Loading...
HomeMy WebLinkAboutParcel Map 22419 Parcel 1 Geotech & Compaction Results of Precise Grading I I I I I I -- I I I I I I I I I RECEIVED FEB 2 8 ZOOl CITY OF TEMECULA ENGINEERING DEPARTMENT ~~~~~tf:s~'~.GEN Comoration -SoilflVreerirvOlldCo:s.ilillgSatm.Engira!ingGeo/,(lqy_ CoolpadiooTeslirw;I .':IslleClions.Constr~~'Marlalsr{!SlIr.g.l.abcr.lIoryT~.~Testtng .. Gco/llgy'.WiiarReswwSltdics.. Pl'esc1&UEIMrm:TOll3ISiktAssessrrolls ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK GEOTECHNICAL REPORT AND COMPACTION TEST RESULTS PRECISE GRADING OPERATIONS Schork Residence Parcel 1 of Parcel Map 22419 43225 Avenida de San Pasqua I City of Temecula, County of Riverside, California Project Number: T2224-C January 29, 2001 Prepared for: Dr. Bill Schork clo Bratene Construction 41607 Enterprise Circle North Temecula, California 92590 .'~" " r'( _ ,}:S,:-;~.:.,7'3l::i;,:;/;'-t;:'f:~?~!1;, " c":", . .',,:' ',' .. .." "",' i .. (, ".. . ,. < .~ \ ,..'>:d, ___ " ,. ,," _,: .., .. ~~t~:~~I'~~~liiO;F~I:9il~2~ ,,,,,,-J ~.th",c?"..",>..",o""J~~;"c~,,",,", u"",""?,':;;,,,,,,,,,, ,l'J~,'''~'!c~~~::''~~~i'J.~''c''';''~''''i "'""::'0'''', ,:,.=~fL''i'f:"i..~~''c,.1'",';;"!.!',i,',,c:'','-:''T:'};;':: - I I I I I , I I I I I I I I I I I I I I Dr. Bill Schork clo Bratene Construction Project Number: T2224-C TABLE OF CONTENTS SECTION NUMBER AND TITLE PAGE 1.0 SITE/PROJECT DESCRIPTION AND LOCATION .............................................................1 1,1 PROJECT LOCATJON",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"""""'"'''''''''' 1 1.2 PROJECT DESCRIPTION"",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,",,,,,,,,,,,,,,,,1 1.3 SITE DESCRIPTION """"""",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,2 2.0 SCOPE OF WORK ....................................................................................................2 2.1 TIME OF GRADING ,,,,,,,,,,,,,,,,,,,,,,,,,,, ........",,,,,,, ''''''''''''''''''''''''''''''.."""",,, """",,,,2 2.1 CONTRACTOR AND EQUIPMENT..,,,,,,,..,,,,,,,,,,,, ",,,,,,,,,,,,,,,,,,,,, ""'"'''''''''''''''''' """",2 2.2 GRADING OPERATIONS ,,,,,,,,, "",,,,,,, ,,,,,,,,,,, "",,,,,,'..,.., ,.. "",,,,,,,,,,,,,,,,,,,,, ..,..",,,,,,,,, 2 3.0 TESTING ............... ..................................................................................................3 3,1 FIELD TESTING PROCEDURES",,,.,,,,,,,,,,,,,,,,,,.........,,..,,,,,,,,,,,,,,,,,,,,,,.,,.,,........,,,,,,,,,,3 3,2 LABORATORY TESTING"""",.".""".",."""""."""."""",.".""""""""""""""""""" 3 3,2,1 MOISTURE-DENSITY RELATIONSHIP TEST """"""....",............".".""".".."..3 4.0 EARTH MATERIALS/ExPANSIVE SOILS/SOLUBLE SULFATES .......................................3 5.0 CONCLUSIONS AND RECOMMENDATIONS...................................................................3 5,1 GENERAL",,,,,,,,.,,,,,,,,,,,.,,,,,.,,,.,,,,,,, ,,,..,,,,,. ,.......,,,,,,,,, ".." ,,,..,,,,,,,,,,,,, "..,.., "..""..4 6.0 CLOSURE. ..... ... ..... ... ....... ... .... ... ........... ... .... ....... .... ... ... .... ... ... ... ... ... ...... ... ..... ... .......4 APPENDIX TEST RESULTS DRAWINGS Z- EnGEN Corporation I I I I I I I I I I I I I. I I I 'f;:~LC!.~~~_~~~~,~~.._;.~{:;~~~~~~_: . , , ..'" .....,..'fi' 'aGEN . ,"' -, "" ..<,<." ,,', . . '" ...". .~" .,'..,.:, .7_.:~ ~_:'ftL', 30_,:' -V-'V - ~'i 1:':_".': :: :,,:;.-- :~- '\, _ .~ _"'-~'_ -':.:._....,.-~~.....p'!t4...., _' """"~', . '..,-." '~'_,:~. ". January 29, 2001 Comoration . SoiI&'lgirmiJga'ToCalSllllingSer;k;:es. EngiwingGaicgv_ C~Ol T~ .lrlSDeetiOJG.COnslr-X::Cl\~re$lllY;l.Labc:rilIayTesling.PertolalictITestlng .Gcdt1gy.