Tract Map 21067 Lot 1-86 Final Compaction Report (May19,1998)
. RECEiVED JUN 02 1998 erN OF 1EMtCULA ENGINEERING DEPARTMENT Final Compaction Report Riverwalk Residential Tract Temecula, California . Project Number 4660-94 May 19, 1998 . NorCal Engineering . NorCal Engineering Soils and Geotechnical Consultants 10641 Humbolt Street Los Alamitos, CA 90720 (562) 799-9469 Fax (562) 799-9459 May 19, 1998 Project Number 4660-94 Westmark Communities One Columbia Aliso Viejo, Califomia 92565 Attn: Mr. Mike Armstrong RE: Final Compaction Report - Proposed Residential Tract Development - Located at Murfield Drive, Trotsdale Drive, Canterfield Drive and Rein Court, in the City of Temecula, Califomia (Legal Description: Tract 21067, Lots 1-86) . Dear Mr. Armstrong: Pursuant to your request, this firm has observed and tested grading and backfill operations at the above referenced project. Results of the compaction tests are attached and locations of these tests are shown on the accompanying Site Plans. All work was performed in accordance with our Geotechnical Investigation dated May 31, 1994, Project Number 4660-94 and with all present day standards of the Geotechnical Engineering Industry. . Site Gradina The purpose of the grading operations was for the placement of fill to provide structural support for the proposed development. All vegetation and demolition debris was stripped and removed from the fill areas prior to grading operations. The existing low density soils were removed to native soils, the exposed subgrade scarified, moisture conditioned and then recompacted to a minimum of 90% relative compaction. Areas of high groundwater, and/or high moisture levels of the subsurface soils, Lots 9 thru 41 and 55 thru 84 required stabilization prior to placement of fill. These areas were stabilized with "Tensar BX1100", a reinforcement geogrid fabric or a 18 inch thick blanket of crushed rock. All excavations were observed and approved by this firm prior to placement of fill material. \ May 19, 1998 Page 2 Project Number 4660-94 . The overexcavation consisted of a minimum of five horizontal feet or to the depth of fill placed, whichever is greater, beyond the outside edge of all proposed foundations. A septic tank and leach field were located in Lot 52 and portions of Murfield Drive and were completely removed to competent native bottoms prior to placement of engineered fill. The rear yard areas of lots 22 thru 34 were excavated below groundwater from the neighboring grading operations for the adjacent park site. Fill soils were placed at a minimum of 85% relative compaction up to previous natural grade per a contractual agreement with the City of Temecula. Any fill placed above previous natural grade was compacted to a minimum of 90% of the laboratory standard. Fill soils placed were compacted to a minimum of 90% of the laboratory standard in lifts not in excess of eight inches in thickness. Conventional earthmoving equipment was utilized for compaction control. Water trucks provided moisture control. . The relative compaction was determined by Sand Cone Method (ASTM: D 1556-82) and by the Drive Tube Method (ASTM: D-2937). The maximum density of the fill soils was obtained by the laboratory standard (ASTM: D 1557-78) and results are shown on Table I. Tests were performed a minimum of every 500 cubic yards placed and every two feet in depth of fill placed. Results of the field density tests are presented in Table II. . Slope and Drainaoe Gradino All slope and drainage channels, located around the perimeters of the site were property graded and tested under the supervision of this firm. Any old channel structures were properly removed prior to the start of these grading operations. Due to high moisture levels, some of the proposed bottom areas were excavated to elevations that would allow for a three feet thick stabilization section. The stabilization section consisted of a two feet thick crushed rock blanket covered by filter fabric and one foot cap of compacted fill soils. N orCal Engineering 1,;- May 19, 1998 Page 3 Project Number 4660-94 . All slope areas were properly benched into competent soils during the cut and fill operations. All fills placed in the drainage channel areas were properly compacted and tested to at least 90% relative compaction. The maximum depth of fill placed was 101/2 feet. There were existing irrigation lines present in the east wash channel areas. These line were properly removed under the supervision of this firm. The locations where the lines extended on to the adjacent property were properly capped as per specifications of the City of Temecula. Trench Excavation Backfill A sewer trench excavation was backfilled and tested under the supervision of this firm. All placed underground pipe was shaded with a minimum of one foot of crushed rock prior to utilizing fill soils for backfill. The areas nearby Manhole No. 1 were backfilled with fill soils up to within 11 feet below grade, and then rushed rock was placed up to . within 5 feet from grade. The final 5 feet was backfilled with a concrete slurry mix. An abandoned irrigation line was encountered traversing through lots 17, 18, 38, 39, 61,62,67,71 and 78. These areas were completely excavated down to the concrete pipe which was crushed in-place prior to placement of backfill material. All areas were properly backfilled and compacted under the direct supervision of the firm. All water service trenches for Phases 1 thru 4 and the wash channel crossing areas, were properly backfilled, compacted and tested to at least 90% relative compaction. The maximum depth of fill over the water lines was 9 feet. The areas within Pala Road were backfilled with a concrete slurry mix as per the city of Temecula. Electrical trenches located in Phase 1 thru 4 and the wash channel crossing areas, were properly compacted and tested to at least 90% relative compaction. The maximum depth of fill over the electrical lines was 8 feet. . N orCal Engineering "? May 19,1998 Page 4 Project Number 4660-94 . The storm drain areas located between Pala Road and Lots 7 and 8, east of Lot 34 crossing Canterfield, and between Lots 19 and 20 were properly backfilled and compacted to at least 90% relative compaction. The maximum depth of fill placed over the storm drain was 6 feet. The backfill operations around the box culvert, located at Murfield Drive and Pala Road, were properly compacted and tested to at least 90% relative compaction. The maximum depth of fill placed was 7.5 feet. Street Pavement Suborade All street sidewalks and curbs for Phases 1 thru 4 and the Pal a Road improvement areas, were properly compacted and tested to at least 90% relative compaction. The maximum depth of fill placed in these areas was one foot. Due to high moisture levels the street subgrades required stabilization methods. The street subgrade areas were cement treated using a 2% mixture as recommended by this firm. These areas were properly compacted and tested to at least 90% relative compaction. The street subgrades for the Pala Road improvement areas were excavated to depths that . allowed for the placement of a "Mirafi stabilization fabric" overlayed by an additional 12 inches of crushed miscellaneous base. The maximum depth of base materials placed was two feet. All base materials were properly compacted and tested to at least 95% relative compaction prior to any paving operations. Conclusions The geotechnical engineering aspects of the grading and backfill operations have been observed and are in compliance with the geotechnical engineer's recommendations. The development has been graded to the approval of this firm and is suitable for its intended use. . N oreal Engineering l\ May 19,1998 Page 5 Project Number 4660-94 . We appreciate this opportunity to be of service to you. If you have any further questions, please do not hesitate to contact the undersigned. Respectfully submitted, NORCAL ENGINEERING h7' ~l Keith D. Tucker Project Engineer R.G.E.841 Scott D. Spensiero Project Manager . . N orCal Engineering 5 May 19,1998 Project Number 4660-94 Page 6 I . TABLE I MAXIMUM DENSITY TESTS (ASTM: D-1557-781 Optimum Maximum Dry Soil Type Classification Moisture Density C1bs.lcu.ft.) SAND, fine grained, 15.0 113.0 silty II SAND, fine grained, 12.5 118.0 slightly silty III SAND, fine grained, 16.0 106.0 silty IV SAND, fine grained, 15.5 110.0 silty V SAND, fine grained, 13.5 115.0 slightly silty . .VI SAND, fine to coarse 8.5 132.0 grained, slight silt content, slight clay content .VII SAND, fine to coarse 9.0 129.0 grained, slight silt content with gravel .VIII SAND, fine to coarse 10.0 119.0 grained, silty with gravel .IX SAND, fine to coarse 9.0 130.5 grained, slight silt content slight clay content with gravel .X SAND, fine to coarse 9.5 124.0 grained silty with gravel .XI SAND, fine to coarse 9.0 126.5 grained, silty, slight clay content with gravel .XII SAND, fine grained, silty 14.5 112.0 . N oreal Engineering f.e May 19,1998 Project Number 4660-94 Page 7 . TABLE I MAXIMUM DENSITY TESTS (ASTM: D-1557-781 Optimum Maximum Dry Soil Type Classification Moisture Density C1bs.lcu.ft.) XIII SAND, fine grained, silty with 9.5 126.0 pebbles mixed with cement XIV SAND, fine grained, silty, slight 11.0 124.0 .XV Crushed Miscellaneous Base 6.0 138.0 Material .XVI Crushed Miscellaneous Base 6.0 145.0 Material XVII SAND, fine grained, slightly 9.0 128.0 silty with occasional gravel . .XVIII Crushed Miscellaneous Base 8.0 128.0 Material "Import Soils . N oreal Engineering ~ May 19, 1998 Project Number 4660-94 Page 8 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu. ft. Compaction ~ 12/19/94 101 36 6.0-6.5 13.7 106.4 94 I 12/19/94 102 39 6.5-7.0 16.2 103.3 91 I 12/19/94 103 42 6.0-6.5 13.2 111.3 94 II 12/19/94 104 44 5.5-6.0 12.7 109.1 92 II 12/19/94 105 44 8.5-9.0 14.0 97.4 92 III 12/19/94 106 42 9.0-9.5 15.9 97.5 92 III 12/19/94 107 43 7.5-8.0 17.2 102.9 91 I 12/19/94 108 41 6.0-6.5 14.0 109.2 93 II 12/19/94 109 41 5.0-5.5 16.5 102.5 91 I 12/19/94 110 37 5.5-6.0 13.7 108.5 92 II . 12/20/94 111 82 7.0-7.5 18.1 100.5 95 III 12/20/94 112 85 10.0-10.5 18.0 99.5 94 III 12/20/94 113 Murfield Dr. 4.5-5.0 16.5 104.7 93 I 12/20/94 114 54 6.0-6.5 15.9 103.9 92 I 12/20/94 115 56 5.5-6.0 16.2 106.1 94 I 12/20/94 116 42 6.0-6.5 16.9 99.9 96 III 12/20/94 117 44 6.0-6.5 13.5 107.9 91 II 12/20/94 118 43 4.0-4.5 18.0 100.4 95 III 12/20/94 119 Murfield Dr. 3.5-4.0 15.9 106.5 94 I 12/20/94 120 84 9.0-9.5 20.7 98.7 87 I *Depth below finish grade (in feet) **Retest of failing tests after area reworked . N orCal Engineering t6 May 19,1998 Project Number 4660-94 Page 9 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction IYQg 12/22/94 120A" 84 9.0-9.5 17.0 102.4 91 I 12/20/94 121 56 8.0-8.5 21.1 97.9 86 I 12/20/94 122 54 5.0-5.5 9.5 99.0 88 I 12/20/94 122A'" 54 5.0-5.5 16.2 105.1 93 I 12/20/94 123 57 4.0-4.5 17.0 103.2 91 I 12/20/94 124 84 8.0-8.5 17.5 99.8 91 IV 12/20/94 125 82 8.0-8.5 16.0 103.1 94 IV 12/22/94 126 83 7.0-7.5 15.9 102.4 93 IV 12/22/94 127 83 6.0-6.5 14.7 100.9 92 IV 12/23/94 128 57 6.0-6.5 15.5 101.1 92 IV . 