HomeMy WebLinkAboutParcel Map 22513 Parcel 1 Geotechnical Report & Compaction Test Results I lTJ , :Q:" -r--: ._.-J__~,,"...' .:,., ~'"".,..:....,.,Cj'"';".;~"-,,, ,.,......,.... .,,''''_...... - ,It L~_':"'''i 'lG-EN Coq~oration . Soil Enllineering and Consulling Services -Engineering Geology. CompaclionTesling -Inspections . Construction Materials Testing . Laboratory Tesling .PercolalionTesling . Geology. Water Resource Studies .Phasel&IIEnvironmentaISiteAssessments I ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK I I I GEOTECHNICAL REPORT AND COMPACTION TEST RESULTS FINAL ROUGH GRADING OPERATIONS Meadows Village Assessor's Parcel Number: 954-030-001 Parcel 1 of Parcel Map 22513 Meadows Parkway and Rancho California Road City of Temecula, County of Riverside, California Project Number: T1916-C ( I I I August 1, 2005 I I I I I I I Prepared for: I Venture Point Real Estate Group ;, 3419 Via Lido, Suite 640 'N~port Beach, California 92663 " , " , " , , ' . ~ \- - - \ ~ \' , ,,' ' .. , ~__,,~':...:~:,;,~~~~!:~~~i;;:;;;;;'~..;,~;;;'~"!!! ci, :"."ll:i",s!iiliiiliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii M~e0lo.,*iS=___=d===:c=ft~:cll'&S;t;:...,;;s_... ________.IIl:lII """ - .....-. --- .- ------- .. ... . .- ...! u, -- \... -- , I I I I I I I I I I I I I I I I I I J Venture Point Real Estate Group Project Number: T1916-C TABLE OF CONTENTS SECTION NUMBER AND TITLE PAGE 1,.0 SITE/PROJECT DESCRIPTION AND LOCATION ..................................................................... 2 1.1 PROJECT LOCAl1I0N. .... ... ... ... ........., '.. ....... ....... ... ... .,. ... ... ... ........ ... ... .... ... ... ........, ... ..2 1.2 SITE DESCRIPTION... ..,. ... ... ....... ....... .., ,.. .... ... ......... .... ............ ...... ... .,. ... ................ ...2 1.3 PROJECT DESCRIPTION.., ... .... ... ... ....... ....... ... ....................... ............... ... ... .... ... ... .....2 2.0 SCOPE OF WORK. ............................................................................................................. 2 2.1 TIME OF GRADING..............,..............................".....................................................2 2.2 CONTRACTOR AND EQUIPMENT ........................................................................,........2 2.3 GRADING OPERATIONS.. ........,.................................................................................3 3.0 TESTING .......................................................................................................................... 4 3.1 FIELD TESTING PROCEDURES ...................................................................................4 3.2 LABORATORY TESTING..................... ........... '...................................................... ......4 3.2.1 MOISTURE-DENSITY RELATIONSHIP TEST ................................................... 4 3.2~2 EXPANSION INDEX TEST ............................................................................ 4 3.2'.3 SOLUBLE SULFATE TEST ........................................................................... 5 4.0 EARTH MATERIALS........................................................................................................... 5 5.0 CONCLUSIONS AND RECOMMENDATIONS ........................................................................... 5 5,1 GENERAL 5 6.0 CLOSURE............ ............................................................................................................. 