Loading...
HomeMy WebLinkAboutGeotech&CompactionResultsWaterlineTrenchBackfill(Feb.15,2000) I """f: I J I I I I I I I I I I I I I '1a... 1.~\C!D - Ce\ll~ l~A:~~GEN Corporation . SoilEngineeringandConsullingServices-EngineeringGeology . Compaction Testing -Inspections .Corrstruc1ionMalelialsTesting-LahOlatoryTestilllJ-Pt,IOO\alionTestinQ -Geology . Water Resource Studies .PIlaseI&lIEnvilOnmefllaISiteAssessmen~ ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK GEOTECHNICAL REPORT AND COMPACTION TEST RESULTS WATERLINE TRENCH BACKFILL Meadows Parkway Transmission Main Meadows Parkway City of Temecula, County of Riverside, California Project Number: T1805-C February 15, 2000 Prepared for: Rancho California Water District 42135 Winchester Road Temecula, California 92590-9017 \ "'\ i - / .... ~? I ,r \_ \ ~,- ~,- , ' ,.. " ", I .... _ /....." / / "_ /,...... I" " / , ". \ _ _ _ \ -' " / IF, _ _ _ \ .... ~ " I / \ __ ' , i:~';1~~i~~~-~~~~~~i~i~~~i!!!~'~~~~~~~~'~~!~~! " ... . ._'~~.~J ~$~~~~ - , -' -- I ""' _'~ 'w ___ I I I I I I I I I I I I I I I I I I I Rancho California Water District Project Number: T1805-C TABLE OF CONTENTS . SECTION NUMBER AND TITLE PAGE 1.0 PROJECT LOCATION AND DESCRIPTION .......................,.......................,....,........................1 1.1 PROJECT LOCATION,...,..,....,.............................................................................................1 1.2 PROJECT DESCRIPTION "....., ..,.., ...,..,....,...........................,....,................,.,.".................... 1 .2.0 SCOPE OF WORK,.,................... ....... ................................... .............................................. 2 2.1 BACKFILL OPERATIONS ......... ... ... ...........,.,.,............ ,."................, ........, ,.,......................... 2 . 2.2 WORK DATES...., ........ ......... .... ...... ............................ ................ ..................... .................. 2 2.3 EQUiPMENT..."",..........................."..,....,......................................".....,."........................ 2 3.0 TESTING..............,.,..,..,."..,..,.................................,..,..,.,.,..,.,.......................................... 2 3.1 FIELD TESTING PROCEDURES ............................................................................................ 2 3.2 LASORA TORY TESTING.."."."..,..,.......,..,....,. ..............."...........................,........................ 2 3.2.1 MOISTURE-DENSITY RELATIONSHIP TEST ............................................................... 3 4.0 EARTH MATERIALS ,........... ............... .......... ............... .......,....,.., ,.......,..........,................... 3 .5.0 CONCLUSIONS AND RECOMMENDATIONS.....,................. ..... ......... ....... .........,...................... 3 ApPENDIX TEST RESULTS DRAWINGS -z- EnGEN Corporation I 1.2 I I .:2:;:. "\'" 1'''-- .Liie' ## ~~ I I I I I I I I I I I I I " ]:~~GEN Corporation -Soil Engineering and Consulling Services _EngioeeringGeology_CompactionTesting _lnspec\ions_ConstruclionMaterialsTesting_\..aooratoryTesliflg_Pelcola\\oo'lesling _ Geology _ Water Resouf'Cll Studies _ Phase I & II Environmental Site Assessments ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK . February 15, 2000 i Rancho California Water District 42135 Winchester Road Temecula, California 92590-9017 (909)676-4101 I FAX (909) 676 0615 . Attention: Mr. Dennis Williams , Regarding: GEOTECHNICAL REPORT AND COMPACTION TEST RESULTS WATERLINE TRENCH BACKFILL Meadows Parkway Transmission Main Meadows Parkway City of Temecula, County of Riverside, California Project Number: T1805-C References: 1. Rancho California Water District, Plans, Specifications, and Project Documents for Meadows Parkway Transmission Main, Project