Loading...
HomeMy WebLinkAboutParcel Map 17688 Parcel 1 Geotech Report (Jul.27,1998) I~ "I ---~~L' "I~'. ....GEN I - -I Corporation . Soil EIlgineeringand ConsullingServices. Engineering Geology . Compaction Testing -Inspections. ConslruclionMalerialsTesling. Laboratory Testing . PercolalionTeslinq . Geology. Water Resource Studies . Phase I & II Environmental Site Assessml3!1ts ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK I I GEOTECHNICAL REPORT & COMPACTION TEST RESULTS ROUGH GRADING OPERATIONS Assessor's Parcel Number: 945-180-001 Parcel 1 of Parcel Map 17668, Paulita Road and Lolita Road City of Temecula, County of Riverside, California LD98-049GR Project Number: T1409-C I I July 27, 1998 I I I I 'I -. I 1 Prepared for: Brett Sackett / --'" 29401 Via La Plaza Murrieta, California 92563 , I' . I' / " ,,, - . " \ - - - \-" . ' - , . "" " __, / _' - ' /" I'" , / " __, I _.... _ __ / I, __ \ /'" 1-, \_ __ \....'" " \_ __ \ /" , \~:-~'-_ <__:~~)"p~~T:B~~;;~:;~~~:=;;~'~~~!! ;, ~fi;j~~.~~ii~i~~imiiiiiMiiEii~i!iiiiiiiiiii; ~.~~~ ~~iilr,i,:m~~!<lij!r.:;:~#:i::J6j,~i!!i.~*,,=~m<::'l;:~n:::St~e:!S:!:m:J:$2=t=.._.i ........."........--::...--....--""; ""..Y,:-"'''''''''''-'''''' """==== """...""_"""===_~=;;; , , I I I I I I I I I I I I I I I I I I 1 Mr. Brett Sackett Project Number: T1409-C TABLE OF CONTENTS SECTION NUMBER AND TITLE PAGE 1.0 PROJECT LOCATION AND DESCRIPTION ....................................................................1 1.1 PROJECT LOCATION ................................................................................................1 1.2 PROJECT DESCRIPTION .......... ... ..............................................................................1 2.0 SCOPE OF WORK .................................................................................................... 2 2.1 TIME OF GRADING ...................................................................................................2 3.0 CONTRACTOR AND EQUIPMENT ................................................................................2 3.1 GRADING OPERATIONS ............... ..... ........................................................................2 4.0 TESTING .................................................................................................................3 4.1 FIELD TESTING PROCEDURES...................................................................................3 4.1.1 LABORATORY TESTING ..............................................................................3 4.1.2 MOISTURE-DENSITY RELATIONSHIP TEST ...................................................3 4.2 EXPANSION INDEX TEST........................................................................................... 3 5.0 EARTH MA TERIALS..................................................................................................3 6.0 CONCLUSIONS AND RECOMMENDATIONS...................................................................4 6.1 FOUNDATION DESIGN RECOMMENDATIONS................................................................4 6.2 FOUNDATION SIZE ................................................................................................... 4 6.3 DEPTH OF EMBEDMENT.... ........ ... ..... ................... ..................................................... 4 6.4 SLAB-ON-GRADE RECOMMENDATIONS...................................................................... 4 6.5 INTERIOR SLABS...................................................................................................... 5 6.6 EXTERIOR SLABS.................................................................................................... 5 6.7 GENERAL ....... ............. ............. ............ ... ............ ... ........... ....... ...... .... ... ........ ......... 6 7.0 CLOSURE ............................................................................................................6 ApPENDIX TEST RESULTS DRAWINGS EnGEN Corporation z.- :~EN I I I I I I I I I I I I I I "",L,' .1.2" IF,-'.->c~ \ -../ . Corporation -Soil EngineeringarldConsullinllServices-EnllineefinllGeology. CompaclionTesting -Inspeclions. ConstruclionMaterialsTesling elaboraloryTeslinll.PercolationTesting . Geology. Water ResourceSludies . Phasel& II Environmental Site Assessmenls ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK July 27,1998 Mr. Brett Sackett 29401 Via La Plaza Murrieta, California 92563 (909) 677-2555 I FAX (909) 694-6888 Regarding: GEOTECHNICAL REpORT & COMPACTION TEST RESULTS ROUGH GRADING OPERATIONS Assessor's Parcel Number: 945-180-001 Parcel 1 of Parcel Map 17668, Paulita Road and Lolita Road City of Temecula, County of Riverside, California LD98-049GR Project Number: T1409-C References: 1. EnGEN Corporation, Soils Report, Single Family Residence, Parcel 1 of Parcel Map 17668, Paulita Road and Lolita Road, City ofTemecula, County of Riverside, California, Project Number: T1409-LGS, report dated April 8, 1998. 