HomeMy WebLinkAboutTract Map 3883 Lot 255 Update Field Density Testing
.
Update
REPORT of OBSERVATION
and FIELD DENSITY TESTING
for RESIDENTIAL GRADING
Lot 255; TR 3883
APN: 919-190-011
LDOO-093GR
.
Original Report Dated: December 15, 2000
This Report Dated: July 24, 2001
Prepared for:
Mr. Michael Brewer
28465 Front Street, Ste. 313
Temecula, California 92590
909/699-6868
Prepared by:
Gunvant Thakkar, P.E.
45712 Classic Way
Temecula, California 92592
909/676-7541
-w.. ~
L-o\' 2~
\
.
.
GUNVANT THAKKAR,
PROFESSIONAL ENGINEER
45712 Classic Way, Temecula, California 92592 909)676-7541
July 24, 2001
Mr. Michael Brewer
28465 Front Street, Ste. 313
Temecula, California 92590
909/699-6868
RE: Compaction Testing Report Update
Lot 255; TR 3883
APN: 919-190-011
LDOO-093GR
Dear Mr. Brewer:
In accordance with your request, we have prepared this compaction report for the subject property.
The report represents a summary of the observations and compaction testing of the fill placed on
the proposed grading pad. Field testing and observations indicate the compaction and grading of
the soil was performed properly. The soil should perform satisfactorily for the expected usage. The
included findings and recommendations have been derived in accordance with generally accepted
professional principles and practices in the fields of soil mechanics and foundation engineering.
This warranty is in lieu of all other warranties, either expressed or implied.
z..
.
.
INTRODUCTION
In accordance with your request, tests have been performed on the fill placed on the rough graded
residential pad. The excavation, fill placement, compaction and testing associated with this phase
of the grading was performed during November 16, 2000 through December 1, 2000. This report
presents a summary of the testing services provided.
PROJECT DESCRIPTION
The site will have a single family residence with attached garage constructed on it with associated
landscaping and access drive. This structure could consist of a one or two story, wood framed
residence founded on a continuous perimeter footings foundation system.
GRADING PROCEDURES
The observations and test results indicated that the grading was performed in the method
consistent with the U.B.C. as amended by Ordinance 457. All areas to receive fill were stripped and
cleared of vegetation and soft soil prior to placement of soil fill.
Keying and benching into natural ground was completed in general compliance with the Uniform
Building Code, Appendix Chapter 33.
The minimum acceptable degree of compaction was 90 percent of the maximum density.
FIELD DENSITY TESTING
Field density testing was performed in accordance with ASTM D1556-64 (Sand Cone Method). The
results of the field density tests are presented in Table I of this report. The approximate location of
the tests are shown on the Plot Plan, Plate 1.
MAXIMUM DENSITY DETERMINATIONS
Maximum density / optimum moisture determinations were made from representative samples of
on-site soils used in the fill operations. The tests were performed in accordance with ASTM D1557-
78 Method.
..3
.
.
LIMITATIONS
The findings and recommendations of this report were prepared in accordance with contemporary
principles and practices in the field of geotechnical engineering. No other warranty or guarantee is
either expressed or implied. Only a portion of the subsurface soils and conditions were evaluated or
observed and the conclusions are based upon an interpretation of the soils conditions encountered
in the field tests. Conclusions are also based on the assumption that these findings do not vary
appreciably in the adjacent areas. However, minor variations may occur: should soil conditions
significantly different be encountered in the future, an assessment of the impact on subsequent
recommendations should be made.
All future grading and fill placement should be performed under the inspection and testing of a
registered civil engineer.
SUMMARY
Our description of grading and backfill operations, as well as testing services, were limited to those
grading operations performed during November 16, 2000 through December 1, 2000. The
conclusions and recommendations contained herein have been based upon our observation and
testing as noted. To the best of my knowledge, the work within my area of responsibility is in
accordance with applicable provisions of U.B.C. as amended by Ordinance 457.
Due to periodic site inspections and testing, footing excavations should be inspected by a registered
civil engineer prior to concrete placement to verify proper embedment entirely into competent soils.
RECOMMENDATIONS (As no additional grading appears to have been done on this property, the
following previously~made recommendations remain the same.
1. A minimum of three-feet over-excavation has been performed five feet outside proposed building
limits to ensure a uniform blanket of a minimum of 90 percent compaction under structures.
2. A safe allowable bearing value for foundations embedded a minimum of 12" below lowest
adjacent grade into competent ground is 1,500 psf. Continuous footings should have a minimum
width of 12 inches. The isolated column footings should have a minimum embedment of 18
inches below lowest soil grade.