6 APPENDIX: TEST RESULTS DRAWINGS 7--- EnGEN Corporation I I I I I I il I I I I I I I I I -~GEN COfl~oration -Soil Engineering and ConsullingServices-EngineeringGeolow. Compaction Testing -Inspections-Construction Materials Testing. LaboraloryTesting .PercolalionTestirrg -Geolow-WaterResourceSludies . Phase I &/1 Environmental Site Assessmenls ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK August 1, 2005 "enture Point Real Estate Group 3419 Via Lido, Suite 640 Newport Beach, California 92663 (949) 673-4660 / :FAX (949) 673-4540 Attention: Mr. John E. Clement Regarding: GEOTECH,NICAL REpORT AND COMPACTION TEST RESULTS FINAL ROlJGH GRADING OPERATIONS Meadows Village Assessor:s Parcel Number: 954-030-001 Parcel 1 of Parcel Map 22513 Meadows Parkway and Rancho California Road City of Temecula, County of Riverside, California Project N!Jmber: T1916-C References: 1. EnVEN Corporation, Geotechnical Report and Compaction Test Results, Interim Rough Grading Operations, Meadows Village, Buildings A - D and F - I, Ass,essor's Parcel Number: 954-030-001, Parcel 1 of Parcel Map 22513, Me<ildows Parkway and Rancho California Road, City of Temecula, County of Riverside, California, Project Number: T1916-C, dated June 22,2005. 2. EnGEN Corporation, Overexcavation and Recompaction of Pad E, Meadows Villqge, Parcel 1 of Parcel Map 22513, Meadows Parkway and Rancho California Road, City of Temecula, County of Riverside, California, Project Number: T1916-C, dated June 21, 2005. 3. EnGEN Corporation, Geotechnical Report and Compaction Test Results, Retaining Wall Backfill, Meadows Village, Assessor's Parcel Number: 954-030- 0011, Parcel 1 of Parcel Map 22513, Meadows Parkway and Rancho California Road, City of Temecula, County of Riverside, California, Project Number: T1916-C, dated June 6,2005. 4. EnGEN Corporation, Geotechnical/Geological Engineering Study, Meadows Village, Parcel 1 of Parcel Map 22513, Meadows Parkway and Rancho California Road, City of Temecula, County of Riverside, California, Project Number: T1916-GS, dated June 4,2004. 5. A.J: Tefi!$tli~!:,ngineering, Inc., Precise Grading Plan, PA04-0200-Meadows Village, pr;L',1} PM 22513, APN 954-030-001, City of Temecula, plans dated March 26. 2005. " , '" . , " - \" l , ' I I I I I I I I I I I I I I I I I I I I Venture Point Real Estate Group Project Number: T1916-C AU9ust2005 Page 2 Dear Mr. Clement: In accordance with your, request and signed authorization, EnGEN Corporation has performed field observations, sampling, and in-place density testing at the above referenced site. Submitted, herein, are the test results and the supporting field and laboratory data. t.O SITE/PROJECT DESCRIPTION AND LOCATION 1.1 PROJECT LOCATION The subject site consists of approximately 10-acres, located on the eastern corner of Meadows 'Parkway and Rancho California Road, in the City of Temecula, County of Riverside, California. 1,.2 SITE DESCRIPTION According to the Referenced NO.4 Report, this site was previously rough graded and is underlain by previously engineered fill materials measuring up to 16-feet thick overlying alluvial material.: Prior to current grading operations, topography and surface conditions of the site were relatively flat with surface drainage to the west at a gradient of less than 4 percent. 1.3 PROJECT DESCRIP,TION It is understood ,that the subject site is to be developed with nine (9) commercial buildings with slab-on-grade concrete floors, supported on conventional continuous and pier footings, with associated hardscape and landscape improvements. 