12/23/94 129 55 6.0-6.5 16.5 97.3 92 III 12/23/94 130 56 5.0-5.5 13.9 99.5 94 '" 12/23/94 131 55 4.0-4.5 18.2 96.4 91 III 12/23/94 132 57 4.0-4.5 18.0 97.0 92 III 12/23/94 133 Trotsdale Dr. 4.0-4.5 14.1 103.9 90 V 12/23/94 134 Trotsdale Dr. 4.0-4.5 14.2 103.5 90 V 12/23/94 135 9 5.0-5.5 15.9 100.6 91 IV 12/23/94 136 11 7.0-7.5 16.4 104.7 95 IV 12/23/94 137 10 5.5-6.0 17.0 102.1 93 IV 12/23/94 138 12 6.0-6.5 14.8 100.6 91 IV "Depth below finish grade (in feet) ""Retest of failing tests after area reworked . N orCal Engineering C\ May 19,1998 Project Number 4660-94 Page 1 0 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth- Moisture Ibs.lcu.ft. Compaction ~ 12/23/94 139 11 5.0-5.5 15.6 103.7 94 IV 12/23/96 140 10 4.0-4.5 16.5 100.9 92 IV 12/23/94 141 12 4.0-4.5 13.7 104.2 91 V 12/23/94 142 54 6.0-6.5 15.4 102.4 93 IV 12/23/94 143 54 4.0-4.5 16.5 100.9 92 IV 12/23/94 144 85 8.0-8.5 15.0 106.7 93 V 12/23/96 145 85 7.0-7.5 14.6 107.9 94 V 12/23/94 146 84 6.0-6.5 14.9 105.5 92 V 12/23/94 147 46 3.5-4.0 15.1 108.4 94 V 12/23/94 148 50 6.0-6.5 14.2 104.1 91 V . 12/23/94 149 48 2.5-3.0 14.0 105.7 92 V 12/23/94 150 45 6.5-7.0 16.2 101.0 92 IV 12/23/94 151 45 5.0-5.5 17.1 100.7 92 IV 12/23/94 152 47 1.0-1.5 16.1 98.4 93 I 12/23/94 153 49 2.0-2.5 15.5 99.1 93 I 12/23/94 154 61 4.0-4.5 13.7 107.6 91 II 12/26/94 155 53 5.5-6.0 11.1 109.2 93 II 12/26/94 156 53 2.5-3.0 10.8 107.5 91 II 12/26/94 157 86 2.5-3.0 10.8 108.6 92 II 12/26/94 158 53 4.0-4.5 13.6 110.7 94 II -Depth below finish grade (in feet) --Retest of failing tests after area reworked . N oreal Engineering \0 May 19, 1998 Project Number 4660-94 Page 11 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu.ft. Compaction ~ 12/26/94 159 8 7.0-7.5 11.0 110.4 94 II 12/26/94 160 6 3.0-3.5 10.9 106.9 91 II 12/26/94 161 4 3.5-4.0 11.2 108.1 92 II 12/26/94 162 5 2.5-3.0 12.5 107.4 93 V 12/26/94 163 7 1.5-2.0 9.0 100.7 88 V 12/26/94 163"" 7 1.5-2.0 12.9 108.2 94 V 12/26/94 164 8 5.0-5.5 14.0 107.5 91 II 12/26/94 165 9 5.0-5.5 13.1 110.2 93 II 12/26/94 166 8 4.0-4.5 13.5 106.9 93 V 12/26/94 167 9 4.0-4.5 12.9 109.1 92 II I . 12/26/94 168 8 2.0-2.5 14.0 107.7 94 V 12/26/94 169 7 0.5-1.0 13.2 109.4 95 V 12/26/94 170 5 0.5-1.0 12.5 107.7 91 II 12/26/94 171 4 0.5-1.0 12.7 108.0 94 V 12/26/94 172 6 0.5-1.0 14.1 106.2 92 V 12/26/94 173 4 0.5-1.0 14.0 105.6 92 V 12/26/94 174 54 2.0-2.5 16.0 101.1 92 IV 12/26/94 175 53 2.0-2.5 15.9 102.6 93 IV 12/26/94 176 86 1.0-1.5 16.1 100.9 92 IV 12/26/94 177 53 1.0-1.5 14.7 102.5 93 IV . "Depth below finish grade (in feet) ""Retest of failing tests after area reworked N oreal Engineering \\ May 19, 1998 Project Number 4660-94 Page 12 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu.ft. Compaction ~ 12/26/94 178 53 0.5-1.0 15.1 103.7 94 IV 12/26/94 179 46 2.0-2.5 15.5 97.5 89 IV 12/26/94 179"" 46 2.0-2.5 16.2 104.1 95 IV 12/26/94 180 50 3.0-3.5 14.9 102.6 93 IV 12/26/94 181 46 1.0-1.5 15.2 100.9 92 IV 12/26/94 182 50 1.5-2.0 15.7 102.4 93 IV 12/26/94 183 45 3.0-3.5 10.0 100.7 92 IV 12/27/94 184 55 3.0-3.5 14.2 101.6 92 IV 12/27/94 185 54 1.0-1.5 14.7 104.2 95 IV 12/27/94 186 56 0.5-1.0 14.0 100.7 92 IV . 12/27/94 187 9 3.0-3.5 15.1 99.9 91 IV 12/27/94 188 8 1.0-1.5 13.7 103.2 94 IV 12/27/94 189 47 0.5-1.0 13.2 104.1 95 IV 12/27/94 190 48 0.5-1.0 14.5 101.6 92 IV 12/27/94 191 49 1.0-1.5 13.6 102.2 93 IV 12/27/94 192 50 3.0-3.5 15.0 101.5 92 IV 12/27/94 193 46 4.0-4.5 14.1 101.9 93 IV 12/27/94 194 48 0.5-1.0 14.9 102.6 93 IV 12/27/94 195 17 6.0-6.5 14.1 99.2 94 III 12/27/94 196 15 8.5-9.0 13.7 98.9 93 III "Depth below finish grade (in feet) ""Retest of failing tests after area reworked . N orCal Engineering \-1) May 19, 1998 Project Number 4660-94 Page 13 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 12/27/94 197 13 7.0-7.5 17.1 98.7 93 III 12/27/94 198 58 6.5-7.0 17.0 97.7 92 III 12/27/94 199 60 7.0-7.5 18.4 99.1 94 III 12/27/94 200 62 6.0-6.5 16.7 97.4 92 III 12/27/94 201 14 6.0-6.5 17.2 98.6 93 III 12/27/94 202 17 5.0-5.5 18.0 101.1 95 III 12/27/94 203 59 5.0-5.5 15.9 99.2 94 III 12/27/94 204 61 4.5-5.0 18.1 98.7 93 III 12/27/94 205 59 5.0-5.5 17.4 100.1 94 III 12/27/94 206 1 5.0-5.5 12.7 100.4 94 II . 12/27/94 207 3 2.5-3.0 13.1 109.2 93 II 12/27/94 208 1 3.0-3.5 14.0 108.7 92 II 12/27/94 209 1 4.0-4.5 14.1 107.1 93 V 12/27/94 210 2 2.0-2.5 14.0 108.4 94 V 12/27/94 211 3 0.5-1.0 14.4 107.2 93 V 12/27/94 212 1 3.0-3.5 15.0 105.0 91 V 12/27/94 213 2 0.5-1.0 13.7 106.1 92 V 12/28/94 214 50 1.5-2.0 15.0 101.4 92 IV 12/28/94 215 50 0.5-1.0 13.9 102.1 93 IV 12/28/94 216 50 2.0-2.5 15.0 106.6 93 V . 'Depth below finish grade (in feet) "Retest of failing tests after area reworked N orCal Engineering \~ May 19, 1998 Project Number 4660-94 Page 14 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu.ft. Compaction ~ 12/28/94 217 1 1.5-2.0 13.7 109.9 93 II 12/28/94 218 1 1.0-1.5 14.7 107.1 93 V 12/28/94 219 Trotsdale Dr. 4.0-4.5 16.0 102.9 91 I 12/28/94 220 Trotsdale Dr. 2.0-2.5 15.6 103.7 92 I 12/28/94 221 Trotsdale Dr. 1.0-1.5 13.9 108.7 92 II 12/28/94 222 Murfield Dr. 1.0-1.5 14.1 110.2 93 II 12/28/94 223 Murfield Dr. 1.0-1.5 14.0 109.1 92 II 12/28/94 224 64 6.5-7.0 15.9 105.1 93 I 12/28/94 225 66 6.5-7.0 16.1 103.9 92 I 12/28/94 226 63 5.0-5.5 16.0 102.4 93 IV . 12/28/94 227 65 4.5-5.0 17.0 101.9 93 IV 12/28/94 228 67 7.5-8.0 16.4 100.9 92 IV 12/28/94 229 67 6.0-6.5 16.2 100.7 92 IV 12/28/94 230 1 0.0-0.5 13.8 110.5 96 V 12/28/94 231 1 0.0-0.5 13.7 111.5 94 II 12/28/94 232 2 0.0-0.5 14.2 108.5 94 V 12/30/94 233 ReinCt. 3.0-3.5 15.7 104.1 92 12/30/94 234 68 8.0-8.5 16.2 102.9 91 12/30/94 235 68 6.0-6.5 16.3 101.1 92 IV 12/30/94 236 69 8.0-8.5 16.4 103.7 92 I . "Depth below finish grade (in feet) ""Retest of failing tests after area reworked N oreal Engineering Y>v May 19,1998 Project Number 4660-94 Page 15 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu.ft. Compaction ~ 12/30/94 237 70 6.0-6.5 15.1 106.1 92 V 12/30/94 238 71 7.0-7.5 15.4 105.6 92 V 12/30/94 239 72 5.5-6.0 16.7 100.7 92 IV 12/30/94 240 ReinCt. 2.5-3.0 16.1 105.0 93 I 12/30/94 241 72 5.5-6.0 16.4 104.1 92 I 12/30/94 242 70 6.0-6.5 17.0 103.0 94 IV 12/30/94 243 69 6.5-7.0 16.2 102.4 93 IV 12/30/94 244 68 6.5-7.0 17.0 103.2 92 I 12/30/94 245 67 6.0-6.5 15.9 104.7 93 I 12/30/4 246 65 5.0-5.5 16.7 105.6 92 I . 12/30/94 247 63 5.0-5.5 16.6 101.7 92 IV 12/30/94 248 18 5.0-5.5 16.9 103.7 92 12/30/94 249 16 6.5-7.0 17.0 105.6 93 I 12/30/94 250 14 6.5-7.0 15.2 107.2 93 V 1/2/95 251 3 0.0-0.5 15.1 103.4 92 I 1/2/95 252 4 0.0-0.5 14.0 109.5 93 II 1/2/95 253 5 0.0-0.5 17.0 103.2 94 IV 1/2/95 254 6 0.0-0.5 14.9 105.1 93 I 1/2/95 255 27 7.0-7.5 14.8 108.2 95 V 1/2/95 256 25 7.0-7.5 15.3 109.1 95 V "Depth below finish grade (in feet) ""Retest of failing tests after area reworked . N orCal Engineering \~ May 19,1998 Project Number 4660-94 Page 16 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu. ft. Compaction ~ 1/2/95 257 23 7.0-7.5 14.3 110.8 94 II 1/2/95 258 21 7.0-7.5 15.5 105.9 92 V 1/2/95 259 20 5.5-6.0 15.3 106.7 93 V 1/2/95 260 22 5.5-6.0 14.2 111.6 95 II 1/2/95 261 24 5.5-6.0 14.0 110.5 94 II 1/2/95 262 26 5.5-6.0 15.2 106.9 93 V 1/2/95 263 28 5.5-6.0 15.0 107.2 93 V 1/2/95 264 73 6.5-7.0 16.1 107.1 95 I 1/30/95 265 75 6.5-7.0 15.5 106.4 93 V 1/30/95 266 77 8.0-8.5 14.9 109.1 95 V . 1/30/95 267 79 8.5-9.0 16.2 106.2 94 I 1/30/95 268 81 8.5-9.0 13.7 107.1 93 V 1/30/95 269 74 5.0-5.5 15.7 104.7 93 I 1/30/95 270 76 5.0-5.5 16.9 105.9 94 I 1/30/95 271 78 7.0-7.5 14.0 108.2 94 V 1/30/95 272 80 7.0-7.5 17.0 107.2 95 I 1/30/95 273 81 7.5-8.0 13.9 109.2 93 II 1/30/95 274 79 7.5-8.0 15.2 107.5 93 V 1/30/95 275 77 6.0-6.5 15.4 106.1 94 I 1/30/95 276 74 5.5-6.0 15.3 106.7 93 V *Depth below finish grade (in feet) **Retest of failing tests after area reworked . N orCal Engineering \10 May 19,1998 Project Number 4660-94 Page 17 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.1 Depth" Moisture Ibs.lcu.ft. Compaction ~ 1/30/95 277 Murfield Dr. 5.0-5.5 16.3 105.2 93 I 1/30/95 278 Murfield Dr. 5.5-6.0 16.9 107.8 95 I 1/30/95 279 Murfield Dr. 4.5-5.0 17.0 104.1 92 I 2/3/95 280 22 7.5-8.0 18.2 1014.8 90 I 2/3/95 281 24 7.5-8.0 18.0 100.9 89 2/3/95 282 26 7.0-7.5 19.1 102.0 90 2/3/95 283 28 5.5-6.0 17.5 97.1 86 2/3/95 284 30 7.0-7.5 17.2 98.5 87 2/3/95 285 25 6.0-6.5 17.0 99.5 88 2/3/95 286 27 6.0-6.5 16.9 96.1 85 . 2/3/95 287 29 5.0-5.5 17.1 101.7 90 2/3/95 288 31 5.5-6.0 17.0 100.1 89 2/3/95 289 23 5.5-6.0 17.2 98.5 87 I 2/3/95 290 Canterfield 3.5-4.0 14.7 105.1 91 V 2/3/95 291 Canterfield 3.5-4.0 15.0 106.9 93 V 2/3/95 292 29 6.5-7.0 17.0 102.5 91 I 2/3/95 293 31 6.5-7.0 14.9 107.5 93 V 2/3/95 294 30 5.0-5.5 16.5 103.9 92 I 2/3/95 295 32 5.0-5.5 16.0 104.1 92 I 2/6/95 296 35 7.5-8.0 15.1 105.2 91 V "Depth below finish grade (in feet) ""Retest of failing tests after area reworked . N orCal Engineering \1 May 19,1998 Project Number 4660-94 Page 18 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu. ft. Compaction ~ 2/6/95 297 37 7.5-8.0 17.2 102.7 91 I 2/6/95 298 39 7.5-8.0 13.9 104.1 91 V 2/6/95 299 41 7.5-8.0 14.0 105.4 92 V 2/6/95 300 36 6.0-6.5 24.2 97.2 86 I 4/11/95 300A " 36 6.0-6.5 26.1 98.5 87 V 2/6/95 301 38 6.0-6.5 20.4 97.4 85 V 4/11/95 301A" 38 6.0-6.5 15.1 106.7 93 V 2/6/95 302 40 6.0-6.5 26.1 98.5 87 I 4/11/95 302A " 40 6.0-6.5 15.0 106.0 92 V . 2/6/95 303 51 6.5-7.0 14.0 109.1 92 II 2/6/95 304 52 5.0-5.5 14.3 110.2 93 II 2/6/95 305 51 3.5-4.0 14.2 108.7 96 II 2/10/95 306 9 2.0-2.5 9.7 119.0 90 VI 2/10/95 307 10 3.0-3.5 9.6 119.9 92 VI 2/10/95 308 11 3.5-4.0 9.7 118.9 91 VI 2/10/95 309Trotsdale Dr. 2.0-2.5 21.2 100.2 87 V 2/11/95 309A"Trotsdale Dr. 2.0-2.5 15.0 104.9 91 V 2/10/95 310 56 3.0-3.5 9.5 119.5 91 VI 2/10/95 311 55 3.0-3.5 9.7 120.5 91 VI 2/10/95 312 55 3.0-3.5 11.2 113.1 87 VII . 'Depth below finish grade (in feet) "Retest of failing tests after area reworked N orCal Engineering \~ May 19,1998 Project Number 4660-94 Page 19 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu.ft. Compaction J:yQg 2/11/95 312A** 55 3.0-3.5 10.1 119.1 92 VII 2/10/95 313 68 6.0-6.5 11.3 110.2 93 VIII 2/10/95 314 69 5.5-6.0 9.2 121.2 92 VI 2/1 0/95 315 81 7.0-7.5 10.0 120.2 93 VII 2/10/95 316 82 6.0-6.5 9.7 118.8 90 VI 2/10/95 317 84 7.0-7.5 13.2 106.1 89 VIII 2/11/95 317A"" 84 7.0-7.5 11.2 108.8 91 VIII 2/10/95 318 44 5.0-5.5 11.0 110.2 93 VIII 2/11/95 319 43 4.0-4.5 9.9 119.5 92 IX 2/11/95 320 83 5.0-5.5 9.2 119.0 90 VI . 