Loading...
HomeMy WebLinkAboutTract Map 9833-3 Lot 25 Soil Report --." DUCO ENGINEERING, INC. SOIL & GEOLOGIC INVESTIGATIONS All CONTROL - SOIL TESTING 20938 CURRIER RD. - WALNUT, CA 91789 . (909) 594-7414 . FAX (909) 594-3853 REPORT OF SOILS INVESTIGATION PROPOSED PRIVATE RESIDENCE LOT 25, TRACT 9833-3 EL FARO PLACE TEMECULA, CALIFORNIA FOR: Mr. and Mrs. Sean Browning 28234 Corte Malbino Temecula, CA 92592 May 24, 1999 Job No.: 99-25 \ Page One May 24, 1999 Job No.: 99-25 Introduction This report presents the results of a geotechnical investigation for a residential parcel of land to be developed in the City of Temecu1a, California. Figure No. 1 presents a plot plan of the site showing the soils data and surface features deemed pertinent to this report. The object of this investigation was to gather information and test data regarding the surface and subsurface soils conditions existing on the site upon which to base our recommendations for the safe and economical site preparation, grading and construction of the proposed structure. The results of our field and laboratory investigations, which form the basis of our recommendations, are included as a part of this report. Site Conditions The subject site occupies approximately 2.66 acres of an irregularly shaped parcel of property located at the western end ofEI Faro Place in the City of Temecula, California. Topographically, the site is characterized by a gentle to moderately sloping, south trending ridge, which has been altered by previous grading to create a level pad along the ridge crest. Fairly uniform (1.5: I to 2: I) natural slopes descend to the east and west. The overall relief is approximately thirty-six (36) feet on the west and fifty-six (56) feet on the east. The existing natural slope gradients on the site vary from nearly level on the graded pad area to as steep as 1. 5: I locally on the flanks of the ridge. Current site drainage is by sheettlow toward the east to EI Faro Place and to the west into a south flowing drainage course. Surface vegetation currently consists of moderate to locally heavy assemblages of native and volunteer weeds, grasses and shrubs on the undisturbed area of the lot and a light to locally heavy assemblage of weeds and grasses on the cut pad area.. The soils encountered in the test holes consisted of soft to fairly firm topsoils composed of clayey silts and silty clays varying between three (3) and four (4) feet in thickness, overlying dense to very dense silty to clayey, coarse to medium sands with scattered grave~ silty fine to very fine sands and coarse to fine sandy silts of the Pauba Formation. 2.- Page Two May 24, 1999 Job No.: 99-25 No ground water or appreciable caving of the side walls were encountered during the excavation of the test holes to the depths explored. ProDoSed DeveloDment The subject parcel is proposed to be developed by conventional cut and fill grading procedures to construct an access drive from EI Faro Place and to create a building pad suitable for the construction of a single family residential structure with raised foundations, a barn, tennis court and a future swimming pool. Fill soils will be generated by lowering the existing pad grade as needed and the cutting of a 2: I to 3: 1 slope on the east flank of the ridge. The majority of the fill will be placed to construct the driveway and tennis court. The structure will be constructed on natural ground. No grading will take place on the west slope of the property. Field Investil!ation The subsurface soils conditions were explored by excavating seven (7) engineering test holes to depths of six (6) to seven (7) feet with a backhoe using an eighteen (18) inch wide bucket. The approximate location of each test hole is shown on Figure No. 1. Relatively undisturbed samples and disturbed, bulk samples of the typical soils encountered in the test holes were obtained to be subjected to laboratory testing and analysis. A continuous log of each test hole was kept in the field at the time of excavation. These test hole logs, reflecting the condition and classification of each soil strata encountered, based on the Unified System of Soil Classification, as devised by A. Casagrande, are presented as a part of this report as Figure Nos. 2 through 8. Laboratory Investil!ation In-situ moisture and density tests were performed on the undisturbed samples and the results of these tests are shown on the appropriate test hole logs at the depths sampled. Also shown are results of calculations made to determine the relative compaction of the samples compared to the maximum density determined in accordance with ASTM test method D1557-94T. The expansion potential of the onsite soils was determined in accordance with the UBC test standard 18-2. The results of the laboratory tests performed on the typical bulk soil samples are summarized as follows: -3 - Page Three May 24,1999 Job No.: 99-25 Soil TVDe Maximum Densitv Ootimum Moisture EXDansion Index A-Clayey silty crse. to med. sand 130.6 ocf. 8.0% 15 B-Silty crse. to med. sand 129.3 ocf. 8.0"10 15 C-Silty very fine sand 118.5 ocf. 12.3% 65 D-Silty fine to med. sand 119.9ocf. 11.3% - E-Crse. to finesandy silt 121.9ocf 10.5% - F-Slightly clayey med. to crse. sand 129.4 pef. 7.8% 21 Direct shear tests were performed on selected samples of the undisturbed soils. The samples were tested in a state of saturation in order to duplicate extreme field moisture conditions. The results of these tests, showing peak and ultimate values are shown graphically on Figure Nos. 9 and 10. The results of consolidation tests, indicating the load-settlement characteristics of the typical subsurface soils are shown on the Consolidation Test Reports, presented as Figure Nos. 11 throug\114. Conclusions and Recommendations Development of the site, as proposed, is considered to be feasible from a geotechnical engineering standpoint, based on the implementation and incorporation of the recommendations which follow into the site preparation, grading, design and site development. The preliminary results of the geotechnical investigation indicate that the site may be developed by conventional grading procedures. The eighteen (18) foot high 2: 1 to 3: 1 cut slopes in the area proposed will result in a stable slope condition. General recommendations for site grading are as follows: Site PreDaration and Gradinl! Prior to any grading, all existing surface vegetation, including brush and shrubs, not to remain, shall be stripped and hauled off site to the satisfaction of the geotechnical engineer. ~ Page Four May 24,1999 Job No.: 99-25 The resulting cavities shall be cleaned of roots and loose soils, processed as specified by the geotechnical engineer, and brought to grade with compacted fill if not entirely removed in a proposed cut or removal area. Any fill soils encountered within the proposed grading area shall be removed to expose the underlying natural ground, as determined by the geotechnical engineer. These materials may be incorporated into the compacted fill, when cleaned of any decomposable substances. Prior to the placing of any fill soils, the existing topsoils shall be removed to a minimum depth of two (2) feet to expose the underlying approved natural ground. On slopes steeper than 5: 1 a minimum fifteen (15) foot wide by two (2) foot deep shear key (measured into