~rIlesoorreSltdcs .Phascl&U[FVi~Si~AssessmenIs ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK Dr. Bill Schork clo Bratene Construction 41607 Enterprise Circle North Temecula, California 92590 (909) 296-3440 I FAX (909) 296-2237 Attention: Mr. Oz Bratene Regarding: GEOTECHNICAL REPORT AND COMPACTION TEST RESULTS PRECISE GRADING OPERATIONS Schork Residence Parcel 1 of Parcel Map 22419 43225 Avenida de San pasqual City of T emecula, County of Riverside, California Project Number: T2224-C References: EnGEN Corporation, Updated Geotechnical Study, Proposed Residence, Parcel 1 of Parcel Map 22419, 43225 Avenida de San Pasqual, City of Temecula, County of Riverside, California, Project Number: T2224-UGS, report dated November 16, 2000, Bratene Construction and Engineering, Precise Grading Plan, Schork Residence, Parcel 1 of Parcel Map 22419, plans dated December 14, 2000, 1. 2. Dear Mr. Bratene: According to your request and signed authorization, EnGEN Corporation has performed field observations, sampling, and in-place density testing at the above referenced site. Submitted, herein, are the test results and the supporting field and laboratory data. 1.0 1.1 SITEIPROJECT DESCRIPTION AND LOCATION PROJECT LOCATION The subject site consists of approximately 1 acre, located on the west side of Avenida de San pasqual in the City of Temecula, County of Riverside, California, 1.2 PROJECT DESCRIPTION It is understood that the subject site is to be developed with a 2-story single family residence,'wjth slab-on-grade concrete floors, supported on conventional continuous and I.",{''.):: .,' . ':, pier f~ptj~~~[~, Tr.eremainder of the,~ii~ ~iliconsist "of a drivewayahdt;Pical re!>igel'ltial. . ,:: ,'., ':">':':':~','}:':"'<:':'-__-_.' ..~ i,;,,: _~,':-{ '''''C>.,..::.., __.,'___.,'..:..,." ,'_ :'-_.___--_-i'~- _ _ _ ,', _ ",:,,-,,_, _ ," _ ' " ',' ,"__'" TT-'''i1oiiiim''''''''''r'"''--"'''~--'~~~....;;'~~~ I I I I I I I I I I I I I I I I I I I I Dr. Bill Schork clo Bratene Construction Project Number: T2224-C January 2001 Page 2 1.3 SITE DESCRIPTION Based on the Referenced No, 1 report, this site was previously graded, The site is a cut/fill lot with a majority of the lot underlain by Pauba Formation Bedrock, The existing northern and western 2: 1 fill slopes were created and certified during the previous grading, Prior to current grading operations, topography and surface conditions of the existing pad area were relatively flat with surface drainage to the west at a gradient of less than 1 percent. 2.0 SCOPE OF WORK 2.1 TIME OF GRADING This report represents geotechnical observations and testing during the construction operations on January 22, 2001. 2.1 CONTRACTOR AND EQUIPMENT The grading operations were performed by Kiene Construction through the use of one (1) CAT D4 dozer. 2.2 GRADING OPERATIONS Grading within the subject site consisted of a minor cut/fill operation designed to alter the pad surface for proper building footprint and drainage arrangements, Grasses and weeds were removed prior to fill placement. Fill material was generated from the small elevated area in the eastern most portions of the site, and used to bring the driveway a~ well as the building pad portions of the site to finish grade elevation, Bottoms were observed, probed and found to be into competent bedrock by a representative of this firm, The exposed bottoms were scarified and moisture conditioned to a depth of 6 to 12-inches then compacted to 90 percent. Less than 