HomeMy WebLinkAboutTract Map 3883 Lot 319 Final Compacted Fill & Foundation
B&FSOILS
PREUMINARY SOILS 1NVEST1GA1l0N 8: COMPACTION TESTING
PERCOlATION REPORlS
INK f/C:.<icD
31174R1VmroNLANE-Tl:MECUlA.CA92591
PHONE 19(9)699-1 499
RECEIVED
APR 0 6 Z004
CITY OF TEMECULA
ENGINEERING DEPARTMENT
FINAL REPORT OF COMPACTED FILL
AND FOlJNDA TION RECOMMENDATIONS
A large, single-family residential building pad area, including driveway
and parking area, located at Calle Fiesta, Meadowview Community,
Temecula, CA
Legal Description:
Lot 319 of Tract No. 3883;
A.P.N.919-210-008
Site Location:
Calle Fiesta
Temecu1a, CA 92591
Ownerl Applicant:
Kurt Eddy
3784 Mission Avenue
PMV 344
Oceanside, CA 92054
760757-0103
Job No. CF04-107
February 20, 2004
\
TABLE OF CONTENTS
INTRODUCTION....................................................................................................1
GENERAL SITE PREPARATION .......................................................................1
GENERAL EXCAVATION AND GRADING PROCEDURES.........................2
GENERAL LABORATORY TESTING ...............................................................2
Expansion Test Results................................................................................3
Settlement Criteria.......................................................................................3
FIELD COMPACTION TESTING .......................................................................3
Relative Compaction Test ResuIts..............................................................4
RECOMMENDATIONS AND ADDITIONAL SOIL CRITERIA ....................4
Grading and Compaction Conclusions ......................................................4
Approved Allowable Soil Bearing Values..................................................5
Foundation Recommendations ...................................................................6
Utility Trenches ............................................................................................6
Subgrade for Driveway and Parking .........................................................6
Suggested Pavement Design ........................................................................6
Soluble Sulfate Content ...............................................................................7
CLOSURE ................................................................................................................ 7
UNIFIED SOIL CLASSIFICATION SYSTEM...................................................8
MAXIMUM DENSITY CURVE ............................................................................9
KEYING-BENCHING DETAIL............................................................................I0
PLANS..........................................................................................................Enclosed
B&FSOILS
1-
Job No. CF04-107
February 20, 2004
Page I
FINAL REPORT OF COMPACTED FILl.
AND FOlJNDA TION RECOMMEND A TIONS
A large, single-family residential building pad area, including driveway
and parking area, located at Calle Fiesta, Meadowview Community,
Temecula, CA
Site Location:
Lot 319 of Tract No. 3883;
A.P.N.919-21O-008
Calle Fiesta
Temecula, CA 92591
Kurt Eddy
Legal Description:
Ownerl Applicant:
INTRODUCTION
At the request of owner, Kurt Eddy, B & F Soils has provided all the field
supervision and compaction testing of all fill soil emplacements, and all the required
laboratory analysis necessary to control all of the grading operations. This soils
engineering work has been conducted in complete accordance with currently accepted
engineering techniques as set forth by the V.B.C., (Appendix, Chapter 33).
GENERAL SITE PREPARATION
The complete project area involved in the grading operations was stripped of all
vegetation and all other materials which could not be used in the construction of the
compacted fills.
A keyway slot was excavated into natural bedrock formation along the toe ofthe
major fill slope area.
The existing native fill soils were thoroughly processed and premixed to optimum
moisture prior to emplacement as compacted fill.
B&FSOILS
~
Job No. CF04-107
February 20, 2004
Page 2
GENERAL EXCAVATION AND GRADING PROCEDURES
The grading equipment used included a D-4 Cat and a 3000-gallon water truck,
which was used both for wheel rolling and for soil moisture.
The fill soils were thoroughly pre-mixed to optimum moisture and processed
during the overexcavation operation and were emplaced in 6-inch to 8-inch lifts with
continuous wheel and track rolling.
The resulting structural fills tested to 90% or better throughout the complete
overexcavated building pad area.
All the grading operations and compaction testing were completed in compliance
with the Uniform Building Code, (Appendix Chapter 33).
GENERAL LABORATORY TESTING
Maximum density determinations were made on the typical structural fill soils, as
accepted by the Uniform Building Code and the County of Riverside grading ordinances.