2. Bratene Construction and Engineering, Precise Grading Plan, Sackett Residence, 43780 Paulita Road, City of Temecula, County of Riverside, California, LD98-049GR, plan dated April 14, 1998, sheet 1 of 1. Dear Mr. Sackett: According to your request and signed authorization, EnGEN Corporation has performed field observations, sampling, and in-place density testing at the above referenced site. Submitted, herein, are the test results and the supporting field and laboratory data. 1.0 PROJECT LOCATION AND DESCRIPTION 1.1 PROJECT LOCATION The subject property is located southeast of the intersection of Lolita Road and Paulita Road, in the City of Temecula, County of Riverside, California. PROJECT DESCRIPTI~N -"\, , , . Prior to grading' operations, topography and surface conditions of the site were I I I I I I I I 1 I I I I I I I I I I Mr. Brett Sackett Project Number: T1409-C July 1998 Page 2 2.0 SCOPE OF WORK 2.1 TIME OF GRADING This report represents geotechnical observations and testing during the construction operations from June 17, 1998 through July 10, 1998. 3.0 CONTRACTOR AND EQUIPMENT The grading operations for the house pad were performed by One Tractor Doze- It-All through the use of one (1) Caterpillar D8K track mounted dozer, one (1) John Deere Track mounted dozer, and a water hose attached to a hydrant. 3.1 GRADING OPERATIONS Grading within the subject site consisted of a cuUfill operation. Grasses and weeds were removed prior to fill placement. Fill material was generated from the cuts made in the eastern portions of the site, and used to bring the northern, western and southern portions of the site to finish grade elevation. Removal of alluvium, slopewash, etc., was performed to a depth of 3 feet below original elevation. Over-excavated earth material was stockpiled and later used as fill. Keying and benching into competent bedrock was observed during the grading operations. Over-excavation was performed in the cut portion of the garage building pad to a depth of 3.0 feet below finish grade elevation and to a distance of 5 feet outside the proposed structure. The exposed bottoms were scarified and moisture conditioned to a depth of 12-inches then compacted to 90 percent. No excavation was necessary in the house pad since it was entirely in cut. Fill was placed in lens thicknesses of 4 to 6-inches, thoroughly moisture conditioned to near optimum moisture content, then compacted to a minimum of 90 percent relative compaction. Moisture conditioning of the on-site soils was performed during the compaction process, through the use of a water truck. The pad area was generally graded to the elevations noted on the Grading Plan. However, the actual pad location, dimensions, elevations, slope locations and inclinations, etc. were surveyed and staked by others and should be verified by the Project Civil Engineer. 1\ EnGEN Corporation I I I I I I I I I I I I I I I I I I I Mr. Brett Sackett Project Number: T1409-C July 1998 Page 3 4.0 TESTING 4.1 FIELD TESTING PROCEDURES Field in-place density and moisture content testing were performed in general accordance with the ASTM-D-2922-81 (90) and ASTM-D-3017-88 procedures for determining in-place density and moisture content, respectively, using nuclear gauge equipment. Relative compaction test results were within the 90 percent required for all material placed and compacted. Test results are presented in the Appendix of this report. Fill depths and test locations were determined from review of the referenced grading plans. 4.1.1 LABORATORY TESTING The following laboratory tests were performed as part of our services during the compaction operations for the subject project. The test results are presented in the Appendix of this report. 4.1.2 MOISTURE-DENSITY RELATIONSHIP TEST Maximum dry density - optimum moisture content relationship tests were conducted on samples of the materials used as fill. The tests were performed in general accordance with ASTM D1557-91 procedures. The test results are presented in the Appendix of this report under the Summary of Optimum Moisture Content I Maximum Dry Density Relationship Test Results. 