HomeMy WebLinkAboutGeotechRoughGrading(Feb.7,1997) I I I I I I I I I I I I I I I I I I PETRA GEOTECHNICAL, INC. 27620 Commerce Centre Drive Suite 103 Temecula, CA 92590 Tel: 19D9) 699-6193 Fax: (909) 699-6197 I . PEliRA COSTA MESA' NEWPORT BEACH' SAN DIEGO' TEMECULA February 7, 1997 J.N, 474-96 CCL CONSTRUCTION, INe. 2010 Main Street, Suite 960 Irvine, California 92714 Attention: Mr, Charlie Kluger Subject: Geotechnical Report of Rough Grading and Post-Grading During Sewer Line Backfilling Operations, Tracts 23100-4 and 23101-3, City of Temecula, Riverside County, California Submitted herewith is a summary of the geotechnical observation and testing services provided by Petra Geotechnical, Inc, (Petra) during grading operations within the subject tracts, Conclusions and recommendations relative to the suitability of the grading forthe proposed developmentare presented.... . REGULATORY COMPLIANCE All fills, removals and processing of original ground under the purview of this report have been completed under the observation and with selective testing by Petra, and are found to be in compliance with the grading code of the County of Riverside and the City of Temecula, California, The completed work has been reviewed and is considered adequate for the construction now planned, On the basis of our findings, the following recommendations were prepared in conformance with generally accepted professional engineering practices and no further warranty is implied or made, SUMMARY OF GRADING OPERATIONS I. The purpose of the grading operation was to develop a 15:t-foot-wide, primarily level-graded access road to accommodate construction of an 8-inch-diameter sewer line through the site, as shown on the accompanying geotechnical maps (in pockets) \ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC. Sewer Line Backfill/ Tracts 23100-4 & 23101-3 February 7, 1997 J.N. 474-96 Page 2 2. Earthwork operations were conducted in essentially three phases, The first phase consisted of the rough-grading of a 15:t-foot-wide access road through the site to the general configuration shown on the accompanying grading plans, This area was left approximately 2 feet below the final grades during this phase of grading, The second phase included construction of the sewer line and testing of the backfill soils on a full-time basis, The third phase consisted of completing the placement of the final 2 feet of fill soils, subgrade compaction and placement of 4 inches of base over the entire alignment, Additionally, the fill slopes were trimmed back to achieve the design grades, 3, Grading of the entire alignment began on November I, 1996, and was completed on February 6, 1997, Rough grading was conducted by WA Guthridge ofY orba Linda, California, and the sewer line was constructed by Southern California Pipeline of Tustin, California, 4, An existing active 24-inch reclaimed water line was encountered just southeast of the intersection ofParducci Lane and Promenade Chardonnay Hills. The actual location of this water line, where it encroached into the sewer-line alignment, was from Stations 54+00 to 54+70, as indicated on the sewer and water plans, Removal of alluvial soils was conducted to within approximately 10 feet of this line based on the locations identified by Underground Service Alert in the field, Porous alluvial soils were observed underlying this water line, but were not removed due to the potential for damaging the line, The approximate location of the 24-inch water transmission line and limits of alluvial removals are shown on the accompanying geotechnical maps, ENGINEERING GEOLOGY General Geologic conditions exposed during the process of grading were frequently observed by our geologic staff, A California Certified Engineering Geologist observed and approved all removal bottoms prior to fill placement. Geolol!:ic Units Bedrock materials exposed within the cut areas of the streets and slopes consist of the Pauba Formation bedrock (map symbol