ONSltE HYl>ROLOGY AND
HYDRAULICS REPORT
Rancho California Road
Storm. Drain lm:pr()v~ments
PREPARED FOR:
Bedf€Jrd:Ptopetties, lnc.
,.,
~
C
C
C
C
C
C
PRE1>ARED'BY:
~;=:~=.:i=:ui~~tes
Temecula, Califofuia 92390
(714) 676-8042
REVISW:FEB. 1, 1991"
Jiln<<t19; 1990
JN242SS
Contact Person: Dick Heffner
r'I
~
\-
.
.
.
.
.
.
.
'.
.
.
I
I
I
.
.
.
I
I
I
I.
II.
III.
IV.
v.
EXHIBIT A
EXHIBIT B
EXHIBIT C
EXHIBIT D
EXHIBIT E
TABLE OF CONTENTS
INTRODUCTION
HYDROLOGY
STREET CAPACITY CALCULATIONS
CATCH BASIN DESIGN
STORM DRAIN DESIGN
HYDROLOGY MAP
SOILS MAP
10- AND 100- YEAR HYDROLOGY (RATIONAL METHOD)
CATCH BASIN DESIGN CALCULATIONS
STORM DRAIN DESIGN CALCULATIONS
PAGE
1
2
3
4
7--
I
I
I
I
I
I
I
I
I
i I
I
il
I
I
il
II
II
il
II
I. INTRODUCTION
This report includes the hydrologic and hydraulic calculations
performed for the design of drainage facilities for Rancho
California Road proposed for. the City of Temecula, Riverside
county, California. The development site is located east of
Interstate Route 15 and south of the Long canyon Wash channel.
Summary results of the analyses presented in this report are
illustrated on the HydrOlOgy Map and Exhibit A. The runoff will
be directed to existing drainage structures constructed per Tract
23304 which empty into Murrieta Creek.
The primary objectives of this report are as follows:
1.
drainage areas tributary to each of the Qnsite
inlets for Rancho California Road street
Delineate the
subareas and
improvements.
2. Based on drainage patterns, ground slope, land use, and soils
type and using the Riverside~ountyRational Method, perform
a hydrologic analysis of onsite runoff to 'provide 10- and 100-
year existing conditions and ultimate condition design flows
for the sizing of drainage fa-cilities.
3. Bas7d on t~e hydr:ology,resu~ts ,andphysi,cal site requirements,
desJ.gn the catch basJ.n and J.nlets to convey the computed
design discharges.
4. Determineuffsit~ drainage areas tributary to this property,
and provide for the safe handling of the drainage in the final
project.
- 1 -
I
I I
I
I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II. HYDROLOGY
Hydrologic calculations were performed using the Riverside County
Rational Method from the RCFC&WCD Hydrology Manual, dated April,
1978. ThE! 10- and 100-year design discharge at each storm drain
concentration point was computed by generating a hydrologic "link-
node.. model which dividelil the area into drainage subareas, each
.tributary to a concentration point or hydrologic "node" point
determined by .the existing topography map. The computer results
are included as Exhibit C.
The followingassumptionlil/guidelines were applied for use of the
Rational Method:
1. The soils map from the Riverside County Hydrology Manual
indicates that the study area is Group "B" soil. The soils
map, excerpted from the Hydrology Manual, is included as
Exhibit B. The classification Group lIB" was used in the
calculations.
2.
The runoff coefficient specified for
used to describe the proposed
characteristics the several subareas.
apparent land use was
ultimate development
3. Initial subareas Were drawn to be less than 10 acres in size
and less than 1,000 feet in length per County guidelines.
4. Standard intensity-duration curve data was taken from the
County Hydrology Manual (values apply for Murrieta-Temecula
and Rancho California areas).
The resulting 10- and 100-year discharges for each subarea are
flagged on the Rational.Method Computer Summary, Exhibit C, and on
the Hydrology Map, Exhibit A.
- 2 -
3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
III. STREET CAPACITY CALCULATIONS
Upstream from the sump catch basin location, runoff is carried by
the symmetric street section. Calculations are given in Exhibit
D verifying that the capacity of the street section is not exceeded
by the runoff. Two cases are considered:
1. Q-10 must be carried within the street section without
overtopping the curbs.
2. Q-100 must be carried within the right~of-way of the street.
Q-100 may overtop curbs by up to 0.24 feet. Q-100 will not
spillover the street crown.
Street depth calculations were
software, Hydraulic Elements 1
calculations.
performed using the AES P.C.
(symmetrical street) computer
- 3 -
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
IV. CATCH BASIN DESIGN
The catch basin on this project will be in a sump condition. The
capacity of the inlet was calculated using the City of Los Angeles,
Department of Public Works Catch Basin Chart LL-15. Output from
this chart is presented in Exhibit D.
The ultimate condition design discharge for the catch basin was
used to determine the sump capacity. This assumes that streets
within the sub-basins tributary to the sump will have surface
flows. If ultimate construction proposes a sub-surface drainage
system, the catch basin pipe (Line "A") will convey the lOO-year
design capacity flow.
- 4 -
-5
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
V. STORM DRAIN DESIGN
Reinforced concrete pipe or cast-in-place pipe storm drains will
connect the system to the existing storm drain channel, north of
Rancho California Road. Hydraulic calculations to establish rates
of flow and the hydraulic and energy grade lines were performed
with the use of the Water Surface Pressure Gradient computer
Program (WSPG) created by the Los Angeles County Flood Control
District. Printouts of the calculations are presented in Exhibit
E. Note that n-values used will allow the pipe system to function
with an alternative cast-in-place pipe design.
The reference water surface elevation for the Long Valley Wash
Channel at the junction with Line "A" was obtained from a Riverside
County Flood Control Report by Rick Engineering. The hydraulic
report for Long Valley Wash, dated May 4, 1988, gives a 100-year
water surface elevation of 1091.00 (100 year design flow = 1,947
CFS).
Due to the short time of concentration of Line "A" (13.9 Min.), at
the junction with Long Valley Wash, and the length of drainage area
for Long Valley it was determined in a conversation with Coen
couwenberg, of the Riverside County Flood Control District that the
peale flow of the channel could not accurately be determined.
Therefore, the water surface elevation for Pipeline "A" was assumed
not to match the 1091.00 elevation, but conservatively set at the
pipe outlet soffit elevation.
- 5 -
~
I
I
I
I
I
. I
I
I
il
il
II
i II
II
ill
II
II
II
II
II
EXHIBIT A
1-
---1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
,I
I
, .~,.,. ,.. .' . - ".,..__ 'M ... w .
EXHIBlr B
.... .. .::.-, .": .. ,.- ~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
RCFcaWCD
. HYDROLOGY J\;IANUAL
~
HYDROLOGIC SOILS GROUP MAP
FOR
I
LEGEND
SOILS GROUP ! BOUNDARY
A SOILS GROUP .OESIGNATION
-
o
~
FEET 5000
WRRIETA
l\
01 AT~ r_1 Ii.~
___n__
.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
H
I EXHIBIT C
I \0
I
******************,**********************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON
RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT
(RCFC&WCD) 1978 HYDROLOGY MANUAL
(c) Copyright. 1982-89 Advanced Engineering Software (aes)
Ver. 5.4A Release Date:12/29/89 Serial # 4280
I
I
I
Analysis prepared by:
Robert Bein, William Frost & Associates, Inc.
28765 Single Oak Drive, suite 250
Temecula, CA 92390
(714) 676-8042
I ***,*********************** DESCRIPTION OF STUDY **************************
* RANCHO CALIFORNIA ROAD *
* 100 YR. ULTIMATE CONDITION HYDROLOGY *
t OCT. :1990 *
**************************************************************************
I__~~~~~~~~~~~~~~~~~:~~~:~-_:~~:~~:~~~----------------_____________________
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
Ir---------------------------------------------------------------------------
I USER SPECIFIED STORM EVENT (YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00
I SPECIFIED PERCENT OF. GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = .90
10-YEAR STORM 10-MINUTE INTENSITY (INCH/HOUR) = 2.360
10-YEAR STORM 60-MINUTE INTENSITY (INCH/HOUR) = .880
100-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 3.480
I 100-YEAR. STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.300
SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = .5505732
SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = .5495536
COMPUTED RAINFALL INTENSITY DATA:
I STORM: EVENT = 100.00 I-HOUR INTENSITY (INCH/HOUR) = 1. 3000
SLOPE OF INTENSITY DURATION CURVE = .5496
RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED
I NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
(* * *,* * '* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
FLOW PROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE = 2
---------------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
Ir========~~~;;;;=~~~~~~~=~;;~;~=;~~;~~====================================
DEVELOPMENT IS APARTMENT
I TC = 'K*[ (LENGTH**3)/(ELEVATION CHANGE) ]**.2
INITIAL SUBAREA FLOW-LENGTH = 600.00
UPSTREAM ELEVATION = 1211.50
DOWNSTREAM ELEVATION = 1119.00
I ELEVA:TION DIFFERENCE = 92.50
TC = .323*[( 600.00**3)/( 92.50)]**.2 = 6.060
100..00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.583
SOIL:CLASSIFICATION IS "B"
I APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8665
SUBAREA RUNOFF(CFS) = 21.05
TOTAL AREA(ACRES) = 5.30 TOTAL RUNOFF(CFS) =
A-I
21. 05
Il*****~********************************************************************* \\
FLOW PROCESS FROM NODE 2.00 TO NODE 10.00 IS CODE = 3
I
-1-
~---------------------------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
t===========================================================================
DEPTH OF FLOW IN 21.0 INCH PIPE IS 12.8 INCHES
PIPEFLOW VELOCITY(FEETjSEC.) = 13.7
I UPSTREAM NODE ELEVATION = 1119.00
DOWNSTREAM NODE ELEVATION = 1094.00
FLOWLENGTH(FEET) = .600.00 MANNING'S N = .013
ESTIMATED PIPE DIAMETER(INCH) = 21.00 NUMBER OF PIPES = 1
I PIPEFLOW THRU SUBAREA(CFS) = 21.05
TRAVEL'TIME(MIN.) = .73 TC(MIN.) = 6.79
/17'7IM"e;/J {)L.1': c,.t'o. f.f'" 1"'>>..."" A-z.
t***************************************************************************
FLOW PROCESS FROM NODE 2.00 TO NODE 10.00 IS CODE = 8
. >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
===========================================================================
100.00 YEAR RAINFALL INTENSITY(INCHjHOUR) = 4.306
SOIL CLASSIFICATION IS "B" A-z
I APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8648
SUBAREA AREA(ACRES) = 10.00 SUBAREA RUNOFF(CFS) =
TOTAL AREA(ACRES) = 15.30 TOTAL RUNOFF(CFS) =
TC(MIN) = 6.79
I c;1o:> (tAt..'('.) ro f'fe: IN<-en. 111'" ,(DM7 (l/w
****************************** *********************************************
FLOW PROCESS FROM NODE 10.00 TO NODE 10.00 IS CODE = 7
~-~~~~~~~;;-~;;~~;~;~~~~~;~~~~-~;;~~;~~;-~;-;~~;~~~~~--------------------
37.24
58.28
============================================================================
I USER-SPECIFIED VALUES ARE AS FOLLOWS:
TC(MIN) = 6.79 RAIN INTENSITY(INCHjHOUR) = 4.31
TOTAL AREA(ACRES) = 15.30 TOTAL RUNOFF(CFS) =
34.30
.. ~ ' .
ItJl.h. CAt. Pt.ow I~"'V- I-/N':: ~
***************************************************************************
FLOW PROCESS FRml NODE 10.00 TO NODE 11.00 IS CODE = 4
.--~~~~~~~;;~;;-;~;;;~;-;~;;~;~;;-;~;~-~~~~;~~~~~~------------------------
. >>>>>USING USER-SPECIFIED PIPESIZE<<<<<
----------------------------------------------------------------------------
----------------------------------------------------------------------------
I DEPTH OF FLOW IN 36.0 INCH PIPE IS 17.9 INCHES
PIPEFLOW VELOCITY(FEETjSEC.) = 9.8
UPSTREAM NODE ELEVATION = 1091.50
DOWNSTREAM NODE ELEVATION = 1084.50
I FLOWLENGTH(FEET) = 500.00 MANNING'S N = .014
GIVEN PIPE DIAMETER (INCH) = 36.00 NUMBER OF PIPES =
PIPEFLOW THRU SUBAREA(CFS) = 34.30
I TRAVEL:TIME(MIN.) = .85 T,C(MIN.) =
1
7.64
****************************************************************************
I FLOW PROCESS FROM NODE 5.00 TO NODE 6.00 IS CODE = 2
---------------------------------------------------------------------------
>>>>>RATIONAL METHOD.INITIAL SUBAREA ANALYSIS<<<<<
----------------------------------------------------------------------------
----------------------------------------------------------------------------
I 'ASSUMED INITIAL SUBAREA UNIFORM
DEVELOPMENT IS APARTMENT
TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
I INITIAL SUBAREA FLOW-;-LENGTH = 450.00
UPSTREAM ELEVATION = 1171.50
DOWNSTREAM ELEVATION = 1107.00
ELEVATION DIFFERENCE = 64.50
I
8-1
yz.;
_7-
-- ,
I TC = .323*[( 450.00**3)/( 64.50)]**.2 = 5.480
100"00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.843
SOIL:CLASSIFICATION IS "B"
I APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8680
SUBAREA RUNOFF(CFS) = 15.97
TOTAL AREA(ACRES) = 3.80 TOTAL RUNOFF(CFS) = 15.97
l*****.*********************************************************************
FLOW I PROCESS FROM NODE 6.00 TO NODE 7.00 IS CODE = 6
It-~~~~;~~;;~;~-;;;~~;;~;-;~;~~;~;~-;~;~-;~;~~~~~~~~----------------------
============================================================================
UPSTREAM ELEVATION = 1107.00
I STREET LENGTH(FEET) = 350.00
STREET HALFWIDTH(FEET) = 43.00
I
I
I
I
I
I
DOWNSTREAM ELEVATION =
CURB HEIGTH(INCHES) = 8.
1094.00
DISTANCE FROM CROWN TO CROSS FALL GRADE BREAK =
INTERIOR STREET CROSSFALL(DECIMAL) = .020
OUTSIDE STREET CROSSFALL(DECIMAL) = .020
24.00
E':>-Z--
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF =
1
**TRAVELTIME COMPUTED USING MEAN FLOW (CFS) =
STREETFLOW MODEL RESULTS:
STREET FLOWDEPTH(FEET) = .55
HALFSTREET FLOODWIDTH(FEET) = 19.62
AVERAGE FLOW VELOCITY(FEET/SEC.) =
PRODUCT OF DEPTH&VELOCITY = 3.60
STREETFLOW TRAVELTIME(MIN) = .89 TC(MIN) =
26.42
6.54
6.37
100.00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.458
SOIL CLASSIFICATION IS "B"
APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8657
SUBAREA AREA(ACRES) = 5.40 SUBAREA RUNOFF(CFS) =
SUMMED AREA(ACRES) = 9.20 TOTAL RUNOFF(CFS) =
END OF SUBAREA STREETFLOW HYDRAULICS:
DEPTH (FEET) = .60 .HALFSTREET FLOODWIDTH(FEET) = 22.18
FLOW .VELOCITY(FEET/SEC.) = 7.21 DEPTH*VELOCITY = 4.34
20.84
36.82
IL***************************************************************************
FLOW:PROCESS FROM NODE 7.00 TO NODE 7.00 IS CODE = 1
I[:~~~~~~~~~~~~~~:~~~~~~~~~~~:~~~~~:~~~:~~~~~~~~~~~~~~~:::::::::::::::::::::
TOTAL NUMBER OF STREAMS = 2
I CONFLUENCE VALUES USED FOR INDEPENDENT STREAM
TIME OF CONCENTRATION(MIN.) = 6.37
RAINFALL INTENSITY(INCH/HR) = 4.46
I TOTAL STREAM AREA(ACRES) = 9.20
PEAK FLOW RATE(CFS) AT CONFLUENCE = 36.82
1 ARE:
(***************************************************************************
FLOW PROCESS FROM NODE 12.00 TO NODE 13.00 IS CODE = 2
----------------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
It========~;;;;i~=i;i;i~~=;~~~i~=~;i;~;;====================================
DEVELOPMENT IS APARTMENT
I TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREA FLOW-LENGTH = 900.00
UPSTREAM ELEVATION = 1201.50
DOWNSTREAM ELEVATION = 1096.50
I
8-4
\;?
