Loading...
HomeMy WebLinkAboutTract Map 33421 Parcel 5-13 Geotechical Investigation 'T .H.E. Soils Co., Inc. . Phone: (951) 894-2121 FAX: (951) 894-2122 i41548 Eastman Drive, Unit G. Murrieta, CA 92562 /};; g3~/ E-mail: thesoilsco@aol.com , , , , , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ October 24, 2004 Mr. Gary Hamro The Pres Companies 120 I Dove Street, Suite 100 Newport Beach, California 92660 SUBJECT: LIMITED GEOTECHNICAL INVESTIGATION Update to Preliminary Geotechnical Investigation Proposed 14 Building, 200,000:!: Square Foot COImnercial Development East and West Sides of Via Industria City ofTemecula, Riverside County, California Work Order No. 784401.00 Dear Mr. Hamro: INTRODUCTION This report presents the results of our site inspection and geotechnical review of the above- mentioned parcels. The geographical relationships of the site and surrounding area are shown on our Site Location Map, Figure 1. These pads were reported as having been rough graded with cut-to-fill transitions through them. There were no obvious signs of compromise observed on L1J.e pad surfaces during this assessment, with the exception of minor eroded areas. Plans relevant to the subject property were reviewed to confmn the field observations and are included as Appendix A of this report. FIELD INVESTIGATION Field Investieation Subsurface exploration, field reconnaissance, and mapping of the site were conducted on September 9, 2004. Five exploratory trenches were advanced utilizing a Case No. 580 Super !Vi. extenda- backhoe equipped with a 24-inch bucket. Exploratory trench T-3 was advanced to the maximum depth explored of 15.0-ft below the ground surface (bgs). Information collected during our field mapping and the approximate location of the exploratory trenches are depicted on our Geotechnical Map, Plate 1. Our field geologist. prepared field logs, performed in-place density tests and obtained bulk soil samples for laboratory'testing and supervised excavation of the trenches. Copies of our exploratory trench logs are presented in Appendix B. T.H.E. Soils Co., Inc. W.O. #784401.00 \ I~ ! , ',-. , , , , ',' , ~. , , \\ I . , I~ \ , " ~\:::~ )- .~ (9 ~ ~ \O'"i;:. , , ~ ~ , ~ ~ ~ ~ ." .' '. .). FIGURE 1 z- , I' , , , , , , , , , , ~ ~ ~ ~ ~ ~ ~ Mr. Gary Hamro The Pres Companies October 24, 2004 Page 2 Laboratory Testinl! Prol!fam Representative bulk and in-place soil samples of the on-site soils encountered during our site investigation were obtained for laboratory testing. Laboratory testing to determine the engineering parameters of representative soils included maximum density/optimum moisture, sieve analysis, soluble sulfate content, corrosivity suite and expansion index. Laboratory testing was conducted in accordance with ASTM, Caltrans, and Uniform Building Code (UBC) test specifications, where applicable. The results of our laboratory tests are presented in Appendix C of this report. E. S. Babcock & Sons, Inc. of Riverside, California performed soluble sulfate and corrosivity suite testing. SEISMICITY Rel!ional Seismicity The site is located in a region of generally high seismicity, as is all of southern California. During its design life, the site is expected to experience strong ground motions from earthquakes on regional and/or local causative faults. The subject parcel is not located within a State of California Alquist Priolo Fault Rupture Hazard Fault Zone (Hart, 2000) and no active faults are known to traverse the site (Kennedy, 1977). The closest known active fault is the Elsinore Fault Zone (Glen Ivy) located within 2.0-kilometers to the southwest (lCBO, 1998) of the subject site. No fault traces or photo- lineaments have been mapped on the subject site (Kennedy, 1977). 2001 California Building Code (CBC) Factors specific to the subject site are as follows: The site is located within 2.0-kilometers from the Elsinore fault (Glen Ivy) zone (ICBO, .1998). The Elsinore fault (Glen Ivy) is reported as a Type B fault (lCBO, 1998; and 2001 CBC Table 16-U) in the vicinity of the subject site. The site is within Seismic Zone 4 (2001 CBC Figure 16-2, Table 16-1). The soil profile for the site is SD (200 I CBC Table 16-1). The near source acceleration (N.I) and velocity (N}) with respect to the subject site are 1.3 and 1.6, respectively (200 I CBC Tables 16-S and 16- T). The site seismic coefficients of acceleration (C.) and velocity (Cv) are O.44N. and O.64Nv, respectively (2001 CBC Tables 16-Q and 16-R). T.H.E. Soils Co., Inc. w.O. #784401.00 :? ----. .____------ I _ ~l') _ _ \~,.:::,..,..,.:;~~..!.,'.,.!.TnTI if\'TTTn' I ..-- .. .. __ ~. .t.r....-l \ I : ' ~ I . , I.,. . t . . . , , : ' i . . ; . . . '.. r: ' . . .'_\ .('\ ~7\ ' \ \ c...., . '",...> ! 1 , , ,....-.:,\."-,,--.. .~,' '- I r..........l~ '/- . . ...\ U. "-': I B,......:, '11.,,_~' X'''''.\, \ ,.-....--.. --"- ....-" -.....-...-. -..... ~ ..,. I ._... ,-', , ' ....~ -~ .m I . ..- .,-- " ..-" ......, ..... , . 8,~~, i "..... "D""'; ;\-. ...., .: .l ,....,...., '. · I 'v .. ..d:"" ..I.... "1\ < .'. " '...".. .....,... · ~1 Q I ': ~: l" .... \,V ......\ , ~~ ,..... ~. :: W ~ Jt\. .jf~lll!"ro \' "e:m., .......'~/:..'."'\. "".~\\ ~~. it \... ,\ .!~l: a.. I ~~: ~~- ! \';".. "~,,,,,,,,,,"'(;;:-lI,, \ \ . . \, ""'::.:':,\-,~!." I " 0 "..' . 'I.... .......,,,.... ..,.~;(j.."J' ~.3 ! ,..." . ~:I'''Iil' .... ,,!. I ". .i ',... ,\....' ,..,,~,." !t \,,,.. ......\ "i'i~' .0 "' j.., I. . I t..... ~. :...'. ".j C)\..f.'f~.:'1 ~" \ \ \.......,::' ... !?" ...... 10.0 I ! ,....' ......~,., ~w. \ !..... ....-' ............... J ~i!'i! . ...... . .,.... ..... ...) -~ . ..'..", ,1 ,..... ............. I '.~ ~~.. \( ,..~......-.......~".~..f... ." . '7f'~" ~.\. \.- .-", I. . [;-/,.._.. .. -."-.. ,,:::::. ('\ \ \ \ \ j.(;!~)!: ' i I \.::::::A ,............. .......-...:1 Is".' .'\' ~ d....~ 'I,.._J..."._l...:c\:~~:;~::::.".'." ';> " 1'\ ,I \...... ''''1 - U;;,." O. , . . ,,'--"'"'.'1::... . ,,);', I ' \ ..... ...... .... !' v . 11\ ' '" ~, I'"'''' " . \ i.. .."" "" i' ,. . ,:. t...... """'. I ,," ..." ' ~, i?:@j "...\ 11'"'''''' \ \ \. '\. : \ · I' ' .'1......: "...., 8i~".!I\ \\\ \ l...".:,.:.!. iA~'~ I I ......;..::.. ~ ......\ ..n.6:.:" I I...... . ..... ,\;';lI" 'f Ff.','TT",,,,.{,,' ...' "\' ,,,,it ~+..., \: '" \....., ''''''1 '"'''~''''' I." ) I I,!.j " _,(._ :r.. . '. .:.' I ~". '1 "",,(\l,. I 1 ,,: ......:.:.: ^' .. . :::E~' ';.. ~,":':: t1 '....., V'~ II f............. I .:' R'~ <~. '. .., . . '.' ,,, "".....\ , @O :~: ....,..,.. "" :::::: ~. "'\ .. .' 'I~ ..".....,,"'" ' _. .~:.. l ! j i 1 f"r~::;'i r........' . '! .;! ./ ,.....J t...... ......~. :: .. I il,'" ' .hmn, ....--)t...... ..,,1 ~, 'I: · ...... :::::::. :\: ...... ,,I ~'~>'! . [,..". ..,'~". I -, -q: I ..." ........., v , " , O'V"" I .~ .....,.~ l' .. ,., '0 ...... ' .: '.' "..t' ! ...... . II L..... ....... !. . ., . .: ':....... I Qt' . I Ii .~2:>1: it. '. ~. ' A !!~ - ,I ca";' ,...).., ~ !ti<: '\ &llV,;"'-i I"~ j..... I 11"1 ,....., " ' N, ..... I : ....;.~. Ii'" :t~.,. .~ i'" I. :..... .....:::1 ~.: . 'I t. ,I """ . ,..... J[ . Cl.. f ..,...." ...."...., I . i .. "r." .", i ' ...... I' I I.... , ,...., ' ' . , , ,I .... . ,'1' '. L...... . !II . ....., '. I ,...... t Ii I' , , /. __, ,...;,.., "'1 .' 1 f /.......1....,."'............... ......,.. G:: ./ I M /: 'I : , ,... '.-:.r' iA:::' I!' '"- ' ,......, ,........ , . ...................... I I . , j.. ,_ (' . . . 'I I /-.... .......: l !Wi'.: · II..... fl.'..". ..j!i ,. ,..... ....J~, ,~, I "-': I " >O.~'\ .... ,~,i'''' Q.... I'" ".. f,,'.., I' ( ^ ' ,"'" ..,..j ,,~ lClt'ioi~/ (7)-'(''. ~ ::::::' ~/l -.. _, t. -. ~.," I v I I' r.... .. .,' ~"""': ~ l~,,(c~if~~,. ~ \' . ; (~;i~it:~'" '.:,';.'.:. I \.;:)~,,' ,1/ III j"':' ,~"",j ,,~:~l I W I '7,("VI ">'::;'ll ...".~'~."c, ''';:-.iJ'l:'~'! ........ . ("" ...., ~.Pj,~' , I ll. I of' ~) , . r', -j<<' /t~;~~:. :, -.......J I ,...... ".....! ~:: 0 ." ': I : " , '1~' . iJ-.1::I" ',..: ";"I~: ...-..... . i ,1"'1 ~l<: 0) u3 I ". ,': '. ' , , ". /ffiJ.. I .':1'1,' ...1..' . , .u., ....,. .' . I .;;. ,..-..:::~:.::-...q.),~W;=.:1,~s..~f.'./ f- .-(::'.. t:::l k......),' ". ,f' ,"""" ., .. :i",'i? ..1'.'1:=. '. _. I I '1'"---'''''-''' I ,i ' '_', Jt .,. . /.1.:.: (-,~.'" \,.. '..... 1 I' ;.~:: ~t..,/ ... j ,..I. )..-.. ~ ..:""::"-..., ~ ..-,- '. ,-'-'-. i :B:: :i-... ", -. ...* ~~ .' _:..:.::';:1'-_'_' '-:- ...;.....;. i .. h" - ~'~: :/' . .!.., LI9 ..\~~ ~ . ...,..._L r '''~'''''/ -.... ..,..", .....,..".. ,. ..... .lil",. .' . ,... ,~, ,I f~. t::""-" ... ,.. . J I 'I "~:....N. I J ./. '.. f I Ii'~ I'. ..-.... , .....-......-...1 ,-"-- - -.. ,I; i' fl. . ,., .:.: . ...; '/J:; o~ , , ',. '-"" .L.':' '''r- ..1-........ .....:( .J' .' ,'..._ '" ' '. .').', ,/ ~~ f, ....,.... " . \... , ' 6: . j ,. . 1.:...... I "'........ . . ~-.' .-...~ '1 ,. I fo._.. t.....: " f'l ll' ,r'" : :'. Ii": "'n I \.~....~. '. ...._ ../ . r .,. I . ....... ~,. _"_--".'. J;j Ii.... -'" J l r" 'a.. ,. . ./ ~ I 15 ;.. "/1\ C) j! ......... .. :::' (;'i .. ..: r:.~: '::::' 'i! ; ! CO.... .. ,:,'.:1 (.:,.:"..0 I t!.. .. ,... . ...f.:': ~ "...-IO'i! " ' . ,? . ('.f ....., "" ...., 'Ii ~:)!!J' I ' /.. c). j . ~~ I~' f I. -""''':..:...i..i.' i '! ':::"'. -' J I I~ 'if :p,<: ..a 'I !:::. .0.