Numbers D0814 and 98010. , Dear Mr. Williams: . According to your request and signed authorization, EnGEN Corporation has performed field observations, sampling, and in-place density testing at the above referenced site. Subrnitted, . herein, are the test results and the supporting field and laboratory data. 1.0 PROJECT LOCATION AND DESCRIPTION 1.1 PROJECT LOCATION The subject projects are located along Meadows Parkway north of the intersection of Meadows Parkway and Rancho California Road, in the City of Temecula, County of Riverside, California, PROJECT DESCRIPTION The subject project consisted of the installation of 6485 linear feet of 24-inch CM&L concrete water main and associated appurtenances along the subject road. ~ / , , , ~ , , ' "- ~,. - . " ~ I " \ _ _ _ \ . , .. , " '" ~ -_ I - ,. / , ~ ~ I _...."_ "/ "-- ~"I _'"_ ~", ~,I _' _ ~ / -~.~~Tfu~.:;;"ii;~~iis~ii~~~~~~~~~.~~~~~*~~~t!~ ~~~;u,u::,"",l!:({;~':".;; ;~,.::::,.s;;:""J;i:>J;;;,;0>*J:;:,,",~>;>i;.W""~~NiIill:~~~~~H':~$:m!!i!:fliti~:t ""......"'_."".,'"'""..;~"'::: ',";;"~~"";"::--"",~"'" -" _....,...L'......."'" ....,___...._.,.,...,'.",.~.....,;..,"""_.,.,.,;::=:;:~ .- / .... ~ ~ I _ ~ : \ - ~ - - \ \ ~ \ / ~ -_ I I I I I I I I I I I I I I I I I I I I Rancho California Water District Project Number: T1805-C February 2000 Page 2 2.0 SCOPE OF WORK The scope of work performed by this office consisted of "part-time" field observations and in-place density testing during the trench backfill operations on an "on-call" basis. 2.1 BACKFILL OPERATIONS The backfill operations consisted of the placement and compaction of the excavated trench material. These native materials were moisture-conditioned to near optimum moisture content, processed, and placed in lifts of 6-inches to 12-inches, then compacted with mechanical equipment. The backfill and compaction operations were performed in accordance with the minimurn standards and requirements of Rancho California Water District and the City of Temecula, California. 2.2 WORK DATES This report represents geotechnical observations and testing during the construction operations from November 15,1999 through December 7,1999. 2.3 CONTRACTOR AND EQUIPMENT The compaction operations were performed by Genesis Construction through the use of one (1) excavator with sheepsfoot, one (1) backhoe, one (1) front end loader, one (1) motor grader, and one (1) 2,000 gallon water tank, 3.0 TESTING 3.1 FIELD TESTING PROCEDURES Field in-place density and moisture content testing were performed utilizing a nuclear density gauge in general accordance with ASTM-D-2922-81-90 and ASTM-D-3017-88 respectively. Relative compaction test results were within the 90 percent required for all material placed and compacted, Test results are presented in the Appendix of this report. Fill depths and test locations (by station numbers when applicable) were determined from review of the referenced improvement plans, 3.2 LABORATORY TESTING The following laboratory tests were performed as part of our services during the compaction operations for the subject project. The test results are presented in the Appendix of this report. " EnGEN Corporation I I I I I I I I I I I I I I I I I I I Rancho California Water District Project Number: T180S-C February 2000 Page 3 3.2.1 MOISTURE-DENSITY RELATIONSHIP TEST Maximum dry density - optimum moisture content relationship tests were conducted on samples of the materials used as backfill. The tests were performed in general accordance with ASTM 01557-91 procedures. The test results are presented in the Appendix of this report under the Summary of Optimum Moisture Content I Maximum Dry Density Relationship Test Results. 