2/11/95 321 55 3.0-3.5 10.0 120.9 93 IX 2/11/95 322 51 3.0-3.5 14.0 105.2 91 V 2/11/95 323 55 3.0-3.5 13.9 108.7 88 X 2/21/95 323A "" 55 3.0-3.5 10.5 114.9 93 X 2/11/95 324 84 5.0-5.5 11.5 110.2 87 XI 2/21/95 324A "" 84 5.0-5.5 10.0 116.2 92 XI 2/11/95 325 12 3.0-3.5 16.0 106.1 95 XII 2/11/95 326 14 5.5-6.0 15.1 106.6 93 V 2/11/95 327 16 5.5-6.0 10.5 113.5 91 X 2/11/95 328 15 4.5-5.0 11.9 114.5 89 VII "Depth below finish grade (in feet) ""Retest of failing tests after area reworked . NorCal Engineering \Do.. May 19, 1998 Project Number 4660-94 Page 20 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu. ft. Compaction ~ 2/21/95 328A ., 15 4.5-5.0 10.2 117.1 91 VII 2/11/95 329 13 5.0-5.5 19.2 98.7 88 XII 2/21/95 329A " 13 5.0-5.5 16.5 103.5 92 XII 2/11/95 330 58 5.5-6.0 9.6 121.5 92 VI 2/11/95 331 60 6.0-6.5 9.2 119.2 90 VI 2/11/95 332 62 5.0-5.5 9.2 109.9 92 VIII 2/11/95 333 63 4.0-4.5 10.2 121.9 93 IX 2/11/95 334 59 5.5-6.0 20.0 98.7 88 XII . 2/21/95 334A " 59 5.0-5.5 16.5 102.9 92 XII 2/11/95 335 61 4.5-5.0 19.7 99.1 88 XII 2/21/95 335A " 61 4.5-5.0 16.2 101.9 91 XII 2/11/95 336 62 4.5-5.0 18.5 100.0 89 XII 2/21/95 336A .. 62 4.5-5.0 16.5 100.8 90 XII 2/13/95 337 17 5.5-6.0 21.1 98.2 88 XII 2/21/95 337A" 17 5.5-6.0 16.6 104.1 93 XII 2/13/95 338 15 4.0-4.5 19.9 97.1 87 XII 2/21/95 338A " 15 4.0-4.5 16.4 103.2 92 XII 2/13/95 339 13 4.0-4.5 20.1 98.8 88 XII 2/21/95 339A " 13 4.0-4.5 16.2 101.1 90 XII 2/21/95 340 9 1.0-1.5 9.6 119.0 90 VI . 'Depth below finish grade (in feet) "Retest of failing tests after area reworked N orCal Engineering 7P May 19, 1998 Project Number 4660-94 Page 21 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu.ft. Compaction ~ 2/21/95 341 11 2.5-3.0 9.5 120.4 91 VI 2/21/95 342 12 2.0-2.5 10.0 118.1 90 IX 2/21/95 343 14 3.0-3.5 9.7 121.1 92 VI 2/21/95 344 16 3.5-4.0 10.2 116.9 91 VII 2/21/95 345 18 4.0-4.5 10.1 119.1 91 IX 2/21/95 346 19 5.0-5.5 10.3 120.2 92 IX 2/21/95 347 56 3.0-3.5 10.1 117.5 91 VII 2/21/95 348 58 4.0-4.5 10.2 118.5 90 IX . 2/21/95 349 59 3.5-4.0 10.9 114.2 87 IX 2/22/95 349A ** 59 3.5-4.0 10.0 117.9 90 VI 2/21/95 350 61 3.5-4.0 9.7 118.9 90 VI 2/21/95 351 62 3.5-4.0 10.1 118.4 91 IV 2/21/95 352 58 3.0-3.5 9.5 120.5 91 VI 2/21/95 353 61 3.5-4.0 10.0 117.2 91 VII 2/21/95 354 57 3.0-3.5 12.6 114.2 89 VII 2/22/95 354A ** 57 3.0-3.5 10.3 117.0 91 VII 2/22/95 355 10 1.5-2.0 10.5 113.2 91 X 2/22/95 356 12 1.0-1.5 10.2 119.2 91 IX 2/22/95 357 14 2.0-2.5 10.9 115.0 93 X 2/22/95 358 16 2.5-3.0 10.3 114.1 90 XI . *Depth below finish grade (in feet) "Retest of failing tests after area reworked N orCal Engineering 1,.\ May 19,1998 Project Number 4660-94 Page 22 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu.ft. Compaction ~ 2/22/95 359 58 2.0-2.5 10.2 116.0 92 XI 2/22/95 360 60 2.5-3.0 10.0 115.2 91 XI 2/22/95 361 62 2.5-3.0 9.9 113.9 90 XI 2/22/95 362 61 2.5-3.0 10.2 113.1 91 X 2/22/95 363 59 2.0-2.5 10.3 115.0 91 XI 2/22/95 364 57 2.0-2.5 10.1 114.2 90 XI 2/22/95 365 16 2.0-2.5 10.2 116.0 92 XI 2/22/95 366 18 3.5-4.0 10.2 119.9 92 IX 2/22/95 367 19 4.0-4.5 10.1 115.1 91 XI , . 2/22/95 368 33 7.5-8.0 17.0 104.1 92 I 2/22/95 369 34 8.5-9.0 16.1 106.7 94 I 2/23/95 370 33 6.0-6.5 15.5 107.1 95 I 2/23/95 371 34 7.0-7.5 16.4 103.2 91 I 2/23/95 372 34 7.0-7.5 15.2 104.1 92 I 2/23/95 373 22 4.5-5.0 10.3 116.5 92 XI 2/23/95 374 24 4.5-5.0 10.2 117.1 93 XI 2/23/95 375 26 4.5-5.0 10.3 114.2 92 X 2/23/95 376 28 4.5-5.0 10.0 117.2 93 XI 2/23/95 377 30 4.0-4.5 10.2 115.7 91 XI 2/23/95 378 32 4.0-4.5 10.3 118.1 93 XI *Depth below finish grade (in feet) . **Retest of failing tests after area reworked N orCal Engineering 1P May 19, 1998 Project Number 4660-94 Page 23 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu.ft. Compaction ~ 2/23/95 379 34 6.0-6.5 10.1 117.9 93 XI 2/23/95 380 21 4.5-5.0 10.0 115.1 93 X 2/23/95 381 23 3.5-4.0 9.9 116.2 94 X 2/23/95 382 25 3.5-4.0 9.5 122.5 94 IX 2/23/95 383 27 3.5-4.0 9.9 124.7 96 IX 2/23/95 384 29 3.0-3.5 9.4 121.6 93 IX 2/23/95 385 31 3.0-3.5 13.7 107.2 85 XI 2/24/95 385A ". 31 3.0-3.5 10.3 116.5 92 XI 2/24/95 386 33 5.0-5.5 9.7 114.5 92 X 2/24/95 387 19 3.0-3.5 10.2 117.1 93 XI . 2/24/95 388 20 3.5-4.0 10.1 116.5 92 XI 2/24/95 389 21 3.0-3.5 10.3 116.5 92 XI 2/24/95 390 22 3.0-3.5 10.1 117.1 93 XI 2/24/95 391 10 4.0-4.5 9.9 119.2 94 XI 2/24/95 391A** 10 4.0-4.5 10.2 115.9 92 XI 2/24/95 392 12 4.0-4.5 10.3 118.4 94 XI 2/24/95 392A** 12 4.0-4.5 10.2 117.2 93 XI 2/24/95 393 14 4.0-4.5 10.0 118.3 94 XI 2/24/95 394 16 4.0-4.5 10.1 116.5 92 XI 2/24/95 395 18 3.0-3.5 9.7 119.2 94 XI "Depth below finish grade (in feet) ""Retest of failing tests after area reworked . N orCal Engineering t> May 19, 1998 Project Number 4660-94 Page 24 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. {Lot No.1 Depth* Moisture Ibs.lcu.ft. Compaction ~ 2/24/95 396 20 3.0-3.5 9.9 117.7 93 XI 2/27/95 397 67 4.5-5.0 9.8 116.2 92 XI 2/27/95 398 67 3.0-3.5 10.2 117.9 93 XI 2/27/95 399 56 1.5-2.0 9.7 116.5 94 X 2/27/95 400 55 1.5-2.0 9.9 115.2 93 X 2/27/95 401 68 5.0-5.5 9.5 113.2 91 X 2/27/95 402 70 5.0-5.5 9.9 115.1 93 X 2/27/95 403 72 4.0-4.5 9.7 119.7 92 IX 2/27/95 404 74 4.0-4.5 10.3 118.4 91 IX . 2/27/95 405 76 4.0-4.5 14.2 113.1 87 IX 2/27/95 405A ** 76 4.0-4.5 9.8 120.6 92 IX 2/27/95 406 78 5.0-5.5 10.2 117.7 93 XI 2/27/95 407 80 5.0-5.5 10.0 119.1 94 XI 2/27/95 408 82 5.0-5.5 10.3 116.7 92 XI 2/27/95 409 84 4.0-4.5 9.7 117.2 93 XI 2/27/95 410 85 4.0-4.5 9.6 118.4 94 XI 2/27/95 411 69 4.0-4.5 9.8 118.0 93 XI 2/27/95 412 71 4.0-4.5 10.0 117.0 92 XI 2/28/95 413 69 3.0-3.5 9.8 115.0 93 X 2/28/95 414 71 3.0-3.5 9.5 114.7 93 X *Depth below finish grade (in feet) . **Retest of failing tests after area reworked N oreal Engineering lA May 19,1998 Project Number 4660-94 Page 25 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction IYQg 2/28/95 415 73 3.0-3.5 10.3 115.1 93 X 2/28/95 416 75 3.0-3.5 9.7 114.2 92 X 2/28/95 417 77 4.0-4.5 13.2 109.7 88 X 2/28/95 417AU 77 4.0-4.5 10.4 115.7 93 X 2/28/95 418 79 4.0-4.5 10.2 114.1 92 X 2/28/95 419 81 4.0-4.5 10.9 116.7 94 X 2/28/95 420 83 3.5-4.0 10.2 117.2 95 X 2/28/95 421 85 4.0-4.5 10.9 116.7 94 X 2/28/95 422 70 2.0-2.5 9.9 120.4 93 VII . 2/28/95 423 72 2.0-2.5 11.0 110.7 93 VIII 2/28/98 424 78 2.0-2.5 10.4 112.5 95 VIII 2/28/95 425 80 2.0-2.5 10.6 117.1 94 X 2/28/95 426 82 2.0-2.5 10.9 115.5 93 X 2/28/95 427 84 2.0-2.5 10.7 114.2 92 X 3/1/95 428 7 3.0-3.5 10.9 115.0 89 VII 3/2/95 428A " 7 3.0-3.5 10.3 119.9 93 VII 3/1/95 429 9 3.0-3.5 11.9 105.1 88 VIII 3/2/95 429A u 9 3.0-3.5 10.7 110.7 93 VIII 3/1/95 430 11 3.0-3.5 13.1 103.2 87 VIII 3/2/95 430A u 11 3.0-3.5 11.0 109.5 92 VIII 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering r 1--? May 19, 1998 Project Number 4660-94 Page 26 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu.ft. Compaction ~ 3/1/95 431 8 3.0-3.5 10.0 115.1 93 X 3/1/95 432 9 3.0-3.5 10.5 116.7 94 X 3/1/95 433 11 3.0-3.5 10.9 110.2 93 VIII 3/1/95 434 13 3.0-3.5 10.5 117.7 91 VII 3/1/95 435 15 3.0-3.5 10.3 119.5 93 VII 3/1/95 436 17 3.0-3.5 10.2 111.5 97 VIII 3/1/95 437 19 2.0-2.5 10.1 118.2 95 X 3/1/95 438 21 2.0-2.5 10.2 117.1 94 X 3/1/95 439 8 2.0-2.5 10.9 115.0 93 X 3/1/95 440 10 2.0-2.5 10.3 114.2 92 X . 3/1/95 441 12 2.0-2.5 11.2 110.4 93 VIII 3/1/95 442 14 2.0-2.5 10.8 113.9 92 X 3/1/95 443 16 2.0-2.5 10.7 115.2 93 X 3/1/95 444 18 2.0-2.5 10.9 114.0 92 X 3/1/95 445 20 2.0-2.5 11.5 109.1 92 VIII 3/1/95 446 22 2.5-3.0 10.1 115.1 93 X 3/2/95 447 20 2.0-2.5 10.0 116.5 92 XI 3/2/95 448 22 2.0-2.5 9.8 118.4 94 XI 3/2/95 449 24 2.0-2.5 9.9 119.0 94 XI 3/2/95 450 26 2.0-2.5 9.7 116.1 92 XI -Depth below finish grade (in feet) "Retest of failing tests after area reworked . N orCal Engineering po May 19, 1998 Project Number 4660-94 Page 27 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu. ft. Compaction IYQg 3/2/95 451 28 2.0-2.5 10.0 117.2 93 XI 3/2/95 452 30 2.0-2.5 10.2 115.5 91 XI 3/2/95 453 32 2.0-2.5 10.1 114.9 91 XI 3/2/95 454 34 3.0-3.5 10.3 116.1 92 XI 3/2/95 455 8 1.5-2.0 10.2 117.2 93 XI 3/2/95 456 10 1.5-2.0 9.9 116.0 92 XI 3/2/95 457 12 1.5-2.0 9.7 117.9 93 XI 3/2/95 458 7 0.5-1.0 10.3 115.9 92 XI 3/2/95 459 9 0.5-1.0 10.1 116.4 92 XI . 3/2/95 460 11 0.5-1.0 10.2 117.2 93 XI 3/2/95 461 13 0.5-1.0 9.9 116.1 92 XI 3/2/95 462 15 1.0-1.5 9.7 118.5 94 XI 3/2/95 463 17 2.0-2.5 10.1 115.8 92 XI 3/2/95 464 19 2.0-2.5 10.3 116.7 92 XI 3/2/95 465 58 1.0-1.5 21.1 98.1 88 XII 4/5/95 465A .. 58 1.0-1.5 16.0 104.1 93 XII 3/17/95 466 60 1.5-2.0 20.2 97.4 87 XII 4/5/95 466A "* 60 1.5-2.0 16.3 103.5 92 XII 3/17/95 467 62 1.5-2.0 22.1 96.2 86 XII 4/5/95 467A** 62 1.5-2.0 16.6 112.4 91 XII *Depth below finish grade (in feet) . **Retest of failing tests after area reworked N orCal Engineering '2-\' May 19,1998 Project Number 4660-94 Page 28 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu. ft. Compaction ~ 4/3/95 468 34 2.0-2.5 10.3 117.2 93 XI 4/3/95 469 32 1.5-2.0 9.9 116.5 92 XI 4/3/95 470 30 1.5-2.0 9.5 118.4 94 XI 4/3/95 471 28 1.5-2.0 10.0 119.1 97 XI 4/3/95 472 26 1.5-2.0 10.2 118.0 93 XI 4/3/95 473 24 1.5-2.0 10.1 117.2 93 XI 4/3/95 474 22 1.5-2.0 10.3 116.5 92 XI 4/3/95 475 20 1.5-2.0 9.9 117.5 93 XI 4/3/95 476 18 1.5-2.0 10.2 118.8 94 XI . 4/3/95 477 16 1.5-2.0 9.4 116.5 92 XI 4/3/95 478 14 1.5-2.0 9.1 117.9 93 XI 4/4/95 479 21 5.0-5.5 9.5 123.9 95 IX 4/4/95 480 22 3.0-3.5 9.7 121.1 93 IX 4/4/95 481 21 2.0-2.5 10.3 120.7 92 IX 4/4/95 482 13 0.5-1.0 10.0 124.1 95 IX 4/4/95 483 15 1.0-1.5 9.1 122.4 94 IX 4/4/95 484 17 1.0-1.5 9.2 123.6 95 IX 4/4/95 485 19 1.0-1.5 9.7 125.1 96 IX 4/4/95 486 20 1.0-1.5 9.9 117.2 93 XI 4/4/95 487 21 1.0-1.5 9.7 118.5 97 XI "Depth below finish grade (in feet) . ""Retest of failing tests after area reworked N oreal Engineering 1,!h May 19,1998 Project Number 4660-94 Page 29 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth. Moisture Ibs.lcu. ft. Compaction ~ 4/4/95 488 23 1.0-1.5 9.5 122.4 94 IX 4/4/95 489 25 1.0-1.5 9.9 120.1 92 IX 4/4/95 490 27 1.0-1.5 9.1 116.5 92 XI 4/4/95 491 29 1.0-1.5 10.1 123.7 95 IX 4/4/95 492 31 1.0-1.5 10.3 122.4 94 IX 4/4/95 493 33 1.0-1.5 10.0 120.5 92 IX 4/4/95 494 63 3.0-3.5 10.9 117.2 95 X 4/5/95 495 65 4.0-4.5 10.3 116.4 94 X 4/5/95 496 67 2.0-2.5 10.2 115.3 93 X . 4/5/95 497 62 2.0-2.5 10.7 115.7 93 X 4/5/95 498 64 2.0-2.5 10.5 116.6 94 X 4/5/95 499 66 2.0-2.5 10.4 115.1 93 X 4/5/95 500 57 1.5-2.0 10.0 114.2 92 X 4/5/95 501 59 1.5-2.0 10.9 117.0 94 X 4/5/95 502 61 1.5-2.0 10.2 113.9 92 X 4/5/95 503 63 1.5-2.0 10.3 115.2 93 X 4/5/95 504 65 1.5-2.0 10.1 117.0 94 X 4/5/95 505 67 1.5-2.0 10.2 116.5 94 X 4/5/95 506 67 1.5-2.0 10.4 114.1 92 X 4/5/95 507 68 2.5-3.0 10.7 117.2 95 X .Depth below finish grade (in feet) ..Retest of failing tests after area reworked . N oreal Engineering 1,-0.. May 19, 1998 Project Number 4660-94 Page 30 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 4/6/95 508 69 1.5-2.0 10.2 116.4 92 XI 4/6/95 509 71 1.5-2.0 10.3 116.8 92 XI 4/6/95 510 73 2.0-2.5 10.0 117.9 92 XI 4/6/95 511 75 2.0-2.5 10.3 117.4 93 XI 4/6/95 512 77 1.5-2.0 9.9 116.2 92 XI 4/6/95 513 79 1.5-2.0 10.2 116.3 92 XI 4/6/95 514 81 1.5-2.0 9.7 115.9 92 XI 4/6/95 515 83 1.5-2.0 9.5 118.4 94 XI 4/6/95 516 85 1.5-2.0 9.1 119.2 94 XI . 