( J! :::,!If'i~1 'f ; I "".' i ,I '2 '~'~:I ,~ill<,~. ,j-. '"")1..:' _~ ...1 '; I . "..." I ~l'/ !Yr'C:" . /.".." ...;.. .: r.,J.. ItJ} 1 J I .:...."".'.:'.'.'/" I .~l ,'I o't.~) .I-'~' - \-i:s~~J ' i..... . I fl,:, - !! :.~! rE:;!tj~~..~1 1Jit.! f,+-'f. J j ~!!~ I L:~", ..::)' ..~ll'ifl. I " t~, f- ",, SiP ~' I 1'j-~ J ~~.. . j, --- ; . lai A' ,'tj. 1 ;.;.,.......... 'nf'''''' ~< &....' i/~ II Itt.,~L . ~.. / ~",i'9'i I ~' ....., " , " ~ ..... ." It , "'~ I ' .. . It",CJ ~ . ~.<), . I I / t '" , '- -._........_....1 '1 J It.... ,+-" .1 I 1!1r ,'1 :':,J.. L. , fi\ ,.! ~g I -.~ .;\! j... CrJ .'f f]."..",., ~~~; I-~L If!! 'j""" ...,....!~r.; " !fS~ I:..,/..I!' 'i/-J;r::~~! '.' ,~d ' ,I! .....'d 'j ......, '.,,1 IS ,~~ 'J I~ // I .... ". '''' 1 ~. !'~..i -",..,..."" I I 11 ,f . ~"'....i""":1 ....-.( .,..ii'li!t:iri ! '1 i!f. J I.!. .,.-......"...-:~~.-.. !..J! ! 'r';-+;..i..J .,! , A 'H'~ }',., ...."I M'.,/V'...., '1 f.~ I",,,,,.. -i : r ' """"" . , , :..." '" , If i i8!~;ri Ii' ....) {c:(' .. 'I ~ ' I, ',~.:.!i:.J:~:~::::;.i:;:;,.:..',... .......... I), . ,..15...~ .t.." '''f@). ~'f" '. .:1.,....... ,., .,....J ...., . " , , ' . .'" {..... t:: I Ii ! r"""; I C'"'.''' /"'"'' I .1' !~t' '" /...., I"(';";";~.i ' ! ; i .......,"~.., ,-'''''' '!..._ ...__..' 0\ /. .....,.....~ ...........',,;; /. 'I J " I.....! '_....;.... lit', , ,........,."....., ,,'.... ,....... ........ ' .:it; , I ~~ " ,,~, . , ,. .... ,..t.. W 1 " ~ .......:-.. ~.,._ l. ,; -:-"'.(-_......,.. ................. ~~' ,I;!3- . _!It ell. '_n : . ....'. . .~. '-. ..... .....-. ~ ' '.. ""'_~V'-<, '.., '. 'I' , .' ~.~.,~~ .fJ;J,i>fl ''''''~ 1 "'::j''''~' !..... ''',..I \7 ".. I ~_ I . ~...,,' .... , , ! , .. , ,~' !:-.". .. ",.I. .ll><ti1 I...""{&,,....' I "" .. ~,f .1.:'."'" , ';"", .::' '/ ~~ f , · "-l':\'<:'.:!J (..'....- '.. ,,! ,......., ,~.....- .., ' . . ".... ' ~. ~,_.. I.... c..-....., ........ \ I l&. ......,. '. ...... a.. ...Jill]'; I I :.<':~-: 0: ~: I . "'_..J _ # l. ,~ ! ! ...,......~, ' ,~ .Qlf.i ~t I .......,J."" ,t". i.! ;~.'-'~~., )""71, , , ,I i : : ,',""" ...I....,ltl~''''..i.1 I H I O'~~'" ~' ", " "..".... ' . ' . . ' , , , ! , "'I ~ ,-r.>;... :SU Ojl_"': """ ", " "~ ....,. ~ I . .: r: : .- w rc-.J" .. I : .: . n' /. , ....,. .... ~~:... ,I _.. ; . ... "I ~~~.;x.,.,1 ~ ~@) ,'''.' rr.::::......, ~;,-:' ~I ~ II ...iJ.;!:".. .:'1 ~/ f... ..",.... ,,,,,'.., ,. "<1 '1 I~' . I 'f 1\" . {""/'" ,.. . \' .. " ',,'. .., / 'Ali' /' f J.ll ! · '''',~L! ; i ! , r'" !.... J I'~ \ .r- ,,", . '1" I! '. f :...... ..'-....:...~.l.j! ! · .. 1'// ...., .,Ii~ Jj'.'" f,........ /.\ ~~' ~ -l \.....~ I . ' ."f+: '1 i t~ ; .J if i i ;' ; r';"r.~: "- I .,/ -, ."..i' ' . , f- -<tl .1, ,. 1i~'~"" '.. . , , , , ' ' I [ \ 1 -"-i..~f -i,.1 ~ !,..;&!f .... / lJ.J I . _! :"v): -,$ .... I,.. ,..., c.. ~~Ii I . " i I ~" ..., ,.,) !-'......, i L...' !. .' . 9 ~5t, "i I.~ ~. ,I !~ <11 ........' f" -'''''''.. L / '. en I !loll:'> , % ,/ ; ..... ". ~: " 1../ ", I ~!~ ,<" ~"" .., ' " ." '. I'. O' .' ... ' , ' . / ~;>~ ., \ :; !l . a ~!! ~:. - - i..; , ; " , , ' . ' '. .2. ~.!~ ~~ E~ f~..$ 'ti~ ~a. g .. .. .........J..i i ! i? i ".' / ~iJ ---il~ ~c~ ~~ ~~ ~a....- m~1l ......... - .........' ; i i./' , . ~ ..., _-4. ..--=~. ............- . -. <~ .... :I: o 0 Z <(:z 0 ..... w ~I Z 0:: i= LL 01- < . S 0 0> ~ U "'z ~ 0 0:: 0:: Z Z !;to::";;; 0 0 0 mO w ~I- LL- .... N!!:!;[ 9 < z!;[ ~ Q.......J 0 0:: 0 ~ <(3 a.. wg !Zo:: i ~~ ~ ~ C3 f2 ~ ;i~~~ g ~ ~ ~ ~ o !2~Q.8 N i=!:i f2f u ~ c.,fw g.... (3 0 fa C .A 0 Z ~ coo lD W ...~ _ :I: - ..J (!) = l!!~Clfl1 u.i u: w ::l fil < O o>:lW .... ....!:; ii: Cl > w 0> < <.... < 0:: r.f.l (!) o::~ c ~ ~ ;i 0 < . :1:. xXo-_z ,_, .... <( 0 0 III II: ~ 1t).J 0 0:: cr: LL U'J W == [!?5 "! 11. g; ~ ~ !;[ ... _ -E-<~ 0 w ~, ~ <. <. :l :J '"' i5'~ _ _.,_ ' , ..., a .... ~ l~rLl--~-~ w ,..... 'Iii ~ a c . 0:: o ~ ) ;= ~ .-... , , , , , , , , , ~ ~ ,~ ~ - ~ ~ ~ ~ ~ Mr. Gary Hamro The Pres Companies October 24, 2004 Page 3 Based on the above values, the coefficient of acceleration (Ca) is 0.57 and a coefficient of velocity (Cv) is 1.02 for the subject site. The Wildomar Fault of the Elsinore Fault zone (Glen Ivy Segment) is characterized as a right lateral strike slip fault with a total length of approximately 38 kilometers (CDMG, 1996). The State of California has assigned the Elsinore Fault (Glen Ivy Segment) a slip rate of 5 mm/yr. (+/- 2 mm/yr.) with a recurrence interval of 340 years (CDMG, 1996). This fault segment has been assigned a maximum moment magnitude of 6.8. SECONDARY SEISMIC HAZARDS Lianefaction Soil liquefaction is the loss of soil strength due to increased pore water pressures callsed by a significant ground shaking (seismic) event. Liquefaction typically consists of the re-arrangement of the soil particles into a denser condition resulting, in this case, in localized areas of settlement, sand boils, and flow failures. Areas underlain by loose to medium dense cohesionless soils, where groundwater is within 30 to 40 feet of the surface, are particularly susceptible when subject to , ground accelerations such as those due to earthquake motion. The liquefaction potential is generally considered greatest in saturated loose, poorly graded fine sands with a mean grain size (D50) in the range of 0.075 to 0.2mm. Typically, liquefaction has a relatively low potential at depths greater than 45-ft and is virtually unknown below a depth of60-ft. Procedures outlined in two publications, I) The Guidelines for Evaluation and Mitigation of Seismic Hazards in California, Special Publication 117: Department of Conservation, Division of Mines and Geology (1997); and 2) Recommendations for Implementation of DMG Special Publication 117: Guidelines of Analyzing and Mitigation, Liquefaction Hazards in California: Southern California Earthquake Center University of Southern California (1997), provi.de for a "screening study" in lieu of a complete liquefaction analysis. It is our opinion that, due to the depth to groundwater of + 1 aD-ft (Rancho Water District, 1984)), as well as the medium dense to dense engineered fill and/or the dense to very dense sedimentary bedrock underlying the subject site at depth, liquefaction and other shallow groundwater related hazards are not anticipated, and further analysis appears to be unwarranted at this time. Based on the above information, the liquefaction potential is anticipated to be negligible. Secondary Hazards Due to the absence of known faulting on the subject site, the distance from large bodies of water, the potential for secondary seismic hazards, including ground rupture, seiches, and seismically induced soil settlement, are considered unlikely. T.H.E. Soils Co., Inc. w.O. #784401.00 ~ ~ ~ ~ ~ , , , , , , , , , ~ , ~ ~ ~ ~ \ '\" , " ---". '\ ----- "'-, ;/\ \. ... II \. \ \ '. I \ ',._ \..,,/\ \. .- \... ~--........ " --" " " ..-..\ \. ~. \ <''''' .~\. . \. .J~., -"'-. """", \ \ ..J''''' . \, \ ''I]'' ", ". ' \ " ;~', - (''''-, -,./ r'1t>"St, ',-- II . 1" ~/ / Q,(" , \ ~ '~_./ r ~~ ,/~ ''-.. ,r I~ ~.-/ "#I 9p", .~ 1- L~ -.I ~, i -----/ -T---- J ,,~~ I "-..J ", \ _------..:. I ,,<fI(, // ",x',' ------ :.J..<'" \, \.v//-''''' ~ /.r-<>___. -''-.1 'O"'~ '\ ,\\~~,/.\." / // ""<=1'1<-'<;:/ " ... 0-'\ ./ ,,' ". '<." ,. <."" ,', \"~C-Cl'l'li'~, \, <. \///;;;,:::,;";:'7<2 \\ \.\--...----'." ,x,,1."'\ ' ", '. . . ",\,... \.__-..- I, :''w/, ...-<".o(:~_. \, ,:.,/"-._ _/~._(',,>,,/ " " \ , ,,' /\ "'.,;' -/- ' >', "/0." ,'" /i<'v;;;;)~::'\~;~c~f\~~~~~\~S:\:~~~~~:_<~>.<;:".~~~:;~',. i ,p" v \\/ i. " \_,~., -/,', , ,~~:};-/.,A, "', ",/ ,./ " -,.,' /, '. .. \---1 \ '. / /', v ~~v/>'. .'>-./ ' . v~."" -', \ I " /,' . , ,>. v ' / .,.... ' ~,../'),..~~(..:,,/.>~;:~~ :--::h~-=~~-'---\::':',--><:~,-,;:;.~~~ '_ . /~ A<;>"". >:~ ~~;" /v' i-_ 9. -=:J g ___c.,'<_.<:" .:. ./ /<',,>; -.cr. \1 V" 1--'...... 'y, 'o' ", "( /"--J.il' , ~.... \____':1 ,...--11 -7~' .)/ ...., - ~ 'Y.... '\.. .,- ......\ -::r;;. -~ \", .-; ,. ~ ~.... ., __-~..~\.... ..,;-.-. JI ..(....... / "'~j; <~ '< ...,'~/<\" )l(.~ "\... "'~"---- \ ,/ .' ..., ~ /~ ' ". / '\ " . ~'<i".<f" ~'" /~ "... ~O .........' #".... ' \\ ,. '<I' " "'"' , , ./ '..... ./ ~....., 'I Y '..... }'.\. ,,/ '; trV'. ,~~.... ,,>.... . .... ~'t- ....,~... ,/ /....~_... '/ ...... ~., 'y \ """ \ " ,',\ .., -.\'<i ',,' '. /:":~':'5~~'<:;?~~~~___)~> /:.:~) , )., -'-,--- "~''yJ, \'~'" .,~\. "~I \\ . ':\ '\. \~" ,::~><:~~.:,.."., '. \.