4.2 EXPANSION INDEX TEST A soil sample was obtained for expansion potential testing from the building pad area upon completion of rough grading of the subject site. The expansion test procedure utilized was the Uniform Building Code Test Designation 18-2. The material tested consisted of silty sand, which has an Expansion Index of 1. This soil is classified as a very low expansion potential. The results are presented in the Summary of Expansion Index Results in the Appendix of this report. 5.0 EARTH MATERIALS The natural earth materials encountered on-site generally consisted of brown sand with varying amounts of silt. EnGEN Corporation '5 I I I I I I I I I I I I I I I I I 1 I Mr. Brett Sackett Project Number: T1409-C July 1998 Page 4 6.0 CONCLUSIONS AND RECOMMENDATIONS 6.1 FOUNDATION DESIGN RECOMMENDATIONS Foundations for the proposed structure may consist of conventional column footing and continuous wall footings founded upon properly compacted fill or sound bedrock. The recommendations presented in the subsequent paragraphs for foundation design and construction are based on geotechnical characteristics and a very low expansion potential for the supporting soils and should not preclude more restrictive structural requirements The Structural Engineer for the project should determine the actual footing width and depth to resist design vertical, horizontal, and uplift forces. 6.2 FOUNDATION SIZE Continuous footings should have a minimum width of 12-inches. Continuous footings should be continuously reinforced with a minimum of one (1) NO.4 steel reinforcing bar located near the top and one (1) NO.4 steel reinforcing bar located near the bottom of the footings to minimize the effects of slight differential movements which may occur due - to minor variations in the engineering characteristics or seasonal moisture change in the supporting soils. Column footings should have a minimum width of 18-inches by 18-inches and be suitably reinforced, based on structural requirements. A grade beam, founded at the same depths and reinforced the same as the adjacent footing, should be provided across garage door openings and other doorway entrances. 6.3 DEPTH OF EMBEDMENT Exterior and interior footings founded in properly compacted fill should extend to a minimum depth of 12-inches below lowest adjacent finish grade for the structure. 6.4 SLAB-QN-GRADE RECOMMENDATIONS The recommendations for concrete slabs, both interior and exterior, excluding PCC pavement, are based upon the anticipated building usage and upon a very low expansion potential for the supporting material as determined by Table 18-1-B of the Uniform Building Code. Concrete slabs should be designed to minimize cracking as a result of shrinkage. Joints (isolation, contraction, and construction) EnGEN Corporation Go 1 I I I I I I I I I I I I I II I I 1 I Mr. Brett Sackett Project Number: T1409-C July 1998 Page 5 should be placed in accordance with the American Concrete Institute (ACI) guidelines. Special precautions should be taken during placement and curing of all concrete slabs. Excessive slump (high water/cement ratio) of the concrete and/or improper curing procedures used during either hot or cold weather conditions could result in excessive shrinkage, cracking, or curling in the slabs. It is recommended that all concrete proportioning, placement, and curing be performed in accordance with ACI recommendations and procedures. 6.5 INTERIOR SLABS Interior concrete slab-on-grade may be a minimum of 4-inches nominal in thickness and be underlain by a properly prepared subgrade. Slab reinforcement may consist of 10 gauge wire mesh (in sheets), supported on cement blocks for proper placement. The reinforcing should be placed at mid-depth in the slab. The concrete section and/or reinforcing steel should be increased appropriately for anticipated excessive or concentrated floor loads. In areas where moisture sensitive floor coverings are anticipated over the slab, we recommend the use of a polyethylene vapor barrier with a minimum of 6.0 mil in thickness be placed beneath the slab. The moisture barrier should be overlapped or sealed at splices and covered by a 1.0-inch minimum layer of clean, moist (not saturated) sand to aid in concrete curing and to minimize potential punctures. 