2.0 SCOPE OF WORK 2.1 TIME OF GRADING This report represents geotechnical observations and testing during the construction operations from:April8, 2005 through June 14, 2005 and for July 15, 2005 through July 18, 2005, 2.2 CONTRACTOR AND, EQUIPMENT The grading operations were performed by Mountain Movers Engineering Contractors through the use. of two (2) CAT 627 Scrapers, one (1) CAT D9 Dozer, two (2) CAT Front End Loaders, one (1) CAT 14G Motor Grader and one (1) water truck. " EnGEN Corporation I I I I I II I I I I I I I I I I I I I Venture Point Real Estate Group Project Number: T1916-C August 2005 Page 3 2.3 GRADING OPERATIONS Grading within the subject site consisted of an over-excavation and replacement operation, a cuVfill operation, and an import fill operation. Grasses and weeds were removed prior to fill placement. Fill material was generated from the parking lot and driveway portions of the site as well as the off-site sources, and used to bring the building pad portions of the site to finish grade elevation. Removal of previously engineered fill material was performed to a minimum depth of 1-foot below finish grade elevation for buildings A. G, H and I. Over- excavated earth I material for buildings B, C, D and F was stockpiled and later used as fill. Bottoms were observed, probed and found to be into previously engineered fill material in building pads A.: G, H and I, into competent alluvial material in building pads B, C, and E, and into a combination of previously engineered fill material and Pauba Formation bedrock in building, pads D and F, by a representative of this firm. The alluvial material in building area B, C, and E is considered competent based on the removals extending to the minimum elevations recommended in the Referenced No. 4 Geotechnical/Geological Engineering Study as well as the materials having undisturbed densities greater than 85 percent relative compaction. Over-excavation was performed in building pads D, E and F, to a depth of 3 and 5-feet below finish grade elevation, and to a minimum distance of 5-feet outside the proposed structures. Over-excavation was performed in building pads Band C, to a depth of 18 to 21-feet below original grade elevation and to a minimum distance of 20-feet outside the proposed structures. The exposed bottoms were scarified and moisture conditioned to a depth of t2-inches then compacted to 90 percent. Fill was placed in lens thicknesses of 6 to 8-inches, thoroughly moisture conditioned to near optimum moisture content, then compacted to al minimum of 90 percent relative compaction. Moisture conditioning of the on-site soils was performed during the compaction process through the use of a water truck. Near surface water drainage occurred on the hillside during grading operations, This surface water was ponding at the base of the hill in areas of the southern and southeastern portions of the I site. Although the water did not appear to be derived from naturally occurring ground water conditions, rather from seepage of irrigation and landscaping water, steps were taken to mitigate negative impacts of this condition. Mitigation included EnGEN Corporation I I I I I I I I I I I I I I I I I I I Venture Point Real Estate Group Project Number: T1916-C August 2005 Page 4 removal/recompaction of any saturated soils to competent earth material, intercepting the seeping water using a 3-d rain system at the cut-slope to retaining wall backfill material interface, and diversion of the intercepted water. The piping and diversion system has not yet been fully cOfllpleted and only diverts the water from behind the retaining wall to outside the retaining wall to date. The pad areas were generally graded to the elevations noted on the Precise Grading Plan. However, the actual pad locations, dimensions, elevations, slope locations and inclinations, etc. were: surveyed and staked by others and should be verified by the Project Civil Engineer. 