -1- -I- -I- I-
s " .02862 .020664 .17 6.88 .000 .062 .013 .00 PIPE
I I I I
1011.22 1312.31 . S13 1319.123 15.1 8.54 1.134 1320.257 .00 1.408 .00 1.50 .00 .00 0 .0
-1- -I- -I- -I- -I- -I- -1- -1- -1- -I- -1- -I- -I- 1-
55.08 .02868 .020664 1.14 .00 .000 1.061 .013 .00 PIPE
I I I I
1066.30 1313.89 6.513 1320.403 15.1 S 54 1.134 1321.53'7 .00 1.408 .00 1.50 .00 .00 0 .0
-1- -1- -1- -1- -I- -I- -1- -I- -1- -1- -I- -I- -I- I-
404.21 .028'75 .020664 8.35 .00 .000 060 .013 .00 PIPE
I I I I
1470.51 1325.51 3.512 1329 022 15. 1 8.54 1.134 1330.155 .00 1.408 .00 1.50 .00 .00 0 .0
-1- -I- -1- -1- -I- -I- -1- -1- -I- -1- -I- -I- -I- I-
51.15 .05963 .020664 1.06 .00 .000 .828 .013 .00 PIPE
I I I I
1521 .S' 1328.56 1.711 1330 m 15.1 54 1.134 1331.405 .00 1.408 .00 50 .00 .00 0 .0
-I- -I- -I- -I- -I- -1- -I- -I- -I- -1- -I- -I- -I- 1-
HALL ENTRANCE
I I I
1521.66 1328.56 , 412 1331.9'72 15.1 .16 .000 1331 972 .00 .208 28.00 . 50 2B 00 .00 0 .0
-I- -I- -I- -I- -I- -I- -1- -I- -I- -I- -I- -1- -I- 1-
0
v~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD SECT
CODE NO
W 5 P G N
WATER SURFACE
HEIGHT 1 BASE
DIAMETER WIDTH
Dat.: 5-19-2000 Time: 9:45:50
PAGE 1
'tIS) Y{51 Y(7) TIB) Y{91 T(lO)
- EDIT LISTING - VerBion 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR UN Y(l) y(2) ye3l 'f(4)
DROP
CHN NO OF AVE PIER
TYPE PIER/PIP WIDTH
CD I 4 0 .50
CD 2 , 0 .00 .00 7.00 .00 .00 .00
0 WSPGN PAGE NO
WATER SURFACE PROFILE - TITLE CARD LISTING
HEAD IHG LINE NO IS
LINE ".1'.-4"
HEADING LINE NO 2 IS
HEADING LINE NO , IS (N.5. t. 820tl1
0 w S P G N L,-tNe "A" PAGE NO
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO IS A SYSTEM OUTLET .
uts DATA STATION INVERT SECT
1001.95 1316.23 I
ELEMENT NO 2 IS A REACH
u/s DATA STATION INVERT SECT N RADIUS ANGLE ANG PT NAN H
1010.43 1321.03 1 ,013 .000 .000 .000 0
ELEMENT NO , IS A NAU. ENTRANCE
U/S DATA STATION INVERT SECT FP
1010.43 1321.03 2 .500
ELEMENT NO 4 IS A SYSTEM HEADWORKS
uts DATA STATION INVERT SECT W S EUV
1010.43 1321.03 2 1321.03
'Z}ct
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
WARNING NO.2 ** - WATER SURFACE ELEVATION GlVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWl<DS, W S.ELEV _ INV + DC
o W S P G H - CIVILDESIGN Vera 7. 1 PAGE
For: RANPAC Inc., Temecub., California - SIN 560
WATER SURFACE PROFILE LISTING Oat.: 5-19-2000 Time: 9:45 55
LINE "A-4"
**************,*..",.*****",.".****************"."*....*,,,..***fI""*****......"'................*.............****...***..****************
I Invert I Depth I Water I 0 I Vol Vol I Enarqy I Super ICriticallFlow ToplHaiqht/lBasa Wtl INo Wth
Station I Elev I (FT) I Elev I (CFS) I (FPS) H..d I Gt"d.El.1 Elav I Depth I Width IOia.-FTlor 1.0. f ZL IPrs/Pip
-I- -I- -1- -I- -I- -I- -1- -I- -1- -1- -I- -1- -I- I-
L/El&lll ICh Slope I I I I SF Avel HF IS' Dpth I Froude N I Norm Dp I "N" I I ZR f Type Ch
*********t**...*..I........I***.....*I.**.....**I***...*I*"***"**I..**...**I..*****I********I********!*******1*******1*****1*******
I I I I
1001.95 1316.23 7 070 1323.300 2 7 53 .036 1323.336 .00 .623 .00 1.50 .00 .00 0 .0
-1- -1- -1- -1- -I- -I- -1- -I- -I- -1- -I- -I- -I- 1-
8.48 .56604 .000661 .01 7.07 .000 .190 .013 .00 PIPZ
I I I I
1010.43 1321.03 2 276 1323.306 2.7 53 .036 1323.342 .00 .623 .00 50 .00 .00 0 .0
-1- -1- -1- -1- -I- -I- -I- -1- -1- -I- -I- -I- -I- 1-
WALL ENTRANCE
I I I
1010 43 1321 .03 2 .330 1323 360 2.7 .17 .000 1323.360 .00 .167 7.00 00 00 .00 0 .0
-I- -I- -1- -I- -1- -1- -1- -I- -I- -1- -I- -1- -I- 1-
0
t'lP
I
I
WSPGN
WATER SURFACE
HEIGHT 1 BASE
DIAMETER WIDTH
- EDIT LISTING - V.reion 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR INV TIl) TI21 Yl31 Y14)
DRD'
CARD SECT
CODE NO
CHN NO OF AVE PIER
TYPE PIER/PIP WIDTH
I
,
2
3
4
4
4
4.50
1.50
2.00
CD
CD
CD
o
WSPGN
TITLE CARD LISTING
WATER SURFACE PROFILE
I
HEADING LINE NO IS
LINE "L"
HEADING LINE NO 2 IS
HEADING LINE NO 3 IS
I
o
Ii S P G N
PROFILE - ELEMENT CARD LISTING
.
INVERT SECT
1267.78 1
ELEMENT NO
WATER SURFACE
IS A SYSTEM OUTLET
U/S DATA STATION
1350.00
I
ELEMENT NO 2 IS A REACH
U/S DATA STATION INVERT SECT
1680,18 1272.57 1
ELEMENT NO 3 IS A REACH .
U/S DATA STATION INVERT SECT
1726.77 1272.80 1
ELEMENT NO
4 IS A REACH
U/S DATA
SECT
,
I
STATION
1770.00
.
INVERT
1273.02
.
ELEMENT NO
5 IS A REACH
uls DATA
STATION
1829.39
.
INVERT
1275.47
.
SECT
,
ELEMENT NO
IS IS A REACH
u/s DATA
STATION INVERT SECT
1873.61 1277.30 1
I
ELEMENT NO
IS A JUNCTION
UIS DATA
STATION INVERT SECT LAT-l LAT-2
1882.08 1277.65 1 2 2
I
ELEMENT NO
8 IS A REACH
U/S DATA
STATION INVERT SECT
1913.84 1278.96 1
ELEMENT NO
9 IS A REACH
U/S DATA STATION INVERT SECT N
1919.34 1279.18 1 .013
10 IS A REACH .
U/S DATA STATION INVERT SECT N
2118.34 1282.28 1 .013
11 IS A JUNCTION .
U/S DATA STATION INVERT SECT LAT-1 LAT-2 N
2120.98 1282.33 1 3 3 .013
I
ELEMENT NO
ELEMENT NO
I
o
W S P G N
WATER SURFACE PROFILE - ELEMENT CARD LISTING
I
ELEMENT NO 12 IS A REACH
U/S DATA STATION INVERT SECT
2396.96 1286.63 1
ELEMENT NO 13 IS A REACH
U/S DATA STATION INVERT SECT
2863.87 1291.84 1
I
ELEMENT NO 14 IS A JUNCTION
u/s DATA STATION INVERT SECT IAT-1 LAT-2 N
2866.48 1291.87 1 2 2 .013
I
ELEMENT NO 15 IS A REACH
U/S DATA STATION INVERT SECT
2884.47 1292.06 1
I
ELEMENT NO 16 IS A REACH
U/S DATA STATION INVERT SECT
3029.42 1293.69 1
ELEMENT NO 17 IS A WALL ENTRANCE
U/S DATA STATION INVERT SECT
3029.42 1293.69 1
ELEMENT NO 18 IS A SYSTEM HEADWORKS
U/S DATA STATION INVERT SECT
3029.42 1293.69 1
I
I
I
I
N
.013
N
.013
N
.013
N
.013
N
.013
N
.013
03
728
N
.013
03
6.55
N
.013
N
.013
03
5 60
N
.013
N
.013
.,
.500
04
11.60
04
1.89
Date: 5-19-2000 Timel: 6:24:12
PAGE 1
y(5) Y(6) Y(7) y(8) Y(9) yno)
W S ELEV
1272.28
RADIUS ANGLE
.000 .000
RADIUS ANGLE
90.488 29.500
RADIUS ANGLE
90.069 -27.500
RADIUS ANGLE
.000 .000
RADIUS ANGLE
89.212 -28.400
04
6.58
PAGE NO
PAGE NO
ANG PT
.000
ANG PT
.000
ANG PT
.000
ANG PT
.000
ANG PT
.000
INVERT-3 INVERT-4 PHI 3 PHI 4
1277.88 1280.17 40.00 14.00
RADIUS ANGLE
346.638 -1.400
RADIUS ANGLE
76.781 -23.700
RADIUS ANGLE
.000 .000
RADIUS ANGLE
1583.593 7.200
ANG PT
.000
ANG PT
.000
ANO ,.,
.000
INVERT-3 INVERT-4 PHI 3 PHI 4
1283.73 1283.65 40.00 40 00
RADIUS ANGLE
1512.547 .100
RADIUS ANGLE
1597.221 9.900
RADIUS ANGLE
1601.915 16.700
PAGE NO
ANG PT
.000
ANG PT
.000
INVERT-3 INVERT-4 PHI 3 PHI 4
1293.63 1293.76 40.70 34.30
RADIUS ANGLE
.000 .000
RADIUS ANGLE
1392.906 .740
RADIUS ANGLE
.000 .000
W S ELEV
1293.69
ANG PT
.000
ANG 1>T
.000
2
MAN N
D
MAN "
D
MAN "
D
MAN "
D
MAN N
D
MAN N
o
MAN "
,
MAN "
D
3
MAN "
1
MAN "
D
MAN "
D
MAN "
D
#
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.. WARNING NO.2" - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HOWI<DS, W.S.ELEV '"' INV .;. DC
o W S P G N - CIVILDESIGN Ven 7.1 PAGE
Fo:r: RANPAC Inc., Temecula, California - SiN 560
WATER SURFACE PROFILE LISTING Oat.: 5-19-2000 Time: 6:24:18
LINE "L"
........********..........********.............*********.............**.........****.***************....."'*.......................
I Invert I Oepth I Water I Q t Vel Vel I Energy I Super tCriticaltFlow ToplHeiqht/IBaBe Wtl tHo Wth
Station I Elev 11FT) I Elev I (eFS) I IFPSJ Head I Grd.El.1 Elev I Depth I Width jDia.-FTlor 1.0.1 ZL lPn/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/El8lll I Ch Sl~ I I I I SF Ave I HF t BE Dpth I Frauds N I Norm Dp I "N" I I ZR I Type Ch
........*1........1.....**.1*********1*********1*******1********1*********1*******1********1********1*****"*1".*****1*.***1***"***
1 1 1 1 I I 1 1 I
1350 00 1267.78 3.525 1271.306 232 7 17.41 4.705 1276.010 .00 .211 3.71 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
80 81 .01451 .015511 1.25 3 53 .615 3.619 .013 .00 PIPE
I I I 1
1430.81 1268.95 3 477 1272.429 232 7 17.64 4.833 1277.262 .00 .211 3.77 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
153 68 .01451 .016623 2.55 3.48 1.663 3.619 .013 .00 PIPE
I 1 I !
1584.50 1271.18 3.319 1274.501 232 7 18 50 5.316 1279.817 .00 4.211 3.96 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
95.68 .01451 .018547 1.77 332 1.830 3.619 .013 .00 PIPE
I I I I
168018 1272.57 3174 1275744 2327 19.41 5.847 1281.591 .53 4.211 4.10 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1824 .00494 .020315 .37 3.70 2.000 4.500 .013 .00 PIPE
! 1 1 I
1698 42 1272.66 3 087 1275 747 232 7 20.00 6.211 1281.958 .57 4.211 4.18 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- r-
28.35 .00494 .022355 .63 3.66 2.112 4.500 .013 .00 PIPE
I I I I
1726.77 1272.80 2.960 1275.760 232.7 20.98 6.833 1282.592 .65. 4.211 4.27 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
15.46 .00509 .024451 .38 3.61 2.294 4.500 .013 .00 PIPE
I I I I
1742.23 1272.88 2.893 1275772 232.7 2153 7.197 1282969 .69 4.211 4.31 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
27.77 .00509 .026852 .75 3.58 2.396 4.500 .013 .00 PIPE
I I I I
1770.00 1273.02 2 778 1275 798 232.7 22.58 7.917 1283.714 .00 4.211 4.37 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
24 45 .04125 .027554 .67 2 78 2.593 2.467 .013 .00 PIPE
I 1 1 1
179445 1274.03 2.839 1276.868 232.7 22.00 7.516 1284.383 .00 4.211 4.34 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
34.94 .04125 .025153 .88 2 84 2.484 2.467 .013 .00 PIPE
o W S P G N - CIVILDESIGN Vera 7.1 PAGE 2
For: RANPAC Inc. T_cula, Ca1H'ornia - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 6:24:18
LINE "L"
***************************************************************************************'****.*...***************.******************
I Invert 1 Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeiqht/lBaae Wtl INo Wth
Station I Uev I (FT) I Uev I (CFS) I (FPS) Head I Grd.E!.1 Elev I Depth I Width IDia.-FTlor 1.0.1 ZL Ipra/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slope I I I I SF Ave I HF ISE DpthlFroude NINorm Dp 1 "N" I I ZR IType Ch
*********1********1********1*******.*1*******.*1*.....*.1.*..*...1....*..*.1*****.*1.*.*****1********1*******1*******1*****1*******
,
1829.39 1275.47
-1- -1-
23 95 .04139
,
185334 1276.46
-!- -1-
20 27 .04139
,
1873 61 1277 .30
-1- -1-
JUNCT STR .04132
,
1882.08 1277.65
-1- -1-
3 44 .04124
,
1885 52 1277.79
-1- -1-
1592 .04124
,
1901431278.45
-1- -1-
12 41 .04124
,
1913 84 1278.96
-1- -I-
S 50 .04002
,
1919.34 1279.18
-1- -1-
66 35 .01558
,
1985 69 1280 21
-1- -\-
,
29601278430
-1- -1-
,
232 7 20 98 6.832 1285.262
-1- -1- -1- -1-
.022456 .54
,
3 076 1279.537
-1- -1-
,
6.2611285.798
-1- -1- -1-
.020107 .41
232.7 20.08
-I-
,
1280.514
232.7 19.14
-,-
"L-2...
,
,
5.6911286.206
-1- -1- -1-
.019170 .16
,
5.6761286.369
-1- -1- -1-
.019170 .07
3.214
-1- -1-
L-I>J~ " L.-I', it
3.043 1280.693 218.8 19.12
-1- -1- -1-
,
3 067 1280 859
-1- -1-
,
218 8 18 95 5.577 1286
-1- -1- -1-
.017937
,
3 203 1281.651
-1- -1-
,
2188 1807 5.070 1286.721
-1- -1- -1- -1-
.016026 .20
,
218 8 17.23 4.609 1286
-1- -1- -1-
.014736
,
3.351 1282.311
-1- -1-
,
3 432 1282.612
-1- -1-
,
218 8 16 81 4.389 1287
-1- -1- -1-
.014020
001
-,-
."
,
3 502 1283.716 2188 1648
-1- -1- -1- -1-
,
.2151287931
-1- -!-
.os
-,-
3.61
4.211
-I-
2.294
4.27
-I-
2.464
."
-1-
3.66
.211
-,-
2 127
4.19
-I-
2.464
.13
-,-
3.35
4.211
-,-
.951
4.07
-I-
.62
-I-
367
.147
-,-
.044
4.21
-I-
2.376
435
-,-
."
.61
-,-
3"
.147
-,-
2.012
4.19
-,-
2.376
.54
-I-
3.74
147
-,-
'"
4.08
-,-
2.376
,,,
-,-
.0'
.00
-,-
3.35
147
-I-
1.688
3.92
-,-
2.398
.02
-,-
3.45
4.147
-I-
1.607
3.83
-I-
3.311
.02
-,-
4.147
-I-
3.74
-,-
4.50
-,-
.013
.00 .00
-,-
4.50
-I-
.013
.00 .00
-I-
4.50
-I-
.013
.00 .00
-I-
.00
4.50
-,-
.013
.00 .00
-,-
4.50
-,-
.013
.00 .00
-I-
4.50
-,-
.013
.00 .00
-,-
4.50
-I-
.013
.00 .00
-,-
4.50
-,-
.013
.00 .00
-,-
50
-,-
.00 .00
-,-
.00
1
,-
PIPE
,
.0
.00
1
,-
PIPE
,
.0
1
,-
PIPE
,
.0
.00
1
,-
PIPE
,
.0
.00
1
,-
PIPE
,
.0
.00
1
,-
PIPE
,
.0
.00
1
,-
PIPE
,
.0
.00
1
,-
PIPE
,
.0
1
,-
.0
~~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
81.17
.01558
.013063 1.06 3.52
W S P G N - CrvILDESIGN Vera 7.1
For: RANPAC Inc., TlIIllI8cula, California - SIN 560
WATER SURFACE PROFILE LISTING
o
LINE "L"
1.540
3.311 .013 .00 PIPE
PAGE ,
Date: 5-19-2000 Time: 6:24:18
...."'................................---"..........-.........**.....*****......................."............**.......................-
I Invert 1 Depth I Water I Q I Vel Vel I Energy I Super ICritieallFlow ToplHei9ht/lBase Ntl INo Nth
Sbtion I Elev I IFTI I Elev I (CFS) I (FPSl Head J Grd.El.l Elev I Depth I Width IDia.-FTlor 1.0.1 ZL IPrs/Pip
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- J-
L/Elem I eh Slope I I I I SF Ave I HF I BE Dpth I Froude N I Norm Op J "N" I I ZR 1 Type eh
.**...***1*........1......**.1...***...1.......**1*".....*1..."'''''''''''''1'''''''''''''''''''''''''''1'''''''''''''''''''''1''''''''''''''''''''''''1''''''''''''''''''''''''1'''''''''''''''''''''1"'''''''''''''''''''1'''''''''''''''1'''''''''''''''''''''
1 I I I 1 1 I I I I 1 I I
2066.86 1281.48 3 681 1285.159 218 8 15 11 3.832 1288 991 .02 4.141 3.41 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
38.45 .01558 .011902 .46 3.10 1.382 3.311 .013 .00 PIPE
I 1 I I
2105.32 1282.08 3 888 1285.965 218 8 14.98 3.483 1289.449 .01 4.141 3.08 4.50 .00 .00 1 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
13.02 .01558 .011065 .14 3.90 1.213 3.311 .013 .00 PIPE
I I I I
2118.34 1282.28 4.141 1286.421 218.8 14.28 3.166 1289593 .01 4.147 2 42 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
JUNCT STR .01891 LINE: *8". .c....' .010577 .03 4.16 1.000 .013 .00 PIPE
I I! I I
2120.98 1282.33 5217 1287547 200.1 12.62 2.412 1290019 .00 4.040 .00 4.50 .00 .00 1 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
84.88 .01558 .010413 .88 .00 .000 3094 .013 .00 PIPE
I I I I
2205.861283.65 .874 1288.526 200.7 12.62 24721290998 .00 .040 .00 .50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
HYDRAULIC JUMP
I I I
2205.86 1283.65 3.196 1286.849 200.7 16.61 4.285 1291.134 .02 4.040 4.08 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
53.32 .01558 .014061 .75 3.22 1.102 3.094 .013 .00 PIPE
I 1 I I
2259.18 1284.48 3.240 1281.123 2007 16.37 4.159 1291.883 .02 4.040 4.04 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
91 40 .01558 .013096 1.20 3.26 .656 3.094 .013 .00 PIPE
I 1 1 1
235058 1285.91 3391 1289.298 2007 15.60 3.781 1293.080 .02 .040 3.88 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
46.38 .01558 .011768 .55 3.41 510 3.094 .013 .00 PIPE
1 1 I I
2396.96 1286.63 3558 1290.188 200.1 14.88 3.431 1293.625 .02 4.040 3.66 4.50 .00 .00 1 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
38.86 .01116 .011158 .43 3.57 1.366 3.558 .013 .00 PIPE
o W S 51 G N - ctvU.DESIGN Ver" 7.1 PAGE
For: RANPAC Inc., T8IIl8cula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 6:24:18
LINE "L"
*****"''''*'''''''''*****************''''''''''''*'''**************'''*''''''''''''"',."'*******************,.*..,.,."',.,.,.,...,...,."',."'........................"'...."'''''''..............................'''..
I Invert I Depth 1 Water I Q I Vel Vel I Energy I Super ICritica11Flow TopIHeiqht/IBa". Wtl INo Wth
Station I Elev I (FT) I Elev I (CFSI I (FPSI Head I Grd.El.1 Elev I Depth I Width IDia.-FTlor 1.0.1 ZL lPn/Pip
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elfllll ICh Slopel I 1 I SF Ave I HF ISE DpthlFroude NINorm Dp I "N" 1 I ZR 1'1'ype Ch
......"'''''''..''''''1*...........1'''.''''''''''''...1'''.....'''.....,'''....'''.'''.1..''''''.'''..1................1..........1.......1........,...1"'...."'''''''...1....''''''..''''''1"'''''''..''1...'''.1'''''''''''''''''''
I I I I
2435 82 1287.06 3.558 1290.622 200.7 14.88 3.437 1294.059
-1- -1- -1- -1- -1- -1- -1- -1-
266 43 .01116 .010995 2.93
I
270224 1290.04
-1- -I-
135.60 .01116
I
2837.84 1291.55
-1- -1-
26.03 .01116
I
2863.871291.84
-1- -1-
JUNCT STR .01151
I
2866481291.87
-1- -1-
17.99 .01056
I
2884.47 1292.06
-1- -1-
119.30 .01124
I
3003.77 1293.40
-1- -1-
25 65 .01124
WALL ENTRANCE
I
302942129369
-1- -1-
I
1293
-1-
I
3.342 1296.988
-I- -I- -1-
.010356 1.40
3 610
'"
-I-
2007 14.67
-1-
I
3.0381298.393
-1- -1- -)-
.009533 .25
I
38051295
-1-
m
-1-
200.7 13.99
-1-
I
4.040 1295.880 200.7 13.33 2.761 1298.641
-1- -1- -1- -1- -1-
LINE. .. L-~" ~ VL-4" .00941'
1 I 1 I
4.665 1296.535 193.2 12.15 2.291 1298
-1- -1- -1- -1- -1-
.009650
I
2.291 1299
-1- -1-
.009589
I
690 1296.750
-1- -1-
1932 12.15
-I-
041
-1-
1.14
I
2.291 1300.192
-1- -(- -1-
.009132 .23
I
.5001297
-I-
go,
-1-
1932 12 15
-1-
I
4.431 1298
-I-
12l
-I-
193 2 12 19
-1- -1-
I
2 306 1300.427
-1- -1-
o
.02
-1-
3.57
.0'
-1-
3.63
.0'
-I-
3.82
-I-
.02
.00
-I-
4.05
'"
-I-
.n
.00
-I-
.00
.00
-1-
4.69
.00
-1-
4.50
.00
-I-
4.040
-I-
'"
.040
-1-
1.323
4.040
-I-
1.174
4.040
-1-
1.000
3 988
-I-
.000
3 988
-I-
.000
3 988
-I-
.000
3 988
-I-
3.66
-1-
3.558
3.58
-I-
3.558
3.25
-1-
3.558
273
-1-
.00
-I-
3 521
.00
-1-
3 422
.00
-1-
3 422
4.50
-1-
.013
4.50
-1-
.013
4.50
-I-
.013
4.50
-1-
.013
4.50
-I-
.013
4.50
-1-
.013
4.50
-1-
.013
11
-I-
.50
-1-
.00
-I-
.00
.00
-1-
.00
-I-
.00
-I-
.00
-1-
.00
.00
-1-
.00 .00
-1-
.00
-I-
.00
,
1-
PIPE
I
.0
.00
.0
.00
,
1-
PIPE
I
.00
,
1-
PIPE
I
.0
.00
.00
.00
]
1-
PIPE
I
.0
.00
.0
]
1-
PIPE
I
.00
.00
,
1-
PIPE
I
.0
.00
]
1-
PIPE
.0
.00
o
1-
.0
1-';"
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD
CODE
SECT
.0
W 5 P G N
WATER SURFACE
HEIGHT 1 BASE
DIAMETER WIDTH
- EOIT LISTING - Ver.ion 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR IN\' Y{1) Y(2) Y13) Y(4)
OROP
Oat.: 5-19-2000 Time: 3:11:19
PAGE 1
yeS) 'f(6) Y(7) Y{S) Y(9) 't(IO)
eRN NO OF AVE PIER
TYPE PIER/PIP WIDTH
CO , , 0 1.50
CO 2 , 0 .00 7.00 7.00 .00 .00 .00
0 w S P G N PAGE NO
WATER 'URFACE PROFILE - TITLE CARD LISTING
HE.ADING LINE NO' "
LINE "L-l"
HEADING LINE .02 IS
HEADING LINE NO' IS W.>.c- Fr2or-j
0 w S P G N L-I tJE- uL-!' PAGE NO 2
WATER SURFACE. PROFILE - ELEMENT CARD LISTING
ELEMENT NO , IS A SYSTEM OUTLET
U/S OATA STATION INVERT SECT
1003.22 1278.77 ,
ELEMENT NO 2 IS A REAC'
uta DATA STATION INVERT SECT . RADIUS ANGLE ANG PT MAN .
1021.42 1283.69 , .013 .000 .000 .000 0
ELEMENT NO , IS A REACH
UjS DATA STATION INVERT SECT . RADIUS ANGLE ANG PT MAN H
1055.73 1289.40 , .013 26.673 -73.100 .000 0
ELEMENT NO ISA WALL ENTRANCE
uta DATA STATION INVERT SECT FP
1055.73 1289.40 2 .500
ELEMENT NO 5 IS A SYSTEM HEADWORKS
u/s DATA STATION INVERT SECT W S ELEV
1055.73 1289.40 2 1289.40
7P
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
u WARNING NO.2 '** - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWKDS, W.S.ELEV .. INV + DC
o W S P G N - CIVILDESIGN Vera 7.1 PAGE
For: RANPAC Inc., T_eula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Ti_: 3: 11: 24
LINE ilL_I"
**************.............***..**.........**..*****.......................***.**.**********........*****...........................
I Invert I Oepth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeiqht!IBase Wtl INo Wth
Station I nav I (FT) J Elev I ICFSI I IFPS) Head I G1"d.El.l Elev I Depth I Width 10i..-FTlo1" 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -J- -J- -1- -1- -1- -1- 1-
L/Elem I Ch Slope I I I I SF Ave J HF I BE Dpth, Froude N I Norm Op I "N" J I ZR J Type Ch
******.**1*******.1........1.........1..*******)*******1********1*********1*******1********1********1*******1*******1*****1*******
I
1003.22 1278.77
-1- -1-
6.06 .27033
I
1009.28 1280.41
-1- -1-
4,96 .27033
I
1014.241281.75
-1- -1-
3.95 .27033
I
1018.20 1282.82
-1- -1-
3.22 .27033
I
1021.421283.69
-1- -1-
3.43 .16643
I
1024.85 1284.26
-1- -1-
5.87 .16643
I
1030.72 1285.24
-1- -1-
.62 .16643
I
1035 34 1286.01
-1- -1-
3.74 .16643
I
1039.08 1286.63
-1- -1-
3.08 .16643
o
I
.616 1279.386
-1- -1-
I
.636 1281.044
-1- -1-
I
.6601282.409
-1- -I-
I
.684 1283502
-1- -I-
I
.111 1284.401
-1- -I-
I
.723 1284.984
-t- -1-
I
.751 1285 989
-1- -I-
I
.780 1286.786
-1- -I-
I
.8101287.439
-1- -1-
For: RANPAC Inc.
LINE "L-l"
I
15.4 22.52 7.877 1287.264
-1- -1- -1- -1-
.162058 .98
I
15.4 21 55 7.211 1288.255
-1- -1- -1- -1-
.143022 .71
I
15 4 20 55 6.556 1288
-1- -1- -1-
.125689
'"
-1-
.50
.58
-I-
1.30
.53
-I-
1.28
...
-1-
1.26
..3
-I-
1.25
.00
-I-
.62
1.414
-I-
5.832
1.48
-1-
.545
1.48
-1-
.545
1.49
-I-
.545
1.49
-1-
.545
1.50
-1-
.622
1.50
-1-
.622
1.50
-I-
.622
1.50
-1-
.622
1.50
-1-
.622
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.013
.00 .00
-1-
.00 .00
-I-
.00 .00
-I-
.00 .00
-I-
.00 .00
-1-
.00
.00 .00
-1-
.00
.00 .00
-I-
.00 .00
-1-
.00 .00 0
-1- 1-
.00 PIPE
,AGE
.00
o
1-
"'"
I
.0
.00
o
1-
PIPE
I
.0
I
15 4 19.59 5.960 1289.462
-1- -1- -1- -1-
.110524 .36
I
15.4 18 68 5.418 1289
-1- -1- -1-
.100215
818
-I-
.3'
.00
-1-
.64
1.414
-1-
5.470
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
I
15.4 18 24 5.164 1290.148
-1- -1- -1- -1-
.091166 .53
I
15 4 17.39 4.694 1290.683
-1- -1- -1- -1-
.080322 .37
I
15.4 16.58 4.268 1291
-1- -1- -1-
.070793
.054
-I-
.26
.00
-I-
."
1.414
-I-
5104
o
1-
PIPE
I
.0
o
1-
"'"
I
.0
I
3.880 1291.319
-1- -1- -1-
.062449 .19
W 5 P G N - CIVILDESIGN Vers 7.1
Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING
15.4 15.81
-1-
.00
-I-
."
41.
-I-
4.760
.00
o
1-
"'"
I
.0
.00
o
1-
"'"
I
.0
.61
-1-
.32
1.414
-I-
4,437
.0
Date: 5-19-2000 Tim&: 3:11:24
2
**********************************************************************************************************************************
I Invert 1 Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeiqht/IBase Wtl INo Nth
Station I Elev I (F'I') I Elev I (CFS) I (FPS) Heild I Gro.EI.1 Elev I Depth I Width rOia.-FTlor 1.0.1 ZL lPn/Pip
-t- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/EIUl 1 Ch Slope I I I I SF Ave I HF I SE Dpth I Froud8 N I Norm Op I "N" 1 I ZR 1 Type Ch
*********1********1********1*********1*********1*******1********1*********1*******1********1********1*******1*******1*'"***1*******
1 I 1 I I I
1042.171287.14 .8421287.985 15.4 15.07 3.5271291.512
-1- -1- -1- -1- -1- -1- -1- -1-
2.58 .16643 .055166 .14
I
1044.74 1287.57
-1- -1-
2.18 .16643
I
1046.92 1287.93
-1- -1-
84 .16643
I
761288.24
-1- -1-
57 .16643
1048
I
1050.33 1288.50
-1- -1-
1.33 .16643
I
1051.66 1288.72
-1- -1-
1.13 .16643
I
1052.79 1288.91
-1- -j-
.94 .16643
I
1053.73 1289.07
-1- -1-
.77 .16643
1054
I
.501289.