3. All. concrete slabs on grade should be 4" thick. They should be underlain by 3" of sand or gravel.
Areas that are to be carpeted or tiled, or where the intrusion of moisture is objectionable, should
be. underlain by 6 mil visqueen properly protected from puncture with an additional 1 " of sand
over it. This arrangement of materials would result in a profile downward of concrete, 1" of sand,
6 mil visqueen, 3" of sand and subgrade soil. Contractors should be advised that, when pouring
during hot or windy weather conditions, they should provide large slabs with sufficiently deep
weakened plane joints to inhibit the development of unsightly and irregular cracks.
~
.
.
4. All footings for single story construction shall be a minimum of 12" in width and 12" in depth,
measured below the lowest adjacent compacted or firm grade. For two story construction, the
footings shall bea minimum of 15" in width and 18" in depth. All footings shall incorporate a
minimum of one # 4 bar running continuously through the footings. The bars shall be lapped a
minimum of 30 bar diameters and shall be placed approximately 3" from the bottom. All footings
shall be extended to a depth sufficient to provide a minimum setback from the bottom of the
footings to the daylight in any adjacent slope in accordance with U.B.C.
5.
:S
.
.
GUNVANT THAKKAR, PROFESSIONAL ENGINEER
45712 Classic Way, Temecula, California 92592 (909) 676-7541
Mr. Mike Brewer
Maximum Density Optimum Moisture Content
(pct) (%)
127.0 10.8
Eleva-
Tion
(Feet)
Max.Dry
Density
(pcf)
Water
Content
(%)
Dry
Density
(pcf)
Relative Method
Compac-
tion (%)
1. 1219 127.0 10.2 115.6 91 SC
2. 1220 127.0 10.5 116.9 92 SC
3. 1221 127.0 10.8 114.3 90 SC
4. 1223 127.0 10.9 118.1 93 SC
5. 1224 127.0 10.2 116.9 92 SC
6. 1225 127.0 9.8 118.1 93 SC
7. 1227 127.0 9.9 114.3 90 SC
8. 1226 127.0 10.2 115.6 91 SC
9. 1230 127.0 10.3 118.1 93 SC
10. 1232 127.0 10.4 116.9 92 SC .
11. 1333 127.0 10.5 115.6 91 SC
12. 1232 127.0 10.2 116.9 92 SC
13. 1233 127.0 10.8 114.3 90 SC
14. 1235 127.0 10.2 116.9 92 SC
15. 1235 127.0 10.1 116.9 92 SC
16. 1235 127.0 10.3 116.9 92 SC
"
.
?tl
~
~
....
()
:t:.
~
\~
......
i~
J~
(~
\~
,
~ATE: I 2-- ~:.-OO' !
~
---
lJ1
YNcj? R~.:.---
&
I"'
J>,
~
~
~
~
\.
.1'\
t-
~
.c..
.
~
.{:;
01
~
I
T
--_/
t7r-e ,.;" r; ;1;1, ( e--
SiTE LOCATION PLAN fPiATE: I
-.---
-
1
.
.
---
.---'~~..~.
-~
....... #/.,.
~i" P?/
---..
-~
fl.J /:/{
___jc; D~
---~-~-
'-. --.
~ .
"
',-
-,~
'-
~'1
oVER. IE)('. Lp>1i71
;;JrnS'
'J .
~~
4t1
"
. .
. :-.
.
;:c
-~~I-I
, ...
\
LOz- '01'/ .~
IJ?Idd/:l AM<l ';7;
l'
------ ----
-;atJiiOJ
LEGEND
~ APPROXIMATE TEST LOCATION
DATE: 1z..-I5'-oo
TEST LOCATION
PLAN
gv€wey,ih: te
PLATE: '7
8
.
....". TR3@S3
hW"'i~ Le"r .G<tt:,
RECEIVED
FEB 9 1999
CITY OF TEMECULA
ENGINEERING DEPARTMENT
PRELIMINARY SOILS STUDY
AND
COMPACTION TESTING OF EXISTING PAD MODIFICATIONS
Purpose: Final compaction testing and approval of
grading operations to the existing building
pad located at 31260 Calle Felicidad,
Meadowview Subdivision, Temecula
Owners: Gary and Martha McKay
41821 Calle Cabrillo
Temecula, CA
(909) 699-4692
Le gal:
Lot 296 of Tract 3383, A.P.N. 919-240-006
Job No. F99-16B
February 1, 1999
~
.
TABLE OF CONTENTS
INTRODOCTION. . . .
SOIL PROFILE AND LABORATORY TESTING
EXPANSION TEST.