_'!? -
I ELEVATION DIFFERENCE = 105.00
TC = .323*[( 900.00**3)/( 105.00)J**.2 =
100,00 YEAR RAINFALL INTENSITY(INCHjHOUR) =
I SOILICLASSIFICATION IS "B"
APARTMENT DEVELOPMENT RUNOFF COEFFICIENT =
SUBAREA RUNOFF(CFS) = 16.84
I TOTAL AREA(ACRES) = 4.80
7.535
4.066
.8631
TOTAL RUNOFF(CFS) =
16.84
******************~*********************************************************
~ FLOWIPROCESS FROM NODE 13.00 TO NODE 7.00 IS CODE = 6
-~~~~;~~;~~;;-;;~;;;~;-;~~;L;~;;-;~;~-;~~~;~~~~~~----------------------
I==~~~~~~~~~~~~~i~~~~:==~~~~~~g===gg~~~~~~:~~~~~~~f;:~:~=~~~~~~~=========
STREET HALFWIDTH(FEET) = 43.00
I
I SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1
I
I
I
I
I
I
. DISTANCE FROM CROWN TO CROSSFALL GRADE BREAK =
INTERIOR STREET CROSSFALL(DEClMAL) = .020
OUTSIDE STREET CROSSFALL(DEClMAL) = .020
24.00
~-'?
**TRAVELT.IME COMPUTED USING MEAN FLOW(CFS) =
STREETFLOW MODEL RESULTS:
NOTE: STREETFLOW EXCEEDS TOP OF CURB.
THE FOLLOWING STREETFLOW RESULTS ARE BASED ON THE ASSUMPTION
THAT NEGLIBLE FLOW OCCURS OUTSIDE OF THE STREET CHANNEL.
THAT IS, ALL FLOW ALONG THE PARKWAY, ETC., IS NEGLECTED.
STREET FLOWDEPTH(FEET) = .74
HALFSTREET FLOODWIDTH(FEET) = 29.23
AVERAGE FLOW VELOCITY(FEET/SEC.) =
PRODUCT OF DEPTH&VELOCITY = 2.20
STREETFLOW TRAVELTIME(MIN) = 2.98 TC(MIN) = 10.52
25.88
2.96
100.00 YEAR RAINFALL INTENSITY(INCHjHOUR) = 3.385
SOIL.CLASSIFICATION IS "B"
APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8575
SUBAREA AREA(ACRES) = 6.20 SUBAREA RUNOFF(CFS) =
SUMMED AREA(ACRES) = 11.00 TOTAL RUNOFF(CFS) =
END OF SUBAREA STREETFLOW HYDRAULICS:
DEPTH (FEET) = ;-a-l/. HALFSTREET FLOODWIDTH(FEET) = (32:41)
FLOW.VELOCITY(FEETjSEC.) = 3.25 DEPTH*VELOCITY = 2.63
12- <;-(. WIP'n.(." 4-'?' j J-:::. ~l" (y..... '>1: flooP''''c" DN/..'O
****,************************************************************************
~_:~~_:~~:~~~_:~~~-~~~~-----~:~~_:~-~~~~-----~:~~_:~_:~~~_:_-_:_-----------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
It=~~;~;,~~~~~:~;~~;~~~~~~~;:~~~~~~~=~~~~~=~~~~~~:::::===================
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
I TIME OF CONCENTRATION (MIN.) = 10.52
RAINFALL INTENSITY(INCH/HR) = 3.39
TOTAL, STREAM AREA(ACRES) = 11.00
PEAK FLOW RATE(CFS) AT CONFLUENCE =
I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
I
I
18.00
34.84
34.84
** PEAK
STREAM
NUMBER
FLOW RATE
RUNOFF
(CFS)
TABLE **
TIME
(MIN.)
INTENSITY
(INCH/HOUR)
\~
_A_
I
I
1
2
57.93
62.80
6.37
10.52
4.458
3.385
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 62.80 Tc(MIN.) =
TOTAL AREA (ACRES) = 20.20
I CAru-/ E!>A-S/rI (!AI'ACt7Y' 44po Y,C (1AL.7) .
******:t.********************************************************************
FLOW PROCESS FROM NODE 7.00 TO NODE 11.00 IS CODE = 4
I--~~~~~~~;;~~;-;ip;;~;-~~~;~~i;;-~~~-~~;~;~;;;;;------------------------
>>>>>USING USER~SPECIFIED PIPESIZE<<<<<
10.52
----------------------------------------------------------------------------
----------------------------------------------------------------------------
1
I
PIPEFLOW VELOCITY(FEETjSEC.) = 6.5
UPSTREAM NODE ELEVATION = 1087.00
DOWNSTREAM NODE ELEVATION = 1084.00
FLOWLENGTH(FEET) = 600.00 MANNING'S N = .014
GIVEN PIPE DIAMETER(INCH) = 42.00 NUMBER OF PIPES =
PIPEFLOW THRU SUBAREA(CFS) = 62.80
TRAVEL TIME(MIN.) = 1.53 TC(MIN.) = 12.05
1****************************************************************************
FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 1
I--~~~~~~;~i~;~~;-;;~;;;;~;;~-~~~;~-;~~-~~;;~~;;~;;;;;;---------------------
1
----------------------------------------------------------------------------
----------------------------------------------------------------------------
I
I
TOTAL ,NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM
TIME:OF CONCENTRATION(MIN.) = 12.05
RAINFALL INTENSITY(INCHjHR) = 3.14
TOTAL STREAM AREA(ACRES) = 20.20
PEAK FLOW RATE(CFS) AT CONFLUENCE = 62.80
1 ARE:
1* * * ~ * * * *,* * * * * * * * * *'* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 7
-------_._-------------------------------------------------------------------
Ir=;;;~:;;~~i;i;~~~~~;;;~~~~;~;~~~~:~~~=~:=~~~~~~~~~====================
TC(MIN) = 7.64 RAIN INTENSITY(INCHjHOUR) = 4.03
TOTAL AREA(ACRES) = 15.30 TOTAL RUNOFF(CFS) =
4t?O Itpr<:. A-ow "'1" fUrfC7i "'~
****************************************************************************
~_:~~~:~~:~::_:~~~-~~~~---_:::~~_:~-~~~~---_:::~~_::_:~~~_:_-_:_-----------
>>>>~DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
1r=;~;~~~~;~;~~~ES;;;;;;~:=~;~~~~~=~~=~:~~~=~~~~~~~~~~~===================
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
I TIME OF CONCENTRATION(MIN.) = 7.64
RAINFALL INTENSITY(INCH/HR) = 4.03
TOTAL STREAM AREA(ACRES) = 15.30
PEAK I FLOW RATE(CFS) AT CONFLUENCE =
I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
I
I
I
34.30
34.30
** PEAK
STREAM
NUMBER
FLOW RATE
RUNOFF
(CFS)
TABLE **
TIME
(MIN. )
INTENSITY
( INCH/HOUR)
\5
""--
I
1
1 74.12
2 89.50
COMPUTED CONFLUENCE
PEAK I FLOW RATE(CFS)
TOTAL AREA (ACRES) =
7.64
12.05
4.035
3.141
ESTIMATES ARE AS FOLLOWS:
= 89.50 Tc(MIN.) =
35.50
12.05
1****************************************************************************
FLOW I PROCESS FROM NODE 11.00 TO NODE 14.00 IS CODE = 4
I------------------~---------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
----------------------------------------------------------------------------
---~------------------------------------------------------------------------
I
I
PIPEFLOW VELOCITY(FEETjSEC.) = 7.1
UPSTREAM NODE ELEVATION = 1084.00
DOWNSTREAM NODE ELEVATION = 1083.00
FLOWnENGTH(FEET) = 500.00 MANNING'S N = .014
GIVEN PIPE DIAMETER(INCH) = 48.00 NUMBER OF PIPES =
PIPEFLOW THRU SUBAREA (CFS) = 89.50
TRAVEL TIME(MIN.) = 1.17 TC(MIN.) = 13.22
Ir=;;;=~;=;~;~=;~~~=====================================================
PEAKiFLOW RATE(CFS) = 89.50 Tc(MIN.) = 13.22
TOTAl, AREA(ACRES) = 35.50
1r=;;;=~;=~;~~;~~~M;;~~;=~~~~;~;===========================================
1
I
I
I
I
I
I
I
I
I
I
I
/0.,--*(.. OlAfIA:.., ftf€. ~vJ Ai
loNe.. V",/lItT W~!i CI4tNI'U,L.
\(p
,
I
* * * * * * * *:* * * * * * * * * ** * * *:* * * '* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
I
I
I
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON
RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT
(RCFC&WCD) 1978 HYDROLOGY MANUAL
(c) Copyright 1982-89 Advanced Engineering Software (aes)
Ver. '5.4A Release Date:12/29/89 Serial # 4280
Analysis prepared by:
Robert Bein, William Frost & Associates, Inc.
28765 Single Oak Drive, suite 250
Temecula, CA 92390
(714) 676-8042
I *********************.***** DESCRIPTION OF STUDY **************************
* RANCHO CALIFORN~A ROAD *
* 100 YR. EXISTING CONDITION HYDROLOGY *
1* OCT. 1990 (THIS RUN. NEEDED TO CHECK CAPACITY OF LINE 'B' INLET) *
* * * * * * .'. * * * * * * * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
I
FILE I NAME: A:RCBDEXST.DAT
TIME/DATE OF STUDY: 15: 8
10/17/1990
USER: SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
1----------------------------------------------------------------------------
USER:SPECIFIED STORM EVENT(YEAR) = 100.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00
I SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = .90
10-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 2.360
10-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = .880
100-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR) = 3.480
1 100-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.300
SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = .5505732
SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = .5495536
COMPUTED RAINFALL INTENSITY DATA:
1 STORM EVENT = 100.00 1-HOUR INTENSITY(INCH/HOUR) = 1.3000
SLOPE OF INTENSITY DURATION CURVE = .5496
RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED
1 NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
1* *** * ***,*** * * ****** * * * * * * * * * * ** *** ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
FLOW PROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE = 2
--------,--------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
It========~;;;;;;=i;i;i~~=;~~~;~=~;i;~;;====================================
DEVELOPMENT IS: UNDEVELOPED WITH FAIR COVER
1 TC =. K* [ (LENGTH** 3) / (ELEVATION CHANGE)] * * . 2
INITIAL SUBAREA FLOW-LENGTH = 600.00
UPSTREAM ELEVATION = 1211.50
DOWNSTREAM ELEVATION = 1119.00
1 E~EVATION DIFFERENCE = 92.50
TC = .709*[( 600.00**3)/( 92.50)]**.2 = 13.322
100.00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.973
SOIL,CLASSIFICATION IS "B"
1 UNDEVELOPED WATERSHED RUNOFF COEFFICIENT = .6655
SUBAREA RUNOFF(OFS) = 10.48
TOTAL AREA(ACRES) = 5.30
A-I
TOTAL RUNOFF(CFS) =
10.48
l * * * * * * ** * * * * * * * * *,* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
FLOW PROCESS FROM NODE 2.00 TO NODE 10.00 IS CODE = 5
1
\1
~---------------------------------------------------------------------------
>>>>>COMPUTE TRAPEZOIDAL-CHANNEL FLOW<<<<<
1F=~;~;~~~;;~~~~~~~;i~~~~~~~~~~:~~=======================================
DOWNSTREAM NODE ELEVATION = 1105.00
I CHANNEL LENGTH THRU SUBAREA(FEET) = 600.00
CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 3.000
MANNING'S FACTOR = .030 MAXIMUM DEPTH(FEET) =
CHANNEL FLOW THRU SUBAREA(CFS) = 10.48
I FLOW ,VELOCITY (FEETjSEC) = 3.79 FLOW DEPTH(FEET) =
TRAVEL TIME(MIN.) = 2.64 TC(MIN.) = 15.96
3.00
.44
t,** *,* * * * * * * ***** * *** ** ** * * * * * * * * * * ** * * * * * * * * * * * ** * * * ***** * * * * ** * * * * * * * * * * * * *
FLOW I PROCESS FROM NODE 2.00 TO NODE 10.00 IS CODE = 8
----------------------------------------------------------------------------
1= >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
===========================================================================
100;00 YEAR RAINFALL INTENSITY(INCHjHOUR) = 2.692
SOIL CLASSIFICATION IS "B" A - 2-
I UNDEVELOPED WATERSHED RUNOFF COEFFICIENT = .6479
SUBAREA AREA(ACRES) = 10.00 SUBAREA RUNOFF(CFS) =
TOTAL AF.EA(ACRES) = 15.30 TOTAL RUNOFF(CFS) =
I TC(MIN) = 15.96
17.44
27.92
400 (e'/.,~) 7Z> f"'rf'€ rrll.ei -L-rN€. '6'
******************~*************************************************~*******
I- FLOW I PROCESS FROM NODE 10.00 TO NODE 11.00 IS CODE = 4
---------------------~-----------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
It=;~;;~=~;=;~;=~;==;;~~=~;~~=;~;~=~;==~~~;=~;~~~;==========================
PIPEELOW VELOCITY(FEETjSEC.) = 9.3 .
UPSTREAM NODE ELEVATION = 1091.50
I DOWNSTREAM NODE ELEVATION = 1084.50
FLOW~ENGTH(FEET) = 500.00 MANNING'S N = .014
GIVEN PIPE DIAMETER(INCH) = 36.00 NUMBER OF PIPES =
I PIPEELOW THRU SUBAREA(CFS) = 27.92
TRAVEL TIME(MIN.) = .90 TC(MIN.) = 16.85
ftS<;O<-fV7e? T/f-A, 1</1 6)<1';,(, ~(.C/)J Goe.? ''''io '-{Ne 'e:J /'11'6
r**********~~~*~~~r**~~;~*J~;~,*14***~::1i*~~*~*~~f~a~*******************
FLOW I PROCESS FROM NODE 5.00 TO NODE 6.00 IS CODE = 2
1
------------------,----------------------------------------------------------
It=~~~~~~~~;;;i;~i;i;i~~~~~~~;~~~~;~~~~:~:~:::::========================
DEVELOPMENT IS: UNDEVELOPED WITH FAIR COVER
I TC = IK*[ (LENGTH~'*3)j(ELEVATION CHANGE) ]**.2
INITIAL SUBAREA FLOW-LENGTH = 450.00
UPSTREAM ELEVATION = 1171.50
DOWNSTREAM ELEVATION = 1107.00
I ELEVATION DIFFERENCE = 64.50
TC = .709*[( 450.00**3)/( 64.50)]**.2 = 12.048
100;00 YEAR RAINFALL INTENSITY(INCHjHOUR) = 3.141
SOIL CLASSIFICATION IS "B"
I UNDEVELOPED WATERSHED RUNOFF COEFFICIENT = .6749
SUBAREA RUNOFF(CFS) = 8.06
TOTAL AREA(ACRES) = 3.80 TOTAL RUNOFF(CFS) = 8.06
~*****************~*********************************************************
FLOW PROCESS FROM NODE 6.00 TO NODE 7.00 IS CODE = 6
i?-I
I
\<0
-"--
, 1----------------------------------------------------------------------------
I >>>>>COMPUTE STREETELOW TRAVELTIME THRU SUBAREA<<<<<
, I==~~ii~~~~~~~ji~~~::==~~i~~gg===gg~;~~~~:~~~~~i~f~:::~=~~;~~~~=========
I STREET HALFWIDTH(FEET) = 43.00
I I
I
I
I
I
I
I
DISTANCE FROM CROWN TO CROSSFALL GRADE BREAK =
INTERIOR STREET CROSS FALL (DECIMAL) = .020
OUTSIDE STREET CROSSFALL(DEClMAL) = .020
24.00
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF =
**TRAVELTIMECOMPUTED USING MEAN FLOW(CFS) =
,STREETFLOW MODEL RESULTS:
STREET FLOWDEPTH(FEET) = .46
HALFSTREET FLOODWIDTH(FEET) = 15.13
AVERAGE FLOW.VELOCITY(FEET/SEC.) =
PRODUCT OF DEPTH&VELOCITY = 2.50
STREETFLOW TRAVELTIME(MIN) = 1.07 TC(MIN) =
5.43
13.12
e>-Z-
1
13.46
100.00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.997
SOIL'CLASSIFICATION IS "B"
UNDEVELOPED WATERSHED RUNOFF COEFFICIENT = .6669
SUBAREA AREA(ACRES) = 5.40 SUBAREA RUNOFF(CFS) =
SUMMED AREA(ACRES) = 9.20 TOTAL RUNOFF(CFS) =
END OF SUBAREA STREETFLOW HYDRAULICS:
DEPTH (FEET) = .'50 HALFSTREET FLOODWIDTH (FEET) = 17.05
FLOWVEJ~CITY(FEET/SEC.) = 6.08 DEPTH*VELOCITY = 3.04
10.79
18.85
****************************************************************************
I FLOW. PROCESS FROM NODE 7.00 TO NODE 7.00 IS CODE = 1
---~-----------------~------------------------------------------------------
. >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
I
I
1 ARE:
----------------------------------------------------------------------------
----------------------------------------------------------------------------
TOTAL NUMBER OF .STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM
TIMEIOF CONCENTRATION(MIN.) = 13.12
RAINFALL INTENSITY(INCH/HR) = 3.00
TOTAL STREAM AREA(ACRES) = 9.20
PEAK FLOW RATE(CFS) AT CONFLUENCE = 18.85
1******************;**********************************************************
FLOW;PROCESS FROM NODE 12.00 TO NODE 13.00 IS CODE = 2
----------------------------------------------------------------------------
1= >>>>~RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
===========================================================================
ASSUMED INITIAL SUBAREA UNIFORM
DEVELOPMENT IS: UNDEVELOPED WITH FAIR COVER
I TC = I K* [ (LENGTH*'*3) / (ELEVATION CHANGE)] **.2
INITIAL SUBAREAFLOW~LENGTH = 900.00
UPSTREAM ELEVATION = 1201.50
I DOWNSTREAM ELEVATION = 1096.50
ELEVATION DIFFERENCE = 105.00
TC = .709*[( 900.00**3)/( 105.00)]**.2 = 16.565
100,00 YEAR RAINFALL INTENSITY (INCH/HOUR) = 2.637
I SOIL:CLASSIFICATION IS "B"
UNDEVELOPED WATERSHED RUNOFF COEFFICIENT = .6441
SUBAREA RUNOFF(CFS) = 8.15
I TOTAL AREA(ACRES) = 4.80
I
TOTAL RUNOFF(CFS) =
B-4
8.15
******~*********************************************************************
\c\,
-"f-
I
FLOW.PROCESS FROM NODE
13 . 00 TO NODE
7.00 IS CODE =
6
---~--------------,----------------------------------------------------------
>>>>>COMPUTE STREETFLOW TRAVELTIME THRU SUBAREA<<<<<
1============================================================================
UPSTREAM ELEVATION = 1096.50 DOWNSTREAM ELEVATION = 1094.00
STREET LENGTH(FEET) = 530.00 CURB HEIGTH(INCHES) = 8.
