DATUM GEOTECHNICAL CONSULTANTS, INC.
III! 1ft! /k; I
COMPACTION TEST REPORT
FOR THE PROPOSED
PRE-MANUFACTURED DWELLING
UNIT AND GARAGE LOCATED AT
31850 CALLE SARA GOZA
CITY OF TEMECULA, CALIFORNIA
JOB NO. 2301-CI-03
JANUARY 17,2003
PREPARED FOR:
MRS. SANDY FRINK
31850 CALLE SARA GOZA
CITY OF TEMECULA, CA
(909)461-0902
I RECEIVED .
~JAN 2 2 Z003
CITY OF TEMECUlA
ENGINEERING DEPARTMENT
27304 NUEVO ROAD,PERRIS,CA 92571. (909)928-1991,FAX (909) 928-1991
\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
JOB NO.:2301-C1- 03
DATE:JANUARY 17 ,03
CLIENT:
MRS. SANDY FRINK
31850 CALLE SARA GOZA
TEMECULA, CALIFORNIA.
SUBJECT:
Compaction test report for the proposed pre-
manufactured dwelling unit and garage located at
31850 Calle Sara Goza, City of Temecula,
California.
REFERENCES:
1)
A plot plan for the subject site prepared by
Sake Engineers, Inc.
DEAR MRS. FRINK
At your request, this office has provided grading observations
and performed compaction and maximum density testing during the
grading operations of the subject site. The grading operations
consisted of overexcavations to depths of 3 feet below original
existing grades in the proposed building and garage areas as
discussed during our pre-construction meeting with project
contractor and City of Temecula project inspectors.
1 of 5
z,.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PROPOSED DEVELOPMENT
A pre-manufactured
approximately 27'by 63'
subject lot.
single-family dwelling measuring
and a car garage are proposed for the
SCOPE OF WORK
Our scope of work was to perform grading observation, compaction
and maximum density testing during the grading operations of the
subject project on part time basis.
DATES OF OBSERVATION AND TESTING
Grading observations, sampling and maximum density testing were
performed on call basis and on part time basis during January
13,14 and 15, 2003.
GRADING EQUIPMENT
The grading work was performed using the following equipment:
1) 580 case backhoe
2) 450 H track wheel dozer
3) Water hose
The above-mentioned grading equipment were used for excavating,
over excavating, mixing, watering and to achieve the minimum
required relative compaction.
2 of 5
2/
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
GRADING AND FILL OPERATIONS
A pre-construction meeting was held on January 7, 2003 on the
job site with property owners, project contractor and City of
Temecula inspectors and grading issues for the subject property
were discussed. Property owners indicated that the property was
graded 10 years ago and that there is no need for re-grading,
however, no compaction test reports were available and property
did not appear to have been graded as per the grading codes,
slopes around the proposed dwelling were observed to be rough
graded at an inclination of roughly 2:1 (horizontal to vertical)
and did not appear to have been precisely graded therefore an
agreement was reached to do minimum grading in the proposed
building and garage areas prior to issuing a building permit.
The proposed building area and the proposed garage area were
overexcavated to a depth of 3 feet below original existing grade
and the bottom foot was processed mixed with water and was
recompacted to minimum relative density of 90% prior to
backfilling. The overexcavation extended at least 5 feet around
the proposed buildings perimeters. The backfill was placed in
thin 8-inch lifts and was mixed with water and was compacted to
minimum relative densities of 90%. The finished grade of
dwelling and garage areas also indicated minimum relative
densi ty of 90%. This office does not assume any responsibility
for soils conditions below 3 feet depth measured from finished
grades nor the stability of surrounding slopes or any area on
the lot that was not a part of the grading work performed on the
subject property. The overexcavated soils consisted of brown
medium to coarse sands low to medium in relative densities and
with low moisture content, therefore the bottom 12 inches of the
overexcavation was processed, moisture conditioned and was
recompacted to 90% prior to backfilling. Exterior footings for
the proposed dwelling were excavated to a depth of 15 inches in
width and 18 inches in depth and were observed to extend in
competent backfill soils, and are proposed to be reinforced with
one number 4 rebar at the top and one at the bottom of exterior
footings. Proposed size and reinforcement of dwelling footings
appears to be adequate based on the granular nature of the soils
encountered during overexcavation and backfilling. The garage
footings were not excavated and were not observed by this office
at the time of this report preparation, therefore, we strongly
recommend that garage footings be inspected by city inspector
prior to reinforcing with steel or pouring of concrete. The
upper 12 inches of proposed concrete drive way shall be
scarified mixed with water and recompacted to a minimum of 90%
relative compaction prior to concrete pouring. This office must
be notified prior to grading of driveways otherwise will not be
responsible for the subject work. No other areas other than the
proposed building and garage areas were graded at this time and
therefore, any proposed future buildings or driveways must be
graded under the supervision of a geotechnical consultant.
3 OF 5
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I
FIELD DENSITY TESTING
In-place density tests were performed in accordance with the
sand cone method ASTM D 1556-64 (74) and or the nuclear gauge
test method. The maximum density of the fill and backfill soils
was determined in accordance with ASTM D 1557-91.