The maximum density determinations were made in accordance with A.S.T.M. D1557-
70T, modified to use 25 blows on each of five layers with a 1O-pound hammer falling 18
inches in a mold of 1/30 cubic foot volume.
Soil Type 1: Tan-brown coarse to fine sand and silt with some clay; SM and SC
according to U.S.C.S.; Maximum Density 130.2 p.c.f. @ 7.5% Optimum
Moisture.
The results of the expansion tests performed on the remolded samples ofthe
typical backfill soils are as follows. The samples were compacted to over 90% relative
compaction and set up to be equal to 50% saturation, and then measured to full 1 00%
B&FSOILS
it
Job No. CF04-107
February 20, 2004
Page 3
saturation after a period of several days and until no further expansion occurred in a
24-hour period in accordance with Table 29-C of the Uniform Building Code.
Expansion Test Results
Soil Type
Confining Load
Expansion Index
% Expansion
1
144 p.s.f.
15
1.5
The typical fill soils involved in the grading process are essentially non-expansive
and as such will not require any special foundation design.
Settlement Criteria
The total settlement calculated to occur over the proposed project will be less than
1/2 inch and the differential settlement total will be 1/4 inch.
FIELD COMPACTION TESTING
The results of relative compaction testing throughout the building pad area were
in all instances at least 90% of the maximum soil density values obtained for Soil Type
A, based on the results oftesting methods (Drive Cylinder Method D2937-71 and/or Sand
Cone Method Dl556-64).
(See Page 4.)
B&FSOILS
5"
Job No. CF04-107 February 20, 2004 Page 4
Relative Compaction Test Results
Test Date Soil Elev. Dry Dens. Field Maximum
No. Type (ft.) p.c.f. Moist. Density--%
S-l 1/27 1 1202 121.6 5.1 93
S-2 1/27 1 1202 118.9 4.0 91
S-3 1/27 1 1202 124.4 5.0 95
S-4 1/27 1 1203 126.3 4.4 97
S-5 1/28 1 1202 120.0 4.8 92
S-6 1/28 1 1203 117.3 5.6 90
S-7 1/28 1 1203 116.7 6.6 90
S-8 1/28 1 1204 119.7 5.1 91
S-9 1/28 1 1204 121.3 5.2 93
S-1O 1/29 1 1204 123.5 6.1 95
S-l1 1/29 1 1204 120.0 4.9 92
S-12 1/29 1 1204 123.5 5.9 95
8-13 1/30 1 1204 117.8 6.3 90
* S-14 1/30 1 1204 128.8 7.5 99
* S-15 1/30 1 1204 127.6 7.8 98
*Sand Volume Tests
RECOMMENDATIONS AND ADDITIONAL SOIL CRITERIA
Grading and Compaction Conclusions
The fill soils used in the grading operations consisted of tan-brown coarse to fine
sand and silt with some clay. These fill soils were thoroughly processed and pre-mixed to
optimum moisture and were then emplaced in thin lifts and wheelrolled in multiple
directions until the required 90% relative compaction test results were attained.
The overexcavation area involved most of the building pad area (See Grading
Plan), and extended to a minimum of 4 feet below the existing grade. The exposed
subgrade consisted of granitic bedrock formation, which was very tight and well
compacted.
B&FSOILS
<t>
Job No. CF04-107
February 20, 2004
Page 5
The premixed fill soils were recompacted in place in minimum 6-inch to 8-inch
lifts under constant wheel and track rolling until relative compaction test results of 90%
or better were attained.
All grading operations were completed in accordance with the Uniform Building
Code, (Appendix, Chapter 33).
Approved Allowable Soil Bearing Values
The results oflaboratory analysis and direct shear testing, utilizing a controlled
rate of strain .050 inch per minute under varying normal loads, has produced test results
indicating an angle of internal friction of 30 with 100 p.s.f. available cohesion.
Utilizing the Terzaghi Bearing Capacity Equation with a factor of safety of 3.0,
the following calculations have been determined:
Sq.uare or Continuous Footings
q = CNc + wDfNq + wBNw
= 100(23) + 100(1.0)18 + 100(0.5)14
2300 + 1800 + 700
= 4800 p.s.f. (ultimate)
qa = 1600 p.s.f. (allowable for square or continuous footings 12" wide
and 12" deep);
qa = 1900 p.s.f. (allowable for square or continuous footings 12" wide
and 18" deep);
qa = 2100 p.s.f. (allowable for square or continuous footings 18" wide
and 18" deep);
qa = 2300 p.s.f. (allowable for square or continuous footings 24" wide
and 18" deep).