Qps), This material consists of massive to crudely bedded silty sand which is medium dense to dense, ~ ~ ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INe. Sewer Line Backfill/ Tracts 23100-4 & 23101-3 February 7,1997 J.N, 474-96 Page 3 Adverse geologic conditions, such as faults or landslides, were not observed within the area of grading, Cut Slopes All temporary cut slopes ranging from 8 to 46 feet high and inclined at a 2: I (horizontal to vertical [H: V]) gradient, are considered grossly stable and will remain so under normal conditions and maintenance, Cut slopes in Pauba Formation bedrock tend to erode during periods of significant rainfall. Proper slope maintenance should be provided to mitigate excessive erosion to the slopes, SOILS ENGINEERING Preparation of Existinl!: Ground I. All weeds, grasses and similar organic materials were stripped and removed from the site prior to grading, 2. All loose, excessively wet and compressible topsoil, slopewash, alluvial and colluvial materials were removed to competent material prior to placing fill, Removal depths varied from 2 to 12 feet and were conducted to the toe-of-slope, as shown on the accompanying geotechnical maps. 3, Areas to receive fill were scarified and bladed to a depth of 6 to 8 inches, watered and mixed, as required, to achieve optimum moisture conditions, and were compacted to a minimum relative compaction of90 percent of the maximum dry density as determined by ASTM D1557-91. 4, T oe-of-fill slope keys having a minimum width of 15 feet were placed at the base of all fill slopes, Fill keys were excavated into competent native material with a minimum slope of 2 percent to the heel of the key, Temporary Fill Slone Construction Temporary fill slopes ranged from 2 to 20 feet high at a 2:1 (H:V) gradient, were overfilled and backrolled every 4 to 5 feet with a sheepsfoot roller pulled by a rubber- tired dozer. Slopes were track-walked with the dozer and then trimmed back to the ~ . ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC. Sewer Line Backfill/ Tracts 23100-4 & 23101-3 February 7, 1997 J.N. 474-96 Page 4 compacted inner core, All temporary fill slopes are considered grossly stable under normal conditions. Laboratorv Testinl!: The laboratory maximum dry density and optimum moisture content for each major soil type were determined in accordance with ASTM Test Method D1557-91. Table I (below) presents the pertinent test values, TABLE I Optimum Maximum Dry Moisture Sample Soil Description Density Content (ocf) (%) I Dark brown, silty fme to coarse SAND 131.0 7.5 1A Light brown to gray SILT with Sand 128,0 10,0 2A Light brown Silty SAND fill(?) 128,0 10,0 3 Medium brown, clayey, fine to medium 133.0 8.0 SAND 3A Brown silty SAND mix with gray fme Silt 127,0 10,0 4 Dark brown, clayey, fme to medium 131.0 9,0 SAND; Silt 4A Red brown, silty, fine to coarse SAND 127,0 10.0 with Clay 5 Olive tan, silty, fine SAND 124.5 10.5 SA Dark brown to black Silty SAND 132,0 8.0 6 Olive tan, fine t coarse SAND; Clay 129,0 8.5 6A Red brown, silty, fme, fme to coarse 128.0 10,0 SAND 8 Medium brown, fine to coarse SAND; Silt 134,0 8,0 13 Orangish brown, clayey, medium to 130,5 8.5 coarse SAND 15 Orangish brown, sandy CLAY with Silt 129,0 9,5 . ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC. Sewer Line Backfill! Tracts 23100-4 & 23101-3 February 7, 1997 J.N, 474-96 Page 5 Optimum Maximum Dry Moisture Sample Soil Description Density Content (pcf) (%) 16 Orange brown, fme to medium SAND 126,0 10.5 with Clay 17 Medium brown, silty, medium to coarse 128,0 11.5 SAND 19 Medium brown, medium to coarse SAND 130,0 8,0 with Gravel AB1 Processed miscellaneous base 128,5 7.5 AB2 Processed miscellaneous base 139,0 6.5 Fill Placement I. Fill consisted of onsite materials having the above-mentioned soil classifications, Fill materials were placed in lifts restricted to 6 inches in thickness, watered, as required, to achieve optimum moisture conditions and were compacted to a minimum relative compaction of 90 percent of the maximum dry density as determined by ASTM Dl557-91. 