6.6 EXTERIOR SLABS All exterior concrete slabs cast on finish subgrade (patios, sidewalks, etc., with the exception of PCC pavement) should be a minimum of 4-inches nominal in thickness. Reinforcing in the slabs and the use of a compacted sand or gravel base beneath the slabs should be according to the current local standards. Subgrade soils should be moisture conditioned to at least optimum moisture content to a depth of 6.0-inches and proof compacted to a minimum of 90 percent relative compaction based on ASTM D1557-91 procedures immediately before placing the concrete. EnGEN Corporation 1 I I , I I I I I I I I I I I I I I I I I I Mr. Brett Sackett Project Number: T1409-C July 1998 Page 6 6.7 GENERAL Based on the observations and tests performed during grading, the subject site in the areas noted has been completed in accordance with the Referenced No. 1 report, project plans, and the Grading Code of the City of Temecula. The graded site in the areas noted as graded is determined to be adequate for the support of a typical residential development. Any subsequent grading for development of the subject property should be performed under engineering observation and testing performed by EnGEN Corporation. Subsequent grading includes, but is not limited to, any additional fill placement and excavation of temporary and permanent cut and fill slopes. In addition, EnGEN Corporation should observe all foundation excavations. Observations should be made prior to installation of concrete forms and/or reinforcing steel so as to verify and/or modify, if necessary, the conclusions and recommendations in this report. Observations of overexcavation cuts, fill placement, finish grading, utility or other trench backfill, pavement subgrade and base course, retaining wall backfill, slab presaturation, or other earthwork completed for the development of subject site should be performed by EnGEN Corporation. If any of the observations and testing to verify site geotechnical conditions are not performed by EnGEN Corporation, liability for the safety and performance of the development is limited to the actual portions of the project observed and/or tested by EnGEN Corporation. 7.0 CLOSURE This report has been prepared for use by the parties or project named or described above. It mayor may not contain sufficient information for other parties or purposes. The findings and recomrnendations expressed in this report are based on field and laboratory testing performed during the rough grading operation and on generally accepted engineering practices and principles. No further warranties are implied or expressed beyond the direct representations of this report. EnGEN Corporation ~ I I I I I 1 I I I I I I I I I I I I I Mr. Brett Sackett Project Number: T1409-C July 1998 Page 7 Thank you for the opportunity to provide these services. If you should have any questions regarding this report, please do not hesitate to contact this office at your convenience. Respectfully submitted, EnGEN Corporation se, If, Field Operatio Osb' rn Br ne, GE 162 Pri cipal Geotechnical Engineer Expires 09-30-01 TD/OB:ch Distribution: (4) Addressee FilE: EnGENIReportingCfT1409C Brett Sackett Rough Grading EnGEN Corporation q 1 Mr. Brett Sackett 1 Project Number: T1409-C Appendix Page 1 ApPENDIX I I I I I I I I 1 I I 1 I I I I I EnGEN Corporation \0 1 1 I I I I I I I I 1 I I 1 I I I I I Mr. Brett Sackett Project Number: T1409-C Appendix Page 2 FIELD TEST RESULTS (Summary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) Test Test Depth. Soil Max Moisture Dry Relative Required No. Date Test Elev. Type Density Content Density Compaction Compaction (1998) Locations (FT) (PCF) (%) (PCF) (%) (%) 1 6-17 See Site Plan Bottom 1 130.0 10.8 120.8 92.9 90 2 6-17 See Site Plan +2 1 130.0 11.8 117.8 90.6 90 3 6-17 See Site Plan +4 1 130.0 12.1 117.9 90.7 90 4 6-17 See Site Plan +6 1 130.0 11.5 121.5 93.5 90 5 6-19 See Site Plan +8 1 130.0 8.5 122.0 93.8 90 6 6-19 See Site Plan +10 2 124.4 7.7 114.3 91.9 90 7 6-19 See Site Plan +10 2 124.4 7.8 111.8 90.0 90 8 6-19 See Site Plan +12 2 124.4 8.5 113.6 91.3 90 9 6-19 See Site Plan +12 2 124.4 10.5 117.7 94.6 90 10 7-13 South Side F.G. 1 130.0 6.6 110.8 85.2 90 11 7-13 North Side F.G. 1 130.0 7.8 117.9 90.7 90 12 7-13 Slope F.G. 2 124.4 8.4 98.0 78.8 90 13 7-13 Retest of 10 F.G. 1 130.0 7.9 116.9 90.0 90 14 7-13 Retest of 12 F.G. 2 124.4 9.2 112.8 90.7 90 (F.G.) Indicates Finish Grade EnGEN Corporation t\ 1 I I I I 1 I I I I I I I 1 I I I 1 I Soil Type 1 2 SUMMARY OF OPTIMUM MoiSTURE CONTENT (Maximum Dry Density Relationship Test Results) ASTM 01557-91 Soil Description (USCS Symbol) Dark Brown Silty Sand (SM) Brown Silty Sand (SW-SM) Maximum Dry Density (PC F) 130.0 124.4 Mr. Brett Sackett Project Number: T1409-C Appendix Page 3 Optimum Moisture Content (%) 9.5 10.4 EnGEN Corporation Iz.. 1 I I I Soil Depth Type (FT) I 1 1.5 I I I I I I I I I I I I 1 I SUMMARY OF exPANSION INDEX TEST RESULTS Dry Density (PCF) 110.5 Moisture Condition Before Test (%) 9.8 Moisture Condition After Test (%) 16.4 Mr. Brett Sackett Project Number: T1409-C Appendix Page 4 Expansion Index 1 EnGEN Corporation ~ ~ I I I I I I 1 I I I I I I 1 I I I 1 I, I Mr. Brett Sackett Project Number: T1409-C Appendix Page 5 DRAWINGS EnGEN Corporation 1,\