4.0 EARTH MATERIALS The natural earth materials encountered on-site generally consisted of sands with various percentages of SiH. 5.0 CONCLUSIONS AND RECOMMENDATIONS 5.1 GENERAL Based on the observations and tests performed during the backfilling operations, the subject backfill in the areas tested has been compacted in accordance with Rancho California Water District's Plans and Specifications and the grading Code of the City of Temecula. 6.0 CLOSURE This report has been prepared for use by the parties or project named or described above. It rnay or may not contain sufficient information for other parties or purposes. The findings and recommendations expressed in this report are based on field and laboratory testing performed during the backfill operation and on generally accepted engineering practices and principles, No further warranties are implied or expressed beyond the direct representations of this report. ~ ":> EnGEN Corporation I I I I I I I I I I I I I I I I I I I Rancho California Water District Project Number: T1805.C February 2000 Page 4 Thank you for the opportunity to provide these services. If you should have any questions regarding this report, please do not hesitate to contact this office at your convenience, Respectfully submitted, EnGEN Corporation Q:D!~~ne~ Field Operations Manager JDG/OB:cp Distribution: (4) Addressee FILE: EnGEN/Reporting/CfT1805C, Rancho California Water District, Waterline Trench Backfill &- EnGEN Corporation I I I I I I I I I I I I I I I I I I I APPENDIX: TEST RESULTS Rancho California Water District Project Number. T1805-C Appendix Page 1 \ EnGEN Corporation I I Rancho California Water District Project Number: T180S-C Appendix Page 2 FIELD TEST RESULTS (Sumrnary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) I (S.G.) = Subgrade/(F.G.) = Finish Grade Test Depth Soil Max Moisture Dry Relative Required I Test Date Test Locations Elevation Type Density Content Density Compaction Compaction No. (1999) (FT) (PCF) (%) (PCF) (%) (%) PROJECT #D0814 I 1 12-07 Station 10+25 1 A1 128.7 12.4 117.8 91.5% 90.0% 2 12-07 Station 10+50 8.G. A1 128.7 10.7 118.8 92.3% 90.0% I 3 12-07 Station 12+00 1 A1 128.7 10.4 116.9 90.8% 90.0% 4 12-07 Station 12+50 S.G. A1 128.7 9.8 119.8 93.1% 90.0% 5 12-07 Station 13+50 1 A1 128,7 7.9 119.9 93.2% 90,0% I 6 12-07 Station 14+00 8.G. A1 128.7 7.7 117,5 91.3% 90,0% 7 12-07 Station 15+75 1 A2 130.3 8.3 120.8 92.7% 90.0% I 8 12-07 Station 16+25 8.G. A2 130.3 8.7 121.4 93.2% 90.0% 9 12-07 Station 18+00 1 A2 130:3 7.2 121.4 93.2% 90.0% 10 12-07 Station 18+50 S.G. A2 130.3 9.8 119.0 91.3% 90.0% I 11 12-07 Station 20+00 1 A2 130.3 9.7 120.4 92.4% 90.0% 12 12-07 Station 21 +00 8.G, A2 130.3 12.1 118.4 90.9% 90.0% I 13 12-07 Station 22+50 1 A2 130.3 9.2 118.8 91.2% 90.0% 14 12-07 Station 23+00 8.G. A2 130.3 8.3 120.0 92.1% 90.0% I 15 '12-08 Station 24+00 1 A3 123.2 8.4 112.0 90.9% 90.0% 16 12-08 Station 24+50 8.G. A3 123.2 9.7 112.6 91.4% 90,0% 17 12-08 Station 24+50 1 A3 123.2 8.2 113.1 91.8% 90.0% I 18 12-08 Station 26+00 8.G. A3 123.2 10.3 114,8 93.2% 90,0% 19 12-08 Station 27+00 1 A3 123,2 10.7 111.9 90.8% 90.0% I 20 12-08 Station 27+50 8.G. A3 123.2 8.7 113.7 92.3% 90.0% 21 12-08 Station 28+50 1 A2 130.3 10.6 122.0 93.6% 90.0% 22 12-08 Station 29+00 8.G. A2 130.3 11.2 126.6 97.2% 90.0% I 23 12-08 Station 29+75 1 A2 130.3 10.2 118.9 91.3% 90.0% 24 12-08 Station 30+00 8,G. A2 130.3 10.8 124.3 95.4% 90,0% 25 12-08 Station 15+25 Tank Tie In 1 A3 123.2 9.6 114.1 92,6% 90,0% 26 12-08 Station 14+25 Tank Tie In 1 A3 123.2 10.6 117.5 95.4% 90.0% 27 12-08 Station 13+25 Tank Tie In 1 A3 123.2 10.1 113,5 92,1% 90.0% I 2000 28 02-07 Main 10+00 2 A3 123.2 13.3 111.4 90.4% 90.0% I 29 02-07 Main 10+00 8.G. A3 123.2 10.3 111.5 90.5% 90.0% 30 02-07 Main 15+60 2 A3 123.2 9.0 114.1 92.6% 90.0% 31 02-07 Main 15+60 8.G. A3 123.2 11.0 112.3 91.2% 90.0% I 32 02-07 Main 12+50 Tank Tie In 2 A3 123.2 9.5 