2. Maximum depth offill is approximately 26 feet. 3, Fill placed on surface having a slope gradient steeper than 5: 1 (H: V) were keyed and benched into compacted materials or dense native soils, Field Testinl! I. Field density tests were performed using the nuclear gauge method (ASTM D2922-91) and the sand cone method (ASTM DI556-82), Test results are shown in Table II (attached), The approximate locations of the field density tests are shown on the accompanying geotechnical maps, 2, Field density tests were taken at sufficient intervals to determine that adequate compaction was being achieve, Where tests indicated inadequate compaction, the areas were reworked and retested, 3. Visual classification of earth materials in the field was the basis for determining which maximum density value to employ for a given density test, Frequent one- point checks were performed to supplement visual classifications. ~ ~ ~ I I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC. Sewer Line Backfill! Tracts 23100-4 & 23101-3 February 7, 1997 IN. 474-96 Page 6 UTILITY TRENCHES Onsite soils generally consisted of silty sands and required mechanical effort to achieve proper compaction, All backfill for the sewer line was compacted to a minimum relative compaction of 90 percent ofthe maximum dry density as determined by ASTM Dl557-91. CONCLUSIONS AND RECOMMENDATIONS All fill soils tested ultimately met the minimum relative compaction requirement of 90 percent of the maximum dry density as determined by ASTM D1557-91. Since all slopes constructed during this phase of grading are considered temporary, it is our understanding that slope landscaping will not be provided, Due to the potential for erosion on fill slopes and cut slopes derived from the Pauba Formation, rain water should not be allowed to overtop slopes, Minor settlement may occur along the alignment between Stations 54+00 and 54+70 where porous alluvial soils were left in-place under the existing 24-inch water transmission line, This potential settlement is not expected to adversely impact the sewer line which was constructed in competent soils approximately 4 feet below the existing water line, During future phases of grading, this existing water transmission line may need to be relocated, At this time, the alluvial soils left in-place below and within approximately 10 feet of this pipe should be removed and replaced with compacted fill soils. Additional Considerations The project soils engineer shall be notified prior to fill placement regarding the site or backfilling of trenches after rough grading has been completed, Additionally, Petra should be notified to conduct footing excavation observation under slab-trench '" ~ ~ I I I I I I I I I I I I I I I I I I I eeL CONSTRUCTION, lNe. Sewer Line Backfill/ Tracts 23100-4 & 23101-3 February 7, 1997 IN, 474-96 Page 7 compaction testing and testing of driveways, drive approaches, city sidewalks and utility hookups, This report is subject to review by the controlling authorities for the project, We appreciate this opportunity to be of service, If you have any questions, please contact this office at your convenience. Respectfully submitted, fl ~:p' Mark Bergmann Senior Associate Geolo CEG 1348 MB/TL/SJ/keb Attachments: Table II - Results ofField Density Tests Geotechnical Maps -- Plates I through 5 (in pocket) Distribution: (6) Addressee 1 ~ ~ I I I I I I I I I I I I I I I I I I I eCL CONSTRUCflON, INe. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 J,N,474-96 Page Tll-l TABLE 11 Results of Field Density Tests DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNIT WT. COMPACTION TYPE (ft) (%) Ibs/cu ft (%) 11/0 I/96 1 Culbertson Lane 1212 14.9 1147 90 1A 11/01/96 2 Culbertson Lane 1213 114 115.7 90 6 11/01/96 3 Culbertson Lane 1208 9.0 118,3 91 19 11/01/96 4 Culbertson Lane 1209 11.0 118.7 91 19 11/04/96 5 Culbertson Lane 1219 8,2 116.2 90 6 11/04/96 6 Culbertson Lane 1220 8.8 115,6 90 6 11/04/96 7 Culbertson Lane 1215 10.2 119.6 91 1 11/04/96 8 Culbertson Lane 1216 94 117,7 91 19 11/04/96 9 Promenade 1206 84 114.3 89** 17 Chardonnay 11/04/96 10 Promenade 1209 13.7 114.5 91** 16 Charonnay 11/04/96 11 Culbertson Lane 1218 9.8 122.1 91 8 11/04/96 12 Culbertson Lane 1219 11.7 119.3 90 I 11/04/96 13 Culbertson Lane 1222 10.3 121.3 91 8 11/04/96 14 Culbertson Lane ]223 11.7 1205 90 8 11/04/96 15 Culbertson Lane 1224 9.1 121.7 91 8 11/04196 16 Culbertson Lane 1225 104 123.9 92 8 11/04/96 17 Culbertson Lane 1221 9.9 113,1 88* 1A 11/04/96 18 Culbertson Lane 1222 9.9 112.3 88* lA 11/05/96 19 Promenade 1212 9.0 114.8 90 ]A Chardonnay 11/05/96 20 Promenade 1213 12,6 105.5 85* 5 Chardonnay 11/05/96 21 Promenade Retest #20 12.5 111.7 87* lA Chardonnay 11/05/96 22 Promenade 1211 12.7 Iln 89* lA Chardonnay Notes: * Failing Tests (retests noted in Elevation Column) ** Test Taken in Native S Sewerline SG AB Aggrcgate Base Subgrade 8 ~ ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCfION, INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 IN. 474-96 Page Tll-2 DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNITWT. COMPACTION TYPE (ft) (%) lbs/cuft (%) 11105/96 23 Promenade 1212 11.3 114.8 90 IA Chardonnay 11/05/96 24 Promenade Retest #22 8.9 1117 90 5 Chardonnay 11/05/96 25 Promenade Retest #21 8,9 111.8 90 5 Chardonnay 11/05/96 26 Promenade 1215 122 119.2 91 I Chardonnay 11/05/96 27 Promenade 1216 11.6 112.2 87' IA Chardonnay 11/05/96 28 Promenade Retest #27 11.3 114.8 90 lA Chardonnay 11105/96 29 Promenade 1214 7.5 118,8 91 1 Chardonnay 11105/96 30 Promenade 1215 10.6 115.1 90 IA Chardonnay 11105/96 31 Promenade 1225 8.1 114.1 89' lA Chardonnay 11/05/96 32 Promenade Retest #31 8.1 114.7 90 lA Chardonnay 11/06/96 33 Promenade 1218 11.1 116.4 90 15 Chardonnay 11/06/96 34 Promenade 1219 10.0 114.7 90 lA Chardonnay 11/06/96 35 Promenade 1218 10.1 116,7 91 lA Chardonnay 11106/96 36 Promenade 1218 14.4 117.1 91 15 Chardonnay 11106/96 37 Promenade 1219 12.9 117,8 91 15 Chardonnay 11/06/96 38 Promenade 1221 6.0 121.5 91 8 Chardonnay 11106/96 39 Promenade 1222 11.0 120.4 90 8 Chardonnay Notes: , Failing Tests (retests noted in Elevation Column) " Test Taken in Native S Sewer line SG AB Aggregate Base Subgrade <\ ~ ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCfION, INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 j,N.474-96 Page TIl-3 DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNIT WT. COMPACTION TYPE (ft) (%) Ibslcu ft (%) 11106/96 40 Promenade 1220 12,6 122.3 91 8 Chardonnay 11106/96 41 Promenade 1221 12.6 117,5 90 1 Chardonnay 11/06/96 42 Culbertson Lane Retest # 1 7 10.8 123.0 92 8 11/06/96 43 Culbertson Lane Retest # 18 10.9 122,8 92 8 11/06/96 44 Culbertson Lane 1224 10.2 123.6 92 8 11/06/96 45 Culbertson Lane 1223 13.9 112.3 88' 3A 11/06/96 46 Culbertson Lane 1224 11.6 113.6 89' 3A 11107/96 47 Culbertson Lane Retest #46 12.4 116.3 91 3A 11/07/96 48 Culbertson Lane Retest #45 11.8 125.0 93 8 11107/96 49 Culbertson Lane 1226 10.0 1170 91 2A 11/07/96 50 Culbertson Lane 1227 12.9 ] ]5.1 90 2A 11/07/96 51 Culbertson Lane 1226 10.6 115.2 90 2A 11107/96 52 Culbertson Lane 1227 11.2 117.3 92 2A 11/07/96 53 Culbertson Lane 1223 10.1 115,9 91 2A 11107/96 54 Culbertson Lane 1224 10,6 114.8 90 2A 11/07/96 55 Culbertson Lane 1225 10.4 116.8 91 15 11/07/96 56 Culbertson Lane 1224 10.2 120,3 92 1 11/08/96 57 Culbertson Lane 1226 13.4 120.1 92 1 11/08/96 58 Culbertson Lane 1227 14.4 118.7 93 17 11108/96 59 Culbertson Lane 1228 11.6 113.3 91 5 11108/96 60 Culbertson Lane ]229 12.1 111.7 90 5 11108/96 61 Culbertson Lane 1230 11.6 114.8 90 17 11/08/96 62 Culbertson Lane 1220 12.1 112,7 88' 2A 11108/96 63 Culbertson Lane 1221 12.0 1141 90 3A 11108/96 64 Culbertson Lane Retest #62 13.4 116.6 90 15 11108/96 65 Culbertson Lane 1222 12.7 116.0 90 15 Notes: · Failing Tests (retests noted in Elevation Column) .. Test Taken in Native S Sewerline SG AB Aggregate Base Sub grade \0 . ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 J.N,474-96 Page Tll-4 DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNIT WT. COMPACTION TYPE (ft) (%) Ibs/cuft (%) 11/08/96 66 Culbertson Lane 1223 11.7 117,0 91 15 11108/96 67 Promenade 1216 11.3 105.3 85' 5 Chardonnay 11/08/96 68 Promenade Retest #67 13.1 112.5 88' 2A Chardonnay 11/08/96 69 Promenade Retest #68 12.2 118.8 92 15 Chardonnay 11/08/96 70 Promenade 1219 10.0 120.1 92 13 Chardonnay 11/08/96 71 Promenade 1220 10.2 120] 92 13 Chardonnay 11109/96 72 Promenade 1221 11.7 117,6 90 4 Chardonnay ] 1/09/96 73 Promenade 1223 9.6 124.0 93 8 Chardonnay 11/09/96 74 Promenade 1224 9.4 123,8 92 8 Chardonnay 11/09/96 75 Culbertson Lane 1222 9.6 122.2 91 8 11/09/96 76 Culbertson Lane 1223 11.1 119.3 90 3 11/12/96 77 Culbertson Lane 1224 10.5 122,0 91 8 11112/96 78 Culbertson Lane 1225 10.7 1175 90 1 11/12/96 79 Culbertson Lane 1227 12,8 114.6 90 4A 11/12/96 80 Culbertson Lane 1228 14.0 115.5 90 2A 11/12/96 81 Culbertson Lane ]226 12,3 110.8 87' 4A 11/12/96 82 Culbertson Lane 1228 11.7 113,5 89' 4A 11/12/96 83 Culbertson Lane 1226 13,2 117.3 92 2A 11112/96 84 Culbertson Lane 1227 12.2 117.2 92 4A 11/12/96 85 Culbertson Lane 1229 11.9 117.8 90 1 11/12/96 86 Culbertson Lane 1230 12,8 113.8 90 4A 11/12/96 87 Culbertson Lane Retest #81 106 109.6 86' 4A 11/12/96 88 Culbertson Lane Retest #82 11.3 107.6 85* 4A Notes: * Failing Tests (retests noted in Elevation Column) ** Test Taken in Native S Sewer line 5G AB Aggregate Base Subgrade \\ tti ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7,1997 IN. 474-96 Page TIl-5 DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNIT WT, COMPACTION TYPE (ft) (%) Ibs/cu ft (%) 1 ] 112/96 89 Culbertson Lane Retest #87 14,1 117,2 92 2A 11112/96 90 Culbertson Lane Retest #88 12.2 114.3 90 2A 11/13/96 91 Culbertson Lane 1228 11.6 113 ] 89' 4A 11/13/96 92 Culbertson Lane 1229 12,1 105.5 83' 4A 11113/96 93 Culbertson Lane 1230 121 110.9 87' 4A 11/13/96 94 Culbertson Lane 1231 12.0 108.3 85' 4A 11/13/96 95 Culbertson Lane 1230 13.5 118.2 92 2A 11/13/96 96 Culbertson Lane 123] 12.2 1]4.3 90 2A 1lI13/96 97 Culbertson Lane Retest #91 13.4 114.4 90 4A 11/13/96 98 Culbertson Lane Retest #92 13.5 115.2 92 2A 11/13/96 99 Culbertson Lane Retest #93 11.01 108.8 86' 4A 11113/96 100 Culbertson Lane Retest #94 9.0 111.7 88' 4A 11/13/96 101 Culbertson Lane Retest #99 112 111.9 88' 4A 11113/96 102 Culbertson Lane Retest # 100 9.9 114.0 90 4A 11/13/96 103 Culbertson Lane Retest # 10 1 11.4 115.7 90 2A 11113/96 104 Culbertson Lane 1231 11.1 113.8 90 4A 11113/96 105 Culbertson Lane 1228 11.6 115.9 91 2A 11/13/96 106 Culbertson Lane 1229 11.0 113.3 89' 4A 11113/96 107 Culbertson Lane Retest # 1 06 12,2 114.3 90 4A 11/13/96 108 Promenade 1236 12.4 119.1 90 SA Chardonnay 11/14/96 109 Culbertson Lane 1231 13.7 116.3 90 15 11114/96 110 Culbertson Lane 1232 12.7 1179 90 4 11/14/96 11] Culbertson Lane 1230 13.4 II5,7 90 15 11/14/96 112 Culbertson Lane 1231 12,3 121.0 92 5A 11/14/96 113 Promenade 1238 12.1 119.2 90 SA Chardonnay 11/14/96 114 Promenade 1239 10.7 119.2 90 SA Chardonnay Notes: , Failing Tests (retests noted in Elevation Column) " Test Taken in Native S Sewer line SG AB Aggregate Base Sub grade \z" ~ ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC. ~RACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 IN. 474-96 Page TII-6 DATE OF TEST RELATIVE SOIL TEST NO, LOCATION ELEVATION MOIST UNIT WI COMPACTION TYPE (ft) (%) Ibs/cuft (%) ] l/14/96 115 Culbertson Lane 1233 14.4 111.1 87' 4A 11114/96 116 Culbertson Lane Retest #115 11.3 114.8 90 2A 11114/96 117 Culbertson Lane 1231 12.1 116,0 91 2A 11114/96 118 Culbertson Lane 1232 13,5 114.3 90 4A ll/lS/96 119 Culbertson Lane 1229 12.4 113,2 88' 6A 11115/96 120 Culbertson Lane Retest #119 10.9 116.3 91 6A 1l/IS/96 121 Culbertson Lane 1231 14,1 117.0 91 6A 11115/96 122 Culbertson Lane 1232 10.1 118.8 93 6A 11115/96 ]23 Culbertson Lane 1234 14.6 115.0 90 6A 