4/6/95 517 53 1.5-2.0 10.3 118.4 94 XI 4/6/95 518 82 1.5-2.0 10.2 116.7 92 XI 4/6/95 519 80 1.5-2.0 10.1 117.8 93 XI 4/6/95 520 78 1.5-2.0 10.3 116.2 92 XI 4/6/95 521 75 1.5-2.0 10.0 115.9 92 XI 4/7/95 522 22 0.5-1.0 10.9 114.5 92 X 4/7/95 523 24 0.5-1.0 10.2 117.0 97 X 4/7/95 524 26 0.5-1.0 10.7 116.5 97 X 4/7/95 525 28 0.5-1.0 10.1 119.0 97 XI 4/7/95 526 30 0.5-1.0 10.0 118.1 93 XI 4/7/95 527 32 0.5-1.0 10.3 115.1 93 X 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering ?P May 19,1998 Project Number 4660-94 Page 31 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Deoth" Moisture Ibs.lcu. ft. Compaction ~ 4/7/95 528 34 0.5-1.0 10.2 113.9 92 X 4/7/95 529 14 0.5-1.0 10.5 114.5 92 X 4/7/95 530 16 0.5-1.0 10.9 116.5 97 X 4/7/95 531 18 0.5-1.0 10.4 117.2 95 X 4/7/95 532 20 0.5-1.0 10.2 117.4 93 XI 4/7/95 533 21 0.5-1.0 10.3 114.1 92 X 4/10/95 534 54 1.0-1.5 10.3 117.2 93 XI 4/10/95 535 56 1.0-1.5 10.2 118.4 94 XI 4/10/95 536 58 1.0-1.5 10.3 119.9 95 XI . 4/10/95 537 60 1.0-1.5 10.2 116.5 92 XI 4/10/95 538 62 1.0-1.5 10.1 117.1 93 XI 4/10/95 539 64 1.0-1.5 10.3 116.5 92 XI 4/10/95 540 66 1.0-1.5 10.0 117.5 93 XI 4/10/95 541 68 1.0-1.5 10.1 119.2 97 XI 4/10/95 542 70 3.0-3.5 10.2 116.5 92 XI 4/10/95 543 12 3.0-3.5 9.9 117.9 93 XI 4/10/95 544 14 3.0-3.5 10.2 118.4 97 XI 4/10/95 545 11 1.5-2.0 10.3 119.0 94 XI 4/10/95 546 13 1.5-2.0 9.8 117.8 93 XI 4/11/95 547 35 5.0-5.5 9.1 123.2 93 VI "Depth below finish grade (in feet) . ""Retest of failing tests after area reworked N orCal Engineering 7\ May 19,1998 Project Number 4660-94 Page 32 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu. ft. Compaction ~ 4/11/95 548 37 5.0-5.5 8.7 125.1 95 VI 4/11/95 549 39 5.0-5.5 9.0 124.5 94 VI 4/11/95 550 41 5.0-5.5 8.9 122.6 93 VI 4/11/95 551 36 4.0-4.5 9.7 113.9 92 X 4/11/95 552 38 4.0-4.5 10.3 114.2 92 X 4/11/95 553 40 4.0-4.5 10.0 115.7 92 X 4/11/95 554 35 3.0-3.5 9.2 124.0 97 VI 4/11/95 555 37 3.0-3.5 8.8 123.2 93 VI 4/11/95 556 39 3.0-3.5 9.1 126.1 96 VI . 4/11/95 557 41 3.0-3.5 9.0 127.4 97 VI 4/11/95 558 43 3.0-3.5 8.7 122.5 93 VI 4/12/95 559 85 0.5-1.0 9.7 116.7 92 XI 4/12/95 560 83 0.5-1.0 10.3 118.2 93 XI 4/12/95 561 81 0.5-1.0 10.1 119.1 97 XI 4/12/95 562 79 0.5-1.0 9.6 117.6 93 XI 4/12/95 563 77 0.5-1.0 9.5 116.2 92 XI 4/12/95 564 75 0.5-1.0 10.2 115.9 92 XI 4/12/95 565 73 0.5-1.0 10.2 115.0 93 X 4/12/95 566 71 0.5-1.0 9.7 116.7 94 X 4/12/95 567 69 0.5-1.0 9.6 117.0 94 X "Depth below finish grade (in feet) . ""Retest of failing tests after area reworked N orCal Engineering ~ May 19, 1998 Project Number 4660-94 Page 33 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 4/12/95 568 67 0.5-1.0 10.0 117.4 93 XI 4/12/95 569 65 0.5-1.0 10.2 118.8 94 XI 4/12/95 570 63 0.5-1.0 10.3 119.1 94 XI 4/12/95 571 61 0.5-1.0 10.3 122.4 95 IX 4/12/95 572 59 0.5-1.0 9.7 125.1 96 IX 4/12/95 573 57 0.5-1.0 9.9 120.7 92 IX 4/12/95 574 55 0.5-1.0 9.4 119.5 92 IX 4/13/95 575 36 2.5-3.0 10.1 124.5 95 IX 4/13/95 576 38 2.5-3.0 10.0 121.9 93 IX . 4/13/95 577 40 2.5-3.0 9.7 120.7 92 IX 4/13/95 578 42 2.5-3.0 9.9 120.5 92 IX 4/13/95 579 44 2.5-3.0 10.3 121.5 93 IX 4/13/95 580 35 2.0-2.5 10.1 122.5 94 IX 4/13/95 581 37 2.0-2.5 9.7 120.4 92 IX 4/13/95 582 39 2.0-2.5 10.3 118.9 91 IX 4/13/95 583 41 2.0-2.5 10.2 119.5 92 IX 4/13/95 584 43 2.0-2.5 10.1 122.0 93 IX 4/13/95 585 45 2.0-2.5 10.3 123.6 95 IX 4/13/95 586 85 0.0-0.5 14.7 112.7 86 IX 4/14/95 586A .. 85 0.0-0.5 10.3 120.5 92 IX 'Depth below finish grade (in feet) . .'Retest of failing tests after area reworked N orCal Engineering ?~ May 19, 1998 Project Number 4660-94 Page 34 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu. ft. Compaction ~ 4/13/95 587 86 0.0-0.5 14.9 113.7 87 IX 4/14/95 587A"" 86 0.0-0.5 10.2 122.1 94 IX 4/13/95 588 53 0.0-0.5 15.7 115.4 88 IX 4/14/95 588N" 53 0.0-0.5 10.3 123.4 95 IX 4/13/95 589 52 9.0-9.5 9.7 119.5 92 IX 4/13/95 590 Murfield Dr. 5.0-5.5 14.9 108.1 94 V 4/13/95 591 Murfield Dr. 3.0-3.5 15.2 1 06.4 93 V 4/14/95 592 Trotsdale Dr. 3.0-3.5 14.3 111.5 97 II 4/14/95 593 TrotsdaleDr. 3.0-3.5 15.4 105.9 92 V . 4/14/95 594 Canterfield 2.0-2.5 15.1 107.2 93 V 4/14/95 595 Canterfield 3.0-3.5 15.0 106.1 92 V 4/14/95 596 Canterfield 3.0-3.5 13.2 110.7 94 II 4/14/95 597 Murfield Dr. 3.0-3.5 13.9 109.5 93 II 4/14/95 598 Murfield Dr. 4.0-4.5 15.2 107.1 93 V 4/14/95 599 Murfield Dr. 2.0-2.5 15.5 105.1 91 V 4/14/95 600 52 7.0-7.5 10.3 116.7 92 XI 4/22/95 601 Manhole 1-215.0-15.5 15.0 107.1 91 II 4/22/95 602 Manhole 1-213.0-13.5 17.1 106.5 90 II 4/22/95 603 Manhole 1-211.0-11.5 16.3 109.1 92 II 4/22/95 604 Manhole 1-2 9.0-9.5 15.5 105.1 89 II "Depth below finish grade (in feet) . ""Retest of failing tests after area reworked N orCal Engineering ?t\ May 19, 1998 Project Number 4660-94 Page 35 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 5/11/95 604A"Manhole 1-2 9.0-9.5 14.3 107.7 91 " 4/22/95 605 Manhole 1-2 7.0-7.5 18.2 104.7 89 II 5/11/95 605A"Manhole 1-2 7.0-7.5 14.2 108.8 92 II 4/22/95 606 Manhole 1-2 5.0-5.5 17.9 105.0 89 " 5/11/95 606A**Manhole 1-2 5.0-5.5 14.7 109.5 93 II 4/22/95 607 Manhole 1-2 3.0-3.5 16.9 103.2 87 " 5/11/95 607A"Manhole 1-2 3.0-3.5 14.3 110.1 93 " 4/22/95 608 Manhole 1-2 1.0-1.5 16.0 102.1 87 " 5/11/95 608A"Manhole 1-2 1.0-1.5 14.2 109.5 93 " . 4/24/95 609 Manhole 1-213.0-13.5 15.0 108.4 92 II 4/24/95 610 Manhole 1-211.5-12.0 15.7 107.1 91 II 4/24/95 611 Manhole 1-210.0-10.5 14.9 106.4 90 II 4/24/95 612 Manhole 1-2 8.0-8.5 19.5 101.1 86 II 5/11/95 612A"Manhole 1-2 8.0-8.5 14.3 106.9 91 II 4/24/95 613 Manhole 1-2 6.0-6.5 20.0 103.0 87 " 5/11/95 613A"Manhole 1-2 6.0-6.5 14.0 107.9 91 II 4/24/95 614 Manhole 1-2 4.0-4.5 17.9 102.1 87 II 5/11/95 614A**Manhole 1-2 4.0-4.5 14.2 108.9 92 II 4/24/95 615 Manhole 1-2 2.0-2.5 14.0 117.9 90 II 4/24/95 616 Manhole 1-2 0.5-1.0 17.2 100.4 85 " 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering ~{ May 19,1998 Project Number 4660-94 Page 36 , . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu. ft. Compaction IYQg 5/11/95 616A**Manhole 1-2 0.5-1.0 14.1 109.1 92 II 4/25/95 617 Manhole 1-213.0-13.5 15.0 108.7 92 II 4/25/95 618 Manhole 1-211.0-11.5 15.5 107.2 91 II 4/25/95 619 Manhole 1-2 9.0-9.5 14.3 106.5 90 II 4/25/95 620 Manhole 1-2 7.0-7.5 13.9 106.6 90 II 4/25/95 621 Manhole 1-2 5.0-5.5 12.9 107.2 91 II 4/25/95 622 Manhole 1-2 3.0-3.5 10.3 116.6 92 XI 4/25/95 623 Manhole 1-2 1.0-1.5 10.1 117.5 93 XI 4/25/95 624 Manhole 1-212.0-12.5 10.5 115.2 93 X . 4/25/95 625 Manhole 1-210.0-10.5 9.7 117.1 94 X 4/25/95 626 Manhole 1-2 8.0-8.5 10.4 114.0 92 X 4/25/95 627 Manhole 1-2 6.0-6.5 10.3 114.9 91 XI 4/25/95 628 Manhole 1-2 4.0-4.5 10.1 117.0 92 XI 4/25/95 629 Manhole 1-2 2.0-2.5 10.0 118.2 93 XI 4/26/95 630 Manhole 1-2 0.0-0.5 9.9 116.9 92 XI 4/26/95 631 Manhole 1-2 0.0-0.5 10.3 117.4 93 XI 4/26/95 4/26/95 4/26/95 4/26/95 632 Manhole 1-2 0.0-0.5 633 Manhole 1-213.0-13.5 634 Manhole 1-211.0-11.5 635 Manhole 1-2 9.0-9.5 10.2 9.8 9.7 10.0 117.1 116.5 117.0 119.1 93 92 92 94 XI XI XI XI . *Depth below finish grade (in feet) **Retest of failing tests after area reworked N oreal Engineering -1f May 19,1998 Project Number 4660-94 Page 37 . TABLE" COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. {Lot No.) Depth* Moisture Ibs.lcu.ft. Compaction J:yQg 4/26/95 636 Manhole 1-2 7.0-7.5 16.1 110.1 87 XI 5/11/95 636A**Manhole 1-2 7.0-7.5 10.3 113.9 90 XI 4/26/95 637 Manhole 1-2 5.0-5.5 10.9 109.4 86 XI 5/11/95 637A**Manhole 1-2 5.0-5.5 10.3 114.7 91 XI 4/27/95 638 Manhole 1-2 3.0-3.5 14.3 110.7 88 XI 5/11/95 638A**Manhole 1-2 3.0-3.5 10.1 115.2 91 XI 4/27/95 639 Manhole 1-2 1.5-2.0 17.1 112.0 89 XI 5/1/95 640 Manhole 2-1210.5-11.0 10.3 114.7 93 X 5/1/95 641 Manhole 2-12 8.5-9.0 10.0 115.1 91 XI . 5/1/95 642 Manhole 2-12 6.5-7.0 10.2 116.3 94 X 5/1/95 643 Manhole 2-12 6.0-6.5 10.3 117.2 93 XI 5/1/95 644 Manhole 2-12 6.0-6.5 10.0 115.7 91 XI 5/2/95 645 Manhole 2-12 4.5-5.0 9.9 115.9 93 X 5/2/95 646 Manhole 2-12 4.5-5.0 9.7 114.7 91 XI 5/2/95 647 Manhole 2-12 4.5-5.0 9.6 114.9 91 XI 5/2/95 648 Manhole 2-12 4.5-5.0 9.9 116.8 92 XI 5/2/95 649 Manhole 2-12 3.0-3.5 10.2 117.2 93 XI 5/2/95 650 Manhole 2-12 3.0-3.5 10.3 117.2 93 XI 5/2/95 651 Manhole 2-12 3.0-3.5 10.7 118.5 94 XI 5/2/95 652 Manhole 2-12 3.0-3.5 10.2 119.2 94 XI *Depth below finish grade (in feet) **Retest of failing tests after area reworked . Noreal Engineering "?'\ May 19,1998 Project Number 4660-94 Page 38 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu. ft. Compaction IYQg 5/4/95 653 Manhole 2-121.5-2.0 13.9 109.1 92 II 5/4/95 654 Manhole 2-121.5-2.0 12.5 110.5 94 II 5/4/95 655 Manhole 2-12 1.5-2.0 13.5 111.2 94 II 5/4/95 656 Manhole 2-121.5-2.0 13.1 109.0 92 II 5/4/95 657 Manhole 2-311.0-11.5 15.2 104.5 91 V 5/4/95 658 Manhole 2-3 9.0-9.5 15.0 104.1 91 V 5/4/95 659 Manhole 2-3 8.0-8.5 14.1 106.4 93 V 5/4/95 660 Manhole 2-3 7.0-7.5 21.5 100.1 87 V 5/11/95 660A**Manhole 2-3 7.0-7.5 15.4 107.7 94 V . 5/4/95 661 Manhole 2-3 7.0-7.5 22.0 99.5 87 V 5/11/95 661A"" Manhole 2-3 7.0-7.5 15.5 105.1 91 V 5/4/95 662 Manhole 2-3 7.0-7.5 21.1 101.2 88 V 5/11/95 662A"" Manhole 2-3 7.0-7.5 15.3 104.2 91 V 5/5/95 663 Manhole 3-4 8.0-8.5 15.5 106.1 92 V 5/5/95 664 Manhole 3-4 6.0-6.5 15.1 105.7 92 V 5/5/95 665 Manhole 3-4 6.0-6.5 14.7 105.8 92 V 5/5/95 666 Manhole 3-4 4.0-4.5 15.1 103.5 90 V 5/5/95 667 Manhole 3-4 4.0-4.5 15.0 103.9 90 V 5/5/95 668 Manhole 3-4 4.0-4.5 10.3 116.0 92 XI 5/5/95 669 Manhole 3-4 4.0-4.5 10.0 114.9 91 XI "Depth below finish grade (in feet) . ""Retest of failing tests after area reworked N orCal Engineering ~ May 19,1998 Project Number 4660-94 Page 39 I . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction I:iQg 5/5/95 670 Manhole 3-4 3.0-3.5 10.1 115.2 91 XI 5/5/95 671 Manhole 3-4 3.0-3.5 10.2 116.5 92 XI 5/5/95 672 Manhole 3-4 3.0-3.5 10.3 117.0 92 XI 5/5/95 673 Manhole 3-4 3.0-3.5 10.2 119.4 94 XI 5/8/95 674 Manhole 4-5 5.5-6.0 15.5 103.8 90 V 5/8/95 675 Manhole 4-5 5.5-6.0 15.3 104.7 91 V 5/8/95 676 Manhole 4-5 5.5-6.0 10.3 118.5 94 XI 5/8/95 677 Manhole 4-5 5.5-6.0 10.1 117.2 93 XI 5/8/95 678 Manhole 4-5 4.0-4.5 15.5 105.0 91 V . 5/8/95 679 Manhole 4-5 4.0-4.5 15.1 108.1 94 V 5/8/95 680 Manhole 4-5 4.0-4.5 15.3 107.7 94 V 5/8/95 681 Manhole 4-5 4.0-4.5 15.0 106.9 93 V 5/8/95 682 Manhole 5-136.0-6.5 14.4 108.4 94 V 5/8/95 683 Manhole 5-13 5.0-5.5 15.0 107.5 93 V 5/8/95 684 Manhole 5-13 4.0-4.5 15.5 105.4 92 V 5/8/95 685 Manhole 4-5 2.5-3.0 14.3 109.2 93 II . 