1-foot of fill was placed in lens thicknesses of 4 to 6- inches, thoroughly moisture conditioned to near optimum moisture content, then compacted to a minimum of 90 percent relative compaction. Moisture conditioning of the on-site soils was performed during the compaction process, through the use of a water truck, The pad area was generally graded to the elevations noted on the Grading Plan, However, the actual pad location, dimensions, elevations, slope locations and inclinations, etc, were surveyed and staked by others and should be verified by the Project Civil Engineer. EnGEN Corporation ~ I I I I I I I I I I I I I I I I I I I Dr, Bill Schork clo Bratene Construction Project Number: T2224-C January 2001 Page 3 3.0 TESTING 3.1 FIELD TESTING PROCEDURES Field in-place density and moisture content testing were performed in general accordance with ASTM-D-2922-96 and ASTM-D-3017-96 procedures for determining in-place density and moisture content, respectively, using nuclear gauge equipment. Relative compaction test results were within the 90 percent required for all material tested, which is an indication that the remainder of the fill placed has been properly compacted, Test results are presented in the Appendix of this report. Fill depths and test locations were determined from review of the referenced grading plans, 3.2 LABORATORY TESTING The following laboratory tests were performed as part of our services during the grading of the subject site, The test results are presented in the Appendix of this report, 3,2.1 MOISTURE-DENSITY RELATIONSHIP TEST Maximum dry density - optimum moisture content relationship tests were conducted on samples of the r;naterials used as fill. The tests were performed in general accordance with ASTM D1557-91 (98) procedures, The test results are presented in the Appendix (Summary of Optimum Moisture Content I Maximum Dry Density Relationship Test Results), 4.0 EARTH MATERIALS/ExPANSIVE SOILS/SOLUBLE SULFATES The natural earth materials used to construct the building pad generally consisted of brown coarse sands which are considered non-expansive. As a result, no special design or construction is necessary for expansive soils purposes, Based on this firm's familiarity with the soils used to construct the building pad, it is our opinion that soluble sulfates are not a concern and, as a result, normal Type II cement can be used in concrete making contact with the native soils, 5.0 CONCLUSIONS AND RECOMMENDATIONS No conditions were encountered which would cause a change in the previously provided design and construction recommendations, As a result, design and construction should adhere to the recommendations provided in the Referenced No, 1 Updated Geotechnical Study, EnGEN Corporation 5 I I I I I I I I I I I I I I I I I I I Dr. Bill Schork clo Bratene Construction Project Number: T2224-C January 2001 Page 4 5.1 GENERAL Based on the observations and tests performed during grading, the subject site in the areas noted as test locations has been completed in accordance with the Referenced No, 1 report, the project plans, and the Grading Code of the City of Temecula. The graded site, in the areas noted as graded, is determined to be adequate for the support of a typical residential development. Any subsequent grading for development of the subject property should be performed under engineering observation and testing performed by EnGEN Corporation, Subsequent grading includes, but is not limited to, any additional fill placement and excavation of temporary and