-"'- 1'1 ' ---- ./ I I I I I I ---- http://www.cityoftemecula.org/output/TemPcl_CHWEBOI1960286826714.png o 1'1 "'/ ;" o o SlnIet Name. City Boundary Highways Fault Une. Parcels Fault Zones Uqueractlon Areas FIGURE 2 9/29/04 <P ~ , , , , , , , , ~ ~ , , , , , ~ ~ ~ Mr. Gary Hamro The Pres Companies October 24, 2004 Page 4 . The subject site is located in an area of moderate to steep terrain, is free of large loose rock, and the potential for rockfall is anticipated to be moderate. RECOMMENDATIONS General Based on the results of our investigation, the proposed development is feasible from a geotechnical standpoint, provided the recommendations and information contained in this report are implemented during planning, design and construction. Erosion Damal!e The subject site has incurred minimal erosion damage since the completion or rough grading operations. Minor erosion rills were observed within the existing cut and fill slopes. These areas should be moisture conditioned to near optimum moisture and recompacted to 90 percent of the maximum density as determined by ASTM 1557. Cut-to-Fill Transition Due to the existing cut-to-fill transitions located through the subject site, the proposed building pads should be overexcavated a minimum of 3-ft below finish grade elevation or 2 feet below the bottom of the footings, whichever is deeper. The overexcavation should extend a minimum of 5- ft outside the building footprint or distances equal to the overexcavation depth, whichever is greater. The overexcavation should expose medium dense, competent bedrock or compacted fill soils that are free of voids and roots with a minimum of 90 percent of the maximum dry density as determined by ASTM D-1557. The soils engineer and/or geologist should veritY the depth of removals in the field. .In areas that do not yield competent material and/or areas containing large trees with deep root systems, basements, and/or septic systems, deeper removals may be necessary. Site Preparation Prior to placement of fill materials, the exposed earth materials should be scarified a minimum of 12-inches bgs, moisture conditioned to near optimum moisture content, and recompacted to a minimum of90-percent of the maximum dry density as determined by ASTM D-1557. Fill Placement Onsite earth materials are expected to be suitable for use as structural fill provided they are free of organics and are non-expansive. A qualified soil engineer should test import materials to determine T.H.E. Soils Co., Inc. w.o. #784401.00 l ~ ~ , , , , , , , , , , , , , , ~ , , Mr. Gary Hamro The Pres Companies October 24, 2004 Page 5 their feasibility for use as structural fill. Fill imported from off-site areas should have low to very low expansion potential. The project geotechnical consultant should approve imported soils. At least two working days notice should be allowed for approval. If laboratory testing is necessary to obtain approval of the import source, an additional I to 2 days should be allowed. Approved fill material should be placed in 6 to 8-inch lifts, brought to at least optimum moisture content, and compacted to a minimum 90 percent of the maximum laboratory dry density, as determined by the ASTM D 1557 test method. No rocks, chunks of asphalt or concrete larger than 6 inches in diameter should be used as fill material. Rocks larger than 6 inches should either be hauled' off-site or crushed before being used as fill material. EXDansion Index Testinl! An expansion index test was performed on representative onsite soil sample collected during our investigation. The results, which are listed in Appendix C, indicate that the expansion index for the onsite soils varied from 7 to 9, which is equivalent to very low expansion potential, respectively (Table 18-I-B - 2001 CBC). Additional testing for expansion should be conducted within the building pads at the completion of overexcavation and recompaction, and fInal recommendations should be made at that time. Expansion testing should also be performed on irnported 'soil s prior to their approval as structural fill material. Sulfate Content Based on our sulfate content testing, it is anticipated that, from a corrosivity standpoint, Type II Portland Cement can be used for construction. Laboratory analysis, which is listed in Appendix C, Table ill indicate a test result of 49 and 150ppm (parts-per-million) of water soluble sulfates, which equates to a negligible sulfate attack hazard (2001 CBC, Table 19-A-4). Sulfate content testing should be conducted within the building pad at the completion of grading and on imported i:oils prior to their approval as structural fill material. Foundation Systems For one-story and two-story structures, all foundation elements should be placed a minimum of 18 inches and 24 inches respectively below lowest adjacent grade into engineered fill material. An allowable safe soil bearing capacity of 1600 psf can be considered for continuous spread. footings with a minimum width of 15-inches and a minimum depth of 18-inches below the lowes1 adjacent grade. The allowable bearing capacity may be increased by 10% for each 1- ft of depth or 0.5 feet of width, up to a maximum of 2900 psf. Isolated square footings should be designed by the structural engineer in accordance with the anticipated loads and the soil parameters given. A friction coefficient of 0.30 can be considered for concrete poured neatly against compacted fill soils. A minimum reinforcement of 1-#4 bar top and bottom should be utilized. T.H.E. Soils Co., Inc. w.O. #784401.00 B ~ ~ ~ ~ ~ ~ ~ , , , , , , , , , , , ~ Mr. Gary Hamro The Pres Companies October 24, 2004 Page 6 These values are for dead plus live loads and may be increased by 1/3 for combinations of short term vertical and horizontal forces. Total differential settlements, under static loads of footings supported on properly compacted fill or competent native material and sized for the allowable bearing capacity, are not expected to exceed 1/4 to 1/2 inch. These settlements should occur primarily during construction. Lateral Earth Pressures The following parameters should be considered for lateral loads against permanent structures founded on fill materials compacted to 90% of the maximum dry density. These values represent backfill compacted to 90% of the maximum dry density that are free draining against permanent structures. Soil engineering parameters for imported soil may vary: Equivalent Fluid Pressure for Level Backfill Active Passive Co-efficient of friction (concrete on soil): 35 pcf 320 pcf 0.30 If passive earth pressure and friction are combined to provide required resistance to lateral forces, the value of the passive pressure should be reduced to two thinl1; of the above recommendations. These values may be increased by one third when considering short term loads such as wind or seismic forces. Tentative Structural Section We recommend the following tentative structural section for the on-site drive and parking areas. The tentative design of the pavement sections are based on an assumed R-value of 40 and Traffic Index (TI) of 5.0 for parking and light duty drives and 8.0 for heavy duty dJives. R-value testing should be conducted at the completion of rough grading to verify soils exposed at subgrade, and a final structural section design should be recommended at that time. The recommended tentative pavement section is: AREA Parking & Light Duty Drives Heavy Duty Drives TI 5.0 8.0 PAVEMENT SECTION 0.25' (3") AC over 0.35' (4.2") ABU 0.38' (4.6") AC over 0.70' (8.4") ABU It is recommended that the subgrade materials be compacted to a depth of I foot below subgrade elevation and that both the subgrade rnaterials and the ABU be compacted to 95% relative to the T.H.E. Soils Co., Inc. w.o. #784401.00 ~ ~ ~ , , , , , , , , ~ '~ , , , - ~ ~ ~ Mr. Gary Hamro The Pres Companies October 24, 2004 Page 7 maximum density of the respective materials, as determined by ASTM 1557 laboratory tests. Laboratory test results are presented in Appendix C. R-Value testing should be conducted on imported soils prior to their approval as structural fill material. Similar testing should be conducted at the completion of rough grading to verify that soils exposed at sub grade are consistent with the findings of this report. A final structural section design should be recomrnended at that time. Gradinl!lFoundation Plan Review A grading/foundation plan review should be conducted prior to the commencement of construction to verify the recommendations of this report have been incorporated into the design. Specific recommendations for site grading should be provided at that time based on actual proposed grading and site layout. Additional subsurface exploration or fieldwork may be necessary to evaluate specific areas of the site. Construction Monitorinl! Observation and testing during grading, prior to placement of concrete, is essential to verifY compliance with our recommendations and to confmu that the conditions encountered are consistent with the fmdings of this investigation. The observations made are believed representative of the building pad; however, soil and bedrock conditions can vary significantly. As in most projects, conditions revealed by excavation may be at variance with preliminary findings. If these conditions occur, the possible variations must be evaluated and designs adjusted, as required or alternate designs recommended. LIMITATIONS Our investigation was performed using the degree of care and skill ordinarily exercised, under similar circumstances, by reputable Engineers and Geologists practicing in this or similar localities. No other warranty, expressed or implied, is made as to the conclusions and professional advice included in this report. This report is issued with the understanding that it is the responsibility of the owner, or his representative, to ensure that the information and recommendations contained herein are brought to the attention of the architect and engineer for the project and incorporated into the plans, and the necessary steps are taken to see that the contractor and subcontractors carry out such recommendations in the field. This fmu does not practice or consult in the field of safety engineering. We do not direct the contractor's operations, and we cannot be responsible for other than our own personnel on the site; therefore, the safety of others is the responsibility of the contractor. The contractor should notifY the owner if he considers any of the recommended actions presented herein to be unsafe. This firm did T.H.E. Soils Co., Inc. w.o. #784401.00 \t) ,~ !