NOTE:
Allowable soil bearing pressures may be increased by a factor of one-third
when considering momentary wind and seismic loadings which are not
considered to act simultaneously and is in accordance with the Uniform
Building Code.
B&FSOILS
1,
Job No. CF04-107
February 20, 2004
Page 6
Foundation Recommendations
All of the footing trenches should be excavated into well compacted,
non-expansive equigranular soils. For adequate support we recommend that all
single-story structures have a minimum 12-inch deep footing and all two-story structures
have at least an 18-inch deep footing. All continuous bearing footings should be
reinforced with not less than one #4 steel bar in the top and one #4 steel bar in the
bottom. We also strongly recommend that a field inspection of the footing trenches be
made prior to concrete emplacement.
Utility Trenches
All plumbing, utility and other trenches beneath the concrete slab should be
properly restored to minimum 90% compaction value comparable to the remaining
building pad.
Subgrade for Driveway and Parking
Care should be taken to properly backfill and compact any utility trenches
involved in subgrade areas that will be subsequently paved. This can be accomplished by
moistening the native soils and wheelrolling or mechanically tamping them so that the
utility trench and surrounding subgrade has approximately the same compaction, which
should be 90% or better.
Suggested Pavement Design
All of the earth materials on the site are high maximum density with excellent
bearing values, and R-values would fall in the approximate 60 range, which is excellent
support for vehicular wheel loads. If concrete surfacing is desired, a 4-inch thick concrete
B&FSOILS
B
Job No. CF04-107
February 20, 2004
Page 7
driveway could be placed directly on the compacted subgrade where the top 6 inches is
95% compaction.
If asphaltic concrete is utilized, then we would recommend that a minimum
thickness of 3 inches of A.C. be placed over 4 inches of Class II rock base, which is
compacted to minimum 95%. Asphaltic concrete could be placed directly on the
subgrade, which should be compacted to a minimum 95% also.
Soluble Sulfate Content
Numerous sulfate content laboratory test results indicate consistently low soluble
sulfate content in decomposed granitic-type soils and thus requiring standard strength
concrete (2500 p.s.i.).
CLOSURE
All the soils engineering work, including the field inspections, supervision and
laboratory analysis, and all the grading and compaction operations have been undertaken
in complete compliance with and according to the Uniform Building Code and all city
and other local codes and requirements.
We appreciate this opportunity to be of service and remain available to answer
any questions or provide any additional information.
Respectfully submitted,
Peter H. Buchanan,
Soils Consultant
andolph F. Fleming,
R.C.E. 45687
~~>-
~.". ....... f\. - .'. f"'\., "
. "\ ,I l....., ,
/ . ' .
'('" :--'
.; ,<.~....v . l ;~. ~~". _
:/...:..//~...)~)' '.~-"'.' ,
,<" -->. "-"." " t -)_ \
I -:; :'.:~ .
1/ CeJ 1:< ., .;'
':----' f,'q C C:'-'" / "\ -i"
II ~_ \ E~:P/2.~ ;/~:, ~.J ,;
II).. ~ ~'-I:
~ I~'
\~l'~> ~ CIVI' ~f/
., ''/'' ,. -' ~ - ",,-:.
"/P -- ,,"'"
'c,.:;; Or CI\L\\ ':'>
~_." .____.... .4
"
B & F SOILS
a~
B&FSOILS
\
~s NC:c~~4";'1t)7
.BHSoILS' .o,Q're: ~/ZO/o4-
p.6
MAJOR DIVISIONS
CLEAN
GRAVELS
(Llhle .. ,. ,..... )
GR~VELS
,...,.."..~,_.
t:OD'N hticI....,
UIIlG(A "*' 1M
.... .. I'''' ......
GR.VEI.:S
WITH FINES
. f'""...... .....,.
iI 'INtI
COARSE
'''GRAINED
SOILS.
. ,ew.. ... to, _
............. L.&ItGta
"*" No. 200 ......
..../
Cl.LAN SANDS
CLift'. .. .. ,... l
:I~~:i:'
':::}fi SW
..;:j~
. ~...' r
,SANDS
..... ..... "" .,
~.. It.,.. "
S.,.AlL(Il tflM....