approved ground on the downslope side) shall be excavated at the toe of slopes. The shear key shall be approved by the geotechnical engineer prior to filling. If any retaining walls are to be constructed prior to starting a fill slope, the excavation should be brought to the original ground elevation with compacted fill and the wall footings shall be excavated into the compacted fill. All retaining walls shall be allowed to cure properly prior to surcharging with fill. As the compacted fill placement progresses upslope, all topsoils shall be removed to expose the underlying, competent natural ground and adequately sized, horizontal benches shall be excavated into the bedrock to receive the compacted fill. Prior to placing any compacted fiR the exposed surface of the approved natural ground shall be thoroughly scarified to a depth of six (6) inches, moisture conditioned as necessary and shall be precompacted to the minimum requirement specified herein. The fill soils shall be spread in six (6) to eight (8) inch thick, loose lifts, watered or dried back as necessary to provide near optimum moisture content and shall be compacted to a minimum of 90% of the maximum density determined in accordance with ASTM test method Dl557-94T. The cut portion of the tennis court shall be undercut and recompacted to a depth of three (3) feet. As the fill slopes progress upwards the surface shall be backrolled at maximum four (4) foot vertical intervals using a sheepsfoot roller and the finished slope surface shall either be grid or track rolled to provide 90% compaction to the slope surface or the slope shall be overfilled sufficiently to allow for trimming back to expose the compacted inner core. -5 Page Five May 24,1999 Job No.: 99-25 The estimated subsidence anticipated to occur during the processing of the natural ground to accept fill will be on the order of 0.1 foot. The anticipated shrinkage in soils volume expected to occur during the removal and recompaction of the topsoils and bedrock will be on the order of 10"10 to 1 5% for the topsoils and 0% to 5% for the bedrock. The actual shrinkage will depend on the average degree of compacted obtained. Any imported fill soils required to be brought to the site for use as structural fill shall be approved in advance, of importation by the geotechnical engineer. Foundation Recommendations The recommended soil bearing value for continuous and square footings a minimum of fifteen (15) inches in width and embedded a minimum depth of eighteen (18) inches below the lowest adjacent ground surface shall be 2000 psf. and 2250 psf. respectively. This value may be increased by 20% for each additional foot in depth and/or width to a maximum value of 3000 psf. Lateral value may be computed at 250 psf. per foot of depth to a maximum value of 3000 psf. The anticipated maximum settlement for foundations designed in accordance with the foregoing recommendations, is on the order of 0.40 inch with maximum differential settlement on the order of 0.20 inch. Exoansive Soils Recommendations The expansion potential of the existing onsite topsoils and bedrock is are considered to be low to moderate. It is assumed that the topsoils and bedrock materials will be blended during grading and will be similarly expansive. The recommended remedial construction measures required to minimize the affects of this condition are shown on Figure No. 15. A final determination of the expansion potential should be made upon the completion of grading. Additional reinforcement of the foundations and any floor slabs should be made in consideration of structural strength requirements of the structural engineer. ~ Page Six May 