~ , , , , , , , , , , , - - - , - - Mr. Gary Hamro The Pres Companies October 24, 2004 Page 8 not provide any surveying services at the subject site and does not represent that the building locations, contours, elevations, or slopes are accurately depicted on the plans. The fmdings of this report are valid as of the present date. However, changes in the conditions of a property can occur with the passage of time, whether they be due to natural processes or the works of man on this or adjacent properties. In addition, changes in applicable or appropriate standards may occur, whether they result from legislation or the broadening ofYJlowledge. Accordingly, the findings of this report may be invalidated wholly or partially by changes outside our control. Therefore, this report is subject to review and revision as changed conditions are identified. This opportunity to be of service is sincerely appreciated. If you have any questions, please contact our office. Very truly yours, ToHoEo Soils Company, Inc. ~~~~ General Manager John T. eiuhart, RCE 23464 Registration Expires 12/31/0S \)1 10 . Frey . ect Manage JRH/JTR/JPF:jek Enclosures: Figure I - Site Location Map Figure 2 - Fault Map Appendix A - References Appendix B - Exploratory Trench Logs Appendix C - Laboratory Test Results Appendix D - Standard Grading and Earthwork Specifications T.H,E. Soils Co., Inc. W.O. #784401.00 \\ , I' , , , , , , , ~ . ~ ~ ~ ~ ~ - - ~ T.H.E. Soils Co., Inc. ~ APPENDIX A References w.o. #784401.00 \z...- ~ ~ ~ ~ , , , , , , , , , , , , , ~ ~ REFERENCES California Division of Mines & Geology, 1997, "Guidelines for Evaluating and Mitigating Seismic Hazards in California", Special Publication 117. California Division of Mines & Geology, 1996, "Probabilistic Seismic Hazard Assessment for the State of California", DMG Open File Report 96-08, USGS Open File Report 96-706. California Division of Mines & Geology, 1990, "State of California Special Studies Zones, Murrieta, CA Quadrangle, Revised Official Map", Effective January I, 1990, Scale I" = 2,000'. Coduto, Don, P., 1994, "Foundation Design Principles and Practice", Prentice Hall, pages 637-655. Department of Water Resources, August 1971, "Water Wells and Springs in the Western Part of the Upper Santa Margarita River Watershed, Riverside and San Diego Counties, California", Bulletin No. 91-20. EnGen, Corporation, 2002, "Supplemental Geotechnical EngineeIing Study, KTM West Coast Headquarters, Parcels 10 through 13 of Parcel Map 18743, Via Industria, City ofTemecula, County of Riverside, California", dated, December 18,2002, Project Number: T1330-sgs. Hart, E.W., 2000, "Fault-Rupture Hazard Zones in California", California Division of Mines and Geology Special Publication 42, CD-003 (CD-ROM Version). International Conference of Building Officials, 2001, "California Building Code". International Conference of Building Officials (lCBO), February 1998, "Maps of Known Active Fault Near-Source Zones in Califomia and Adjacent Portions of Nevada to be Used with 1997 Uniform Building Code" prepared by California Department of Conservation Division of Mines and Geology. International Conference of Building Officials, 1997, "Uniform Building Code". Jennings, Charles W., 1994, "Fault Activity Map of California and Adjacent Areas with Locations and Ages of Recent Volcanic Eruptions", California Division of Mines and Geology, Geologic Data Map No.6, scale 1:750,000. Kennedy, Michael P., 1977, "Recency and Character of Faulting Along the Elsinore Fault Zone in Southern Riverside County, California", California Division of Mines and Geology, Special Report 131. Mann, John F. Jr., October 1955, "Geology of a Portion of the Elsinore Fault Zone, California", California Division of Mines, Special Report 43. T.H.E. Soils Co., Inc. w.o. #784401.00 \;. ~ , , , , , , , , , , , , , , , , , J REFERENCES (Continued) Petersen, M., Beeby, D., Bryant, W., Cao, C., Cramer, C., Davis,.I., Reichle, M., Saucedo, G., Tan, S., Taylor, G., Toppozada, T., Treiman, J., and Wills, c., 1999, Seismic Shaking Hazard Maps of California", California Division of Mines and Geology Map Sheet 48, varied scales. Ploessel, M.R., Slosson, J.E., September, 1974, Repeatable High Ground Accelerations from Earthquakes, California Geology. Proceedings of the 7th International Conference on Expansive Soils, Volume I, "Foundations on Hydro-collapsible Soils, Pages 256-261. Rancho California Water District, March 1984, "Water Resources Master Plan". Schaefer Dixon Associates, Inc., 1992, "Geotechnical Mass Grading Report No.2, Parcel Map No. 21383 (Core I, Phase II), Temecula, California", dated January 7, 1992, Project No. A T40SB. Schaefer Dixon Associates, Inc., 1991, "Geotechnical Mass Grading Report No. I, Parcel Map No. 21383 (Core I, Phase I), Temecula, Califomia", dated August I, 1991, Project No. J.N. AT405B. Schaefer Dixon Associates, Inc., 1990, "Alluvial Removal Recommendations, Core I Business Park Project, West of Winchester and Diaz Roads, Rancho California, Califomia", dated November 7, 1990, Project No. AT405B. Schaefer Dixon Associates, Inc., 1990, "Geotechnical Review of Grading Plans, Core I (Assessment District No. 155), Parcel Map 21383, Temecula, California", dated February 15, 1990, Project No. A0405A. Schaefer Dixon Associates, Inc., 1989, "Report on Geotechnical Investigation, Assessment District No. 155, Parcel Map 24085, 24086, 21029,12382 and 21383, Rancho California, Riverside County, California", dated June 7, 1989, Project No. 9R4332C. Schnabel, P.B., and Seed, H.B., 1973, "Accelerations in Rock for Earthquakes in the Western United States", Bull. of the Seismol. Soc. of Am., Vol. 63, No.2, pp 501-516. ' Seed, H.B., Idriss, LM., 1982, Ground Motion and Soil Liquefaction During Earthquakes, Earthquake Engineering Research Institute. T.H.E. Soils Company, Inc., 2003, "Rough Grading Report, Testing Services During Rough Grading, KTM Sportmotorcycles, Parcel 10-13 of PM 28473, Temecula, Riverside County, Califomia", dated April 15, 2003, Work Order No. 415301.22. Toppozada, T., Branum, D., Petersen, M., Hallstrom, c., Cramer, C. and Reichle, M., 2000, "Epicenters of and Areas Damaged by M;:: 5 California Earthquakes, 1800-1999" California Division of Mines Geology Map Sheet 49, varied scales. T.H.E. Soils Co., Inc. w.o. #784401.00 \~ ~ ~ ~ , , , I' , , J J J , - , - - - - REFERENCES (Continued) U.S.G.S., 1953 (photorevised 1979) "Murrieta, CA., 7.5 Minute Series Topographic Quadrangle Map", Scale I" = 2,000'. Weber, F.H., Jr., 1977, Seismic Hazards Related to Geologic Factors, Elsinore and Chino Fault Zones, Northwestern Riverside County, California, DMG Open File Report, 77-4 L.A., 96 pages. T.H.E. Soils Co., Inc. w.o. #784401.00 \5' , I' , , , I , , , , ~ , , , ~ , ~ , , T.H.E. Soils Co., Inc. ~ APPENDIX B Exploratory Trench Logs W.O. #784401.00 \fo v ^ . ,. ~ '"' . s;: ~Q ~ 002 5 ~I!!) n m tn III ~ Ul ::E ~ ~~ ~ ~~ ~ ~~fg~m~8 _ m ~-l :NOI.l\l^313 !3lfOn8 ,,~z \I H.lIM 03ddJn03 30H \lON3.lX3 VII lJ3dnS OBS ON 3S\l0 :NOI.l\l^\lOX3 ~O OOH.l3V11 ~OIW6 :03^lJ3S80 3.l\lO :NOIlYOOl NOI.ldllJOS3Q r-'ON lid 1831 1831 110S (je) 111:l1VIOI:l11~V 3Cin.lSIOVII V\lnVIIJ.1dO/A.lISN30 VIInVIIIX'9'V11 ON3 HHWN. 3G1S 183M .9dO.t ~313V'fvla..s 01 >l~OCl C1'v'lm)NV '13^'Vl:l~/M 111S AON\fS NMOH8 03H NOANVO O~0:1038/)fOO~038 (8::>) 31108 'uIAISmH::lO:J '(S) IN31NOO 31'r/.::nnS 'lN31'v^ln03 ON'I$ (13) X30NI NOISNVdX3 '(sa) C1V3HS 1:J3C110 '(:xvwl .Z = Hld30 1\1101 lid 1831 :l0 801 1-.l:3lJnElI~ \..\ ~ Z-1 :3t1n91" lid lS3l =10 €l01 00. ~O~MlL :ON eor d o. ~ i-= ~ ~ - t - j j j 1 - -= ~ ~ - .1: = Hld3a lVlOl 1 1 liS AONVS A 113AVHD ~ NOANV:> a~O=la38f)t:>o~a38 V ("IS) SIS)" l\fNV 3^31S .9 dOL - I j ON3 Hinos ~ 30lS 153M (Je) 11I=llVI:>I=lll~V ^ z n . . 0 0 c ~ I N011dltl:>S30 ~ z r . " ' ~ 1831 110S m ~ ~ ~ Z 'ON .LId .LS3.L m z o " ~ m ~ ~ m " :NOIIVOOl :N011lfA313 13>t:>ne ..~z If H11M 03ddln03 30H I ~OILZl6 :03Atl3SeO 31lfO IfON31X3 W tl3dnS oas ON 3SIf:> :NOI1lfAIf:>X3"0 00H13W Htlr :Ae 039901 1 <a\ ~ E'l :3~nEJI~ lid lS31 ~O E>01 00' ~omlL :ON sor I ~ 3 - ~ - ~ 04 -I -I j - o .O'S~ = Hld3C1 1'9'10.L J ~ 3 -' ~I - .LSIO" '3SN30 0.l3SN30 "m03" '.l< 0.L318800 '-13f,V>J<;>/M .L11S AON'S NMO"8 03" : I ~ ~I lSIO\^j '3SN30 013SN30 VIInl031"l '_Z~ 0131880~ 'l~^VHDfM 111S AON\fS NMOCl8 A~~ I H i- S:::> 's '13 '\fS 'X'</V'l 13^V1lEl/MllIS AON\fS NMOCl13 >n;IVO 'AClO '380('1 ^ 30lS .LS"";O ON3 H.L"ON ye) 111~ l'9'I:JI~I.L~\1 H I lil z n ~ j!! :il NOI1dl~OS3a ~~ ~ !< ~ ~ II' .LS3.L1IOS C 'ON l.ld l.S3l. ~ g ~ ~ ~ ~ .:!)-< ~ In ... 'NOllYOOl :NOI1"'^313 13}jons ..~z '" H1IM 03ddln03 30H ~OIW6 '03^~3SS0 31"'0 "'ON3lX3 W ~3dns oas ON 3S"'O :NOI1"'^"'OX3 ~O 00H13W H~r :).s Q3EJEJOl I b\ I r.L :3~n~l; lid lS31 ;010 E>01 00' ~omL :ON 80r oi ~ J ~ f-- ~ ~ --j ~ ,O'S ~ = Hld30 1'9'101 -. --j -' ~ i 0 ~31'9'MONnO~E) ON I- 31dW'9'S ON I- ,O'!: = Hld30 1'9'101 I- Ig t1Vln8NV . A>t:)OB ^~H^ i--" NOANV:> O~O;olO38J)tOO~038 H 13AVel8/M ON.....S A.l.llS 3SHv'OJ '38001 'AtlO I- {leI 111;01 l'9'IOI;olll~'9' H 3GJS 1S'V3 :lQ 31aOl\l'l . n . . 