3.0 TESTING 3.1 FIELD TESTING PR9CEDURES Field in-place density and moisture content testing were performed in general accordance with ASTM D 2922-03 and ASTM D 3017-01 procedures for determining in-place density and moisture content, respectively, using nuclear gauge equipment. Relative compaction test results were within the 90 percent required for all material tested, which is an indication that the remainder of the fill placed has been properly compacted. Test results are presented:in the Appendix of this report. Fill depths and test locations were determined from review of the referenced grading plans. 3..2 LABORATORY TESTING The following laboratory tests were performed as part of our services during the grading of the subject site. . The test results are presented in the Appendix of this report. 3.2.1 MOISTUR!'-DENSITY RELATIONSHIP TEST Maximum dry density-optimum moisture content relationship tests were conducted on samples of the materials used as fill. The tests were performed in general accordance with ASTM D 1557-02 procedures. 3.2.2 EXPANSION INDEX TEST Three soil samples were obtained for expansion potential testing from the building pad areas upon completion of rough grading of the subject site. The expansion test was performed in ac.cordance with CBC 18-2. The materials tested consisted of brown silty sand, which have an Expansion Indexes of between 1 and 16. These soils are classified -s EnGEN Corporation I 'I I I I I I I II I I I I I I I I I I Venture Point Real Estate Group Project Number: T1916-C AU9ust2005 Page 5 as having;a very low expansion potential. The results are presented in the Summary of Expansion Index Results in the Appendix of this report. 3.2.3 SOLUBLE SULFATE TEST Based on ,this firm's familiarity with the soils used to construct the building pad, it is our opinion that soluble sulfates are not a concern, and as a result, normal Type II cement can be used in concrete making contact with the native soils. 4.0 EARTH MATERIALS The natural and imported earth materials encountered on-site generally consisted of dark gray, red brown and brown silty sands. 5.0 CONCLUSIONS AND ~ECOMMENDATIONS No conditions were encountered which would cause a change in the previously provided design and construction recommendations. As a result, design and construction should adhere to the re.commendations provided in the Referenced NO.4 Geotechnical/Geological Engineering Study. 5.1 GENERAL Based on the observations and tests performed during grading, the subject site, in the areas noted as test locations, has been completed in accordance with the Referenced No, 2 and NO.4 Reports, or as amended in the field based on conditions encountered, the project plans and the Grading Code of the City of Temecula. The graded site, in the areas noted as graded, is determined to be adequate for the support of a typical commerciallindustrial development. Any subsequent grading for development of the subject property, should be performed under engineering observation and testing performed by EnGEN Corporation. Subsequent grading includes, but is not limited to, any additional fill placement and excavation of temporary and permanent cut and fill slopes. In addition, EnGEN Corporation should observe all foundation excavations. Observations should be made prior to installation of concrete forms and/or reinforcing steel so as to verify and/or modify, if necessary, the conclusions and recommendations in this report. Observations of overexcavation cuts, fill placement, finish grading, utility or other trench backfill, pavement subgrade .and base course, retaining wall backfill, slab presaturation, or other earth work completed for the development of the subject site should be performed by EnGEN Corporation. If any of the observations and testing to verify site geotechnical conditions are EnGEN Corporation I I II I i I i I I I I I I II I II . '. I I . I Venture Point Real Estate Group Project Number: T1916-C Augusl2005 Page 6 not performed by EnGEN Corporation, liability for the safety and performance of the development is llimited to the actual portions of the project observed and/or tested by EnGEN Corporation. 