24,1999 Job No.: 99-25 Soil Corrosivitv Study Laboratory tests were conducted on the near surface soils to determine if these soils may have deleterious effects on underground utilities and concrete floors and slabs. The results of these tests are as follows: Soluble Sulfate per CA. 417 Bor. #1 90 Bor. #4 100 Soluble Chloride per CA.422 54 64 Minimum Resistivity per CA. 643 2774 ohm-cm 14160hm-cm pH 6.8 6.6 Based on the results of the above tests, the onsite soils are considered to be moderately corrosive. It is recommended that all metal pipes should be wrapped with poly-sleeves or other appropriate materials. As an added precaution the metal pipes in trenches should be backfilled with clean sand. Type I or II cement may be used in concrete poured in direct contact with onsite soils. Site Drainal!e Recommendations All surface runoff shall be conducted away from the top of the slopes onto approved drainage devices. The residence shall have roof gutters to collect runoff and conduct it to approved, non-erodable drainage areas. Retaininl! Wall Recommendations When properly drained and backfilled, any proposed retaining walls shall be designed for the following equivalent fluid pressures: Slope of Retained Surface Recommended Equivalent Fluid Pressure Level Surcharge 35ocf. 3: 1 Surface Gradient 38 ocf. 2: 1 Surface Gradient 45ocf. All retaining walls shall be provided with adequate weep holes or subdrains to preclude the build-up of hydrostatic pressure. 1 ~ Page Seven May 24, 1999 Job No.: 99-25 Backdrains shall consist of a four (4) inch diameter, perforated pipe, with perforations down. The pipe shall be surrounded by twelve (12) inches of'!. inch gravel wrapped in an approved filter fabric to minimize the infiltration of soil particles. The drains shall be graded to flow to a suitable outlet or controlled disposal system which will not result in erosion or saturation of the slope surface. A coefficient of friction of 0.35 may be used between the concrete poured in direct contact with the compacted fill or bedrock. It is the opinion of this firm that once the site has been satisfactorily graded in accordance with the recommendation contained in this report, the site will be free from the hazard of landslide, settlement or slippage and will not adversely affect the geologic stability of the adjacent properties. The recommendations contained in this report are based on the results of our field and laboratory investigations, combined with the principles of modern soil mechanics and sound engineering judgment. Should any unusual conditions or should drastic design changes be contemplated, this firm shall be notified immediately in order that proper modification to the recommendations contained herein may be made as deemed necessary. If you have any questions with regard to this report or the recommendations contained herein, please contact this office. Respectfully submitted, DUCO ENGINEERING, INC. h2J1~ Ronald Cobine Approved by: f> 'b w " " ~ ;" . z '" ~ .; ;; - i I / i \ '--- / .~ d.t>/ .r j ~ .: ; . '" .. ; ~ ~ . . . . . . ~ t '<; ;, , . . / ~ I -~ ." -- -.-.. .- ~- ,-/ /--------. ---. ._~.--" ! ,~ <? " .' ,,0':' '. ...... ", ". "-- .,------ -'_. ----- --" -----_.=~~~=-=._---- __.__..__..m. =, J'?i?':".6J/v .1/ JJut' I; ,. ., . ~, \ ,. r" 1. It \ 1. 1.11 " j ~.. ,I i I ~.1 . .. i 1 01 ! ., \ '01 \. Z~ \! ;t...... ~...:>,~}.-.;o -t. ....., .' -.... ci~~jl I: , , , ~i 1. II . " "~ P 8~ .@ 1 ,. , ~ ....._;t;. " -->1[' ~--" , ~. ~ o <: '\ j.l,..;....-.! ;~~ I J.-4 Tl"_ ,. ...l........!~ -,...",.. ..........".f/' , ' ..~- -; Z.o .:J0' ---1V :d : .