0 ~ 0 c ~ II NOI.Ldl~:JS3a r ~ '\ ~ ~ 1831 110S m ~ I> 'ON .lId lS3.l m z ~ ~ o '" ~ m ~ ~ ~ m :NOIIYOOl :NOlllf^313 .L3>l:Jns "r~ If HllM C3ddln03 30HI I rOILZ/6 :C3^~3S80 3.LlfC IfCN3.LX3 W ~3dns OSS ON 3SIf:J :NOI.LIf^If:JX3;0 COH.L3WI H~r :A8 C3~~01 I cfZ Sol. :3lJnE)l~ lid 1831:10 ElOl OO"IOmL :ON eor 7i: ~ ~ -' ~ ~ - 1 ~ '- ~ j H31VMCNnmm ON -' .S'~~ = Hld3C lV.LO.l ~ --' _ f-.- NOANVO CHC:lC38f)lOOHC38 H ~ ~I -' ~I 3^31$ ~'Z~~ 6'l S ....1 3SN3G 0.1 3SN30 Volnl03Vol 'lSIOVol A llH81lS '.o~ 0131880::> ONV 1:'^\I}:I8fM 1.11$ AONVS NMO~8 >l~'qa '-I - .~ C13ddn 3S0(ll n H g'g I (Je) 111:11VIOI:lIIHV lil z n ~ CIl (1 0 NOIl.dllJOS3C ~~ ~~ I< ~ ~ ~Ii mHOS . !i 'ON lid 1531 U ~~ i ~ ~ ~\~ :NOI1.001 :NOI1....^313 l.3}10ns "~z... Hl.lM C3ddln03 30H I ~OILZl6 :C3^lJ3SS0 31....C "'CN3.lX3 W lJ3dnS OSS ON 3S...0 :NOI1....^...OX3 ~O COH1.3W HlJr :AS C3E)E>Ol . \'2 ~ , , , , , , , , , , , , , , , , , , APPENDIX C Laboratory Test Results T.H.E. Soils Co., Inc. w.o. #784401.00 2Z, I ~ , , , , , , , , ~ ~ ~ - ~ ~ ~ - - - LABORATORY TESTING A. Classification Soils were visually classified according to the Unified Soil Classification System. Classification was supplemented by index tests, such as particle size analysis and moisture content. B. Expansion Index An expansion index test was performed on a representative sample of the onsite soils remolded and tested under a surcharge of 144 Ib/ft2, in accordance with Uniform Building Code Standard No. 29-2. The test results are presented on Figure C-l, Table I. C. Maximum DensitY/Optimum Moisture Content Maximum density/optimum moisture content relationships were determined for typical samples of the on-site soils. The laboratory standard used was ASTM 1557-Method A. The test results are summarized on Figure C-l, Table XI, and presented graphically on Figures C-2 and C-3. D. Particle Size Determination Particle size determination, consisting of mechanical analyses (sieve), were performed on representative samples of the on-site soils in accordance with ASTM D 422.63. Test results are shown on Figures C-4 through C-7. E. Direct Shear A direct shear strength test was performed on a representative sample of the on-site undisturbed soils. To simulate possible adverse field. conditions, the samples were saturated prior to shearing. A saturating device was used which permitted the samples to absorb moisture while preventing volume change. Test results are graphically displayed on Figures C-8 & C-9. F. Sand Equivalent A sand equivalent test was performed on a representative sample of the subsurface soils to supplement visual classifications and mechanical analysis. The laboratory standard used was ASTM D 2419-74. The test results are presented on Figure C-l, Table III. T.H.E. Soils Co" Inc. w.O. #784401.00 z'? ~ , , , , , " , , , , , , ~ , , ~ , ~ LABORATORY TESTING (Continued) G. Sulfate Content Testinl! A soluble sulfate content test was performed on a representative sample of the onsite soils. The laboratory standard used was California 417 A. The test results are presented on Figure C-l, Table IV and Figure C-I0 & C-ll. H.. Corrosivitv Suite A corrosivity suite was performed on a representative sample of the onsite soils. The laboratory. standard used was ASTM D 4318. The test re:;ults are presented on F'igure C- 1, Table IV and Figure C-I0 & C-ll. T.H.E. Soils Co., Inc. W.o. #784401.00 2-'\ ~ ~ ~ ~ , , , , , ~ ~ ~ ~ - - - - - - TABLE I ~ EXPANSION INDEX TEST LOCATION EXPANSION INDEX EXPANSION POTENTIAL I . ~ T-I@0-5' 9 Very Low T-3 @ 0-12' 7 Very Low TABLE II ~ MAXIMUM DENSITY/OPTIMUM MOISTURE RELATIONSHIP ASTM D 1557 I I MAXIMUM DRY DENSITY [ OPTIMUM MOISTURE TEST LOCATION (pcf) (%) T-I @ 0-5' 126.4 10.8 T-3 @ 0-12' 120.5 13.8 I TABLE III SAND EQillV ALENT , TEST LOCATION SE T-I @0-5' 24 T-3 @0-12' 18 I TABLE IV SULFATE CONTENT TEST LOCATION SULFATE CONTENT T-I @0-5' 49 ppm T-3 @0-12' 150 ppm Figure C-I T.H.E. Soils Co., Inc. W.O. #784401.00 2,.5 ~ ~ ~ ~ ~ , , , , , , , , , , , , , ~ I TABLE V CORROSIVITY SUITE SATURATED CJ REDOX G: TEST LOCATION RESISTIVITY H POTENTIAL SULFIDE T-l lalO-Sft 620 I 4.9 I[ 270 I NEGATIVE T-3 lal O-I2ft 760 II 4.2 330 NEGATIVE Figure C-l (Continued) T.H.E. Soils Co., Inc. W.o. #784401.00 z.~ ~ ~ ~ ~ , ~ , , , , , , , ~ , ~ J , ~ 14121 4- U 0- 13121 :n ... ~ c " "tl 125 :n L 0 MAXIMUM DENSITY/OPTIMUM MOISTURE 135 ..... ..... ... :--... ..... ..... 1'- ...... ...... f", I... f", ...... ...... ...... ..... ... .... ... .... I" . ZAV for Sp. G. = 2.9121 12121 115 9 1121 11 12 13 14 15 Water content, % Test specification: ASTM D 1557-91 Method A. Modified Oversize correction applied to final results Elev/ Depth 121-5 Classification Nat. Mo I st. % > % < No . 4 No .2121121 USCS AASHTO Sp.G. LL PI SM 11.5 % 2.9121 TEST RESULTS MATERIAL DESCRIPTION Maximum dr~ densit~ . 126.4 pcf Optimum moisture = 1121.8 % ROCKY SILTY SAND Remarks: Project No.: 78441211.121121 Project: PRESS COMPANY Location: T-l Date: 1121-11-21211214 MAXIMUM DENSITY/OPTIMUM MOISTURE C--2 Fig. No. z' ~ ~ ~ ~ , , , , , , , , , ~ ~ ~ , , ~ '+ U "- 125 , ::n ~ '" c ~ -0 ::n 120 L 0 MAXIMUM DENSITY/OPTIMUM MOISTURE 135 ....... r-.... ...... ...... to.... ...... ..... ..... ...... ...... ..... ....... to.... ...... ...... r-.. r-... L." ",. r"'" "" " ",. ....... I. i' " 130 115 110 11 12 13 14 t5 16 Water content, % Test specification: ASTM D 1557-91 Method A, Modified Oversize correction applied to final results Elev/ Depth 0-12 Classification Nat. Moist. PI % > No.4 Sp.G. LL USCS AASHTO 8M 11.7 % 2.85 TEST RESULTS ZAV for Sp.G.. 2.85 17 % < No. 2130 MATERIAL DESCRIPTION Maximum dr~ densit~ . 120.5 pcf Optimum moisture = 13.8 % DARK BROWN SANDY SILT Remarks: Project No.: 7844131.130 Project: PRES COMPANY Location: T-3 @ 0-12 Date: 10-11-213134 MAXIMUM DENSITY/OPTIMUM MOISTURE Fig. No. G~.3 Z$ ~ ~ , , " , , , , , , , , J , ~ ~ ~ ~ Particle Size Distribution Report .s .s.s 8 ~ ~ . . :. ~ ~ ~ I i ~ a i i " " e ~ i , ~ i Ii , : ..... , "- , ! I I I i , , '\ , : ili , , i I , i i , , , , , ! ! , , , , , ; , , , I ! ! , , , : , ; , i I , , , , : i , , ; , , , , ... ~ , , , , , , , , : , , 100.'>- , , , , , , , --+ , , , Ii I , , , ! i , , i f , i i ; , I I ; j , , i im , Ii i , , , , , i II , , , +--+ , , ' , i , , , ! I I i I , , Ii , , , ; , , i , , , , , , , , II , , ; , ! ! I , , ! It , , i I i , ! II , ! , : , , , : , ; ; ; , , , , II ! , I ,- i , I! , , , , , , Ii , , , , ! , , ! I , , , , , 11' ! , I I II: ! I , i I , , , , , , , , , II , , Ii , ! , , , il , ! , i ! , , , , i , Ii , , II , i , , I , , , , i , , II i , , i I , i i I I 1- , III , , i , , , T i , , , , , , , , , jI , i ! , i I ; i , i i i I i , i i II I I , II , Iii , I I , , I ! , , ; ; , ouu 100 10 1 0.1 0.01 0.001 100 90 80 70 et: W 60 Z u:: !z50 W (J et: W4Q Cl. 30 20 10 o GRAIN SIZE - mm % COBBLES '0 GRAVEL % SAND =1 % SILT :::J % ClAY I 0.0 3.0 34.6 62.4 SIEVE PERCENT SPEC.' PASS? Soli DescrlDtlon SIZE FINER PERCENT (XaNO) 3/4 in. 100.0 , 1/2 In. 99.1 3/8 in. 98.7 #4 97.0 Atterbera LImits #10 91.0 PL= LL= PI= #30 75.3 #50 67.4 Coefficients #100 63.9 #200 62.4 085= 1.21 !lao= 050= 030= 015= 010= Cu= Cc= Classification USCS= AASHTO= Remarks (110 specification provided) Sample No.: T-1 @ 0~2 LocatIon: Source of Sample: Date: 10/11/04 Elev./Dopth: 0-2 T.H.E. SOILS CO. Client PRES COMPANIES Project: Pro act No: 78440 1.00 Plate C-. 2-" , , , , , , , , , , , , , , , , , , , Particle Size Distribution Report ~ ..s .s.s . ~ ~ ~ I 8 i - ~ .s .s Ii ~ ~ II 0 " ~ - - i I I! ~ , Iii ! I , i , , i , ! , i i i , : ~ ! , , " , , II! : '" , i , , , II! , , , , , , ~ Iii Ii , , ~:J. , Iii Ii , , , I , Ii , , , II , , ; t: i , Ii , , , , , Ii , ! , , , , I II , , , , , , , , I , , , , , , , II , , i III i , , , ! ! i , i i , , II : r- II! ! I , I , , I I ! I , i i I i Iii , I r- I , I , , I Iii I i ! I ! , , , , , , I It: , , , , , 100 90 80 70 c:: W 60 Z IT: ~50 W Q c:: W40 a. 30 20 10 100 1 GRAIN SIZE - mm % SAND 26.2 0.1 0.01 0.001 I % COBBLES % GRAVEL 0.0 20.4 SIEVE PERCENT SPEC.' PASS? SIZE FINER PERCENT (XaNO) I in. 100.0 3/4 in. 97.9 1/2 in. 93.0 3/8 in. 89.0 #4 79.6 #10 70.1 #30 59.3 #50 55.3 #100 53.4 #200 53.4 ~ % SILT ::::J %CLAVI 53.4 . ~oll DescrlDtlon ~tterbera Umlts PI= PL= LL= Coefficients 085= 7.15 060= 0.660 050= 030= 015= 010= Cu= Cc= Classification USCS= AASHTO= Remarks (no specification provided) Sample No.: T-2@0-3 Loc:atIon: Source of Sample: Date: 10/11/04 ElevJDepth: 0-3 T .H.E. SOILS CO. Client PRES COMPANIES Project: Pro ect No: 78440 1.00 Plate C~5 '?O , , , , , , , ~ ~ ~ ~ , ~ I I , ~ ~ ~ ~ Particle Size Distribution Report . . . t! .s:.Ii .5..s: a 8 ~ S ~ .. y S ~ ; 0 ~ II i , N - - , , Ii ~ ; Ii i ! ; , , , i ; I I , , , ; , , , , , ; ! ; , , , , ! ; , ; ; ! ....'