STREET HALFWIDTH(FEET) = 43.00
I
I
I
I
I 100,0.0 YEAR RAINFALL INTENSITY (INCH/HOUR) = 2.371
SOILICLASSIFICATION IS "B"
I UNDEVELOPED WATERSHED RUNOFF COEFFICIENT = .6242
SUBAREA AREA(ACRES) = 6.20 SUBAREA RUNOFF(CFS) =
SUMMED AREA(ACRES) = 11.00 TOTAL RUNOFF(CFS) =
END OF SUBAREA STREETFLOW HYDRAULICS:
I DEPTH (FEET) = .65 HALFSTREET FLOODWIDTH(FEET) = 24.74
FLOW'VELOCITY(FEET/SEC.) = 2.75 DEPTH*VELOCITY = 1.79
DISTANCE FROM CROWN TO CROSSFALL GRADE BREAK =
INTERIOR STREETCROSSFALL(DECIMAL) = .020
OUTSIDE STREET CROSSFALL(DECIMAL) = .020
24.00
B~~
SPECIFIED NUMBER OF HALF STREETS CARRYING RUNOFF =
1
**TRAVELTIME COMPUTED USING MEAN FLOW(CFS) =
,STREETFLOW MODEL RESULTS:
STREET FLOWDEPTH(FEET) = .60
HALFSTREET FLOODWIDTH(FEET) = 22.18
AVERAGE FLOW VELOCITY(FEET/SEC.) =
PRODUCT OF DEPTH&VELOCITY = 1.50
STREETFLOW TRAVELTIME(MIN) = 3.54 TC(MIN) =
12.74
2.49
20.11
9.17
17.33
r'*******'*********~**********************************************************
FLOW PROCESS FROM NODE 7.00 TO NODE 7.00 IS CODE = 1
----------------------------------------------------------------------------
>>>>:>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
. >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
IF===========================================================================
TOTAL NUMBER OF STREAMS = 2
I CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME:OF CONCENTRATION(MIN.) = 20.11
RAINFALL INTENSITY(INCH/HR) = 2.37
TOTAL STREAM AREA(ACRES) = 11.00
I PEAK:FLOW RATE(CFS) AT CONFLUENCE =
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
I
I
I
17.33
** PEAK
STREAM
NUMBER
1
FLOW RATE
RUNOFF
(CFS)
30.16
32.24
TABLE **
TIME
(MIN.)
13.12
20.11
INTENSITY
(INCH/HOUR)
2.997
2.371
2
COMPUTED CONFLUENCE
PEAK:FLOW RATE(CFS)
TOTAL AREA (ACRES) =
ESTIMATES ARE
= 32.24
20.20
AS FOLLOWS:
Tc(MIN.) =
20.11
. tA7"cH ~('" Cht""'cl/1' en",.,-<<. (e)(i,:>-r:J
~****************~*****************************'****************************
FLOW PROCESS FROM NODE 7.00 TO NODE 11.00 IS CODE = 4
I--~~~~~~~;;~;~-;~;~;~;-;~~~~;~;~-;~;~-~~~~~~~~~~~------------------------
>>>>>USING USER-SPECIFIED PIPESIZE<<<<< ZO
----------------------------------------------------------------------------
----------------------------------------------------------------------------
I
-JD_
I
I
I
DEPTH OF FLOW IN 42.0 INCH PIPE IS 21.4 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 6.6
UPSTREAM NODE ELEVATION = 1087.00
DOWNSTREAM NODE ELEVATION = 1084.00
FLOWLENGTH(FEET) = 600.00 MANNING'S N = .014
GIVEN PIPE DIAMETER (INCH) = 42.00 NUMBER OF PIPES =
PIPEFLOW THRU SUBAREA(CFS) = 32.24
TRAVEL TIME(MIN.) = 1.52 TC(MIN.) = 21.63
1
1- ****************************************************************************
FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 1
----------------------------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
I==;~;~~=;;;~~~=~;=;;;;~;=~==;==============================================
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN.) = 21.63
I RAINFALL INTENSITY(lNCH/HR) = 2.28
TOTAL STREAM AREA (ACRES) = 20.20
PEAK FLOW RATE(CFS) AT CONFLUENCE = 32.24
1****************************************************************************
FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 7
1_---------------------------------------------------------------------------
>>>>>USER SPECIFIED HYDROLOGY INFORMATION AT NODE<<<<<
----------------------------------------------------------------------------
---------------------~------------------------------------------------------
I
USER-SPECIFIED VALUES ARE AS FOLLOWS:
TC(MIN) = 16.82 RAIN INTENSITY(INCH/HOUR) = 2.62
TOTAL AREA (ACRES) = 15.30 TOTAL RUNOFF(CFS) =
27.95
I !/ot? fife. rLov-J A-r .;JW'I'-'-rlO,J
****************************************************************************
FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 1
----------------------------------------------------------------------------
1
----------------------------------------------------------------------------
----------------------------------------------------------------------------
I
I
1
1
1
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT
TIMEIOF CONCENTRATION(MIN.) = 16.82
RAINFALL INTENSITY(INCH/HR) = 2.62
TOTAL STREAM AREA(ACRES) = 15.30
PEAK FLOW RATE(CFS) AT CONFLUENCE =
STREAM
2 ARE:
27.95
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK
STREAM
NUMBER
1
2
FLOW RATE
RUNOFF
(CFS)
53.01
56.58
TABLE **
TIME
(MIN. )
16.82
21. 63
INTENSITY
(INCH/HOUR)
2.615
2.277
COMPUTED CONFLUENCE ESTIMATES ARE
PEAKIFLOW RATE(CFS) = 56.58
TOTAL AREA(ACRES) = 35.50
1* * * * * * * ** * * * * * * * * *,* * * *,* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
FLOW PROCESS FROM NODE 11.00 TO NODE 14.00 IS CODE = 4
It-~~~~~~~;;~;~-;~;~;~;-;~~~~;~;~-;~;~-;~~~~~~~~~~------------------------ \
>>>>~USING USER-SPECIFIED PIPESIZE<<<<< ~
AS FOLLOWS:
Tc(MIN.) =
21. 63
1
-If-
~===========================================================================
DEPTH OF FLOW IN 48.0 INCH PIPE IS 39.3 INCHES
I PIPEFLOW VELOCITY(FEETjSEC.) = 5.1
UPSTREAM NODE ELEVATION = 1084.00
DOWNSTREAM NODE ELEVATION = 1083.00
FLOWLENGTH(FEET) = 500.00 MANNING'S N = .014
I GIVEN PIPE DIAMETER(INCH) = 48.00 NUMBER OF PIPES =
PIPEFLOW THRU SUBAREA(CFS) = 56.58
TRAVEL TIME(MIN.) = 1.62 TC(MIN.) = 23.26
1
----------------------------------------------------------------------------
----------------------------------------------------------------------------
I END OF STUDY SUMMARY:
PEAK FLOW RATE(CFS) =
TOTAL AREA (ACRES) =
56.58
35.50
Tc(MIN.) =
23.26
I==;~;=~;=~;~~~~~=;;;~~;=;;~~~;~;===========================================
I I
I
I
, I
I
I
I
I
I
I
I
I
I
I
% rAL- ov<rt-er t"i;Re. f""'--"',,-,
boNG.. V",ll,zy 1J-'.k51-t C!{",,,,L.
~r
z,P
-/'1-
I
****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON
'RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT
(RCFC&WCD) 1978 HYDROLOGY MANUAL
(c) Copyright 1982-89 Advanced Engineering Software (aes)
Ver. 5.4A Release Date:12/29/89 Serial # 4280
I
I
1
I ************************** DESCRIPTION OF STUDY **************************
* RANCHO CALIFORNIA ROAD *
* 10 YR. HYDROLOGY (ULTIMATE CONDITIONS) *
1* FOR STREET DEPTH CHECK NEAR SUMP CATCH BASIN *
**************************************************************************
Analysis prepared by:
Robert Bein, William Frost & Associates,
28765 Single Oak Drive, suite 250
Temecu1a, CA 92390
(714) 676-8042
Inc.
I
FILE NAME: A:RCBD10.DAT
TIME/DATE OF STUDY: 13:17 10/18/1990
----------------------------------------------------------------------------
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
I--~s~~-s;~~i~i~~-s;~~-~;~~;(~~~~)-:---~~~~~--------------------------------
SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00
SPECIFIED PERCENT OF GRADIENTS(DEClMAL) TO USE FOR FRICTION SLOPE = .90
10-YEAR STORM 10-MINUTE INTENSITY (INCH/HOUR) = 2.360
10-YEAR STORM 60-MINUTE INTENSITY (INCH/HOUR) = .880
100-YEAR STORM 10-MINUTE INTENSITY (INCH/HOUR) = 3.480
100-YEAR STORM 60-MINUTE INTENSITY (INCH/HOUR) = 1.300
SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = .5505732
SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = .5495536
COMPUTED RAINFALL INTENSITY DATA:
STORM EVENT = 10.00 I-HOUR INTENSITY(INCH/HOUR) = .8888
SLOPE .OF INTENSITY DURATION CURVE = .5506
I
I
1
I
RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED
NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
1****************************************************************************
FLOW PROCESS FROM NODE 5.00 TO NODE 6.00 IS CODE = 2
---~------------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
I=========~;;~~~=i;~;~~~=;~~~~~=~;~;~;;====================================
DEVELOPMENT IS APARTMENT
TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREA FLOW-LENGTH = 450.00
UPSTREAM ELEVATION = 1171.50
DOWNSTREAM ELEVATION = 1107.00
ELEVATION DIFFERENCE = 64.50
TC = .323*[( 450.00**3)/( 64.50)]**.2 = 5.480
10.00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.319
SOIL CLASSIFICATION IS "B"
APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8568
SUBAREA RUNOFF(CFS) = 10.81
TOTAL AREA (ACRES) = 3.80
I
1
1
TOTAL RUNOFF(CFS) =
10.81
1***************************************************************************~
FLOW PROCESS FROM NODE 6.00 TO NODE 7.00 IS CODE = 6
I
-1::'-
1----------------------------------------------------------------------------
>>>>>COMPUTE STREETFLOW TRAVELTIME THRU SUBAREA<<<<<
----------------------------------------------------------------------------
----------------------------------------------------------------------------
.10.00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.023
SOIL CLASSIFICATION IS "B"
APAR~MENT DEVELOPMENT RUNOFF COEFFICIENT = .8537
SUBAREA AREA(ACRES) = 5.40 SUBAREA RUNOFF(CFS) =
SUMMED AREA(ACRES) = 9.20 TOTAL RUNOFF(CFS) =
END OF SUBAREA STREETFLOW HYDRAULICS:
DEPTH (FEET) = .54 HALFSTREET FLOODWIDTH(FEET) = 18.98
1==~~;~~;:;;;;~~;~;7:~~=:==~~~~===~:::~:~:~~:~:~=:===~~~~================
PEAK FLOW RATE(CFS) = 24.74 Tc(MIN.) = 6.50
I~=;;~~~;~~;~~;~~~~~~~~;=~~~~~~i;===========================================
I
I
I
I
I
I
I
UPSTREAM ELEVATION = 1107.00
STREET LENGTH(FEET) = 350.00
STREET HALFWIDTH(FEET) = 43.00
DISTANCE FROM CROWN TO CROSS FALL GRADE BREAK =
INTERIOR STREET CROSS FALL (DECIMAL) = .020
OUTSIDE STREET CROSSFALL(DECIMAL) = .020
DOWNSTREAM ELEVATION =
CURB HEIGTH(INCHES) = 8.
1094.00
24.00
SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF =
1
**TRAVELTIME COMPUTED USING MEAN FLOW(CFS) =
:STREETFLOW MODEL RESULTS:
STREET FLOWDEPTH(FEET) = .50
HALFSTREET FLOODWIDTH(FEET) = 17.05
AVERAGE FLOW YELOCITY(FEET/SEC.) =
PRODUCT OF DEPTH&VELOCITY = 2.87
STREETFLOW TRAVELTIME(MIN) = 1.02 TC(MIN) =
17.80
5.74
6.50
13.93
24.74
I
I
I
I
I
I
I
I
I
"A..
.111._
~===========================================================================
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON
. RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT
l (RCFC&WCD) 1978 HYDROLOGY MANUAL
===========================================================================
r<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
(C) Copyright 1982,1986 Advanced Engineering Software [AES]
I
Especially prepared for:
ROBERT BEIN, WILLIAM FROST & ASSOCIATES
It<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
**********DESCRIPTION OF RESULTS********************************************
IL RANCHO CALIFORNIA ROAD *
IL 10 YR. ULTIMATE CONDITION HYDROLOGY *
. * OCT. 11990 (USED TO CHECK HALF STREET DEPTH AND PIPE VELOCITY LINE A) *
Ir***************************************************************************
__~~~_~~~j?_i~~ii_i~~~~~~~~_~~~~~_~~~_~~_!P_~~_____~_-------------------
USER .SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
It-~~;;-~~;~~;~;~-~;~~-;;;~;(~;~)-:---i~~~~--------------------------------
SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00
I SPECIFIED PERCENT OF, GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = .90
10-YEAR STORM 10-MlNUTE INTENSITY(INCH/HOUR) = 2.360
10,-YEAR STORM 60-MlNUTE INTENSITY (INCH/HOUR) = .880
100-YEAR STORM 10-MlNUTE INTENSITY (INCH/HOUR) = 3.480
I 100-YEAR STORM 60-MlNUTE INTENSITY (INCH/HOUR) = 1.300
SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = .5505732
SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = .5495536
COMPUTED RAINFALL INTENSITY DATA:
I STORM EVENT = 10.00 I-HOUR INTENSITY(INCH/HOUR) = .8888
SLOPE OF INTENSITY DURATION CURVE = .5506
RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED
IL<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
I
Advanced Engineering Software [AES]
SERIAL No. 100981
VER. 3.3C RELEASE DATE: 2/20/86
If<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
I*****************~*********************************************************
FLOWIPROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE = 2
-----------------_._---------------------------------------------------------
I >>>>>RATIONAL METHOD. INITIAL SUBAREA ANALYSIS<<<<<
===========================================================================
ASSUMED INITIAL SUBAREA UNIFORM
DEVELOPMENT IS APARTMENT
I TC =IK*[(LENGTH*'*3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREAFLOW~LENGTH = 600.00
UPSTREAM ELEVATION = 1211.50
DOWNSTREAM ELEVATION = 1119.00
I ELEVATION DIFFERENCE, = 92.50
TO = .323*[( 600.00**3)/( 92.50)]**.2 = 6.060
:10.00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.141
I
,..