-'J > -j , ~? ; ~ ~ ~ p , , ~ .. .. Z a: o .. ::; .. tJ !5 3 ~ . o .. li a: w ir a: 6 I LL Obi Z 3 2 2: t- e t- o III 0'" ..J t- ~ ~l 'R '01- "il'"6 "O"""z -- 0 w "'zo: ..Jill:::> .. '" 00- Ul ., LL CJ Z - a: w w Z - CJ Z w o o ::>> c KEY TO SYMBOLS Symbol Description Strata symbols II mI ItIm ~ - - [l1l1lli [S] l2lJ ~ Poorly graded clayey silty sand Silty sand and gravel Clayey sand Silt Silty sand Poorly graded sand Clayey gravel Soil Samplers . California sampler Notes: 1. Exploratory test holes were excavated on April 21, 1999 using a conventional rubber-tired backhoe wim an 18 inch wide bucket. All test holes were immediately backfilled upon me completion of me logging and sampling. 2. No free water was encountered at me time of excavation. 3. Test hole locations were extrapolated from existing features and me elevations extrapolated from an assumed datum elevation. 4. These logs are subject to me limitations, conclusions, and recommendations in this report. 5. Results of tests conducted on samples recovered are reported on me logs. \0 SOIL EXPLORATION LOG PROJECT: Browning Residence - EI Faro, Temecula JOB NO.: 99--25 CUENT: Sean Browning LOCATION: See Figure No.1 LOGGED BY: RDC EXCAVATING EQUIPMENT: DEPTH TO WATER: None Encountered CAVING: TEST HOLE NO.: I DATE: 4-21-99 ELEVATION: 1172.0 Backhoe None Encountered SUMMARY OF SUBSURFACE CONDITIONS: This log is part of the report prepared by Duco Engineering, Inc. for this project and should be read together with the report. This summary applies only to the location of the test hole at the time of the excavation. Subsurface conditions may differ at other locations and may change at this location with the I oassae:e of time. The data Dresented is a simolification of the actual conditions encountered. SAMPLE DATA '" on u ~~ ~z ~.... ~~ u ~3 z": 3~ DESCRIPTION 0,. w~ ~ UJ.!l on "'" o. "/j 0- ;:i 00 ,.Ii "'u <:> -'~ ~:1 u ~o ~" 0 SM-SC Clayey Silty Coarse to Medium Sand - brown to light brown - top 12' loose A then firm - damp to moist - scattered 30 gravel 5.6 107.5 82.3 - 5 G"-~I Silty Coarse to Medium Sand with Gravel - 18 B - tan brown - firm - moist 8.4 112.1 86.7 Bottom of Test Hole 10 15 20 25 30 DUCO ENGINEERING, INC. FIGURE NO.: 2 \\. SOIL EXPLORATION LOG PROJECT: Brownin~ Residence - EI Faro, Temecula JOB NO.: 99--25 CUENT: Sean Brownin~ LOCATION: See Figure No.1 LOGGED BY: RDC EXCAVATING EQUIPMENT: DEPTH TO WATER: None Encountered CAVING: TEST HOLE NO.: 2 DATE: 4-21-99 ELEVATION: 1214.0 Backhoe None Encountered SUMMARY OF SUBSURFACE CONDITIONS: This log is part of the report prepared by Duco Engineering, Inc. for this project and should be read together with the report. This summary applies only to the location of the test hole at the time of the ~~cavation. Subsurface conditions may differ at other locations and may change at this location with the passave of time. The data "resented is a simnlification of the actual conditions encountered. SAMPLE DATA ~~ '" vi ~ ~~ ;l:"" die :1:" ffili OZ u "'0 DESCRIPTION o~ ~ ",.:l ....;:0 g~ .; ;:;.... ~~ 0; ..~ Q- 0>0 ;i 00 ~!,! 0 u " -'~ :5:S u !!l0 ~.. 0 I Clayey Coarse to Medium Sand - sc brown to light brown - top 12" soft then fairly dense - damp to moist . i scattered gravel - A .//. 30 I;> 5.4 111.6 85.5 5 GM-SM ':a Silty Coarse to Medium Sand with scattered Gravel - tan brown - firm - .. moist .. - .. .. R : : 10 .. : 9.3 108.2 83.7 - .