11115/96 124 Culbertson Lane 1235 13.9 119.2 93 6A 11115/96 125 Culbertson Lane 1233 15,3 113.4 86' 5A 11115/96 126 Culbertson Lane 1234 13.0 120.0 91 5A 11115/96 127 Culbertson Lane 1235 11.1 118.6 90 SA 11115/96 128 Culbertson Lane 1237 12.2 120.1 91 5A 11115/96 129 Culbertson Lane Retest #125 13.7 1200 91 SA 11118/96 130 Promenade 1238 14.1 113.8 90 4A Chardonnay 11118/96 131 Promenade 1231 101 113.8 88' 6A Chardonnay 11118/96 132 Promenade 1232 10.4 113.4 89' 6A Chardonnay 11118/96 133 Promenade Retest #131 13.2 112.8 88' 6A Chardonnay 11118/96 134 Promenade Retest #132 10.7 118.1 90 1 Chardonnay 11118/96 135 Promenade 1227 11.5 115.6 90 6A Chardonnay 11118/96 136 Promenade 1228 9,7 112.8 90 16 Chardonnay 11118/96 137 Promenade 1223 12,5 1212 92 SA Chardonnay Notes: , Failing Tests (retests noted in Elevation Column) " Test Taken in Native S Sewerline SG AB Aggregate Base Subgrade \? & ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 J.N,474-96 Page TIl-7 DATE OF TEST RELATIVE SOIL TEST NO, LOCATION ELEVATION MOIST UNIT WT. COMPACTION TYPE (ft) ('Yo) Ibs/cuft ('Yo) ] 1/18/96 138 Promenade ]225 12.4 116,8 9] 6A Chardonnay I III 8/96 ]39 Promenade Retest #133 10.3 110.8 87' 6A Chardonnay 11/18/96 140 Promenade Restest #139 10.4 112 ] 88' 6A Chardonnay 1 III 8/96 141 Promenade Retest #] 40 10.9 109.8 86' 4A Chardonnay 1]/18/96 ]42 Promenade 1233 13,2 1] 1.1 87' 4A Chardonnay I II18/96 143 Promenade Retest #]41 13.4 121.5 92 SA Chardonnay 1]/18/96 144 Promenade Retest #142 10] 113.8 90 4A Chardonnay 1 III 8/96 145 Culbertson Lane ]239 11.0 122.8 92 8 ] II18/96 ]46 Culbertson Lane 1240 9.4 ]20.5 90 8 11/18/96 147 Culbertson Lane 1247 8.5 126,1 94 8 11/18/96 148 Culbertson Lane 1248 14.1 113.3 90 16 11/19/96 149 Promenade 1237 9,0 118.6 90 SA Chardonnay 11/19/96 150 Promenade 1239 10.4 115.3 90 6A Chardonnay 11/19/96 151 Promenade 1231 12,7 115,6 90 6A Chardonnay 11/19/96 152 Promenade 1232 ]2.7 115.1 90 6A Chardonnay 11/19/96 153 Promenade 1243 11.5 1 ]3.8 90 4A Chardonnay 11/19/96 154 Promenade 1245 11.0 118.8 90 SA Chardonnay 11/19/96 155 Promenade 1247 9,2 117.0 91 6A Chardonnay Promenade Chardonnay Notes: . Failing Tests (retests noted in Elevation Column) " Test Taken in Native S Sewerline SG AB Aggregate Base Subgrade v\ ~ ~ I I I I I I I I I I I I I I I I I I I €CL CONSTRUCfION, INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 IN. 474-96 Page Tll-8 DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNIT WT, COMPACTION TYPE (ft) (%) lbs/cuft (%) 11/27/96 IS Promenade 1235 13.9 115.0 90 2A Chardonnay Sta 53+11 11/27/96 2S Promenade 1237 13.0 117.25 91 2A Chardonnay Sta 53+07 , 11/27/96 3S Promenade 1239 13.4 112,0 88' 3A Chardonnay Sta 53+03 11/27/96 4S Promenade Retest #3S 15.4 113.9 90 3A Chardonnay Sta 53+03 11/27/96 5S Promenade 1230 14.0 114.0 90 3A Chardonnay Sta 53+93 11/27/96 6S Promenade 1238.5 13,5 115.0 90 2A Chardonnay Sta 51+73 11/27/96 7S Promenade 1246 8.7 114.0 90 3A Chardonnay Sta 51+10 11/27/96 8S Promenade 1241 16.2 108,0 85' 3A Chardonnay Sta 49+80 11/27/96 9S Promenade Retest #8S 17,1 108,9 86' 3A Chardonnay Sta 49+80 11/27/96 10S Promenade Retest #9S 14,0 111.0 87' 3A Chardonnay Sta 49+80 11/27/96 lIS Promenade Retest # IOS 14.0 114.5 90 3A Chardonnay Sta 49+84 11/27/96 12S Promenade 1243 14.5 114.5 90 3A Chardonnay Sta 49+85 Notes: , Failing Tests (retests noted in Elevation Column) " Test Takcn in Native S Sewerline SG AB Aggregate Base Sub grade \?' ~ ~ II I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 J.N,474-96 Page Tll-9 DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNITWT COMPACTION TYPE (ft) (%) Ibslcu ft (%) 11/29/96 l3S Promenade 1246 11.7 115.0 90 2A Chardonnay Sta 49+70 11/29/96 14S Promenade 1248 10.2 117.5 92 2A Chardonnay Sta 49+45 , 11/29/96 15S Promenade 1250 11.5 109.0 86" 3A Chardonnay Sta 49+85 1 1/29/96 16S Promenade Retest #15S 12,3 118.0 93 3A Chardonnay Sta 49+85 11/29/96 17S Promenade 1242 13.8 110.25 87" 3A Chardonnay Sta 49-Kl9 11/29/96 