5/8/95 686 Manhole 4-5 2.5-3.0 14.0 108.4 92 II 5/8/95 687 Manhole 4-5 2.5-3.0 14.3 107.0 91 II 5/8/95 688 Manhole 4-5 2.5-3.0 14.1 111.1 94 II 5/9/95 689 Manhole 5-105.0-5.5 14.2 110.7 94 II 'Depth below finish grade (in feet) "Retest of failing tests after area reworked NorCal Engineering 7q May 19, 1998 Project Number 4660-94 Page 40 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu.ft. Compaction ~ 5/9/95 690 Manhole 5-105.0-5.5 15.1 109.1 95 V 5/9/95 691 Manhole 5-103.0-3.5 15.0 107.9 94 V 5/9/95 692 Manhole 5-103.0-3.5 14.7 108.5 94 V 5/9/95 693 Manhole 5-103.0-3.5 13.9 110.5 94 II 5/9/95 694 Manhole 5-10 2.0-2.5 14.3 109.9 93 II 5/9/95 695 Manhole 5-102.0-2.5 14.0 108.5 92 II 5/9/95 696 Manhole 5-102.0-2.5 15.5 106.9 93 V 5/9/95 697 Manhole 5-6 6.0-6.5 15.1 105.7 92 V 5/9/95 698 Manhole 5-6 6.0-6.5 15.2 108.2 94 V . 5/9/95 699 Manhole 5-6 6.0-6.5 15.0 107.4 93 V 5/9/95 700 Manhole 5-6 5.0-5.5 13.7 107.1 91 II 5/9/95 701 Manhole 5-6 5.0-5.5 15.5 108.5 94 V 5/9/95 702 Manhole 5-6 4.0-4.5 15.0 107.2 93 V 5/9/95 703 Manhole 5-6 4.0-4.5 15.1 106.4 93 V 5/9/95 704 Manhole 5-6 4.0-4.5 15.0 105.1 91 V 5/10/95 705 62 4.0-4.5 15.4 108.2 94 V 5/10/95 706 62 2.0-2.5 14.8 107.5 93 V 5/10/95 707 ' Manhole 5-6 2.0-2.5 14.7 106.4 93 V 5/1 0/95 708 Manhole 5-6 2.0-2.5 14.5 105.2 91 V 5/10/95 709 Manhole 5-6 2.0-2.5 14.2 107.1 93 V "Depth below finish grade (in feet) . ""Retest of failing tests after area reworked N orCal Engineering AD May 19, 1998 Project Number 4660-94 Page 41 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu.ft. Compaction ~ 5/10/95 710 Manhole 6-14 5.0-5.5 15.4 106.1 92 V 5/10/95 711 Manhole 6-144.0-4.5 15.0 105.4 92 V 5/10/95 712 Manhole 6-14 3.0-3.5 15.1 105.7 92 V 5/10/95 713 Manhole 6-14 2.0-2.5 15.2 107.2 93 V 5/10/95 714 Manhole 6-7 5.5-6.0 14.7 108.8 92 II 5/10/95 715 Manhole 6-7 5.5-6.0 14.1 109.9 93 II 5/10/95 716 Manhole 6-7 5.5-6.0 13.9 110.5 94 II 5/10/95 717 Manhole 6-7 5.5-6.0 13.2 109.2 93 II 5/10/95 718 Manhole 6-7 4.0-4.5 15.0 108.1 94 V . 5/10/95 719 Manhole 6-7 4.0-4.5 15.5 105.9 92 V 5/10/95 720 Manhole 6-7 4.0-4.5 10.4 116.7 94 X 5/10/95 721 Manhole 6-7 4.0-4.5 14.0 109.1 92 II 5/11/95 722 Manhole 6-7 3.0-3.5 15.1 106.7 93 V 5/11/95 723 Manhole 6-7 3.0-3.5 15.7 105.8 92 V 5/11/95 724 Manhole 7-8 5.5-6.0 15.4 105.4 92 V 5/11/95 725 Manhole 7-8 5.5-6.0 15.2 104.2 91 V 5/11/95 726 Manhole 7-8 5.5-6.0 14.9 105.8 91 V 5/11/95 727 Manhole 7-8 5.5-6.0 14.7 107.2 93 V 5/11/95 728 Manhole 7-8 4.0-4.5 14.2 109.7 93 II 5/11/95 729 Manhole 7-8 4.0-4.5 13.6 110.4 94 II *Depth below finish grade (in feet) . **Retest of failing tests after area reworked N orCal Engineering A,\ May 19, 1998 Project Number 4660-94 Page 42 , . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu. ft. Compaction ~ 5/11/95 730 Manhole 7-8 4.0-4.5 15.5 107.7 94 V 5/11/95 731 Manhole 7-8 4.0-4.5 15.2 108.8 95 V 5/11/95 732 Manhole 2-3 5.0-5.5 10.7 115.6 93 X 5/11/95 733 Manhole 2-3 5.0-5.5 14.9 107.4 93 V 5/11/95 734 Manhole 2-3 5.0-5.5 15.5 108.1 94 V 5/11/95 735 Manhole 2-3 5.0-5.5 16.0 109.5 95 V 5/12/95 736 Manhole 2-3 3.0-3.5 17.1 110.1 94 V 5/12/95 737 Manhole 2-3 3.0-3.5 17.8 108.2 94 V 5/12/95 738 ,Manhole 2-3 3.0-3.5 18.4 107.1 93 V i . 5/12/95 739 Manhole 2-3 3.0-3.5 17.2 106.5 93 V , 5/12/95 740 Manhole 8-9 5.0-5.5 13.2 110.7 94 II 5/12/95 741 Manhole 8-9 5.0-5.5 14.0 110.9 94 II 5/12/95 742 Manhole 7-8 3.0-3.5 14.0 105.7 92 V 5/12/95 743 Manhole 7-8 3.0-3.5 13.0 108.9 92 II 5/12/95 744 Manhole 7-8 3.0-3.5 13.5 109.7 93 II 5/12/95 745 Lots 27-28 8.0-8.5 10.4 117.1 93 XI 5/12/95 746 Lots 27-28 6.0-6.5 9.8 119.5 92 XI 5/12/95 747 Lots 27-28 4.0-4.5 9.9 120.2 95 XI 5/12/95 748 Lots 27-28 2.0-2.5 10.1 118.4 94 XI 5/12/95 749 Lots 27-28 0.5-1.0 10.3 116.7 92 XI 'Depth below finish grade (in feet) "Retest of failing tests after area reworked . N orCal Engineering A,V May 19,1998 Project Number 4660-94 Page 43 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu. ft. Compaction lYQg 5/15/95 750 Manhole 8-9 3.0-3.5 10.8 114.7 93 X 5/15/95 751 Manhole 8-9 3.0-3.5 10.9 115.2 93 X 5/15/95 752 Manhole 8-9 3.0-3.5 10.3 116.5 94 X 5/15/95 753 Manhole 8-9 1.5-2.0 10.5 115.9 93 X 5/15/95 754 Manhole 8-9 1.5-2.0 10.7 114.2 92 X 5/15/95 755 Manhole 8-9 1.5-2.0 10.0' 113.9 92 X 5/15/95 756 Manhole 8-9 0.5-1.0 10.5 115.9 93 X 5/15/95 757 Manhole 8-9 0.5-1.0 10.2 115.9 93 X 5/15/95 758 Manhole 8-9 0.5-1.0 10.9 116.7 94 X 5/16/95 759 Manhole 2-3 1.5-2.0 15.0 108.2 92 II . 5/16/95 760 Manhole 2-3 1.5-2.0 17.1 107.5 91 II 5/16/95 761 Manhole 2-3 1.5-2.0 17.0 109.1 92 II 5/16/95 762 Manhole 2-3 1.5-2.0 16.7 108.8 92 II 5/19/95 763 77 0.0-0.5 11.5 117.1 93 XI 5/19/95 764 78 0.0-0.5 10.9 118.4 94 XI 5/19/95 765 79 0.0-0.5 11.0 119.2 94 XI 5/19/95 766 5/19/95 767 5/19/95 768 5/19/95 769 80 81 82 83 0.0-0.5 0.0-0.5 0.0-0.5 0.0-0.5 12.4 15.0 12.1 10.9 116.7 118.0 117.0 117.5 92 95 92 93 XI X XI XI 'Depth below finish grade (in feet) "Retest of failing tests after area reworked . N orCal Engineering t>..,1/ May 19,1998 Project Number 4660-94 Page 44 , . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu.ft. Compaction ~ 5/23/95 770 13 0.0-0.5 11.8 116.1 94 X 5/23/95 771 14 0.0-0.5 12.1 117.2 93 XI 5/23/95 772 15 0.0-0.5 13.0 117.9 93 XI 5/23/95 773 15 0.0-0.5 13.0 117.9 93 XI 5/23/95 774 16 0.0-0.5 13.1 117.2 95 X 5/23/95 775 17 0.0-0.5 10.3 116.5 92 XI 5/23/95 776 18 0.0-0.5 10.1 117.5 93 XI 5/23/95 777 19 0.0-0.5 10.5 118.4 94 XI 5/23/95 778 20 0.0-0.5 10.3 117.2 93 XI . 5/23/95 779 34 0.0-0.5 10.0 118.5 94 XI 5/23/95 780 33 0.0-0.5 10.2 116.1 92 XI 5/23/95 781 32 0.0-0.5 10.4 116.7 92 XI 5/23/95 782 31 0.0-0.5 10.0 117.5 93 XI 5/25/95 783 83 0.0-0.5 9.9 118.4 94 XI 5/25/95 784 84 0.0-0.5 9.7 118.9 94 XI 5/25/95 785 85 0.0-0.5 10.4 117.0 92 XI 5/25/95 786 86 0.0-0.5 9.8 116.5 92 XI 5/25/95 787 53 0.0-0.5 10.3 115.9 92 XI 5/25/95 788 54 0.0-0.5 10.3 116.2 92 XI 5/25/95 789 55 0.0-0.5 10.4 116.7 92 XI "Depth below finish grade (in feet) . ..Retest of failing tests after area reworked N orCal Engineering M May 19, 1998 Project Number 4660-94 Page 45 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu. ft. Compaction ~ 5/25/95 790 56 0.0-0.5 10.5 115.0 93 X 5/25/95 791 57 0.0-0.5 10.4 114.7 93 X 5/25/95 792 58 0.0-0.5 10.9 114.1 92 X 5/25/95 793 59 0.0-0.5 11.0 113.9 92 X 5/25/95 794 78 0.0-0.5 10.3 115.2 93 X 5/25/95 795 77 0.0-0.5 10.7 116.4 94 X 5/25/95 796 76 0.0-0.5 10.1 117.9 93 XI 5/25/95 797 75 0.0-0.5 10.3 117.4 93 XI 5/25/95 798 74 0.0-0.5 10.2 118.2 93 XI . 5/25/95 799 73 0.0-0.5 10.5 117.1 93 XI 5/25/95 800 72 0.0-0.5 10.0 116.0 92 XI 5/25/95 801 71 0.0-0.5 9.9 115.5 91 XI 5/25/95 802 70 0.0-0.5 9.8 116.7 92 XI 5/25/95 803 69 0.0-0.5 9.5 118.4 94 XI 5/25/95 804 68 0.0-0.5 10.1 118.9 94 XI 5/25/95 805 67 0.0-0.5 10.7 119.5 94 XI 5/25/95 806 66 0.0-0.5 10.4 117.0 92 X 5/25/95 807 65 0.0-0.5 10.5 118.0 93 XI 5/25/95 808 64 0.0-0.5 11.0 119.5 94 XI 5/25/95 809 63 0.0-0.5 10.3 116.8 92 XI 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering ~ May 19,1998 Project Number 4660-94 Page 46 I . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth- Moisture Ibs.lcu. ft. Compaction ~ 5/30/95 810 7 0.0-0.5 10.0 117.2 93 XI 5/30/95 811 8 0.0-0.5 9.7 117.5 93 XI 5/30/95 812 9 0.0-0.5 9.8 116.0 92 XI 5/30/95 813 10 0.0-0.5 10.4 118.1 93 XI 5/30/95 814 60 0.0-0.5 10.2 116.3 92 XI 5/30/95 815 61 0.0-0.5 10.3 117.2 93 XI 5/30/95 816 62 0.0-0.5 10.1 118.5 94 XI 5/30/95 817 21 0.0-0.5 10.1 118.0 93 XI 5/30/95 818 22 0.0-0.5 10.5 117.2 93 XI . 5/30/95 819 23 0.0-0.5 10.2 117.9 93 XI 5/30/95 820 24 0.0-0.5 10.5 116.7 92 XI 5/30/95 821 25 0.0-0.5 10.3 115.8 92 XI 5/30/95 822 26 0.0-0.5 9.7 115.5 91 XI 5/30/95 823 27 0.0-0.5 9.9 116.6 92 XI 5/30/95 824 28 0.0-0.5 9.8 117.2 93 XI 5/30/95 825 29 0.0-0.5 10.4 118.4 94 XI 5/30/95 826 30 0.0-0.5 10.2 116.5 92 XI 5/31/95 827 Trotsdale Dr. 1.0-1.5 11.7 117.2 93 XI 5/31/95 828 Trotsdale Dr. 1.5-2.0 11.9 116.5 92 XI 6/1/95 829 Canterfield 1.5-2.0 12.0 116.0 92 XI -Depth below finish grade (in feet) . --Retest of failing tests after area reworked N orCal Engineering hie May 19, 1998 Project Number 4660-94 Page 47 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth. Moisture Ibs.lcu.ft. Compaction ~ 6/1/95 830 Canterfield 1.5-2.0 10.9 116.2 92 XI 6/1/95 831 ReinCt. 1.0-1.5 11.7 117.1 93 XI 6/2/95 832 East Channel 0.0-0.5 19.5 92.5 84 IV 6/2/95 832A..East Channel 0.0-0.5 14.1 105.1 91 IV 6/2/95 833 East Channel 0.0-0.5 10.0 93.6 85 IV 6/2/95 833A ."East Channel 13.0 104.6 91 IV 6/2195 834 East Channel 0.0-0.5 20.5 94.1 86 IV 6/2/95 834A ""East Channel 13.5 107.1 93 IV 6/2/95 835 52 5.0-5.5 10.4 116.9 92 XI . 6/2/95 836 52 3.0-3.5 10.1 116.8 92 XI 6/2/95 837 51 1.0-1.5 10.3 115.2 93 X 6/2/95 838 52 1.0-1.5 10.7 116.7 94 X 6/2/95 839 35 2.5-3.0 10.3 116.8 92 XI 6/2/95 840 37 2.0-2.5 10.2 117.2 93 XI 6/2/95 841 39 1.5-2.0 9.7 118.5 96 X 6/2195 842 41 1.0-1.5 9.8 119.2 96 X 6/2/95 843 43 0.5-1.0 10.0 117.1 94 X 6/2/95 844 45 0.5-1.0 10.9 116.1 92 XI 6/2/95 845 52 1.5-2.0 10.0 116.5 92 XI 6/5/95 846 35 1.0-1.5 9.8 117.5 93 XI .Depth below finish grade (in feet) . ""Retest of failing tests after area reworked N orCal Engineering ~~ May 19,1998 Project Number 4660-94 Page 48 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu. ft. Compaction Ii:Qg 6/5/95 847 36 1.0-1.5 9.5 120.4 95 XI 6/5/95 848 38 0.5-1.0 9.9 119.2 94 XI 6/5/95 849 40 0.5-1.0 10.4 118.5 94 XI 6/5/95 850 49 0.0-0.5 10.0 114.9 93 X 6/5/95 851 48 0.0-0.5 10.2 116.5 94 X 6/5/95 852 47 0.0-0.5 10.2 117.2 93 XI 6/5/95 853 46 0.0-0.5 10.4 116.9 92 XI 6/5/95 854 45 0.0-0.5 10.3 117.5 93 XI 6/5/95 855 44 0.0-0.5 10.9 115.0 93 X . 6/6/95 856 62 6.0-6.5 10.7 114.9 93 X 6/6/95 857 62 4.0-4.5 10.4 115.2 94 X 6/6/95 858 62 2.0-2.5 10.1 115.9 93 X 6/6/95 859 67 6.0-6.5 9.7 119.0 94 XI 6/6/95 860 67 4.0-4.5 9.5 119.2 94 XI 6/6/95 861 67 2.0-2.5 9.2 116.7 92 XI 6/6/95 862 67 1.0-1.5 10.1 115.7 93 X 6/6/95 863 35 0.0-0.5 10.6 114.9 93 X 6/6/95 864 36 0.0-0.5 10.8 114.2 92 X 6/6/95 865 37 0.0-0.5 10.9 114.8 93 X 6/6/95 866 38 0.0-0.5 10.9 115.7 93 X "Depth below finish grade (in feet) ""Retest of failing tests after area reworked . N oreal Engineering A.~ May 19,1998 Project Number 4660-94 Page 49 I . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth. Moisture Ibs.lcu. ft. Compaction ~ 6/6/95 867 39 0.0-0.5 10.2 117.5 95 X 6/6/95 868 40 0.0-0.5 10.4 116.9 94 X 6/6/95 869 41 0.0-0.5 10.7 117.2 95 X 6/6/95 870 42 0.0-0.5 10.2 117.1 93 XI 6/6/95 871 78 6.0-6.5 10.3 119.5 94 XI 6/6/95 872 78 4.0-4.5 10.1 120.4 95 XI 6/6/95 873 78 2.0-2.5 10.0 118.6 94 XI 6/6/95 874 71 6.0-6.5 9.7 118.9 94 XI 6/6/95 875 71 4.0-4.5 9.5 117.5 93 XI . 6/6/95 876 71 2.0-2.5 10.3 116.8 92 XI 6/6/95 877 78 1.0-1.5 9.5 117.2 93 XI 6/7/95 878 51 0.5-1.0 9.7 117.9 93 XI 6/7/95 879 50 0.5-1.0 9.5 118.5 94 XI 6/7/95 880 17 6.0-6.5 9.9 119.2 94 XI 6/7/95 881 17 4.0-4.5 10.2 118.6 94 XI 6/7/95 882 18 6.0-6.5 10.2 118.5 96 X 6/7/95 883 18 4.0-4.5 10.5 119.0 96 X 6/7/95 884 17 2.0-2.5 10.4 118.7 94 X 6/7/95 885 17 1.0-1.5 10.1 118.9 94 XI 6/7/95 886 38 6.0-6.5 10.0 118.0 93 XI .Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering A.o... May 19,1998 Project Number 4660-94 Page 50 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. {Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 6/7/95 887 38 4.0-4.5 10.5 117.1 93 XI 6/7/95 888 38 2.0-2.5 10.7 114.1 92 X 6/7/95 889 39 6.0-6.5 10.9 115.9 93 X 6/7/95 890 39 4.0-4.5 10.1 116.5 94 X 6/7/95 891 39 2.0-2.5 10.5 117.2 95 X 6/7/95 892 38 1.0-1.5 10.2 116.5 92 XI 6/7/95 893 7 0.0-0.5 10.3 117.2 93 XI 6/7/95 894 8 0.0-0.5 9.7 118.0 93 XI 6/7/95 895 Murfield Dr. 3.0-3.5 10.2 118.5 96 X . 6/7/95 896 Murfield Dr. 3.0-3.5 10.1 117.9 95 X 6/7/95 897 Canterfield 2.0-2.5 10.4 116.7 94 X 6/8/95 898 51 0.0-0.5 10.3 122.4 95 IX 6/8/95 899 52 0.0-0.5 10.2 120.7 92 IX 6/8/95 900 Murfield Dr. 0.5-1.0 9.7 118.9 94 XI 6/8/95 901 Trotsdale Dr. 0.5-1.0 9.8 117.0 92 XI 6/8/95 902 Murfield Dr. 2.0-2.5 10.5 116.2 92 XI 6/13/95 903 Trot. water 2.0-2.5 12.0 109.5 93 II 6/13/95 904 Trot. water 0.5-1.0 13.1 110.2 93 II 6/13/95 905 Trot. water 2.0-2.5 15.0 108.0 94 V 6/13/95 906 Trot. water 0.5-1.0 12.2 108.7 92 II 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering ?0 May 19,1998 Project Number 4660-94 Page 51 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu. ft. Compaction ~ 6/13/95 907 Trot. water 2.0-2.5 14.7 107.1 93 V 6/13/95 908 Trot. water 0.5-1.0 10.9 108.6 91 VIII 6/13/95 909 Trot. water 1.5-2.0 10.8 109.9 92 VIII 6/13/95 910 Trot. water 1.5-2.0 15.1 111.2 97 V 6/13/95 911 Trot. water 1.5-2.0 11.0 110.4 93 VIII 6/14/95 912 Trot. elect. 1.5-2.0 11.1 108.7 91 VIII 6/14/95 913 Trot. elect. 1.5-2.0 10.5 107.9 91 VIII 6/14/95 914 Trot. elect. 1.5-2.0 10.8 112.9 91 X 6/14/95 915 Trot. elect. 1.5-2.0 15.2 109.1 95 V . 6/14/95 916 Murfield water 1.5-2.0 15.0 108.7 95 V 6/14/95 917 Murfield water 1.5-2.0 14.7 110.4 96 V 6/14/95 918 Murfield water 1.5-2.0 14.1 109.2 95 V 6/14/95 919 Murfield water 1.5-2.0 10.7 108.2 91 VIII 6/14/95 920 Murfield water 1.5-2.0 10.6 113.8 92 X 6/14/95 921 Murfield water 1.5-2.0 11.2 107.1 90 VIII 6/14/95 922 Murfield water 1.5-2.0 11.0 109.4 92 VIII 6/14/95 923 Murfield water 1.5-2.0 10.9 110.2 93 VIII 6/15/95 924 Murfield water 1.5-2.0 10.8 115.1 93 X 6/15/95 925 Murfield water 1.5-2.0 11.5 108.5 91 VIII 6/15/95 926 Cant. water 1.5-2.0 15.2 106.7 93 V *Depth below finish grade (in feet) . **Retest of failing tests after area reworked N orCal Engineering ~\ May 19,1998 Project Number 4660-94 Page 52 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 6/15/95 927 Cant. water 1.5-2.0 16.7 101.1 92 IV 6/15/95 928 Cant. water 1.5-2.0 13.9 106.8 93 V 6/15/95 929 Cant. water 1.5-2.0 17.1 100.2 91 IV 6/15/95 930 Cant. water 1.5-2.0 13.7 109.2 95 V 6/15/95 931 Cant. water 1.5-2.0 15.0 105.7 92 V 6/15/95 932 Cant. water 1.5-2.0 17.2 102.4 93 IV 6/15/95 933 Mur. elect. 1.5-2.0 14.2 106.1 92 V 6/15/95 934 Mur. elect. 1.5-2.0 13.0 104.9 91 V 6/15/95 935 Mur. elect. 1.5-2.0 14.1 105.8 92 V . 6/15/95 936 Mur. elect. 1.5-2.0 13.5 106.9 93 V 6/15/95 937 Mur. elect. 1.5-2.0 10.9 114.9 93 X 6/16/95 938 Cant. water 3.0-3.5 13.9 107.2 93 V 6/16/95 939 Cant. water 1.5-2.0 14.7 105.5 92 V 6/16/95 940 Cant. water 1.5-2.0 15.0 106.4 93 V 6/16/95 941 Cant. water 1.5-2.0 10.8 116.2 94 X 6/16/95 942 Cant. water 1.5-2.0 16.9 103.0 94 IV 6/16/95 943 Cant. water 1.5-2.0 15.2 107.0 93 V 6/16/95 944 Cant. water 1.5-2.0 17.1 102.1 93 IV 6/16/95 945 Cant. water 1.5-2.0 14.1 105.7 92 V 6/16/95 946 Cant. water 1.5-2.0 14.7 106.2 92 V 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N oreal Engineering :;1/ May 19,1998 Project Number 4660-94 Page 53 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction IYQg 6/16/95 947 Trot. water 5.0-5.5 16.2 100.7 92 IV 6/16/95 948 Trot. water 3.0-3.5 15.0 107.1 93 V 6/16/95 949 Rein water 1.5-2.0 17.5 95.4 87 IV 6/19/95949A .. Rein water 1.5-2.0 16.2 100.3 91 IV 6/19/98 950 Rein water 1.5-2.0 17.6 101.9 93 IV 6/19/95 951 Rein water 1.5-2.0 17.0 99.9 91 IV 6/19/95 952 Rein water 1.5-2.0 16.5 102.4 93 IV 6/19/95 953 Rein water 1.5-2.0 17.1 100.7 92 IV 6/19/95 954 Cant. water 3.0-3.5 11.7 108.5 92 II . 6/19/95 955 Cant. water 3.0-3.5 12.4 111.2 94 II 6/19/95 956 Cant. water 1.5-2.0 12.5 110.7 94 II 6/19/95 957 Mur. water 4.0-4.5 12.3 109.3 93 II 6/19/95 958 Mur. water 3.0-3.5 12.5 108.0 92 II 6/19/95 959 Mur. water 2.0-2.5 13.1 109.5 93 II 6/19/95 960 Mur. water 1.5-2.0 11.9 110.4 94 II 6/19/95 961 Mur. water 1.0-1.5 12.3 108.7 92 II 6/19/95 962 Mur. water 1.5-2.0 13.2 109.6 93 II 6/20/95 963 Trot. water 2.0-2.5 15.0 108.1 94 V 6/20/95 964 Trot. water 1.5-2.0 14.7 107.4 93 V 6/20/95 965 Trot. water 1.5-2.0 14.9 105.1 91 V 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N oreal Engineering ?'? May 19, 1998 Project Number 4660-94 Page 54 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 6/20/95 966 Trot. water 1.5-2.0 14.5 106.8 93 V 6/20/95 967 Trot. water 1.5-2.0 16.5 103.1 94 IV 6/20/95 968 Trot. water 1.5-2.0 15.9 100.7 92 IV 6/20/95 969 Trot. water 1.5-2.0 13.2 105.9 92 V 6/20/95 970 Trot. water 1.5-2.0 13.9 106.4 93 V 6/20/95 971 Trot. water 1.5-2.0 17.0 100.6 91 IV 6/20/95 972 Trot. water 1.5-2.0 14.1 107.0 93 V 6/20/95 973 Trot. water 1.5-2.0 16.2 101.7 92 IV 6/20/95 974 Trot. water 1.5-2.0 13.7 108.1 94 V . 6/20/95 975 Trot. water 1.5-2.0 14.2 107.2 93 V 6/20/95 976 Trot. water 1.5-2.0 15.5 105.7 92 V 6/23/95 977 S.D. bet. 19-20 3.0-3.5 9.7 123.7 94 VI 6/23/95 978 S.D. bet. 19-20 1.5-2.0 9.5 122.9 93 VI 6/23/95 979 S.D. bet. 19-20 1.5-2.0 9.3 124.7 94 VI 6/23/95 980 S.D. bet. 19-20 0.5-1.0 9.2 122.5 93 VI 6/23/95 981 S.D. crossing Trot. 1.0-1.5 9.4 119.9 91 VI 6/26/95 982 Wash channel 7.5-8.0 13.8 108.7 92 II 6/26/95 983 Wash channel 6.0-6.5 13.7 109.1 92 II 6/26/95 984 Wash channel 5.0-5.5 16.0 105.2 93 I 6/26/95 985 Wash channel 4.0-4.5 13.9 110.2 93 II 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering -st\ May 19,1998 Project Number 4660-94 Page 55 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction illg 6/26/95 986 Wash channel 3.0-3.5 13.2 107.6 91 II 6/27/95 987 Water line 7.0-7.5 13.7 110.4- 94 II 6/27/95 988 Water line 5.0-5.5 14.1 111.2 94 II 6/27/95 989 Water line 3.0-3.5 14.3 111.0 94 II 6/27/95 990 Elect. crossing 2.5-3.0 11.0 109.1 92 VIII 6/27/95 991 Elect. crossing 1.0-1.5 10.7 110.2 93 VIII 6/27/95 992 Mur. water service 1.0-1.5 10.0 118.9 94 XI 6/27/95 993 Elect. crossing 2.5-3.0 10.5 111.4 94 VIII 6/27/95 994 Elect. crossing 1.5-2.0 10.8 109.9 92 VIII . 6/28/95 995 water s. of channel 7.0-7.5 12.0 111.4 94 II 6/28/95 996 water s. of channel 5.0-5.5 14.0 110.7 94 II 6/28/95 997 water s. of channel 3.0-3.5 13.7 109.1 92 II 6/28/95 998 water s. of channel 1.0-1.5 13.8 112.1 95 II 6/28/95 999 Elect. crossing 6.0-6.5 11.9 86.3 75 V 6/28/95999A .. Elect. crossing 6.0-6.5 12.9 107.4 93 V 6/28/95 1000 Elect. crossing 4.0-4.5 12.0 95.4 81 II 6/28/951000A"Elect. crossing 4.0-4.5 12.1 109.7 93 II 6/28/95 1001 Elect. crossing 2.0-2.5 11.5 100.0 87 V 6/28/951 001A "Elect. crossing 2.0-2.5 14.0 105.9 92 V 6/28/95 1002 Elect. crossing 6.0-6.5 11.7 93.2 79 II 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N oreal Engineering -s~ May 19, 1998 Project Number 4660-94 Page 56 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. {Lot No.1 Depth* Moisture Ibs.lcu.ft. Compaction ~ 6/28/951 002A **Elect. crossing 6.0-6.5 12.0 110.7 94 II 6/28/95 1003 Elect. crossing 4.0-4.5 12.0 89.0 77 V 6/28/951 003A **Elect. crossing 4.0-4.5 13.9 107.2 93 V 6/28/95 1004 Elect. crossing 2.0-2.5 12.5 103.1 87 II 6/28/951004A"Elecl. crossing 2.0-2.5 12.4 111.5 94 II 6/28/95 1005 S.D. east of 34 7.0-7.5 10.4 115.2 93 X 6/28/95 1006 S.D. east of 34 3.0-3.5 10.0 116.7 94 X 6/28/95 1007 S.D. east of 34 1.0-1.5 10.7 113.8 92 X 6/28/95 1008 S.D. east of 34 5.0-5.5 10.9 114.2 92 X . 6/29/98 1009 S.D. east of 34 3.0-3.5 9.7 121.1 92 VI 6/29/95 1010 S.D. east of 34 1.5-2.0 9.5 124.9 95 VI 6/29/95 1011 S.D. east of 34 0.5-1.0 10.5 116.7 94 X 6/29/95 1012 S.D. east of 34 1.5-2.0 10.8 115.1 93 X 6/29/95 1013 S.D. east of 34 0.5-1.0 9.3 125.2 95 VI 6/29/95 1014 water service 1.0-1.5 14.0 108.7 92 II 6/29/95 1015 water service 1.0-1.5 13.7 109.9 93 II 6/29/95 1 016 water service 1.0-1.5 13.0 111.5 94 II 6/29/95 1017 main channel 7.5-8.0 14.3 112.1 95 II 6/29/95 1018 main channel 7.5-8.0 14.0 110.7 94 II 6/29/95 1019 main channel 5.5-6.0 14.1 112.0 95 II *Depth below finish grade (in feet) . **Retest of failing tests after area reworked N oreal Engineering "5(q May 19, 1998 Project Number 4660-94 Page 57 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth. Moisture Ibs.lcu.ft. Compaction ~ 6/29/95 1020 main channel 5.5-6.0 14.0 111.5 94 II 6/30/95 1021 S.D. Pala Road 0.5-1.0 13.7 112.5 95 II 6/30/95 1022 S.D. Pal a Road 0.5-1.0 14.1 110.7 94 II 6/30/95 1023 elec. channel 6.0-6.5 14.3 109.1 92 II 6/30/95 1024 elec. channel 4.0-4.5 14.0 109.9 93 II 6/30/95 1025 elec. channel 2.0-2.5 13.5 110.4 94 II 6/30/95 1 026 elec. channel 0.5-1.0 13.0 111.1 94 II 6/30/95 1027 elec. channel 0.5-1.0 10.3 116.5 92 XI 6/30/95 1028 elec. channel 6.0-6.5 10.0 117.2 93 XI . 6/30/95 1029 elec. channel 4.0-4.5 10.2 118.1 93 XI 6/30/95 1030 elec. channel 2.0-2.5 10.3 117.0 92 XI 6/30/95 1031 elec. channel 0.5-1.0 10.1 116.4 92 XI 6/30/95 1032 lots 1-52 2.0-2.5 13.1 116.5 92 XI 7/5/95 1033 lots 3-9 0.0-0.5 8.4 117.1 93 XIII 7/5/95 1034 lots 3-9 0.0-0.5 12.3 118.6 95 XIV 7/5/95 1035 lots 3-9 0.0-0.5 9.2 114.4 92 X 7/5/95 1036 lots 3-9 0.0-0.5 8.7 109.5 91 VIII 7/5/95 1037 lots 3-9 0.0-0.5 9.0 117.4 93 XIII 7/5/95 1038 lots 35-52 0.0-0.5 10.2 117.0 93 XIII 7/5/95 1039 lots 35-52 0.0-0.5 11.5 117.5 94 XIV .Depth below finish grade (in feet) . ..Retest of failing tests after area reworked N oreal Engineering -5'\ May 19,1998 Project Number 4660-94 Page 58 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth'Moisture Ibs.lcu. ft. Compaction ~ 7/5/95 1040 lots 35-52 0.0-0.5 9.2 117.2 93 XIII 7/5/95 1041 lots 35-52 0.0-0.5 9.1 114.5 92 X 7/5/95 1042 lots 35.52 0.0-0.5 9.8 119.3 94 XIII 7/5/95 1043 lots 35-52 0.0-0.5 11.5 116.6 94 XIV 7/5/95 1044 lots 35-52 0.0-0.5 10.3 113.3 91 XIV 7/6/95 1045 lots 28-34 0.0-0.5 8.4 113.5 91 X 7/6/95 1046 lots 28-34 0.0-0.5 9.3 116.2 92 XIII 7/6/95 1047 lots 28.34 0.0-0.5 8.7 117.7 93 XIII 7/10/95 1048 main channel 3.5-4.0 12.9 106.7 90 II . 7/10/95 1049 main channel 3.5-4.0 12.4 109.4 93 II 7/10/95 1050 main channel 2.0-2.5 13.2 107.5 91 II 7/10/95 1051 main channel 2.0-2.5 14.1 108.2 92 II 7/10/95 1052 main channel 0.0-0.5 13.0 107.1 91 II 7/10/95 1053 rework lot 76 0.0-0.5 10.0 114.2 90 XI 7/12/95 1054 main channel 1.5-2.0 12.1 105.6 92 V 7/12/95 1055 water 1.5-2.0 13.0 100.2 87 V 7/27/951055A*' water 1.5-2.0 12.9 107.6 94 V 7/13/95 1056 lot 4-water 0.5-1.0 14.0 109.5 93 II 7/13/95 1057 lot 4-water 1.0-1.5 13.6 110.0 93 II 7/13/95 1058 lot 4-sewer 2.0-2.5 13.9 110.2 93 II 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering ?~ May 19, 1998 Project Number 4660-94 Page 59 , . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu.ft. Compaction ~ 7/13/95 1059 lot 4 sewer 0.5-1.0 14.1 109.9 93 II 7/13/95 1060 lot 5-water 0.5-1.0 13.5 108.4 92 II 7/13/95 1061 lot 5-water 1.0-1.5 12.9 107.9 91 II 7/13/95 1062 lot 5-sewer 2.0-2.5 12.5 110.4 94 II 7/13/95 1063 lot 5-sewer 0.5-1.0 12.7 109.9 93 II 7/13/95 1064 lot 6-water 0.5-1.0 12.1 108.8 92 II 7/13/95 1065 lot 6-water 1.0-1.5 12.4 109.2 93 II 7/13/95 1066 lot 6-sewer 2.0-2.5 12.5 111.2 94 II 7/13/95 1067 lot 6-sewer 0.5-1.0 12.9 108.6 92 II . 7/21/95 1068 wash channel 1.5-2.0 10.3 119.1 92 VII 7/21/95 1069 wash channel 0.0-0.5 12.1 108.4 92 \I 7/21/95 1070 wash channel 1.0-1.5 11.8 109.2 93 II 7/21/95 1071 wash channel 0.0-0.5 9.6 120.0 93 VI\ 7/21/95 1072 wash channel 0.0-0.5 11.9 110.1 93 II 7/21/95 1073 wash channel 0.0-0.5 12.6 108.7 92 II 7/21/95 1074 wash channel 0.0-0.5 9.9 118.6 92 VII 7/21/95 1075 wash channel 0.0-0.5 12.5 107.6 91 \I 7/21/95 1076 wash channel 0.0-0.5 11.7 108.8 92 II 7/21/95 1077 wash channel 0.0-0.5 12.0 106.9 91 II 7/26/95 1078 utility trench 1.0-1.5 10.0 118.0 91 VII *Depth below finish grade (in feet) . **Retest of failing tests after area reworked N orCal Engineering ~<\ May 19, 1998 Project Number 4660-94 Page 60 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu.ft. Compaction IYQg 7/26/95 1079 utility trench 1.0-1.5 10.3 121.3 94 VII 7/26/95 1080 utility trench 1.0-1.5 9.4 116.5 92 XI 7/26/95 1081 utility trench 1.0-1.5 9.7 120.2 93 VII 7/26/95 1082 utility trench 1.0-1.5 9.8 119.4 93 VII 7/26/95 1083 utility trench 1.0-1.5 9.2 117.5 91 VII 7/26/95 1084 utility trench 1.0-1.5 9.6 117.0 92 XI 7/26/95 1085 utility trench 1.0-1.5 9.9 118.6 92 VII 7/26/95 1086 utility trench 1.0-1.5 9.8 117.2 93 XI 7/26/95 1087 utility trench 1.0-1.5 10.2 115.8 92 XI . 7/27/95 1088 utility trench 1.0-1.5 10.0 119.1 92 VII 7/27/95 1 089 utility trench 1.0-1.5 10.3 120.0 93 VII 7/27/95 1090 utility trench 1.0-1.5 10.1 117.5 93 XI 7/27/95 1091 utility trench 1.0-1.5 10.1 120.2 93 VII 7/27/95 1092 utility trench 1.0-1.5 10.2 116.9 92 XI 7/27/95 1093 utility trench 1.0-1.5 9.4 115.8 92 XI 7/27/95 1094 utility trench 1.0-1.5 9.7 119.4 93 VII 7/27/95 1095 utility trench 1.0-1.5 9.8 116.4 92 XI 7/27/95 1096 utility trench 1.0-1.5 10.2 117.6 91 VII 7/27/95 1097 utility trench 1.0-1.5 9.7 117.5 93 XI 7/27/95 1098 utility trench 1.0-1.5 10.0 118.7 92 VII "Depth below finish grade (in feet) ""Retest of failing tests after area reworked . N orCal Engineering &P May 19,1998 Project Number 4660-94 Page 61 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 7/27/95 1099 utility trench 2.0-2.5 10.1 113.0 88 VII 7/27/981 099A "utility trench 2.0-2.5 10.2 119.5 93 VII 7/27/951100 utility trench 2.0-2.5 9.9 112.4 87 VII 7/27/951100A"utility trench 2.0-2.5 10.1 121.3 94 VII 7/27/951101 utility trench 2.0-2.5 9.9 118.1 93 XI 7/27/95 1102 utility trench 2.0-2.5 10.3 122.4 95 VII 7/27/95 1103 utility trench 2.0-2.5 10.0 117.2 93 XI 7/27/95 1104 utility trench 2.0-2.5 10.1 116.4 92 XI 7/28/951105 utility trench 1.0-1.5 10.3 117.9 93 XI . 7/28/95 1106 culvert backfill 5.5-6.0 12.5 110.4 94 II 7/28/95 1107 culvert backfill 4.0-4.5 12.9 109.9 93 II 7/28/95 1108 culvert backfill 3.0-3.5 13.1 108.8 92 II 7/28/95 1109 culvert backfill 1.0-1.5 13.0 108.7 92 II 7/28/95 1110 culvert backfill 3.0-3.5 12.5 111.6 95 II 7/28/95 1111 culvert backfill 1.0-1.5 12.1 112.4 95 II 7/28/95 1112 culvert backfill 5.0-5.5 12.9 110.7 94 II 7/28/95 1113 culvert backfill 4.0-4.5 10.2 119.5 93 VII 7/28/95 1114 culvert backfill 3.0-3.5 10.3 120.4 93 VII 7/28/951115 sidewalklD.A. 4 0.0-0.5 12.5 111.9 95 II 7/28/95 1116 sidewalklD.A. 5 0.0-0.5 13.2 110.0 93 II 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering (P\ May 19,1998 Project Number 4660-94 Page 62 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.1 Depth* Moisture Ibs.lcu.ft. Compaction ~ 7/28/95 1117 sidewalklD.A. 6 0.0-0.5 13.0 111.4 94 II 7/28/95 1118 sidewalklD.A. 7 0.0-0.5 12.9 112.1 95 II 7/28/95 1119 culvert backfill 2.0-2.5 10.2 121.2 94 VII 7/31/95 1120 culvert backfill 1.0-1.5 10.0 119.7 93 VII 7/31/95 1121 culvert backfill 1.0-1.5 9.5 120.7 94 VII 8/4/95 1122 utility crossing 3.0-3.5 10.3 119.0 92 VII 8/4/95 1123 utility crossing 2.0-2.5 10.1 117.9 91 VII 8/4/95 1124 utility crossing 2.0-2.5 10.0 118.6 92 VII 8/4/95 1125 utility crossing 1.0-1.5 9.8 119.8 93 VII . 8/4/95 1126 utility crossing 1.0-1.5 9.7 120.4 93 VII 8/10/95 1127 On-site Street 0.0-0.5 10.0 119.7 95 XIII 8/10/95 1128 On-site Street 0.0-0.5 10.9 120.2 95 XIII 8/10/951129 On-site Street 0.0-0.5 10.3 119.9 95 XIII 8/10/95 1130 On-site Street 0.0-0.5 10.5 121.0 96 XIII 8/10/95 1131 On-site Street 0.0-0.5 10.4 121.4 96 XIII 8/10/95 1132Pala Rd. curb & gutterO.0-0.5 12.0 110.8 94 I 8/10/95 1133Pala Rd. curb & gutterO.0-0.5 12.5 110.2 93 I 8/10/95 1134Pala Rd. curb & gutterO.0-0.5 10.2 119.9 93 VII 8/10/95 1135Pala Rd. curb & gutterO.0-0.5 10.0 121.4 94 VII 8/10/95 1136Pala Rd. curb & gutterO.0-0.5 12.9 111.5 94 I *Depth below finish grade (in feet) . **Retest of failing tests after area reworked N orCal Engineering (,1/ May 19,1998 Project Number 4660-94 Page 63 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth> Moisture Ibs.lcu.ft. Compaction ~ 8/10/95 1137Pala Rd. curb & gutterO.0-0.5 12.2 110.3 93 I 8/10/95 1138Pala Rd. curb & gutterO.0-0.5 12.4 108.7 92 I 8/11/95 1139 cross gutter 0.0-0.5 6.7 132.4 96 XV 8/11/95 1140 cross gutter 0.0-0.5 3.7 124.0 90 XV 8/11/951140A>> cross gutter 0.0-0.5 6.1 133.7 97 XV 8/18/951141 Pala Road 0.0-0.5 9.7 119.8 95 XIII 8/18/95 1142 Pala Road 0.0-0.5 10.0 120.4 96 XIII 8/18/95 1143 Pala Road 0.0-0.5 9.1 119.9 95 XIII 8/21/95 1144 Pala Road 1.0-1.5 17.8 110.4 94 II . 8/24/95 1145 Pala Road 0.0-0.5 6.5 133.6 97 XV 8/24/95 1146 Pala Road 0.0-0.5 6.1 134.5 97 XV 8/24/95 1147 Pala Road 0.0-0.5 5.9 133.6 97 XV 8/24/95 1148 Pala Road 0.0-0.5 6.3 134.1 97 XV 8/24/95 1149 Pala Road 0.0-0.5 6.4 132.5 96 XV 8/24/95 1150 Pala Road 0.0-0.5 6.7 131.6 95 XV 8/24/95 1151 Pala Road 0.0-0.5 6.1 133.9 97 XV 8/24/95 1152 Pal a Road 0.0-0.5 6.1 132.0 96 XV 8/24/95 1153 Pal a Road 0.0-0.5 6.2 133.5 97 XV 8/24/95 1154 Pala Road 0.0-0.5 6.4 131.4 95 XV 8/24/95 1155Elec. Its.-Pala Rd. 0.0-0.5 12.5 100.3 85 II >Depth below finish grade (in feet) . >>Retest of failing tests after area reworked N oreal Engineering (q'? May 19,1998 Project Number 4660-94 Page 64 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 8/24/95 1156Elec. Its.-Pala Rd. 0.0-0.5 13.1 108.6 92 II 8/24/95 1157Elec. Its.-Pala Rd. 0.0-0.5 14.0 107.5 91 II 8/24/95 1158Elec. Its.-Pala Rd. 0.0-0.5 12.9 108.6 92 II 8/24/95 1159Elec. Its.-Pala Rd. 0.0-0.5 13.6 110.2 93 II 8/24/95 1160 Pala Rd. SW. 0.0-0.5 14.3 107.7 91 II 8/24/95 1161 Pala Rd. S.w. 0.0-0.5 12.9 109.5 93 II 8/24/95 1162 Pal a Rd. SW. 0.0-0.5 14.1 110.5 94 II 8/24/95 1163 Pala Rd. SW. 0.0-0.5 14.3 111.1 94 II 8/24/95 1164 Pal a Rd. SW. 0.0-0.5 14.0 111.6 95 II . 8/24/95 1165 Pala Rd. SW. 0.0-0.5 13.7 110.7 94 II 8/24/95 1166 Elec. trench 0.0-0.5 13.9 109.9 93 II 9/8/95 1167 Elec. Trench 0.0-0.5 14.0 110.4 94 II 9/11/95 1168 Pala Rd. 0.0-0.5 13.9 109.2 93 II 9/11/95 1169 Pala Rd. 0.0-0.5 14.3 107.9 91 II 9/11/951170 Pala Rd. 0.0-0.5 13.0 111.1 94 II 9/11/95 1171 Pala Rd. 0.0-0.5 17.5 108.1 92 II 9/11/95 1172 Pal a Rd. 0.0-0.5 9.1 110.5 93 VIII 9/11/95 1173 Pala Rd. 0.0-0.5 9.9 111.6 94 VIII 9/11/95 1174 Pal a Rd. 0.0-0.5 12.5 109.0 92 VIII 9/15/951175 Pala Rd. 0.5-1.0 6.1 137.9 95 XVI 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering ~ May 19,1998 Project Number 4660-94 Page 65 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth< Moisture Ibs.lcu.ft. Compaction IYQg 9/15/951176 Pal a Rd. 0.5-1.0 5.7 138.5 96 XVI 9/19/951177 Pal a Rd. 0.0-0.5 6.2 139.1 96 XVI 9/19/95 1178 Pala Rd. 0.0-0.5 6.5 140.1 97 XVI 9/19/95 1179 Pala Rd. 0.0-0.5 6.6 139.5 96 XVI 9/19/951180 Pala Rd. 0.0-0.5 6.1 141.2 97 XVI 9/19/951181 Pala Rd. 0.0-0.5 6.4 139.8 96 XVI 9/19/95 1182 Pala Rd. 0.0-0.5 6.2 138.7 96 XVI 9/19/95 1183 Pala Rd. 0.0-0.5 6.3 139.9 96 XVI 9/20/95 1184 Sewer repair 8.0-8.5 10.1 116.5 92 XI . 9/20/95 1185 Sewer repair 6.0-6.5 9.6 117.1 93 XI 9/20/95 1186 Sewer repair 4.0-4.5 9.8 118.0 93 XI 9/20/95 1187 Sewer repair 2.0-2.5 10.2 117.1 93 XI 9/21/95 11881rrigation channel 1.5-2.0 12.5 110.1 93 II 9/21/95 11891rrigation channel 0.5-1.0 12.0 108.7 92 II 9/21/95 1190lrrigation channel 1.5-2.0 11.7 109.7 93 II 9/21/95 11911rrigation channel 0.5-1.0 11.9 110.4 94 II 9/22/95 11921rrigation channel 1.5-2.0 12.1 110.3 93 II 9/22/95 11931rrigation channel 0.5-1.0 12.1 110.3 93 II 9/25/95 1194 East chann. bottom 0.5-1.0 11.1 108.7 92 II 9/25/95 1195 East chann. bottom 0.5-1.0 11.9 109.5 93 II <Depth below finish grade (in feet) . <<Retest of failing tests after area reworked N orCal Engineering ~ May 19, 1998 Project Number 4660-94 Page 66 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu. ft. Compaction ~ 9/26/95 1196 East channel 0.5-1.0 12.4 110.3 93 II 9/26/95 1197 East channel 0.5-1.0 12.0 108.6 92 II 10/3/95 1198 East channel 0.0-0.5 12.5 109.5 93 II 10/3/95 1199 East channel 0.0-0.5 13.1 110.1 93 II 10/3/95 1200 East channel 0.0-0.5 13.2 111.2 94 II 10/10/951201 East channel 0.0-0.5 13.0 109.7 93 II 10/10/951202 East channel 0.0-0.5 13.0 109.5 93 II 10/12/951203 East channel 0.0-0.5 12.6 110.1 93 II 10/20/951204 Lots 31-52 0.0-0.5 12.6 111.9 94 II . 10/20/951205 Lots 31-52 0.0-0.5 11.8 109.1 92 II 10/20/95 1206 Lots 31-52 0.0-0.5 14.1 107.8 93 V 10/20/95 1207 Lots 31-52 0.0-0.5 13.6 109.2 92 II 10/20/95 1208 Lots 31-52 0.0-0.5 14.0 107.0 93 V 11/6/95 1209 Lots 76-82 0.0-0.5 13.1 108.6 92 II 11/6/95 1210 Lots 76-82 0.0-0.5 12.5 110.6 94 II 11/6/95 1211 Lots 76-82 0.0-0.5 12.0 111.2 94 II 7/2/96 1212 30 0.0-0.5 8.8 120.4 95 XI 7/2/96 1213 27 0.0-0.5 8.4 114.4 92 X 7/2/96 1214 24 0.0-0.5 8.7 115.0 93 X 7/2/96 1215 21 0.0-0.5 8.9 114.8 91 XI *Depth below finish grade (in feet) **Retest of failing tests after area reworked . N oreal Engineering c/o May 19, 1998 Project Number 4660-94 Page 67 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.1 Depth* Moisture Ibs.lcu.ft. Compaction ~ 7/2/96 1216 63 0.0-0.5 8.6 118.8 94 XI 7/2/96 1217 66 0.0-0.5 8.5 118.0 93 X 7/3/96 1218 74 0.0-0.5 7.9 115.8 92 XI 7/3/96 1219 70 0.0-0.5 8.1 117.5 93 XI 7/3/96 1220 68 0.0-0.5 7.7 119.8 95 XI 7/3/96 1221 67 0.0-0.5 4.3 110.0 87 XI 7/11/961221A** 67 0.0-0.5 8.5 116.2 92 XI 7/31/96 1222 Edison Rein Ct. 1.0-1.5 10.3 125.5 96 IX 7/31/96 1223 Edison Rein Ct. 0.5-1.0 9.4 118.8 92 vii . 