-1-
I
.8761288.447
-1- -1-
I
.911 1288,845
-1- -1-
I
.949 1289
-I-
190
-I-
I
.9891289.491
-1- -1-
I
.032 1289
-1-
m
-I-
I
1.078 1289.988
-1- -r-
I
.128 1290.195
-1- -1-
19
-1-
I
.1631290
-1-
m
-1-
I
3.206 1291.654
-1- -j- -j-
.048777 .11
15.4 14.37
-I-
I
2.9151291.760
-1- -1- -1-
.043186 .08
15,4 13,70
-I-
I
2.650 1291
-1- -1-
.038310
15 4 13 06
-I-
.840
-I-
.06
I
2.4091291.900
-)- -1- -1-
.034052 .05
15.4 1246
-1-
I
2.1901291
-1- -1-
.030345
15 4 11 88
-1-
..5
-I-
.03
I
1.9911291.979
-1- -1- -1-
.027129 .03
15.4 11.32
-1-
I
1.810 1292
-1- -1-
.024367
15.4 10 80
-I-
oos
-I-
.02
154 10.29
-1- -1-
I
1.6451292.023
-1- -1-
.3'
-I-
1.24
.30
-I-
1.23
.32
-I-
1.23
.29
-1-
1.24
.26
-1-
1.25
.23
-I-
1.26
.20
-I-
1.28
.18
-1-
1.30
1.414
-1-
4.282
1.414
-I-
3.988
1.414
-1-
3.711
1.414
-1-
3.451
1.414
-1-
3.206
1.414
-I-
2.975
1.414
-I-
2.756
1.414
-I-
2.550
1.414
-1-
2 354
1.414
-I-
2167
.414
-I-
.987
1.414
-1-
.813
.>5
-1-
1.414
-1-
1.49
-1-
.622
1.48
-1-
.622
1.46
-I-
.622
1.45
-I-
.622
1.42
-1-
.622
1.39
-1-
.622
1.35
-I-
.622
1.30
-I-
.622
1.22
-I-
1.50
-1-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-I-
.013
.00
-I-
.00
.00
-I-
.00 .00
-1-
.00
.00 .00
-1-
.00
-I-
.00
-I-
.00
-I-
.00
.00
-I-
50
-1-
.00 .00
-1-
.00
o
1-
"'"
I
.0
.00
.00
o
1-
"'"
I
.0
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
.0
.00
o
1-
"'"
I
.00
.00
o
1-
"'"
I
.0
.00
o
1-
"'"
I
.0
.00
.00
o
1-
PIPE
I
.0
o
1-
.0
1,.'/JP
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.60
.16643
o
.022047 .01 1.33
'If S P G N - CIVILDESIGN Ven 7.1
For: RANPAC Inc., Temeeula, C.lifornia - SIN 560
WATER SURFACE PROFILE LISTING
LINE "L-l"
1.641
.622 .013 .00 PIPE
PAGE 3
Date: 5-19-2000 Time: 3:11:24
*****...,,*******************************************************.**...........********************.**..****.*******.**************
I Invert I Depth I Water I Q I Vel Vel I Energy f Super ICriticallFlow ToplHeiqht/lBase Wtt tNo Wth
Station I Elev I (FT) I Elev I ICFS) I IFPS) Hllild t Grd.El.1 Elev I Depth I Width IDia.-Ftlor 1.0.1 ZL lPn/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/.tl81'11 teh Slope I 1 I I SF Avtll HF ISE DpthlFroude NINorm. Dp I "N" I I ZR IType en
....**...1...*****1*****...1**..*****1*****.***1.****.*liriririririririrliririririririririrliriririr***I**ir*****I********I*******1**ir*irir*I*****)***irir**
II! 1 1 1 1 1 I) I
1055.10 1289.29 .246 1290.541 15.4 9.81 1.496 1292.037 .13 1.414 1.12 1.50 .00 .00
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1-
.44 .16643 .020176 .01 1.37 1.465 .622 .013
I
1055.54 1289.37
-1- -1-
.19 .16643
I
1055 73 1289.40
-1- -1-
WALL ENTRANCE
I
1055731289.40
-1- -1-
o
I
1.3181290.686
-1- -I-
I
1.414 1290.814
-1- -1-
I
38191293219
-1- -1-
I
15.4 9.36 1.360 1292.045 .10 1.414 ." 1.50 .00 .00
-I- -I- -1- -1- -I- -I- -I- -I- -1-
.018966 .00 1.42 1.272 .622 .013 .00
I
15.4 8.92 1.235 1292.049 .06 1.414 .70 1.50 .00 .00
-1- -1- -I- -I- -1- -1- -I- -1- -1-
15 .
-1-
I
.0051293224
-1- -1-
7.00 .00
-I-
.58
-I-
.00
-I-
.532
-I-
7 00
-I-
7.00
-I-
.00
o
1-
PIPE
I
.0
0 .0
1-
PIPE
I
0 .0
1-
o
1-
.0
-z,;,"\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD SECT
CODE NO
WSPGN
WATER SURFACE
HEIGHT 1 BASE
DIAMETER WIDTH
Date: 5-19-2000 Tilll&' 2:55:16
PAGE 1
YIS) Y(6) YI') Yla) y{p) 'tIIOI
- EDIT LISTING - Verllion 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR INV YlII 't(2) Y(3) Y(4)
DROP
CHN NO OF AVE PIER
TYPE PIER/PIP WIDTH
CD 1 4 0 1 .50
CD 2 2 0 .00 7 00 7.00 .00
0 1'1' S P G N PAGE NO
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING LINE 00 I IS
LINE "L-2"
HEADING LINE 002 IS
HEAD IHG LINE 003 IS LN . S .r;. !--RoM
0 WSPGN L--INf> ut-:' PAGE NO 2
WATER SURFACE PROFILE - ELEMENT CARD LIS1'!NG
ELEMENT NO IS A SYSTEM OUTLET
u/s DATA STATION INVERT SECT
1008.86 1280.17 1
ELEMENT NO 2 IS A REACO
U/S DATA STATION INVERT SECT 0 RADIUS ANGLE ANG 1"T MAN 0
1057.20 1290.40 1 .013 .000 .000 .000 0
ELEMENT NO 3 IS A WAU. ENTRANCE
U/s DATA STATION INVERT SECT FP
1057.20 1290.40 2 .500
ELEMENT NO 4 IS A SYSTEM KEAOWORKS
ulS DATA STATION INVERT SECT 1'1' S ELEV
1057.20 1290.40 2 1290.40
1.:(,'&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.. WARNING NO.2" - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWKDS, W.S.ELEV _ UN + DC
o W S P G N - CIVlLOESIGN VerI 7.1 PAGE
For: R.l>.NP,l,C Inc., T_cu1a, Calif'ornia - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 2:5521
LINE "L-2"
***.**...................***..***.**...............**********.....***...**.......*...........***.........***....*****."'**.............
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow TopIHeiqht/IBalll. Wtj IHo Wth
Station I tlev 11FT} I tlev I (CFSI I IFPS) Head I Grd.El.t tlev I Depth I Width ICia.-FTlar 1.0.' ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/E18lll I Ch Slope 1 I I I SF Ave I NF I SE Opth I Froud_ HI Horm Op I "N" I I ZR, Type Ch
***......I..**....I..******I*********J*********I*******1********1*********1*******1********1********1*******1*******1*****1*******
I I I I! I 1 I I I I I I
1008.86 1280.17 .541 1280.711 12.0 20.89 6.779 1287.490 .00 1.314 1.44 1.50 .00 .00 0 .0
-J- -1- -1- -1- -1- -1- -1- -1- -1- -J- -1- -1_ _1_ 1_
.04 .21163 .168239 .01 .54 5.832 .509 .013 .00 PIPE
1 1 I t
1008.90 1280.18 .541 1280.720 12.0 2087 6.766 1287.486 .00 1.314 1.44 1.50 .00 .00 0 .0
-1- -J- -1- -1- -1- -f- -f- -1- -1- -1- -1- -1- -1- 1_
11.03 .21163 .157596 1.74 .54 5.824 .509 .013 .00 PIPE
1 I I 1
1019.94 1282.51 .560 1283.074 12 0 19 90 6.151 1289.225 .00 1.314 1.45 1.50 .00 .00 0 .0
-1- -1- -J- -1- -1- -1- -1- -1- -1- -1- -1- _1_ -1_ 1_
7.33 .21163 .138247 1.01 .56 5.441 .509 .013 .00 PIPE
I 1 1 1
1021.27 1284.07 .581 1284.647 12.0 18.98 5.592 1290.239 .00 1.314 1.46 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- _1_ -1- 1_
5.40 .21163 .121358 .66 .58 5.084 .509 .013 .00 PIPE
I 1 I I
1032.67 1285.21 .602 1285.811 12 0 18 09 5.084 1290 894 .00 1.314 1.47 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
4.19 .21163 .106514 .45 .60 4 748 .509 .013 .00 PIPE
I I t 1
1036.86 1286.09 .624 1286 719 12 0 17.25 4.621 1291.340 .00 314 1.48 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1_ 1_
3.31 .21163 .093481 .32 .62 4 433 .509 .013 .00 PIPE
I 1 I 1
1040 23 1286.81 .646 1287.454 12.0 16.45 4.201 1291 655 .00 1.314 1.49 1.50 .00 .00 0 .0
-1- -1- -1- -f- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1_
2 76 .21163 .082078 .23 .65 4.136 .509 .013 .00 PIPE
I I 1 I
1042.99 1287.39 .670 1288.063 12 0 15.68 3.819 1291.882 .00 1.314 1.49 1.50 .00 .00 0 .0
-1- -1- -f- -1- -J- -1- -1- -1- -1- -J- -1- -1- -1- f-
2.31 .21163 .072148 .17 .67 3 859 .509 .013 .00 PIPE
I 1 I I
1045 30 1287.88 .695 1288.576 12.0 14.95 3.472 1292 049 .00 314 1.50 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
95 .21163 .063481 .12 .70 3.598 .509 .013 .00 PIPE
o W S P G N - CIVILDESIGN Vera 7.1 PAGE 2
For: RANPIIC Inc., Temecula, California - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 2:55:21
LINE "L-2"
***""*****"*"*""""",,***..*......*................................,,..,,........,,.."""""""""...................."".."".."""*..................*....******....""..",,""......*..""""""".."",,*....*
I Invert I Depth I Water I 0 I Vel Vel 1 Energy 1 Super ICriticallFlow ToplHeivht/IBaae Ntl INo Wth
Station' Elev I (FT) J Elev I ICFSI I IFPSI Head 1 Grd.El.1 Elev 1 Depth 1 Width IDia.-FTlor 1.0.1 ZL IPrs/Pip
-!- -1- -1- -1- -1- -1- -1- -1- -1- -1- -f- -1- -1- 1-
L/Elem ICh Slope I I I I SF Ava I HF ISE DptnlFrouda NINorm Dp 1 "Nil I 1 ZR IType en
"""""""""1"""""*** 1**""""""1 ,,*..***....* I..................J..*..*** *1....******1"*****......1*......"""1""***"....1............""1......"..**1**........"1..........1..........*"
I
1047.25 1288.29
-1- -1-
67 .21163
1
1048921288.65
-1- -1-
1.43 .21163
I
1050.35 1288.95
-1- -1-
1.23 .21163
I
1051581289.21
-1- -1-
1.06 .21163
1
1052.64 1289.43
-1- -1-
.92 .21163
I
1053 55 1289.63
-1- -I-
.79 .21163
1
1054.34 1289.79
-1- -1-
.67 .21163
1
1055 01 1289.94
-1- -1-
.57 .21163
I
1055.58 1290 06
-1- -1-
I
.722 1289.016
-1- -1-
I
.7491289396
-1- -1-
1
.778 1289.727
-1- -1-
I
.808 1290 018
-1- -1-
1
.840 1290274
-1- -1-
1
.873 1290.501
-1- -1-
I
.908 1290 703
-1- -1-
I
.9461290882
-1- -1-
I
.9861291043
-1- -1-
I
12.0 14.26 3.157 1292
-1- -1- -1-
.055883
172
-1-
.09
I
2.870 1292.266
-1- -1- -1-
.049208 .07
12 0 13 59
-I-
1
2.6091292
-1- -1-
.043373
12.0 12.96
-I-
336
-I-
.05
1
2.372 1292
-1- -1-
.038262
120 1236
-1-
'"
-1-
.0'
I
2.156 1292
-1- -1-
.033785
12.0 11.78
-1-
430
-I-
.03
I
12.0 11.23 1.960 1292.461
-1- -1- -1- -1-
.029857 .02
1
12.0 10.71 1.782 1292.484
-1- -1- -1- -1-
.026436 .02
I
12.0 10 21 1.620 1292
-1- -1- -1-
.023453
50'
-1-
.0'
1
12 0 9 74 473 1292.515
-1- -1- -1- -1-
.00
-I-
.n
314
-1-
3 353
.00
-I-
."
1.314
-1-
3.123
.00
-I-
. "
1.314
-1-
2 906
.00
-1-
.81
1.314
-1-
2 703
.00
-1-
.84
31.
-1-
2.511
.00
-1-
.B7
1.314
-I-
2.330
.00
-I-
.Ol
1.314
-1-
2 160
.00
-I-
. "
.314
-I-
1.998
.00
-1-
1.314
-I-
1.50
-I-
.509
1.50
-I-
.509
1.50
-I-
.509
1.50
-1-
.509
1.49
-1-
.509
1.48
-I-
.509
1.47
-1-
.509
1.45
-1-
.509
1.42
-1-
1.50
-I-
.013
.00 .00
-1-
.00
o
1-
P,PE
I
.0
1.50
-I-
.013
.00 .00
-1-
.00
o
1-
PIPE
I
.0
1.50
-1-
.013
.00 .00
-1-
.00
o
1-
P,PE
I
.0
1.50
-1-
.013
.00 .00
-I-
.00
o
1-
PIPE
I
.0
1.50
-1-
.013
.00 .00
-1-
.00
o
1-
PIPE
I
.0
1.50
-1-
.013
.00 .00
-1-
.00
o
1-
PIPE
I
.0
1.50
-1-
.013
.00 .00
-1-
.00
o
1-
PIPE
I
.0
1.50
-1-
.013
.00 .00
-1-
.00
o
1-
PIPE
I
.0
1.50
-I-
.00 .00
-1-
o
1-
.0
7P\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.48 .21163 .020846 .01 ." 1.845 .S09 .013 .00 PIPE
0 W , P G W - CIVILDESIGN Vera 7.1 PAGE ,
For: "'PA<: Inc., T8IfI8cula, California - SiN SSO
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Ti.me: 2:55 21
LINE "L-2"
..................................................................................................**...............................
I Invert I Depth I Water I 0 I V.l V.l I Emilr<1)" I Super ICriticallFlow TopjHeiqht!IBue Wtl IHo Wth
Station I tlev I (FT' I tlev I (CiS) , {FPSJ Head ( Grd.El.l tlev I Depth I Width IDia.-FTlor 1.D.1 2L lPn/Pip
-(- -I- -I- -1- -1- -1- -(- -I- -I- -I- -1- -1- -I- I-
L/Ellllll (Ch Slopel I I I SF Ave I NF ISE DpthjFroude NINorm Dp I UN" I I ER I Type Ch
......***1........1........1.........1.........1.......1.....***I********.l"......I......**I........I.......1......"1*****1........
I I I I I I I I
1056.06 1290.16 029 1291.187 12.0 9.28 1.339 1292 52' .00 .314 1.39 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -I- -1- -1- -I- -1- -1- -I- I-
." .21163 .018577 .01 1.03 .698 .509 .013 .00 PIPE
I I I I
1056.45 1290.24 1.075 1291.316 12 .0 8.85 1.217 1292.533 .00 .314 1.35 1.50 .00 .00 0 .0
-I- -I- -I- -I- -I- -I- -1- -1- -I- -1- -I- -I- -I- I-
.32 .21163 .016601 .01 1.08 1,558 .509 .013 .00 PIPE
I I I (
1056.76 1290.31 1.124 1291.432 12.0 8.44 1.106 1292.538 .00 1.314 1.30 1.50 .00 .00 0 .0
-I- -I- -1- -I- -I- -I- -1- -(- -I- -1- -I- -I- -I- I-
.23 .21163 .014902 .00 1.12 422 .509 .013 .00 PIPE
I I I I
1057 00 1290.36 1.179 1291 '" 12 0 , 05 1.006 1292.541 .00 .314 1.23 1.50 .00 .00 0 .0
-I- -1- -1- -I- -I- -I- -I- -I- -I- -I- -I- -1- -I- 1-
.15 .21163 .013476 .00 1.18 2" .509 .013 .00 PIPE
I I I I
1057.14 1290.39 1.241 1291 "9 12.0 7.67 .914 1292.543 .00 31. 1.13 1.50 .00 .00 0 .0
-I- -,- -I- -I- -I- -,- -I- -1- -(- -(- -I- -,- -I- 1-
.06 .21163 .012316 .00 1.24 151 .509 .013 .00 PIPE
I I I I
1057 20 1290.40 1.314 1291.714 12.0 7.31 .830 1292.544 .00 1.314 ." 1.50 .00 .00 0 .0
-I- -I- -1- -1- -1- -1- -1- -I- -I- -1- -I- -I- -I- I-
WALL ENTRANCE
I I I
1057 20 1290 40 2 .851 1293.251 12 0 .60 .006 1293.257 .00 .450 7.00 7.00 00 .00 0 .0
-1- -1- -1- -1- -1- -(- -(- -(- -(- -(- -I- -I- -I- I-
e
1?
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD SECT eRN NO OF AVE PIER
CODE NO TYPE PIER/PIP WIDTH
CD 1 . 0
CD 2 3 0
0
HEADING LINE NO 1 "
HEADING LINE NO 2 "
HEADING LINE NO 3 ,.
0
.00
WSPGN
WATER SURFACE
HEIGHT 1 BASE
OIAMETER WIDTH
- EDIT LISTING - Versi.on 7.0
PROFILE - CHANNEL DEFINITION
ZL ZR IHY Y(l) Y(2)
OROP
1.50
6.00
1.00
.00 .00 .00
WSPGN
TITLE CARD LISTING
WATER SURFACE PROFILE -
LINE "L-3"
ELEMENT NO
WATER SURFACE
IS A SYSTEM OUTLET '*
'J/s DATA STATION
1003.45
ELEMENT NO 2 IS A REACH
u/s DATA STATION
1057.61
ELEMENT NO 3 IS A WALL ENTRANCE
UIB DATA STATION
1057.61
ELEMENT NO IS A SYSTEM HEADWORKS
u/s DATA STATION
1057.61
W S P G N
PROFILE - ELEMENT CARD LISTING
INVERT SECT
1293.63 1
INVERT SECT N
1298.25 1 .013
INVERT SECT FP
1298.25 2 .500
INVERT SECT
1298.25 2
Date: 5-19-2000
LISTING
Y(3) Y(4)
Y(5) Y(6) Y(7)
RADIUS ANGLE
.000 .000
W S ELEV
1298.25
Tilfllt: 2:36:17
PAGE 1
Y(8) Y(9) Y(101
PAGE NO
PAGE NO 2
ANG PT
,ODD
MAN N
o
1,-"'1.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
WARNING NO.2" - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWKDS, W. S. ELEV .. UN + DC
o W S P G N - CIVILDESIGN Ven 7.1 PAGE
For: RANPAC Inc., T_cula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 TirMl: 2:36 23
LINE "L-3"
**************.........**...........................................".""............................-...........-................."'....
I Invert I Capth I Water I Q I Vel Vel I Energy I Super ICriticallFlow TopIHeight/IBa.. Wtl 'No Wth
Station I Elev I (FT) 1 Elev I CCFS) I IFPS) Head I Grd.El.1 Uev I Depth I Width IOia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem leh Slope I I I I SF Ave I HF ISE DpthlFroud8 NINorm Op I "N" I I ZR IType eh
********.1*****...1******..,.........1.........1.......1...........1.........1.......1........1............1.............1"""""""1.."""1"""""""
I
1003.45 1293.63
-1- -1-
9.91 .08530
I
1013.421294
-1-
HYDRAULIC ..:ruMP
I
1013 42 1294
-I-
'55
.48
-1-
48
-1-
.08530
I
1019.91 1295.04
-1- -1-
8.83 .08530
I
1028.19 1295.19
-1- -1-
6.14 .08530
I
1034.93 1296.32
-1- -1-
.61 .08530
I
103954 1296.11
-1- -1-
3 60 .08530
I
1043.14 1291.02
-1- -1-
2.91 .08530
I
1046.05 1291.26
-1- -1-
2.36 .08530
o
I
2.9101296540
-1- -I-
I
2.122 1296.602
-1- -1-
I
.561 1295 048
-1- -1-
I
.511 1295.616
-1- -I-
I
.591 1296 389
-1- -1-
I
.619 1296.935
-1- -I-
I
.642 1291351
-1- -I-
I
.6661291.682
-1- -1-
I
.6901291.954
-1- -1-
For: RANPAC Inc.,
LINE "L-3"
I
8.3 4.10 .343 1296
-1- -1- -1-
.006243
883
-1-
.0'
I
8.3 4.10 .343 1296.945 .00
-1- -1- -1- -1- -1-
.00
-1-
2.91
I
8.3 13 56 2.854 1291
-1- -1- -1-
.065501
'01
-1-
.43
7.1
560
LISTING
1.116
-I-
.000
11'
-I-
.00
-I-
.57
116
-I-
3 683
.00
-I-
.533
..
-I-
.533
1.46
-I-
.533
1.41
-1-
.533
1.48
-1-
.533
1.48
-1-
.533
1.49
-I-
.533
1.50
-I-
.533
1.50
-1-
.013
.00
-1-
.50
-1-
.00 .00
-1-
.00 .00
-I-
.00 .00
-1-
.00
.00 .00
-1-
.00 .00
-1-
.00
.00 .00
-I-
.00 .00
-I-
.00
.00 .00
-I-
.00 .00 0
-1- 1-
.00 PIPE
PAGE
.00
o
1-
PIPE
I
.0
1.50
-1-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-1-
.013
o
1-
.0
I
8.3 13.25 2.125 1298.341
-1- -1- -1- -1-
.059510 .53
I
8 3 12 63 2.411 1298.866
-1- -1- -1- -1-
.052203 .32
I
3 12 04 2.252 1299
-1- -1- -1-
.045850
187
-I-
.21
.00
-I-
...
1.116
-I-
3.563
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
I
8 3 11.48 2.041 1299.398
-1- -1- -1- -1-
.040290 .15
I
8.3 10.95 1.861 1299.543
-1- -1- -1- -1-
.035400 .10
I
1.6921299646
-1- -1- -1-
.031116 .07
W S P G N - CIVILDESIGN Vera
Temecula, California - SiN
WATER SURFACE PROFILE
8.3 10.44
-I-
.00
-1-
.'0
1.116
-1-
3.327
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
-I-
.62
1.116
-1-
3.107
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
-I-
.64
116
-1-
2 900
.0
Date: 5-19-2000 Time: 2:3623
2
..............................................................................................................................................................................................................................................
.00
-I-
.67
1.116
-1-
2.705
1 Invert I Depth 1 Water I Q I Yel Yel I Enerqy I Super ICriticallFlow TopIHeiqht/IBa,. Wtl IHo Wth
Station I Elev I (FT) 1 Elev I ICFS) 1 IFPB) Head I Grd.El.l Elev I Depth 1 Width IOia.-FTlor 1.0.1 ZL lPn/pip
-1- -1- -1- -1- -1- -1- -1- -t- -1- -1- -1- -1- -1- 1-
L/Elem I Ch Slope I I I I SF Ave t HF 1 BE Opth I Froude HI Horm Dp I "H" I J ZR I Type Ch
..................I...............t................I................. I""""""""" I"""""" ..1................1..............,............1................,................1..............1..............1..........1............
I 1 I 1 I 1 1 1 1
1048.41 1297.47 .716 1298181 8.3 9.95 1.538 1299.720 .00 1.116
-1- -1- -1- -1- -1- -1- -1- -1- -t- -t-
1.93 .08530 .027393 .05 .72 2.351
I
1050.34 1297.63
-1- -1-
1.62 .08530
I
1051.96 1297.77
-1- -1-
34 .08530
I
1053 30 1291.88
-t- -1-
1.11 .08530
I
1054.41 1297.98
-1- -1-
.91 .08530
I
1055.32 1298.05
-1- -1-
.73 .08530
I
1056.05 1298.12
-1- -1-
.51 .08530
I
1056.62 1298.17
-1- -1-
.44 .08530
I
1057.06 1298.20
-1- -1-
I
.744 1298
-I-
374
-I-
I
.772 1298.540
-1- -1-
I
.8021298.684
-1- -1-
I
.833 1298.810
-1- -1-
I
.8661298
-1-
921
-1-
I
.901 1299.018
-1- -t-
I
.939 1299
-1-
'"
-1-
I
.9781299
-1-
181
-1-
. 3
-I-
I
1.3981299
-1- -1-
.024127
772
-I-
."
"
'.3
-I-
I
1.211 1299.812
-1- -1- -1-
.021256 .03
9.05
. 3
-1-
I
1.1561299
-1- -1-
.018745
."
-I-
.02
8.63
. 3
-I-
I
1.0511299
-1- -1-
.016545
861
-I-
.02
23
'.3
-I-
I
.9551299.876
-[- -[- -t-
.014623 .01
7.84
'.3
-1-
I
.8681299.887
-t- -1- -t-
.012949 .01
7.48
. 3
-I-
I
.789 1299
-t- -t-
.011484
."
-1-
.01
7 "
'.3
-I-
I
.118 1299
-I-
'"
-I-
6.80
-I-
.00
-I-
."
1.116
-1-
2.523
.00
-I-
."
1.116
-I-
2.190
.00
-I-
.77
1.116
-I-
2.039
.00
-I-
.80
1.116
-I-
1.896
.00
-I-
.83
.116
-I-
.762
.00
-I-
.87
1.116
-I-
1.635
.00
-1-
.90
.116
-1-
.516
.00
-I-
."
.116
-1-
.403
.00
-1-
.116
-1-
1.50
-I-
.533
1.50
-I-
.533
1.50
-I-
.533
1.50
-1-
.533
1.49
-I-
.533
1.48
-I-
.533
1.47
-1-
.533
1.45
-I-
.533
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.013
.43
-1-
1.50
-1-
.00 .00
-I-
.00
.00
-I-
.00
-1-
.00
-1-
.00
-1-
.00
-I-
.00
-I-
.00
.00
-1-
.00
-1-
o
1-
PIPE
I
.0
.00
.00
o
,-
PIPE
I
.0
.00
.00
o
,-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
1
.0
.00
o
,-
.0
~'J}-'
I
I
I
I
I
I
I
I
I'
I
I
I
I
I
I
I
I
I
I
.31
,08530
.01019a .00 .98
W S P G N - CIVILDESIGN Vera 7.1
For: RANPAC Inc., Temecula, California - SiN 560
WATER SURFACE PROFILE LISTING
1.296
.533 ,013 .00 PIPE
PAGE 3
o
Oat.: 5-19-2000 Time: 2:36 23
LINE "L-3"
*************....,,*****"'.........,,****...................***....""...,,**..............**................**....,,****.....*****................
1 Invert I Depth I Waur I Q I Vol Vol I Ener\JY I Super ICriticallFlow ToplHeiqht/IBue Wtl INo Nth
Station I Elev I eFT) I Ellilv I (CFS) 1 (FPS) Head I Grcl.El.l Elev I Oepth I Width fDia.-FTlor I.D.l ZL IPrsjPip
-1- -1- -1- -1- -I- -I- -I- -1- -1- -I- -1- -I- -I- I-
L/Elmn leh Slope I I I I SF Avel HF IS' Opth I Froude N I Norm Op I "N" I I ZR 'Type Ch
*"......**1"...****1*"....**1*********1*********1.**...*1........1...."**..1....***1******..,.....**.1.......!.......I.....,.......
I I I
1057.37 1298.23 1.020 1299 250 8.3 6.48 .652 1299.902 .00 .116 1.40 1.50 .00 .00 0 .0
-I- -1- -I- -I- -1- -1- -1- -1- -1- -1- -1- -1- -I- I-
.19 .08530 .009080 .00 1.02 .194 .533 .013 .00 PIPZ
I I I I
1057 56 1298.25 065 1299 311 8 3 6. 18 .593 1299.904 .00 .116 1.36 1.50 .00 .00 0 .0
-1- -I- -1- -I- -1- -1- -I- -1- -I- -I- -1- -1- -I- 1-
.05 .08530 .008105 .00 07 0" .533 .013 .00 PIPE
I I I 1
1057 61 1298.25 1.116 1299.366 '.3 5.89 .538 1299.904 .00 1.116 31 .50 .00 .00 0 .0
-I- -1- -I- -I- -1- -1- -I- -1- -1- -I- -1- -1- -I- I-
WALL ENTRANCE
I I I
1057.61 1298.25 .996 1300.246 8.3 .59 .005 1300.251 .00 .352 7.00 6.00 7.00 .00 0 .0
-1- -1- -1- -I- -1- -1- -I- -I- -1- -I- -1- -1- -I- I-
0
~~9;)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
w S P G N - EDIT LISTING - Version 1.0 Data: 5-19-2000 Time: 2:45 56
WATER SURFACE PROFILE - CHANNEL DEFINITION LISTING PAGE 1
CARD SECT CRN NO OF AVE PIER HEIGHT 1 BASE ZL Z. INY T(l) Y(2) Y(3) Y(4) TIS) Y(Sl Y(7) Y(S) Ylg) '((lO)
COOE NO TYPE PIER/PIP WIDTH DIAMETER WIOTH OROP
CD 1 4 0 1.50
CO 2 3 0 .00 7.00 7.00 .00 .00 .00
0 WSPGN PAGE NO
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING LINE PO IS
LINE "L-4"
HEADING LINE PO 2 IS
HEADING LINE PO 3 IS W-5.t;.. FRoM
0 w 5 P G N LfNt.. .ft.-If PAGE NO 2
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO IS A SYSTEM OUTLET .
u/s DATA STATION INVERT SECT
1003.99 1293.76 I
ELEMENT NO 2 IS A REACH
U/S DATA STATION INVERT SECT P RADIUS ANGLE ANG PT ..... H
1046.76 129B.25 1 .013 ,000 .000 .000 0
ELEMENT NO 3 IS A NAU. ENTRANCE
u/s DATA STATION INVERT SECT PP
1046.76 1298.25 2 .500
ELEMENT NO IS A SYSTEM HEADWORKS
uta DATA STATION INVERT SECT W S ELEV
1046.76 1298.25 2 1298.25
-z,~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'I
I
I
I
WARNING NO.2 ** - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELeVATION IN HOWKDS, W S.ELEV - IN\! + DC
o W S P G N - CIVILDESIGN Ven 7.1 PAGE
For: llANPAC Inc., T_cula, Calit'ornia - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 2:46:
LINE "L-4"
.**.....**.................******.**..*..*******.........-...........--...............".........................".......-.......--
I Invert I Depth I water I a I Vel Vel J Energy I Super ICriticallFlow TopIHeight/lBa.. Wtl INo Wth
Station I Elev 11FT) I Elev J (CFS) 1 IFPS) Head I Grd.El.1 Elev I Depth I Width IDia.-FTlor 1.0.1 ZL lPn/Pip
-1- -j- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slopel I I I SF Avet HF ISE DpthlFroude NINorm Op I "M" I I ZR I~ Ch
.......**1........1........1.........1.........1.......1........1.........1.......1........1........1.......1.......1.....1.......
1 I 1 I I I I I I I j I
1003 99 1293.76 2 780 1296.540 3.3 87 .054 1296 594 .00 .692 .00 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- !-
12 31 .10498 .000976 .01 78 .000 .315 .013 .00 PIPE
1 1 I I
1016.30 1295.05 1.500 1296 552 3.3 87 .054 1296.606 .00 .692 .00 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1.28 .10498 .000914 .00 1.50 .000 .315 .013 .00 PIPE
1 I I I
1017 .58 1295.19 .360 1296 547 3.3 1.96 .060 1296.607 .00 .692 .87 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -j- -j- -1- -1- -1- -1- -1- -1- 1-
.45 .10498 .000893 .00 1.36 .248 .315 .013 .00 PIPE
1 I I I
1018 03 1295 23 .280 1296.514 3 3 2.05 .066 1296 579 .00 .692 06 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
HYDRAULIC JUMP
I I I
1018.03 1295.23 .322 1295.556 3.3 11.85 2.180 1297.736 .00 .692 1.23 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
2.32 .10498 .090395 .21 .32 4.392 .315 .013 .00 PIPE
I I I I
1020.35 1295.48 .333 1295.BI0 3.3 1129 1.979 1297.789 .00 .692 1.25 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
6.47 .10498 .07BBBl .51 .33 4.109 .315 .013 .00 PIPE
I I I j
1026 82 1296.16 .344 1296.501 3.3 10 76 1.799 129B.300 .00 .692 1.26 1.50 .00 .00 0 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
21 .10498 .06B948 .29 .34 3 848 .315 .013 .00 PIPE
I I I 1
1031.03 1296.60 .356 1296.954 3 3 10 26 1.636 1298.590 .00 .692 1.28 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- [-
3.06 .10498 .060290 .18 .36 3.604 .315 .013 .00 PIPE
I I I 1
1034.08 1296.92 .368 1297.287 3 3 79 1.487 1298.774 .00 .692 1.29 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
2.34 .10498 .052729 .12 .37 3 374 .315 .013 .00 PIPE
o w S P G N - CIVILOESIGN Vera 7.1 PAGE
For: RANPAC Inc. Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 2:46:
LINE "L-4"
...................................................."".".."...................................................""""............."..