6.0 CLOSURE This report has Peen prepared for use by the parties or project named or described above. It mayor may not contain sufficient information for other parties or purposes. The findings and recommendations expressed in this report are based on field and laboratory testing performed during the rough grading operation and on generally accepted engineering practices and p~nciples. No further warranties are implied or expressed beyond the direct representations :of this report. Thank you for the opportunity to provide these services. If you should have any questions regarding this report, pl,ease do not hesitate to contact this office at your convenience. Distribution: (4)Add~see FILE: EnGEN1Reporting/C1T1916-C,Venture Point, Final Rough Grade -,?-. Ja- . .EnGEN Corporation fer I I I I I I I I I I I I I I I I I I I APPENDIX: TEST RESULTS Venture Point Real Estate Group Project Number: T1916-C Appendix Page 1 1 EnGEN Corporation I I I I I I I I I ,I I I i I I I I II I :1 Venture Point Real Estate Group Project Number: T1916-C Appendix Page 2 (Summary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) (S.G.) = Subgrade / (F.G.) = Finish Grade Test Test! Depth Max Moisture Dry Relative Required No. Date~ Test Locations Elevation Soil Type Density Content Density Compaction Compaction (2005) (FT) (PCF) (%) (PC F) (%) (%) *A 04-15 Building # BIC Bottom 1191 A1 128.8 13.3 115.7 89.8% 85.0% *B 04"15 Building # 0 Bottom 1207 A1 128.8 10.3 117.3 91.1% 85.0% *C 04-15 Building # BIC Bottom 1191 A1 128.8 9.2 114.6 89.0% 85.0% 1 04'15 Building # A 1205 A1 128.8 9.5 118.2 91.8% 90.0% 2 04'19 Building # A 1205 A1 128.8 10.2 119.6 92.9% 90.0% 3 i 04,19 Building # D 1209 A1 128.8 10.6 120.3 93.4% 90.0% 4 I 04'19 Building # BIC 1193 A1 128.8 10,5 113.4 88.0% 90.0% 5 I 04'19 Retest #4 1193 A1 128.8 11.1 118.9 92.3% 90.0% 6 I 04'19 Building # BIC 1193 A1 128.8 9.3 119.1 92.5% 90.0% i 7 04+19 Building # BIC 1193 A1 128.8 9.1 118.1 91.7% 90.0% 8 1 04'19 Building # D 1210 A1 128.8 10.1 119.1 92.5% 90.0% 9 1 04+20 Building # BIC 1194 A:2 130.9 9.3 118.6 90.6% 90.0% 10 04'20 Building # BIC 1195 A:2 130.9 9.5 119.2 91.1% 90.0% 111 04+20 Building # BIC 1195 A:2 130.9 9.1 119.4 91.2% 90.0% 12 i 04,20 Building # BIC 1194 A:2 130.9 9.0 118.5 90.5% 90.0% , 04+20 1188 A1 128.8 7.4 113.4 88.0% 85.0% *0 I Building # BIC Bottom *E 04+20 Building # F Bottom 1209 A1 128.8 9.5 123.9 96.2% 85.0% 131 04;20 Building # BIC 1197 A1 128.8 11.8 118.8 92.2% 90.0% 141 04+20 Building # BIC 1197 A:2 130.9 9.0 124.8 95.3% 90.0% 151 04;20 Building # BIC 1199 A1 128.8 10.0 120.7 93.7% 90.0% 161 04+20 Building # BIC 1199 A1 128.8 9.9 119.6 92.9% 90.0% 171 04,20 Building # A 1205 A2 130.9 8.8 126.0 96.3% 90.0% 18 04;20 Building # A 1206 A1 128.8 8.7 118.2 91.8% 90.0% 191 04+21 Building # BIC 1190 A1 128.8 9.6 111.6 86.6% 90.0% 201 04;21 Retest # 19 1190 A1 128.8 9.3 120.1 93.2% 90.0% 21 04'21 Building # BIC 1190 A1 128.8 9.3 117.4 91.1% 90.0% 221 04'21 Building # BIC 1192 A1 128.8 11.1 117.3 91.1% 90.0% 231 04,21 Building # BIC 1192 A:2 130.9 10.2 123.5 94.3% 90.0% 241 04;21 Building # BIC 1201 A:2 130.9 10.4 119.6 91.4% 90.0% 251 04,21 Building # BIC 1201 A:2 130.9 9.9 118.7 90.7% 90.0% 261 04;21 Building # BIC 1203 A3 131.4 10.4 122.7 93.4% 90.0% 271 04+21 Building # BIC 1203 A1 128.8 9.1 117.4 91.1% 90.0% 28 ! 