1 , EROSION CONTROL IS REQUIRED FOR GRAVING OPERATIONS .DURING THE
RAINY RAINY SEASON FROM OCTOBER 15;th,TO APRIL 15th,. APPROVED
PLANS ARE REQUIRED FOR ALL ROUGH GRADING.
210 IN CASE OF EMERGENCY CALL PQUC9 Of MANNING &V6/N66RIN6 Al (114)676/944
3 . THE DESIGN CIVIL ENGINEER WILL SUPERVISE EROSION CONTROL WORK
AND INSURE THAT WORK IS IN ACCORDANCE WITH THE APPROVED CLANS
( 1P REQUIRED) .
• � 4 . EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MAUI AVAI-
LA13LE AT ALL'.
LL TIMES DURING THE RAINY SEASON. NECESSARY
MATERIALS SHALL 13E AVAILABLE ON SITE AND STOCKPIl.EO AT
II CONVENIENT LOCATIONS 70 FACILITATE RAPID CONSTRUCTION OF TEM-
PORARY DEVICES WHEN RAIN IS IMMINENT.
01 5 . DEVICES SNAIL NOT ME MOVED OR MODIFIED WITHOUT THE APPROVAL
OF THE CITY ENOtNEE .
I N 44"07' 15"E 2��.0D� �� 6 * ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL /3E IN PLACE AT
me MEMO 6�one THE ENV OF EACH WORKING DAY WHEN THE 5-DAY RAIN PROBABILITY
I \
FORECAST EXCEEDS 40$ .
I
o1w5 alpmo G&alVo
7 , ASTER A RAINSTORM, ALL SILT AND UE/3RIS SHALL /3E REMOVEU FROM �
mow MEMO�---�. 6101) CHECK BERMS, SILT FENCES , AND nESILTING BASINS ETC .
100
$ . GRAVED AREAS AROUND THE TRACT PERIMETER MUST DRAIN AWAY FROM
THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY .
�� ''d ri
9 . THE CON7RAC.Tt�R SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY
PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE LMPOUN- o � ON
I � \ UEU WATER CREATES A HAZARDOUS Ct�NDITIt�N . '`' �:� � ,�
/ 10 . DESLl.TINO BASINS ARE TO /3E CONSTRUCTED AS QRADING OF ZNULVIUUAL
� i I GRAVINGAREAS ARE COMPLETE PER ROUGH GRADING PLANS . �� �� cl
1 1 . THE CITY ENGINEER RESERVES THE RIGHT TO MAKE CHANGES OR MOUIFI-
I 1 CA'1'IONS TO THIS PLAN AS UEEMED NECESSARY ,
I
1 12 . INFORMATION ON THIS FLAN IS FOR EROSION CONTROL t7NLY .ALL %OTHER o
1 L I \ INFORMATION IS SUBJECT TO CHANGE . � +--+
cr c,
{� � I
13 . TEMPORARY EROSION PROTECTION IS REQU,(REU FOR MANUFACTURED � F--+
SLOPES PRIOR TO PERMANENT Pl.ANTINl3.
II I �
14 . AREAS SHALL /3E MAINTAINED IN SUCH A STATS THAT FIRE ACCESS
IR Z N SHALL MAINTAINED AT ALL TIMES ( INCLUDING ACCESS TO NEIGHBORING
PROP05� BUILVING00 I DRO�ERTLES ) .
N � � I f5 . NO OBSTRUCTION OR DISTURBANCE OF NATURAL DRAINAGE COURSES OR (c �
� � I EXISTING STORM DRAIN INLETS SHALL OCCUR DURING THE RAINING
� I I SEASON) UNLESSAUEQUATB TEMPORARY/PERMANENT DRAINAGE FACLLl—
T1ES HAVE BEEN APPROVED AND INSTALLED TO CARRY SURFACE WATER
A AITOTHE
I � I Ct�URSE. NEAREST PRACTICAL STREET, STORM DRAIN OR NATURAL WATER
C
A MANNER16 . THE CO � f
o � � THAT STORM RUNOFF WILL 13E CONTAINED WITHIN THE PROJECTOR
( � I / \ 14CHANNELEn INTO THE STORM DRAIN SYSTEM WHICH SERVES THE RUNOFF
I
AREA, STORM RUNOFF FROM ONE AREA SHALL NOT /3E ALLOWED TO DIVERT
TO ANTHER RUNOFF ARBA.
Q 1 N
11 . CONFORMANCE WITH THE REQUIREMENTS OF THESE PLANS SHALL IN NO
I I �
WAY RELIEVE THE CONTRACTOR FROM HIS RESPONSIBILITIES TO THIS
some� I� I
SITE AND ADJACENT PROPERTIES . TEMPORARY EROSION CONTROL SHALL CONSIST 0F , BUT- NOT /3E LIMITED Td, CONSTRUCTING SUCH FACILITIES
I I
\
AND TAKING SUCH MEASURES AS ARE NECESSARY TO PREVENT, CONTROL
I I
AND ABATE WATER , MUDAND EROSION DAMAGE TO PU/3LIC. AND PRIVATE
Q � i
PROPERTY AS A RESULT OF THE Ct�NSTRUCTIt�N OF TNIS, PROJECT.