...... I",," ..n' .
, SANDS
WITH FINES
(A.....-.:..... ......
., '....1
SI,LTS AND CLAYS
(l.eH,I_,t LUJ I~.'O)
FINE
"G'IlA'INEO
SOILS
,...... .... 50......
_,.... .. StoMu.D'I
.,..... ,.. 200.......
..", .
SILTS 'AND CLAYS
4l...... 1.._ "'UT(",~ SO)
HIGHLY ORGA,!,C SOILS
TYPICAL NAMES
.... ........ .,........ ,. ....- WI4I ""'I""'".
lin" .. .. ....... .
.....t, ......." .,.....,..., . ,.....,...,., ....".....
I,,", .. .. r....
,;ny, ....... .....,.....~.... ""........
. 0.,., .......~. ....,..,.....--... ...........
.... ....... ........ "...."'.~. ifni. .
.. ,....
SP
. ~,........ __ .. ,.......,., ...... hn'"
. .. r....
SM
StHy ........ .......... .n"'-.
sc
t..,.., -.II, --"ClIrJ -M'.''':'.
ML
....,... "'h ..., ~ ,.... ....... f"IO ,......
.11."., ...... ... ...,... . c~ ..ltt
~",I"t"'l ~ha".: .
~oC"~........ ....--'! ......CIf'.
.....", ~. .....-y ct.", ...ty a.,., .....
''-''0
,0.
01.
o-,..c ...~ ~ ~ ...., c.IerI .. ....
. ......ttry
MH
l-....lC "",, ","n"'-,". tII-..c_.
'....~ ., .~., ",.1". e:'"'"C "'".
CH
~~C c-.,.. .f "'.... ".,hCt",.'" c..,s.
OH
~'C mY' _ ......""'" .. "'.... .;.thel', .
. ""","C ,.n"
Pt ..... "h~ ~""IJ .......,UC ~tt.
IOVHOAiIlT. ClASS"'C.'IO)lls: S..... .."..t1"'cf'!oH~l..i'hn .,.... ......... .... .ft..,........ .,
.~..,I..... ef p-r- ........',
, '
I
P A' R TIC L 'E
S
Z E
'AND
GIlI....eL
SILT 011. CLAY
'...
1Cl.200 .:1.0 M)..IO~"
V.,...t1.'....D....O 't(y!
UNIFIED
SOIL
CLASSIFICATION
SYSTEM
...,,,,...ct .
r,. ~.loH s., (I....',ntl~ s,......... c..o." .,
(....".....,. U 5 A""T hcI,"'IOCitl .........O"~ No ).)57
\oOtl I, wnl'l."!3 1'-"1'IIH1 .."'. 'HOI
L I M ITS
coeelU
100'-0[111$
--
).;
'tll
IIJ-.J
\<5>
BSrFSOR.S
oJ"lSA.KJ: cFo9"-/t:)7
047'6': ,2/2&:>/.o?
p.9
-
PflEUMIIWl\"SOlI.s lNVESI'I<M'I'Ja aCOMPACTION1ESJ1NG
. . PERcoI.AnoNREP\..nlo
31174 RIYEIm:>>N LANE..1'EIIE:caA.-CA 92591
Pl-QE: C9OQ) 69&1499
SOILS ENGINEERING DATA
" . Typical fill Materials.
lOCATION
80ring No.
Depth, in lte'-/.S'
-
MAXIMUM DENSITY CURVE
N.ois ture . Content in Per Cent of Dry Weight
130
SOIL CLASSIfICATION
i
'"
"
:a
::I
U
125
""
.,f
'"
"
c 115
l.
IJ\
~~
'"
\~
\
120
c
.-
>-
-
.-
..
.c
.!
\
METHOD Of COMPACTION
ASTM S'onclord Test Method O~I.5.
110
105
>-
o 100
... Dio_,., -'d; 1130 cw. It \'01_
5 10"" 75 blew. pe, Io-,e,. .
10 Ib !.O_ dtoPPtcl " whe.
o
OPTIMUM MOISTUU CONTENT, In '" C,nl 01 Dry W,ight
MAXIMUM DIY DENSITY. In Pounds 'It Cubic Foot
~5
4/'),;2.
..
\\