~ 10 Bottom of Test Hole 15 20 25 30 DUCO ENGINEERING, INC. FIGURE NO.: 3 \z.. SOIL EXPLORATION LOG PROJECT: Brownin2 Residence - EI Faro, Temecula JOB NO.: 99--25 CLIENT: Sean Browning LOCATION: See Fi2U1'e No.1 LOGGED BY: RDC EXCAVATING EQUIPMENT: DEPTH TO WATER: None Encountered CAVING: TEST HOLE NO.: 3 DATE: 4-21.99 ELEVATION: 1182.0 Backhoe None Encountered SUMMARY OF SUBSURFACE CONDITIONS: This log is part of the report prepared by Ouce Engineering, Inc. for this project and should be read together with the report. This summary applies only to the location of the test hole at the time of the excavation. Subsurface conditions may differ at other locations and may change at this locatIon with the I passage of time. The data presented is a simolification of the actual conditions encountered. SAMPLE DATA '" .; u ~~ i5p ~f-< oJ'" U @" ~~ ,,-v OZ ~~ "-0 DESCRIPTION 0,. ~ ",oI! oJ::> .; ;::ioJ "" 0, .." Q- 0>0 ::i 00 ,.Ii 0 u " -'~ ~j u ,"0 ~.. 0 SC . .. .. . Clayey Coarse to Medium Sand - V// 1/.// brown to light brown - top 12" soft 1/.// then dense. damp to moist - - V// scattered gravel 25 A ~: 6.8 109.7 84.0 - "Z ..... . 5 Bottom of Test Hole 10 15 20 25 30 DUCO ENGINEERING, INC. FIGURE NO.: 4 ~ SOIL EXPLORATION LOG PROJECT: Browning Residence - EI Faro. Temecula JOB NO.: 99--25 CUENT: Sean Browning LOCATION: See Figure No. I LOGGED BY: RDC EXCAVATING EQUIPMENT: DEPTH TO WATER: None Encountered CAVING: TEST HOLE NO.: 4 DATE: 4.21-99 ELEVATION: 1210.0 Backhoe None Encountered SUMMARY OF SUBSURFACE CONDITIONS: This log is part of the report prepared by Duco Engineering, Inc. for this project and should be read together with the report. This summary applies only to the location of the test hole at the time of the c::xcavation. Subsurface conditions may differ at other locations and may change at this location with the oassall'e of time. The data oresented is a simnlification oime actual conditions encountered. -- SAMPLE DATA E~ '" .; u ~~ ~.... =If u ~" ffiu: OZ 3 DESCRIPTION o~ ~ "'~ ,.J;:> 0>- .; "'~ o. ..'" 0- ",0 "'.... :i 00 ~\! 8 u " -'~ ~~ ",0 ~.. 0 ML Silty Very Fine Sand - yellow tan top 12" fractured then very dense - - C damp - 32 8.4 108.9 9\.9 5 6" thick coarse sand lense @ 5.5' depth I--- D SM .. 25 Silty Fine to Medium Sand. tan grey - 22.8 102.4 85.4 I--- dense - damp .. scattered coarse sand lenses 10 SP : Coarse to Medium Sand - grey and tan - .. .- .- dense - damp 15 Bottom of Test Hole 20 25 30 DUCO ENGINEERING, INC. FIGURE NO.: 5 P\ SOIL EXPLORATION LOG TEST HOLE NO.; 5 DATE: 4-21-99 ELEVATION: 1229.0 Backhoe None Encountered PROJECT: Brownin~ Residence - EI Faro, Temecula JOB NO.: 99--25 CLIENT: Sean Brownin2 LOCATION: See Figure No.1 LOGGED BY: RDC EXCAVATING EQUIPMENT: DEPTH TO WATER: None Encountered CAVING: SUMMARY OF SUBSURFACE CONDITIONS: This log is part of the report prepared by Duco Engineering, Inc. for this project and should be read together with the report. This summary applies only LO the location of the test hole at the time of the excavation. Subsurface conditions may differ at other locations and may change at this location with the I nassal!e of time. The data oresented is a simolification of the actual conditions encountered. SAMPLE DATA ~1l '" ..; u ~~ ~... dOl U OJ" ffili OZ Sl~ ~3 DESCRIPTION 0,. ~ ",.e ",,::> ..; ~'" 0; ..~ ",- ",0 ~ 00 ,.~ 0 u " ~~ g;1 " wO ii:.. 0 SC .. ../-. Coarse Sandy Clay - reddish brown - '1./1. .... .. firm to dense . damo ML Coarse to Fine Sandy Silt - tan - dense to very dense . moist - E scattered coarse to medium sand lenses 42 8.6 121.3 99.5 5 Bottom of Test Hole 10 15 20 25 30 DUCO ENGINEERING, INC. FIGURE NO.: 6 't> SOIL EXPLORATION LOG PROJECT: Brownin~ Residence - EI Faro, Temecula JOB NO.: 99--25 CLIENT: Sean Brownin~ LOCATION: See Fi~ure No. I LOGGED BY: RDC EXCAVATING EQUIPMENT: DEPTH TO WATER: None Encountered CAVING: TEST HOLE NO.: 6 DATE: 4-21-99 ELEVATION: 1228.5 Backhoe None Encountered SUMMARY OF SUBSURFACE CONDITIONS: This log is part of the report prepared by Duco Engineering, Inc. for this project and should be read together with the report. This summary applies only to the location of the test hole at the time of the excavation. Subsurface conditions may differ, at other locations and may change at this location with the nassa2e of time. The data oresented is a simolification of the actual conditions encountered. SAMPLE DATA E~ '" 0 U ~~ ~f-< ~~ ~3 i": OZ U DESCRIPTION o~ w~ ~ ",oil ....:::> on ~~ 0; ..