-. , , , i ! , ! , : i I , , , , , ; , , ; , , , i , , , ...... i ; , I , , I ; , , i I , , ; , , I , , ! I , , , ; ; ; , ! i , , , i i ; , i I , ; , i ; ; I i i I , II , , i , ; ; i i , , ....L-.J , , ; ; Ii , , , ! ' , 1 , ; ; , , : , ! i ; , Ii , , : , , i i i i ; ; , ; i , ; , ; I ; , ; , , ; , , ; , , I , I Ii I ; I , ; I ; ; , i ; , , , , , ; ; , , ; ; , , , , 11 i ; I ; ; ! i " : , ; , , , , Ii ; ; , -;- , , i , , i I I i I I ; , , , , I , , , , ; i , I : , , , i , , I , I Ii i i , i I I I Ii , , , ; , , I ; I , , I i , ; ! I , I i i i I : , ; , I , Ii ; I I ; , , , I , 100 90 80 70 a:: W80 Z u: ~ 50 ~ a:: W4Q Q. 30 20 10 % COBBLES 0.0 1 GRAIN SIZE - mm % SANO 21.1 0.1 0.01 0.001 % SILT =:J 66,0 % CLAY I % GRAVEL 12.9 ~ SIEVE SIZE 3/4 in. 1/2 in. 3/8 in. #4 #10 #30 #SO #100 #200 PERCENT FINER 100.0 97.0 93.8 87.1 78.9 70.8 , 69.4 66.7 66.0 SPEC.' PERCENT Soli Desc:r1Dtlon PASS? (X-NO) PL" Atterbera Umlts LL" PI" CoefficIents ~O" 050= 015" D10" Cc" Classmc:atlon AASHTO" 085" 3 .80 030" Cu" uses" Remarlls (no specificatioo provided) Sample No.: T.3 @ 0-12 Location: Source of Sample: Date: 10/11I04 ElevJOepth: 0-12 T.H.E. SOILS CO. Client PRES COMPANffiS Project: Pro act No: 784401.00 C.-6 Plate "f ~\ ~ ~ ~ , , , , " i' , , , , , , , , , , ,Particle Size Distribution Report . . .,~.'" .Iii Ji .. l::! S; o uail8iS 100 . ~ M - - - ; . . . i l l !~ III l ! , , , , , l , , , Iii , : , I i : , , i , , , , , , ...., , i , , , , I \ Ii , l , , , , , i " , , , , , I i I l , l , 11 l 1 , , Q~ , , i ! I 1 II , , , , , l , , , , l Iii I I , \ , , ! ! , l , , , i , \ , ! , , I , , , , , , , , , , l i ! Ii , , , i , Ii , , \ , , q , , , i \ , , , ! 1 , , , , , , , , , , 1 Ii , , , , , , , : 1 , , , , , , , , , , , L- , , ; i , I , i , i , , , , , : , , l , i i , , , , i , , , ! ! , ! \ i I , , i , i Ii , , , , , , , , , , , , , , , , , , , , , , I , I , , \ ! r , ! , I , , , , , I I , , , l , i , , , I , , , I l , , , , , , , , I i , I ! , : , , I , I , , , , , , l , , , l , , , , , i , i , , , II I , , i I ! i i ! i i , I , I I , ! , I , I I I , , I ! , , ,. i i I I I , I +-- , Ii 1 I I 1\ , , , ! I , , i i , , l i 1 I , I i I] I I I I I i , I I I I Ij I I i ] , , , , , , 90 80 70 0: w 60 Z u: ~ 50 W () 0: W 40 [l, 30 20 10 1 1 GRAIN SIZE - mm % SAND 19.3 0,1 0.01 0.001 % COBBLES 0.0 % GRAVEL 9.0 =:J % SILT ~ %CLAY I 71.7 . SIEVE SIZE 3/4 in. 1/2 in. 3/8 in. #4 #10 #30 #50 #100 #200 SPEC.' PERCENT Soli DescrlDtlon PASS? (XaNO) PERCENT FINER 100.0 97.S 95.6 91.0 84.2 76.1 73.3 71.9 71.7 Atterbero Limits PL= LL= PI= Coefficients 085= 2.21 Oeo= D5O= 030= 015= D10= Cu= CcO: uses= claS8m~olJ SHTO= Remarks <no specification provided) Sample No.: T-5 @0-15 Location: Source of Sample: Date: 10111/04 ElevJDepth: 0-15 T .H.E. SOILS CO. Client: PRES COMPANffiS Project: Pro act No: 784401.00 Plate {(;-7 ,?'l-- ~ , , , , , , , , ~ ~ ~ '~ ~ ~ ~ ~ ~ ~ SENT BY: GEOSOILS, INC.; 7609310915; OCT-20-04 11:55AM; PAGE 719 3,000 ....... ., 2.!iOO _._..n. .., - -- 2,000 .., -.-'-'-""'- -- l ri " ./ ffi I,eoo e: -.-.. .-.. ./ II> ;,.... ~ // ........ '" '" /' .... T~' 1,000 -- ._,.......__.__ __h'_.." ..... .... ,........ .-.---.. _'n,_'_"_'_ ....../ ./ 500 '~'..._-- ,../"/ / 0 1.000--".-'-" '--'.500 0 500 2,000 2,!iOO 3,000 NQRI,W, PRESSURE. psI - sample DepthIEI. Prim.ryIR.oid.... $'-r S-.... T"", ~ MC% C + .... ,- -..._---,._----- . - .-..--< "__'n ! . 1&U01T - 0.0 Primuy Shear Remolded 113,8 10.8 126 26 -.........-.. .. . _T- 0.0 Reskl~1 Shear Remolded 113.8 10.8 133 28 ---'.. ,.~"._~ 3 !l Nelle: SIll "pie Innundaled prior to -.g _.__.....~-_. GeoSoils, Inc. DIRECT SHEAR TEST .....--. es~ .. 5741 Palmer Way Project: The SoIls Co. Carlabad, CA 92008 ! Telephone: (760) 438-3155 Numbero 2498-A-SC Fax: (780) 931-0915 Date; 0ct0be.2004 Plate: A-3 C-8 . '!J?:? ~ , , , , , , , , , , , , ~ ~ ~ ~ ,~ ~ SENT BY: GEOSOILS, INC.; 7609310915; OCT-20-f)4 11:~tiAMj ""J.u.J~ ~/~ 3,000 "-',-- T -- 2.500 c-..,. ""u . . -- . '. 2,000 ._..h.... -- ~+-- ,.. i :r: l; ",,/ ~ "" ~ 1,500 '--""... "'--- ,.' ... ~' -~..... '" /.,.. '" // ili :J: '" ~~ 1.000 -...,-,- ._,. -,.,.,.-.,-. v/ , ",/ 500 ~"-' ~._. --. ,'-. ..-........ ---, ,/ //~ "" A'~ ," ,'" 0 .- ..-. .................. -.-..-- 0 500 1,000 1.600 2.000 2.600 3;000 IlIORMAL PRESSURE. psI . ""-. .-.... ,....... ~ Depth/EI. ........,~l SMo' ........ Type ~ MC% C + ""0' ., "..-. ! . 7I44OIT 0.0 Primary Shear llndlaturbed 110.7 13.8 119 77 -.-" .......- ...-- . 7_17 0,0 ReoiduaJ Shear UndisWrbed 110.7 13,8 106 27 .- ..m -, ..- E ..... T- ~ .- .... ___.n ~ i !ok*: Sa 1PIe Innundeled prior 10 testing I " .~... ", -" . ~ .... .-. GeoSoiIs, Inc. DIRECT SHEAR TEST I -- ... es~ .. 5741 patmerWay Project: The Solla Co. ! to- CartIlIad,.CA 92008 Number: 24l18-A-$C ~ Telephone: (760) 438-3155 F.x: (7eCl) 93Hl915 Date: October 2004 Plate: A-1 C-9 , ?J'.. ~' , , , , , , , , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1lil/22/2004 15;08 E.S. BABCOCK & 5UN~. ~ ~~lL~ 1'IU.OJl::J ","0 NElAPI0210tCA E'LAPlllS8 6'000..11 \/olley CDurt RI,oml.. CA 92507-0704 P,O. Bo' 432 RiV1lroGe, CA 92502-0432 PH (95') 1153-3351 FAX (95'1653,'~2 www.babcocklnbs.eom ~ ; -. . -,,.. Client Name T. H. E. Soils Co. Contact: ,John P. Frey Address: 41548 Eastmen Drive. Unit G Murrlel8. CA 92562 Report Data: 22-Ocl-2004 AnalytiClll Report: Page 6 of 9 Project Name: No Project Project Number; No PrOject Wall< Order Number. AW771 Received O~ 100 (Y IN): No romp: 'C San'lole DescriDtion 784401.00 Pres companies T -I @ 0-5 LaIlOI1IlOIV Rllf8rence Number A4J0771-D5 M!IlilI Samoled OatelTime Soil 10108/04 00:00 Received OslelTlme 10111104 1:12 Anilyte(e) Result RDL Units Method AnelvSls Dalt AnalYst Flag Saturaled Paste pH 4.9 0.1 pH Units S-l.10W's. 10118/04 15:23 Imm Redox plllentisl 270 1.0 mV SM 2580 10118/04 15:24 . Imm Saturated Extract Salurllled Re.iolillily 620 5 ohm-cm 5M 25209 10/1810415:28 imm Sulfide NEe NiA Water Elution 10/1810416:23 Imm Water Extract SlIIfete 49 10 ppm Ion CnromaL 10113104 19:07 CTHN-SAG, N.WEJ( ~o \~ .cco~~~ ," . o ".. ~ . u - u ~ .. ,. / ":/':; C-10 ~ ~ ~ ~ , , , , , ~ ~ ~ , , , , ~ ~ ~ H'l/22/2004 E.S. BABCOCK & SONS. . B94212~ ~w 1'tU.OJU 15:08 ~~ E.s. IIAICOCK '. ., .... . SONS. 'NC. E...,.. ... NEW 1021 01 CA EUlPI1156 8.00 Quail Wiley Coun Rive'...., CA 825Q700704 P,O, IlOx 432 RiWrsldo, CA 92502-D432 PH (95118$S-33S1 FAX (951165.'3-1662 www.babCock.lab6.com Client Name: T. H, e, Soils Co. Cootacl John P. Frey Address: 41548 Eastman Drive, UM G Murrleta. CA 92562 Report Date: 22.oct-20Q4 Analytk;aI Report: Page 5 01 9 Project Name No Project Project Number. No Project Work Order Number: A4J0771 Received on Ice (Y IN): No remp: .C LBboratorv ReflInlnC8 Number A4J0711.o4 SamDIe Descnclion 784401.00 Pres CompaniesT-3 @0-12 Matrix SOil Sampled Oate/Time 10108104 00:00 Received OatelTlme 10111104 7:12 Anatyte(a) Result RDL Units Method Anl1y8l1 Dale Analyst Flag $aturallld Pastil pH 4.2 0.1 pH UnMs S-1.10W,S. 101,llIIl415::!3 imll'l Redox Potential 330 1.0 mV SM 2580 10/18104 15:24 imm Saturated Extract Salurated FiesiSlilIiIy 760 5 ohm-cm SM 25208 ,0/18/04 15:26 imm SllIfide NEG N1A Weter Elution 10/18104 15:23 imm Water Extract Sulfale 150 10 ppm Ion Chroma! 10113104 18:57 CTHN-SAG. N-WEX ~(\ \" U.O~D. ,~ .(1 ~ .. ... .. " ~ .. ~ . .. '1jP 0-11 , , , , , , , , , ~ , .~ ~ , ~ , , , ~ T.H.E. Soils Co., Inc. APPENDIX D Standard Grading and Earthwork Specifications W.O. #784401.00 ,?l . ~ I~ ~ ~ ~ ~ ~ , , , , , , ~ , ~ ~ ~ ~ STANDARD GRADING AND EARTHWORK SPECIFICATIONS Th"", specificatioos pr<senl T .H.E. Soils Company. _dard recomJl1a1datioos foc grading and earthworlc, No deviatioo. from thec;e specifications should be pennitted tmless specifically superseded in the ge<<.edmil:al rq>ort of the project. or by written cooununication siWled by the Soils Consultant. Evaluations performed by the Soils Consultant during the oourse of grading may re:uh in subsequent recommendations which could supenede these specifications or the recormnendations of the geotechnical nvort. 1.0 GENERAL 1.1 The Soils Consulumt is the Qwner-'s or Developer's represent.stive 00 the projed For the purpose of these specifications, observations by the Soils Consultant include observations by the Soils Engineer. Soils Engineer. Engineering Geologi~ and ((hers employed by and respoosible to the Soils Consultant. 1.2 All clearing. site prq>aration, or earthwork perfomled on the project shall be (ooducted and directed by the C001rador WIder the allowance or supervision of the SQils Consultant 1.3 The Cootrador should be responsible for the safety of the project. and satisfad.ory ~ld.ion of all grading. During grading, the OJntrador shall remain accessible. 1.4 Priorto the commencement of grading, the Soils Consuhant shall be employed forthe purpose of providing field. laboratory, and office services for conformance with the recommendations of the geotedmical report and these specifications. h will be necessary that the Soils Consultant provide adequate testing and observations so that he may provide an opinion as to dd.ennine that the work was accomplished as specified. h shall be the respcnsibility of the Contractor to assist. the Soils Consultant and keep him apprir.ed of work. schedules and manges so that be may schedule his pe:sonne1aocordingly. 1.S h shall be the sole responsibility of the Contractor to provide adequate equipment and methods to ao:::omplish the work in accordance with applicable grading codes. agEnCY ordinances., these specifications, and the approved grading plans. ~ in the opinion of the Soils Consultant, unstrtisfactory conditions. such as questionable soil, poor moisture lXlfldition. inadequate compaction. adverse weathf'r, ac.. are resuhing in a quality ofworlc less than required in th"", specifications, the Soils Consultant will be _""" to rejea the worlc and reoommmd that ooostrudiOll be .opped until the oooditioos are redified. 