04+21 Building # BIC 1194 A:2 130.9 9.0 122.6 93.7% 90.0% 29 I 04;21 Building # BIC 1194 A:2 130.9 8.9 124.8 95.3% 90.0% ~ * Indicating undisturbed bottom test EnGEN Corporation FIELD TEST RESULTS II I I II I I I I I I I I I I I I I I I Venture Point Real Estate Group Project Number: T1916-C Appendix Page 3 FIELD TEST RESULTS (Summary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) (s. G.) = Subgrade / (F. G.) = Finish Grade Test Testi Depth Max Moisture Dry Relative Required I Date I Test Locations Elevation Soil Type Density Content Density Compaction Compaction No. , (2005) (FT) (PCF) ("!o) (PCF) ("!o) ("!o) 30 04-21 Building # BIC 1196 A2 130.9 11.3 120.5 92.1% 90.0% 31 04-21 Building # BIC 1196 A1 128.8 11.1 118.5 92.0% 90.0% 32 04-21 Building # BIC 1196 A1 128.8 10.5 119.3 92.6% 90.0% 33 04"21' Building # BIC 1197 A1 128.8 10.2 119.1 92.5% 90,0% 34 04"22 Building # BIC 1199 A1 128.8 11.8 107.3 83.3% 90.0% 35 04'22 Building # BIC 1199 A1 128.8 11.3 114.1 88.6% 90.0% ,36 04"22 Retest #34 1199 A1 128.8 10.4 116.8 90.7% 90.0% 37 04"22 Retest # 35 1199 A2 130.9 10.8 117.9 90.1% 90.0% 38 04'22 Building # BIC 1201 A1 128.8 11.2 117.3 91.1% 90.0% 39 04'22 Building # BIC 1201 A2 130.9 10.8 120.1 91.7% 90.0% 40 04'22 Building # BIC 1203 A1 128.8 11.3 117.9 91.5% 90.0% 41 04~22 Building # BIC 1203 A2 130.9 11.2 120.7 92.2% 90.0% 42 04~25 Building # F 1209 A1 128.8 11.1 119.8 93.0% 90.0% 43 04~25 Building # F 1211 A2 130.9 10.8 120.3 91.9% 90.0% .44 04~25 Building # BIC 1203 A1 128.8 10.5 117.8 91.5% 90.0% 45 04~25 Building # BIC 1203 A1 128.8 11.1 117.9 91.5% 90.0% 46 04~25 Building # BIC 1205 A2 130.9 9.2 119.8 91.5% 90.0% 47 04~25 Building # BIC 1205 A2 130.9 9.5 118.8 90.8% 90.0% ,48 04~26 Building # BIC 1205 A1 128.8 10.5 118.8 92.2% 90.0% 49 04~26 Building # BIC 1205 A1 128.8 10.9 117.5 91.2% 90.0% 50 ! 04~26 Building # BIC 1205 A2 130.9 10.2 121.6 92.9% 90.0% 51 04,26 Buildin9 # BIC 1205 A2 130.9 11.4 119.5 91.3% 90.0% , I 04,26 Building # F 1211 A1 128.8 11.1 119.7 92.9% 90.0% , 52 I 53 i 04~26 Buiiding # F 1212 A1 128.8 10.8 120.3 93.4% 90.0% 54 I 04'27 Building # BIC 1207 A2 130.9 10.8 121.6 92.9% 90.0% 551 04,27 Building # BIC 1207 A2 130.9 10.9 122.3 93.4% 90.0% , . 56 i 04,27 Building # BIC 1206 A1 128.8 10.3 118.8 92.2% 90.0% . 57 04'27 Building # BIC 1206 A1 128.8 10.4 117.9 91.5% 90.0% 58 i 05+02 Building # I 1212 A2 130.9 11.3 122.5 93.6% 90.0% 591 05;02 Building # H 1212 A2 130.9 9.9 123.2 94.1% 90.0% 60 05;02 Building # H 1213 A2 130.9 10.2 120.6 92.1% 90.0% 61 I 05;02 Building # F 1213 A1 128.8 7.9 117.8 91.5% 90.0% 62 I 05'02 Building # 8 1202 A2 130.9 8.9 121.9 93.1% 90.0% 63 05,02 Building # B 1202 A2 130.9 9.2 121.1 92.5% 90.0% I I. Indicating undisturbed bottom test ~ EnGEN Corporation I I I I I I I I I I I I I I I I I I I Venture Point Real Estate Group Project Number: T1916-C Appendix Page 4 FIELD TEST RESULTS (Summary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) (5. G.) = Subgrade / (F. G.) = Finish Grade 1" est Testl Depth Max Moisture Dry Relative Required , No. Datei Test Locations Elevation Soil Type Density Content Density Compaction Compaction (2005) (FT) (PCF) (%) (PCF) (%) (%) 64 05-{)2 Building # C 1204 A1 128.8 8.2 117.3 91.1% 90.0% ,65 05-{)2 Building # C 1206 A1 128.8 8.5 118.0 91.6% 90.0% 66 05-05 Building # B 1203 A2 130.9 9.6 122.5 93.6% 90.0% 67 05-{)5 Building # B 1204 A2 130.9 9.8 120.4 92.0% 90.0% ,68 05-{)5 Building # C 1207 A2 130.9 8.7 118.3 90.4% 90.0% ,69 05-{)5 Building # C 1208 A2 130.9 8.2 117.9 90.1% 90.0% 70 05-{)5 Building # H F.G. A2 130.9 8.4 122.1 93.3% 90.0% 71 05-{)5 Building # H F.G. A2 130.9 8.1 123.0 94.0% 90.0% 72 05-Oq Building # H F.G. A2 130.9 9.1 121.9 93.1% 90.0% 73 05-05 Building # H F.G. A2 130.9 8.0 121.2 92.6% 90.0% 74 05-{)5 