112.8 91.6% 90.0% ~ I EnGEN Corporation I I Rancho California Water District Project Number: T1 B05-C Appendix Page 3 FIELD TEST RESULTS (Sumrnary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) I (5. G.) = 5ubgrade I (F. G.) = Finish Grade Test De pth Soil Max Moisture Dry Relative Required I Test No. Date Test Locations Elevation Type Density Content Density Compaction Compaction (1999) (FT) (PCF) (%) (PCF) (%) (%) 33 02-07 Main 12+50 Tank Tie In 8.G. A3 123.2 9.0 114.4 92.9% 90.0% I 34 02-07 Station 0+74 Tank tie In 2 A3 123.2 10.5 117.0 95.0% 90.0% 35 02-07 Station 0+60 Tank Tie In $,G. A3 123.2 9.1 116.2 94,3% 90,0% I 36 02-07 Station 42+10 2 A3 123.2 8,8 118.8 96.4% 90.0% 37 02-07 Station 42+10 $.G. A3 123.2 8.2 117.3 95.2% 90.0% 1999 PROJECT #98010 I 1 11-15 Station 32+50 1 A1 128.7 8,3 121.1 94,1% 90.0% 2 11-15 Station 32+00 $.G. A1 128.7 10.0 123.2 95.7% 90.0% I 3 11-15 Station 31 +00 1 A1 128.7 8.7 120.2 93.4% 90.0% 4 11-15 Station 30+00 $.G. A1 128,7 9.1 117.0 90.9% 90.0% I 5 11-15 Station 29+25 1 A1 128.7 10.4 118.6 92.2% 90.0% 6 11-15 Station 28+50 S,G. A1 128.7 8.7 118.9 92.4% 90.0% 7 11-15 Station 27+75 1 A1 128,7 9.2 117.4 91.2% 90,0% r: 11-15 Station 26+75 $.G. A1 128.7 8.2 118.0 91.7% 90.0% 11-15 Station 26+00 1 A1 128.7 9.4 119.7 93.0% 90.0% I 10 11-15 Station 25+00 $,G. A1 128.7 10.3 117.4 91.2% 90.0% 11 11-15 Station 24+50 1 A1 128.7 9,7 121.9 94.7% 90.0% 12 11-15 Station 23+50 $.G. A1 128.7 8.7 119.8 93.1% 90.0% I 13 11-15 Station23+00 1 A1 128.7 10.4 123.8 96.2% 90,0% 14 11-15 Station 21 +75 S,G. A1 128.7 7.3 116.7 90.7% 90.0% I 15 11-15 Station 21 +50 1 A1 128.7 8.1 117.5 91.3% 90,0% 16 11-15 Station 20+00 $.G. A1 128.7 9.3 117.4 91.2% 90.0% 17 11-15 Station 19+50 1 A1 128.7 10.7 123.8 96.2% 90.0% I 18 11-15 Station 1 B+ 75 $.G. A1 128,7 10.4 122.1 94.9% 90.0% 19 11-15 Station 18+00 1 A1 128.7 8,7 120.6 93.7% 90.0% I 20 11-15 Station 17+00 $.G. A1 128.7 8.3 119.8 93.1% 90.0% 21 11-15 Station 16+50 1 A1 128.7 9.4 118,9 92.4% 90.0% 22 11-15 Station 15+00 $.G, A1 128.7 9.7 116.2 90.3% 90.0% I 23 11-15 Station 11 +50 1 A1 128.7 9,2 117.6 91.4% 90.0% 24 11-15 Station 12+50 S.G. A1 128.7 9.4 117.8 91.5% 90.0% I 25 11-15 Station 14+00 1 A1 128.7 8,3 119.3 92.7% 90.0% 26 11-15 Station 10+50 $.G. A1 128.7 7.2 122.0 94.8% 90.0% 27 11-22 Station 33+50 $.G. A2 130.3 10,5 123.1 94.5% 90.0% 28 11-22 Station 35+00 8.G. A2 130.3 9.7 121.7 93.4% 90.0% I 0.. EnGEN Corporation I I Rancho California Water District Project Number. T180S-C Appendix Page 4 I = ugrae = InlS ra e Test Depth Soil Max Moisture Dry Relative Required Test Date Test Locations Elevation Type Density Content Density Compaction Compaction I No. (1999) (FT) (PCF) ('I.) (PCF) ('I.) ('I.) 29 11-22 Station 36+00 S.G. A2 130.3 9.8 120.9 92.8% 90.0% I 30 11-22 Station 37+25 S,G. A2 130.3 10.4 122.0 93.6% 90.0% 31 11-22 Station 38+50 S,G, A2 130.3 9.1 118.3 90.8% 90.0% I 32 11-22 Station 40+00 S.G. A2 130.3 11.0 119.5 91,7% 90.0% 33 11-22 Station 41 +00 S.G. A2 130.3 10.7 120.3 92.3% 90.0% 34 11-22 Station 42+00 S.G. A2 130.3 10.1 123.5 94.8% 90.0% I 2000 35 01-07 Station 42+10 2 A3 123.2 8.8 118.8 96.4% 90.0% I 36 01-07 Station 42+05 S.G. A3 123.2 8.2 117.3 95.2% 90,0% FIELD TEST RESULTS (Surnrnary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) (5 G ) 5 b d / (F G) F" h G d I I I I I I I I I I I \0 EnGEN Corporation I I I Rancho California Water District Project Number: T1805-C Appendix Page 5 SUMMARY OF OPTIMUM MOISTURE CONTENT MAXIMUM DRY DENSITY RELATIONSHIP TEST RESULTS ASTM 01557-91 I Maximum Optimum Soil Description (USCS Symbol) Soil Type Dry Density Moisture I (PCF) Content (%) Silty sand (with clay), brown (SM) A1 128.7 8.9 I Silty sand, brown (SM) A2 130.3 9.0 I Silty sand, brown (SM) A3 123.2 9.3 I I I I I I I I I I I I \\ EnGEN Corporation