"')..-=>
-J-::' -
1
1
SOIL CLASSIFICATION IS "B"
APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8550
SUBAREA RUNOFF(CFS) = 14.23
TOTAL AREA(ACRES) = 5.30 TOTAL RUNOFF(CFS) =
14.23
1* * * * * * * ** * * * * * * * * ** * * *.* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
FLOW PROCESS FROM NODE 2.00 TO NODE 10.00 IS CODE = 3
---~------------------------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
1= >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
===========================================================================
DEPTH OF FLOW IN 18.0 INCH PIPE IS 11.1 INCHES
I PIPEFLOW VELOCITY (FEET/SEC.) = 12.5
UPSTREAM NODE ELEVATION = 1119.00
DOWNSTREAM NODE ELEVATION = 1094.00
FLOW~ENGTH(FEET) = 600.00 MANNINGS N = .013
I ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES =
PIPEFLOW THRU SUBAREA(CFS) = 14.23
T~VEL TIME(MIN.) = .80 TC(MIN.) = 6.86
1
~***************************************************************************
FLOW ,PROCESS FROM NODE 2.00 TO NODE 10.00 IS CODE = 8
----------------------------------------------------------------------------
. >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
IF===========================================================================
10.00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.933
SOIL.CLASSIFICATION IS "B"
I APAR~ENT DEVELOPMENT RUNOFF COEFFICIENT = .8526
SUBAREA AREA(ACRES) = 10.00 SUBAREA RUNOFF(CFS) = 25.00
TOTAL AREA (ACRES) = 15.30 TOTAL RUNOFF(CFS) = 39.23
I TC(MIN) = 6.86
****;**.*********************************************************************
~ FLOW PROCESS FROM NODE 10.00 TO NODE 11.00 IS CODE = 4
-~~~~;~;;;~;~-;~;i;~;-;~;~~;~;~-;~;~-~~~~~~~~~~~------------------------
Ir=;;;;~~~;~;~~~~~~~;~~~:~~~~:~~~;~~~::~;~~=~~~~;;==========================
PIPEFLOW VELOCITY(FEET/SEC.) = 10.7
I UPSTREAM NODE ELEVATION = 1091.50
DOWNSTREAM NODE ELEVATION = 1084.50
FLOWLENGTH(FEET) = .500.00 MANNINGS N = .013
GIVEN PIPE DIAMETER (INCH) = 36.00 NUMBER OF PIPES = 1
I PIPEFLOW THRU SUBAREA(CFS) = 39.23
TRf\VEL TIME(MIN.) = .78 TC(MIN.) = 7.64
1******1*********************************************************************
FLOW PROCESS FROM NODE 5.00 TO NODE 6.00 IS CODE = 2
-------.---------------------------------------------------------------------
1= >>>>>RATIONAL METHOD,INITIAL SUBAREA ANALYSIS<<<<<
===========================================================================
,ASSUMED INITIAL SUBAREA UNIFORM
,DEVELOPMENT IS APARTMENT
I TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2
INITIAL SUBAREA FLOW-LENGTH = 450.00
UPSTREAM ELEVATION = 1171.50
DOWNSTREAM ELEVATION = 1107.00
I ELEVATION DIFFERENCE = 64.50
TC = .323*[( 450.00**3)/( 64.50)]**.2 = 5.480
10.00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.319
I
~
- 1/_
I SOIL CLASSIFICATION IS "B"
APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8568
SUBAREA RUNOFF(CFS) = 10.81
I TOTAL AREA (ACRES) = 3.80 TOTAL RUNOFF(CFS) =
10.81
(***************************************************************************
FLOW PROCESS FROM NODE 6.00 TO NODE 7.00 IS CODE = 6
---------------------------------------------------------------------------
>>>>>COMPUTE STREETpLOW TRAVELTIME THRU SUBAREA<<<<<
It=~~~;;~=i~i~~;;~;=:===~~~;~~~===;~;;~;;i~=i~~~;;~;=:===~~~~~~~=========
STREET r~NGTH(FEET) = 350.00 CURB HEIGTH(INCHES) = 8.
I STREET HALFWIDTH(FEET) = 43.00
I SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 1
I
I
I
I
I
DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK =
II'l"TERIOR STREET CROSS FALL (DECIMAL) = .020
OUTSIDE STREET CROSSFALL(DEClMAL) = .020
24.00
**TRAVELTIME COMPUTED USING MEAN FLOW(CFS) =
STREETFLOW MODEL RESULTS:
STREET FLOWDEPTH(FEET) = .49
HALFSTREET FLOODWIDTH(FEET) = 16.61
AVERAGE FLOW VELOCITY(FEET/SEC.) =
PRODUCT OF DEPTH&VELOCITY = 2.96
STREETFLOW TRAVELTlME(MIN) = .97 TC(MIN) =
17.79
6.03
6.45
10;00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.035
SOIL.CLASSIFICATION IS "B"
APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8538
SUBAREA AREA(ACRES) = 5.40 SUBAREA RUNOFF(CFS) =
SUMMED AREA(ACRES) = 9.20 TOTAL RUNOFF(CFS) =
END OF SUBAREA STREETFLOW HYDRAULICS:
DEPTH (FEET) = .55 HALFSTREET FLOODWIDTH(FEET) = 19.38
FLOWVEr~CITY(FEET/SEC.) = 6.29 DEPTH*VELOCITY = 3.43
13.99
24.80
f***.**************~*********************************************************
FLOW I PROCESS FROM NODE 7.00 TO NODE 7.00 IS CODE = 1
---------------------------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
1r=~~;;~~i;~i=~~~~i~=~~~;=;~;=;;;i~i;;i;;=~;;~~==~=~i7=====================
TIME OF CONCENTRATION(MlNUTES) = 6.45
RAINFALL INTENSITY (INCH./HOUR) = 3.04
I TOTAr. STREAM AREA (ACRES) = 9.20
TOTAL STREAM RUNOFF(CFS) AT CONFLUENCE = 24.80
1***,************************************************************************
FLOW PROCESS FROM NODE 12.00 TO NODE 13.00 IS CODE = 2
----------------------------------------------------------------------------
I >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
=====================~=====================================================
ASSUMED INITIAL SUBAREA UNIFORM
DEVELOPMENT IS APARTMENT
I TC =K*[ (LENGTH**3)/:CELEVATION CHANGE) ]**.2
INITIAL SUBAREA FLOW,LENGTH = 900.00
UPSTREAM ELEVATION = 1201.50
DOWNSTREAM ELEVATION = 1096.50
I ELEVATION DIFFERENCE, = 105.00
TC = .323*[( 900.00**3)/( 105.00)]**.2 = 7.535 Z\
10..00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.785
I
_ ,::2. _
I SOIL. CLASSIFICATION IS "B"
APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8508
I SUBAREA RUNOFF(CFS) = 11.38
TOTAl, AREA(ACRES) = 4.80
TOTAL RUNOFF(CFS) =
11. 38
[********:********************************************************************
FLOW.PROCESS FROM NODE 13.00 TO NODE 7.00 IS CODE = 6
---------------------------------------------------------------------------
>>>>>COMPUTE STREETFLOW TRAVELTIME THRU SUBAREA<<<<<
Ir=~;~~;;~=~~;~~~~;=:===~~;~~;~===~~;;~~;~~=~~~;~~~~;=:===~~;~~~~=========
STREET LENGTH(FEET) = 530.00 CURB HEIGTH(INCHES) = 8.
I STREET HALFWIDTH(FEET) = 43.00
I SPECIFIED NUMBER OF HALF STREETS CARRYING RUNOFF = 1
I
I
I
I
I
DISTANCE FROM CROWN TO CROSSFALL GRADE BREAK =
INTERIOR STREET CROSSFALL(DEClMAL) = .020
OUTSIDE STREET CROSSFALL(DEClMAL) = .020
24.00
**TRAVELTIME COMPUTED USING MEAN FLOW(CFS) =
,STREETFLOW MODEL RESULTS:
STREET FLOWDEPTH(FEET) = .65
HALFSTREET FLOODWIDTH(FEET) = 24.63
AVERAGE FLOW VELOCITY(FEET/SEC.) =
PRODUCT OF DEPTH&VELOCITY = 1.81
STREETFIQW TRAVELTIME(MIN) = 3.18 TC(MIN) =
17 .39
2.78
10.71
10..00 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.295
SOIL CLASSIFICATION IS "B"
APARTMENT DEVELOPMENT RUNOFF COEFFICIENT = .8436
SUBAREA AREA(ACRES) = 6.20 SUBAREA RUNOFF(CFS) =
SUMMED AREA(ACRES) = 11.00 TOTAL RUNOFF(CFS) =
END OF SUBAREA STREETFLOW HYDRAULICS:
DEPT~(FEET) = .73 HALFSTREET FLOODWIDTH(FEET) = 28.38
FLOWVELOCITY(FEET/SEC.) = 2.84 DEPTH*VELOCITY = 2.06
12.00
23.38
****************************************************************************
I FLOW PROCESS FROM NODE 7.00 TO NODE 7.00 IS CODE = 1
---------------------------------------------------------------------------
>>>>>.DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
~ >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
=~~;;~;~;~i=;~~~~~=~;i~=;~;=~;~~;i;~~;~=;~;;~==;=~;7=====================
TIME OF CONCENTRATION(MlNUTES) = 10.71
I RAINFALL INTENSITY (INCH./HOUR) = 2.30
TOTAL STREAM AREA (ACRES) = 11.00
TO~AL STREAM RUNOFF(CFS) AT CONFLUENCE =
I
23.38
CONFLUENCE INFORMATION:
STREAM RUNOFF TIME INTENSITY
NUMBER (CFS) (MIN.) (INCH/HOUR)
Ir---~-------;~~;~------~~~;-------;~~;;-------------------------------------
2 23.38 10.71 2.295
I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
FORMULA (RCFC&WCD) USED FOR 2 STREAMS.
VARIOUS CONFLUENCED RUNOFF VALUES ARE AS FOLLOWS:
38.87 42.13
I COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
RUNOFF (CFS) = 42;13 TIME (MINUTES) = 10.711
TOTAL AREA(ACRES) = 20.20
I
zB
_ID _
I
* * * * * *.. *~*.. * * * * * * * ** * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
I FLOW PROCESS FROM NODE 7.00 TO NODE 11.00 IS CODE = 4
---~------------------------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
Ir=;;;;~~~;~;~;~~;~~~;~~:~~~;:;~;~~~;~~;;~;=~;~~;;==========================
PIPEFLOW VELOCITY(FEET/SEC.) = 7.4
I UPSTREAM NODE ELEVATION = 1087.00
DOWNSTREAM NODE ELEVATION = 1084.00
FLOWnENGTH(FEET) = 600.00 MANNINGS N = .013
GIVEN PIPE DIAMETER(INCH) = 48.00 NUMBER OF PIPES = 1
I PIPEFLOW THRU SUBAREA(CFS) = 42.13
TRAVEL TIME(MIN.) = 1.35 TC(MIN.) = 12.06
t*****************'**********************************************************
FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 1
----------------------~-----------------------------------------------------
. >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
=====================~=====================================================
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION (MINUTES) = 12.06
I RAINFALL INTENSITY (INCH./HOUR) = 2.15
TOTAL STREAM AREA (ACRES) = 20.20
TOTAL STREAM RUNOFF(CFS) AT CONFLUENCE = 42.13
~***************************************************************************
FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 7
[---------------------~.-----------------------------------------------------
>>>>>USER SPECIFIED HYDROLOGY INFORMATION AT NODE<<<<<
---------------------------------------------------------------------------
---~-----------------~-----------------------------------------------------
USER-SPECIFIED VALUES ARE AS FOLLOWS:
I TC:(MLN) = 7.64. RAIN INTENSITY (INCH/HOUR) = 2.76
TOTAL AREA(ACRES) = 15.30 TOTAL RUNOFF(CFS) =
39.23
f * * * * * *1* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
FLOW PROCESS FROM NODE 11.00 TO NODE 11.00 IS CODE = 1
----------------------------------------------------------------------------
. .
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
l >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
===~=======================================================================
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
I TIME OF CONCENTRATION(MINUTES) = 7.64
RA~NFALL INTENSITY (INCH./HOUR) = 2.76
TOTAL STREAM AREA (ACRES) = 15.30
TOTAL STREAM RUNOFF(CFS) AT CONFLUENCE =
I
39.23
CONFLUENCE INFORMATION:
STREAM RUNOFF TIME INTENSITY
NUMBER (CFS) (MIN.) (INCH/HOUR)
I---~-----------------------------------------------------------------------
1 42.13 12.06 2.150
2 39.23 7.64 2.764
I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
FORMULA (RCFC&WCD) USED FOR 2 STREAMS.
VARIOUS CONFLUENCED RUNOFF VALUES ARE AS FOLLOWS:
I 72.64 65.92
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
RUNOFF (CFS) = 72.64 TIME (MINUTES) = 12.061
I
'2-'\
-19-
1
TOTAL AREA(ACRES) =
35.50
1,****************************************************************************
FLOW PROCESS FROM NODE 11.00 TO NODE 14.00 IS CODE = 4
----------------------------------------------------------------------------
1
1
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I >>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
=====================~======================================================
PIPEFLOW VELOCITY (FEET/SEC.) = 5.8
UPSTREAM NODE ELEVATION = 1084.00
DOWNSTREAM NODE ELEVATION = 1083.00
FLOWLENGTH(FEET) = 500.00 MANNINGS N = .013
GIVEN PIPE DIAMETER(INCH) = 48.00 NUMBER OF PIPES =
P[PEFLOW THRU SUBAREA(CFS) = 72.64
TRAVEL TIME(MIN.) = 1.44 TC(MIN.) = 13.50
1
----------------------------------------------------------------------------
----------------------------------------------------------------------------
END OF RATIONAL METHOD ANALYSIS
?O
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
EXHIBIT D ?\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~. "1@bert"lJeill,'William"Ftbstt;&c7Associates
i ' PROFESSIONAL ENGINEERS. PLANNERS & SURVEYORS
, 28765 SINGLE OAK DRIVE. SUITE 250. RANCHO CALIFORNIA, CA 92390
(7141676-8042. (7t4) 676-7240
;:?""/'ICI-b 0"'/1/:
/
JOB
R.?",..11 ~N~EL~
SHEET NO
CALCULATED BY _~r.!..~tt-
OF
DATE _4-/tz/40
CHECKED BY
DATE
SCALE
CAtCIAt.A-te- cltrul I3A$/N (~,,-,.r;I') ?1'.A. iPO-fzt:;; ~tl/eJ. &.,R'.
,
.
A).
~oo ut..t: :. (PZ.B c.!s.
??rooP etf>1 = 72.'2- c.{".
:,r.. <7" /"" ,
u?~ (/ C.r. t;J1/,-I 4- P61"~~~SloN + <?Z~ 13>
p;/-v ('t. .,")
"" et.f5I/. rofG 5~1' c.b. " 81/+~"t--z.9' ~ /1:9 N ~ /.ztf'
,
U'7<! /-Z4" /A1A-;<. /0 ,tltq-e.~."/",,,c. c.~. 7/~
~ Lt.-It?
:\ use ~ ~ ZI ' \
tJc..". :: 70 I! .r.'7. ;;> t.Z.13 c.r.? ./
I;::' t1t.t: fi ~w; t9-<""rI
70 "i>r~u-r hIP IN"{1:>
C.b.
8) ?Hec,< 7f,(a::r cn',P. /Cte-- MAl><'. rtoQp t?61'fH (i}. (lZ9-'
r.rbot"6 t:",,~6.
Kef: Ae:'7 7orTWi1,<.,t. fI,uGt~ (;''(IAl'lertZlc..<<- S1'~1'~)
-:;;e6 Sol-!=, :!>
'?J-z....
-[-
,,':
...
...
~ ..
.: ClI)
~
r---
~
'"
- - '-..1 ~. ,...
- '"
,,:,.to
...
-'-
-'--~
'"
~.:
- - ..1 ..
...
.: _.~ en
..
~
"J
I
~-,.
'"
"r.\::
."
...
. ~ - - - --
-. . - --- - -..
..- - ..
...
'"
... -..
...-.--...
... --*. - .
. . . . at
.': :~:~ :-::;~ 00
...
~
-- <D
III
'"
::.:: =. .:.. -- =
-+t-
N
...-
o;c: C.:: --01
;~~~ ;;~:- ~-:.
..-..--
..""--=-"'<0,
U'I
... ...--..- -.
-
...- - -
.-..
::~
<"l
'"
'"
...
.
,~
..,.....
-
-
o.
f_
f_
.-
....
-
....
-
,
-
....
-
-
-
....