Building # A F.G. A3 131.4 10.9 123.6 94.1% 90.0% 75 05-{)5 Building # A F.G. A3 131.4 9.2 123.3 93.8% 90.0% 76 05-05 Building # A F.G. A2 130.9 10.6 120.7 92.2% 90.0% 77 05-05 Building # A F.G. A2 130.9 10.1 119.2 91.1% 90.0% 78 05-17 Building # C 1207 A5 129.5 8.6 118.3 91.4% 90.0% 79 05-17 Building # C 1208 A5 129.5 9.4 119.8 92.5% 90.0% ,80 05-20 Building # C 1210 A5 129.5 10.1 118.0 91.1% 90.0% 81 05-20 Building # C 1210 A5 129.5 8.7 119.5 92.3% 90.0% ,82 05-20 Building # B 1203 A4 128.3 9.8 119.6 93.2% 90.0% 83 05-20 Building # B 1203 A4 128.3 7.9 122.0 95.1% 90.0% 84 05-23 Building # B 1205 A4 128.3 8.4 116.0 90.4% 90.0% 85 05-23 Building # B 1206 A4 128.3 7.8 118.5 92.4% 90,0% 86 05'27 Building # B 1208 A4 128.3 8.7 116.4 90.7% 90.0% 87 05-27 Building # B 1207 A4 128.3 8.9 116.0 90.4% 90.0% 88 05'31 Building # B 1208 A4 128.3 9.1 116.8 91.0% 90.0% 89 05-31 Building # B 1208 A4 128.3 8.8 116.2 90.6% 90.0% 90 06-01 Drive Approach Fill 1213 A7 129.6 8.4 116.8 90.1% 90.0% 91 06-01 Drive Approach Fill 1213 A7 129.6 8.0 117.0 90.3% 90.0% 92 06_06 Building # D F.G. A3 131.4 7.9 123.3 93.8% 90.0% 93 06-06 Building # D F.G. A3 131.4 8.3 122.1 92.9% 90.0% 94 06-06 Building # D F.G. A3 131.4 8.1 123.6 94.1% 90.0% 95 06-06 Building # G F.G. A3 131.4 7.6 121.2 92.2% 90.0% 96 06-06 Building.# G F.G. A3 131.4 8.0 122.3 93.1% 90.0% I 97 06-06 Building # G F.G. A3 131.4 8.5 120.5 91.7% 90.0% I [. Indicating undisturbed bottom test EnGEN Corporation \0 I I I I I I I I I I I I I I I I I II I Venture Point Real Estate Group Project Number: T1916-C Appendix Page 5 FIELD TEST RESULTS (Summary of Field In-Place Density Test Results) (Nuclear Gauge Test Method) (5. G.) = Subgrade / (F. G.) = Finish Grade Test Testl Depth Max Moisture Dry Relative Required No. Date! Test Locations Elevation Soil Type Density Content Density Compaction Compaction (2005) (FT) (PC F) ('Yo) (PCF) ('Yo) ('Yo) 98 06-07 Building # C F.G. A4 128.3 8.1 120.3 93.8% 90.0% .99 06-07 Building # C F.G. A4 128.3 8.1 118.3 92.2% 90.0% 100 06,07 Building # C F.G. A4 128.3 8.3 120.7 94.1% 90.0% 101 06'07 Building # C F.G. A4 128.3 7.6 117.9 91.9% 90.0% 102 06-07 Building # B F.G. A4 128.3 7.8 120.1 93.6% 90.0% 103 06'07 Building # B F.G. A4 128.3 8.0 117.7 91.7% 90.0% 104 06i08 Building # F F.G. A2 130.9 9.6 119.0 90.9% 90.0% 105 06'08 Building # F F.G. A2 130.9 8.4 118.5 90.5% 90.0% 106 06-13 Building # I F.G. A2 130.9 7.7 119.0 90.9% 90.0% 107 06-13 Building # I F.G. A2 130.9 8.4 122.5 93.6% 90.0% 108 06-13 Building # I F.G. A2 130.9 10.0 120.3 91.9% 90.0% 109 06-13 Building # H F.G. A2 130.9 8.8 118.1 90.2% 90.0% 110 06-13 Building # H F.G. A2 130.9 8.3 119.1 91.0% 90.0% *F 07-15 Building # E Bottom 1208 A2 130.9 12.6 117.8 90.0% 85.0% 111 07"15 Building # E Fill 1210 A2 130.9 12.5 120.6 92.1% 90.0% 112 07-15 Building # E Fill 1210 A2 130.9 12.2 120.2 91.8% 90.0% *G 07-15 Building # E Bottom 1208 A2 130.9 11.8 117.6 89.8% 85.0% 113 07-18 Building # E F.G. A2 130.9 7.6 118.7 90.7% 90.0% 114 07-18 Building # E F.G. A2 130.9 8.0 119.9 91.6% 90.0% 115 07-18 Building # E F.G. A2 130.9 7.7 119.0 90.9% 90,0% * Indicating undisturbed bottom test EnGEN Corporation \\ I I 'I I II i I 'I :1 ,I I I I I I I I I I I I Venture Point Real Estate Group Project Number: T1916-C Appendix Page 6 SUMMARY OF OPTIMUM MOISTURE CONTENT MAXIMUM DRY DENSITY RELATIONSHIP TEST RESULTS ASTM D 1557-02 Maximum Optimum Soil Description (USCS Symbol) Soil Type Dry Density Moisture (PCF) Content (%) Silty Sand Brown (SM) A1 128.8 9.4 Silty Sand Red Brown (SM) A2 130.9 9.2 Silty Sanc;i Dark Gray (SM) A3 131.4 8.8 Silty Sand Brown (SM) A4 128.3 9.4 Silty S~nd Brown (SM) A5 129.5 9.9 Silty Sand Brown (SM) A7 129.6 9.1 EnGEN Corporation \~