1.6 h is the Contractors responsibility to provide safe access to the Soils Consuhanl for testing and/or grading observatioo purposes. This may require the excavation of test pits andlorthe relocation ofgradingequipmmt. 1.7 A final nvort shall be issued bylbe Soils Consultant attesting to the Conl""'or', cooformana:with these specificali,,,,,,, Z.O SITE PREPARATION 2,\ All vegttation and deleterious material shall be disposed of off-site. This removal shall be observed by the Soils Consultant and concluded prior to fill placement.. 2,2 Soil, alluviUlIl; or bedrock. materials determined by the Soils Consullant as being unsuitable for placemmt in compllcted fills shall be removed from the site or used in open areas as dd.cnnined by the Soils Consultant Any tt:l81trial inoorporated as a part of a compacted fill must be approved by the Soils Consuhant prior to fill plac:emmt. 2.3 AftcI"the ground surfaceto receive fill has been cleared, it shan be scarified, disced and/or bladed by the CootractOI" until it is uniform and free from ruts, hollaw~ h1lllllllOd<s. oc <XlIer unev'" features whidt may prevent uniform oompadioo. The scarified ground surface shall then be brought to optimum. moisture, mixed as required, and compaded as specified If the scarified zone is grcaterthan twelve indus in depth. the eKOeSS mall be removed and placed in lifts 001. to exceed six inches or less. Prior to placing fill, the grotmd sunareto receive fill shall be observed, tested. and approved by the Soils Ccosultanl 2.4 Any under-ground structures or cavities sum as cesspools, cisterns. mining shafls, tunnels, septic tanks. wells, pipe lines, or others are to be removed or treated in a mannCl' presaibed by the Soils Coosultant. 2_5 In cul-fill transitioo Ids and where c:ullots are partially in soil, colluvium. or lJDWeuthen:d bedrock m&terials, in ordeI" to provide uniform bearing conditions, the bedrock portioo of the l<:t eJdmding a minimum of S feet outside of building lines shall be overexcavated a minimwn of 3 fed and replaced with compacted fill. Greater overexcavatioo could be required as detcnnined by Soils Ccosuhant. TypiCll1 details are lttad1ed. 3.0 COMPACTED FILLS 3.\ Material to be placed as fill Iban be ftec of organic IDlIttCI' and <diCl' deldcrious suOOtaoOC5, and shall be approved by the Soils Consultant. Soils 01 poor wadstion. cxpmsion" or 1lrati1h chuad.cristia: 1Ih.ll be placed in areas desi@'1l8l.ed by Soils Coosuharrt. or mall be mixed with dhCl' soils to serve as aatisfactory fill mataial, as dircded by the Soils Consuhant. 1ft> ~ , , , , , , , , , , , , , , , , , ~ Standard Grading and Earthwork Specifications Page 2 3,2 Rock fragmmts less than six inches in diamder may be utilized in the filL provided: They are net placed or nested in ooocmtnrted pockets. There is a sufficient amount of approved soil to surround the: rocks. The distribution of rocks is supervised by the Soils Cmsuhant. 3,3 Rodes great.erthan twelve inches in diamd.<< man betak.m off-5ite, orplaoed in acoordance with the reomunmdations oCthe Soils Consuhant in areas desil91ated as suitable for rock disposal. (A typiCllI daail for ~ock Dispost I is aUached.) 3.4 Material that is spongy, subject to decay, or otherwise OJIlsidered unsuitable shall nc( be used in the compacted fill. 3.5 Represartative samples of materials to be utilized as compacted fill shall be analyzed by the laboratory oCthe Soils Consultant to dd.ermine their physical properties. If any msteriat otherthan that previously ~ is encounte:ed during grading. the appropriate analysis of this material shall be c::onduded by the Soils Consultant before being approved as fill material. 3.6 Material used in the compacting process shall be evenly spread, wata-ed, processed, and compacted in thin lifts not to exceed six inches in thickness to obtain a Wliformly dense layer. The fill shall be placed and compacted on a horiz.ontal plane, W11ess otherwise approved by the Soils Consuhant. 3,7 If the moisture oootmt or relative oompaction varies from that required by die Soils Consultant. the Corrtrac1ol shalt rework the fill lUrtil it is approved by the Soils Coosultmrt. 3,8 Each layer shalt be oompaded to at least 90 percent of the maximum density in compliance with the testing mdhod specified by the controlling governmental agency or ASTM 1557w70, whichever applies. If compaction to a 1esserperoentage is authorized by the CCJOtr">)lling govemmeo1.a1 agency because of a specific land use or expansive soil ooodition., the area to receive fill compacted to less than 90 perocnt shall either be delineated on the grading plan md/or appropriate reffl'((loe made to the area in the geotedmical rq>ort. , 3.9 Ail fiUs shall be keyed and benched through all topsoil, colluvium, al1uvium, or aeep material. into sound bedrock or firm material where the slope receiving fill exceeds II ratio offive horizontal to one vertical or in acrordance with the rocommendations of the Soils Consultant. 3.10 The keyfor side bill fills sbaU bea minimum width ofl5 fea within bedrod< or firm materials, unless <<II<<wise specified in the geotcdmical "Port. (Seeddailallached.) 3.11 Subdrainage devices shall be consln1ded in compliance with the ordinances of1he cootrolling govemmentalagency, or with the recommendations of the Soils Consultant.. (Typical Canyon Subdrain dd.ails are attached.) 3.12 The cmtrador will be required to obtain a minimum relative ClJIq)adion of at le:u;t 90 percent out to the fmish slope face of fill slopes, buttresses, and stabilizatioo fi1ls.. This may be achieved by either over building the slope and cutting baclc. to the ClJIq)aded oore. or by direct. ~adion of the slope fa.. with suitable equipma1t, or by any <<II... prooedure. wbich produoes the required oompadim approved by the Soils Coosultant. 3.13 All fill slopes should be planted or proteded from a"OSioo by other methods specified in the Soils rqlort. 3.14 Fill..over..a.l1 slopes shall be properly keyed through topsoil. colluvium or aeep rnuterial into rode or fum materials, and the transition shall be stripped orall soil priortoplacing fiU. (See attadJ.edddail) 4.0 CUT SWPES 4,1 The Soils Consuhant shall insped a11 cut slopes at vertical intervals exceeding five feet. 4.2 If any conditions ncA. anticipated in the ged.edmical report such as perched water, seepage. lenticular or confined strata of a potentially adverse nature. unfavorably inclined bedding. joints or fauk planes enoount.acd during grading, these conditioos shall be analyzed by the Soils Consultant., and 1~d8tions shan be madeto mitigat.ethese problems. (fypical details for stabiliutioo. ora portion ofa.cut slope are attached.) 4,3 Cut slopes that face in the same direction as the prevailing drainage shall be ploted:ed from slope wash by a non-erodible interceptor swale placed lit thetop 9fthe slope. 4.4 Unless otherwise specified in the geot.cdtnical rqxxt, no cut slopes maD be excavated higher or steeper than that allowed by the ordinances of controlling govemmeotal agencies. 4.5 Drainage terraces mall be constructed in compliance with the ordinances of controlling governmental agencies, or with the recommendations ofthf Soils Coosuhant. 1A ~ ~ ~ ~ , , , , , , , , , , , , , , - Standard Grading and Earthwork SpecifiClrtions Page 3 5.0 TRENCH BACKFILLS 5.1 Trmdt excavation shall be inspededpriorto strudureplae:emmt for~bcttom. 5.2 Trendl excavatioru; for utility pipes shall be backfilled under the supervision of the Soils Consuhmt. 5.3 After the utility pipe has beut laid, the space undtt and arowld the pipe shall be badcfilled with clean sand or approved granular soil to a depth of at least ooefOlX overthelop of the pipe. The sand badcfdJ shall be wrifonnly jd1ed into place before the controlled ba~ is placed over the sand. 5.4 The m-sit.e maUrials. or l:ther soils approved by the Soils Consultant, man be watered and mixed, as necessary, prior to placcnent in lifts over the sand backfill. 5.5 The control1ed backfill shall be compaded to at least. 90 percent ofthema>cimum laboratory density, as determined by the ASTM D1557-70 or the controlling governmental agency. 5.6 Field density tesl.s and insped.ion of the backfill proc.edurcs shan be made by the Soils Coosuhaot during baddilling to see that proper moisture content and uniform compactLm is being maintained. The contractor shan provide tf9. holes and exploratory pits as required by the Soils Consult.a:nt to enable sampling and testing. 6.0 GRADING CONTROL 6.1 Inspection of the fdl placement shan be provided by the Soils Consultant during the progress of grading. 6.2 In gaunl., dmsitytcsts mould be made at. intervals not exceeding two fed. offill heiWrt or every 500 OJbic yri offill placed.. This aiteria.will vary dqxndingon soil conditions and the size of the job. In any everrt., an adequstenumbcr offield deosityte!itS man be made to verifY that the required oompadion is being adlleved. 