7/31/96 1224 Edison Rein Ct. 0.5-1.0 10.1 118.9 92 VII ! 7/31/96 1225 Canterfield Drive 1.0-1.5 10.2 122.5 94 IX 7/31/96 1226 Canterfield Drive 0.5-1.0 9.1 120.9 92 IX 7/31/96 1227 Canterfield Drive 1.0-1.5 8.1 120.2 93 VII 7/31/96 1228 Canterfield Drive 0.5-1.0 10.0 120.9 94 VII 7/31/96 1229 Canterfield Drive 1.0-1.5 9.2 119.0 92 VII 8/20/96 1230 Canterfield Drive 0.0-0.5 7.1 114.0 88 VII 8/20/961230A**Canterfield Drive 0.0-0.5 10.4 123.1 95 VII 8/20/96 1231 Canterfield Drive 0.0-0.5 9.7 124.0 96 VII 8/20/96 1232 Canterfield Drive 0.0-0.5 9.7 124.1 95 IX 8/20/96 1233 Canterfield Drive 0.0-0.5 10.2 125.2 96 IX *Depth below finish grade (in feet) . **Retest of failing tests after area reworked N oreal Engineering r,p1. May 19,1998 Project Number 4660-94 Page 68 , . TABLE II COMPACTION TEST RESULTS Date of Test Locatjon Percent UnitWt. Relative Soil Test No. {Lot No.) Depth' Moisture Ibs.lcu. ft. Compaction ~ 8/20/96 1234 Canterfield Drive 0.0-0.5 9.9 122.6 95 VII 8/20/96 1235 Canterfjeld Drive 0.0-0.5 10.1 123.4 96 VII 8/20/96 1236 Canterfield Drive 0.0-0.5 9.2 125.9 95 VII 8/20/96 1237 Canterfield Drive 0.0-0.5 9.7 124.1 96 VII 8/21/96 1238 Canterfield Drive 0.0-0.5 17.1 110.6 86 XVII 8/21/961238A "Canterfield Drive 0.0-0.5 10.1 121.9 95 XVII 8/21/96 1239 Canterfield Drive 0.0-0.5 9.5 122.5 96 XVII 8/21/96 1240 Canterfield Drive 0.0-0.5 9.0 127.5 97 VI 8/21/96 1241 Canterfield Drive 0.0-0.5 10.1 122.8 95 VII . 8/21/96 1242 Canterfield Drive 0.0-0.5 10.2 123.7 96 VII 8/21/96 1243 Canterfield Drive 0.0-0.5 10.0 124.6 95 IX 8/21/96 1244 Canterfield Drive 0.0-0.5 9.2 125.2 96 IX 8/21/96 1245 ReinCt. 0.0-0.5 9.4 125.6 95 VI 8/22/96 1246 ReinCt. 0.0-0.5 6.5 140.7 97 XVI 9/4/96 1247 Rein Ct. Utility 1.5-2.0 9.2 122.5 93 VI 9/4/96 1248 Rein Ct. Utility 1.0-1.5 9.5 121.1 92 VI 9/4/96 1249 Rein Ct. Utility 1.5-2.0 9.1 123.6 94 VI 9/4/96 1250 Rein Ct. Utility 1.0-1.5 9.0 120.0 91 VI 9/4/96 1251 Rein Ct. Utility 1.5-2.0 9.3 122.9 93 VI 9/4/96 1252 Rein Ct. Utjlity 1.5-2.0 10.0 118.6 92 VII 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering ~ May 19, 1998 Project Number 4660-94 Page 69 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu.ft. Compaction IYQg 9/4/96 1253 Rein Ct. Utility 1.0-1.5 9.6 119.9 93 VII 9/4/96 1254 Rein Ct. Utility 1.0-1.5 9.1 124.0 94 VI 9/4/96 1255 Rein Ct. Utility 1.5-2.0 8.7 123.7 94 VI 9/4/96 1256 Rein Ct. Utility 1.0-1.5 9.9 118.7 92 VII 9/4/96 1257 Elec. Utility 1.0-1.5 8.7 124.5 94 VI 9/4/96 1258 Elec. Utility 1.5-2.0 9.1 123.1 93 VI 9/4/96 1259 Elec. Utility 1.0-1.5 8.2 125.6 95 VI 9/4/96 1260 Elec. Utility 1.0-1.5 8.9 123.7 94 VI 9/4/96 1261 Elec. Utility 1.5-2.0 9.1 122.5 93 VI . 10/10/96 1262 Utility Trench 1.0-1.5 9.7 120.1 91 VI 10/10/96 1263 Utility Trench 2.0-2.5 7.8 120.6 91 VI 10/10/961264 Utility Trench 0.5-1.0 8.1 124.9 95 VI 10/10/961265 Utility Trench 1.5-2.0 9.9 118.3 95 X 10/10/961266 Utility Trench 1.0-1.5 10.7 110.9 93 VIII 10/10/961267 Utility Trench 1.0-1.5 9.5 122.3 93 VI 10/21/961268 Utility Trench 0.0-0.5 9.7 114.2 90 XI 10/21/961269 Utility Trench 0.0-0.5 9.5 115.7 91 XI 10/21/961270 Utility Trench 0.0-0.5 10.2 119.4 93 VII 10/21/961271 Utility Trench 0.0-0.5 10.0 116.4 92 XI 10/21/961272 Utility Trench 0.0-0.5 10.1 121.1 94 VII "Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering CA May 19,1998 Project Number 4660-94 Page 70 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Deoth' Moisture Ibs.lcu.ft. Compaction ~ 10/21/961273 Utility Trench 0.0-0.5 10.3 120.6 93 VII 10/21/961274 Utility Trench 0.0-0.5 9.7 116.5 92 XI 10/21/961275 Utility Trench 0.0-0.5 11.9 111.9 88 XI 10/24/961275A** Utility Trench 0.0-0.5 10.2 116.2 92 XI 10/24/96 1276 Utility Trench 0.5-1.0 9.7 120.7 95 XI 10/24/961277 Trotsdale 0.0-0.5 10.6 119.9 97 XIV 10/24/961278 Trotsdale 0.0-0.5 11.2 118.7 96 XIV 10/24/96 1279 Trotsdale 0.0-0.5 9.5 119.8 95 XIII 10/24/961280 Trotsdale 0.0-0.5 9.2 120.4 96 XIII . 10/24/961281 Trotsdale 0.0-0.5 10.9 112.9 91 XIV 1 0/24/961281 A" Trotsdale 0.0-0.5 10.4 117.9 95 XIV 10/24/961282 Trotsdale 0.0-0.5 9.7 121.1 96 XIII 10/25/961283 Trotsdale 0.0-0.5 10.2 121.7 96 XI 10/25/961284 Trotsdale 0.0-0.5 9.6 122.0 96 XI 10/25/961285 Trotsdale 0.0-0.5 10.2 125.2 97 VII 10/25/961286 Trotsdale 0.0-0.5 9.9 125.9 98 VII 10/25/96 1287 10/29/96 1288 10/29/96 1289 10/29/961290 Trotsdale Street base Street base Street base 0.0-0.5 9.7 0.0-0.5 7.6 0.0-0.5 7.0 0.0-0.5 7.3 121.9 123.1 121.8 124.4 96 96 95 97 XI XVIII XVIII XVIII . 'Depth below finish grade (in feet) "Retest of failing tests after area reworked N oreal Engineering '\(J May 19, 1998 Project Number 4660-94 Page 71 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. {Lot No.) Depth" Moisture Ibs.lcu. ft. Compaction ~ 10/29/961291 On-site Street 0.0-0.5 7.2 125.8 98 XVIII 10/29/961292 On-site Street 0.0-0.5 8.3 121.7 95 XVIII 10/29/96 1293 On-site Street 0.0-0.5 7.9 122.6 96 XVIII 10/29/96 1294 On-site Street 0.0-0.5 6.9 125.4 98 XVIII 10/29/96 1295 On-site Street 0.0-0.5 7.5 124.0 97 XVIII 10/29/961296 On-site Street 0.0-0.5 7.0 123.1 96 XVIII 11/8/96 1297 On-site Street 0.0-0.5 10.8 113.1 95 VIII 11/8/96 1298 On-site Street 0.0-0.5 11.2 113.3 95 VIII 2/26/97 1299 52 0.0-0.5 9.5 124.2 94 VI . 2/26/97 1300 51 0.0-0.5 9.1 118.2 90 VI 2/26/97 1301 50 0.0-0.5 8.5 110.9 93 VIII 2/26/97 1302 49 0.0-0.5 8.3 120.0 91 VI 2/26/97 1303 48 0.0-0.5 7.6 121.7 92 VI 2/26/97 1304 1 0.0-0.5 8.7 121.4 92 VI 2/26/97 1305 2 0.0-0.5 8.3 108.9 92 VIII 2/26/97 1306 3 0.0-0.5 8.2 119.2 90 VI 4/14/97 1307 86 0.0-0.5 8.1 110.6 93 II 4/14/97 1308 85 0.0-0.5 9.6 107.3 90 VIII 4/14/97 1309 83 0.0-0.5 9.3 116.7 94 X 4/14/97 1310 44 0.0-0.5 9.1 119.2 93 XVII "Depth below finish grade (in feet) . ""Retest of failing tests after area reworked N orCal Engineering \\ May 19, 1998 Project Number 4660-94 Page 72 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth* Moisture Ibs.lcu.ft. Compaction ~ 4/14/971311 46 0.0-0.5 8.1 113.8 96 VIII 6/19/97 1312 8 0.0-0.5 8.4 115.3 93 X 6/19/97 1313 9 0.0-0.5 9.2 113.6 92 X 6/19/97 1314 10 0.0-0.5 9.3 111.6 94 VIII 6/19/97 1315 11 0.0-0.5 10.1 114.4 92 X 6/19/97 1316 12 0.0-0.5 10.2 112.5 91 X 6/19/97 1317 53 0.0-0.5 8.6 110.4 93 VIII 6/19/97 1318 54 0.0-0.5 9.9 113.7 92 X 6/19/97 1319 55 0.0-0.5 9.1 110.9 93 VIII . 6/19/97 1320 56 0.0-0.5 11.4 109.5 93 II 6/19/97 1321 57 0.0-0.5 8.8 110.2 93 VIII 7/1/97 1322 Lots 1-3 0.0-0.5 9.5 118.7 94 XI 7/1/97 1323 Lots 1-3 0.0-0.5 7.0 109.6 87 XI 7/1/971323A** Lots 1-3 0.0-0.5 10.1 117.4 93 XI 7/1/97 1324 Lots 1-3 0.0-0.5 9.7 116.9 92 XI 7/1/97 1325 Lots 48-52 0.0-0.5 10.6 109.7 93 II 7/1/97 1326 Lots 48-52 0.0-0.5 10.9 110.4 94 II 7/1/97 1327 Lots 48-52 0.0-0.5 8.9 117.5 93 XI 7/3/97 1328 Channel 5.0-5.0 36.1 85.5 81 "' 7/11/971329 Channel 5.0-5.5 13.1 113.2 96 II *Depth below finish grade (in feet) . **Retest of failing tests after area reworked N orCal Engineering ~v May 19,1998 Project Number 4660-94 Page 73 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu. ft. Compaction ~ 7/11/971330 Channel 5.0-5.5 14.3 107.1 91 II 7/11/971331 Channel 5.0-5.5 10.6 108.6 92 II 7/13/97 1332 Channel 3.0-3.5 10.9 109.5 93 II 7/13/97 1333 Channel 3.0-3.5 10.7 107.9 91 II 7/13/97 1334 Channel 7.0-7.5 20.1 95.8 90 III 7/15/97 1335 Channel 5.0-5.5 10.9 109.7 93 II 7/15/97 1336 Channel 3.0-3.5 10.8 111.0 94 II 7/16/97 1337 Channel 0.5-1.0 16.2 106.9 93 V 7/16/97 1338 Channel 0.0-0.5 11.2 113.7 92 X . 7/16/97 1339 Channel 0.0-0.5 11.5 110.6 93 VIII 7/16/97 1340 Channel 0.5-1.0 10.0 111.5 94 VIII 7/16/97 1341 Channel 3.0-3.5 17.9 103.9 92 I 7/18/97 1342 Channel 0.0-0.5 11.2 113.2 96 II 7/18/97 1343 Channel 0.0-0.5 11.3 113.2 96 II 7/18/97 1344 Channel 0.0-0.5 10.1 112.6 95 II 7/18/97 1345 Channel 0.0-0.5 11.2 108.8 92 II 7/21/97 1346 Channel 4.0-4.5 9.4 120.6 91 VI 7/21/97 1347 Channel 3.0-3.5 9.7 121.9 92 VI 7/22/97 1348 Channel 5.0-5.5 9.1 117.3 93 XI 7/22/97 1349 Channel 3.0-3.5 10.1 118.1 92 VII 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N oreal Engineering ",\'7 May 19, 1998 Project Number 4660-94 Page 74 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 7/22/97 1350 Channel 2.0-2.5 9.5 120.5 92 IX 7/22/97 1351 Channel 1.0-1.5 11.3 112.3 94 VIII 7/23/97 1352 Channel 0.0-0.5 9.1 117.3 93 XI 7/23/97 1353 Channel 0.0-0.5 10.2 117.1 94 X 7/23/97 1354 Channel 2.0-2.5 9.8 113.8 92 X 7/23/97 1355 Channel 0.5-1.0 9.2 113.6 92 X 7/23/97 1356 Channel 2.0-2.5 8.2 115.5 93 X 7/23/97 1357 Channel 1.5-2.0 9.3 116.2 90 VII 7/23/97 1358 Channel 5.0-5.5 13.2 107.7 91 II . 7/23/97 1359 Channel 4.0-4.5 9.4 117.9 91 VII 7/24/97 1360 Channel 0.0-0.5 8.2 116.4 94 X 7/24/97 1361 Channel 0.0-0.5 9.4 114.2 92 X 7/24/97 1362 Channel 2.0-2.5 11.8 110.9 94 II 7/24/97 1363 Channel 2.0-2.5 10.3 113.3 91 X 7/25/97 1364 Channel 1.0-1.5 10.4 110.5 93 VIII 7/25/97 1365 Channel 0.0-0.5 8.7 114.1 92 X 7/25/97 1366 Channel 0.0-0.5 8.8 117.6 93 XI 7/25/97 1367 Channel 0.0-0.5 8.9 115.7 91 XI 7/29/97 1368 Channel 2.0-2.5 13.4 107.8 91 II 7/29/97 1369 Channel 1.0-1.5 12.6 105.7 92 V 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering ,A. May 19, 1998 Project Number 4660-94 Page 75 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth' Moisture Ibs.lcu.ft. Compaction ~ 7/29/97 1370 Channel 0.0-0.5 8.9 114.8 93 X 7/29/97 1371 Channel 0.0-0.5 8.2 120.1 91 VI 10/16/971372 58 0.0-0.5 6.5 120.2 91 VI 10/16/971373 59 0.0-0.5 7.2 123.1 93 VI 10/16/971374 60 0.0-0.5 6.7 121.8 92 VI 10/16/971375 61 0.0-0.5 7.4 120.1 92 IX 10/16/971376 13 0.0-0.5 8.6 122.5 94 IX 10/16/971377 14 0.0-0.5 7.9 121.4 92 VI 10/16/971378 15 0.0-0.5 8.2 120.2 93 VII . 10/16/971379 16 0.0-0.5 8.6 118.8 91 IX 10/16/971380 17 0.0-0.5 8.7 119.6 92 IX 10/16/971381 18 0.0-0.5 8.3 120.0 91 VI 10/16/971382 19 0.0-0.5 7.2 122.2 93 VI 10/20/97 1383 20 0.0-0.5 8.9 119.4 91 IX 11/3/97 1384 Sidewalk 0.0-0.5 9.8 114.6 92 XIV 11/3/97 1385 Sidewalk 0.0-0.5 10.7 119.5 96 XIV 11/4/971386 Sidewalk 0.0-0.5 8.9 106.4 90 II 11/4/97 1387 Sidewalk 0.0-0.5 8.5 112.8 91 XIV 12/16/971388 Sidewalk 1.0-1.5 8.6 124.3 94 VI 12/16/971389 Sidewalk 1.0-1.5 8.9 123.0 93 VI 'Depth below finish grade (in feet) . "Retest of failing tests after area reworked N orCal Engineering / 1.";) May 19,1998 Project Number 4660-94 Page 76 . TABLE II COMPACTION TEST RESULTS Date of Test Location Percent UnitWt. Relative Soil Test No. (Lot No.) Depth" Moisture Ibs.lcu. ft. Compaction ~ 12/16/971390 Sidewalk 0.5-1.0 8.1 125.8 95 VI 12/16/971391 Sidewalk 1.5-2.0 10.5 120.3 91 VI 12/16/971392 Sidewalk 1.0-1.0 10.2 126.8 96 VI 12/16/971393 Sidewalk 1.0-1.0 11.3 121.2 91 VI 12/16/971394 Sidewalk 1.5-2.0 10.5 120.3 91 VI 12/16/971395 Sidewalk 0.0-0.5 10.5 120.3 91 VI 4/16/98 1396 21 0.0-0.5 11.7 117.8 93 XI 4/16/98 1397 22 0.0-0.5 11.5 121.5 96 XI . "Depth below finish grade (in feet) ""Retest of failing tests after area reworked . N oreal Engineering ,,\fc,