-
iIiiiiiiIiI
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
_f-____ --___.__._~__ ---- .---
... i . .. , ... ... ~ .' ... " .... '" . .. .. '" ;- " -;,- ... ~ .. ... *" _ ... ~ .. ~ _ . .. ,;, .. .. .. * ~. .. .. .., ... .. __ '" ole .. ... .. . .. ... ... .. '" "..,. .. ~. . .. .. ... ... cO- ,. " -- .. . .. .. .;.-
~Y)RAULIC ELEM~S~~ - i ?~('JSAM ;A~KACE
I~J Copyrlght lSd2-88 A~va~ce~ EngllleeC:ng Softwire (223)
Ver. 2.7A Relea~e jdte: 6/25/88 ~erl~l # 2~4)
AnalY813 prepared by:
:~.~t"::::/~,ATE OF ::.TlJJY: ::'~:27
GI :~i~'}'J)
'1==='==.="'-"===='-"='====='==========='='="'========.......====....==.
..........~..*..*~......**...........** DESCR!P710~ OF 5TUDY .*~......**..**..*....*..*.*.****..
*'~ANC~O CALIFO~~!A ~OA0 ..
.. ~:1G U::I~ATE CON~I~[U~ .;TREET CAPAC:TY C~ECK
.
~ .~':A. 4~~S~ :0 ~TA. 49~75 ..
**~*....*.****...**..*..**~......~**....*****.*....,.***.*....***+*~*~*****..**..*********
.t~...+*~.~*****t**..***k********....**************.*****....*~..*********,~.****
>1>~ST~EET;LOW ~OJEL INPUT INF0RMAT:ON<<<<
C';~3TAN! 3~REET JRAJEIFEE1!FSET) = .00640G
':L'NS:A~l 3T~EET FLOWlCFS;: 36.70
AVc~AGi S~~EE~FLvW F~ICTION ~ACTOR(MA~~I~G) :
CJNSTA~T S~MM~~RI(AL ST~EET HA~F-WIJT~(FES7) =
:C~S~AN~ SYM~2T~ICA: STREET C~O;;SFALL(DECIMA~ =
:0~~T~Nf 3Y~XET~:CA: CURB ~E:G7~(FEETl = .~7
1:~::~'IAN~ ~Y~~ETRI(AL GUTTEh-WI)TrltFEE~) = 2.uJ
~~~~;A~: ~YMMST~ICA: 0ij:TE~-:~P(FEET) = .031~5
('JNS7A~T SY~METR:CAL GU:TER-HrKElFEETl = .167i)}
.0:5(/':1
43. ~ )
. ;J2'::C"i';(1
_0 _ ._ ____________________________________________________. ______________
-...- ----.-------------..----------- ------------------------------------------
~r~~~:FL0~ ~uJ~L RESULI~:
,"-..:':
~HE FJ~L0WING STREETFLOW RESJLTS ARE 3ASED ON :~E ASSJMPTION
THAT NEGLIBLE rLOW OCCURS OUTSIDE OF TEE STREET CHAN~EL.
7HAT IS, ALL FLOW ALONG THE PARKWAY, ETC., IS NEG~E:':~E:J.
S'REE,. FLOWDEPTH(FEETJ; .78 <..<1/ o,t:.
r'ALL'nEET :'LOODW !DTE (FEE r.; 31. IS' L: 4~' o/<-
AV~RAGS FLOW VELOCI]YCFEET/SEC.) = 3.71
~~GD~CT OF JE~lh&VELOCITY = 2.90
-~- --- .-----------------------------.----------- -------- ------------------
-~---------------------------------------------------------------------------
A ' "I,
C O{.(~ f';le,€- -t'. 24 ~ 'o/w ~ ,~7 f" . 24 = OJ1/
i euv.
111"'1< .
llboV'6
~6ove. Cl.'-jC.b ;:I"Ic/! = 0.?7
}z. "i r: H:..x>P'Nr;. 8t!t*,u'.
;::: c:...
. ( ,
~ ~ . &7-1-. ~7 ,/.o{-
or.t:J!.1"of'
3~
-'?-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
;--}j ....;
.~.~....+*.~*.****.*****+**~*..*.'i'.*'.~.~**.**+~****~**~..*.*+~**.*~'*-+.~
HYDRA~LIC EL~~~:~:~ -
: ::.: ~<;;:A;': ?AC :<A";E
'-' I C,:)pyrlqht
V.:;-:. .i., A
:.9.L-:;.j ~C.Ycin.C'-?G :':rll;:"Leer:.nq SO!::':Vla.:-e (.~e::.:)
.. .
::t~:'L:L n
23'-:"
~~_~3.~e :a:8: ~1~5jSa
ll:,.: _!-=-.~.:> ;.'r,:::,~ ~!"ec ~y:
TIt1:::JJA:E G.;' S':'C~'i: ::.:..::-;
:.; I 2'"y / ::. ;jlj,j
.'- - - ... -.. -- - - .- ~ - - - - -- - .. - - - - - -
-; - - - .. - - - - - + - - -- - - -- - - . -- - .. - - - - -
----.. --'~-'--"'-------'._"----
. - - - ~ -- -- -.. - - - - - -- -- - - - - - - -' - - --
-.. - - - -"" - --
-- ...-----..--------
" ... ... . .. ... . " " .. .., ~ ..... . . ... ~ ... ... ..... .. .. ... ... ~::. _",~;: = ~-.-=- ~ C ~\:'? :::.. T ...: ~I y .... t. .. - .. .. I< "" '" .. ;" .. ... ... ... .. .. .. ..,.. .. .. '" ..
~..:\:~c::'.: CA....~?I_~:,:A ,1(A~
.' I.....l; LLTIt"Jk:E ((':;:"1::':.':) .:)'~.<::E: __A';AC~'='1 ,~:t-:ECK "
~TA. 4S.5) 7u ::A. 4jT7~
.
.~.~**.~~+.+*~....~.._....*.*.~~***....*_t..r~...+.+**...*....*...*.*.*.***"'*
.'.. .. ... -r "'" _ '. . .. .. .., -. 1- I< . . ... .. .... l- .. .. .. * . ~ . .. --.- . .. -p .. .. ... ... .... ... .. ... . .. '" "" .. .. .. .. .. .. .. .. .. ... .. '" . . * * '" . " . .... * .. + " .. .. *
:-:-; :.....;'~ '.::~:~'?:fil ~r~.=='.. ~:'?~.-=.' ~~~~'l~'~.~~l~:=(~0;::{<~
_~~S:A~: S:RES:' ~RAJ=;F~~:!F=ZT) - .JO~4v0
,>.:';3:A~.' ::,.-:ES;' ,L('''(C?3) ::4.70 (';~e ~'(",,,,,,'oG.Y olA-rflA-r ,;+e:e:r,
.\Vs....:,il.G::: :~.~.RSE~F~C~ ?:,,:,'~.:~j~ :AC~C~(M.;:~~n~:;i;:; .,):~~o,:,:)
1~~14)
~~~~_A~: _Y~~Z~~~:!~~
-~. , T "
._J A :<. ;:'..~ t
nA~:-~I):~\~E=~)
43. ::C:
=
.;~j+~J: ~Y~~~:;~lJA~
'_(.}I,:J'::A:~T Sl'~:M~Tr~~CAj..
~1~~~_ (~(~~fAL~(~EC:MAL)
. O;::)():~llj
~,~B ~~:GTH.FEE:) ;:;
,7
. U I
v\:~~TA~: ~Y~MiT~r:A~
~C:TER-wr~T~\FSE?)
~.oo
~_'~.~EA~T ~YMM~~2.(AL GU7:i~-~i~(?EE:) = .03:~5
C:.~~:A~: ~y~~~:s:c~_ GU~~SR-~:l.E(FEE:) = .:6700
:<..~'rl .~.:).:i\.::-!:::~ :-, ~;'~;~L :::T t-, t: 2 '1' t-.~~ (\~::: :::[:2, A::J T:-.:E:.l ~;?~~:.3
_ . ~ n _ n_
-.- - - - .-
.------ .------- ----- .- ---------- .--------------------..----
------------. ---. ------- ----------. --------- .-----.-.-----.
_7RhE:F:~~ ~0~EL RE3~LTS:
---------------------------------------------------------------------
~~rE: S1REETFLOW EX~EED3 T0P :~F CG~8.
!HE FOLLOWING STRES:F:CW R2SG~7~ A~E 8A3~D eN ~HE AEstJMPTION
:HAT NEGLIBLE FLOW O~C~~3 CUTSIJE G~ TES S7REE: C~A\NEL.
THAT IS, ALL FLOW AL,:~(; ~SE PA~~~AY, E:C., 13 NE0LSC~E~.
S:2EET FLOWj~)7~:~SE:) .6~
/0 ,-~.
71>
r~..-.> (",'-"r:) ft.-.,r 8e",,J,
~Vf$~Iof' ~<<I'l.6 I'f-~ I r
"'1'1'f/A-~ """"'1" c.6,
-,.
20.(;6
~A~FSTRE~: ?:00:W=J?hlF~E:) =
ji J 2R.t\:;r:: :'LCW VE...l.,C r~Y '. :-'::ST:, SE'~ .
:~~[,UC: C? ~~~Tr:~V~~CC~rY
3,33
2.34
___________ _______.____ __n__._. _____________________n____________ _________
_____ ~ . __ _________ __ ______+ . .______ ____..__..__________ _____ ____n_____ _ .__
3fi'
-4-
I
I
!I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
EXHIBIT E
3~
--------.----
I
I
I
I
I
I
I
I
I
I
II
I
I
I
I
I
I
I
I
~
'"
~
>-
w
~ ~
>-
e
>-
;:::
~
>-
.~
>-
on
~
>-
~
~
'" >-
z
,- ~
'1) ':!.
~ >-
z
o
N
,- ~
>-
Z
.. ~
W
'"
>-
~
I 0.... ~~
on z
..
on %
'" '0
~
Q.
> '"
Z "'
Q
"'
W N
~
'L
a
,. ~
,. N
W
U
.. %
l~ W ....
t!: f,./) C
=> <<
tl) co :J:
,.
W '"
>- W
.. ~ ~
:1: % w
'" :E
'"
W
% Q
"'
w
0: ~
Q
~ i
<<
~ '"
0",
W
o
Z 0.
w
Z 0.
% >-
U ,...
~
U Q
W z
,n
Q '"
~ 8
U U
'"
'"
'"
'"
'"
'"
'"
'"
.;
<>
'"
<>
~
00000000
o U"\U"\ U"\U"\ 11'I11'I lI\
<>
<>
o
~
...:t N N N "'" N ..; ..;
'"
'"
'"
'"
'"
'"
'"
~ "'" ~ """ ~ "'" ~ ...:t
'"
o
~
'"
'"
~
.....N""'~II'I-o......CO
'"
'"
'"
~
8 8 8 e 8 81 8 8
'"
'"
'"
z
W
'"
<<
Q.
'"
z
~
Q. on
on ~
Q
"'
on <<
U
'"
W
~ ~
~
~
w
~
~
'"
"'
Q.
W
U
<<
~
"'
::>
'"
"'
W
~
~
on
'"
z
W
z
~
'"
z
o
'"
W
%
~
U
"'
~
on
Q
~
~
W
Z
W
'"
o
<<
o
"'
:'!:
z
"'
12
~
<<
U
Q
%
U
Z
<<
"'
on
N
'"
z
W
z
~
'"
z
'"
<<
W
%
<<
w
z
~
>-
'"
o
-'
o
"'
o
>-
%
"'
<<
W
>-
'"
'"
~
'"
'"
z
w
z
::;
'"
z
~
W
%
N
'"
z
W
'"
<<
Q.
~
on
'"
'"
U
"'
w
:E
<<
z
W
~
:;:
~
on
Q. ~
on '"
"'
<<
U
~
Z
W
:E .
W
~
W
on
Q. '"
on
:> ~
~
0;
"
z
-/-
'"
z
W
~
~
'"
"'
Q.
W
U .
<<
~
"'
::>
on
~
"' W
W ~
~ ~
:i ~ cC
,...
:E <<
w'"
,...
on on
>- ,
on ::>
> '"
won
~
w <0
<0
on '"
:>
,...
u....
W
on
.
,... '"
"' '"
w
~ cZ
'"
z
'" N
~ :3!
<<
,...
on
<<
on
o
z
,...
z
W
:E
w
~
W
.J
()
l:l
I-
7.
<>
()
}--
\l.
I.L
o
~
.
.
N
.... .
<<
,...
<<
% '"
U
<< on
w,
"' ::>
<<
on
N
'"
z
~
z
W
:E
W
~
W
%
z
<<
:E
,... '"
Q. '"
'"
z
<<
W'"
~ '"
'"
z
<<
on '"
:= '"
'"
<<
"'
~
z 0;
,...
U ....
W
on
:;;; (;
W
~ cZ
'"
~
'" .
~,..=
<0
,... '"
<<
,...
on
'"
.
.
<<
,...
<<
% 0
U
<< on
w,
"' ::>
<<
on
'"
Q
z
,...
z
W
:E
W
~
W
%
Z
<<
:E
'"
,... '"
Q. '"
'"
z
<<
W'"
~ '"
'"
z ~
<< on
on '"
::> '"
'"
<<
"'
~
W
Z
Z
<<
%
;! U
Z '"
,...
U ....
W
on
W
W .
,... N on
"'
W
~ cZ
'"
~
'"
U
~ ~ il
~ c>. :g
N
,... '"
<<
,...
on
on
z
'"
,...
z
~
W
'"
'"
z
<<
on
"'
W
'"
:E
::>
z
z
'"
,... .
U
W
on
~
o
z
w
"'
<<
<<
,...
on <<
Z % '"
'" U
<< on
,... w ,
U "' ::>
W
on <<
,... on
z
W
U ~
<<
~
'"
<< '"
z
,...
'" z
z W
:E
z W
"' ~
:i W
%
Z
<<
:E
,... '"
Q. '"
'"
z
<<
W'"
~ '"
'"
z
<<
on '"
::> '"
'"
<<
"'
;!
z '"
,...
U <0
W
on
,... .... .
"' N
W
> on
Z <0
'"
'"
on .
~ ,..=
<0
,... ~
'"
,...
on
on
'"
z
~
z
W
:E
W
-'
W
.
z
o
<<
~ ~
<<
on 0
z
<< on
"' ,
,... ::>
<<
on
~
W
o
~
w
z
z
<<
%
on U
z (5 CI
z
'"
on
'"
w
'"
:E
::>
z
Z
o
~
UN
W
on
W
W .
,... N on
"' '"
w
> on
Z <0 -'
'" '"
U
'" ,...
on Z .
~ ,..= :g
'"
~ on
<<
,...
on
%
Z
'"
:E
'"
~ '"
Q. '"
'"
Z
'"
w '"
~ '"
"
Z
'"
.
on '"
::> '"
'"
'"
'"
.
on
Z
o
,...
Z
.
on
Z 0;
.
,... .
U
W
on
,...
U <>
W
on
.
,... '"
"' '"
w
> on
Z <0
o
.
,...
'"
Z
<0
<0 .
Z
o '"
'"
,... on
<<
~
on
W
'"
<< <<
,...
on '"
Z % '"
o U
<< on
,... w ,
U "' ::>
w
on <<
,... on
z
W
U '"
<<
~
o
'" 0
Z
z
o
,...
u
z
::>
~
<<
on
....
o
z
,...
Z
W
:E
W
~
W
~
'" Z
Z W
:E
Z W
"' ~
<< w
:>
~"\
I
I
I
I
I
I
I
I
I
I
I.
I
I
I
I
I
I
I
I
~ig
~.
0.
'" 0
o
~ 0
0.,'"
~ 0
, ,0
~ .
~
w
:>.
z
'" 0
,,~
~. .
~ on
w..,
:> 0
z ~
~
o
....
'"
""'N
o
on
Z10
N.
, ,0
~
..
~
~
..
~
~'
u ~
w
'"
~ 0
'" ~
w
:> on
z .,
-t~
'0
o .
Z' .
81~
~ on
.. -
~;
.".
..
~
..
0,
""
;;i
~
'"
.
.
..
~
..
~ 0
C,
0: '"
w ....
'" ::>
<:
"'
.,
Cl
Z
~
Z
"'
>:
"'
-,
",
~
Z
..
:E
~ "
0. "
"
Z
""
w "
~ 0
"
Z
""
'" 0
::> 0
o
..
'"
on
'" "
~
u ~
w
'"
~ '"
ffi ~~
:> on
z .,
o
18 .
z
o :;
~ "'
""
~
'"
"
.
.
""
~
..
~ 0
u
.. '"
w ....
'" ::>
""
~
0-
o
z
~
z
w
:E
w
~
w
~
z
..