permanent cut and fill slopes. In addition, EnGEN Corporation should observe all foundation excavations, Observations should be made prior to installation of concrete forms andlor reinforcing steel so as to verify andlor modify, if necessary, the conclusions and recommendations in this report, Observations of overexcavation cuts, fill placement, finish grading, utility or other trench backfill, pavement subgrade and base course, retaining wall backfill, slab presaturation, or other earth work completed for the development of subject site should be performed by EnGEN Corporation, If any of the observations and testing to verify site geotechnical conditions are not performed by EnGEN Corporation, liability for the safety and performance of the development is limited to the actual portions of the project observed andlor tested by EnGEN Corporation. 6.0 CLOSURE This report has been prepared for use by the parties or project named or described above, It mayor may not contain sufficient information for other parties or purposes, The findings and recommendations expressed in this report are based on field and laboratory testing performed during the rough grading operation and on generally accepted engineering practices and principles, No further warranties are implied or expressed beyond the direct representations of this report. EnGEN Corporation (b I I I I I I I I I I I I I I I I I I I Dr. Bill Schork clo Bratene Construction Project Number: T2224-C January 2001 Page 5 Thank you for the opportunity to provide these services, If you should have any questions regarding this report, please do not hesitate to contact this office at your convenience, Respectfully submitted, EnGEN Corporation i~Off Osb'orn Princip Geotechnical Engineer Exp' s 09-30-01 ~-~-.._,~~, .,....\t.~-.... ,<"" .:':...,t[jr.:_>>. t.~ ;:", b~~<"'" <,->V . JI ~I'- l-:;..c--:.::-- ~ \'" ,.,,- ~. '~<!:."1-"'" ( i & '{i\)::;~\\ L!.J :-.1 , '" No. 152 <,1 '~-:[ ',', ~'"" ''':;;;" 'i/ -r:, 0'0' ..,'~ ;.1 V'. ,.. 1 ' . , ' '0. . FCI'i\\~' ,. ',' ~:r{'o--~..r~,,// -~.' G!\\:.t'1i/ ~~~;:;::-~ Supervising Tech SRW/OB:rr Distribution: (4) Addressee FILE: EnGEN/Reporting/CfT2224-C Silt Schork, Precise Grading EnGEN Corporation 1 I I I I il I I I I I I I I I I I I I I Mr. Bill Schork Project Number: T2224-C Appendix Page 1 APPENDIX: TEST RESULTS ~ EnGEN Corporation I I I I I I I I I . I I I I I I I I I Mr. Bill Schork Project Number: T2224-C Appendix Page 2 FIELD TEST RESULTS (Sumrnary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) (S, G) = Subgrade I (F. G) = Finish Grade Test Depth Soil Max Moisture Dry Relative Required Test Date Test Locations Elevation Type Density Content Density Compaction Compaction No. (2000) (FT) (PCF) (%) (PCF) (%) (%) 1 01.-22 Pad Area Garage F,G, Al 127.4 10,0 116,8 91,7% 90,0% 2 01.-22 Pad Area SE Corner F,G, Al 127.4 9.2 119,2 93,6% 90,0% 3 01-22 Pad Area SW Corner F,G, Al 127.4 9.8 120,3 94.4% 90,0% 4 01-22 Pad Area N Corner F,G, Al 127.4 10,3 115.6 90.7% 90.0% 5 01-22 NW Corner F,G, Al 127.4 9,8 116,0 91,1% 90,0% EnGEN Corporation '\ I , I '. I !I I I I I I I I I I I I I . . Mr. Bill Schork Project Number: T2224-C Appendix Page 3 SUMMARY OF OPTIMUM MOISTURE CONTENT MAXIMUM DRY DENSITY RELATIONSHIP TEST RESULTS ASTM 01557-91 Maximum Optimum Soil Description (USCS Symbol) Soil Type Dry Density Moisture (PCF) Content (%) Sand, Brown (SP) A1 127,4 9,9 \0 EnGEN Corporation I I II I II I I I I . I I I I I I I I I Mr. Bill Schork Project Number: T2224-C Appendix Page 4 APPENDIX: DRAWINGS EnGEN Corporation t\