CONCLUSIONS AND RECOMMENDATIONS
. The proposed dwelling and garage areas were overexcavated
to a minimum depth of 3 feet below original existing grade
and the bottom 12 inches were scarified, mixed with water
and was recompacted to a minimum of 90% relative compaction
prior to backfilling.
. The backfill soils consisted of Brown medium to coarse
sands, which were placed in thin 8-inch lifts and were
compacted to 90% relative compaction.
. The finished grades of dwelling and garage areas indicated
minimum relative compaction of 90%.
. Other areas on the lot including surrounding slopes were
not graded and therefore no other future structures shall
be built anywhere else on the lot prior to proper grading
of proposed future areas.
. The proposed 15 inch wide, 18 inch deep perimeter footings
proposed to be reinforced with one No. 4 rebar at the top
and at the bottom of footings were observed to extend into
competent backfill soils and appears to be adequate based
on the types of soils encountered during grading.
.
The upper 12 inches of
processed, mixed with water
relative compaction prior to
proposed driveways shall be
and shall be compacted to 90%
paving with concrete.
. Should any of the above-mentioned recommendations not be
requested or performed by a representative of this office,
this office will not be responsible for the subject work.
4 of 5
-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CLOSURE
Our findings and conclusions have
accepted engineering practices. No
implied nor made.
been based on generally
further warranties are
This opportunity to be of service is appreciated; should you
have any questions regarding this report, please contact this
office.
Respectfully,
DATUM GEOTECHNICAL CONSULTANTS, INC.
'!.SW\6 ,,~\\. L
Ismail A. Hadi, P.E.
Principal Engineer
./~~
. f\i'A :~~!!1(~,
. .~.. Ii"". (~
'. \,- '0 "\~'.
.....-l r (~\,'
~ ~ :2.\
, . 4'"'2'1 ,m,
...:: No. J't' ;Jl'l
(i:. ~ Exp. 12! ;;/06 I:"
"~~~~-<,~~'~
~OF." \..:;
=::-:.. \..r._ -
Attachments:
Appendix A:
Maximum Density Test Results and
Summary of Field Density Test Results.
Appendix B:
plot Plan
5 of 5
Cp
I
I
I
I
I
I
I
I
I
I
I
I
II
I I
I
I
I
I
I
I
APPENDIX A
MAXIMUM DENSITY AND SUMMARY
OF FIELD DENSITY TEST RESULTS
'\
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
MAXIMUM DENSITY TEST RESULTS
Soil
Description
Maximum
Density
Optimum
Moisture
Soil
Type
A)
Brown medium to coarse sands
130.0
11.0
Maximum density and Optimum Moisture were determined in accordance with ASTM
D 1557-78, Five layers, 25 Blows, 18"Drop with 10 Lbs. Hammer.
A-1
<0
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SUMMARY OF FIELD DENSITY TESTS
TEST TEST COMMENTS DRY DENSITY MOISTURE%
NO DATE TEST LOCATION TYP AND R.C.
TEST ELV FIELD MAX. FIELD OPT
1 01-13 Bottom of dwelling A -3' 119.6 130.0 10.6 11. 0 92
2 01-21 Bottom of dwelling A -3' 119.5 130.0 10.9 11. 0 92
3 01-21 Bottom of garage A -3' 120.8 130.0 11. 6 11.0 93
4 01-21 Bottom of garage A -3' 119.5 130.0 11. 3 11.0 92
5 01-21 Dwelling backfill A -1' 120.7 130.0 11.2 11.0 93
6 01-22 Dwelling backfill A -1' 120.8 130.0 11. 7 11.0 93
7 01-22 Garage backfill A -1' 119.5 130.0 11.1 11.0 92
8 01-23 Garage backfill A -1 ' 120.6 130.0 11. 0 11.0 93
9 01-23 Dwelling F.grade A F.G 122.3 130.0 11. 5 11.0 94
10 01-24 Dwelling F.grade A F.G 122.4 130.0 11. 5 11.0 94
11 01-24 Garage F.grade A F.G 119.7 130.0 11. 3 ll.O 92
12 01-25 Garage F.grade A F.G 120.8 130.0 11. 0 11.0 93
I
Density tests were performed utilizing the sand cone method ASTM D 1556(74)
Or the Nuclear Gauge Method. Maximum density and Optimum Moisture were
Determined in accordance with ASTM D 1557-78, five layers, 25 Blows, 18"
Drop with 10 Lbs. Hammer.
<\
A-2
I
I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
APPENDIX B
PLOT PLAN
\0
.......
,~.
C1( ~~.-
51531 AilS N30
0l3L:l.:lO NOllV)Ol 'XOeJ ddl;f .
09:l 'V'l'o' <;um' I I 1:0/91/10 '6MP'd::Jd\ll^'J\~UU-,98<;Nr\spaloJd\)j8 spaloJd a~us\p."nJcI-a~os\JOlsq':','
?