6.3 Density tests mould also be made on the native surface material to receive fill, tlS required by the Soils Consulta:aL 6.4 All clean...out, prooessed ground to received fill. key excavations, subdrains, and rode disposals should be inspected and approved by the Soils Coo.suJtant priOl'" to placing any fill h shall be the Contractor's responsibility to nctify the Soils Consultant wlun such areas will be ready for impe<1ioo. 7.0 CONSTRUCfION CONSIDERATIONS 7.1 Erosion control measures, when necessary, shall be provided by the Contra(1Of during grading and prior to tIlt: completion and ocosuud.ion of permanent. drainage controls. 7.2 Upon oomplet.ion of grading and terminatioo. of inspections by the Soils Coo.m1haat,. no. further filling or excavating. including that necessary for footin~ fO\Uldatioos. large tree weDs. n:tainingwaUs. or other features shall bepetformed without the approval oftbe Soils Consultant. 7.3 Care shan be takm by the Contractor during fmal grading to preserve any bc:nm, drainage terraces. intercqrt.or swales, Of other devices of permanent nature on or adjacent to the property. P(J I ~ lJ ,~ '0 i'C ,[ , ,-: , i~ , [. , [" , [, 'l '1 , I; '1 , , , , ~ SIDE HILL CUT PAD DETAIL -- NATURAL", ..-"- GROUND :;.--- ..- --..- ..- - - .....- /..", ...".....,., " ./ UNWEATHERED BEDROCK OR , r- MATERIAL. APPROVED BY ~ r THE GEOTECHNICAL CONSULTANT SUB DRAIN AND KEY WIDTH REQUIREMENTS DETERMINED BASED ON EXPOSED SUBSURFACE CONDITIONS AND THICKNESS OF OVERBURDEN A.\ ~ , , , , , , , , , , , , I I ROCK DISPOSAL DETAIL FINISH GRADE - ---1 --=-::'=::==::'=::=~===:~=-=--=======::'=::i::==~c~-M-P~~E-D-?=-~ _-_-::::::-=~-=-::::_=-~jQ'J1i~:.. ::::-=-=-=--:='-_-...:' - - =---:::~-:: ____ ________~---_- FILL.----__ _-_-======~=~=~-==-~===;=;=;=~ii;====~=;~;~~~~E=~~=-=-~~~ --------I--U----------U -:=0:- --==============~D;::~=====S===::E===[=::'=::=-l~===~======~=~n=~=~~3E=~=-=~-:-- ------~-- ----.-:..1:- -- ----- -------.:-2:;-::::.---- --------=- t--- --=-=-------=------ -:...-------:.- _ 7~. --....-_-~-------- -_-_--=.=c...~ -_-_-=~_::_:-=-- :-=--=---- --10 MIN .---------------------1E ~-- ------ ..;.. ------------ I - --:.------ ----- _--------:z'-------------4 MIN. --- -I c, MIN - ---.::...-:- :...---------=-==-::::- =-=-I-=--fn--- --=-=-=-=-=-=-=-=-=--------- -_-_-:::-_-=...:_~-_-_-_..:_=-E_:---- ----=--- -------- ~------- :...=-=-=-=-=-=~-=-::7_-_-=-= =-=-=-=-=-=-=-=-_ _ ~=j-=~-=-~:::-=~===::'=::~-:---;-- ~=====E:a=~3f=:~=:=:=:=3=====:===:::f=S=:=:=:=-~===- -=-=--...:~- -- :=----------------C~~~~~6Z~;---- ~ ~ SLOPE FACE '- GRANULAR SOIL' - To 1m voids, densified by f loodi og ...... . --..;;::::::::: .- ~ ~ ~ ~ ~ PROFILE ALONG WINDROW ]'....:.... ..... '. .' :::' . '.- ..... "'Yo'\\ 1\1/ ~ , , , , , , , , ~- ~ ~ ~ ~ ~ ~ ~ ~ ~ TRANSITION LOT DETAILS CUT-FILL LOT NATURAL GROUND t .- -- .- -- -- ---"...~ --"'.....- __-.-- ~ 5' L __ -- -- __ -- -- I MIN. r-- , :Ce)MPACffo =: FILL :...-----:...---:.;;:-::~?,\~':::-:::~- -:::.::::::-:::---:--F------:...---:.:-~l 36" MIN. -- ------::---.:....--::c.-=:----:-f'\""\~_-_J::_- --:..~-- -- - - -- --;; -\~- .-----------~---..-~l\r.-~- ^' "l ,<. -r. --:~===~:::=~~~~~\~~s~~~-:::-=-= OVEHEXCAVATE AND RECOMPACT -...?:::""_~--:.:-.;-..:\J~~-:...- ","/A --'-.....o--J<;. ---.....,.- ---"'~ .------- -..:.t\~ - ---=--~ ------ , , .UNWEATHERED BEDROCK OR J ,--- MATERIAL APPROVED BY --1 1 THE GEOTECHNICAL CONSULTANT CUT LOT - - --- - --- - NATURAL GROUND 1- --. -- - -- NOTE: Deeper overexcovation and recomooction sholl be performed if determined -0 be necesscry by the geotechniCOI consultont.. A?? ~ ~ ~ , , , , , , , , , ~ , , , ~ , ~ SLOPE BUTTRESS OR REPLACEMENT FILL DETAIL C,~f~.-1 l' ~ _.L._______, .c:.: -:::-...::... -:... --.c: -- - ~==.:Ej:;= F1L~ BLANf ~:=:=~:~~ 30" MIN. .~----:...-:...-:...-:...-_- BACK CUT --..:-:.:.:...=::-=-=-=--:::--::- /-'-- I: I OR FLA HE _ _-=-=..:::-=-::::-=-:::-: - BENCHING ------:.2%--:---:...---:...- ---~-~7SUBORAIN _-::::~4::=i====~~~=~~~-V / SEE ALTERNATES A <: --=-:=::~~:~:~t:~~:~:~:"~ /:::,.", --=--:::====~~=========]-=~==-::::-=-::t.:V J ft. J/I,. '\ Dc:.!5pE_ly....~' I': -----:...-------------------/-_-.-:...---~ - T-CONNECTiON..... ..:: ~""'IN II ..;5;--:-_-_-_-_-_-:.2%_-_-:.:r...:---~.J~ f": .:1..0.... . ". " 5 . .'. '. ;:z: ;w,""J'HN. - ':'-'-'--::: " ' :.A //LJJI:J>- -- --7- 't-'- .....--------:2a...--M-::-------------- .:"o-u~\,.-e1P\PE. \VII t ---____ ,0" In.._____-:? . " , I, PERFORA TED ?!F5 4,'" N.IN. , 4"tlMJN. EauIP"':Ni~~. ~~~I~ Y IS ra' ! OUTLET PIPES 4" ~ I'Jonperforated Pipe, 100' Max. a.c. Horizontally, 30' Max. O.c. Vertically ~ I 2'MIN. AL TERNA TE A TEMPOAARY FILL LEVEL 8" MIN. O'IEPLA? .POSITlVE Si;AL\. 'd SHOULD ae ~\ l!l" MIN. PROVloeo J;I GRA.VEL OR AT THE JOiNT "~* ~ (.APPRO. VEa 5% MrN # ~ C1. ,- : 5:!JurJAL:~lT ': . -""1.;;, "to .~~".. . OUTLET ,..~-:. oI~' PIPE~,..- MIRA;I '''0 FIL TE:1: FABRIC OR APPROVED EQUIVALENT '" ',' - - RECOMPACTEa FILL .tiLl, - -- ~'}\IN;'SELECT SEaalNG BACKFilL 'OM"'1. NONPEilFORATED / PIP; / DETAIL A-A' AL TERNA TE 8 . NOTES: . Fill blanket,back cut, key width and key depth ore subject to field change, per report/plans. . Key. .heel subdrain, blanket drain, or vertical drain may be required at the discretion of the geotechnical consultant. . SUBORAIN INST ALLA TION - Subdrain pipe sholl be installed with perforations down or, at locations designated by the geotechnical consultant, shall be nonperforated pipe. . SUBORAIN TYPE - Subdrain type sholl be ASTM 02751, SOR 23.5 or ASTM 01527, Schedule 40 Acrylonlbile Butadiene Styrene (ABS) or ASTM 03034 SOR 23.5 or ASTM 01785, Schedule 40 Polyvinyl Chloride Plastic FILTER MATERIAL: Filter material shall be Closs 2 permeable material per State of Colifomia . Standard Specifications, or approvedalterno.te. Class 2 grading as follows: PERCENT PASSING SIEVE SIZE 100 90-100 40-100 25-40 18-33 5-IS 0.7 0-3 I" 3/4" 3/8" No.4 No.8 No. 30 No. SO No. 200 M . . _. .~. .-.--.. ~ , , , , , , , , , , , , , , , ~ ~ '~ BENCH I NG OETAI LS ~~-c~;~~==~=i==-- ..-<:---------~-== I -""-:--------- --::::-_-_-:...-------F.LL ------- ------------------ ------------------ --- --=-=:-:::-=-=-=~ ~-::=-=~-=~-:;:: = -=~==-~ , .. __-_-_-::-_-_~_-__:....-_~_=_-~""::"::_-_.::_-c:::'- ~... _ -------- --=--~---.-~---l ----------~c-------;------:ll '^'^' PROJEf'T"'-, P! ^N!= ------------------"."""'- '-" _L _J-I.l _ ---------~.----~--~-- I to I moximum from toe :_-_-_-_-_-_"7-z:...------"7- ---;-- -,.1 _-_-_-:_-_--~-_-_-:.:;.::.r--- # ot "ope to cpproved ground -----2:7----"------- '\ _-_-:-:::-::;-::?-:---:-:::~?-r=- t - - ;;';y~ REMOVE _-....-2-=-:.-------;...?:::"----~ UN~;UITA8LE -_------ ~- "AT"'RI^L ~_______......... '^. -'\ If I _.,.... -------..-- ~ I .--- _____~-:---- 4' MIN. , -r---"....------ .J BENCH _/-__"....-------- B"'NCH' -L ,r--..---------- I - . HEIGHT _-=:::-::-~2%MTN.:::-=-=- (typical) VARIES -----=,;;;,---- T ^' . 2' MNI 15' MIN. I KEY h-OWEST BENCH "1 DEPTH (KEY) FiLL SLOPE NATURAL GROUND \ ----7/0.,,' ~ - ------------ _-: COMPACTED ;-:-::::-:;::::.:- ---------lFILl =---:.;:-:.:----~ .__=_=_:_=_=_=_:'~~_~_::;:_-2": _~;~=?k====~=::=~=-:~=Z=~-=:- __.__~_____.."J'_ ----~:::::--_---------~------ ( REMOVE. NATURALz-::---:::::;-,:-::?:..g" ^,' UNSUITABLE GROUND ...., ::.?'----.:---------~ I MATERIAL \ _ ~ -. _-:-:::-,,;;,--c--' r-4' MIN: _ --.......--- . BENC~ __ __ - -- ~c~fMiN.~- ,(typical)l __ J -- - __..-..... --.-. ~151 MIN.~ ..- __ -- I LOWEST BENCH I FILL OVER CUT SLOPE BENCH HEIGl;H VARIES -- CUT FACE TQ be constructed prior to fill placement -- -- NOTES: LOWEST BENCH: Depth and width subject to field change based C~ consultant's inspection. S~!:DRAI1JAGE:, e~~+ .:~~:.,~ mer be required at the jiscret.an ar the geotechnical consultant. A-5 ~ ~ ~ ,~ .~ ~ ~ , , , , , , , , - , I I - - CANYON SUBDRAIN DETAil ~~ NATURAL GROUND REMOVE _- _. _, ___ ~_- UNSUITABLE "'-s=':>:~:::~~:~~:~:fz~:;;=;~~i;~-;,~~:i:~~~=~{f" M?E"'AL -::s:--~----------- ._.--~ ~ BENCHING ---UU-~~~~ff~~~~i~-~---- =-.- -- - - --,.;z: -_-_~.s::=~~.::: _-SU8DRAIN TRE,NCH SEE Al TERNftTES ASB SUB DRAIN Perfora ted Pipe Surrounded Wi t h Al TERNATE A: Filter Material ---....... FILTER Mt0"ERIAL: - Filter material sholl be Class 2 permeable mCTerial per Slate or California Standard Specifications, or approved alternate. Class 2 grading os follows: ____ FILTER MATERIAL 3 9 ft. 1ft. COVER . 6" MIN. -.---/ 100 ~O-ICO 40-100 25-40 18-33 5-15 0-7 0-3 .' ....'\. . .' .. ;r,"F .'_" :'4".4-.:-';: SIEVE SIZE PERCENT PASSING I" 3/4" 3/8" No.4 No.8 No. 30 No. 50 No. 200 BEDDING Alternate A-1 4" MIN. Alternate A-2 PERFORATED PIPE 6" flMIN. < SUBDRAIN ALTERNATE B: 1 1/2" Gravel Wrapped in Filter Fabric NOTE: In addition to the wrapped gravel, outlet portion of the subdrain should be' equipped with a minimum of 10 feet long perforated pipe con- nected to a nonperforated pipe having a minimum af 5 feet in length inside the wrapped grave I. Alternate B-1 I y," MIN. GRAVEL OR APPROVED EOUWALENT 9 ft. 31ft. B-2 ./ . SUBDRAlN INST ALLA TlON - Subdrain pipe sholl be installed with perforations down ar. at locations designated by the geotechnical consultan1, shall be nonperforoted pipe. . SUBORAIN TYPE - Subdrain type shaff be ASTM 02751, SOR 23.5 or ASTM 01527, Schedule 40 Acrylonitrile Butadiene Styrene (ABS) or ASTM 03034 SOR 23.5 or ASTM 01785, Schedule 40 A,(p Polyvinal ChloridePlaslic (PVC) pipe or approved equivalanl.