1 Invert I Depth I Water I Q I Vel Vel I Energy I S~per ICritica11F1ow ToplHeiqht/1Base Wtl tNo wth
Station! nev I (FT) I nev I (CFS) I (FPS) Head I erd.n.1 nev I Depth I Width IDia.-FTlor 1.0.1 ZL IPrs/Pip
-(- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/E1&1l1 I Ch Slope I I I I SF Ave I HF I SE Dpth I Fro~de N I Norm Dp I "1'1" I I ZR I Type Ch
.........1........1........1.........1.........1.......1........1.........1.......1....."".1........1.......j...."."[.....,.......
1 I I I I I I I I 1 I I
1036.42 1297.16 .3Bl 1297 546 3 3 9 33 1.352 1298 898 .00 .692 1.31 1.50 .00 .00
-[- -1- -1- -1- -1- -1- -1- -1- -1- -1- -[- -1- -1-
1.B7 .1049B .046130 .09 .38 3.160 .315 .013
I
29 1297.36
-1- -1-
51 .10498
I
1039.80 1297.52
-1- -1-
1.26 .10498
1038
I
1041.06 1297.65
-1- -1-
1.06 .10498
I
1042.121297.76
-1- -1-
.87 .10498
I
991297.85
-1- -1-
.75 .10498
I
1043.74 1297.93
-1- -1-
.62 .10498
1042
I
1044.36 1298.00
-1- -1-
.53 .10498
1044
I
891298.05
-1- -1-
I
.394 1297
-I-
I
1.229 129B
-1- -1-
.040362
...
-I-
.06
755
-I-
3 3
-1-
8.90
I
.4081297
-1-
I
1.117 1299.045
-1- -1- -1-
.035324 .04
.928
-I-
3 3
-I-
8.48
I
.4221298.074
-1- -1-
I
1.0161299
-1- -1-
.030892
089
-I-
."
3 3
-1-
8.09
I
.436 1298.199
-1- -1-
I
.923 1299.
-1- -1-
.027039
122
-I-
.02
3 3
-I-
.71
I
.4521298
-I-
I
.8391299.
-1- -1-
.023674
306
-1-
3 3
-1-
.35
'"
-I-
.02
I
.4671298
-1-
I
.7631299.
-1- -1-
.020725
163
-1-
.01
"0
-I-
3 3
-I-
7 01
I
.4B41298
-I-
I
.694 1299.176
-1- -1- -1-
.018161 .01
'"
-I-
3 3
-1-
6.68
I
.501 1298.555
-1- -1-
I
.631 1299.186
-1- -1-
3.3
-I-
6.37
-1-
.00
-I-
.39
.692
-I-
2 95B
.00
-I-
.U
.692
-I-
2.769
.00
-I-
.<2
.692
-I-
2.591
.00
-I-
...
.692
-I-
.424
.00
-I-
...
.692
-I-
2.269
.00
-I-
.n
.692
-I-
2 122
.00
-I-
...
.692
-I-
1.985
.00
-I-
.692
-I-
1.32
-I-
.315
1.34
-I-
.315
1.35
-1-
.315
1.36
-I-
.315
1.38
-I-
.315
1.39
-I-
.315
1.40
-I-
.315
1.41
-I-
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.00
-I-
.00
-I-
.00
-1-
.00
.00
-I-
.00
.00 .00
-1-
.00
.00
-I-
.00 .00
-I-
.00
-I-
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
o
1-
PIPE
I
.0
.00
.0
.00
o
1-
PIPE
I
.00
o
1-
PIPE
I
.0
.00
o
1-
.0
J,:~
I
I
,I
I
I
I
I
I
I
t
I
I
I
I
I
I
,I
I
I
.44 .1049B .015913 .01 .50 1.956 .315 .013 .00 PIPE
C . 5 P G . - CIVILDESIGN Verll 7.1 PAGE 3
For: """PAC Inc. , TBIlI&cu!a, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 2:46:
LINE "L-4"
**.........****......*******....**..*****.........**.....****....................................**...............................
I Invert I Depth I Water I Q I V.l V.l I Enerqy I Super ICriticallFlow ToplHeioht/1Balle Ntl INo Wth
Station I Elev I (FT) I Elev I (eFSI I (FPS) Mead I Grd.El.1 Elev I Depth I Width IDJ.a.-FTlor 1.0.1 'L lPn/Pip
-I- -1- -I- -I- -1- -I- -I- -1- -1- -I- -1- -1- -I- 1-
L/Elem leh Slopel I I I SF Ave' NF ISE OpthlFl:oude NINarm Op I "N" I I '" l'type Ch
.***......I**......j....***.,..**..***I**...**..I**....*1**......1.....**..1.......1........1.......*1"......1...*...1....*1.......
I I I I
1045.34 1299.10 .519 1299 "0 3 3 6.09 .573 1299.193 .00 .692 1.43 1.50 .00 .00 0 .0
-I- -1- -1- -I- -I- -1- -1- -I- -1- -1- -I- -I- -I- I-
.37 .10499 .013944 .01 .52 .736 .315 .013 .00 PIPE
I I I I
1045 71 1299.14 .537 1299.677 3 3 5.79 .521 1299 19. .00 .692 1.44 1.50 .00 .00 0 .0
-I- -1- -I- -1- -1- -I- -I- -I- -1- -I- -1- -1- -I- I-
.30 .10499 .012226 .00 .54 1.622 .315 .013 .00 PIPE
I I I I
1046 01 12518.17 .557 12519.729 3 3 5.52 .474 1299.202 .00 .692 1.45 1.50 .00 .00 0 .0
-1- -1- -I- -1- -I- -1- -1- -I- -I- -I- -1- -1- -I- I-
.24 .104519 .010729 .00 .56 1.516 .315 .013 .00 PIPE
I I I I
1046.25 1298.20 .577 12518.774 3.3 5.27 .431 125151.204 .00 .6512 1.46 1.50 .00 .00 0 .0
-I- -I- -1- -I- -1- -I- -1- -I- -I- -I- -I- -I- -I- I-
. " .10499 .009412 .00 .58 1.417 .315 .013 .00 PIPE
I I I I
1046.44 1298.22 .598 1298.815 3.3 5.02 .392 1299.206 .00 .692 1.47 1.50 .00 .00 0 .0
-1- -1- -I- -I- -1- -I- -I- -I- -I- -I- -I- -I- -I- 1-
.15 .10498 .008257 .00 .'0 323 .315 .013 .00 PIPE
I I I I
1046 59 1298.23 .619 1298.851 3.3 4.79 .356 1299.207 .00 .692 1.48 1.50 .00 .00 0 .0
-1- -1- -1- -I- -I- -1- -1- -1- -I- -1- -I- -I- -I- I-
.10 .10498 .007247 .00 ." 1.235 .315 .013 .00 PIPE
I I I I
1046.69 1298.24 .642 1298 ... 3.3 4.57 .324 1299.208 .00 .692 1.48 1.50 .00 .00 0 .0
-I- -1- -I- -I- -1- -1- -1- -I- -I- -I- -1- -I- -I- 1-
.05 .10498 .006368 .00 ... 1.153 .315 .013 .00 PIPE
I I I I
1046.74 1298.25 .666 1298 ,,, 3.3 4.35 .294 1299 20. .00 .692 1.49 1.50 .00 .00 0 .0
-I- -I- -1- -I- -I- -1- -I- -I- -I- -I- -1- -1- -I- I-
.02 .10498 .005585 .00 .67 .076 .315 .013 .00 PIPE
I 1 I I
1046.76 1298.25 .692 1298 ,., 3 3 " .266 1299.208 .00 .692 1.50 50 .00 .00 0 .0
-1- -I- -1- -I- -I- -1- -1- -1- -1- -1- -1- -1- -I- I-
WALL ENTRANCE
0 W , P G N - CIVILDESIGN Vel'S 7.1 PAC'
For: """PAC Inc. T8I1IfIcula, california - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 2:46:
LINE nL_4"
...................................................................................................................................................................................
1 Invert 1 Depth I Water 1 Q I Vel Vel 1 Enerqy 1 Super ICriticallFlow TopIH8ight/l~se Wtl INo Wth
Station 1 Elev 1 IFTl t Elev 1 (eFS) 1 IFPS) Head 1 Grd.El.1 Elev 1 Depth 1 Width IDia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slope I 1 1 I SF Ave I HF ISE DpthlFroude NINorm Dp 1 "N" I 1 ZR!Type Ch
............1.........1............1.........1.........1........,........1.........1.......,........,........1........1........1.....'.......
1 I 1 1 J 1 I 1 1
1046.76 1298.25 .077 1299327 3.3 .44 .003 1299.330 .00 .190 7.00 700 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
o
?,;'I/e
I
I
I
I
I
I,
I
I
I
i
I
I
I
I
I
I
I
I
I
w S P G N - EDIT LISTING - Verllion 7.0 Data: 5-19-2000 Time: 3:16 52
WATER SURi'ACE PROFILE - CHANNEL DEFINITION LISTING PAGE 1
"""" SECT CRN NO OF AVE PIER HEIGHT 1 .....E ZL ZR INV "ill} '1(2) Y(3) Y(4) Y(S) Y(6) Y171 "fIS) Y(9) "ifIO)
COOE NO TYPE PIER/PIP WIDTH DIAMETER WIDTH DROP
CD 1 D 1.50
CD 2 1 3.00
0 W S P G N PAGE NO
WATER SURFACE PROFILE TITLE CARD LISTING
HEAPING LINE NO IS
LINE "L-S"
HEAOING LINE NO 2 IS tJ.$.E- FRoM
HEADING LINE NO 3 IS
0 MSPGN Uf,JE "(.: 1-' PAGE NO 2
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO IS A SYSTEM OUTLET
U/s DATA STATION INVERT SECT
1000.00 1289,50 1
ELEMENT NO 2 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANa PT MAN N
1036.00 1291.09 1 .013 .000 .000 .000 0
ELEMENT NO 3IS A WALL ENTRANCE
U/S DATA STATION INVERT SECT FP
1036.00 1291.09 Z .500
ELEMENT NO , IS A SYSTEM HEADWORKS
0/5 DATA STATION INVERT SECT W 5 ELEV
1036.00 1291.09 2 1291.09
'2,? 1.
I
I
I
I
I
,I
I
I
I
I
I
I
I
I
I
I
I
I
I
WARNING NO.2'" _ WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWKDS, W.S.ELEV - INV DC
o W S P G N - CIVlLOESIGN Vers 7.1 PAGE
For: RANPAC Inc., Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 3:16:56
LINE "L-S"
......****.....**.****....******.......**..***********..*********************************************..******...***.***********.*.
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICritieallFlow ToplHeight/lBase Wtl IHo Wth
Station I Uev 11FT) I nev I (CFS) I (FPS) Head I Grd.EI.1 tlev I Depth I Width IOh..-FTlor 1.0.1 ZL lPn/Pip
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -j- -1- 1-
L/Uem ICh Slopel I I I SF Avel KF ISE OpthlFroude NINorm Dp I "N" I I ZR I~ Ch
*********1.*******1***+++++1+++++++++1+++++++++1+++++++1++++++++1+++++++++1+++++++1++++++++1++++++++1*******!*******I*****!*******
lit 1 I I t 1 1
1000 00 1289.50 3 720 1293.220 6.5 3.68 .210 1293.430 .00 .986 .00 1.50 .00 .00 0 .0
-1- -1- -1- -1- -j- -1- -1- -1- -1- -1- -1- -1- -1- 1-
3600 .04417 .003829 .14 3.72 .000 .558 .013 .00 PIPE
1 I 1 1
1036 00 1291.09 2.268 1293.358 6.5 3.68 .210 1293.568 .00 .986 .00 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -!- -1- -1- -1- -1- 1-
WALL ENTRANCE
I I I
1036.00 1291 09 2 563 1293 653 65 1.01 .016 1293 669 .00 .801 2.12 3.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
o
7,~
.'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
r
I
I
I
WSPGN - EDIT LISTING - Version 7.0 Date: 5-19-2000 Time: 10:37 27
WATER SURFACE PROFILE - CHANNEL DEFINITION LISTING PAGE I
CARD SECT CHN NO OF AVE PIER HEIGHT 1 BASE EL ZR INV Y(l) Y{2) 'i(3} '((4) Y(51 Y(6) YPI Y(B) y(g) "({lO)
CODE NO TYPE PIER/PIP WIDTH DIAMETER WIDTH DROP
CD 4 0 2.00
D W S P G N PAGE NO
WATER SURFACE PROFILE TITLE CARD LISTING
HEADING LINE NOI IS
LINE "S"
HEADING LINE N02 IS
HEADING LINE NO 3 IS W.S".C- Fr('o('1
D w S P G N l..-Il\l'6 tiLt! PAGE: NO 2
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO IS A SYSTEM OUTLET
U/S DATA STATION INVERT SECT
1003.50 1283.73 I
ELEMENT NO 2 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1025.45 1285.13 I .013 .000 .000 .000 0
ELEMENT NO 3 IS A REACH
fJ/5 DATA STATION INVERT SECT H RADIUS ANGLE ANG PT MAN H
1100.00 1289.92 I .013 ge.803 -48.100 .000 0
ELEMENT NO 4 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1234.17 1298.53 1 .013 85.009 90.430 ,000 0
ELEMENT NO , IS A REACH
ujs DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1269.63 1300.81 I .013 .000 .000 .000 0
ELEMENT NO , IS A REACH
ujs DATA STATION INVERT SECT N RADIUS ANGLE ANG "., MAN H
1294.36 1302.39 I .013 26.938 52.600 .000 0
ELEMENT NO IS A SYSTEM HEADWORKS
UjS DATA STATION INVERT SECT W S ELEV
1294.36 1302.39 I 1302.39
7,. ,?o...
I
I
I,
I
I
,I
I
I
I
I
I
I
I
I
I
I
I
I
I
U WARNING NO.2'" - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDNKDS, W S.ELEV .. INV + DC
o W S 51 G N - CIVIlDESIGN Vel''' 7.1 PAGE
For: RANPAC Inc., T_cula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:lO:37:31
LINE "B"
"'...."''''**...............................................'''..,,*................****.....***........**.............*...."'.*******..............**
I Invert I Depth I Water 1 Q I Vel Vel I Enerqy I Super ICritieallFlow ToplHeight/IBaae Wtl INo Wth
Station I Uev I (FT) I Elev I (CFS) I (FPS) Head I Grd..El.l Uev I Oepth I Width JOia.-FTJor 1.0.1 ZL lPn/Pip
-1- -1- -1- -1- -J- -1- -1- -1- -1- -1- -1- -(- -1- j-
L/E-1em I Ch Slope I I I I SF Ave J HF I BE Dpth I Froude N I Norm Dp I "N" I I ZR I Type Ch
........*1........1........1.........1.........,.......1........I.........I.......I........I........r.......r.......I.....I.......
1 I I 1 1 r I
1003.50 1283.73 3.820 1287.550 14.5 .62 .331 1287.881 .00 372 .00 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
20.36 .06378 .004108 .08 3.82 .000 .687 .013 .00 PIPE
1 1 I I
1023.86 1285.03 2.605 1287.633 14.5 4.62 .331 1287 964 .00 .372 .00 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
HYORAIJLIC JUMP
I I I
1023.86 1285 03 .686 1285 715 14.5 15 21 3.593 1269.307 .00 1.372 90 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1.59 .06378 .064134 .10 .69 3.783 .667 .013 .00 PIPE
t 1 I 1
1025 45 1285.13 .686 1285 816 14.5 15 21 3.593 1289 409 .15 1.372 1.90 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
74.55 .06425 .064134 4.78 .84 3.783 .686 .013 .00 PIPE
I 1 1 1
1100.00 1289.92 .686 1290.606 14.5 15.21 3.593 1294.199 .16 1.372 1.90 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
29.16 .06417 .064134 1.87 .85 3.783 .686 .013 .00 PIPE
I I I I
1129.16 1291.79 .686 1292.477 14.5 15.21 3.593 1296.070 .16 .372 1.90 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
74.99 .06417 .061286 4.60 .85 3 783 .686 .013 .00 PIPE
1 I 1 I
1204.15 1296.60 .703 1297.307 14.5 14 71 3.359 1300.666 .15 1.372 1.91 2.00 .00 .00 0 .0
-1- -1- -1- -1- -!- -1- -!- -1- -1- -1- -1- -1- -1- 1-
30.02 .06417 .054835 1.155 .85 3 608 .686 .013 .00 PIPE
I I I I
1234.17 1298.53 .728 1299.258 14.5 14.02 3.054 1302.312 .00 .372 1.92 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
00 .06430 .049962 .35 .73 3 372 .15815 .013 .00 PIPE
1 I I I
1241 17 1298.98 .738 1299 718 14.5 13 77 2.943 1302.661 .00 .372 1.93 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
12.98 .06430 .045689 .59 .74 3285 .686 .013 .00 PIPE
[J W S P G N - CIVILDESIGN Verll 7.1 PAGE 2
For: RANPAC Inc., Temecula, California - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:l0:3731
LINE "B"
..................................................................................................................................
1 Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeiqht/IBase Wtl IHo Wth
Station! Elev I (FT) I Elev I ICFSI I (FPSI Head I Grd.El.1 Elev I Depth I Width IDia.-FTlor 1.0.1 ZL IPrll/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem I Ch Slope I 1 I I SF Ave I HF ISE Dpth I Froud. HI Horm Dp I "N" I I ZR I Type Ch
.........1........1........1.........1.........1.......1........1.........1.......1........1........1.......!.......I.....I.......
I I I I 1
1254.15 1299.81 .764 1300.579 14.5 13.13 2.676 1303.254
-1- -1- -1- -1- -1- -1- -r- -1-
8 89 .06430 .040075 .36
I
1263 03 1300.39
-1- -t-
6.60 .06430
I
1269.63 1300.81
-1- -1-
1.91 .06389
1271
I
.54 1300.93
-1- -!-
.76 .06389
I
291301.24
-1- -1-
3 84 .06389
1276
I
1280.14 1301.48
-1- -1-
3.08 .06389
I
22 1301.68
-1- -1-
2 S3 .06389
1283
I
751301.84
-1- -1-
2 09 .06389
1285
1287
I
85 1301.
-1-
I
.792 1301.178
-1- -1-
I
2.433 1303
-1- -1-
.035179
14.5 12.52
-I-
I
.821 1301.631
-1- -I-
I
.831 1301
-I-
I
2.211 1303.843
-1- -1- -1-
.032157 .06
14.5 11.93
-I-
14.5 11 74
-I-
I
2.139 1303
-l- -1-
.029515
763
-I-
I
.862 1302.098
-1- -1-
I
1.9451304
-1- -1-
.025925
14.5 11 19
-I-
.043
-1-
,10
I
.893 1302
-1-
I
1.7681304.142
-1- -1- -1-
.022784 .07
374
-I-
14.5 1067
-1-
I
.927 1302
-I-
I
.962 1302
-1-
I
1.607 1304
-1- -1-
.020045
605
-I-
14.5 10.17
-I-
.213
-I-
."
I
1.4611304.263
-1- -1- -1-
.017638 .04
'"
-1-
H ,
-I-
9.70
97
-1-
I
.998 1302
-I-
.300
-I-
I
1.328 1304
-1-
972
-1-
14.5
-1-
9.25
-1-
m
-I-
,23
902
-I-
,H
,"
-I-
1.14
,31
-I-
1.14
,"
-I-
LlS
,24
-I-
1.17
,00
-I-
,"
1.372
-I-
3.0159
,00
-1-
,"
1.372
-I-
2.866
1.372
-I-
2.676
1.372
-1-
2.1513
.372
-I-
2 438
,26
-1-
15
372
-I-
2.275
1.372
-I-
2.121
.22
-I-
15
1.372
-I-
'"
.20
-I-
1.372
-I-
1.94
-I-
.686
1.96
-1-
.686
1.97
-I-
.687
1.97
-I-
.687
1.98
-I-
.687
1.99
-1-
.687
1.99
-I-
.687
2.00
-1-
.687
2.00
-I-
2.00
-1-
.013
2.00
-I-
.013
2.00
-I-
.013
2.00
-1-
.013
2.00
-1-
.013
2.00
-1-
.013
2.00
-I-
.013
2.00
-I-
.013
2 00
-1-
.00
-1-
,00
.00 .00
-I-
,00
-I-
,00
,00
-I-
,00
-1-
,00
-1-
,00
-1-
,00
-I-
.00
-1-
,00
o
1-
pm
I
,0
,00
o
1-
PIPE
I
.0
,00
o
1-
pm
I
,0
,00
,00
o
1-
PIPE
I
.0
,00
,00
o
1-
PIPE
I
.0
,00
.00
o
1-
PIPE
I
.0
,00
.00
o
1-
PIPE
I
,0
,00
.00
o
1-
PIPE
I
,0
.00
o
1-
.0
7,.AP
I
I
I
I
I
I
I
I
I
I
I
1
I
I
I
I
I
I
I
U WARNING NO.2'" - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HOWI<DS, W. S. ELEV .. UN + DC
o W S P G N - CIVILDESIGN Veu 7.1 PAGE
For: RANPAC Inc., Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:lO:48 30
LINE "8-1"
........***...........**********************.**********......******.*..************.........***........*****...**.************....****"'**.
I Invert I Depth I water I Q I Vel Vel I Energy I Super ICritieallFlow ToplHeioht/lBase Wtl INo Wth
Station I E1ev 11FT) I tlev I (CFS) I IFPS) Head I Grd.El.1 tlev I Depth I Width IDia.-Frlor 1.0.1 ZL IFrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slope I I I I SF Aver HF 1st OpthlFroude NINonn Op I "N" t I ZR IType Ch
...........1...******1********'*********1*********1*******1********1*********1*******1********1********1*******1*******1*****1*******
I I I I I I I
1002.92 1302.74 .504 1303244 B.l 1553 3.745 1306.989 .00 1.102 1.42 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -)- -1- 1-
6.75 .12437 .096570 .65 .50 .511 .476 .013 .00 PIPE
I I 1 I
1009 67 1303.58 .514 1304.093 B.l 15.11 3.547 1307.640 .00 102 1.42 1.50 .00 .00 0 .0
-1- -1- -1- -j- -1- -1- -1- -1- -j- -1- -1- -1- -1- 1-
818 .12437 .087156 .71 .51 4.341 .476 .013 .00 PIPE
1 I I 1
101785 1304.60 .532 1305.129 8.1 14.41 3.224 1308.353 .00 1.102 1.44 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- I-
S 71 .12437 .076383 .44 .53 .058 .476 .013 .00 PIPE
I I I I
1023 56 1305.31 .551 1305 858 8.1 13 74 2.931 1308 789 .00 1.102 1.45 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -j- 1-
.29 .12437 .066986 .29 .55 3.792 .476 .013 .00 PIPE
I I I I
102786 1305.84 .571 1306412 8.1 1310 2.665 1309077 .00 102 1.46 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
3 37 .12437 .058781 .20 .57 3 543 .476 .013 .00 PIPE
I 1 I 1
1031.23 1306.26 .592 1306 853 8.1 12 49 2.422 1309275 .00 102 1.47 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.74 .12437 .051579 .14 .59 3.310 .476 .013 .00 PIPE
I I I I
1033 97 1306.60 .613 1307 214 1 11.91 2.202 1309.416 .00 1.102 1.47 1.50 .00 .00 0 .0
-1- -1- -1- -1- -j- -1- -1- -1- -1- -1- -1- -1- -1- 1-
224 .12437 .045279 .10 .61 3.090 .476 .013 .00 PIPE
I I 1 I
103621 1306.88 .636 1307.516 1 11.35 2.002 1309.518 .00 1.102 1.48 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
88 .12437 .039774 .07 .64 2.885 .476 .013 .00 PIPE
I I 1 I
1038 08 1307.11 .659 1307 773 8.1 10 83 1.820 1309593 .00 1.102 1.49 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
57 .12437 .034951 .05 .66 2.691 .476 .013 .00 PIPE
o w 5 P G N - CIVIlDESIGN V..r. 7.1 PAGE
For: RANPAC Inc., Temecu1a, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:10:48:30
LINE "8-1"
****************..........****..........*..****.*******...................**..****..****......*........................*....*..........***........................................................
1 Invert I Depth I Wiater I Q I Vel Vel I Enerqy I Super ICriticdlFlow ToplHeiqht/IBalle Wtl IHo Wth
Station I Elev I (FT) 1 Elev I (CFS) I (ns) Head I Grd.EI.1 Elev I Depth I Width IDia.-FTlor 1.0.1 ZL IPrlll/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slope I I I I SF Ave I HF ISE DpthlFroude NINorm Op' "N" I I ZR IType Ch
.............1......*...1....*......,................1............1.......1.............1......",,,,,,,,,,1,,,..,,,,,,,,,,,,,,,1,,,,,,,,,,,,,,,,,,..,,,1,,,.,,,,,,,,,,,,,,,,,,,..............1....",..*'..........1.............
I I 1 I I I I I ,
1039 66 1307.31 .684 1307.993 8.1 10.32 1.654 1309.647 .00 1.102 1.49 1.50 .00 .00
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1-
.34 .12437 .030729 .04 .68 2 510 .476 .013
I
1040.991307.48
-1- -1-
1.13 .12437
I
1042.12 1307.62
-1- -1-
.96 .12437
I
08 1307.73
-1- -1-
.81 .12437
1043
1043
I
891307.84
-1- -1-
.68 .12437
1044
,
57 1307.92
-1- -1-
.56 .12437
1045
I
13 1307.99
-1- -1-
.45 .12437
1045
I
58 1308.05
-j- -1-
.37 .12437
1045
I
95 1308
-I-
I
.709 1308
-I-
I
1.504 1309
-1- -1-
.027027
.102
-1-
2 340
1.50
-I-
.476
1.50
-I-
.013
.00
-I-
, 84
'"
-I-
.OJ
.00
-1-
.71
184
-1-
'.1
-I-
I
.736 1308
-I-
I
.764 1308
-I-
I
1.367 1309
-1- -1-
.023795
.00
-I-
...
719
-I-
..2
...
-I-
. "
.102
-I-
2.180
1.50
-I-
.476
1.50
-1-
.013
,so
-I-
'.1
-I-
9.38
I
1.2431309
-1- -1-
.020957
1.50
-I-
.013
.00 .00
-I-
742
-I-
.'2
...
-I-
.76
.102
-1-
2029
1.50
-1-
.476
'.1
-I-
."
'"
-I-
I
.793 1308
-I-
I
1.1301309.759
-1- -1- -1-
.018474 .01
.102
-I-
."
1.50
-I-
.476
1.50
-1-
.013
.00
-I-
.00
.00
-,-
.79
'.1
-I-
.53
'"
-I-
I
.824 1308.744
-1- -1-
I
1.0271309
-1- -1-
.016309
102
-I-
7S5
1.49
-1-
.476
1.50
-I-
.013
.00
-1-
.00
771
-1-
.01
.00
-I-
..,
'.1
-I-
8.13
I
.857 1308.847
-1- -1-
I
.934 1309
-1- -1-
.014418
.00
-I-
...
1.102
-I-
1.629
1.50
-,-
.013
.00 .00
-I-
.00
1.48
-1-
.476
781
-1-
.01
.,
-1-
7.76
I
.892 1308
-I-
I
.849 1309.787
-1- -1- -1-
.012757 .00
1.50
-1-
.013
.00
-I-
.00
.00
-I-
...
1.102
-I-
511
1.47
-I-
.476
".
-I-
'.1
-I-
7.39
09
-I-
I
.928 1309.020
-1- -1-
I
.772 1309.792
-1- -1-
1.46
-1-
.50
-1-
.00
-1-
.00
-1-
102
-I-
1
-I-
7.05
-I-
.00
o
1-
PIPE
I
.0
.00
.00
.
1-
PIPE
I
.0
.00
o
1-
PIPE
I
..
.00
.
1-
PIPE
I
.0
.00
.0
o
1-
PIPE
I
.00
o
1-
PIPE
I
..
o
1-
PIPE
I
.0
.00
.0
o
1-
PIPE
,
.00
.0
.
1-
7,6...\
I
I
I
j
I
I
I
I
I
I
I
1
t
I'
I
I
I
I
I
CARD
CODE
w S P G N
WATER SURFACE
HEIGHT 1 BASE
DIAMETER WIDTH
Y(S) Y(61 'tPI
- EDIT LISTING - Version 7.0
PROFILE - CIfANNEL DEFINITION LISTING
ZL ZR INV 'tll) Y(2) Y(3) Y(4)
DROP
Date: 5-19-2000
SECT CHN NO OF AVE PIER
NO TYPE PIER/PIP WIDTH
CD 1 4 0 1 50
CD 2 , 0 .00 11 00 14.00 .00 .00 .00
0 HSPGN
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING LINE NO 1 IS
LINE "B-1"
HEADING LINE NDE IS
HEAD rNG LINE NO' IS
0 W S P G N
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO 1 IS A SYSTEM OUTLET .
UjS DATA STATION INVERT SECT
1002,92 1302.74 1
ELEMENT NO 2 IS A REACH
U/S DATA STATION INVERT SECT N
1046.58 1308.17 1 .013
ELEMENT NO , IS A WALL ENTRANCE
u/s DATA STATION INVERT SECT FP
1046.58 1308.17 2 .500
ELEMENT NO IS A SYSTEM HEADWORKS
U/S DATA STATION INVERT SECT
1046.59 130B.17 2
W.5.c H2.'01-'l
(....INt:- "(3"
RADIUS ANGLE
.000 .000
W S ELEV
1308.11
Timoa:lO:48 25
PAGE 1
yeS) y(g) 'tIlDI
PAGE NO
PAGE NO 2
ANG PT
.000
MAN N
o
'lAy
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1.71 .06389 .015527 .OJ 1.20 1.841 .687 .013 .00 PIPE
0 W , P G N - CIVILDESIGN Vers 7.1 PAG' 3
For: RANPAC Inc. , Temecul a , California - "N 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:l0:37 31
WOE "B"
**********...****.***..***.**************.........................................****..*****..*********...............****....**.......
I Invert I Depth I Water I 0 I V.1 V.l I Enerqy I Super lCritieallFlow ToplHeight/lBall& Wtj tNo Wth
Station I Elev I 1FT) I Elev I (CFS) I {FPSl Head I lOrd.El.t Elev I Depth I Width IDia.-FTlor 1.0.1 ZL IPrs/Pip
-I- -1- -I- -1- -1- -1- -1- -I- -1- -1- -1- -1- -I- 1-
L/Elern IeI'! Slope I I I I SF Avel HF 1st DpthlFroude HIHorm Dp I "N" I I ZR I Type eh
.**......1..****.*1******...1***......1***....**1.**...*1...."...I....****.*I.....'''''I.......*I****....j......*1.......1.....1.......