( � I O0) 1 8 . SLOPES CONSTRUCTED PRIOR TO OCTOBER 1A;t SHALl. /3E TREATED FOR
EROSION CONTROL PRIOR TO OCTOBER 15 . SLOPES CONSTRUCTED AFTER ,
OCTOMER 1,6;t SHALL
TREATED EROSION CONTROL Ar
St�P& PRO(3R�SSES INLNCREM�NTS �� 25FEET OR
I \ �—•�� 2 RDUJ5 LESS MEASURED VERTLCAl.LY .
ONO M05
� I 1 lYllLNS G,�lilp'
I / 19 . ��LC�MVLETIONWHILE
VRI�RBEING
Tt� FINABROUGHT
(3RAUEr� SNALLEf3�AND
PRt�TECT�tiPERIODS
�3Y
II 1
\ VARIOUS MEASURES 1'0 ELIMINATE EROSION AND THE SILTATION OF
DOWNSTREAM FACILITIES AND ADJACENT AREAS . THESE MEASURES MAY e
INCLUVE, BUT SHALL NOT BE LIMITED T0: TEMPORARY OOWNURALNS, � m
IjEITHER IN THE FARM OF PIPES OR PAVED DITCHES WITH PROTECTED
OUTFALL AREAS; GRAVED BERMS AROUND AREAS TOELIMINATE EROSION � V� ■
1 \ I OF SILL SLOES /3Y SURFACE RUNOFF; PROTECTION SUCH AS SAND BAGS z �W
� � /
AROUND INLETS WHICH HAVE NOT BEEN BROUGHT UV TO c3RAUE;
CTION A—A AND
/ �AR'1'N /3�RMS AND APPROPRIATE GRAVING TO DIRECT DRAINAGE AWAY
N:r.G• I Seg, \ � J / I FROM THE EDGE OF THE TOP 0F SLOES SHALL /3E CONSTRUCTED AND
MAINTAINED ON THOSE FILL AREAS WHERE EARTHWORK OPERATIONS ARE J O 0 �
NOT IN PROGRESS , � N Lo `_'
20o TOP OF CUT BROW DITCHES , WHERE REQUIRED ON THE PLANS , SHALL /3E Z LJJJ � ,_..
�S � I CONSTRUCTED PRIOR TO &XCEEDDLNQ 12 FEET OF CUT MEASURED v
ONO m"
54d° 07'/5"GIl 197=0" � �� VERTICALLY . � � V Q
21 . CLEARING AND ORU/3/3INQ SHOULD HE LIMITED TO AREAS THAT WIl.'!.
-- �� � -�'" r" `— RECELV� LMMEOLATB (3RADLNO. EROSION CONTROL MEASURES WILL 13E
REQUIRED T� PROTECT AREAS WHICH HAVE BEEN CLEARED AND f3RUf3i3�D � Q U Q'a'
pi51�,v� CURE AND OU�r� �
PRIOR TO t3RADIN(3 O�ERATEdN, AND WHICH ARE SUi3JECT Tt� RUNt��fi
DURING THE PERIOD FROM OF THE RAINY SEASON . THESE MEASURES MAY D
� INCLUDE BUT SHALL NOT BE LIMITED TO: GRAVED DITCHES; /3RlISN
FARRIERS RAND SILT FENCES . CARE SHALL ME EXERCISED TO PRESERVE
VEGETATION BEYOND LIMITS 0F 4RADLN(3. UJr
22 . CITY APPROVAL OF
CLANS DOES NOT RELIEVE THE DEVELOPER iTROMuiui
LONGITUDINAL SEPm11ON mum _ _ __ _ AVENIDA ALVARADO _ _ _ _ .._._ RESPONSIBILITY FOR THE CORRECTION OF ERROR AND OMISSION ops-
—'�"� COVERED UURIN(3 CONSTRUCTI.ON. UPON REQUEST , TNS REQUIRED ALAN C!1 J
NTS. REVISIONS SHALL /3E PROMPTLY SUBMITTED TO THE CITY EN(3LNEER FOR � � W Lu
APPROVAL *
� N
co
FZ 4C>S I <:> 4C'p"'4C:> M Fk 4C> m
qO 60 80 2-1
PREPARED UNDER THE SUPERVISION OF SHEET NO.
CITY OF TEMECULA
BRUCE J. MANNING __F��.�.�►_ G43$_4 _� .
SCALE 1� =20 s, � . ,� __ _..�xpr- $-3v—g3---- � PLOT PLAN #5 & #6 �
'� ' ` DATE OF ,SHT3.
a �. f�Y0APPROVED BY: DATE:ti� �/q3 , , EROSION CONTROL PLANFILE NO.