l8S Promenade Retest #17S 14.2 109,0 86" 3A Chardonnay Sta 49-Kl9 11/29/96 19S Promenade Retest #18S 10.7 119.25 94 3A Chardonnay Sta 49-Kl9 11/29/96 20S Promenade 1245 12,6 117.25 92 2A Chardonnay Sta 48+96 11/29/96 21S Promenade 1245 11.9 114.0 90 3A Chardonnay Sta 48+70 11/29/96 22S Promenade 1251 13.0 1105 87" 3A Chardonnay Sta 48+46 12/02/96 23S Promenade 1241 9.5 121.0 92 5A Chardonnay Sta 51+49 12/02/96 24S Promenade 1248 9.2 120.0 91 5A Chardonnay Sta 51+49 Notes: " Failing Tests (retests noted in Elevation Column) "" Test Taken in Native S AB Sewerline SG Aggregate Base Sub grade \(, ~ ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 J.N,474-96 Page Tll-lO DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNIT WT. COMPACTION TYPE (ft) (%) Ibs/cu ft (%) 12/03/96 25S Promenade Retest #22S 10.0 115.0 90 2A Chardonnay Sta 48+46 12/03/96 26S Promenade 1249 8.9 114,5 90 3A Chardonnay Sta 48+46 12/03/96 27S Promenade 1246 112 113.75 90 3A Chardonnay , Sta 48+21 12/03/96 28S Promenade 1249.5 10,8 122.25 92 5A Chardonnay Sta 46+97 12/03/96 29S Promenade 1248.5 10.9 121.75 92 5A Chardonnay Sta 46+94 12/03/96 30S Promenade 1253.5 9.2 125,0 95 5A Chardonnay Sta 47+20 12/03/96 31S Promenade 1251.5 12.6 119.5 91 5A Chardonnay Sta 47+04 12/05/96 32S Promenade 1242 8,0 114.3 90 3A Chardonnay Sta 52+71 12/05/96 33S Promenade 1247 9.0 114,5 90 3A Chardonnay Sta5I+24 12/05/96 34S Promenade 1250 8.0 113,6 90 3A Chardonnay Sta 50+37 12/05/96 35S Promenade 1250 11.0 115.8 90 2A Chardonnay Sta 49+42 12105/96 36S Promenade 1253.5 12.0 117.3 90 2A ChardOlUlay Sta 48+19 Notes: · Failing Tests (retests noted in Elevation Column) .. Test Taken in Native S Sewerline SG AB Aggregate Base Subgrade \1 . ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCfION,INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 J.N,474-96 Page Tll-Il DATE OF TEST RELA TlVE SOIL TEST NO. LOCATION ELEV A TlON MOIST UNIT WT, COMPACTION TYPE (ft) (%) Ibs/cuft (%) 12/05/96 37S Promenade 1255 13.0 116,8 91 2A Chardonnay Sta 47+47 12/05/96 38S Promenade 1255 10.7 112.0 88* 3A Chardonnay Sta 45+70 12/05/96 39S Promenade 1257 11.8 114.5 90 3A Chardonnay Sta 45-t{j0 12/05/96 40S Promenade 1259 10.8 ] 15.5 90 2A Chardonnay Sta 45+50 12/05/96 41S Promenade Retest #38S 10,6 117.5 92 2A Chardonnay Sta 45+70 12/05/96 42S Promenade 1253 12.8 119.25 93 2A Chardonnay Sta 45+75 12/06/96 43S Promenade 1253 10,5 114,0 90 3A Chardonnay Sta 43+28 12106/96 44S Promenade 1257 11.8 114.5 90 3A Chardonnay Sta 43+41 12/06196 45S Promenade 1262 11.2 115.5 90 2A Chardonnay Sta 43+54 12/06/96 46S Promenade 1264 104 115.0 90 2A Chardonnay Sta 43+43 12/06/96 47S Promenade 1266 ]0,3 116.0 91 2A Chardonnay Sta 42+96 12/06/96 48S Promenade 1263 9.3 118.5 93 2A Chardonnay Sta 42+96 Notes: " Failing Tests (retests noted in Elevation Column) ** Test Taken in Native S AB Sewer line SG Aggregate Base Subgrade \"b ~ ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCfION, INC. TRACTS 23100,23100-4,23101 &23101-3 February 7, 1997 ],N.474-96 Page Tll-12 DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNIT WT, COMPACTION TYPE (ft) (%) Ibs/cuft (%) 12/06/96 49S Promenade 1268 13,5 114.0 90 3A Chardonnay Sta 43+43 12106/96 50S Promenade 1262 124 115,9 90 2A Chardonnay Sta 42+96 12/l 0/96 51S Promenade 1257 15.6 115.5 90 2A Chardonnay Sta 42-t{)6 12/10/96 52S Promenade 1262 12.5 114.25 90 3A Chardonnay Sta 42+11 12/24/96 53S Promenade 1223 17.3 107.0 84* 3A Chardonnay Sta 58-Hi2 12/24/96 54S Promenade Retest #53S 13.4 115.5 91 3A Chardonnay Sta 58+58 12/24/96 55S Promenade 1224 14.5 115.75 90 2A Chardonnay Sta 58-t{)8 12/27/96 56S Promenade 1227 10.5 129.0 98 SA Chardonnay Sta 57-t{)3 12/26/96 57S Promenade 1226.5 11.7 116.0 91 2A Chardonnay Sta 56+20 12/31/96 58S Open Space 105 1220.5 14,9 126.2 96 5A Sta 7+50 12/3 1/96 59S Open Space 105 1227 14.3 120.1 94 2A Sta 9+46 12/3 1/96 60S Promenade 1224 11.7 116.9 91 2A Chardonnay Sta 9+95 12/31/96 6lS Culbertson Sta 1+35 1229 15.6 128.0 90 2A 12/31/96 62S Open Space 105 1216,5 16.3 128.0 95 2A Sta 7+50 Notes: ,* Failing Tests (retests noted in Elevation Column) ,** Test Taken in Native S AB Sewerline SG Aggregate Base Subgrade \C\, ~ ~ I I. I I I I I I I I I I I I I I I I I CCL CONSTRUCfl0N, INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 IN,474-96 Page T11-13 DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNIT WT, COMPACTION TYPE (ft) (%) Ibs/cu ft (%) 12/3 1/96 63S E. Of Meadows Pl,.