I I I I I
1289 " 1302.08 1.036 1303.119 14 5 B "' 1.207 1304.327 .1H 372 2.00 2.00 .00 .00 0 .0
-1- -1- -1- -I- -I- -I- -1- -I- -I- -1- -I- -I- -I- I-
.39 .06389 .013682 .02 1.22 713 .687 .013 .00 PIPE
I I I I
1290.95 1302.17 1.076 1303 24B 14 .5 8.41 1.098 1304.346 .16 372 1.99 2.00 .00 .00 0 .0
-I- -I- -I- -I- -1- -1- -I- -1- -1- -I- -1- -I- -I- 1-
1.10 .06389 .012072 .01 1.24 .593 .687 .013 .00 PIPE
I I I I
1292 O. 1302.24 1.119 1303 361 14 5 8.02 .998 1304.359 .15 .372 1.99 2.00 .00 .00 0 .0
-I- -I- -I- -I- -I- -I- -1- -1- -I- -I- -I- -I- -I- I-
.HH .06389 .010661 .01 1.27 480 .687 .013 .00 PIPE
I I I I
1292.92 1302.30 163 1303 '61 14.5 7.64 .907 1304.368 .13 372 1.97 2.00 .00 .00 0 .0
-I- -I- -1- -1- -I- -1- -1- -I- -I- -1- -I- -I- -I- I-
.65 .06389 .009423 .01 .30 314 .687 .013 .00 PIPE
I I I I
1293.57 1302.34 1.210 1303 SSO 14 5 7.29 .825 1304.375 .12 372 1.96 2.00 .00 .00 0 .0
-I- -1- -1- -I- -1- -I- -1- -I- -1- -1- -I- -1- -I- I-
.45 .06389 .008342 .00 1.33 1.273 .687 .013 .00 PIPE
I I I I
1294.02 1302.37 1.260 1303. '" 14 .5 , " .750 1304.378 .11 1.372 1.93 2.00 .00 .00 0 .0
-I- -I- -I- -I- -1- -I- -I- -I- -1- -I- -I- -1- -I- 1-
.25 .06389 .007401 .00 .37 .178 .687 .013 .00 PIPE
I I I I
1294 .27 1302.38 .314 1303.698 14 5 6.63 .682 1304 360 .10 372 1.90 2.00 .00 .00 0 .0
-I- -I- -I- -I- -I- -I- -I- -1- -I- -1- -1- -I- -I- 1-
.09 .06389 .006573 .00 1.41 1.088 .687 .013 .00 PIPE
I I I I
1294 36 1302 .39 1.372 1303 762 14.5 6.31 .619 1304 .381 .09 1.372 "' 2 .00 .00 .00 0 .0
-I- -I- -1- -1- -I- -I- -I- -1- -I- -I- -I- -I- -I- 1-
D
1,A~
I
I
I
I
I
J
I
I
I
I
I
1
I
I
I
I
I
I
I
.20 .12437 .011303 .00 .93 1.399 .476 .013 .00 PIPE
Q W S P G W - CIVILDESIGN Ven 7.1 PAG' 3
For: RANPAC Inc. , Temecula, California - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:l0:48 30
LINE "B-1"
******..."'******..................................************...**.........**........**********.**********.........*"'.............
1 InveJ;'t I Depth I Water I 0 I V.l V., I Enerqy I Super ICriticall Flo.... Top I Heiqht/ IBase Wt I tNo Wth
Station I Elev I 1FT) I tlev I ICFSI I IFPS) Head I Grd.El.1 Elev I Depth I Width IDia.-FTlor 1.0.1 'L I Prs/Pip
-I- -I- -I- -I- -1- -I- -1- -1- -I- -I- -1- -I- -I- I-
L/El8111 leh Slope I I I I SF Ave I NF ISE OpthlFroude NINorm Dp I "N" I I Z. l'ryptl Ch
.........)**....."'1.******.1***....."'1*.........1"'.........1****....1.........1*....**...1*......"1......**1.....**1***....1"'''''''''''''1'''''''''''''''''''''
I I I
1046 23 1308.13 .967 1309 ", . 1 6 72 .702 1309 795 .00 .102 1.44 1.50 .00 .00 0 .0
-I- -1- -1- -1- -I- -1- -I- -1- -I- -I- -1- -1- -I- I-
.20 .12437 .010035 .00 .97 2" .476 .013 .00 PIPE
I I I I
1046 43 1308.15 008 1309 159 1 6 " .638 1309.797 .00 1.102 1.41 1.50 .00 .00 0 .0
-I- -I- -I- -I- -I- -I- -1- -I- -1- -1- -I- -I- -I- I-
.11 .12437 .008930 .00 1.01 .192 .476 .013 .00 PIPE
I I I I
1046.54 1308.16 .053 1309 218 '.1 6.11 .580 1309.798 .00 102 1.37 1.50 .00 .00 0 .0
-1- -1- -1- -1- -I- -I- -I- -I- -I- -I- -1- -I- -I- 1-
.04 .12437 .007964 .00 1.05 096 .476 .013 .00 PIPE
I I I I
1046 .. 1308.17 102 1309 272 '.1 5.82 .526 1309.7518 .00 1.102 32 1.50 .00 .00 0 .0
-1- -1- -1- -1- -I- -I- -I- -1- -I- -I- -I- -1- -I- 1-
WALL ENTRANCE
I I I
1046 .. 1308 .17 1.5163 1310 '" '.1 .29 .001 1310. 134 .00 .218 14 .00 11 00 14 .00 .00 0 .0
-I- -1- -I- -1- -1- -I- -I- -1- -I- -1- -I- -I- -I- I-
0
'],}A
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD
CODE
w S P G N
WATER SURFACE
HEIGHT 1 BASE
OIAMETER WIDTH
- EorT LISTING - Version 7.0
PROFILE - CKANNEL DEFINITION LISTING
ZL ZR IN\' 'tll) '((2) Y(3) Y{4)
DROP
D~te' 5-19-2000 Time'lO:52 41
PAGE 1
't(s) '((6) '((7) Hel Y(5I) YUOl
SECT
NO
eRN NO OF AVE PIER
TYPE PIER/PIP WIOTH
CD 1 4 D 1.50
CD , 3 0 .00 10.80 14.00 .00 .00 .00
0 w S P G N
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING LINE NO "
LINE "B-2"
HEADING LINE NO 2 IS
HEAD IHG LINE NO 3 IS
W5.E
l. IfJ E-
FI'?o!-'1
/'f f3> t/
o
WSPGN
PROFILE - ELEMENT CARD LISTING
.
ELEMENT NO
WATER SURFACE
IS A SYSTEM OUTLET
U/S DATA STATION
1003.67
INVERT SECT
1302.85 1
PAGE NO
PAGE NO
,
ELEMENT NO 2 15 A REACH
U/s DATA STATION INVERT SECT N ANGLE ANG PT MAN "
1033.98 1306.61 1 .013 .000 .000 0
ELEMENT NO 3 IS A WALL ENTRANCE
u/a DATA STATION INVERT SECT FP
1033.98 1306.61 , .500
ELEMENT NO 4 IS A SYSTEM HEADWORKS
U/5 DATA STATION INVERT SECT W S EUV
1033.98 1306.61 2 1306.21
?,.Ar~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
WARNING NO.2.. - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWl<DS, W S.ELEV _ tHY + DC
o W 5 P G N - CIVILDESIGN Ven 7.1 PAGE
For: RANPAe rnc., Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 10: 52: 45
....****............****.........******.....****.................................**.........**.**..****.......**-.....................
LINE "B-2"
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow ToplHeiqht/IBase Wtl INo Wth
Station I Elev I (FT) I Elev t (CFS) I (FPSI a.ad I Grd.El.l nav I Depth I Width IDia.-FTlor 1.0.1 ZL lPn/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1_ -1- 1_
L/Elem ICh SlOPf'I I I I SF Avel HF ISE DpthlFroude NINorm Dp I "N" I I ZR 1'rypB Ch
*********1********1********1*********1*********1*******1********1*********1*******1********1********1*******1*******1*****1.......
I I I J J I
1003 67 1302.85 .463 1303 313 5 13 99 3.041 1306.354 .00 .986 1.39 1.50 .00 .00 0 .0
-1- -1- -J- -1- -1- -1- -1- -1- -1- _1_ _1_ _1_ _1_ 1_
3 14 .12405 .086533 .27 .46 .260 .426 .013 .00 PIPE
I I I I
1006.81 1303.24 .470 1303.709 65 13 70 2.916 1306.625 .00 .986 1.39 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- I-
S 48 .12405 .078798 .43 .47 .137 .426 .013 .00 PIPE
I I I I
1012.29 1303.92 .487 1304406 6.5 13.07 2.651 1307.057 .00 .986 1.40 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -J- -1- -1- _1_ !_
4 07 .12405 .069040 .28 .49 3.870 .426 .013 .00 PIPE
I 1 I I
1016 36 1304.42 .504 1304.928 6 5 12.46 2.410 1307 339 .00 .986 1.42 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -J- _1_ _1_ _1_ 1_
3.16 .12405 .060487 .19 .50 3.618 .426 .013 .00 PIPE
1 I I I
1019.53 1304.82 .522 1305.339 6.5 11 88 2.191 1307.530 .00 .986 1.43 1.50 .00 .00 0 .0
-1- -1- -1- -J- -)- -1- -j- -1- -1- -1- _1_ _1_ _1_ 1_
2.55 .12405 .052996 .14 .52 3.383 .426 .013 .00 PIPE
I I I 1
1022.08 1305.13 .540 1305.673 6.5 11.33 1.992 1307.665 .00 .986 1.44 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- _1_ _1_ 1_
2.08 .12405 .046461 .10 .54 3.162 .426 .013 .00 PIPE
I I I I
102415 1305.39 .560 1305951 6.5 1080 1.811 1307.761 .00 .986 1.45 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- _1_ _1_ _1_ _1_ _1_ 1_
1.74 .12405 .040762 .07 .56 2955 .426 .013 .00 PIPE
I I 1 1
1025.89 1305.61 .580 1306.186 6.5 10.30 1.646 1307.832 .00 .986 1.46 1.50 .00 .00 0 .0
-1- -1- -]- -1- -1- -J- -1- -1- -1- -1- -1- -1- -1- 1_
1.46 .12405 .035757 .05 .58 2.760 .426 .013 .00 PIPE
1 1 I I
1027.35 1305.79 .601 1306388 6.5 982 1.497 1307.884 .00 .986 1.47 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1.23 .12405 .031385 .04 .60 2.578 .426 .013 .00 PIPE
o W S P G N - CIVILDESIGN Vera 7.1 PAGE
For: RANPAC Inc. Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:10:5245
..**.............*.*.............****.........*****.........****......*****.......****.......***.......***.*......******..........
LINE "B-2"
I Invert 1 Depth I Water I 0 1 Vel Vel I Enerqy 1 Super ICritieallFlow ToplHeight/IBaae Wtl INo Wth
Station J Elev 1 eFT) I Elev 1 (CFS) 1 (FPS) Head I Grd.El.1 E1ev I Depth 1 Width 10ia.-FTlor I.O.J ZL IPrs/Pip
-!- -1- -J- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- J-
L/Elern ICh Slope I I I I SF Ave I HF ISE OpthlFroude NINorm Dp I "N" I I ZR IType Ch
.........1........1........1*.*......1...*****.1.......I*****...J...******I...****I........,........I.......,.......1.....1.......
I I I I I
1028 58 1305.94 .623 1306 563 5 9 36 1.360 1307.923 .00 .986 1.48 1.50 .00 .00
-1- -1- -J- -1- -1- -1- -1- _1_ -1_ _1_ _1_ _1_ _1_
.04 .12405 .027561 .03 .62 2.407 .426 .013
I
62 1306.07
-1- -1-
.89 .12405
I
1030.51 1306.18
-1- -1-
.75 .12405
1029
1031
I
261306.27
-1- -1-
.64 .12405
I
89 1306.35
-1- -1-
.53 .12405
I
1032.43 1306.42
-1- -1-
.44 .12405
1031
1032
I
86 1306.47
-1- -1-
.36 .12405
1033
I
22 1306.52
-1- -J-
.29 .12405
1033
I
51 1306
-I-
55
-1-
I
.646 1306.
-1-
.00
o
1-
PIPE
I
.0
I
1.237 1307.
-1- -1-
.024216
715
-I-
5
-I-
8.92
'"
-I-
.02
.00
-I-
.65
.986
-I-
2.246
1.49
-I-
.426
1.50
-I-
.013
.00
-I-
.00
.00
o
1-
PIPE
I
.0
I
.670 1306
-1-
I
1.124 1307.973
-1- -1- -1-
.021286 .02
'"
-I-
, 5
-I-
8.51
.00
-I-
.67
.986
-1-
2.095
1.49
-I-
.426
1.50
-I-
.013
.00
-1-
.00
.00
o
1-
PIPE
I
.0
I
.695 1306.967
-1- -I-
I
.721 1307
-1-
I
1.022 1307
-1- -1-
.018719
'.5
-I-
, 11
'"
-1-
.01
.00
-I-
. 70
.986
-1-
'"
1.50
-I-
.426
1.50
-1-
.013
.00
-I-
.00
.00
o
1-
plpE
I
.0
I
.929 1308
-1- -1-
.016468
072
-1-
'.5
-1-
, 74
001
-1-
.01
.00
-I-
.72
.986
-I-
821
1.50
-1-
.426
1.50
-I-
.013
.00 .00
-1-
.00
o
1-
PIPE
I
.0
I
.7481307
-1-
I
.8451308.010
-1- -1- -1-
.014502 .01
165
-1-
'.5
-1-
'"
.00
-1-
.75
.986
-I-
1.696
1.50
-1-
.426
1.50
-I-
.013
.00
-1-
.00
.00
o
1-
PIPE
1
.0
1
.777 1307
-1-
I
.7681308.016
-1- -1- -1-
.012782 .00
'"
-I-
, 5
-I-
03
.00
-I-
.7B
.986
-I-
.578
1.50
-1-
.426
1.50
-1-
.013
.00
-1-
.00
.00
o
1-
PIPE
I
.0
I
.807 1307
-I-
I
.698 1308
-1- -1-
.011271
.323
-I-
'.5
-I-
6.71
'"
-1-
.00
.00
-I-
."
.986
-I-
'"
1.50
-1-
.426
1.50
-I-
.013
.00
-1-
.00
.00
o
1-
PlpE
I
.0
1
.838 1307.390
-1- -1-
1
.635 1308
-1-
, 5
-I-
6.39
-I-
024
-1-
.00
-I-
.986
-1-
."
-I-
1.50
-1-
.00
-1-
.00
o
1-
.0
?-~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.21
.12405
.009952 ,00 .84
W 5 P G N - CIVILOESIGN Vera 7.1
For: RANPAC Inc., Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING
Date: 5-151-2000 Time:l0:S24S
LINE "8-2"
1.364
.426 .013 .00 PIPE
PAGE 3
.******.*******...********.*****************.********..**....*****...***....**...**.***.......**...***....**................*..._--
I Invert I Depth I Water I Q I V.1 V.1 Energy I Super ICriticallF!ow ToplReight/lBase Wtl INo Wth
Station I Elev I IFTI I E!ev I (CFS) I IFPS) Head I GrcS.il.1 Elev I Depth I Width IOia.-FTlor 1.0.1 ZL lPn/Pip
-I- -1- -1- -1- -I- -1- -I- -I- -I- -I- -I- -1- -I- 1-
L/Eltllll leh Slopel I I I SF Ave I HF IS' Dpth I Froude N I Norm Dp I "N" I I ZR I Type Ch
*....****1**..."."1******.*1..*******1..*******1***...*1.**.***.1.****....1*******1..**..**1.....***1"......J.......I.....J.......
I I I
1033 72 1306.58 .872 1307.449 '.5 . 10 .577 1308 ". .00 .986 1.48 1.50 .00 .00 0 .0
-I- -I- -1- -I- -I- -1- -1- -1- -I- -I- -I- -I- -I- I-
.15 .12405 .008800 .00 .87 1.266 .426 .013 .00 PIPE
I I I I
1033 87 1306.60 .~07 1307 .503 . 5 5 81 .525 1308 028 .00 .~86 1.47 1. SO .00 .00 0 .0
-I- -I- -1- -I- -I- -I- -I- -I- -1- -1- -I- -1- -I- I-
.0' .12405 .0077~2 .00 .91 1.173 .426 .013 .00 PIPE
I I I I
1033.95 1306.61 .945 1307 551 . 5 5.54 .477 1308.028 .00 .986 1.45 1.50 .00 .00 0 .0
-1- -1- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- -I- 1-
.03 .12405 .006903 .00 .os 1.085 .426 .013 .00 PIPE
I I I I
1033.98 1306.61 .986 1307.596 . 5 5.28 .432 1308.028 .00 .986 .42 1.50 .00 .00 0 .0
-1- -I- -I- -1- -1- -I- -1- -I- -I- -1- -1- -1- -I- 1-
WALL ENTRANCE
I I I
1033.98 1306 61 m 1308 '61 . 5 .20 .001 1308 '62 .00 .18~ 14 .00 10 .0 14 .00 .00 0 .0
-I- -I- -I- -1- -1- -I- -1- -1- -I- -1- -1- -1- -I- 1-
D
1,.DJ\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD
CODE
W 5 P G N
WATER SURFACE
HEIGHT 1 BASE
OIAMETER WIDTH
- EDIT LISTING - Version 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR IN\' YO) 't{21 Y(3) Y(4)
OROP
Date: 5-19-2000 Time:l1:11: 8
PAGE 1
't(S) YlEi) Y(71 YfS) Y(51) Y{IOI
SECT
NO
eRN NO OF AVE PIER
TYPE PIER/PIP WIDTH
CD , 4 D 2 DD
CD 2 . D , .50
CD J J D .00 S 00 21.00 .DD .00 .00
0 WSPGN
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING LINE NO IS
LINE tiC"
HEADING LINE NO IS
HEADING LINE NO J IS
e w S P G N
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO IS A SYSTEM otnLET . .
U/S DATA STATION INVERT SECT
1003.50 1283.65 ,
ELEMENT NO 2 15 A REACH .
u/a DATA STATION INVERT SECT N
1050.64 1295.64 1 .013
ELEMENT NO 3 IS A REACH
Ujs DATA STATION INVERT SECT N
1070.39 1296.4B , .013
ELEMENT NO . IS A JUNCTION
U/S DATA STATION INVERT SECT IAT-l IA'I'-2 N OJ
1072.79 1286.56 , 2 0 .013 " '0
ELEMENT NO 5 IS A REACN
U/S DATA STATION INVERT SECT N
1092.70 1287.37 , .013
ELEMENT NO 6 IS A REACN
U/S DATA STATION INVERT SECT N
1233.97 1292.93 , .013
ELEMENT NO 7 IS A REACH
u/s DATA STATION INVERT SECT N
1254.71 1293.74 1 .013
ELEMENT NO IS A REACH .
U/S DATA STATION INVERT SECT N
1321.72 1296.38 , .013
ELEMENT NO 9 IS A REACH
U!S DATA STATION INVERT SECT N
1370.72 1298.31 , .013
ELEMENT NO 10 ISA NALL ENTRANCE
U/S DATA STATION INVERT SECT FP
1370.72 1298.31 J .500
ELEMENT NO 11 IS A SYSTEM HEADWORKS
U/S DATA STATION INVERT SECT
1370.72 129S.31 J
PAGE NO
W,), E- FPoM
[...(f\\E "t:'
PAGE NO
RADIUS ANGLE ANG PT MAN "
.000 .000 .000 0
RADIUS ANGLE ANG PT MAN "
22.497 50.300 .000 0
O' INVERT-3 INVERT-4 PHI 3 .-I .
.00 1287.05 .00 -45.00 .00
RADIUS ANGLE
.000 .000
RADIUS ANGLE ANG PT MAN "
.000 .000 .000 0
RADIUS ANCLE ANG PT MAN "
999.281 -8.100 .000 D
RADIUS ANGLE ANG PT MAN N
.000 .000 .000 0
RADIUS ANGLE ANG PT MAN N
391.775 9.800 .000 0
RADIUS ANGLE ANG PT MAN "
48.911 -57.400 .000 0
W S ELEV
1299.18
~Afb
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
o
For: RANPAC Inc.,
w S P G N - CIVILOESIGN Vera
Teme=la, California - SIN
WATER SURFACE PROFILE
u
'"
LISTING
Date: 5-19-2000
PAGE
Tima:ll:1713
..........................**.**............*".**..***............***....."'............................***..........**.......**.........
LINE "C"
I Invert I Depth I Water I Q I Vel Vel I Enerqy 1 Super lCriticallFlow ToplHeiqht/IBaae Wtl [No Wth
Station I Elev I (FT) I Elev I (CFS) I (FPS) Head I Grd.El.1 Elev, Depth I Width [Dia.-FTlar 1.0.1 ZL IPr./Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- _1_ _1_ _1_ 1_
L/Ellllll leh SlopEd j I I SF Ave I HF ISE DpthlFroude NINo:rm Dp I "N"! I ZR [Type eh
.........,........,.**.....1..**....*,.....****).****..,**.**...)****..***,....**.I........I........!........1.......1.....1.............
I I I I I 1 1 1 I I I
1003.50 1283.65 3 900 1287.550 24.7 7 86 .960 1268 510 .00 .754 .00 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1_ _1_ 1-
47.14 .04221 .011921 .56 3.90 .000 1.037 .013 .00 PIPE
I I r I
1050.64 1285.64 2.472 1286.112 24.7 7 86 .960 1289072 .00 1.754 .00 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1_ -1- 1_
19.75 .04253 .011921 .24 .00 .000 035 .013 .00 PIPE
I I I I
1070.39 1286.48 2.011 1288 491 24.7 7.86 .960 1289 451 .00 1.754 .00 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- _1_ _1_ _1_ _1_ _1_ _1_ _1_ 1_
JUNCT STR .03337 .007059 .02 2.01 .000 .013 .00 PIPE
1 I I I
1072.79 1286.56 2.729 1289288 106 3.37 .177 1289464 .00 1.167 .00 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- j_
18.91 .04068 .002175 .04 2.73 .000 .656 .013 .00 PIPE
I I I I
1091 70 1287.33 2 000 1269.329 10.6 3.37 .177 1289 506 .00 1.167 .00 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.00 .04068 .002059 .00 2.00 .000 .656 .013 .00 PIPE
I I I I
1092 70 1287.37 959 1289.329 10.6 3 39 .179 1289 506 .00 1.167 .57 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -J- _1_ -!- _1_ 1_
.26 .03936 .001964 .00 1.96 .254 .661 .013 .00 PIPE
I I I I
1092.96 1287.39 1.959 1299.339 10.6 3.39 .179 1289.519 .00 1.167 .57 2.00 .00 .00 0 .0
-j- -1- -J- -1- -1- -1- -1- -1- -1- -j- -1- -1- _1_ 1_
HYDRAULIC JUMP
I I I
1092 96 1297.38 .661 1268 041 10.6 11.70 2.125 1290 167 .01 .167 .88 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- _1_ _1_ _1_ _1_ _1_ _1_ 1_
47 26 .03936 .039464 1.97 .67 2.971 .661 .013 .00 PIPE
I! I I
114022 1289.24 .661 1269.901 10.6 11.70 2.125 1292.027 .01 1.167 1.88 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- _1_ _1_ _1_ _1_ _1_ _1_ 1_
93.7S .03936 .039063 3.66 .67 2.971 .661 .013 .00 PIPE
o w S P G N - CIVILDESIGN Vora 7.1 PAGE 2
For: AANPAC Inc., TCIIlIecula, California _ SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:11:17:13
LINE "C"
...............................................................................................................................................................................
I Invert I Depth I water 1 Q I Vel Vel I Energy I Super ICriticallFlow ToplHoiqht/IBaso wtl INo Nth
Station I Elev 11FT) I Elev I (CFS) I (FPS) Head I Grd.El.1 Elev I Dopth I Width IDb.-FTlor 1.0.1 ZL lPn/Pip
-1- -1- -l- -1- -1- -1- -1- -1- -1- -1- -1- -1- _1_ 1_
L/Elem ICh Slope I I I I SF AvO I HF lSE OpthlFroude NjNonn Op I "N" I I ZR IType Ch
.............I..........J.........I.............I..............j........ !.......... I""""..... ,............. I".""""". I.."""... I""..... 1...........1......1.......
I I I I I I I 1 I
1233 97 1292.93 .665 1293 595 10.6 11.61 2.094 1295 669 .00 1.167 1.88 2.00 .00 .00
-1- -1- -1- -1- -1- -1- -1- _1_ _1_ _1_ _1_ _1_ _1_
20 74 .03905 .038547 .80 .66 2.940 .663 .013 .00
I
1254 71 1293.74
-1- -1-
40.53 .03940
I
1295.241295.34
-1- -1-
26.48 .03940
I
.72 1296.38
-1- -)-
11 62 .03939
1321
I
34 1296.84
-1- -1-
96S .03939
1333
I
1343.02 1297.22
-1- -1-
6.S3 .03939
I
1349.851297.49
-1- -1-
5.10 .03939
I
1354 95 1297.69
-1- -1-
3.94 .03939
I
S91297.84
-J- -)-
3 06 .03939
1358
I
.6661294.406
-1- -1-
I
2.085 1296
-1- -1-
.0370S0
106 11.59
-I-
401
-I-
1.50
I
.6781296.015
-1- -1-
I
1.9791297.994
-1- -1- -1-
.033526 .99
10 6 11.29
-1-
I
.7031297.082
-1- -)-
I
1.7991298
-j- -j-
.029742
10 6 10 76
-1-
'"
-I-
.35
I
.722 1297
-1-
I
1.666 1299.226
-J- -1- -1-
.026429 .26
560
-1-
10.6 10 36
-1-
I
.7481297
-1-
I
1.5151299
-1- -1-
.023180
.967
-I-
10.6
-I-
88
482
-I-
.16
I
.775 1298.263
-1- -1-
I
1.377 1299
-1- -1-
.020337
10.6
-I-
42
640
-1-
.10
I
.8031298.492
-1- -1-
I
1.252 1299
-1- -1-
.017846
10.6
-I-
8.98
744
-1-
.87
I
.832 1298
-I-
I
1.138 1299
-J- -1-
.015671
676
-I-
10'
-1-
'56
814
-1-
.os
.02
-I-
."
1.167
-1-
2.932
.02
-I-
.70
1.167
-I-
825
.14
-I-
.84
167
-1-
2.641
.13
-I-
.85
167
-1-
2 501
.12
-I-
.87
1.167
-I-
2.337
.11
-1-
.88
1.167
-I-
2184
.10
-I-
.80
167
-1-
2.039
."
-I-
.92
1.167
-I-
1.904
1.88
-1-
.661
1.S9
-1-
.661
1.91
-1-
.661
1.92
-1-
.661
1.94
-1-
.661
1.95
-1-
.661
1.96
-I-
.661
1.97
-1-
.661
2.00
-I-
.013
.00
-1-
2.00
-1-
.013
.00
-I-
2.00
-1-
.013
.00 .00
-1-
2.00
-1-
.013
.00
-I-
2.00
-1-
.013
.00
-I-
2.00
-I-
.013
.00
-I-
2.00
-1-
.013
.00
-1-
2.00
-I-
.013
.00
-1-
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
1
.0
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
1
.0
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
.0
,.A1J..
I
I
.
I
.'
I
.
I
.
.
I
r
.
I
I
I
.
.
.
.
o
w S P G N - CIVILDESIGN Vera
Temecula, California - SIN
WATER SURFACE PROFILE
7.1
560
LISTING
PAGE 3
For: RANPAC Inc.,
Oat.: 5-19-2000
Time:ll:!7"l3
LINE "en
...............***...*..*****..............................**.......******.....******...............**.***.......**.........****......
I lnvert I Depth I Water I Q I V.l V.l I Energy I Super ICriticalj Flow Top I Height/ 18ase Wtl INo Wth
Station I Elev I 1FT) I Elev I (eFS) I (FPS) a.ad I Gro.El.1 Elev I Depth I Width IDia.-FTlor 1.0. , ZL IPrs/Pip
-I- -1- -1- -I- -I- -I- -I- -I- -1- -I- -I- -I- -I- 1-
L/Elem ICh Slope I I I I SF Avel RF ISE Opth I Froude N I Norm Op I "N" I I ER I Type Ch
.........,......**).........1....***..,.........,.......,..."....,...****..,.....**1....****1........,***....,..***..,.....1.....*_
I I I I I I
1361 .. 1297.96 .863 1298.827 10.6 16 1.035 1299.862 .08 ,. 167 1.98 2.00 .00 .00 0 .0
-1- -1- -1- -1- -I- -1- -1- -I- -I- -1- -1- -I- -I- 1-
2 42 .03939 .013771 .03 .OS 777 .661 .013 .00 PIPE
I I I I
1364.37 1298.06 .895 1298.955 10.6 " .941 1299 'OS .08 1.167 1.99 2.00 .00 .00 0 .0
-I- -I- -I- -1- -1- -I- -1- -I- -I- -I- -1- -1- -I- I-
1.92 .03939 .012103 .02 .07 1.657 .661 .013 .00 PIPE
I I I I
1366.29 1298.14 .928 1299.064 10 , 42 .855 1299.919 .07 1.167 1.99 2.00 .00 .00 0 .0
-I- -1- -I- -1- -1- -I- -I- -I- -1- -1- -1- -1- -I- I-
1.49 .03939 .010643 .02 1.00 1.545 .661 .013 .00 PIPE
I I I I
1367 " 1298.19 .963 1299.157 10.6 08 .777 1299 '" .DO 1.167 2.00 2.00 .00 .00 0 .0
-I- -1- -I- -1- -1- -I- -I- -1- -1- -1- -1- -1- -I- 1-
.12 .03939 .009368 .01 .03 440 .661 .013 .00 PIPE
I I I I
1368.90 1298.24 1.000 1299 238 10 , , 75 .707 1299 945 .DO 1.167 2.00 2.00 .00 .00 0 .0
-1- -1- -I- -I- -1- -I- -1- -I- -1- -1- -1- -I- -I- I-
... .03939 .008250 .01 1.06 1.341 .661 .013 .00 PIPE
I I I I
1369.74 1298.27 .038 1299.310 10.6 , 43 .642 1299 '" .05 1.167 2.00 2.00 .00 .00 0 .0
-1- -I- -1- -I- -I- -I- -1- -I- -I- -I- -I- -1- -I- I-
.57 .03939 .007270 .00 1.09 .248 .661 .013 .00 PIPE
I I I I
1370.31 1298.29 .078 1299.372 10 , 6.13 .584 1299 '" .05 167 1.99 2.00 .00 .00 0 .0
-I- -1- -I- -I- -1- -I- -I- -I- -I- -I- -1- -I- -I- I-
.31 .03939 .006414 .00 1.13 161 .661 .013 .00 PIPE
I I I I
1370.62 1298.31 1.121 1299 427 10.6 5 as .531 1299.958 .04 1.167 1.99 2.00 .00 .00 0 .0
-I- -I- -1- -1- -I- -I- -1- -1- -I- -1- -1- -1- -I- I-
.10 .03939 .005659 .00 1.16 1.078 .661 .013 .00 PIPE
I I I I
1370.72 1298.31 167 1299 477 10.6 5.57 .482 1299.959 .04 .167 1.97 2 00 .00 .00 0 .0
-I- -1- -I- -I- -1- -I- -1- -I- -I- -1- -I- -I- -I- I-
WALL ENTRANCE
0 WSPGN - CIVILDESIGN Verll 7.1 PAGE
For; RANPAC Inc., Temecula, California - SIR 560
WATER SURFACE PROFILE LISTING Date; 5-19-2000 Time,U,17,13
LIRE "C"
..............................................................................................................................................................................................................
1 Invert 1 Depth I Water 1 0 1 Vel Vel 1 Energy 1 Super ICriticallFlow ToplHeight/IBase Wtl INo Wth
Station I E.lev 1 (FT) 1 Elev I (CFS) I (FPS) Head I Grd.El.1 Elev I Oepth I Width IOia.-FTlor 1.0.) ZL IPrs/Pip
-1- -1- -1- -1- -1- -j- -1- -1- -1- _1_ _1_ _1_ _1_ 1_
L/Elem I Ch Slope 1 1 1 I SF Ave 1 HF 1 SE Opth 1 Froude N 1 Norm Op 1 "N" 1 1 ZR! Type Ch
................1..........1.........1.........1..............1..........1............1..........1.......1...........,........1.......,........1.......1........
1 f 1 1 1 1 1 1 1 1 1
1370 72 1298 31 885 1300.195 10.6 .27 .001 1300 196 .00 .199 21.00 5 00 21.00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
o
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD SECT
CODE NO
eRN NO OF AVE PIER
T'iPE PIER/PIP WIDTH
WSPGN
WATER SU1U'ACE
HEIGHT 1 BASE
DIAMETER WIDTH
- EDIT LISTING - Version 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR tIN Y(l) 'i(2) Y(3) Y(41
DROP
Date: 5-22-2000 Time: !iI: 6 43
PAGE 1
Y{S) YIS} T(7) Y(B) Y(!iI) 'tllO)
CD . 0 1 50
CD , 0 .00 7 00 28.00 .00 .00 .00
0 W S P G N
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING LINE NO IS
LINE "e-I"
HEADING LINE NO IS
HEADING LINE NO , IS
0 W S P G N
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO 1 IS A SYSTEM OUTLET .