:E
~ 0
0. 0
"
z
""
W N
~ '"
"
Z N
"" '"
'" 0
::> 0
o
..
~
on
Z c;
~
u ~
w
'"
~ 0-
'" ~
w
:> on
z .,
o
o
o .
z
00
'"
~ on
.. ~
~
'"
o
.
.
Z
o
""
~ ~
""
'" 0
Z
"" '"
~ "
~ ::>
..
'"
o
o
Z
~
Z
W
:E
W
~
W
on
Z c;
.
~
u
w
'"
~ ~
~ on
w
:> on
Z .,
o
.
o
o .
Z
o Ie
~ on
""
~
'"
""
~
:::I:' ~
U'
"'" '"
W ....
~ ::>
..
'"
::
o
Z
~
Z
W
:E
W
~
W
~
Z
~
~ 0
0. 0
"
Z
""
w .,
~'"
~,...:
"" on
'" 0
::> 0
!ii!
~
:!
Z 0
~
U
W
'"
~ on
~ '"
~ on
Z .,
o
....
Z ~ .
ON
~ :;;
..
~
'"
o
.
.
""
~
..
~ 0
U
"" '"
W ....
~ ::>
..
'"
~
o
Z
~
Z
w
:E
w
~
w
~
Z
..
:E
o
~ 0 z
0. 0
"
Z
..
w 0
~ 0
"
Z
""
'" 0
::> 0
o
""
~
~
Z 0
~
U
W
'"
~ on
'" '"
W
~ <ll
o
Ie
~ ...:
~
~ 0-
""
~
'"
'"
w
"
..
0.
"
Z
~
'"
0. ~
on 0
~
..
U
on
~
o Z
W
~ :E .
w
~
w
w
~
.
~
o
~
0.
w
u .
..
~
'"
::>
'"
~
W
~
:i
..
~
..
~ 0
U
.. '"
W ....
~ ::>
..
'"
~
o
Z
~
Z
W
:E
w
~
w
~
Z
..
:E
~ 0
0. 0
"
Z
..
w 0
~ 0
"
Z N
..
'" 0
::> 0
o
..
~
~
Z 0
~
U
W
'"
::;: r::
w
~ <ll
o
o
'" .
Z
~ ~
~
'"
o
-2.-
.
.
..
~
..
~ 0
U
.. '"
W ....
~ ::>
""
'"
~
~
o
Z
~
Z
W
:E
w
~
w
~
Z
..
:E
~ 0
0. 0
"
Z
..
w 0
~ 0
"
Z
""
'" 0
::> 0
o
..
~
~
Z c;
~
U
W
'"
~ N
~ .,
W
~ <ll
o
Z Z
0,.., 0,..,
0'" 0
~ 0 ~ .... 0
< N DC: cr: N
t;; ~:n
o
""
w
~ ..
~
:E ..
W 0
~
'" '"
~ ....
'" ::>
o
:>N
W.,
~
W <ll
'" 0
,.
.
.
~
U
W
'"
~ N
'" .,
W
~ <ll
o
'"
0-
'"
0-
""
'"
~
o
Z
~
Z
W
:E
w
~
W
7~
I
I
I
I
I
I
I
I
I
I
I
I
I
'I
I
I
I
I
I
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
o <<
<<
"" <<
~ <<
o
~
. ~
~
U
o
o
'0
...
...
. ~
o
o
~
~
.E
,~
'"
c'
~
'"
~
~
..8
o
'"
~
.0
.~
"ll
. ~
~
a.
~
.~
0.
~
~
~
3
.~
~
o
o
w
'"
..
U 0.
<>
+
>
z
"
>
W
~
W
'"
'"
'"
<>
><
'"
<>
:
z
z
o
~
..
>
W
~
W
~
'"
W
>
Z
'"
Z
~
'"
'"
~
..
:::>
a
w 0. ~
~ <>
'" ~ '"
o ~ 0.
o
Z ..... W .....
.. u U
: ..
~ ~ '"
'" ~
:::> '"
'"
o
'"
w ~
~
.. ~
'" w
z
w w
'" z ..
~
<> ~ 0
~ ~
'" '" a
..
~
w
~
'"
'"
w
~
~
z
w
>
c;
z
8
~
~
w
~
w
w
u
..
~
'"
:::>
'"
'"
w
~
:i
<<
<<
N
o
z
'"
z
z
'"
:i
<<
<<
; ~
<<
<<
<<
<<
<< 0
<<
<<
<<
<<
'" <<
N <<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
: <<
~ <<
0. <<
W <<
<> <<
<<
:E <<
'" <<
o <<
z <<
<<
: ~
<<
<< N
<<
<<
<<
<<
<< 0
<< 0
<<
<<
<<
<<
<<
<<
> <<
'" ~ <<
Q! UJ u.-Ie
w :<<
z 0 <<
w '" <<
'" <<
<<
<<
W'" NNNNNNNO'-
~ > -Ie 0- 0 0- 0 0- 0 0- ~
~wc: ~~'4~-4"~-4'r::
>%1.1....... 0 0 0 0
tn<< <:) 0 0 0
<<
<<
<<
<< '"
<< '"
<<
<< ~
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<< 0
<< 0
<< ~
<<
: 18
<< 0
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
~ <<
'" > <<
w w <<
> ....l 0 -II
:z w U) ..
<<
<<
<<
<<
<<
<<
:E <<
w <<
~ <<
w <<
.... <<
~ <<
<<
~
0. w
'" '" >
'"
..... en ~
:S u1
'"
0.
'"
>
..
'"
ow
Z 0:
~
o
~
o
~
o
~
o
~
o
~
o
~
o
~
o
~
0000000000000000000000
0000000000000000000000
o
~
N
....0
w Z
'"
~ ~
o
o
....
~ '"
'"
: <>
o
~
..
~
'"
u :
~
~ 0.
W
'" 0
u
'"
w >
0. w
:::> ~
'" w
N '" _
~o8~~
18 fi
o 0
~
g;
o
o
~
.;
~
<>:
'"
o
o
o
~
..
..
r-
r-
N
o
o
'"
'"
~
~
'"
<Xl
~
~
18
o
(;
~
..
o
o
o
~
..
N
..
~
(;
'"
'"
o
o
o
~
..
~
N
o
o
o
<>
o
'"
'"
~
~
<>
<Xl
'"
OJ
<>
<Xl
o
'"
..
~
..
:::! & r--.. ~
. 11'\ N co
<> 0
<> <>
o 0
~ ~
o
o
..
o
~
N
8:
..
N
~
..
N
o
o
o
o
..
o
~
N
'"
<>
..
N
o
o
o
o
..
o
~
N
8:
..
N
N
r-
<>
o
o
o
o
..
o
~
N
<>
<>
"
N
~
<>
o
o
o
o
..
o
~
N
~
<>
o
o
o
o
o
o
..
'"
N
r-
N
0:
'"
N
o
o
~>o;eotri..:l~""'~~
00 I"'l 0-.1'0 11'\ ,_
0:
o
0:
o
0:
o
0:
o
~
~
o
o
o
o
o
..
~
N
0:
'"
N
o
o
0:
o
N
w
'"
..
0.
'"
Z
~
'"
~
w
~
..0..
.. <Xl ..
N ~ N
~ 0
'"
~ 0.
o
o~C;~o~~gs ~t--.....~t;
~....."""",I'-"",'-MO::I""lN <(
co 11'\ 11'\"'" N..... 0::
o 0 0 0 0 0 0::.....
o 0 0 0 0 0 :JV'J
'"
(;
~
<>
<Xl
~
<>
<Xl
~
~
'"
g;
o
~
'"
o
..
~
<>
<Xl
~
<>
<Xl
'"
N
'"
<>
<Xl
o
'"
'"
N
..
<Xl
N
,0
<Xl
N
'"
<Xl
o
~
o
<>
o
<Xl
o
~
<Xl
N
'"
<Xl
N
'"
:g
~
o
<>
o
..
'"
.,;
<Xl
N
,0
~
N
'"
..
r-
o
<>
o
~
~
N
.,;
o
o
.,;
<0
N
'"
o
~
o
0:
o
o
:;;
.,;
g"'" 0 ~~ In ~ ~~ g ~ g, ~ ~~;;; ~;:!; ~ ~ ~ ~
N N N N I""l co I""l M I""l N N
~ g ~ g U5 g l:a g ~ g ~ g ::a g ::a g :a g :a g :a g
o 0 0 0 0 0 0 0 0 0 0
~ ~ ~
,..;
;:!
r-
N
o
o
~
00
~ '"
<>
<Xl
o
~
(:l
~
~
<>
<Xl
<>
<Xl
'"
<Xl
<Xl
o
<>
'"
~
..
~
'"
~
'"
~!l!i;:l;;Ul
~ ..; ,...: NO:,.... r-- ,...
~ ~""'~~~~5=:
.- .... 4: ....
'"
~
z
o
&j~~~
'"
-3-
~ 18
'" 0
N '"
~
~
i!! :s 18 !ll
en N 0:
~ '"
u ~
Z ~
:::>
,
~g~g~t::\~
'"
o
o
~
<Xl
N
'"
..
<Xl
0:
o
..
'"
~
~
'"
w ~
~
.. ~
'" w
z
w
'"
'"
0.
'"
>
..
'"
o w
z
0.
~
N
'"
N
>
'" w
o :E
Z ~ '"
'" 0 Z
o '"
~ 0 w
> ~
~ :
'"
u '"
'"
OW"
Q >- (5
.z.o
~ 0 ~ :z:: ~
~ ~
0. ~
W
<> ~
o
.... 0
w z
'"
~ ~
....
~ ..
'"
~ c
~
~
0.
W
C
:E
'"
C
Z
~
..
u ~
~
~ 0.
W
'" C
U
'"
w >
0. W
:::> ~
'" w
>
" ~
'" w ~
w ~
z c
w '"
"
w
c >
~ .. ..
w w
> ~ ~
'"
<>
~
0. W
.. '" >
"
w
z ..
~
c ~ c
.. OJ
o u
'" '" a
>
;: g ~
z ~ ..
'" c z
~ 2i w
> ~
~ ~
..
u '"
'"
OW"
~ >
U 0
Z 0
<( 0 II :J:
0:: :z = 0
~ ~
0. ~
W
C ~
C
~ ~
:;; uj
~
'" >
w w
> ~ c
Z w '"
Z
o
:E
w
~
w
....
~
~
..
~
'"
-;,l\.
I
I
I
I .: c: c: c:
.
.
.
.
I ..
. C> C> C>
.
.
.
. C> <0 C> C> C>
. c: " c: c: c:
.
.
.
I . C>
. C> C>
. c: c: c:
.
:
.
.
.
I .. C> C> C>
. c: c: c:
:; .. .. .. ~
.
.
.
. t-I
" .. ~
., '"
I . ,. ., rlj
" N ,"
.,
.'
.
.
. II
. 0: ;;; 0:
., ~~I~
I . '" '" "l
. N
. N N I\' ~
.
. J.
. ;-I-Sl
.'
. C> C> C>
. c: C> c:
.
I .
. +
.
.
. .. .. .... \0
. '" " C> "' '"
. '" c: .. C> ";
.
. N N N 'N
I . C> '" C>
. C> ~ C> ~
. ~ ~
.
. ....
. i3 ~ i3 i3
. ;;;
.. ; I""l OJ "l "l I'
., OJ N
I :1 <> <0
. c: c:
. -l
. C>
. ' C> C> III
. . C> c: c:
.
. , on on on
.
I . 11'
.
. "! '" 3
. "!
.
. . N N N
. '" '" '"
.
. ?-
I .
.
. Il\
.
. '" ~ g: ~
: i ~ C> c:
.
.. ~ N N
. C> C> C>
I .. iO ~ C>
. - I
.
. '" ~ ~
. '"
. .C> C>
. 'N "l N ~
.
. on on on
I .
.
.
. '" on N
. ,on ;::
. .'" ~. '" '"
. , ..., N :li
. I~ c. :J C>
. c. c:
. j~ C> ~
I .
.
.
. 'on on C> '" ~
. i1"-; 0:) .., ,..,
. ,:
. I!:;: '" :8 ,..,
. ,.., C>
. ' C> ~ C>
I . '- N
.
.
LJ.,D
I -4--
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
o
-
.~
>
W
" ~
:e( '0-
0..,;:
e
>
;:::
.~
>
e
>
'"
>
...
.~
'" >
z
~ ~
Ul .~
~ >
Z
~ :€
>
z
~ ~
W
0>::
'"'
W
~ Z ~
Lt'\ :z ,> 0
< 'Z Cll::
'" % 0
:;> U
~
W N
~
~
o
~ '"'
0.. N
W
U
.. %
~ W ~
~ "' 0
~ ~ :;
~
W ~
,- W
.0('" ....
3 :z: W
" r
..
w
% 0
~
W
%
~ ~
o
~ i
..
~ "'
o ~
W
o
z ~
w
Z ~
% >
U ~
~
U 0
W Z
"'
ow
~ 8
u u
o
o
o
o
o
o
o
o
...
o
.0
o
o
o
o
o
o
.;
o
o
o
o
o
o
o
~
...
C) 0 0 :0 0 0 0
o LI"l Lt'\ Lt'\ 11'\ Lt'\ l.l'l
....zNNN"";N...,.
o
o
o
o
o
.0
o
o
o
~"''''''f'''l'''''P''''l...:t
.....N""',.;f"lI"I-.ot-..
o Co 0 :0 0 Co 0.
U U U U U U U
o
z
W
"
..
~
"
z
~
0. "'
'" ~
o
~
'" ..
u
o
W
~ '"'
~
~
w
'"'
~
o
~
~
W
U
..
~
~
::>
"'
~
W
~
:'i
"'
o
z
W
z
'"'
"
z
o
..
W
%
\I'
~
\I:.
\tI
....\
~
~
u
~
~
"'
o
~
~
w
z
w
m
o
..
o
~
..
z
~
o
~
~
>II
III
r
<J
~
Ill~
> ~
~
r- II'
~\j'
~~
'>'IS..
()~
\-:
L""
~~
<:i:~
{II
_r
~~
..
W
Z
~
'"'
..
u
o
%
U
Z
..
~
>
"
o
'"'
o
~
o
>
%
~
..
w
>
o
"'
"'
N
o
z
w
z
'"'
"
z
o
..
W
%
,.,
o
z
W
z
'"'
"
z
o
..
W
%
N
o
z
w
"
..
~
"
z
~
"'
~ '"'
o
o
m
u
~
w
r
..
z
W
'"'
'" 0
~
..
u
~
z
W
:E .
W
'"'
W
'"
~ 0
"'
:> ~
~
...
;;
"
z
-5-
.
w
~
~
o
~
~
w
u .
..
~
~
::>
"'
N
I'- .
z
ON
.,
~ '"
..
~ ~
~ W "'
W,",
~ ~
~ is <
~
:E ..
W 0
~
"' "'
> ....
"' ::>
..
"'
o
z
~
z
w
:E
w
'"'
w
~ ;:!
'"'
WI'-
.,
",0
:>
~
U I'-
W
"'
~ 0
~ 0
w
iUi
o
.
.
..
~
..
% 0
U
.. "'
W....
~ ::>
..
"'
N
o
z
~
z
w
:E
w
'"'
w
%
Z
..
:E
~ 0
0. 0
"
Z
..
w 0
,",0
"
Z
..
"'0
::> 0
o
..
~
...
-
Z 0
~
u I'-
W
"'
:;: 0
W
S; ;g
o
...
,., .
Z
o I'-
.,
~ '"
..
~
"'
o
.
.
..
~
..
% 0
U
.. "'
W ....
~ ::>
..
"'
,.,
o
z
~
Z
W
:E
w
'"'
W
%
Z
..
:E
~ 0
~ 0
"
Z
..
~ 0:
"
z ,.,
.. '"
"'0
20
o
..
~
...
Z <5
~
U I'-
W
"'
~ N
~
W
S; ;g
o
:g .
~ 0-
N
~ 0
..
~
"'
o
.
.
..
~
..
% 0
U
.. "'
W ....
~ ::>
..
"'
...
o
z
~
Z
W
:E
W
'"'
W
%
Z
..
:E
~ 0
~ 0
"
Z
..
W 0
,",0
"
Z
..
"'0
::> 0
o
..
~
...
-
Z 0
~
u I'-
W
"'
.
~ I'-
~ N
W
>'"
Z .,
o
o
'" .
~ ~
~ ...
..
~
"'
o
..
~ ~
..
",0
Z
.. "'
~ ....
~ ::>
..
"'
'"
o
Z
~
Z
W
:E
W
'"'
W
.
z
o
"'
Z
o
~
z
~
W
o
'"'
W
Z
Z
..
%
'" U.
ZOO
Z
..
"'
~
W
m
:E
::>
Z
Z
o
~
U N
W
"'
~ .