~ c- ",0 ::i CC ~'" 0 U " ~.. ~:3 u ",0 .... 0 SC .. . Coarse Sandy Clay - reddish brown . .. . . .. ML dense - moist Coarse to Fine Sandy Silt - tan - dense -damp 5 40 E scattered silty coarse sand lenses 113.9 f-- 12.4 93.4 - E 40 7.1 108.8 89.3 - 10 Bottom of Test Hole 15 20 25 30 DUCO ENGINEERING, INC. FIGURE NO.: 7 ~ SOIL EXPLORATION LOG PROJECT: Browning Residence - EI Faro, Temecula JOB NO.: 99--25 CLIENT: Sean Browning LOCATION: See Figure No.1 LOGGED BY: RDC EXCAVATING EQUIPMENT: DEPTH TO WATER: None Encountered CAVING: TEST HOLE NO.: 7 DATE: 4-21-99 ELEVATION: 1229.0 Backhoe None Encountered SUMMARY OF SUBSURFACE CONDITIONS: This log is part of the report prepared by Duco Engineering, Inc. for this project and should be read together with the report. This summary applies only to I the location of the test hole at the time of the ~xcavation. Subsurface conditions may differ at other locations and may change at this location with the I nassao-e of time. The data "resented is asimnlification of the actual conditions encountered. SAMPLE DATA f'" '" .; U ~~ ~.... d'" U 5:" ffili 313 o~ "'0 DESCRIPTION 0> ~ ",.e .; ;:i.... ~~ 0; ..~ ""- 0>0 "'.... ::i 00 >~ 0 U " ~~ ~:3 u >90 ~.. 0 GC ~ Slightly Clayey Medium to Coarse Sand with scattered gravel. reddish tan - dense - moist I--- F I--- 30 ~~ 8.8 108.2 83.6 5 ~ Bottom of Test Hole 10 , 15 20 25 30 DUCO ENGINEERING, INC. FIGURE NO.: 8 \7l r ; t ...... (j) (j) a. a. '" '" :J L - :J 0:: ... 0 W"- I- :I. <( 0 ::;; Q) HD- I- ...J ::J 900 600 300 o o Peak ULTIMATE C, pst 128 122 4>. deg 37.2 35.9 TAN q, 0.76 0.72 600 900 1200 1500 1800 Normal Stress. pst 300 I 1800 'i" t I ~~ (j) (j) 1200 a. a. " " ~ L ~ a ._ ~ a wu.. f- .y. 600 <{ a ::; " Hn. f- --' :::> 0 0 Peak ULTIMATE C, pst 388 110 <1>, deg 41.2 31.7 TAN <l> 0.87 0.62 600 1200 1800 2400 3000 3600 Normal Stress, psf 20 SAMPLE TYPE: Undisturbed DESCRIPTION: Clayey Si I ty Sand 1200 1000 ~ (j) a. 800 '" '" " L 600 ~ (!] L a 400 " .r:: (!] 200 0 0 5 10 15 Strain, % 3 SAMPLE NO. : WATER CONTENT, % ~ DRY DENSITY, pct ~ SATURATION, % !z! VOID RA no H DIAMETER. in HEIGHT in WATER CONTENT, % f- DRY DENSITY, pcf (!] W SATURATION, % f- f- VOID RATIO <{ DIAMETER, 'n HEIGHT in NORMAL STRESS, pst Peak Foi lure, psf STRAIN, % ULTIMATE toi lue. pst STRAIN, % S t ra i n ro t e . i n/m i n 10.4 114.7 62.4 0.442 2.50 1.00 18.7 114.7 112.3 0.442 2.50 1.00 260 294 6.4 266 7.3 0.0532 PROJECT: Proposed Residence EI Faro, Temecula SAMPLE LOCATION: Boring #5 Sample #1 @ 4.0' SPECIFIC GRAVITY= 2.65 REMARKS: JT Fig. No.: /0 2 CLIENT: Sean Browning PROJ. NO.: 99-25 13.7 115.8 84.9 0.429 2.50 1.00 20.8 115.8 128.4 0.429 2.50 1.00 520 844 4.8 440 12.2 0.0532 2 3 DIRECT SHEAR TEST REPORT 10.2 116.6 64.4 0.419 2.50 1.00 17.6 116.6 111.1 0.419 2.50 1.00 780 1082 4.3 587 9.6 ".0532 DATE: 5-17-99 DUCO ENGINEERING, INC. \<\ , 3.0 CONSOLIDATION TEST REPORT 2.0 Water Added . .. .... .............. ...... --.. ..... r-. ....... ~ r'\. \~ \ \ , ... \ ~ ~ I" .01 .05 0.1 0.2 0.5 1 Appl ied Pressure - tsf 2 5 10 1.0 SWELL 0.0 (lJ COMPRESSION ~ (/) '- 1.0 c 0 "' "' (lJ 2.0 l.. Q. E 0 U +' 3.0 c (lJ U l.. (lJ D- 4.0 5.0 6.0 7.0 Clpse. Not. Not. Dry Dens. % Sa t . Mo i st. (pc f) o . 3 48 . 8 % 9. 3 % 1 09 . 