0/5 DATA STATION INVERT SECT
1002.83 1287.05 1
ELEMENT NO 2 IS A REACH
u/s DATA STATION INVERT SECT N
1023.19 1288.19 1 ,013
ELEMENT NO , IS A REACH
u/s DATA STATION INVERT SECT N
1036.94 1293.65 1 .013
ELEMENT NO . IS . WALL ENTRANCE
vIS DATA STATION INVERT SECT FP
1036.94 1293.65 2 .500
ELEMENT NO 5 IS A SYSTEM Hr.A!IWOilXS
uls DATA STATION INVERT SECT
1036.514 1293.65 2
W.S.Eo
l..-fl\lE:
W S ELtV
1293.65
FRoM
H .
C
RAD IUS ANGLE
.000 .000
RADIUS ANGLE
.000 .000
PAGE NO
PAGE NO 2
ANG PT
.000
MAN H
o
ANG PT
.000
MAN H
o
1,.-5\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
... WAltNING NO.2" - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWKDS, V.S.ELEV - IN\' + OC
o W S P G N - CIVIlDESIGN Ven 7.1 PAGE
For: RANPAC Inc., T_eula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-22-2000 Ti/fle: 9: 6 48
LINE "C-l"
******........**....**................**............"'..*****......************..*****.**....**........."..................--..........
1 Invert I Depth I Water I Q I Vel Vel I Energy I Super ICritieallFlow ToplHeiqht!IBase lItl !No Wth
Station 1 tlev I (FT) I Elev I (CFS) I (FPS) Head I Grd.El. I Elev I Depth I Width IOia.-FTlor 1.0. I ZL lPr8/P~p
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- !-
L/Elem leh Slope I I I I SF Ave I HF ISE DpthlFroude NINorm Op I "N" I I ZR 1Type eh
*******..,........1........1.........1.........1.......1........1.........1.......1........1........1.......1.......1.....1.......
I
1002 83 1287.05
-1- -1-
3 36 .05599
I
1006.19 1287.24
-1- -1-
9.12 .05599
I
1015.31 1287.75
-1- -1-
7 88 .05599
I
1023.191299.19
-1- -j-
1.14 .39710
I
1024.331299.64
-1- -1-
.93 .39710
I
1026.17 1299.37
-1- -1-
.57 .39710
I
1027 74 1290.00
-1- -1-
.36 .39710
I
1029.10 1290.54
-1- -1-
.19 .39710
I
1030291291.01
-1- -j-
1.03 .39710
I
.694 1287.734
-1- -1-
I
.6761297.915
-)- -1-
I
.6521299.401
-1- -1-
I
.6301288820
-1- -j-
I
.6421299.286
-1- -1-
I
.665 1290 039
-1- -1-
I
.6901290.688
-1- -1-
I
.716 1291 255
-1- -1-
I
.743 1291.753
-1- -1-
For: RANPAC Inc.
LINt "C-l"
I
14.1 1796 5.007 1292.741
-1- -1- -1- -1-
.100949 .34
I
14.1 19.22 5.153 1293
-1- -1- -1-
.109952
I
14 1 19 11 5.668 1294
-1- -1- -1-
.125091
I
14.1 20 04 6.235 1295
-1- -1- -1-
.128630
I
14.1 19.52 5.916 1295.202
-1- -1- -1- -1-
.116453 .21
I
14.1 18 61 5.378 1295
-1- -1- -1-
.102312
I
14.1 17 74 4.999 1295
-1- -1- -1-
.099997
I
14.1 1692 4.4451295
-1- -1- -1-
.079179
I
4.041 1295 793
-1- -1- -1-
.069734 .07
W S P G N - CIVILDESIGN V.r.ll
T_cu1a, California - SIN
WATER SURFACE PROFILE
14.1 1613
-1-
067
-1-
1.00
.069
-1-
.99
055
-I-
.15
416
-I-
.16
577
-I-
.12
700
-I-
.09
7.1
560
LISTING
.00
-I-
."
.384
-I-
365
1.49
-1-
.809
1.49
-1-
.909
1.49
-I-
.909
1.48
-I-
.470
1.48
-I-
.470
1.49
-I-
.470
1.50
-1-
.470
1.50
-1-
.470
1.50
-I-
.470
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
.00 .00
-1-
.00 .00
-I-
.00 .00
-I-
.00 .00
-I-
.00 .00
-1-
.00 .00
-1-
.00 .00
-1-
.00 .00
-1-
.00 .00 0
-1- 1-
.00 PIPE
'''"'
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
-I-
."
38.
-1-
4.459
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
-I-
.65
,..
-I-
.780
.00
o
1-
''''
I
.0
.00
o
1-
PIPE
I
.0
.00
-I-
.63
1.384
-I-
5.122
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
-I-
.64
1.384
-I-
4.931
.0
Date: 5-22-2000 Time: 9: 6 4B
..................................................................................................................................
I Invert I Depth I Water I Q I Vel Vel 1 Energy I Super I Critical I Flow ToplHeiqht/IBa.lle Wtl jNo Wth
Station I Elev I IFTl I Elev 1 (CFS) I (FPS) Head I Grd.E1.1 E1ev I Depth I Width IDia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -!- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- J-
L/E1em ICh Slope I I ! 1 SF Ave I HF ISE DpthlFroude NINorm Dp I "N" I I ZR!'I'ype Ch
.........1........1........1.........1.........1.......1........1.........1.......1........1........\.......1.......1.....1.......
I I I I
1031.32 1291.42 .772 1292.192 14.1 15.38 3.673 1295.865
-1- -J- -1- -1- -1- -1- -1- -1-
.91 .39710 .061442 .06
I
1032.231291.78
-1- -I-
.79 .39710
1033
1
021292.10
-1- -I-
.70 .39710
I
72 1292.37
-1- -1-
.61 .39710
I
.33 1292.61
-1- -1-
.53 .39710
1033
1034
1034
I
B61292.B2
-1- -1-
.46 .39710
1035
I
32 1293.01
-1- -1-
.40 .39710
I
721293.16
-1- -1-
.34 .39710
1035
1036
1
061293
-1-
I
.801 1292
-1-
582
-I-
I
.B331292.92B
-1- -I-
I
.8661293
-I-
23B
-I-
I
.9011293
-1-
514
-I-
1
.938 1293
-I-
762
-1-
I
.977 1293
-I-
'"
-1-
I
.0201294
-1-
.185
-I-
30
-I-
I
1.0651294
-1-
.365
-I-
I
3.339 1295
-1- -1-
.054190
141 14.66
-I-
1
3.036 1295.964
-1- -J- -1-
.047849 .03
14 1 13 99
-I-
I
2.7601295
-1- -1-
.042291
14.1 13 33
-1-
I
2.5091296
-1- -1-
.037432
14.1 12 71
-I-
14.1 12.12
-I-
1
2.2B1 1296
-1- -1-
.033178
I
2.073 1296
-1- -1-
.029478
14.1 11 56
-1-
I
1.BB51296
-1- -1-
.026259
14 1 11 02
-I-
14.1 1051
-1- -1-
1
1.714 1296
-1-
'"
-1-
.04
'"
-1-
.OJ
023
-1-
.02
043
-1-
.02
058
-1-
.01
070
-1-
.01
079
-1-
.00
-1-
1.02
.00
-I-
.67
1.394
-I-
.600
.00
-I-
."
1.384
-1-
.299
.00
-I-
.72
.3B4
-I-
3.999
.00
-I-
.74
1.384
-I-
3 724
.00
-I-
.77
1.394
-I-
3466
.00
-1-
.eo
.384
-1-
3.224
.00
-I-
."
1.384
-1-
2.996
.00
-1-
.87
1.384
-1-
2.781
.00
-I-
.90
1.384
-1-
2.579
.00
-1-
.04
1.384
-I-
2.396
.00
-1-
.9B
'"
-1-
2204
'"
-I-
OJO
.00
-I-
'"
-1-
1.50
-1-
.470
1.50
-1-
.470
1.49
-!-
.470
1.48
-!-
.470
1.47
-1--
.470
1.45
-1-
.470
1.43
-1-
.470
1.40
-I-
.470
1.50
-1-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-1-
.013
.36
-1-
1.50
-I-
.00
-I-
.00
-1-
.00 .00
-1-
.00
-1-
.00 .00
-1-
.00
-I-
.00
.00
-I-
.00
-I-
.00
-I-
.00
.0
.00
o
!-
PIPE
I
.00
.0
.00
o
1-
PIPE
I
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
!
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
.00
o
!-
PIPE
I
.0
.00
.00
o
1-
''''
I
.0
.00
.0
o
1-
1,--5"'"
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.29 .39710 .023454 .01 1.07 1.864 .470 .013 .00 PIPE
0 W S P G N - CIVILDESIGN Verll '.1 PAGE 3
For: RANPAC Inc. , Temecula, California - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-22-2000 Tune: " 6 48
LINE "e-l"
...*******..........***..,,,.....****.........******..............................................................".................
I Invert I Depth I Water I 0 I V.1 V.1 I Enerqy I Super ICritioallFlow ToplHeiqht/lBa1l8 Wtl lNo Wth
Station I Elev I (FT) I Elev I (CFS) I (FPS) Read I Grd.El.1 Elev I Depth I Width tOia.-FTlor I.O.l ZL Iprs/Pip
-1- -1- -1- -1- -1- -1- -I- -1- -I- -I- -1- -I- -I- I-
L/Elem leh Slope! I I I SF Ave' NF ISE OpthlFroude NINorm Op I "N" I I ,. I Type Ch
..........1......**1.........,***.......1..........1........1........1.........1.......1........1.......*,.......1...****1*****1*******
I I I
1036.34 1293.41 .114 1294 528 14. 1 10 02 1.558 1296.086 .00 1.384 1.31 1.50 .00 .00 0 .0
-I- -I- -1- -1- -I- -1- -I- -1- -I- -1- -1- -1- -I- I-
.23 .39710 .021043 .00 .11 1.704 .470 .013 .00 mz
I I I I
1036.58 1293.51 1.168 1294 .674 14.1 9.55 1.416 1296 091 .00 1.384 1.25 1.50 .00 .00 0 .0
-1- -I- -1- -I- -1- -I- -1- -I- -1- -I- -I- -1- -I- 1-
.IS .39710 .018986 .00 17 1.546 .470 .013 .00 PIPE
I I I I
1036 76 1293.58 227 1294.807 14 .1 9.11 1.287 1296.094 .00 .384 1.16 1.50 .00 .00 0 .0
-1- -1- -I- -1- -I- -1- -I- -1- -I- -1- -I- -I- -I- 1-
.12 .39710 .017303 .00 1.23 .387 .470 .013 .00 PIPE
I I I I
1036 " 1293.63 .297 1294 .926 14 .1 " 1.170 1296 0" .00 1.384 1.03 1.50 .00 .00 0 .0
-I- -I- -1- -I- -I- -I- -1- -I- -1- -1- -I- -I- -I- I-
.05 .39710 .016094 .00 .30 1.216 .470 .013 .00 PIPE
I I I I
1036 " 1293.65 .384 1295 034 14.1 8.27 063 1296 '" .00 384 .80 1.50 .00 .00 0 .0
-I- -I- -1- -1- -I- -1- -I- -I- -1- -I- -I- -1- -I- 1-
WALL ENTRANCE
I I I
1036.94 1293.65 3.436 1297.086 14.1 .15 .000 1297.086 .00 .199 28 00 7.00 28 00 .00 0 .0
-1- -I- -1- -I- -I- -1- -I- -1- -1- -I- -I- -1- -I- I-
e
1-~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD
CODE
SECT CHN NO OF AVE PIER
NO TYPE PIER/PIP WIDTH
WSPGN
WATER SURFACE
HEIGHT 1 B1>.SE
DIAMETER WIDTH
_ EDIT LISTING - Version 1.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR INV Y(1) Y(2) Y(3) Y(4)
DROP
CD 1
CD 2
CD 3
CD .
CD 5
o
o
o
o
o
o
.00 3 00 15.00
4.50
1.50
2.00
.00 7.00 4.50
2.00 2.00 .00
WATER SURFACE PROFILE -
2.00 2.00 .00
WSPGN
TITLE CARD LISTING
HEADING LINE NO 1 IS
LINE "0"
HEADING LINE NO 2 IS
HEADING LINE NO 3 IS
o
WSPGN
WATER SURFACE PROFILE - ELEMENT CARD LISTING
IS A SYSTEM OUTLET
u/s DATA STATION INVERT SECT
935.00 1248.68 1
ELEMENT NO
ELEMENT NO 2 IS A REACH
U/B DATA STATION INVERT SECT
1000.00 1249.19 1
ELEMENT NO 3 IS A WALL EXIT
!J/s DATA STATION INVERT SECT
1000.00 1249.19 2
ELEMENT NO 4 IS A REACH ..
U!S DATA STATION INVERT SECT
1059.43 1249.65 2
ELEMENT NO 5 IS A REACH ..
U/B DATA STATION INVERT SECT
1072.65 1249.76 2
ELEMENT NO 6 IS A JUNCTION
U/S DATA STATION INVERT SECT IAT-l IAT-2 N
1072.65 1249.76 2 3 0 .013
"
.050
"
.013
"
.013
03
8.24
Date: 5-22-2000
Y(5) Yl61 Y(7)
W S ELEV
1248.68
RADIUS ANGLE
.000 .000
RADIUS ANGLE
.000 .000
RAD IUS ANGLE
453.562 -1.670
Time: 4:46:54
PAGE 1
Y(8) Y(91 Y(10)
PAGE NO
PAGE NO 2
ANG PT MAN H
.000 0
ANG PT
.000
ANG PT
.000
INVERT-3 INVERT-4 PHI 3 PHI 4
1250.53 .00 90.00 .00
RADIUS ANGLE
.000 .000
-WARNING
-WARNING
O'
.00
THE ABOVE ELEMENT CONTAINED AN
THE ABOVE ELEMENT CONTAINED AN
ELEMENT NO 7 IS A REACH
U/S DATA
STATION INVERT SECT
1093.02 1249.92 2
INVERT ELEV WHICH WAS NOT GREATER THAN THE PREVIOUS INVERT ELEV
INVERT ELEV WHICH WAS NOT GREATER THAN THE PREVIOUS INVERT ELEV
RADIUS ANGLE
457.692 -2.550
ELEMENT NO
8 IS A REACH
U/S DATA STATION INVERT SECT N
1216.49 1250.88 2 .013
9 IS A JUNCTION t-
U/S DATA STATION INVERT SECT lAT-l lAT-2 N
1220.38 1250.91 2 4 0 .013
ELEMENT NO
o
W S P G N
WATER SURFACE PROFILE - ELEMENT CARD LISTING
10 IS A REACH t-
U/S DATA STATION INVERT SECT N
1229.97 1250.98 2 .013
11 IS A REACH
U/S DATA STATION INVERT SECT N
1278.11 1251.36 2 .013
12 IS A JUNCTION
U/S DATA STATION INVERT SECT LAT-l LAT-2 N
1280.20 1251.37 2 3 0 .013
ELEMENT NO
ELEMENT NO
ELEMENT NO
ELEMENT NO
13 IS A REACH
U/S DATA STATION INVERT SECT N
1294.65 1251.49 2 .013
ELEMENT NO 14 IS A REACH
U/S DATA STATION INVERT SECT
1454.70 1255.94 2
ELEMENT NO 15 IS A REACH
U/S DATA STATION INVERT SECT
1593.61 1259.85 2
ELEMENT NO 16 IS A JUNCTION
U/S DATA STATION INVERT SECT LAT-l LAT-2 N
1595.86 1259.91 2 3 0 .013
ELEMENT NO 17 IS A REACH
U/S DATA STATtON INVERT SECT
1711.89 1263.03 2
ELEMENT NO 18 IS A REACH
U/S DATA STATION INVERT SECT
1782.58 1265.17 2
ELEMENT NO
19 IS A REACH
U/S DATA STATION INVERT
1794.321265.50
SECT
2
o
W S P G N
ELEMENT CARD LISTING
ELEMENT NO
WATER SURFACE PROFILE
20 IS A JUNCTION
U/S DATA STATION INVERT
1796.571265.57
SECT LAT-1 LAT-2 N
2 3 0 .013
"
.013
03
22.51
03
, "
"
.013
"
.013
03
5.64
"
.013
"
.013
"
.013
03
, "
RADtUS ANGLE
.000 .000
O'
.00
ANG PT
.000
ANG PT
.000
INVERT-3 INVERT-4 PHI 3 PHI 4
1252.45 .00 -30 00 .00
RAD IUS ANGLE
.000 .000
RADIUS ANGLE
.000 .000
RADIUS ANGLE
44.995 61.300
PAGE NO
ANG PT
.000
ANG PT
.000
O'
.00
tNVERT-3 INVERT-4 PHI 3 PHI 4
1254.64 .00 -45.00 .00
RADIUS ANGLE
.000 .000
RADIUS ANGLE
39.238 21.100
RADIUS ANGLE
331.054 27.700
RADIUS ANGLE
.000 .000
ANG PT
.000
ANG PT
.000
ANG pT
.000
04 INVERT-3 INVERT-4 PHI 3 PHt 4
.00 1263.19 .00 45 00 .00
RAD IUS ANGLE
.000 .000
RADtOS ANGLE
.000 .000
RADIUS ANGLE
45.003 -90.000
RADIUS ANGLE
.000 .000
04
.00
ANG PT
.000
ANG PT
.000
ANG PT
.000
PAGE NO
INVERT-3 INVERT-4 PHI 3 PHI 4
1268.71 .00 -45 00 .00
RADIUS ANGLE
.000 .000
MM"
o
MM"
o
MM"
o
MM"
o
3
MM "
o
MM "
o
MM "
1
MM "
o
MM"
o
MM"
1
MM"
o
MM"
o
.
1--~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ELEMENT NO " IS A REACH
uts DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1818.30 1266.18 2 .013 .000 .000 .000 0
ELEMENT NO 22 IS A REACH .
UIS OATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1843.11 1266.88 2 .013 45.127 31.500 .000 0
ELEMENT NO 23 IS A JUNCTION
uls DATA STATION INVERT SECT LAT-l LAT-2 N Q' Q' INVERT-3 INV'ERf-4 PHI 3 PHI .
1845.22 1266,94 2 , 0 .013 5.92 .00 1268.32 .00 -37 SO .00
RADIUS ANGLE
46.497 2.600
ELEMENT NO " IS A REACH
u/s DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1888.99 1268.17 2 .013 43.016 58.300 .000 0
ELEMENT NO 2S IS A REACH
uls DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN N
1991.77 1271.06 2 .013 .000 .000 ,000 0
ELEMENT NO 26 IS A REACH
UIS DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2000.01 12'71.30 2 .013 90.'7!i12 -5.200 .000 0
ELEMENT NO 27 IS A REACH
u/s DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
2040.99 1272.45 2 .013 .000 ,000 .000 0
ELEMENT NO 28 IS A WALL ENTRANCE
uls DATA STATION INVERT SECT FP
2040.!l!l 1272.45 5 .500
ELEMENT NO 29 IS A SYSTEM HEADWORKS
U/S DATA STATION INVERT SECT W S ELEV
2040.!l!l 1272.45 5 .00
0 W S P G N PAGE NO 5
WATER SURFACE PROFILE ELEMENT CARD LISTING
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
*. WARNING NO.2..
ERROR MESSAG&: NO. 2
o
WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION
WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION
W S P G N - CIVILDESIGN Vers 7.1
For: RANPAC Inc., Temecula, Cali.fornia - SiN 560
WATER SURFACE PROFILE LISTING
IN HDWKOS, W S. ELEV - IN\' OC
IN OTLTllS I W S. EUV - IN\' DC
PAGE
Date: 5-22-2000 Time: 4:46551
LINE "0"
.**..................*"'.......*****..........***.**.*************"'..******..****...*******....********...***'*.............***....**
I Invert I Depth I Water 0 I Vel Vel I Enerqy I Super ICriticallFlow ToplHeiqht/lBase Wt! INo Wth
Station I Elev I (FT) I Elev (CFSl I (FPS) Head I Grd.El.1 Elev I Depth I Width IDia,-FTlor 1.0.1 ZL lprs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -!- -1- -!- 1-
L/Elem ICh Slope I I 1 I SF Ave I HF ISE OpthlFroude NINorm Op I "N" I I ZR IType Ch
.....'.....1........1........,.........1.........1.......1........1.........,.......1........1........1.......,.......1.....1.......
I I 1 I I I 1 I 1 1 1 I I
935.00 1248.68 1.731 1250411 218.9 6.85 .728 1251.140 .00 1.731 21.92 3.00 15.00 2.00 0 .0
-1- -1- -1- -!- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.19 .00784 .031533 .01 1.73 1.000 2.610 .050 2 00 TRAP
I 1 I I !
935.19 1248.68 1.802 1250.483 218 9 6.53 .662 1251.146 .00 1.731 22.21 3.00 15 00 2.00 0 .0
-1- _1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.66 .00784 .027406 .02 80 .937 2.610 .050 2 00 TRAP
I I 1 1 1
935.85 1248.69 875 1250 562 218 9 23 .602 1251.164 .00 731 22.50 3.00 15 00 2 00 0 .0
-1- -1- -1- -\- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
31 .00784 .023829 .03 .87 .978 2.610 .050 2 00 TRAP
I 1 I I j
93717 1248.70 1.951 1250648 2189 594 .547 1251.195 .00 731 22.80 3.00 1500 2.00 0 .0
_j_ _1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
2 22 .00784 .020726 .05 1.95 .823 2.610 .050 2 00 TRAP
I I I I I
939 39 1248.71 2 029 1250.744 218.9 5.66 .499 1251 241 .00 731 23.12 3.00 15 00 2.00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
3.52 .00794 .019034 .06 2.03 .771 2.610 .050 2 00 TRAP
I 1 1 1 I
94291 1248.14 2110 1250.852 219.9 5.40 .452 1251304 .00 .731 23.44 3.00 1500 200 0 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- I-
S 44 .00784 .015699 .09 2.11 .723 2.610 .050 2.00 TRAP
1 1 I ! I
948.35 1248.78 2194 1250.979 218.9 515 .411 1251390 .00 731 23.78 3.00 1500 200 0 .0
-1- -j- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
8.46 .00184 .013669 .12 2 19 .678 2.610 .050 2.00 TRAP
I I I I I
956.81 1248.85 2 281 1251.132 219 9 .91 .374 1251.506 .00 .731 24.12 3.00 15 00 2.00 0 .0
_j_ _1_ -1- -1- -1- -1- -1- -1- -1- -1- -!- -1- -1- I-
n 69 .00784 .011907 .16 2 28 .636 2.610 .050 2.00 TRAP
1 j I I I
970 50 1248.96 2.310 1251.329 218.9 68 .340 1251.669 .00 1.731 24.48 3.00 15.00 2 00 0 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -j- -1- -1- -1- -1- 1-
20.61 .00784 .010502 .22 37 .596 2.610 .050 2.00 TRAP
o W S P G N - CIVILDESIIJN Vera 7.1 PAGE 2
For: RANPAC Inc. T81lI8cula, California - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-22-2000 Time: 4:4659
..................................................................................................................................
LINE "0"
1 Invert I Depth 1 Water 1 Q 1 Vel Vel 1 Enerqy 1 Super ICriticallFlow ToplHei9ht/IBaae Wtl IHo Wth
Station I Elev 1 (FT) 1 Elev 1 (CFS) I (FPS) Head 1 Grd.El.1 Elev I Depth I Width IDia.-FTlor 1.0.\ ZL jPr,/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -j- 1-
L/Uem ICh Slope 1 I I I SF Ave I HF ISE DpthlFrouda NINorm Dp I "N" I I ZR IType Ch
.........I........I........I.........j.........I.......1........1.........1.......1........1........1.......1.......1.....1.......
1 I I 1 \ I I I I
991.11 1249.12 2 445 1251.565 218 9 .50 .315 1251.880 .00 731 24.78 00 15 00 2.00 0
_1_ -1- -1- -1- -1- -!- -1- -1- -1- -1- -1- -1- -1- 1-
HYDRAULIC .ruMP
I
991.11 1249.12
-1- -1-
.12 .00784
I
991.231249.12
-1- -1-
.99 .00784
I
992.21 1249.13
-1- -j-
.97 .00784
'93
I
191249.14
-1- -1-
.95 .00794
I
994.14 1249.14
-1- -1-
.93 .00784
I
07 1249.15
-1- -1-
.90 .00784
'"
'"
I
971249.16
-1- -1-
.87 .00184
996.94
I
1249.17
.0
I
1.1581250.278
-1- -1-
I
1.652 1252.130
-1- -1- -1-
.137314 .02
I
15.00 2.00
-I-
2.00
I
00 2.00
-I-
200
I
15.00200
-1-
2 00
I
00 2.00
-I-
200
I
00 2 00
-I-
2 00
I
00 2 00
-1-
200
I
00 2 00
-1-
2.00
I
15 00 2.00
.0
o
1-
TRAP
I
.0
19.63
-I-
2.610
300
-I-
.050
.00
-I-
1.16
1. 131
-I-
1.904
218.9 1092
-1-
I
1.1521250
-I-
I
105 1250
-I-
I
1.872 1252
-1- -1-
.149199
.00
-I-
LlS
o
1-
TRAP
I
.0
1.731
-I-
.919
19.61
-1-
2.610
3.00 15
-I-
.050
145
-I-
.15
273
-I-
218.9 1098
-1-
I
2.0591252.292
-1- -1- -1-
.172465 .17
.731
-1-
2051
3.00
-I-
.050
o
1-
TRAP
I
.0
19.42
-I-
2.610
.00
-1-
1.10
233
-1-
218.9 11.51
-I-
I
.0591250
-I-
I
2.265 1252
-1- -1-
.199436
460
-1-
.19
o
1-
TRAP
I
.0
19.24
-1-
2.610
3.00 15
-1-
.050
.00
-1-
1.06
.731
-1-
2.192
'"
-I-
2189 1208
-1-
I
015 1250
-1-
I
2.491 1252
-1- -1-
.230712
.00
-I-
01
o
1-
TRAP
I
.0
1.731
-1-
2344
19.06
-I-
2.610
3.00 15
-1-
.050
650
-I-
.21
159
-I-
218.9 1267
-1-
I
.972 1250.124
-1- -1-
I
2.740 1252
-\- -1-
.266993
.00
-I-
.97
o
1-
TRAP
1
.0
.731
-1-
2 507
18.89
-1-
2.610
3.00 15
-1-
.050
'"
-1-
.24
218 9 13 28
-1-
I
.932 1250
-1-
I
3.014 1253
-1- -1-
.309094
.00
-I-
.93
o
1-
TRAP
I
.0
1.731
-1-
.681
18.73
-I-
2.610
3.00 15
-1-
.050
104
-I-
.27
090
-I-
218.9 1393
-1-
.992
1
1250.057
I
1253.373
.00
1.731
o
18.51
3.00
3.316
218.9
14.61
~4>
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-1-
.84
-1-
.00784
-1- -1-
D
For: RANPAC Inc.,
LINE "0"
-1- -1- -1-
.357967 .30
W S P G N - CIVIlDESIGN Vera
T_cul., Cali.fornia - SIN
WATER SURFACE PROFILE
-1- -I-
."
1.1
560
LISTING
-I-
2.867
-1- -1-
2.610 ,050
Date: 5-22-2000
-1- (-
200 TRJ>.P
PAGE ,
TimEl,4:4659
....*****....***.*"...........****...****."*,,..**.......**......**.....*****....*********......***"....,,*.......***.........**.....
I Invert I Depth I Water I Q I Vel Vel I Enerqy! Super ICriticallFlov ToplHeiqht!IBase Wtt tNo Wth
Station I Uev I (FT) I Elev I (CFS) I IFPS) Head. I Grd.E1.1 Elev I Depth I Width IOia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/E11IIrtI I eh Slope I I I I SF Aver HF I SE Opeh I Frou~ N I Norm Op I "N" I I ZR I Type en
****.....t**"..."*I..flflflflflfllflflflflflflflflfllf1f1f1f1f1f1f1f1f1jflflflflflflfllfIfIfIfIfIfIfIfI 1 fIfIfIfIfIfIfIfIfI 1 fIfIfIfIfIfIfI 1 fIfIfIfIfIfIfIfI 1 flfIfIfIfIfIfIfI!fIfIfIfIfIfIfI IfIfIfIfIfIfIfI 1 fI"""" I"""""""
I I 1 1 I 1 1 I 1 II!
997.6B 1249.17 .955 1250.026 21B,9 15.33 3.647 1253674 .00 1.731 IB.42 3.00 1500 200 0 .0
_1_ _1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- j-
.Bl .007B4 .414717 .33 .B5 3 067 2.610 .050 2 00 TRAP
I 1 I 1 I
99B 4B 1249.1B .B19 1249.996 219.9 16.07 4.012 1254.00B .00 731 IB.27 3.00 15 00 2.00 0 .0
_1_ -1- -[- -1- -1- -1- -1- -1- -1- -1- -!- -1- -1- 1-
.77 .007B4 .490636 .37 .82 3.291 2.610 .050 2.00 TRAP
I I 1 1 1
999.26 1249.18 .7B4 1249.969 2199 1696 4.413 1254.3Bl .00 1.731 IB.13 3.00 15.00 200 0 .0
_1_ _1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -[- I-
.74 .00784 .557231 .41 .7B 3.511 2.610 .050 2 00 TRAP
I I I 1 I
1000.00 1249.19 .750 1249.940 218.9 17.68 .854 1254.795 .00 .731 1800 3.00 IS 00 200 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
WALL EXIT
I I I
1000.00 1249.19 .147 1253.337 218.9 14.28 3.168 1256.505 .00 4.147 2.42 4.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
35.34 .00774 .011322 .40 4.15 1.000 4.500 .013 .00 PIPE
I 1 1 I
1035.34 1249.46 4.500 1253.964 2189 13.76 2.941 1256905 .00 4.147 .00 4.50 .00 .00 0 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
24.09 .00774 .012143 .29 4.50 '.000 4.500 .013 .00 PIPE
I I I !
105943 1249.65 612 1254.262 2189 13.76 2.941 1257203 .00 4.147 .00 4.50 .00 .00 0 .0
_1_ -1- -1- -1- -1- -1- -1- -]- -]- -1- -1- -1- -1- ]-
13.22 .00832 .012390 .16 .00 .000 4.500 .013 .00 PIPE
I 1 I I
1072.65 1249.76 4.746 1254.506 2189 1376 2.941 1257447 .00 4.147 .00 4.50 .00 .00 0 .0
-1- -1- -j- -1- -1- -1- -1- -1- -1- -1- -[- -J- -1- 1-
JUNCT STR .00000 LINE. "D- '\ fl .011932 .00 .00 .000 .013 .00 PIPE
I I I \ I
107265 1249.76 5.180 1254.940 210.6 13.24 2.724 1257664 .00 .102 .00 4.50 .00 .00 0 .0
_1_ _1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
20.37 .00786 .011475 .23 .00 .000 4.500 .013 .00 PIPE
o W S P G N - CIVILDESIGN Vers 7.1 PAGE
For: RANPAC Inc. Temecula, California - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-22-2000 Time: 4:46 59
LINE "0"
...................................................flflflflflflfI..fI....,..,.fI.......................................................................................................................fI......................
I Invert I Oepth I Water I Q I Vel Vel I Enerqy I Super ICriticallFlow TopJHeiqht/lBase Wtl INo Wth
Station I Uev 1 (FT) I E18V I (CFS) I (FPS) Head I Grd.El.l Elev I Oepth r Width lDia.-FTlor 1.0.1 ZL lPn/Pip
-1- -!- -1- -1- -1- -1- -1- -]- -]- -1- -1- -1- -1- 1-
L/Uem ICh Slopel I 1 I SF Ave I HF ISE DpthlFroude NINorm Dp I "N" I I ZR IType Ch
..................1................1...........1..................(..................1............lflflfI......I...flflfI....I.......I.,.......I............I.flflflfI....1..............1.....1..........