-wy 1215 14.9 128.0 92 2A Sta 5+50 01/02/97 64S Promenade 1226 14.3 128,0 90 2A Chardonnay Sta 55+45 01/25/97 68S Promenade 1230 9.3 124.1 94 5A ChardonnaylManhole No 23 Sta 54+47 01/25/97 69S Promenade 1232 9.8 123.1 93 5A ChardonnaylManhole #23 Sta 54+55 01/25/97 70S Promenade 123] 10.8 123.0 93 5A ChardonnaylManhole #2 Sta 58+85 01/25/97 7lS Promenade 1233 12.5 ]21.5 92 5A ChardonnaylManhole No, 2 Sta 58+95 01/25/97 72S Promenade 1235 ]2,5 120,7 91 5A ChardonnaylManhole #2 Sta 58+85 01/25/97 73S Promenade 1238 12,1 120,3 91 5A ChardonnaylManhole #2 Sta 58+95 01/25/97 74S Promenade 1240 12.8 119.0 90 5A ChardonnaylManhole #2 Sta 58+85 01/27/97 75S Promenade ]23] 14.5 119.2 90 5A ChardonnaylMain Sta 54+70 01/27/97 76S Promenade ]233 14.0 lIS,5 90 5A ChardonnaylMain Sta 54+70 01/27/97 77S Meadows Parkwayl ]213.5 13.7 118.3 90 5A Manhole #24 Sta 09+95 01/27/97 78S Meadows Parkwayl 1214 13.6 118.6 90 5A Manhole #25 Sta 09+95 Notes: * Failing Tests (retests noted in Elevation Column) ** Test Taken in Native S AB Sewerline SG Aggregate Base Sub grade zP . ~ I I I I I I I I I I I I I I I I I I I I CCL CONSTRUCfION, INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 IN. 474-96 Page Tll-14 DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNIT WT. COMPACTION TYPE (ft) (%) Ibs/cuft (%) 01/30/97 79S Promenade 1272 11.8 120.2 91 SA Chardonnay Sta 42-K50 . 01/30/97 80S Promenade 1266 103 122.3 93 5A Chardonnay Sta 44+90 01/3l/97 81S Promenade 1256 12.4 119.3 90 SA Chardonnay Sta 47+90 0l/3l/97 82S Promenade 1251 11.4 122.5 93 5A ChardolUlay Sta 50+80 01/31/97 83S Promenade 1241.5 9.7 123.0 93 SA Chardonnay Sta 53+70 o l/3l/97 84S Promenade 1233 99 121.6 92 5A Chardonnay Sta 55+70 01/31/97 85S Promenade 1235 12.3 120,0 91 5A Chardonnay Sta 55+20 02/03/97 86S Promenade 1231 12,2 120.0 91 SA Chardonnay Sta 57+50 02/03/97 87S Promenade 1232.5 12.2 120.8 91 SA Chardonnay Sta 57+80 02/03/97 88S Offsite Access 1229 11.7 119.9 91 SA Sta 9+00 02/03/97 89S Offsite Access 1218 10.9 121.8 92 SA Sta 7+40 02/03/97 90S Promenade 1238.5 11.8 121.2 92 SA Chardonnay Sta 54+50 02104/97 ISG Promenade FG 11.2 122,9 93 SA Chardonnay Sta 41+50 Notes: * Failing Tests (retests noted in Elevation Column) ** Test Taken in Native S Sewerline SG AB Aggregate Base Sub grade 'Z.\ =& ~ I I I I I I I I I I I I I I I I I I I CCL CONSTRUCTION, INC. TRACTS 23100,23100-4,23101 & 23101-3 February 7, 1997 J.N,474-96 Page TlI-15 DATE OF TEST RELATIVE SOIL TEST NO. LOCATION ELEVATION MOIST UNIT WT, COMPACTION TYPE (ft) (%) Ibs/cu ft (%) 02/04/97 2SG Promenade FG 116 121.2 92 5A Chardonnay Sta 44+50 02/04/97 3SG Promenade FG 10,7 122,7 93 SA Chardonnay Sta 49+30 02/04/97 4SG Promenade FG 10.3 122.5 93 SA Chardonnay Sta 52+50 02/04/97 SSG Promenade FG 10.0 123.3 93 5A Chardonnay Sta 56+80 02104/97 6SG Offsite Access FG 10,8 123.4 93 5A Sta 8+40 02/04/97 7SG Offsite Access FG 10.6 123,1 93 SA Sta 5+60 02/06/97 lAB Promenade FG 8.0 122.6 95 ABl Chardonnay Sta 43+90 02/06/97 2AB Promenade FG 7,5 1216 95 ABl Chardonnay Sta 46+80 02/06/97 3AB Promenade FG 7.2 123.1 96 AB1 Chardonnay Sta 49+30 02/06/97 4AB Promenade FG 6,8 125.1 96 ABl Chardonnay Sta 52+ 10 02/06/97 5AB Promenade FG 7.2 122.8 95 ABl Chardonnay Sta 56-t{)0 02/06/97 6AB Promenade FG 6.8 132,0 95 ABl Chardonnay Sta 57+90 02106/97 7AB Offsite Sta 8+30 FG 6.9 132.5 95 AB2 02/06/97 8AB Offsite Sta 5+50 FG 7.2 132,6 95 AB2 Notes: '. Failing Tests (retests noted in Elevation Column) .. Test Taken in Native S AB Sewerline SG Aggregate Base Sub grade 7P & ~