U
W
"'
W
W .
~ N "'
~ ,.,
W
> '"
Z ., '"'
o ..
U
o
'"
~~
o
~ '"
..
~
"'
~
Z .
W
o
~
o
Z
W
~
.. ..
~
'" ..
Z % 0
o U
.. "'
~ W ....
U ~ ::>
W
"' ..
~ "'
Z
W
U "
..
~
o
.. 0
Z
~
" Z
Z W
'"
Z W
~ '"'
.. W
:>
%
Z
..
:E
~ 0
~ 0
"
Z
..
W 0
'"' 0
"
Z
..
'" 0
::> 0
o
..
~
'"
Z ;;
~
U "
W
"'
~ '"
~ ,.,
W
> '"
Z .,
o
18 .
Z
00
,.,
~ '"
..
~
'"
o
" 0
o
%
~
.
,., 0
o
% 0
~ ,.,
... 0
o
~
~
W
>
Z
.
,., 0
"
~
~ '"
W .,
> 0
Z
~
...
"
.
I'-
"
"' N
"
'"
Z 0
N
o
.
~
..
'"'
, "'
~
..
~
.
~
U "
W
"'
.
~ 0
~ "
W
> '"
Z .,
o
o
o
Z
o N
"'
~ '"
..
~
"'
Z ..
o ~
..
~ 0
U
Z '"
::> ....
~ ::>
..
'"
I'-
o
Z
~
Z
W
'"
W
'"'
W
A,\
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
~ .
~ .
~ .
~ .
.
u .
o .
~ .
~ .
.: .
.
.. .
.
~ .
~ .
o .
~ .
~ .
.
e .
~ .
.
.
.
.
,. .
.
.
c .
"cv :
'" .
.
~ .
~ .
.8 :
o .
'" .
.
.
~ .
o .
- .
.
.g :
~ .
= .
0..
~ .
~ .
0..
.
~ .
~ .
~ .
, .
.~ .
,~ .
o .
~ .
.
~ .
.
.0 .
... .
:~
.
.
.
.
.
.
.
.
.
'" .
N .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
: .
... .
"- .
w .
o .
.
:E .
'" .
o .
z .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
>- .
,,-' .
e:: w l.l.. -II
W :.
z 0 .
W CY. ..
'" .
.
.
w .
0> .
...J < <0;( 'II
W W .
> ::c l.l.. ..
~ .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
... .
'" > .
w w .
:> -i 0 ...
:z w VI ..
.
.
.
.
.
.
:E .
W .
-' .
w .
.... .
-' .
.
'"
"-
'"
>
.:
w
"
.:
u "-
o
+
>
z
'"
Ow
z ;;:
-'
N
"
>
w
-'
w
~
,.
....0
w z
~
~ ~
....
~ =:
: 0
~
o
""
:>
o
:
:!;
z
o
...
~
w
-'
w
...
'"
w
>
z
-'
.:
u:
...
... "-
w
'" 0
U
"
Z
...
~
'"
w >
"- w
" -'
~ w
~
-'
.:
"
"
w "- ~
'" 0
'" '"
0"'''-
o
z: 1.1.. W ....
.: u u
: .:
... ~ '"
'" ...
" ~
~ ;;
'"
w ...
... -'
<: I.L ,Q. W
:3 wen:>
~ < :::.;
'" w 0
z
00
c( ...I ;r::Cl
o .u
Cll: ,Or:: a
-'
w
-'
~
~
W
-'
~
z
w
~
"
z
o
...
.:
>
w
-'
w
w
u
.:
~
'"
"
~
'"
W
...
:i
c( >- ,w
" I:E
:z 0 'C:
<< ...J ;%
00
..... CY. ,W
0-'
-' >- >
< ::c ,..... VI W
U :::i -'
o ~:::! w
: w _
l.J >- :0
z
:! ~ ;~ :z: 2i
... -'
"- ~
W
o ~
o
.
.
N
o
Z
"
Z
Z
'"
""
,.
.
.
z
o
...
""
...
~
o
o
!(\
~
II
\fI
o
o
o
o
o
o
o
o
o
~
o
~
o
0000000000000000000000
000 Co 00 Co 00 Co 00 Co Co Co 00 0 Co O~ Co
o
o
o
'"
"
1:
o
'"
oo
:;
N
o
o
o
o
o
'"
"
~
oo
N
oo
:;
N
o
o
o
o
o
o
o
o
o
'"
..
oo
:;
N
o
o
~-O~o.;;N~-.1'~O~
..0 -0 Co ,_ '0() I"'l -.1' .... .... 0-
r- ...: ...: oo oo oo
co co co co co co
Co 0 Co ~ 0 Co
o
'"
"
o
'"
..
o
o
"
o
'"
N
8:
":
N
'"
'"
o
N
o
o
oo
~ g
o
o
"
o
'"
N
'"
'"
o
N
o
o
o
o
"
o
'"
N
'"
"
'"
o
'"
o
o
o
o
..
o
'"
N
o
'"
o
o
~
o
o
..
o
'"
N
o
;;;
o
o
N ,.... t-.. I""l
-0 I'-- ,.., 0.. '^ ,.... I""l .... I"'l
Co ONO",,!O
'"
'"
o
'"
oo
o
'"
oo
o
'"
oo
o
'"
oo
o
...
~
o
o
~
o
~
"
'"
'"
<>:
o
o
N
'"
"-
'"
>
""
N
0:
N
N
0:
N
"
'"
.
.
.
.
.
.
.
.
.
.
.
'" .
N .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
: .
... .
"- .
W .
o .
.
:E .
'" .
o .
z .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
>- .
,,-' .
Cll: W l.l.. ..
W :.
z 0 .
W '" .
" .
.
.
W .
0> .
...J c( c( '"
W W .
> ::c ..... ..
~ .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
... .
'" > .
w w .
:> -' 0 ..
:z w V) ...
.
.
.
.
.
.
:E .
W .
-' .
W .
.... .
-' .
.
oo
"
N
oo
"
N
w
"
""
"-
'"
o w
Z
0-
o
o
o
o
-'
N
....0
W Z
~
~ e
....
t; ~
: 0
N
-'
.:
u :
...
... 0-
W
'" 0
U
"
Z
'"
W >
0- W
" -'
~ W
...
~
:;
w
-'
0- ~
'" 0
'"
'" "-
o
~~~~~~~~~~~"",^~~~~~~~-o~l.l..~~
Lf\~Ln~~~Ln~-o~~~~SN~N~N~o-g ~e:
o <:) 0 Co Co Co Co 0 0 Co Co ::::lVl
~
~
'"
oo
:8
o
"
...:
oo
o
o
"
,,;
Co ..... .... 0
o 0'"
N N
~ 8 t/j :5
o 0
~
'"
oo
:8
'"
"
...:
oo
o
'"
'"
'"
18
r-
'"
N
'"
oo
:8
'"
o
N
18
o
'"
'"
'"
N
18
'"
~
:8
'"
o
N
18
o
'"
18
N
18
'"
oo
:8
'"
'"
'"
oo
oo
o
~
'"
N
N
"
N
"
r-
g;
oo
oo
o
r-
'"
"
'"
~~~;;!;~ e:~~~e:gmm
~ ~
~ ~ ~ ~ Ri Ie :g ~ ~ Vl ~ ~ ~ ~ Pl 0. ~
0- 0. ON::! ~~Ll'l l.f'I~l.I'\ ~
'" "
... ,
'"
.0
~
oo
:8
:8
"
N
N
...:
oo
o
...
~
...:
oo
o
~
'"
;:!
'"
N
N _
-.'"
N
" 0
oo 0
o
N
"
N
"
N
N
'"
oo
oo
o
N
'"
"
'"
...
N
"
N
"
N
o
o
'"
oo
o
N
'"
'"
~LI"\~~~g~c::s~~;;;~~~~
N N M co M ,.., ,.., N
a!ig~g::gg::gg~g~g~g~g
Co Co Co Co Co ~ Co Co
co ..0 "'" 0
,., Co ....,. 11"I
-7-
N Co a:: Co ,....
.... Co to- Co 11"I
<0 Co en U"'l ,..:
-0 (/) ,.... M
'" Z '"
.: -
'"
...
'"
'"
'"
--:
'"
"
r-
...
...
'"
oo
o
r-
r-
'"
'"
o
'"
W ...
...
.: ~
:> w
z
w
'" w 0
z
o 0
~ ...J ~
'" "'''
-'
"- W
~ >
.: ,.
::: ~ ~
Z 0 .:
'" -' Z
00
~ '" W
o -'
-' >- >
c( ::c l.L. (II W
U e:: 3' ~
o "" "
: w
U >- 0
Z
~ Co :J:: :::c ~
... -'
"- ~
W
o ~
z
o
...
.:
...
~
L\'::J
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
i
~
c
~
>
.u
..
"" a-
,.
>
e
>
;:::
~
>
~
~
>
~
~
~
>
~
"
" >
,.
.- ~
~ '"
~ ,..
,.
o
N
.- ~
,..
,.
..
W
" ~
>
.,
"'
o..:or:: 0..
II'l ::z > 0
r- c( :z IX
~ x Q
C "
~
~
"' N
.,
"-
"
" ~
.. N
W
"
ct ;:1:
"'_ w t-
l:I~ en Q
~ ~ :;
"
W ~
.- W
~ ~ ~
.. ~
W
% '"
~
W
%
0. ~
"
.U
> ::>
'"
~ ,.
o ~
w
o
z ..
w
Z 0.
% >-
U ~
~
U"
W Z
~
c w
~ 8
" u
c
c
c
c
'"
0000
lI'\ 0 in l/'\
N-4"NN
c
c
c
'" N -4 '4'
.- N ,.., ~
a Co 0 0
u u u u
"
z
w
'"
'"
0.
'"
z
~
0. ~
~ ~
"
~
~ '"
u
c
w
~ ~
~
~
w
~
~
"
~
0.
W
U
'"
~
~
::>
~
~
w
~
~
'"
"
z
w
z
~
'"
z
'"
'"
W
%
~
"
~
~
'"
'"
~
~
w
z
w
"'
'"
'"
"
~
~
z
~
c
~
~
'"
u
"
%
"
Z
'"
~
'"
N
"
z
w
z
~
'"
z
c
'"
W
%
~
w
z
~
>
'"
"
~
"
~
'"
>
%
~
>
c
c
'"
'"
"
z
w
z
~
'"
z
'"
'"
W
%
N
"
z
w
'"
'"
0.
'"
z
~
'"
0. ~
~ '"
~
'"
u
0. ~
'"
::> c
~
z
w
o .... ::E -II
'" W
'" ~
"' w
u
'"
w w
'" ~
'"
z ~
"
w ~
~ 0.
~
"
;;
"
z
-
w
u _
'"
~
~
::>
'"
z
a "
c
~ c
'"
~ ~
'" w '"
w ~
~ ~
;J a -<
~
'" '"
w '"
~
'" '"
> ...
'" ::>
'"
'"
a
z
~
z
w
'"
w
~
w
:z
.\l
tr
-Z
=>
-.
:-4:
III
:t
.:l
I!:.
~
~ il
::>
~
"
w
'"
~ a-
~ '"
w
>~
z <Xl
C
~
-1-
-
-
c
c _
'"
~
'"
% '"
U
'" '"
w ...
'" ::>
'"
'"
N
"
z
~
z
w
'"
w
~
w
%
Z
'"
'"
~ C
0. C
'"
Z
'"
w c
~ c
"
z
'"
'" c
::> c
!;il
'"
"
z c
~
u
w
'"
~ ~
~ ~
w
> ~
Z <Xl
'"
~ N
~ c
'"
~
'"
c
c
r- _
-
-
'"
~
'"
% <>
"
'" '"
w ...
~ ::>
'"
'"
'"
a
z
~
z
w
'"
w
~
w
%
Z
'"
'"
~ C
0. C
'"
Z
'"
w C
~ C
'"
Z C
'" '"
'" c
::> c
'"
'"
~
~
w
<>
~
w
z
z
'"
%
" "
:z c;: 0
z
'"
'"
'"
w
"'
'"
::>
z
z
o
~ -
~ u
u w
w '"
'"
w
w _
~ '" ~
~ N
W
>r-
z <Xl ~
C '"
U
~
a-
z
c '"
c
~
'"
~
'"
c
'"
z
a
~
z
~
z _
w
<>
~
a
z
w
~
'" '"
~
'" '"
Z % <>
a u
'" '"
~ w ...
u ~ ::>
w
'" '"
~ '"
z
w
u "
'"
~
'"
'" a
z
~
'" z
z w
'"
z w
~ ~
'" w
::>
%
Z
'"
'"
c
~ C
0. C
'"
Z
'"
w c
~ c
'"
z
'"
~ c
::> c
<>
'"
~
~
w
'"
~
w
z
z
'"
%
" U
Z C '"
Z
'"
'"
~
w
"'
'"
::>
z
z
a
~ -
~ u
" " w
w '"
'"
w
w _
~ N ~
~ <Xl
w
> a-
z <Xl ~
C '"
U
'"
'"
~ ,...:
"
~ N
'"
~
'"
'"
z
a
~
z
~
z _
w
a
~
a
z
w
'"
'"
'"
~
'" '"
Z % '"
a u
'" '"
~ w ...
u " ::>
w
'" '"
~ ~
w
u ~
'"
~
'"
'" a
z
~
'" z
z w
'"
z w
~ ~
~ w
%
Z
'"
'"
~ C
0. C
'"
Z
'"
w c
~ c
'"
z
'"
'" c
::> c
!;il
'"
"
z c
~
u
w
'"
~ r-
~ ~
w
> '"
z a-
c
z
" "'
~ "
'"
~
~
-
-
'"
r- _
'"
~
'"
% <>
"
'" '"
w ...
~ ::>
'"
'"
'"
a
z
~
z
w
'"
w
~
w
%
Z
;<
~ C
0. C
'"
Z
'"
w C
~ C
"
Z ~
'" "
'" c
::> c
'"
'"
"
"
z ;;
~
u
w
'"
~ ~
w
> "
z a-
c
~ ,...:
~ ~
'"
~
'"
c
-
-
c
- -
'"
~
'"
% <>
U
'" '"
w ...
~ ::>
'"
'"
r-
o
z
~
z
w
'"
w
~
w
%
c
z
'"
'"
~ C
0. C
"
Z
'"
w C
~ C
"
Z
'"
'" c
::> c
'"
'"
~
'"
z
a
~
z
~
w
<>
~ -
w
z
z
'"
%
" U
:z 0: 0
z
'"
'"
"
w
"'
'"
::>
z
z
a
~ -
~ u
u w
w '"
'"
w
w
~ N '"
" "
w
> "
z '" ~
c '"
"
c ~
~ z
z w
a " <>
'"
~ ~
'"
~
'"
'"
~
~ "
a 0
z :>
'"
w '"
" w
'" %
'" '"
z w
o ~
'"
~ >
u '"
w
'" '"
~ '"
%
W
" <Xl
'"
~
<>
'" 0
%
~
" %
% W
'"
% W
" ~
'" w
:>
4.5
I
I
: I
I
I
I
I
> "
WM
~ .
I W if,
'" 0
",-
I
I
I
I ~
u '"
W
'"
I '""''''
OX ~
W .
> ~
Z '"
"'"": :=
,
I ~:
~ ~
" -
~
'"
I ~
",.
I ~
I
I I
I
'*
-/0 -
I
I
I
I
I
I
I
I
I
I
I
I
I
II
:1
II
II
II
II
.
<<
<<
.
.
.
.
<<
<<
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
<<
<<
<<
.
<<
.
<<
.
<<
<<
<<
.
.
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
<<
.
.
.
<<
, .
<<
<<
<<
<<
<<
.
.
<<
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
<<
o .
~ .
.~ .
~ <<
<<
.u .
:0 it
o .
o .
"" <<
<<
.. .
<<
.~ <<
o .
o .
~ .
~ .
.
e .
;ClI it
.
<<
<<
~ :
.
<<
C <<
:a:; :
'" <<
.
~ <<
~ <<
:2! :
o .
'" .
.
<<
~ .
o .
~ .
.
'" .
.~ .
~ .
;[ :
~ .
~ .
;0. ..
.
.~ .
~ .
.~ .
3 .
~ .
~ <<
.0 <<
,0 <<
.
,0 <<
.
'" .
~ .
w
'"
""
U Q.
Q
+
>
z
"
>
W
...
W
'"
,.
'"
Q
'"
,.
Q
Z
~
z
Q
~
~
W
...
W
~
'"
W
>
Z
'"
Z
~
'"
'"
...
:!l
a
w Q. ~
'" 0
'" '"
o '" Q.