I
1093.02 1249.92
-1- -1-
123.47 .00777
I
5 346 1255.266
-1- -1-
I I
1216.49 1250.88 5.B03 1256 6B3
-1- -1- -1- -1-
JUNCTSTR .00772 ("'INE.. "l>-I"
I I I
1220.38 1250.91 6 642 1257.552
-1- -1- -1- -1-
9.59 .00729
I
1229971250.98
-1- -1-
4814 .00789
I
1278.11 1251.36
-1- -1-
JUNCT 8Ta .00479
I
1280.20 1251.37
-1- -1-
14.45 .00830
I
1294.651251.49
-1- -1-
84.89 .02780
I
1379 54 1253 85
-1- -1-
H'lDRAULIC J1JMP
I
1379.54 1253 85
I
6601257640
-1- -I-
I
7.079 1258.439
-1- -1-
Li~c 'P-7"
I I
7 .342 1258.712
-1- -1-
I
.644 1259.134
-1- -(-
I
6.1281259978
-1- -1-
I
2.431 1256281
2106 1324
-1-
I
2.724 1257.990
-1- -1- -1-
.011475 1.42
I
2.724 1259.407
-1- -1- -1-
.010314 .04
210 6 13.24
-I-
I
189 1 11.83 2.173 1259
-1- -1- -1-
.009153
'"
-I-
.co
I
188 1 11 83 2.173 1259.813
-1- -1- -1- -1-
.009153 .44
I
188 1 11.83 2.173 1260.612
-1- -1- -1- -1-
.008853 .02
I
181 9 11.43 2.030 1260
-1- -1- -1-
.008552
'"
-I-
.12
I
181 9 11.43 2.030 1261
-1- -1- -1-
.008552
.164
-I-
."
I
181 9 11 43 2.030 1262 008
-1- -1- -1- -1-
1819 20.75
I
6 686 1262.967
.00
-1-
5.35
.00
-I-
5.80
.00
-1-
, 64
.00
-I-
.00
.00
-I-
.00
.00
-1-
.00
.00
-I-
.00
.00
-I-
102
-I-
.000
4.102
-I-
.000
3 951
-I-
.000
3.951
-1-
.000
3 951
-1-
.000
3 901
-I-
.000
3 901
-1-
.000
3.901
-1-
.1B
3.901
.00
-1-
.500
.00
-I-
4.500
.00
-I-
.500
.00
-I-
3 752
.00
-I-
2 394
4.49
4.50
-I-
.013
.00
-I-
4.50
-I-
.013
4.50
-I-
.013
4.50
-I-
.013
.00
-I-
4.50
-I-
.013
4.50
-I-
.013
4.50
-I-
.013
.00
-I-
4.50
-1-
4.50
.00 .00
-1-
.00 .00
-I-
.00 .00
-I-
.00 .00
-I-
.00 .00
-1-
.00 .00
-1-
.00 .00
-I-
.00 .00
-I-
.00 .00
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIP>:
I
.0
.00
o
1-
PIP>:
I
.0
o
1-
.0
o
.0
'2.--51.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-1- -1-
75.16 .02780
o
-1- -1-
For: RANPAC Inc.,
LINE "0"
-1- -1- -1- -1- -1- -1-
.026132 1.96 2.61 2.616
W S P G N - CIVILDESIGN Ven 7.1
T_cula, California - SIN 560
WATER SURFACE PROFILE LISTING
-1- -1- -1- 1-
2.394 .013 .00 PIPE
PAGE
Data: 5-22-2000 Time: 4:46:59
***..............***..........****.......**..............****......**.......***.***..........................****".....***.................
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriti~llFlow ToplHeight/lBaS8 Wtl INo Wth
Station I Elev I eFT) I Elev I (CFS) I (FPS) Head I Grd.El.1 Elev I Oepth I Width IDia.-FTlor 1.0.1 ZL lPn/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem leh Sloped I f I SF Avel HF ISE DpthlFroude NjNonn Op I "N" I I ZR ITypG eh
*."."****1********1********1*********1*********1*******1********1*********1*******1*****.**1***...*.1.......1.......1.....1.......
I 1 I I I I I I 1 I 1 I
1454.70 1255.94 2.448 1258 388 181.9 20 56 6.566 1264.954 .00 3.901 4.48 4.50 .00 .00
_1_ _1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1-
19 89 .02815 .025655 .51 2.45 2 580 2.385 .013
1474
,
.59 1256.50
-1- -1-
02 .02815
"'
,
1593 61 1259.85
-1- -1-
JUNCT STR .02669
,
1595.86 1259.91
-1- -1-
116.03 .02689
,
1711.89 1263.03
-1- -1-
11.40 .03027
,
1723.29 1263.38
-1- -1-
59 251 .03027
,
1782 58 1265.17
-1- -1-
11.74 .02811
,
1794.32 1265.50
-1- -1-
JUNCT STR .03109
,
1796.571265.57
-1- -1-
21.73 .02808
o
,
2.457 1258.957
-1- -1-
,
2.5551262.405
-1- -1-
LI~F "(>-4;"
2.405 1262.315
-1- -1-
,
2.4441265.474
-1- -1-
,
2457 1265
-I-
'"
-I-
181.9 20.47
-I-
181.9 19 51
-I-
176.2 20 37
-I-
1762 1997
-I-
176.2 15183
-,-
176.2 18.91
-,-
1762 1873
-,-
,
6.504 1265
-!- -1-
.024002
'50
-,-
2.86
,
5.9121268
-1- -1-
.024108
317
-I-
.05
.00
-I-
246
.00
-I-
2.55
.00
-I-
2.41
1.23
-,-
3.68
1.22
-,-
, "
.00
-I-
255
.00
-I-
2.57
,
5.652 1273.729
-1- -1- -1-
.021381 .46
W S P G N - CIVILDESIGN Vera 7.1
T8llI8cu1a, california - SIN 560
WATER SURFACE PROFILE LISTING
173.7 19.08
-,-
,
6.445 1268.760
-1- -1- -1-
.025047 2.91
,
6.1931271.667
-1- -1- -1-
.024170 .28
,
6.109 1271
-1- -1-
.022549
.941
-I-
1.34
.00
-,-
2.51
3 5101
-I-
2561
3 901
-I-
'"
3.852
-,-
2.587
3.852
-I-
2.509
3 852
-I-
2 482
3 852
-I-
2.305
3 852
-I-
2271
3 830
-I-
2.356
4.48
-I-
2.385
4.49
-I-
2.372
4.48
-I-
2.290
4.48
-I-
2.290
4.46
-,-
2.341
4.47
-,-
2.322
4.50
-I-
.013
46
-I-
4.50
-,-
.013
.00
-,-
.00
-,-
.00
-,-
.00
-,-
.00 .00
-,-
.00 .00
-I-
.00
-,-
.00
-I-
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00 0
,-
.00 PIPE
PAGE
TUlle: 4:4659
o
,-
PIPE
,
.0
,
25551267
-I-
72'
-,-
,
5.553 1273.278
-1- -1- -1-
.020893 .25
,
5.450 1273.524
-1- -1- -1-
.021232 .05
4.50
-I-
.013
4.50
-,-
.013
4.50
-,-
.013
4.50
-I-
.013
.45
-,-
4.50
-I-
.013
o
,-
PIPE
,
.0
,
2.574 1268074
-1- -1-
/"(/I!p .p-,';
2.507 1268.077
-1- -1-
For: RANPAC Inc.
LINE "0"
4.50
-I-
.013
Date: 5-22-2000
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
.0
,
*.....*****.....***.................***...........................................................................................
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICritioallFlow TopIHeig-ht/IBue Wtl INo Wth
Station 1 Elev I (FT) 1 Elev I (CFS) I (FPS) Head 1 Grd.E1.1 E1ev I Depth I Width IDia.-FTlor 1.0.1 ZL lPn/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slope I I I I SF Ave I HF ISE DpthlFroude NINorm Dp i "N" I I ZR tType Ch
.........1........1.....*..1.........1.........1.......1..........1.......**1*......,........1........,..........1.......1.....'.......
I I I I I I 1
1818.30 1266.18 2.540 1268 720 173 7 18 78 5.474 1274.194 1.08 3.830
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1-
24.81 .02821 .020337 .50 3.62 .298
,
1843.11 1266.88
-1- -1-
JUNCT STR .02841
,
1845.221266.94
-1- -1-
43.77 .02810
,
1888.991268.17
-1- -1-
11.00 .02812
,
185151.991268.48
-1- -1-
41.48 .02812
,
1941.461269.65
-1- -1-
29 00 .02812
,
46 1270.46
-1- -1-
21.31 .02812
1970
1991
,
77 1271.06
-1- -1-
24 .02912
2000 01
,
1271.30
,
2.5871269.467
-1- -1-
LIN,t. "p-f'
2.430 1269.370
-1- -1-
,
24921270
-I-
'"
-I-
,
2 512 1270.991
-1- -1-
,
2.612 1272.258
-1- -1-
,
2 718 1273.
-,-
m
-,-
,
2 830 1273.891
-1- -1-
2891
,
1274.191
113.1 18.36
-I-
161.8 19.15
-,-
161.8 18.56
-,-
167 8 18 38
-,-
1678 1152
-,-
161.8 16.71
-I-
167 B 1593
-I-
167.8
,
5.232 1274.699
-1- -1- -1-
.021132 .04
,
5.695 1275
-1- -1-
.021638
,
5.350 1276
-1- -1-
.020483
,
5.2441276
-1- -1-
.019035
,
4.767 1277.025
-1- -1- -1-
.016829 .49
,
4.334 1277 .513
-1- -1- -1-
.014900 .32
,
3.9401277
-1- -1-
.013583
1554
3.752
,
1277 .943
1.00
-I-
3.59
0"
-,-
.95
1.19
-,-
'"
013
-I-
."
.00
-I-
249
235
-,-
. "
.00
-,-
2 "
.00
-I-
2.61
.00
-I-
2.72
830
-,-
.ll
."
-I-
, 21
3 830
-I-
2 218
3.776
-,-
2.415
4.46
-,-
2.319
4.45
-I-
4.49
-,-
2.274
3.776 4.47
-1- -1-
2.301 2.274
3 776
-I-
2 266
3.776
-I-
2.103
3 776
-I-
1.949
3.776
-I-
1.B03
.00
3.776
4.47
-,-
2.274
4.44
-I-
2.274
4.40
-,-
2.274
4.35
-,-
2.250
4.31
4.50
-I-
.013
4.50
-I-
.013
4.50
-I-
.013
4.50
-,-
.013
4.50
-,-
.013
4.50
-I-
.013
4.50
-I-
.013
4.50
-I-
.013
4.50
.00 .00
-,-
.00
-I-
.00
.00
-,-
.00
.00
-I-
.00
.00 .00
-,-
.00
-,-
.00
-I-
.00
-,-
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
,-
PIPE
,
.0
o
.0
7,.-1C
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-I- -1- -1- -1- -I- -I- -I- -I- -1- -1- -1- -I- -I- I-
n .62 .02806 .012557 .15 2 " .732 2.275 .013 .00 PIPE
D W S P G N - CIVILDESIGN Vel's 7.1 PAGE 7
For: RANPAC Inc. , Temecula, California - SiN '"
WATER SURFACE PROFILE LISTING Date: 5-22-2000 Time: 4:46 "
LINE "0"
"t"""*.**.*....__................."........,,............-*t"...._....*..._............."......._........"."....****...***********,,***
I Invert I Depth I Water I Q I V.I V.I I Energy I Super ICriticallFlow ToplHeight/IBue Wtl INo Wth
Station I Elev I (FT) I Elev I (CFS) I (FPS) Head I Grd.El.1 Elev I Oepth I Width ICia.-FTlor 1.0.1 2L IPrs/Pip
-I- -I- -I- -I- -1- -1- -1- -1- -1- -I- -I- -I- -I- I-
L/E-lern leh Slopel I I I SF Ave I NF IS' OpthlFroude NINorm Op I "N" I I .. I Type Ch
****...**1**.......1".****..1.**..****1*******.*1***.**'*1****...*I***"...**l****...'*****...'********I*..**".1**....*1".***1....***
I I I I
2011.63 1271.63 2 '" 1274 .616 167 . 14.95 3.470 1278 086 .00 3.776 4.25 4.50 .00 .00 0 .0
-I- -1- -I- -I- -1- -1- -1- -I- -I- -I- -1- -1- -I- 1-
11.00 .02806 .011294 .12 2 " 1.621 2.275 .013 .00 PIPE
I I I I
2022.63 1271.93 3.121 1275.056 167.8 14.25 3.155 1278.211 .00 3 776 4.15 4.50 .00 .00 0 .0
-1- -1- -I- -I- -I- -1- -1- -1- -I- -I- -I- -1- -I- 1-
16 .02806 .010071 .08 3. 12 491 2.275 .013 .00 PIPE
I I I I
2030 " 1272.16 3 '61 1275 425 167 .. 13.59 2.868 1278 283 .00 3.776 4.02 4.50 .00 .00 0 .0
-I- -1- -1- -I- -1- -1- -I- -1- -I- -I- -1- -1- -I- 1-
5.60 .02806 .009012 .05 3 26 1.367 2.275 .013 .00 PIPE
I I I I
2036 " 1272.32 3 415 1275 736 167 . 12 " 2.607 1278.343 .00 3 776 3.85 4.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -I- -1- -1- -1- -1- -1- -1- -I- I-
3 41 .02806 .008106 .03 3 42 .245 2.275 .013 .00 PIPE
I I I I
2039 80 1272.42 3.584 1276 OOI 167.8 12.36 2.370 1278 371 .00 3.776 3.62 4.50 .00 .00 0 .0
-I- -I- -I- -I- -I- -I- -1- -1- -I- -I- -I- -I- -I- I-
1.19 .02806 .007343 .OI 3.58 1.125 2.275 .013 .00 PIPE
I I I I
2040 " 1272.45 3 776 1276.226 167 . 11 78 2.154 1278.380 .00 3.776 3.31 .50 .00 .00 0 .0
-I- -I- -I- -I- -I- -I- -1- -1- -I- -I- -I- -I- -I- 1-
WALL ENTRANCE
I I I I
2040 " 1272 " 7 628 1280 078 167 . 11 .019 1280 097 .00 2.465 " 01 7 00 .50 2 .00 0 .0
-I- -1- -I- -1- -I- -I- -1- -1- -I- -1- -1- -I- -I- 1-
0
1ffi
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
WSPGN - EDIT LISTING - Version 7.0 Date: 5-19-2000 Time: 11:58 "
WATER SURFACE PROFILE - CHANNEL DEFINITION LISTING PAGE ,
C>.RD SECT CRR NO OF AVE PIER HEIGHT 1 BASE ZL ZR IHV 'ill) Y(21 Y(3) Y(41 Y(S) Y(6J Tn) Y(S) Y(P) Y(lO)
CODE NO TYPE PIER/>'!p WIOTH DIAMETER WIDTH OROP
CO , 0 , .00
CO , 0 , .50
w 5 P G N PAGE NO
WATER SURFACE PROFILE TITLE CARD LISTING
HEADING LINE NO IS
LINE "0-1"
HEADING LINE NO , IS LJ.5,E H?o fL1
HEADING L>HE NO 3 IS f;' /,
0 WSPGN LAN E \/ PAGE NO ,
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO IS A SYSTEM OUTLET
u/s DATA STATION INVERT SECT
1004.50 1252.38 1
ELEMENT NO , IS A REACH .
UIS DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1042.39 1254.59 1 .013 .000 .000 .000 0
ELEMENT NO 3 IS A REACH
U/5 DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1082.89 1256.96 1 .013 42.422 -54.100 .000 1
ELEMENT NO IS A REACH .
u/s DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1223.76 1263.93 1 .013 331.061 24.380 .000 0
ELEMENT NO 5 IS A REACH .
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1413.23 1273.31 1 .013 .000 .000 .000 0
ELEMENT NO , IS A JUNCTION .
U/S DATA STATION INVERT SECT tJ>.T-l tJ>.T-2 N 03 O' INVERT-3 INVERT-4 PHI 3 PHI .
1415.23 1273.41 1 , 0 .013 16 00 .00 1273.851 .00 -45 00 .00
RADIUS ANGLE
.000 .000
ELEMENT NO 7 IS A REACH
U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H
1740.25 1289.50 1 .013 354.036 52.600 .000 0
ELEMENT NO , IS A SYSTEM HEADWORKS
U/S OATA STATION INVERT SECT W S ELEV
1740.25 1289.50 1 1289.50
1#>
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.. WARNING NO.2 H - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWKDS, W.S.ELEV - IN\' .. DC
n W 5 P G N - CIVILDESIGN Vera 7.1 PAGE
For: RANPAC Inc., Tamecula, California - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:l1:58 56
LINt "0-1"
......*.**************..*...........******************.***...******..************....**................"'.**......................"................
I InV8rt I Depth I Water I Q I Vel Vel I Enerqy I Super ICriticallFlow ToplHeiqht/Jease Wtl tHo Wth
Station I Elev I eFT) I Elev t (CFS) I (FPSJ Head I Grd.El.l Elev I Depth I Width IDia.-FTlor 1,0.1 ZL IPrll/Pip
-1- -1- -1- -!- -1- -1- -1- -1- -1- -!- -1- -1- -1- 1-
L/Elem I Ch Slope I I I I SF Ave I HF 15E Dpth I Froude N I Norm Dp I "H" I I ZR I Type Ch
.........!........I........I.........I.........I.......1........1.........1.......1........1........1.......1.......1.....1.......
t I 1 1 1 I I I lit 1
1004.50 1252.38 5 030 1257.410 40.2 12.80 2.543 1259.953 .00 1.953 .00 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- ]-
37.89 .05833 .031577 1.20 5 03 .000 1.275 .013 .00 PIPE
1 I I I
1042.39 1254.59 4.017 1258.606 40.2 12 80 2.543 1261.149 .00 953 .00 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -J- -1- -J- -1- -1- -1- -1- 1-
40.50 .05852 .031577 1.28 .00 .000 1.274 .013 .00 PIPE
I I J I
1082.89 1256.96 3 449 1260.409 40.2 12.80 2.543 1262.951 .00 953 .00 2.00 .00 .00 0 .0
-J- -1- -1- -1- -1- -[- -1- -1- -1- -1- -j- -1- -1- 1-
2.46 .04948 .031577 .08 .00 .000 1.352 .013 .00 PIPE
I I I I
1085.35 1257 08 3 410 1260 492 40.2 12.80 2 543 1263 034 .00 .953 .00 2 00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -J- -1- [-
HYDRAULIC JUMP
I I I
1085.35 1257 08 .352 1258 434 40 2 17 79 .913 1263 347 .06 953 1.87 2 00 .00 .00 0 .0
-1- -J- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -J- 1-
138.41 .04948 .048681 6.74 1.41 2 853 1.352 .013 .00 PIPE
I 1 j J
1223.76 1263.93 1.368 1265.298 40.2 17.56 4.786 1270.084 .00 .953 1.86 2.00 .00 .00 0 .0
-J- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
6605 .04951 .046554 3.07 1.37 2.788 1.351 .013 .00 PIPE
I I I I
128981 1267.20 1.398 1268.598 40.2 17.14 4.561 1273.159 .00 1.953 1.83 2.00 .00 .00 0 .0
-1- -1- -J- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
52 38 .04951 .042794 2.24 1.40 2.671 1.351 .013 .00 PIPE
I! 1 I
1342.20 1269.79 .461 1271 254 40.2 16.34 4.147 1275.401 .00 1.953 1.77 2.00 .00 .00 0 .0
-1- -1- -1- -J- -]- -j- -1- -[- -1- -1- -1- -1- -1- ]-
27.52 .04951 .038316 1.05 1.46 2 446 1.351 .013 .00 PIPE
I I 1 1
1369.71 1271.16 1.530 1272.686 40.2 15.58 3.770 1276.455 .00 .953 1.70 2.00 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
17.70 .04951 .034498 .61 1.53 2.226 1.351 .013 .00 PIPE
o W S P G N - CIVILDESIGN Ver.. 7.1 PAGE 2
For: RANPAC Inc. T81T18cula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 TillMl: 11: 58 :56
LINE "0-1"
**********************.*************.***.*.*........*.*.......***.***********.*.......**.******************.****.**..**..*********
I Invert! Depth t Water I Q I Vel Vel I Energy 1 Super ICritical]Flow ToplHeight/IBase Wtl INo Wth
Station I Uev 11FT) I E1ev I (CFS) j (FPSl Head I Grd.El.J E1ev I Depth I Width IDia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem JCh Slope I I 1 I SF A~I HF ISE OpthlFroude NINorm Dp I "N" I I ZR JType Ch
*********J****..**I***.....I*********I*********I*******1********1*********1*******1********1********1****.**1*******1*...*1...*...
J I I I I I I
1387.42 1272.03 1.607 1273 639 40 2 14.86 3.427 1277.066 .00
-(- -1- -1- -1- -1- -1- -1- -1- -1-
12.34 .04951 .031315 .39 1.61
I
76 1272.64
-1- -1-
867 .04951
I
.694 1274.337
-1- -1-
I
3.115 1277
-1- -1-
.028838
1399
402 1416
-I-
I
1408.43 1273.07
-1- -1-
4.80 .04951
I
1413.23 1273.31
-J- -1-
JUNCT STR .04999
I
1415.23 1273.41
-1- -1-
2714 .04950
I
1442371274.75
-1- -!-
HYDRAULIC JUMp
I
1442.37 1274.75
-1- -1-
53.99 .04950
I
1496.36 1277 .43
-1- -1-
110.46 .04950
I
.7981274.870
-1- -1-
I
2.832 1277
-1- -1-
.027942
40.2 1351
-I-
.703
-I-
.13
I
1.953 1275 263
-1- -1-
L-INE "D-B"
I I
4 .160 1277 .570
-J- -I-
I
3.154 1277
-I-
I
2.574 1277
-1- -1-
.019764
40.2 12.87
-I-
I
.921 1278
-1- -1-
.011443
24.2
-I-
770
7.70
-1-
I
.9211278
-I-
'"
-I-
'"
-1-
I
.977 1275.731
-1- -1-
I
3 911 1279
-1- -J-
.049556
24.2 15.87
-I-
'"
-I-
2.68
I
.977 1278
-I-
I
3.911 1282.315
-1- -[- -1-
.048017 5.30
0"
-1-
24.2 15.87
-1-
I
1606.82 1282
-1-
I
.995 1283.889
-1- -1-
I
3 729 1287
-1-
"
-1-
24.2 15 50
-1- -J-
'"
-1-
453
-I-
.20
.00
-1-
1.69
.00
-I-
1.80
837
-1-
.04
'"
-I-
.J>
'"
-I-
.00
-1-
1.02
.00
-I-
1.02
.00
-I-
.96
.00
-I-
.00
.00
-1-
.04
-I-
1.953
-I-
2.006
953
-1-
1.778
.953
-I-
.514
.953
-1-
.999
741
-I-
.000
741
-I-
741
-I-
3.203
1.741
-1-
3 203
.741
-I-
1.59
-I-
1.351
1.44
-I-
1.351
1.21
-I-
.351
.00
-I-
.977
2.00
-1-
.977
2.00
-I-
.977
, 00
-1-
2.00
-I-
.013
2.00
-1-
.013
2.00
-I-
.013
.61
-I-
2.00
-I-
.013
2.00
-1-
.013
.00
-1-
2.00
-1-
2.00
-1-
.013
2.00
-I-
.013
'00
-I-
.00
-I-
.00
.00
-1-
.00
.00
-1-
.00
-1-
.00
-I-
.00
-I-
.00
-I-
.00
-I-
.00
-I-
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
.0
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
.0
1f'\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
51.94
.04950
o
.043710 2.27 1.04
W S P G N - CIVILOESIGN Vera 7.1
For: RANPAC Inc., Temeeula, Calif"ornia - SIN 560
WATER SURFACE PROFILE LISTING
LINE "0-1"
3.090
.977 .013 .00 PIPE
""'
Date: 5-19-2000 Time:ll:58:S6
.**..**.***.......................***..............................**.***.***............................***...........****...........
I Invert I Depth I Water I Q I Vel Vel I Enerqy I Super lCritieallFlo~ ToplHeiqht/lBalle Wtt tHo Nth
Station t nev I In) I tlev I ICFS) I (FPS) Head I Grd.El. I Elev I Depth I Width I Oia. -FT lor I. D. I ZL I Pre/PIp
-1- -1- -1- -1- -1- -1- -1- -1- -1- -j- -1- -j- -1- 1-
LJElern ICh Slope I I I I SF Avtlj HE ISE DpthlFroude NINorm Dp I "N" I I ZR IType Ch
*...*........t***.*....I....****!***......I.....~...l*******I********!*********I *******1 ********1******** I *******1******* I ***** I *******
I
1658.76 1285.47
-1- -1-
24.41 .04950
I
1683 16 1286.67
-1- -1-
1533 .04950
I
1698 50 1287.43
-1- -1-
10 75 .04950
I
1709.251287.97
-1- -1-
8.03 .04950
I
1717 28 1288.36
-1- -1-
621 .04950
I
1723 49 1288.67
-1- -1-
4.82 .04950
I
1728.31 1288.91
-1- -1-
3 77 .04950
I
1732.08 1289.10
-1- -1-
297 .04950
I
1735 05 1289.24
-1- -1-
2 24 .04950
o
I
.033 1286 499
-1- -!-
I
1.0731287747
-1- -1-
I
.115 1288 548
-1- -1-
I
1601289125
-1- -1-
I
.207 1289 570
-1- -1-
I
1.256 1289 926
-1- -1-
I
.3091290.218
-1- -1-
I
1.366 1290 462
-1- -1-
I
1.4261290669
-1- -1-
For: RANPAC Inc.
LINE "0-1"
I
24.2 14.78 3.390 1289.888
-1- -1- -1- -1-
.038518 .94
I
24.2 14.09 3.082 1290.829
-1- -1- -1- -1-
.033974 .52
I
24.2 13.43 2.802 1291.350
-1- -1- -1- -1-
.030003 .32
I
24.2 1281 2.5471291
-1- -1- -1-
.026531
I
24.2 12.21 2.315 1291
-1- -1- -1-
.023481
I
24.2 11.64 2.105 1292.031
-1- -1-' -1- -1-
.020816 .10
I
24.2 11.10 1.913 1292.131
-1- -1- -1- -1-
.018499 .07
I
24.2 1058 1.740 1292
-1- -1- -1-
.016477
201
-1-
.0'
.04
-1-
1.07
.03
-I-
1.11
.03
-I-
LlS
672
-1-
.21
.03
-1-
1.19
.741
-I-
2.876
.741
-I-
2 675
1.741
-1-
2 486
'"
-I-
2 307
. 741
-I-
2.138
1.741
-I-
1.979
.02
-1-
.33
1.741
-I-
1.827
2.00
-I-
.977
1.99
-1-
.977
1.99
-I-
.977
1.97
-I-
.977
1.96
-1-
.977
1.93
-1-
.977
1.90
-I-
.977
1.86
-1-
.977
1.81
-I-
.977
2.00
-I-
.013
2.00
-1-
.013
2.00
-1-
.013
2.00
-I-
.013
2.00
-1-
.013
2.00
-1-
.013
2.00
-1-
.013
2.00
-1-
.013
2.00
-1-
.013
.00 .00
-1-
.00 .00
-1-
.00 .00
-1-
.00 .00
-1-
.00 .00
-I-
.00
.00 .00
-I-
.00
.00 .00
-1-
.00
.00 .00
-1-
.00 .00 0
-1- !-
.00 PIPE
PAm
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
I
1.5811292250
-1- -1- -1-
.014720 .03
w SlOG N - CIVILDESIGN Vere 7.1
TtIlll8cula, California - SIN 560
WATER SURFACE PROFILE LISTING
24.2 10.09
-I-
'"
-1-
.15
.03
-I-
1.23
741
-I-
683
.02
-1-
.44
1.741
-I-
1.545
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.02
-I-
1.28
.02
-I-
1.38
o
1-
PIPE
I
.0
o
1-
PIPE
I
.0
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.0
Date: 5-19-2000 Time:11:5856
......*.............**.......*..*******************.*******.............................................*.........................
I Invert 1 Depth I Water I Q I Vel Vel I Energy 1 Super ICriticallFlow ToplHeiqht/IBaee Wtl INo Wth
Station I Elev 1 (FT) I Elev 1 (eFS) I (FPS) Head I Grd.E1.1 E.lev I Oepth I Width 10ia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/E1em lCh Slope I I I I SF Ave I HF ISE DpthlFroude NINorm Op I "N" I I ZR IType Ch
.........1........1........1......*..1.........1.......1........1.........1.......1........1........1.......1......*1.....1.......
1 I I I I I I
1737 29 1289.35 1.492 1290.845 24.2 9.62 1.438 1292.283 .01
-1- -1- -1- -1- -1- -1- -1- -1- -1-
59 .04950 .013215 .02 1.51
I
1738 88 1289.43
-1- -1-
1.01 .04950
I
881289.48
-1- -1-
.37 .04950
I
1740.251289.50
-1- -j-
1739
o
I
565 1290
-1-
'"
-1-
I
1.6461291
-I-
.128
-1-
I
1. 741 1291
-1-
241
-1-
24.2
-I-
I
1.307 1292
-1- -1-
.011939
3D'
-I-
.01
9.17
24.2
-I-
I
1.1881292
-1- -1-
.010893
316
-I-
.00
.75
24.2
-1-
I
.0791292
-1-
320
-1-
3.
-1-
.01
-1-
1.58
.01
-1-
1.66
.01
-1-
'"
-1-
.411
. 741
-1-
'"
'"
-I-
1.145
.741
-1-
1.74
-I-
.977
1.65
-I-
.977
1.53
-1-
.977
1.34
-1-
2.00
-1-
.013
2.00
-1-
.013
2.00
-I-
.013
2 00
-1-
.00
-I-
.00
-I-
.00 .00
-I-
.00
-I-
.00
.00
o
1-
PIPE
I
.0
.00
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
.0
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CAAD
COD'
If S P G H
WATER SURFACE
HEIGHT 1 BM;i:
OlAHETER WIDTH
- EDIT LISTING - Version 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR INV Till T(2) Yl31 Yl41
DROP
SECT eRN NO OF AVE PIER
NO TYPE PIER/PIP WIDTH
CD 1 4 0 1 .50
CD 2 3 0 .00 7 DO 21.00 .00 .00 .00
C If S P G N
WATER SURF""" PROFILE - TITLE CARD LISTING
HEADING LINE .01 IS
LINE "0-2"
HEADING LINE .02 IS
HEAOING LINE .03 IS
0 W 5 P G N
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO IS A SYSTEM OUTLET . .
U/S DATA STATION INVERT SECT
1002.93 1290.00 1
ELEMENT NO 2 IS A REACH
u/s DATA STATION INVERT SECT .
1019.99 1296.53 1 .013
ELEMENT NO , ISA WALL ENTRANCE
U/S DATA STATION INVERT SECT FP
1019.99 1296.53 2 .500
ELEMENT NO IS A SYSTEM HEADWORKS
ulS DATA STATION INVERT SECT
1019.99 1296.53 2
W.5.c
L-1r\JS
W S ELEV
1296.53
Oat.: 5-19-2000
yeS) Y(6) Tn)
r 120M
('/p'f
RADIUS ANGLE
.000 .000
Tiroe"12:10 13
PAGE 1
Yl81 'f191 T(lO)
PAGE NO
PAGE NO
ANG PT
.000
MAN .
o
2-(,&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
WARNING NO.2 "* - WATER SURFACE. ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWKDS, W.S.ELEV .. INV + DC
Ci W S P G N - CIVILDESIGN Verll 7.1 PAGE
For: RANPAC Inc., Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:12:10 20
LINE "D-2"
.**....***................********...........********..********.......****.**.*........***...........**......**......................