8 TEST RESULTS LL PI Sp.Gr. Initial void ratio 2.650 0.5065 MATERIAL DESCRIPTION Project No.: 99-25 Project: EI Foro, Temeculo Location: Boring #7 Sample #1 @ 3.0 feet Date: 4-29-99 CONSOLIDATION TEST REPORT Medium to Coarse Gravelly Clayey Sand Class: GP-SC Remarks: JT DUCO ENGINEERING, INC. -;.0 Fig. No. -il_ CONSOLIDATION TEST REPORT 2.0 Water Added --... r--. .... .... " "'- ~ .... ~ '\ .... ",... " \ ~ i\. r'" t.... , ~... \ " , ~ 1'1 ....... .... ... 1.0 SWELL 0.0 COMPRESSION 1.0 v ~ (/) ....... 2.0 c 0 Ul Ul v 3.0 L Q. E 0 U ~ 4.0 c v U L V n. 5.0 6.0 7.0 8.0 .01 .05 0.1 0.2 0.5 1 Appl ied Pressure - tsf 2 5 10 Clpse. Not. Not. Dry Dens. LL % Sat. Ma i st. (pc f) 0.3 53.8 % 8.6 % 116.3 TEST RESULTS PI Sp.Gr. In i t i a I vo i d ra t i 0 2.650 0.4240 MATERIAL DESCRIPTION Project No.: 99-25 Project: EI Faro, Temecula Location: Boring #5 Sample #1 @ 4.0 feet Date: 5-7-99 CONSOLIDATION TEST REPORT Coarse to Fine S i I ty Sand Class: SM Remarks: JT DUCO ENGINEERING, INC. Fig. No. IfL -p.. COUPRESSION 2.0 Q) ~ Vl "- 3.0 c 0 Ul Ul Q) 4.0 L D- E 0 U .... 5.0 c Q) 0 L Q) D- 6.0 CONSOLIDATION TEST REPORT 1.0 Water Added -- r-.. .' .... " "" ""'- I'''' ...... ~ \ " "" "- \ ~ ... ~ \ ~.... r\ "'"" ~ .... '" " ~ \ '" " , ..... N... \I N SWELL 0.0 1.0 7.0 8.0 9.0 .01 .05 0.1 0.2 0.5 1 Appl ied Pressure - tsf 2 5 10 Clpse. No t . Not. Dry Dens. LL % Sot. Mo i st. (pc f ) 0.2 68.2 % 14.8 % 105.2 TEST RESULTS PI Sp.Gr. 2.650 0.5732 MATERIAL DESCRIPTION Coarse to Fine S i I ty Sand Closs: SM Remarks: JT Initial void ratio Project No.: 99-25 Project: EI Foro, Temecula Location: Boring #6 Sample #1 @ 5.0 feet Dote: 5-11-99 CONSOLIDATION TEST REPORT DUCO ENGINEERING, INC. ~ Fig. No. (J , 6.0 CONSOLIDATION TEST REPORT 4.0 .1. ........ Water Added . ..... ~ .' .... l' " f\ 1\ 1\ , ~N 2.0 SWELL 0.0 <lJ COMPRESSION ~ (/) "- 2.0 c 0 fJ} fJ} <lJ 4.0 L CL E 0 U +' 6.0 c <lJ U L QJ D- 8.0 10.0 12.0 14.0 .01 .05 0.1 0.2 0.5 1 Appl ied Pressure - tsf 2 5 10 Clpse. Not. Not. Dry Dens. LL % Sat. Mo i st. (pcf ) 44.0 % 9.4 % 105.6 TEST RESULTS PI Sp.Gr. Initial void ratio 2.650 0.5662 MATERIAL DESCRIPTION Project No.: 99-25 Project: EI Faro, Temecula Location: Boring #1 Sample #2 @ 5.5 feet Date: 5-13-99 CONSOLIDATION TEST REPORT Coarse to Medium Gravelly Si I ty Sand Class: GP-SM Remarks: JT DUCO ENGINEERING, INC. Fig. No. ILl 1l!J RECOMMENDATIONS FOR CONSTRUCTION IN EXPANSIVE SOILS Base Rock Depth of Slab Thickness or washed Depth of Continuous footings EXPANSION footing below Slab Reinforcement concrete Subgrade for all bearing walls INDEX lowest sand with Saturation In and a grade beam adjacent Foundation moisture Slab Areas across the garage UBC 18-2 finished dirt Reinforcement barrier door opening grade membrane o to 20 Nominal 4 Inches 12.0 Inches None required None Not Required Not Required Very Low Required None required Nominal 4 Inches 4 Inches of 21 to 50 6X6-10/10 Welded Base - or 12.0 Inches wire mesh In center 6 mil. In 12 Inches Required Low One #4 rebar In the center of top and In the bottom sand Full 4 Inches thick 4 Inches of 61 to 90 6X6-016 Welded wire Base - or 18.0 Inches mesh In center 6 mil. In 18 Inches Required Moderate Two #4 rebar In ~e center of top and In the 'bo.hom sand Full 6 Inches thick 6 Inches of 90 to 130 6X6~/6 Welded wire Base - or . 18.0 Inches mesh In center 6 mil. In 18 Inches Required High Two #5 rebar In the center of top and In the bottom sand Full 6 Inches thick wf 6 Inches of Above 130 #3 rebar 18 Inches O.C. Base - or 24.0 Inches each way dowelled Into 10 mil. In 24 Inches Required Very High the cont. footings. center of Two #5 rcbar In the top sand and In the bottom DUCO ENGINEERING, INC. lob No.: 99-25 11\ Figure No.: IS