Z ~ W I-
"" U U
Z ""
~ ~ '"
'" ~
::> '"
'"
Q
'"
W ~
~
;j tti
z
w
'"
...
w
...
'"
'"
w
...
'"
,Q.
,'" ...
.,. w
~ 0 >
,'"
~i~
Q U
c5 ...JiQ!
'"
z
w
>
a
z
o
~
~
w
...
w
w
U
""
~
'"
::>
'"
'"
w
~
~
,wa
"E
~ ~:~
z 0
Q:: ...J,W
o O...,.l
~ '"
Q .~
... >-
"" z
U
o '" ~
~ ~:~
: o,~:s: 6
~ ...
Q. ~
W
Q ~
o
.
.
N
o
z
'"
z
z
'"
""
,.
.
.
<<
<<
<<
<<
.
.
<<
<<
<<
<<
<<
'" <<
N <<
<<
<<
<<
<< Q
<< 0
<<
<<
<<
.
.
.
<< 0
. '"
<<
. N
.
.
z .
~ .
Q. .
w .
Q .
.
s: .
'" .
o .
z .
<<
i ~
<<
.
<<
<<
<<
. 0
. 0
.
.
<<
.
.
<<
>- <<
"'... .
ffi ~ ~ :
Z Q <<
w" <<
'" <<
.
<<
<II CIOOCQOClOOCQNCOCOo.
: ~U;~~lC<<ilC~lC~lC
.. 0 coo 0
.. 0 0 0 0 0
<<
.
<<
: g:
<<
<< '"
.
<<
.
.
. '"
.
. ~
. '"
.
.
.
.
.
.
.
<<
<<
.
.
.
.
<<
<<
<<
<<
.
<<
: ~
<<
<<
.
.
.. 0-0-"''''''..0-4"1'\.101'\.10-4'
: "'~V'l<<i~~CO~..;f'~..;f'
: ~o~ocoog;ogc;~
...000000
<<
.
<<
: g~~Kl~~~~
s: <<
~: gCON~;g~~~c?i
Wit 0 0 ....~N N
...... '" ............
... <<
<<
'"
Q.
'"
>
""
'"
ow
Z 0:
~
o
~
Q
~
Q
~
o
~
.,
~
.,
~
o
~
o
~
o
~
000000000000000000000
000000000000000000000
o
...
N
... 0
w z
'"
~ ~
...
t; =:
Z Q
...
""
U Z
~
~ Q.
w
'" .,
U
'"
w >
Q. W
::> ...
'" w
w
., >
... "" ""
w w
> Z ~
'"
>
'" w
...
,. w
~
'" >
w w
> ... 0
Z W '"
Z
o
~
""
~
'"
.~..... ~ ':P ~
NO,., ,_ N
N
'"
.,
0:
o
o
'"
.,
'"
.,
-
.,
N
.,
'"
~
.,
o
o
'"
N
15.
~
~
o
o
o
o
o
'"
N
g:
.,
.,
0:
~
o
o
.,
'"
N
g:
.,
.,
o
'"
'"
o
.,
.,
'"
N.
~
.,
.,
0:
.,
-
..;f'~O~ to
"",.., -0 0-0
'"
'"
.,
'"
'"
.,
-
g:
.0
'"
~
'"
;;;
'"
.,
'"
.,
'"
.,
'"
g:
'"
"l
~
'"
'"
'"
":
0:
o
'"
.,
N
~
l)!
.,
g:
'"
'"
~
'"
....
.,
'"
N
'"
.,
....
~
N
g:
'"
'"
~
'"
'"
0:
N
'"
.,
-
.,
.,
'"
N
:riM
.,
'"
'"
.,
.,
.,
'"
N
~
.,
.,
.,
.,
o
'"
N
g:
.,
.,
.,
'"
'"
.,
.,
o
'"
N
g:
.,
.,
.,
'"
'"
.,
o
.,
'"
N
g:
o
o
'"
'"
'"
.,
.,
o
'"
N
g:
o
o
~~~~~~~re~
.D .....: I"-
'" '" '"
., ., .,
-
'"
'"
.,
'"
'"
.,
~~~~~~~g~
V'l V'I '" LI"I
o <:) 0 :0
g:
'"
'"
~
'"
N
N
":
N
'"
.,
:8
~
N
'"
'"
.,
'"
~
'"
'"
g:
0:
.,
.,
'"
'"
'"
'"
o
"l
~
'"
'"
N
....
'"
'"
.,
.,
'"
'"
....
'"
.,
'"
~
'"
'"
'"
'"
'"
.,
'"
'"
'"
'"
~
.,
-
'"
~
'"
~
N
....
'"
'"
.,
~
'"
...;t 0..... o.....,.,;:! 0.. N
..,.~ :aLl'\~ ~-4"
o~C;~;S3:og
00<:) 0
.,
Q. '"
s: 0
::>
~
~u~:gs:~
lI'\ 5 '" CO ,., r-.:
co <ccooo-co
NOlI:: N ,..,
., - -
>-
Z
-11-
~~~~~
...... V'l"': ""'...;t
CIO"'~ ,..,
;:! ~
~
.,
.,
.,
.,
'"
N
~
'"
'"
~
.,
~
....
"l
.,
"l
~
'"
'"
.,
'"
'"
.,
'"
'"
'"
.q-
\~
<:!'J
..
\)
II
,,~
~I<r
c .
CIS
\\\
~
+-
N
~
~
~
I,
\J\
\J\
~
\II
III ~
\.l III
-Z
<t
""-
I-
T.
\\l
.J
..I
<l.
:\
\:l
~
'::l:
I~J"
\>1..1
~~
<J~
I(\~
III
Ill:!:
y
:l
>l'
'J'
<l:
'V
4"\
. '
!I
~
11
I
I
I
11
I
,I
I
11
j
11
t
11
I
11
\
11
;
I
!I
I
1
II
;
:1
il
II
c
~\ ~
UJ
... .
- .
II ~
~ '
- to
~ "''&J I
... ~
j .3
...,
. ...
. ...
<): t 1~
...-
, "" ~ c,
..... -
~~ ......
,p.~ 0
-Qa lr
~-
<l:
.(.) ."
Z 0
W CO)
~ CO)
~ N
I-
ID (.)
:::l. <
...J a:
(.) I-
~(I)
/II."
wZ
a:w
(.)2:
C"
oG:
0<
~~
~~ ~
oJ -
Z
Q:
.0.
LL
:J
<(
u'
~
I '
L-
..,c.b.
),c,lJ;. t
(vi - of''''
II- ~o
0,00 :1 -.1; .
le'p"~'
Q,oO
~
I. is .:<:1.. ,.-..
~;::::::::.-)
-----/
(t13S0dO'tld
\~\' \
r, \
_) \ l_~~_~\f~~
.-: avo~ v~v~oW- \ \ 7'13--::'--
_..,...-__- '\ U SOd-
\ \ O~d
I ZZ-\:::::-
'^
...;
"
()
~
~
I
'^ vi
Il:
'J1,j
tl' ~
IlI\ ~
\j\
" II
r-.
l:'-
.J
::\
'-'
)-
l-
J
(
S
~dl
III
'Z
.J
*
t?'{OtI!./V1 t?~AfN &4I'ACffj ~
CIIC-c./A. 1...141100</$
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'Wp.. I ~t1"Bei1l.."William "Rbst C&c5'-ssociates
i. PROFESSIONAL ENGINEERS. PLANNERS & SURVEYORS
, 28765 SINGLE OAK DRIVE. SUITE 250 . RANCHO CALIFORNIA. CA 92390
I (714) 676-8042. (714) 676-7240
JOB
SHEET NO
CALCULATED BY
CHECKED BY
SCALE
OF
-?JZ;~ OMltV rA-rrrcrr( U!{.I!tA-I-A!ivtlS
:1... t:IleCjC- C.,q'l. Of- (8 II t!.c..f'. .
(utJ(;. 'pi)
~ t-IC-r:;N7-'1'i.e CON?!
CaNlI'^i6~ Ilw-i /f/-G.zS
W.<?f?G.
14- -1&
:1f.
c.r/tu.t::- CA--(.
1'0" C..t'),f.
Or'"
Bill $1:
*' e)(.lS-rG. 1::3" C..M. r. "'-;<-rOlO,z;:>
/0 Pil( Sl.."f/6 Or 0<11 s-r.
II-'l/"e.-. 'toLf. ~ . % flgre..
(/.ox. 0/ ).,. -ft:? 'fo " '1(,.00 INV.
LI...~ qr,-,o,", I((V.
1If. r)e.St'rN ~e~'o Irll.-ef f've. 6.4<;r6,u...y
f,fl!. .
((y
po:: ~ I. tf.e..6. 'f He:I/PWIf/1
DATE
/Vi8.l:.>
l(l:fv. "
-Z.!3
41-' CIMtL-r ~ ;f.5,1:) - <?"''''J(. -=- /4-
~r:s.
M4J,.
('1,(1/.
hf(l-i ~NP-IO'l~.B
II'/V€1-1 - /0'10.$
8.3
f'a cUot.c.-r z./t.c.l'.) .o......x' f;Oc.;::,. 01<-
~.
- 1....-
DATE
t(.~i?:.? ~/t? ~ Cr$
MAt. /?en>> f"Ii'" -
1
..". eXISt'" IfN6f!..,-
~ :; lj. -:./.87
t7 I.r:;
f/tfp-= 8;%:$ ': ?,~Z.
I
I I
I
I 1: %
~ N ~ Z
0
3 <
~ \I :E
~
I 0 0 }. l'- 0
w z z ~
" € '" r:!: Q. ~
< W W
Q. " " ~ "
~ < < Z
Q. Q. <
., " ~ W 0
I ~ ~ ~ 0
~ "
0 z
-J (!) <
;:::
~ ~ x 0 <n 0
~ 2 tt& 2 ~
I " of' 0
~ 1.:- <
0 \ ~
~ '"
~ > 0 > 0
)( () w ~ w ~
~ \~ ~ ~
~ 0 w .. w 0:
I ~ '"
<n ~ <n 0
~ -.l " :> :>
~ ...
" ~ '- ~
z
I ~ ~ 3
<n t:l ~ <.
~ ~ "-
z ~J
~ ~
N oJ.
~ ~ .
I ~
z ~g
~
w ~
<> ... ...
~ <n ... " ;;
~ Z N ~ Z
W " ~
Q. Z Q. Z ~ ~ ~
I ~ z > <> ;: .... < u <n
< ~ "' ~ <
'11'\ % C, Q. <n <> w ~ Q. ~
.0 u z .... ....
,~ ~ ~ 0 < ~ <>
u ~ => ~
~ <> ~ <
W N ~ W Q. % U
~ ~ < .... u .... ~
I u < '" % ....
~ 0 ;!; 0 z
0 w ., <n w
~ ~ ~ ~ .... < ~ :E . . .
Q. N .... ~ :> w .... .... ....
=> ~ u u u
w .... '" ~ w w w w
u <> 0 w <n <n <n
< " < ~ ~
~ w .... 0 ~ . .
I '" <n <> w '" ~ < w .... 0 .... 0 .... 0
=> < ;; ~ > ~ '" .. '" ~ '" ~
<n '" < ~ w w w
~ ~ " ~ > 0 > 0: > 0:
'" 0 z z 0 z '" z z
w '" '" '" z 0 '" <> 0 0
.... "' 0 Q. 0 " ~ Q. ~ ~ ~
~ .... .... ~ ~
" "' w <n 0 w 0 0 0
I " :E U ~ W .... U . 0 . 0 0
< < < <> < z z z
w ~ u <> ~ ~ 0 ~ 0 ~ 0
% <> '" .,; w ~ 0 :0 <n :0
=> 0 <> => .... .... '" ....
<n % ~ Z <n < < '" <
'" u w .... .... .... 0 ....
w '" z 0 .... '" w <n <n :> <n
0: % W < 0 x w ~ <>
.... .... '" ~ w .... .... <
I <> ~ ~ a w
w ;; < < % <
> .... .... ....
< :E < < :E <
w <> % <> W <>
.... u ....
0 0' <n <n < <n <n V>
'" ~ .... w .... ~ ....
w <n => '" => <n =>
I <> 0:
z 0' <n <n < < <
<n <n ~
w N ...
Z Q.
% >- .. co 0 0 N ...
U .... " z z
I "' w w
.... " z z 0 0 0
u c, z z z
w " -. ~ ~
0' .... .... ....
c, " " z z z
" ~ z w w w
<> w :E :E :E
Q. 8 <> <> <> w w w
< <> c, < < ~ ~ ~
I u co u "' w w w w w
" % %
~
I - /4--
I
I
I
I ~ .
0- ~ ~
'" .
> . -J
< .
. 0
~ .
I w 0 w . 0 0
'" z .
< 0- .
U 0- . 0 lfI
0 . 0 0
~ ~ . ~ ~ ~
+ N N . ~
.
> . \l..
:; .
I 0 . 0 0 ~
.... . ~ ~
" w z .
'" .
> < ~ . ~ \j
w '" .
~ .
~ . t'-I
. '" 0 ~
I "? .... . ~ ~ ~ '^
~ ~ .
. ,. :> '" . ~ ~ '\
. t' : 0 .
. . ",' . ~
. '. : . \1 U
. ,. 0 ~ .
. '. '" 0- . '"
. . . :> w . '" " ~
I . ,. 0 0 . ~ ~ .,;
. ,. : .
. . . :E . --. ~ \J
. ~. . Z '" . " ;
. '1lI.. 0 . "-
. ,+-"i1 Z . ~I~
. ~, . Z ~ . \1
. ''-'il ~ < . a- a-
. . U . u : . ~ N.\l
. o. . ~ ~ . N N ~
I . ~.. ;; ~ 0- . ~
. ~.. w . ~
. i<'" w '" Q . -.: t
. '. ~ U .
. ,.. . w . ~
. .. . i-
. .~ . ~ ~ . 0 0
. ~ . '" '" w > . ~ ~ \JI 0
. 0.. w Z 0- W . \.-.
I . ,1...,. > => ~ . 0
. .~ . Z ~ '" w . ~ ~ ():
. ilfi . '" .
. . .
. . '" ~ . "- ~ ~
. . ~ >- .; . a- N ;! ~
. .. < w '" . ~ ~ \l..
. .. => ~ '" w ~ . "
. 13 . 0 ~ w .; : . cJ. ~ g: \\
. . W 0- ~ '" Z .
I . . ~ 0 '" w ~ . '" ;;! "- -i
. .C' . ~ ~ '" '" '" . ~
. . 0 ~ 0- Z N . Ii ....
. ,'~ . '" ~ . ~
. . Z ~ W ~ ~ w . "- '" "-
. '" . < U ~ < U '" > . a- '" a- -,;
I . . : < '" < ~ < < . ~ '" ~ "'t
. ~ . ~ ~ 0 w '" w w . a- III
i . .~ . ~ Z ~ .~ > : ~ . 0
I . ell . '" => 0 < '" . ~ j
. . '" '" U ~ => .
. 0 . w ~ . 'll
. ~ . ~ '" W 0- : .
. . w ~ u ~ . :8 :8
. . '" ~ < ~ ~ .
. ~ . < ;!; : w . \J\
. .0 . :> '" > . ~ ~
. ~ . Z ~ a, < . ~
I . " . w ~ .:> .
. . > => .
. ~ . ~ >- .
. ~ . '" 0 0 .w . '" ~
. '8- . 1!i ~ ~ . VI
<< . Z ~ . '" 0
. '~ . 0 '" il ,< 0 . ~ t/'
<< ~ . .o. . 0
<< ,e. . ~ ~ ~ .
<< . ;; ~ '" . -.}
I << .~ . Z ,Z .
. ~ . w ~ z 0 .
. ~ . ~ 0 '" .~ .
. % . W ~ ;;; . 0 "- \j
. ~ . 0 . 0 :z
. ,~ . w ~ w ~ .,; > . '" v
. 0 . U < 0 w . ~ .; 1
<< ~ . < u 0 :2 ~ .
. ~ . ~ 0 ,,; w w . a- a- ~
I . . ~ .0 . ;;! '"
. . => : >- ,Z .
. .c . '" u .w .
. ~ . z '" ~ .
~ < '" ,x 2: . '" "- ~
w ~ w : . '" ~
~ ~ ~ . '" ~
:!i 0- ~ . ..:
w . '"
'" ~ .
I 0 .
.
. . '"
. ~ . '" '"
~ > . ~ N ~
N W W .
> ~ 0 . '" '" 0:
0 z w '" . g; '"
. ;;!
I z .
'" .
.
z . '" '" '"
z z . '" '" '"
~ :E .
'" W . '" 0 '"
.:!i ~ ~ . ;;! :0
< w . ~
I ~ .... .
., '" ~ . 5\
" .
I -II? -