I Invert I Depth I Water I Q I Vel Vel I Energy I SU~r ICriticallFlow TopIHei9ht/IBa,. Wtl INo Nth
Station I Uev t 1FT) I Elev I (CFS) I (FPS) H.ad. J Grd.El.l Elev I Oepth I Width ICia.-FTlar 1.0.1 ZL lPn/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1_
L/Elem lCh Slope I I I I SF Avel HF tSE DpthlFrou~ NjNonn Op I "N" I I ZR tType Ch
.........1.........1.**.....1.........1.........,.......1........1.........1.......1........1........1*******1*******1*.*.*1*******
I I I 1 1 1 I 1 1 I 1 I 1
1002.93 1290.00 .540 1290 540 11.8 20 59 6.584 1297.125 .00 1.306 1.44 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
2.36 .38277 .154111 .36 .54 5 753 .433 .013 .00 PIPE
1 1 I 1
1005 29 1290.90 .558 1291 462 11.8 19.67 6.006 1297.468 .00 306 1.45 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
213 .38277 .135413 .29 .56 5388 .433 .013 .00 PIPE
I I I 1
100742 1291.72 .578 1292.296 11.8 1875 5.460 1297.756 .00 1.306 1.46 1.50 .00 .00 0 .0
-1- -J- -1- -1- -1- -1- -1- -J- -J- -1- -1- -1- -1- 1_
80 .38277 .118795 .21 .58 5.034 .433 .013 .00 PIPE
I I 1 I
1009.22 1292.41 .599 1293.006 11.8 17.88 4.964 1297.970 .00 1.306 1.47 1.50 .00 .00 0 .0
-1- -1- -J- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
54 .38277 .104276 .16 .60 4.701 .433 .013 .00 PIPE
I I 1 I
1010 76 1293.00 .621 1293.618 11 8 17.05 4.513 1298.130 .00 1.306 1.48 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -f- -1- -1- J-
33 .38277 .091580 .12 .62 4.389 .433 .013 .00 PIPE
I I I 1
1012.09 1293.51 .644 1294.150 11.8 16.25 4.102 1298252 .00 1.306 1.48 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -J- -J- -1- -1- -1- -1- -1- -J- I-
LLS .38277 .080469 .09 .64 4.097 .433 .013 .00 PIPE
I 1 I I
1013 24 1293.95 .668 1294.616 11.8 15 50 3.729 1298.345 .00 1.306 1.49 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -J- -J- -1- -1- -f- -1_ 1_
.01 .38277 .070738 .07 .67 3 822 .433 .013 .00 PIPE
I] J I
1014.25 1294.33 .693 1295 026 11.8 14 78 3.390 1298.416 .00 .306 1.50 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.88 .38277 .062211 .05 .69 3 564 .433 .013 .00 PIPE
I I I I
1015.13 1294.67 .719 1295389 11.8 14.09 3.082 1298471 .00 306 1.50 1.50 .00 .00 0 .0
-j- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1_
.77 .38277 .054734 .04 .72 3.321 .433 .013 .00 PIPE
o W S P G N - CIVILOESIGN Vera 7.1 PAGE 2
For; RANPAC Inc., Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date; 5-19-2000 Time:12:10;20
LINE "0-2"
******************************.**"*"**"*"*"**"**************..******.*.*.*...............................****.................**********
I Invert I Depth 1 Water I Q I Vel Vel I Enerqy 1 Super JCritical]Flow ToplHeight/lBase Wtl INo Wth
Station I E1ev I (FT) 1 Elev I (CFS) I (FPSJ Head I Grd.El.1 Elev 1 Depth 1 Width IDia.-FTlor 1.0.1 ZL IPre/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -t- -1- -1- -1- -1- 1_
L/Elem ICh Slope 1 I I 1 SF Ave! HF ISE DpthlFroude NINorm Op 1 "N" I 1 ZR lType Ch
*********1..******1********1*********1*********1*******1********1*********1*******1********1********1*******1*******1*****'*******
I
1015.90 1294.97
-1- -1-
.67 .38277
I
1016.58 1295.22
-1- -1-
.59 .38277
I
1017.171295.45
-!- -1-
.52 .38277
I
1017 69 1295.65
-1- -t-
.45 .38277
I
1018.14 1295.82
-1- -1-
.39 .38277
I
1018.53 1295.97
-1- -t-
.34 .38277
I
1018.871296.10
-1- -1-
.29 .38277
I
1019.161296.21
-1- -1-
.24 .38277
I
1019 40 129631
-1- -1-
I
.7461295.711
-1- -1-
I
.775 1295.999
-1- -1-
I
.805 1296.255
-j- -1-
I
.8361296.485
-1- -I-
I
.870 1296 692
-1- -1-
I
.905 1296 877
-1- -1-
I
.942 1297 044
-1- -1-
I
.9821297194
-1- -1-
I
.024 1297.330
-1- -1-
I
11.8 13 43 2.802 1298
-1- -1- -1-
.048201
513
-I-
.03
I
11.8 12 81 2.547 1298
-1- -1- -1-
.042488
".
-I-
.03
I
2.316 1298.571
-1- -1- -J-
.037466 .02
11.8 12.21
-I-
11.8 11.64
-1-
I
2.1051298.591
-1- -1- -1-
.033082 .01
I
1.914 1298.605
-1- -1- -1-
.029254 .01
11.8 11.10
-I-
I
11 8 10.59 1.740 1298
-1- -t- -1-
.025891
617
-1-
.01
I
11 8 10 09 1.582 1298
-1- -1- -1-
.022958
'"
-1-
.01
I
11.8 9 62 1.438 1298
-1- -1- -1-
.020398
m
-1-
.00
11.8 9.17
-1- -1-
I
1.307 1298
-I-
m
-I-
.00
-I-
.75
1.306
-1-
3.093
.00
-I-
.78
.00
-I-
.01
1.306
-1-
2 879
1.306
-1-
2.678
.00
-1-
.84
1.306
-1-
2.488
.00
-I-
.87
1.306
-1-
2 309
.00
-I-
.91
.306
-1-
2.140
.00
-I-
.94
.306
-1-
.981
.00
-1-
.9B
1.306
-I-
1.829
.00
-I-
.306
-1-
1.50
-I-
.433
1.50
-1-
.013
.00 .00
-I-
.00
1.50
-I-
.433
1.50
-I-
.433
1.50
-1-
.013
.00 .00
-I-
1.50
-I-
.013
.00 .00
-I-
1.49
-I-
.433
1.50
-1-
.013
.00 .00
-I-
1.48
-I-
.433
1.50
-I-
.013
.00 .00
-I-
1.47
-I-
.433
1.50
-1-
.013
.00 .00
-1-
1.45
-I-
.433
1.50
-1-
.013
.00 .00
-1-
1.43
-1-
.433
1.50
-1-
.013
.00 .00
-1-
.00
.40
-I-
.50
-1-
.00 .00
-I-
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
pm
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
o
1-
PIPE
I
.0
o
1-
.0
-zf/\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.20 .38277 .018169 .00 1.02 1.685 .433 .013 .00 PIPE
0 W S P G W - CIVILDESIGN Ven 7.1 PAG' J
For: RANPAC Inc., Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Ti./IIe:12;lO 20
LINE "0-2"
..********............................................................................................***..........................
I Invert I Depth I Water I Q I V.l v.l I Enerqy I Super ICritieallFlow ToplHeiqht/IBase Wtl INo Wth
Station I Elev I (n) I tlev I (eFS) I (FPSI Head I Grd.El.1 tlev I Depth I Width IOia.-FTlar 1.0.1 'L lPrs/Pip
-I- -1- -1- -I- -I- -I- -I- -1- -I- -I- -I- -I- -I- I-
L/E18lll leh Slope I I I I SF Ave I WF ISE OpthlFroude NINorm Dp I "N" I I '" I Type eh
..*******1******..1........1.........,......***,*****.*1***.....1.........1......*1*.***...1........,.......1...****1.....1.......
I I I I I I I I
1019.60 1296.38 070 1297.453 11.8 8 75 1.188 1298 641 .00 .306 1.36 1.50 .00 .00 0 .0
-I- -I- -1- -1- -I- -I- -1- -1- -1- -I- -1- -I- -I- I-
.16 .38277 .016237 .00 1.07 546 .433 .013 .00 PIPE
I I I I
1019.77 1296.44 .119 1297.563 11.8 8.34 1.080 1298.644 .00 1.306 1.31 1.50 .00 .00 0 .0
-I- -I- -I- -1- -I- -I- -I- -1- -I- -I- -1- -I- -I- 1-
.12 .38277 .014568 .00 1.12 .412 .433 .013 .00 PIPE
I I I I
1019.89 1296.49 l7J 1297 '" 11.8 7.95 .982 1298 645 .00 .306 1.24 1.50 .00 .00 0 .0
-I- -1- -1- -I- -I- -I- -1- -1- -I- -1- -I- -I- -I- I-
.08 .38277 .013158 .00 1.17 1.280 .433 .013 .00 PIPE
I I I I
1019.96 1296.52 .234 1297 754 11 8 58 .893 1298.646 .00 1.306 1.15 1.50 .00 .00 0 .0
-1- -I- -I- -I- -I- -I- -1- -I- -I- -1- -I- -I- -I- 1-
.OJ .38277 .012008 .00 1.23 1.147 .433 .013 .00 P1PE
I I I I
1019 " 1296.S3 .306 1297 .836 11.8 .2J .811 1298 647 .00 .306 .01 50 .00 .00 0 .0
-I- -I- -1- -I- -I- -1- -I- -I- -I- -I- -1- -I- -I- 1-
WALL ENTRANCE
I I I
1019. " 1296 53 2 810 1299.340 11 , .20 .001 1299.341 .00 .214 21 00 .00 21.00 .00 0 .0
-I- -1- -1- -1- -1- -I- -1- -I- -1- -1- -I- -1- -I- 1-
0
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
=
CODE
SECT
ND
eRN NO OF AVE PIER
TYPE PIER/PIP WIDTH
CD 4
CD 3
0
HEADING L1NE ND 18
HEADING LINE ND 2 ,.
HEADING L1NE NO 3 18
0
o
o
WSPGN
WATER SURFACE
HEIGHT 1 BASE
DIAMETER WIDTH
- EDIT LISTING - Version 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR INV 'till TI21 Y13) Y(4)
DROP
'lIS) ,({Ei) Y(7)
Date: 5-19-2000
1.50
.00 7 00 28.00
.00 .00 .00
W S P G N
TITLE CARD LISTING
LINE "0_3"
WATER SURFACE PROFILE -
ELEMENT NO
WATER SURFACE
IS A SYSTEM OUTLET
UIB OATA STATION
1002.83
ELEMENT NO 2 IS A REACH
0/8 DATA STATION
1038.80
ELEMENT NO 3 IS A WALL ENTRANCE
u/s DATA STATION
1038.80
ELEMENT NO 4 IS A SYSTEM HI'.ADWORKS
ula DATA STATION
1038.80
WSPGN
PROFILE - ELEMENT CARD LISTING
.
INVERT SECT
12510.00 1
INVERT SECT N
12516.513 1 .013
INVERT SECT FP
1296.513 2 .500
INVERT SECT
12516.513 2
WS.E.
L-Il\\c
1=1<014
11\)"
RAD IUS ANGLE
.000 .000
W S ELEV
12516.513
Time
12:13 36
PAGE 1
Y(S1) '(IlO)
'lIB)
PAGE NO
PAGE NO
2
ANa FT
.000
MAN H
o
~r,r.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.. WARNING NO.2" - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HOWKOS, W.S.ELEV - INV .. DC
o W S P G N - CIVIlDESIGN VerB 7.1 PAGE
For: RANPAC Inc" Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time; 12; 13 42
LINE "0-3"
****..**...............***......................**....................***.**.............."...**********..........**.......**........**..........
I Invert I Depth I Water I Q t Vel Vel I Energy I Super I Critical 1 Flow ToplHeiqht/IBa8e wtl INo Wth
Station I Uev I (FT) I Uev I (eES) I (EPS) Head I Grd.El.l Uev I Depth I Width IOia.-FTler 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem I Ch Slope I I I I SF Ave I HF I SE Dpth I Froude N I Norm Op I "N" I I ZR I Type Ch
..........I.....***I***.....I...******t*********I*******1********1*********1*******1********1********1*******1*******1*****1*******
1 I 1 1
1002.83 1290.00 .608 1290.609 13 0 19 33 5.802 1296 411 .00 351 1.47 1.50 .00 .00 0 .0
-1- -!- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.12 .19266 .126852 .14 .61 5 042 .545 .013 .00 PIPE
1 1 1 I
1003.95 1290.22 .611 1290 828 13.0 19.19 5.719 1296.547 .00 351 1.47 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- t-
6 65 .19266 .117943 .78 .61 4.989 .545 .013 .00 PIPE
I 1 1 1
1010 60 1291.50 .634 1292.132 13.0 18.30 5.199 1297 331 .00 351 1.48 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
5.05 .19266 .103609 .52 .63 657 .545 .013 .00 PIPE
I! 1 I
1015 65 1292.47 .657 1293 128 13.0 17 45 4.727 1297 854 .00 351 1.49 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -j- -1- -1- -1- -1- 1-
3 99 .19266 .090999 .36 .66 4.346 .545 .013 .00 PIPE
1 1 1 1
1019.64 1293.24 .681 1293921 13.0 1664 4.297 1298.217 .00 351 1.49 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
3.24 .19266 .080007 .26 .68 053 .545 .013 .00 PIPE
1 1 1 1
1022 88 1293.86 .707 1294.570 13.0 15.86 3.906 1298.476 .00 1.351 1.50 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
268 .19266 .070416 .19 .71 3.778 .545 .013 .00 PIPE
1 1 1 1
1025.56 1294.38 .734 1295.114 130 15.12 3.551 1298.665 .00 1.351 1.50 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
26 .19266 .061999 .14 .73 3.520 .545 .013 .00 PIPE
1 I 1 I
102782 1294.81 .762 1295577 130 14.42 3.228 1298.805 .00 1.351 1.50 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -j- 1-
92 .19266 .054608 .10 .76 3.277 .545 .013 .00 PIPE
1 I I j
1029.74 1295.18 .791 1295975 13.0 13.75 2.935 1298.910 .00 1.351 1.50 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1.63 .19266 .048141 .08 .79 3.049 .545 .013 .00 PIPE
o W S P G N - CIVILDEBIGN Vera 7.1 PAGE 2
For: RANPAC Inc. Ternacula, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:12:13:42
LINE "0-3"
**********************************************************************************************************************************
I Invert I Depth 1 Water 1 Q I Vel Vel I Enerqy I Super ICritica11Flow ToplHeiqht/IBaae Wtl INo Wth
Station I Elev 11FT) 1 Elev 1 ICFSI 1 IFPSI Head 1 Grd.El.l Elev 1 Depth 1 Width 10ia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -j- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/.Elem ICh Slope 1 1 I I SF A.vel HF ISE DpthlFroude NIN01"11l Dp I "N" 1 I ZR IType Ch
*********1********1********1*********1*********1*******1********1*********1*******1********1********1*******1*******1*****1*******
I
1031.37 1295.50
-1- -1-
.40 .19266
I
1032 77 1295.77
-1- -1-
.20 .19266
1
1033.97 1296.00
-1- -1-
1.03 .19266
I
1035.00 1296.20
-1- -1-
.88 .19266
I
1035 88 1296.37
-1- -1-
.74 .19266
I
103662 1296.51
-1- -1-
.63 .19266
I
1037.25 1296.63
-1- -1-
.52 .19266
I
1037.78 1296.73
-1- -1-
.42 .19266
I
1038.19129681
-1- -1-
I
.8221296.320
-1- -1-
I
.854 1296622
-1- -1-
I
.8891296.888
-1- -1-
I
.9251297.122
-1- -1-
I
.963 1297.331
-1- -1-
I
.005 1297.516
-1- -1-
I
1.0491297681
-1- -1-
I
.0961297.829
-1- -1-
I
.1481297961
-1- -1-
I
13 0 13 11 2.668 1298
-1- -1- -1-
.042480
9"
-1-
.06
I
2.4261299.048
-1- -1- -1-
.037534 .04
13 0 12.50
-I-
1
2.205 1299.093
-1- -1- -1-
.033213 .03
13.0 11.92
-I-
I
13.0 11.36 2.005 1299
-1- -1- -1-
.029415
127
-1-
.03
I
13.0 10.83 1.822 1299.153
-1- -1- -1- -1-
.026114 .02
I
13.0 10.33 1.657 1299.172
-1- -1- -1- -1-
.023242 .01
1
13.0 9.85 1.506 1299.187
-1- -1- -1- -1-
.020731 .01
I
13 0 9 39 1.369 1299.198
-1- -1- -1- -1-
.018561 .01
I
13.0 8 95 245 1299.206
-1- -1- -1- -1-
.00
-1-
1.01
.00
-1-
.82
1.351
-1-
2.834
.00
-I-
.85
1.351
-I-
2.632
.00
-I-
."
1.351
-I-
2.441
.00
-1-
.9)
1.351
-I-
2.261
.00
-1-
.96
1.351
-1-
2 090
3Sl
-I-
1.927
.00
-I-
."
1.351
-I-
1. 772
.00
-I-
.10
.351
-I-
.622
.00
-I-
1.351
-I-
1.49
-1-
.545
1.49
-I-
.545
1.47
-I-
.545
1.46
-I-
.545
1.44
-1-
.545
1.41
-1-
.545
1.38
-I-
.545
1.33
-I-
.545
1.27
-1-
1.50
-I-
.013
.00 .00
-I-
1.50
-1-
.013
.00 .00
-1-
1.50
-I-
.013
.00 .00
-I-
1.50
-I-
.013
.00 .00
-1-
1.50
-1-
.013
.00 .00
-1-
1.50
-I-
.013
.00 .00
-I-
.00
1.50
-1-
.013
.00 .00
-1-
1.50
-I-
.013
.00 .00
-I-
.SO
-1-
.00 .00
-1-
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
1
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
o
1-
.0
ZJR 1,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.31
.19266
.016716 .01 1.15
W S 51 G N - CIVILOESIGN Vera 7.1
For; RANPAC Inc., Temecula, California - SiN 560
WATER SURFACE PROFILE LISTING
l.476
.545 .013 .00 PIPE
PAGE ,
Q
Date: 5-19-2000 Ti~,12:13 42
LINE "0-3"
...........------.....................---------..............------............-...................----.................--..........
I Invert I Depth I Water I Q I V.l V.l I Enerqy I Super I Cri tical I Flow Top r Haiqhtj I Base WtI tHo Nth
Station I tlev I 1FT) I t1av I (CFS) I (FPSJ Neild I Grd.El.l tlev I Depth I Width IOia.-FTlor 1 0.1 ZL !Prs/Pip
-I- -1- -I- -I- -I- -I- -1- -I- -I- -I- -I- -I- -I- I-
L/Elem ICh SlopGl I I I SF Aver HF ISE DpthlFroude NINo~ Dp I "N" I I ZR [Type eh
.....***.1........1.******.1"........1.........1*.......*1"'.......1...........1........1........1..."**..1..***..1".....*1.....1.......
I I I I I I I
1039..50 1296.97 .206 1298.079 13 0 " 1.132 1299.211 .00 1.3.51 1.19 1..50 .00 .00 0 .0
-I- -I- -I- -I- -1- -I- -1- -1- -1- -I- -1- -I- -I- I-
.21 .19266 .01.5174 .00 1.21 .330 ..54.5 .013 .00 PIPE
I I I I
1039.72 1296.91 1.271 1299 IH5 13.0 8. 14 1.029 1299.214 .00 .3.51 1.09 1..50 .00 .00 0 .0
-I- -1- -I- -I- -1- -I- -I- -I- -1- -I- -1- -I- -I- I-
.OH .19266 .013976 .00 1.27 1.179 .545 .013 .00 PIPE
I I I I
1038.90 1296.93 351 1298 281 13.0 7.76 .934 1299 215 .00 .351 .00 .50 .00 .00 0 .0
-1- -I- -I- -1- -I- -1- -I- -I- -1- -I- -I- -1- -I- 1-
WALL ENTRANCE
I I I
1038 80 1296.93 , 126 1300 056 13.0 .15 .000 1300 OS< .00 .189 28.00 7 00 29.00 .00 0 .0
-1- -I- -I- -I- -I- -1- -I- -1- -I- -1- -I- -1- -I- I-
0
'},.~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
--o~~
CARD SECT
CODE NO
w S P G N
WATER SURFACE
HEIGHT 1 BASE
DIAMETER WIDTH
T(S) Y(6) T(7)
- EDIT LISTING - Version 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR IN\' YIlI Y(2) Y(3) V(4)
0'""
Date: 5-19-2000
Tim.:12:42:
'AGE 1
Y(SI Y(9) Y(101
CHN NO OF AVE PIER
TYPE PIER/PIP WIDTH
co 1 4 0 1 .50
CO 2 3 0 .00 S 00 21.00 .00 .00 .00
0 W S P G N PAGE NO
WATER "J'''= PROFILE - TITLE CARD LISTING
HEADING LINE NO "
LINE "0-4"
HEADING LINE NO 2 IS u).S.
\:: fRoM
HEADING LINE NO 3 IS f( {~
C WSPGN L-INE: 0 PAGE NO 2
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO IS A SYSTEM OUTLET .
U/S DATA STATION INVERT SECT W S ELEV
1000.00 1260.97 1 1262.41
ELEMENT NO 2 IS A REACH
U!S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN N
1019.80 1283.35 1 .013 .000 .000 .000 0
ELEMENT NO 3 ISA WALL ENTRANCE
uls DATA STATION INVERT SECT F'
1019.S0 1283.35 2 .500
ELEMENT NO 4 IS A SYSTEM HEADWORKS
uls DATA STATION INVERT SECT W S EI.EV
1019.80 1283.35 2 1283.35
"j;c'i\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
J
WARNING NO. 2. U - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQU.U.S INVERT ELEVATION IN HDWKOS, W.S.ELEV .. INV + DC
o W S P G N - CIVILOESIGN Vera 1.1 PAGE
For: RANPAC Inc., T_=la, California - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:12:42:11
LINE "D-4"
......................*................"'''''''........................................................................................
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICriticallFlow TopIHeiqht/IBa.. '1ft I IHo Wth
Station 1 Elev I (F'l') t Elev I (CFS) I (FPS) Head I Grd.El.l UIiIV I Depth I Width IDia.-FTlor 1.0.1 ZL lPn/Pip
-J- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slope I I 1 1 SF Ave I HF ISE DpthlFroude NIHorm Op I "N" I I ZR IType Ch
....*****1**......1........1........*1*********,*******1********1*********1*******1********1********1*******1*******1*****1*******
I I I 1 I I I I I I ) I
1000.00 1260.97 .358 1261.328 10.7 33.09 17.007 1278.335 .00 1.256 1.28 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -)- -1- -1- -1- -]- -1- 1-
.01 1.13030 .654031 .66 .36 11.598 .314 .013 .00 PIPE
I I I 1
100101 1262.11 .361 1262.474 10.7 3265 16.559 1279.032 .00 1.256 1.28 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
2.82 1.13030 .601159 1.70 .36 11.385 .314 .013 .00 PIPE
I I [ I
1003.83 1265.30 .373 1265 675 10 7 31.14 15.053 1280.728 .00 .256 1.30 1.50 .00 .00 0 .0
-[- -[- -1- -[- -[- -[- -1- -1- -1- -[- -1- -[- -1- 1-
2 24 1.13030 .525610 1.18 .37 10 659 .314 .013 .00 PIPE
[, [ [
1006 07 1267.84 .386 1268.222 10 7 29 69 13.684 1281 906 .00 1.256 1.31 1.50 .00 .00 0 .0
-[- -1- -1- -]- -J- -1- -[- -J- -1- -J- -1- -1- -I. [-
84 1.13030 .459702 .94 .39 9.980 .314 .013 .00 PIPE
I [I I
1007 91 1269.91 .399 1270.310 107 28.30 12.440 1282.750 .00 1.256 1.33 1.50 .00 .00 0 .0
-1- -[- -[- -[- -[- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1.53 1.13030 .402110 .62 .40 9.341 .314 .013 .00 PIPE
1 I I I
100944 1271.64 .413 1272.058 107 2699 11.309 1283367 .00 1.256 1.34 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -J- -J- -1- -1- -1- -J- 1-
.30 1.13030 .351821 .46 .41 8.744 .314 .013 .00 PIPE
I I I I
101075 1273.12 .427 1273 544 101 25.73 10.281 1283.825 .00 1.256 1.35 1.50 .00 .00 0 .0
-1- -J- -1- -1- -1- -1- -1- -[- -1- -1- -1- -1- -1- 1-
1.12 1.13030 .301844 .34 .43 8.182 .314 .013 .00 PIPE
I I 1 I
1011.86 1214.38 .442 1214.823 10.1 24.53 9.341 1284.110 .00 1.256 1.37 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -I. -1- -1- -1- -1- -1- -1- 1-
.91 1.13030 .269623 .26 .44 1 651 .314 .013 .00 PIPE
I I I I
1012 83 1215.48 .458 1215 934 10 1 23 39 8.491 1284.431 .00 256 1.38 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -j- -1- 1-
.85 1.13030 .236116 .20 .46 165 .314 .013 .00 PIPE
o w s P G N - CIVILDESIGN Vers 1.1 P.l>.QE 2
For: RANpAC Inc., Ternecu1a, California - SIN 560
WATER SURFACE pROFILE LISTING Date: 5-19-2000 Time:12:42:11
LINE "0_4"
*******************.*....***************************...*......................**..***********.........................*..***..*...
I Invert I Depth I Water I Q I Vel Val I Enargy I Super ICriticallFlow ToplHeight/]Base Wtl INo Wth
Station I Elev I (FT) I Elev I (CFS) I (FPSI Head I Grd.El.1 E1ev I Depth I Width IDia.-FTlor 1.0.1 ZL Iprs/Pip
-1- -1- -1- -I. -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem. 1 Ch Slope I I I I SF Ava I HF I SE Opth I Froude N I Norm Op I "N" 1 I ZR I Type Ch
.........1........1........1.........1.........1.......1........1...*.....1.......1........1.***..**1.......[.......1.....1.......
I
1013.68 1216.43
-1- -J-
.14 1.13030
I
1014.42 1277.27
-1- -1-
.651.13030
I
1015.08 1218.01
-1- -1-
.58 1.13030
I
1015661278.66
-1- -I.
.51 1.13030
I
1016.111219.24
-1- -1-
.461.13030
I
1016.63 1279.16
-1- -1-
.411.13030
I
1017 03 1280.22
.1- -1-
.36 1.13030
I
1011.39 1280.63
-1- -1-
.32 1.13030
I
1011.12 1280.99
-1- -]-
I
.414 1276
-1-
go,
-I-
I
.491 1277
-I-
762
-I-
I
.508 1218
-I-
519
-I-
I
.5261219.191
.1. -1-
I
.545 1279.190
-1- -1-
I
.564 1280 325
-1- -1-
I
.585 1280805
-1- -I-
I
.6061281.235
-1- -1-
I
.628 1281 622
-1- -1-
I
101 22.30 1.124 1284
-j- -1- -1-
.206973
631
-I-
.15
I
10 1 21 27 7.022 1284
-1- -1- -1-
.181222
.784
-I-
.12
I
10.7 20.28 6.384 1284
-1- -1- -1-
.158743
.903
-1.,-
.09
I
10 7 19 33 5.804 1284.995
-1- -1- -1- -]-
.139155 .07
I
10.7 18.43 5.276 1295
-1- -1- -1-
.121986
066
-I-
.06
I
10.7 17.57 4.796 1285.122
-1- -1- -1- -1-
.106992 .04
I
10 7 16 76 4.360 1285.
-1- -1- -1-
.093908
165
-I-
.03
I
10.7 1598 3.964 1285
-1- -1- -1-
.082410
19.
-I-
.03
I
10 7 15 23 3 604 1285.226
-1- -1- -1- -1-
.00
-I-
.47
1.256
-1-
6702
.00
-I-
.49
.256
-I-
6 269
.00
-I-
.51
1.256
-1-
5.861
.00
-I-
.53
1.256
-1-
5.419
.00
-1-
.SS
1.256
-1-
5.121
.00
-1-
.56
1.256
-1-
.785
.00
-I-
.59
1.256
-1-
.470
.00
-I-
.61
'56
-1-
4.175
.00
-1-
1.256
-I-
1.39
-I-
.314
1.41
-I-
.314
1.42
-I-
.314
1.43
-I-
.314
1.44
-1-
.314
1.45
-I-
.314
1.46
-I-
.314
1.47
-1-
.314
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-I-
.013
1.50
-I-
.013
..
-I-
1.50
-1-
.00 .00
-1-
.00
o
1-
pIpE
I
.0
.00 .00
-I-
.00
o
1-
PIPE
I
.0
.00 .00
-1-
.00
o
1-
PIPE
I
.0
.00 .00
-I-
.00
o
1-
PIPE
I
.0
.00 .00
-I-
.00
o
1-
PIpE
I
.0
.00 .00
-1-
.00
o
1-
PIPE
I
.0
.00 .00
-I-
.00
o
1-
PIPE
I
.0
.00 .00
-I-
.00
o
1-
PIPE
I
.0
.00 .00
-I-
o
1-
.0
'1,"'P
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.29 1.13030
o
.072358 .02 .63
W S P G N - CIVlLOESIGN Vera 7.1
For; RANPAC Inc., Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING
LINE "0-4"
3.897
.3l4 ,013 .00 PIPE
PAGE 3
Date, 5-19-2000 Time: 12 :42 11
.......................******..................................................................*******....****........****........
I Invert I Depth I Water I Q I Vel Vel I Energy I Super ICritieallFlow ToplHeiqht/lBas8 Wtl INa Wth
Station 1 Elev I (FT) I Elev I (CFSl I (FPS) Head I Grd.El.1 Elev I Depth I Width IDia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Eltlm leh Slope I I I I SF Ave' HF ISE OpthlFroudci NINorm Op I "N" I J ZR IType eh
.........,...***..1......**1.........1**.......1*.....*1...........1..................1..............1................1................1..............1..............1..........1..............
1 I
1018.00 1281.32
-1- -1-
.26 1.13030
I
1018.261281.61
-1- -]-
.23 1.13030
I
1018.49 1281.87
-1- -1-
.20 1.13030
1
1018.69 1282.10
-1- -1-
.18 1.13030
I
1018 87 1282.30
-1- -J-
.16 1.13030
I
1019 03 1282.48
-1- -1-
.14 1.13030
I
1019171282.64
-1- -1-
.12 1.13030
I
1019.30 1282.78
-1- -1-
.11 1.13030
I
1019.401282.90
-1- -1-
.091.13030
o
1
.651 1281 971
-1- -1-
I
.6751282285
-1- -I-
I
.701 1282568
-1- -1-
1
.727 1282.824
-,- -1-
I
.755 1283.056
-1- -1-
I
.784 1283.265
-1- -1-
1
.814 1283 455
-1- -1-
1
.846 1283.627
-1- -1-
I
.880 1283.782
-1- -1-
For: RANPAC Inc.
LINE "0-4"
I I
10.7 14.52 3.276 1285.246
-1- -1- -1- -1-
.063565 .02
I
10 7 13 85 2.978 1285.263
-1- -1- -1- -1-
.055897 .01
I
10 7 13 20 2.707 1285
-1- -1- -1-
.049179
276
-1-
.01
I
10.7 12.59 2.461 1285.286
-1- -1- -1- -1-
.043281 .01
I
10 7 12.00 2.238 1285
-1- -1- -1-
.038129
203
-1-
.01
I
10 7 11.45 2.034 1285
-1- -1- -1-
.033602
299
-1-
.00
I
10 7 10.91 1.849 1285.304
-1- -1- -1- -1-
.029639 .00
1
10.7 10.40 1.681 1285.308
-1- -1- -1- -1-
.026180 .00
10.7
-I-
I
1.528 1285.311
-1- -1- -1-
.023157 .00
W S P G N - CIVILDESIGN Vers 7.1
Temecula, California - SIN 560
WATER SURFACE PROFILE LISTING
9.92
.00
-1-
.65
1.256
-1-
3.637
1.49
-I-
.314
1.49
-1-
.314
1.50
-I-
.314
1.50
-1-
.314
1.50
-I-
.314
1.50
-1-
.314
1.49
-1-
.314
1.49
-1-
.314
1.48
-1-
.314
1.50
-1-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-1-
.013
1.50
-I-
.013
.00 .00
-I-
.00 .00
-I-
.00 .00
-1-
.00 .00
-1-
.00 .00
-I-
.00
.00 .00
-I-
.00 .00
-I-
.00 .00
-I-
.00
.00 .00 0
-1- 1-
.00 PIPE
,AGE
.00
o
1-
PIPE
I
.0
.00
,
1-
PIPE
I
.0
.00
-I-
.68
1.256
-I-
3 392
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
-1-
.70
256
-1-
3 163
o
1-
PIPE
I
.0
.00
o
1-
PlpE
I
.0
.00
-I-
.73
1.256
-1-
2.947
.00
o
1-
PIPE
I
.0
o
1-
PIPE
1
.0
.00
-1-
.76
1.256
-I-
2.744
.0
Date; 5-19-2000 Time:12:42;11
...................................................................................................................................................................................................................................................................
.00
-1-
.78
1.256
-1-
2.554
1 Invert I Depth I Water I Q I Vel Vel I Enerqy I Super ICritieallFlow ToplHeight/lBase Wtl INo Wth
Station I Elev I (FT) 1 Elev I (CFSI J IFPS) Head I Grd.El.J Elev I Depth I Width 10ia.-FTlor 1.0. I ZL IPrs/Pip
-1- -1- -1- -1- -J- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slope I f J I SF Avel HF ISE DpthJFroude N!Nonn Op I "N" I I ZR IType Cn
.................. I................J................ 1"""""""""1"""""""""'"'''''''''' ..,................1..................1..............,................,................1..............1..............1.........1.............
I
1019 50 1283.01
-1- -1-
.081.13030
I
1019.58 1283.10
-1- -1-
.071.13030
I
1019.64 1283.17
-1- -1-
.05 1.13030
I
1019701283.23
-1- -1-
.04 1.13030
I
1019 74 1283.28
-1- -J-
.03 1.13030
I
1019.77 1283.32
-1- -1-
.02 1.13030
I
1019.791283.34
-1- -1-
.01 1.13030
I
1019 80 1283.35
-1- -1-
WALL ENTRANCE
I
1019.80 1283.35
-1- -1-
I
.916 1283 923
-1- -I-
I
.954 1284.051
-1- -1-
I
.9941284.167
-1- -I-
I
1.0381284.273
-1- -1-
I
.084 1284368
-1- -1-
I
1.1351284.455
-1- -1-
I
1.191 1284.534
-1- -1-
I
1.2561284.606
-1- -1-
I
2 539 1285 889
-1- -1-
10.7
-I-
107
-1-
10.7
-I-
10.7
-I-
10.7
-I-
10.7
-I-
10 7
-1-
10 7
-1-
10.7
-1-
1
946 1.389 1285
-1- -1-
.020512
313
-I-
.00
I
02 1.263 1285
-1- -1-
.018195
314
-1-
.00
I
8.60 1.148 1285.316
-1- -1- -1-
.016179 .00
I
8.20 1.044 1285
-1- -1-
.014425
317
-I-
.00
I
82 .949 1285.317
-1- -1- -1-
.012903 .00
I
7 45 .863 1285.318
-1- -1- -1-
.011601 .00
I
7.11 .784 1285
-1- -1-
.010502
31.
-I-
.00
I
6.77 .712 1285.318
-1- -1- -1-
I
.20 .001 1285.890
-J- -1- -1-
.00
-1-
1.08
.00
-1-
1.14
.00
-1-
1.19
.00
-I-
."
1.256
-I-
2.374
.00
-I-
.as
1.256
-I-
2.205
.00
-I-
.88
1.256
-I-
2.046
.00
-I-
."
1.256
-I-
1.896
.00
-1-
.OS
.00
-1-
.99
1.256
-I-
1.753
1.256
-I-
1.618
.00
-1-
04
256
-I-
1.488
1.256
-1-
365
".
-1-
1.244
1.256
-1-
1.124
.00
-I-
.256
-1-
.00
-1-
.201
-I-
1.46
-1-
.314
1.44
-I-
.314
1.42
-I-
.314
1.38
-1-
.314
1.34
-1-
.314
1.29
-1-
.314
1.21
-1-
.314
1.11
-1-
21.00
-I-
1.50
-I-
.013
.00 .00
-1-
.00
1.50 .00 .00
-1- -1-
.013 .00
1.50 .00 .00
-1- -1-
.013 .00
1.50 .00 .00
-1- -1-
.013 .00
1.50
-I-
.013
1.50
-1-
.013
1.50
-1-
.013
.00 .00
-I-
.00
.00 .00
-1-
.00 .00
-1-
50 .00 .00
-1- -1-
8 00 21.00 .00
-1- -1-
o
1-
PIPE
1
.0
o
1-
PIPE
I
.0
o
1-
PIPE
1
.0
o
1-
PIP<
1
.0
o
1-
PIPE
I
.0
.00
o
1-
PIPE
1
.0
.00
o
1-
PIPE
I
.0
o
1-
.0
o
1-
.0
.-z.'\.\.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD SECT
CODE NO
W 5 P G N
WATER SURFACE
HEIGHT 1 BASE
DIAMETER WIDTH
- EDIT LISTING - Version 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR IHY 't{ll Y{2) Y(3) YC4J
DROP
Date: 5-19-2000 Time 12: 52 40
PAGE 1
Y(5) Y(6) Y(7) Yle) Y(51) Y(lO}
eRN NO OF AVE PIER
TYPE PIER/PIP WIDTH
co 1 4 0 1.50
co 2 3 0 .00 7.00 28.00 .00 .00 .00
0 w S P G N
WATER SURFACE PROFILE - TITLE CARD LISTING
HEADING L1NE NO IS
LINE "0-5"
HEADING LINE NO 2 IS
HEADING LINE NO 3 1S
D WSPGN
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO IS A SYSTEM OUTLET .
U/5 DATA STATION INVERT SECT
1000.00 1266.70 1
ELEMENT NO 2 IS A REACH
U/s DATA STATION INVERT SECT N
1019,80 1286.30 1 .013
ELEMENT NO 3 IS A NALL ENTRANCE
0/5 DATA STATION INVERT SECT FP
1019.80 1286.30 2 .500
ELEMENT NO IS A SYSTEM HEADWORKS
U/s DATA STATION INVERT SECT
1019.80 1286.30 2
Lv.).E FRoM
l.-r".!'E "D"
RAe IUS ANGLE
.000 .000
W S ELEV
1286.30
PAGE: NO
PAGE NO 2
AND PT
.000
MAN H
o
-z..1'V'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.. WARNING NO.2 ** - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDIiKDS, W.S.ELtV _ tHY + DC
o W S P G N - CIVILDESIGN Vera 7.1 PAGE
For; RANPAC Inc., TlIIIlI&cula, California - SiN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:12:S2 50
LINE "D-5"
.................***.........***.............................******.........***................**.**.***...........**....................
I Invert I Depth I Water I 0 I Vel Vel I Energy I Super ICriticallFlow ToplHeioht/IBase Wtt INo wth
Station I nev t (FT) I nev I (eFS) I (FPS) Head I Grd.El.l Ellilv I Depth I Width IOia.-FTlor I.D.I ZL IPu/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem leh Slope I I t I SF Avel Hr ISE DpthjFroude NINorm Dp I "N" I I ZR ITypcil eh
........**1**......1.....**.1.........1..,.,..,.,.,.,.1,..,....*1........1...,.,.,.,...1.......,........,.......,.1,.,.,.****1**.".**1*.*.*1.*""*"*
I 1 I I I 1 J
1000 00 1266.70 .229 1266.929 7 27 60 11.828 1278 757 .00 .833 1.08 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- J-
.00 .98990 .775185 .78 .23 12 241 .217 .013 .00 PIPE
I I 1 I
1001.00 1267.69 .230 1267.920 4.7 27.23 11.518 1279.438 .00 .833 1.08 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1_ -1- 1-
3.73 .98990 .711684 2.66 .23 12.013 .217 .013 .00 PIPE
1 I I 1
1004.73 1271.39 .238 1271.625 .7 25 97 10.471 1282.096 .00 .833 1.10 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
2 56 .98990 .621764 1.59 .24 11.262 .217 .013 .00 PIPE
I 1 I J
1007.30 1273.93 .246 1274.171 4.7 24.76 9.519 1283.690 .00 .833 1.11 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1.92 .98990 .542812 1.04 .25 10.555 .217 .013 .00 PIPE
I I I I
1009.22 1275.82 .254 1276 078 7 23 61 8.653 1284 731 .00 .833 1.13 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1_
1.51 .98990 .474163 .71 .25 890 .217 .013 .00 PIPE
I I I I
1010.72 1277.32 .263 1277.579 .7 2251 7.867 1285446 .00 .833 1.14 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1.23 .98990 .414501 .51 .26 9.272 .217 .013 .00 PIPE
I 1 I I
1011.95 1278.53 .272 1278.803 4.7 21.46 7.152 12B5 954 .00 .833 1.16 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.02 .98990 .362074 .37 .27 8 689 .217 .013 .00 PIPE
I I I 1
1012.97 1279.54 .281 1279.823 4.7 20.46 6.501 1286.324 .00 .833 1.17 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- _1_ 1_
.86 .98990 .316422 .27 .28 8.141 .217 .013 .00 PIPE
I 1 I I
1013.84 1280.40 .291 1280687 4.7 19.51 5.910 1286.597 .00 .833 1.19 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1_
.74 .9B990 .276381 .20 .29 7.630 .217 .013 .00 PIPE
o W S P G N - CIVILDESIGN Verll 7.1 PAGE
For: RANPAC Inc., Temecu1a, Calit"ernia - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time: 12 :52' 50
LINE "0-5"
*************************************.,..****,.****************.*.***...**************.**.***********..,.,.,.,.************....,.****.***
I Invert I Depth 1 Water I Q I Vel Vel I tnerqy I Super ICriticallFlew TeplHei9ht/IBalle Wtl INo Nth
Station I Elev 11FT) 1 Elev I (CFS) 1 (FPS) Head I Grd.El. I Elev I Depth 1 Width 10ia.-FTler 1.0.1 ZL IPrs/Pip
-1- -1- -1- -j- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1_
L/Elen1 ICh Slopel I 1 1 SF Avel HF 1St OpthlFroude NINerm Dp 1 "N" I I ZR 1'1'ype Ch
*********1**...*.*1****.**.1.***.****1*********1*******1********1*********1*******1********1****.***1*****"*1***".**1*****1""*""""
I
1014.5B 12B1.13
-1- -1-
.64 .98990
I
1015 21 1281.76
-1- -1-
.56 .98990
I
1015.77 1282.31
-1- -1-
.49 .98990
I
1016.26 1282.79
-1- -1-
.43 .98990
I
1016 69 1283.22
-1- -1-
.3B .9B990
I
1017.07 1283.59
-1- -1-
.34 .98990
I
1017.401283.93
-1- -1-
.30 .9B990
I
1017701284.22
-1- -1-
.27 .9B990
I
1017.97 1284 48
-1- -1-
I
.300 1281 429
-1- -I-
I
.311 12B2071
-1- -I-
I
.321 1282.633
-1- -1-
I
.332 1283.127
-1- -I-
I
.343 1283.563
-1- -1-
I
.355 1283 950
-1- -1-
I
.367 1284.294
-1- -1-
I
.380 1284.602
-1- -1-
I
.3931284.878
-1- -1-
I
.7 18.60 5.373 1286
-1- -1- -1-
.241456
'02
-I-
.15
4.7 1774
-1-
I
4.BBS 12B6.956
-1- -1- -1-
.211099 .12
I
.7 16.91 4.441 1287
-1- -1- -1-
.184389
I
7 16.12 4.037 12B7
-1- -1- -1-
.161139
073
-1-
.09
163
-1-
.07
I
4.7 15 37 3.670 1287.233
-1- -1- -1- -1-
.140858 .05
I
4.7 1466 3.336 1287
-1- -1- -1-
.123177
I
4 7 13 9B 3.033 1287
-1- -1- -1-
.107736
'"
-I-
."
m
-1-
.03
I
.7 13 33 2.757 1287.359
-1- -1- -1- -1-
.094259 .03
I
.7 12.71 2 507 1287.384
-1- -1- -1- -1-
.00
-I-
.30
.833
-1-
144
.00
-I-
.31
.B33
-I-
6.696
.00
-1-
.32
.833
-1-
6271
.00
-1-
.33
.B33
-1-
5.874
.00
-1-
.34
.833
-I-
S 500
.00
-I-
.36
.833
-1-
5151
.00
-1-
.37
.B33
-1-
.823
.00
-I-
.3'
.833
-I-
.517
.00
-1-
.833
-I-
1.20
-1-
.217
1.22
-I-
.217
1.23
-1-
.217
1.25
-1-
.217
1.26
-1-
.217
1.28
-I-
.217
1.29
-1-
.217
1.30
-I-
.217
1.32
-I-
1.50
-1-
.013
.00 .00
-1-
1.50
-I-
.013
.00 .00
-1-
1.50
-1-
.013
.00 .00
-I-
1.50
-1-
.013
.00 .00
-1-
.00
1.50
-1-
.013
.00 .00
-1-
1.50
-1-
.013
.00 .00
-1-
1.50
-1-
.013
.00 .00
-1-
1.50
-I-
.013
.00 .00
-I-
.00
1.50
-1-
.00 .00
-I-
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
.00
o
1-
PIPE
I
.0
o
1-
PIPE
I
.0
o
1-
.0
-z. ,.~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
."
.98990
o
For; RANPAC Inc.,
.082478 .02
W S P G N - CIVILDESIGN Vera
Temecula, California - SIN
WATER SURFACE PROFILE
.39
4.228
.217
.013
.00 PIPE
PAGE 3
7.1
560
LISTING
LINE "0_5"
Date: 5-19-2000
Time:12:52 50
*.***"'*****..*******".,,***"'**....*"'**********"'.."'***"'......"fI..........................................................*******....**...
I Invert I Depth I Water I Q I Vel Vel I Enerqy I Super ICriticallFlow TopIHeiqht/IBa"8 Wtl INo Wth
Statiotl I Elev I (FT) j Elev I (CFSI I (FPS) Head. I Grd.El.1 Elev I Depth I Width IOia.-FTlar 1.0.1 ZL lPn/Pip
-1- -j- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem I Ch Slope I I I I SF Ave' HF I BE Dpth I Froud. N I Norm Dp I "N" I I ZR I Type Ch
.........1.***....1"'.......,"'........1.........1......*1"."...**1*********1*******1********1********1*******1*******1*****1*******
I I I I I I 1 I I I I I
1018.20 1284.72 .407 1285125 7 1211 2.279 1287404 .00 .833 1.33 1.50 .00 .00 0 .0
-1- -1- -!- -1- -1- -1- -j- -1- -1- -1- -1- -1- -j- 1-
.21 .98990 .072186 .02 .41 3.959 .217 .013 .00 PIPE
I 1 1 I
1018.41 1284.93 .421 1285.348 4.7 11.55 2.072 1287.419 .00 .833 1.35 1.50 .00 .00 0 .0
-1- -1- -1- -j- -1- -1- -1- -1- -1- -1- -j- -1- -1- 1-
.19 .9851510 .063183 .01 .42 3 705 .217 .013 .00 PIPE
I I I 1
1018.60 1285.11 .436 1285 548 .7 11.01 1.883 1287 431 .00 .833 1.36 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- (-
.17 .98990 .055312 .01 .44 3.467 .217 .013 .00 PIPE
j I I I
1018.77 1285.28 .451 1285728 .7 1050 1.712 1287440 .00 .833 1.38 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -j- -1- -1- -1- -1- -1- -1- 1-
.15 .98990 .048423 .01 .45 3.244 .217 .013 .00 PIPE
I I 1 I
1018 91 1285.42 .467 1285.891 7 10 01 1.556 1287 447 .00 .833 1.39 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- j-
.13 .98990 .042398 .01 .47 3 035 .217 .013 .00 PIPE
I I I 1
1019.05 1285.55 .483 1286.038 4.7 55 1.415 1287 453 .00 .833 1.40 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -j- -1- -1- -1- -1- 1-
.12 .98990 .037122 .00 .48 2.838 .217 .013 .00 PIPE
1 I I I
1019.16 1285.67 .500 1286.171 .7 9.10 1.286 1287.457 .00 .833 1.41 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.10 .98990 .032529 .00 .50 2.654 .217 .013 .00 PIPE
1 1 1 I
1019.27 1285.77 .518 1286291 7 8.68 1.169 1287.461 .00 .833 1.43 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- j-
.09 .98990 .028505 .00 .52 2.482 .217 .013 .00 PIPE
I I I j
1019.36 1285.86 .536 1286.400 4.7 8.27 1.063 1287.463 .00 .833 1.44 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
.08 .518990 .024978 .00 .54 2.320 .217 .013 .00 PIPE
o W S P G N - CIYILOESIGN Vera 7.1 PAGE
For: RANPAC Inc., T8lIIecula, california - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-19-2000 Time:12:52:50
LINE "0-5"
**********************************************************************************************************************************
I Invert 1 Depth I Water I Q 1 Yel Yel j Enerqy 1 Super jCriticallFlow ToplHeiqht/IBase Wtj INo Wth
Station I Elev 1 (FT) I Elev 1 (CFS) j (FPS) Head I Grd.El.1 Elev I Depth 1 Width 10ia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -j- -1- -j- -1- -!- -1- -1- -1- -1- -j- -1- -1- 1-
L/Elem ICh Slopej I j 1 SF Avel HF ISE OpthlFroude NINorm Dp j "N" I 1 ZR IType Ch
*......*....*..1......*****1********1*********1*********1*******f********I*********I*******I********f********!*"****"1*******1*****1*******
,
101944 1285.94
-1- -1-
.07 .98990
,
1019511286.01
-1- -f-
.06 .98990
,
1019.57 1286.07
-1- -f-
.05 .98990
,
1019.621286.12
-1- -1-
.04 .98990
,
1019671286.17
-1- -1-
.04 .98990
,
1019701286.21
-1- -1-
.03 .98990
,
101973 1286.24
-f- -1-
.02 .98990
,
1019 76 1286.26
-f- -1-
.02 .98990
,
1019 78 1286 28
-1- -1-
,
.5551286499
-1- -1-
,
7 89 .966 1287
-1- -1-
.021901
.7
-,-
.os
-,-
.00
,
.575 1286 588
-f- -1-
,
.52 .8791287
-1- -1-
.019216
'.7
-I-
.467
-I-
.00
,
.5961286669
-1- -I-
I
.618 1286.743
-1- -j-
,
.641 1286 809
-1- -1-
7
-I-
,
7.17 .7991287.468
-1- -1- -j-
.016869 .00
,
6 84 .726 1287.469
-1- -1- -1-
.014817 .00
'.7
-I-
,
6 52 .660 1287
-1- -1-
.013013
.7
-,-
469
-,-
.00
,
.664 1286870
-1- -1-
'.7
-,-
,
622 .600 1287.470
-1- -1- -1-
.011433 .00
,
5 93 .545 1287.470
-1- -1- -j-
.010056 .00
,
5.65 .496 1287.471
-1- -1- -1-
.008849 .00
,
5 39 .451 1287 471
-1- -1- -f-
I
.6891286925
-1- -1-
7
-I-
,
.715 1286 975
-1- -)-
.7
-I-
,
.7421287020
-1- -1-
.7
-I-
.00
-I-
.56
.833
-I-
.168
.00
-I-
.58
.833
-,-
2025
.00
-I-
.60
.833
-I-
1.892
.00
-I-
.62
.833
-I-
.766
.00
-I-
.64
.833
-I-
1.649
.00
-I-
.66
.833
-I-
1.538
.00
-I-
."
.833
-I-
1.434
.00
-I-
.72
.833
-,-
331
.00
-I-
.833
-I-
1.45
-,-
.217
1.46
-I-
.217
1.47
-I-
.217
1.48
-I-
.217
1.48
-I-
.217
1.49
-I-
.217
1.50
-I-
.217
1.50
-I-
.217
1.50
-,-
1.50
-,-
.013
.00 .00
-I-
.00
o
,-
PIPE
,
.0
1.50
-I-
.013
.00 .00
-I-
.00
o
,-
pm
,
.0
1.50
-I-
.013
.00 .00
-I-
.00
o
,-
PIPE
,
.0
1.50
-,-
.013
.00 .00
-,-
.00
o
,-
PIPE
,
.0
1.50
-,-
.013
.00 .00
-,-
.00
o
,-
PIPE
,
.0
1.50
-,-
.013
.00 .00
-I-
.00
o
,-
pm
,
.0
1.50
-,-
.013
.00 .00
-,-
.00
o
,-
PIPE
,
.0
1.50
-I-
.013
.00 .00
-I-
.00
o
,-
pm
,
.0
.50
-I-
.00 .00
-I-
o
,-
.0
z.,1A.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.01
.98990
.007789 .00 .74
Ii S P G N - CIVILDESIGN Vera 7.1
For: RANPAC Inc., T&mecula, California - SIN 560
WATER SURFACE PROFILE LISTING
1.245
.217 .013 ,DO PIPE
'AGE 5
o
Date: 5-19-2000 Time:12:S2 SO
LINE "0-5"
...............*...***.....***.************.....................***"fl.........................................................................._.*"....
I Invert I Depth I Water I 0 I V.l V.l I El'lergy I Super I Critical I Flow Top IHeight/ I Balle Wt I fNo Wth
Station I Elev I (FT) I Elev I (CFS) I {FPSI Head. I Grd.El.1 Elev I Oepth I Width ICia.-FTlor 1.0.1 ZL IPrs/Pip
-1- -I- -1- -I- -1- -I- -1- -1- -I- -I- -I- -1- -I- I-
L/Elem ICh Slopel I I I SF Ave! HF 1St Dpth J Frol.lde N I Norm Dp I "N" I I ZR I Type Ch
.........,****....."1..**...**1...******1**....**.1.******1"...".**1...******'*****..'******..1******'*"1"......1***..**.1.....1.......
I I I
1019.79 1286.29 .770 1287 .061 '.7 5. U .410 1287 471 .00 .833 1.50 1.50 .00 .00 0 .0
-1- -I- -I- -1- -I- -1- -I- -1- -1- -1- -1- -1- -I- 1-
.01 .98990 .006863 .00 .77 1.159 .217 .013 .00 PIPE
I I I I
1019.80 1286.30 .800 1287.098 '.7 4.90 .373 1287.471 .00 .833 1.50 1.50 .00 .00 0 .0
-1- -I- -1- -1- -1- -I- -I- -1- -1- -1- -I- -1- -I- I-
.00 .98990 .006044 .00 .80 1.078 .217 .013 .00 PIPE
I I I I
1019.80 1286.30 .833 1287.133 '.7 . " .338 1287 471 .00 .833 1.49 .50 .00 .00 0 .0
-1- -1- -I- -I- -I- -1- -1- -1- -I- -I- -I- -1- -I- 1-
WALL ENTRANCE
I I I
1019 80 1286.30 .335 1287.635 7 .13 .000 1287.635 .00 .096 28 00 7.00 28 00 .00 0 .0
-I- -1- -I- -I- -I- -I- -I- -I- -1- -I- -1- -I- -I- 1-
0
.",....<
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CARD
CODE
CHN NO OF AVE PIER
TYPE PIER/PIP WIDTH
w S P G N
WATER SURFACE
HEIGHT 1 MSE
DIAMETER WIDTH
- EDIT LISTING - Version 7.0
PROFILE - CHANNEL DEFINITION LISTING
ZL ZR IHY Y(1) Y12) Y(3) Y14)
DROP
Date: 5-21-2000 Time.ll:33: 7
PAGE 1
TIS) Y(6) Y(?) TIS) Y(9) T(IO)
SECT
NO
CD 1 . 0 1 50
CO 2 , 0 .00 10 00 14.00 .00 .00 .00
0 W 5 P G N
WATER SURFACE PROFILE - TITLE CARD LISTING
HEAD ING LINE NO 1 IS
LINE "0_6"
HEADING LINE NO 2 IS
HEADING LINE NO , IS
0 W S P G N
WATER SURFACE PROFILE - ELEMENT CARD LISTING
ELEMENT NO ISA SYSTEM OUTLET
U!S DATA STATION INVERT SECT
1003.57 1268.32 I
ELEMENT NO 2 IS I>. REACH
U/S DATA STATION INVERT SECT N
1051.37 1274.06 1 .013
ELEMENT NO , IS A REACH .
U/S OATA STATION INVERT SECT N
1061.98 1275.23 1 .013
ELEMENT NO . IS A REACH . .
U/S DATA STATION INVERT SECT N
1130.08 1282.77 1 .013
ELEMENT NO 5 IS A REACH
U/S DATA STATION INVERT SECT N
11!P.13 1290.18 1 .013
ELEMENT NO 6 IS A JUNCTION
U/S DATA STATION INVERT SECT LA.T-l LAT-2 N Q3
1199.09 1290.50 1 1 0 .013 7 95
ELEMENT NO 7 IS A REACH
uts DATA STATION INVERT SECT N
1229.59 1291.77 1 .013
ELEMENT NO , IS A WALL ENTRANCE
U/S DATA STATION INVERT SECT FP
1229.59 1291.77 2 .500
ELEMENT NO , IS A SYSTEM HEADWORKS
uts DATA STATlON INVERT SECT
1229.59 1291.77 2
PAGE NO
LJ.). E-. H(oM
erNE- "pl'
PAGE NO
2
RADIUS ANGLE ANG 1'T MAN "
.000 .000 .000 0
RADIUS ANGLE ANG 1'T MAN H
89.927 6.760 .000 0
RADIUS ANGLE ANG PT MAN H
.000 .000 .000 0
RADIUS ANGLE MG 1'T MAN H
89.969 -42.700 .000 0
Q' INVERT-3 INVERT-4 PHI 3 PHI .
.00 1290.70 .00 45 00 .00
RADIUS ANOLE
.000 .000
RADIUS ANGLE ANG 1'T MAN H
.000 .000 .000 0
W S ELEV
1293.77
-z,,c,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
o
For: RANPAC Inc.,
w s P G N - ClVILDESIGN Vera
T_cula, California - SIN
WATER SURFACE PROFILE
7.1
560
LISTING
Date: 5-21-2000
PAC'
Time:1l:33.12
.............**....***...."*,,.*****...**.....**....**....."......**...**.......**...****....***...****...........*...."'.................
I Invert I Depth I Water I Q I Vel Vel I Energy! Super lCriticallFlow ToplHeight/lBase Wtl tNo Wth
Station I &lev I (FT) I Uav I (CFS) I InS) Head I Grd.El. I Elev I Depth I Width 10ia. -FT lor 1.0. I ZL I Prll!Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem ICh Slope I I I I SF Avel HF ISE DpthlFroude NINorm Op I "N" I I ZR IType Ch
....****.1**......,.....**.,............,..........,.***..*,.....***,.........,***....,***...."1"....***,........,....***.1.....1.......
I I 1 1 1 I I I I I
1003.51 1268.32 .601 1268.921 12 4 18 51 5.353 1214.280 .00 1.332 1.41 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
41.80 . 1200Sl .114134 5.46 .61 4.849 .605 .013 .00 PIPE
1 t I 1
1051.31 1214.06 .620 1274.680 12.4 18.05 5.062 1279.742 .17 332 1.48 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
1061 .11027 .109689 1.16 .79 .657 .619 .013 .00 PIPE
I I I I
1061 98 1275.23 .620 1275.850 12.4 18.05 5.056 1280.906 .00 1.332 1.48 1.50 .00 .00 0 .0
-1- _1_ _j_ -1- -1- -1- -1- -1- -1- -1- -!- -1- -1- 1-
15.38 .11072 .109358 1.68 .62 4.653 .61Sl .013 .00 PIPE
I I I I
1077 36 1276.93 .621 1277 554 12 4 18.01 5.039 1282.593 .00 1.332 1.48 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
52 72 .11072 .102462 5.40 .62 4.642 .619 .013 .00 PIPE
I 1 I I
1130.08 1282.77 .644 1283414 124 1718 4.581 1287995 .15 1.332 1.48 1.50 .00 .00 0 .0
_1_ _1_ _1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
8.55 .11051 .093642 .80 .80 4.332 .619 .013 .00 PIPE
I I I I
1138.63 1283.71 .652 1284367 12.4 16.89 4.428 1288.795 .15 1.332 1.451 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
15.39 .11051 .085Sl1Sl 1.32 .80 4.226 .619 .013 .00 PIPE
I I I 1
1154.02 1285.42 .676 1286.092 12.4 16.10 4.025 12Sl0.117 .13 1.332 1.4Sl 1.50 .00 .00 0 .0
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
74 .11051 .075510 .74 .81 3.942 .619 .013 .00 PIPE
I 1 1 I
1163.76 1286.4Sl .701 1287.1Sl3 12.4 15.35 3.659 12Sl0.852 .12 1.332 1.50 1.50 .00 .00 0 .0
-t- _1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
6 93 .11051 .066428 .46 .82 3.675 .619 .013 .00 PIPE
I I I I
11706Sl 1287.26 .728 1287.986 124 14.64 3.326 1291.313 .11 1.332 1.50 1.50 .00 .00 0 .0
_1_ -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- I-
S 251 .11051 .058466 .31 .84 3.424 .619 .013 .00 PIPE
G W S P G N _ CIVILOESIGN Vers 7.1 PAGE 2
For: RANPAC Inc., T_cul.., Californi.. - SIN 560
WATER SURFACE PROFILE LISTING Date: 5-21-2000 Time:ll:33:12
LINE "0-6"
LINE "0-6"
..................................................................................................................................
I Invert I Depth I W..ter I Q I Vel Vel I Energy I Super ICritical1Flow ToplHeiqht/lS..se Wtl tNo Wth
Station I Elev I (FT) I Elev I (CFS) I (FPS) He..d I Grd.El.1 Elev I Depth I Width IDiiI..-FTlor 1.0.1 ZL IPrs/Pip
-1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- -1- 1-
L/Elem I Ch Slope I I I I SF Ave I HF ISE Dpth I Froude N I Norm Dp I "N" 1 I ZR I Type Ch
.........!........I........I.........l.........1.......1........1.........1.......1........1........,.......1.......1.....1.......
1 1 1 1 1 1
117598 1287.84 .755 1288.598 12.4 1396 3.024 1291
-1- -1- -1- -1- -1- -1- -1-
4.17 .11051 .051475
I
151288.30
-1- -1-
3 36 .11051
1180.
I
1183.51 1288.67
-1- -1-
2.77 .11051
I
1186.28 1288.98
-1- -1-
.30 .11051
I
1188 57 1289.23
-1- -1-
1.92 .11051
I
1190 49 1289.45
-1- -1-
1.60 .11051
I
1192.09 1289.62
-1- -1-
.34 .11051
I
1193 43 1289.7i
-1- -1-
1.09 .11051
1194
I
53 1289.89
-1- -j-
.SlO .11051
622
-1-
.21
I
.784 1289
-1-
I
2.7491291.837
-1- -1- -1-
.045387 .15
087
-1-
12.4 1331
-1-
I
.815 1289.
-I-
I
2.499 1291.
-1- -1-
.040056
'"
-I-
.11
"0
-I-
12.4 12.69
-1-
I
.8471289.828
-1- -1-
I
2.272 1292.100
-1- -1- -1-
.035381 .08
12.4 12.10
-1-
I
.88112Sl0
-1-
I
2.0651292
-1- -1-
.031295
181
-I-
.06
"'
-1-
12 4 11 53
-1-
I
.917 1290.363
-1- -1-
I
1.8781292
-1- -1-
.027720
'"
-I-
.04
12 4 11.00
-1-
I
.9551290
-1-
I
1.7071292
-1- -1-
.024588
".
-I-
.03
.05
-1-
1.01
.79
-I-
12 4 10.48
-I-
I
.519512Sl0
-1-
I
1.552 1292.318
-1- -1- -1-
.021864 .02
.05
-I-
1.04
'"
-I-
124 10.00
-I-
I
.039 1290.
-1-
I
1.411 1292.342
-1- -j- -1-
.019493 .02
.04
-I-
1.08
932
-I-
12.
-I-
53
.10
-I-
.B6
1.332
-I-
3.189
.09
-I-
...
.332
-1-
2967
.OB
-I-
.90
332
-I-
2 759
.OB
-1-
.92
332
-I-
.563
.07
-I-
.95
332
-1-
2 377
.06
-I-
.98
1.332
-1-
2202
.332
-I-
2037
332
-I-
1.880
332
-I-
1.729
1.50
-I-
.619
1.50
-I-
.619
1.49
-I-
.619
1.49
-I-
.619
1.48
-I-
.619
1.46
-1-
.619
1.44
-I-
.619
1.42
-1-
.619
1.38
-I-
.619
1.50
-1-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-1-
.013
1.50
-I-
:013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
1.50
-I-
.013
.00
-I-
.00
-1-
.00
.00
-I-
.00
-1-
.00
-I-
.00
-I-
.00
.00
-I-
.00
-I-
.00
.00
-I-
.00
.0
.00
o
1-
pm
I
.00
.0
o
1-
PIPE
I
.00
.00
o
1-
PIPE
I
.0
.00
.0
.00
o
1-
PIPE
I
.00
o
1-
PIPE
I
.0
.00
.00
.0
o
1-
PIPE
I
.00
.0
.00
o
1-
PIPE
I
.00
.0
o
1-
PIPE
I
.00
o
1-
PIPE
.0
.00
z,.""