Expansion Test Results
FIELD COMPACTION TESTING. .
Relative Compaction Test Results
ALLOWABLE SOIL BEARING VALUES
Square or Continuous Footings.
FOOTING REINFORCEMENT
FLOOR SLABS .
MOISTURE BARRIER.
UTILITY TRENCHES.
DRIVEWAYS AND PARKING AREAS
PROPOSED PAVEMENT DESIGN.
DRAINAGE AND SLOPE PROTECTION
CONCLUS IONS
PLAN. . .
.
1
1
2
2
2
3
3
4
4
5
5
5
5
5
6
6
Enclosed
\0
.
.
Job No. F99-16B
February 1, 1999
Page 1
INTRODUCTION
The purpose of this soil study is to complete the compaction
testing of the existing building pad after the lowering of the
pad elevation by approximately one (1) foot.
The excess fill was
used to widen the driveway area and to enlarge the pad egress
approach.
Maximum density determinations were made on the clean,
structural fill soils used for the building pad and driveway
area construction.
All subsequent relative compaction testing
equalled or exceeded the required 90 % values.
SOIL PROFILE AND LABORATORY TESTING
The structural fill soils used in the pad construction
consist of tan-brown micaceous fine sand and silt with some
medium and coarse sands.
These soils are derived from decomposed
granodiorite bedrock which is widespread throughout the Temecula
area.
Maximum density determinations were made on these fill soils
as accepted by the Uniform Building Code and the county of
Riverside grading ordinances.
The maximum density determinations
were made in accordance with A.S.T.M. D1557-70T, modified to use
25 blows on each of five layers with a 10-lb. hammer falling
18 inches in a mold of 1/30 cubic foot volume.
Soil Type A:
Tan-brown micaceous fine sand and silt with
some medium and coarse sand, derived from
decomposed granodiorite; Maximum Density
120.0 p.c.f. at 9.6% Optimum Moisture.
\\
.
.
Job No. F99-16B
February 1, 1999
Page 2
EXPANSION TEST
The results of an expansion test performed on the remolded
sample of the typical soils are as follows.
This sample was
compacted to over 90% and set up to be equal to 50% saturation,
and then measured to full 100% saturation after a period of
several days and until no further expansion occurred in a 24-
hour period in accordance with Table 29-C of the Uniform Building
Code.
Expansion Test Results
Soil Type
Confining Load
Expansion Index
% Expansion
A
144 p.s.f.
5
0.5
These granular soils used in the grading operations exhibit
low to ve'ry low potential expansion.
Test results indicate a
minimum seasonal volume change resulting from moisture variations
in this soil type.
FIELD COMPACTION TESTING
The relative compaction tests shown below were taken at
depths ranging from -0.5 feet to -2.0 feet, measured from the
final finished pad grade elevation.
fill areas were retested.
All critical and additional
(Compaction test results follow, page 3.)
\2-
.
.
Job NO. F99-11B
January 4, 1999
Page 4
foundation soils that are involved in proximity to the proposed
new footLngs, utilized a controlled rate of strain of .050 inch
per minute under varying normal loads.
The test results calcu-
lated graphically to an angle of internal function of 320 with
150 p.s.f. available cohesion.
Utilizing the Terzaghi Bearing
Capacity Equation with a safety factor of 3.0, the following
calculations have been determined:
q
=
CNc + wDfNq + wBNw
= 100(23) + 100(1.0)18+100(0~5)14
= 2300 = 1800 - 700
= 4800 p.s.f. (ultimate)
Square ~ Continuous Footings
qa = 1600 p. s. f. (allowable for square or continuous
footings 12" wide and 12" deep);
qa 1900 p.s.f. (allowable for square or continuous
footings 121' wide and IS" deep);
qa 2100 p.s.f. (allowable for square or continuous
footings 18'1 wide and 1811 deep); and
qa = 2300 p.s.f. (allowable for square or continuous
footings 24" wide and 18" deep).
FOOTING REINFORCEMENT
We recommend one horizontal #4 steel bar as minimum rein-
forcement for all continuous bearing footers.
All excavated
footing trenches should be kept moist prior to pouring.
\3>
. .
Job No. F99-16B
February 1, 1999
Page 3
Relative COmpaction Test Results
Test No. Date Soil Depth Dry Dens. Field Maximum
Type (ft.) (p.c.f.) Moist. Compaction
(%) (%)
S-l 1/29 A -0.5 113.6 9.2 95
S-2 1/29 A -1.0 114.1 9.0 95
S-3 1/29 A -0.5 112.3 9.S 94
S-4 1/29 A -1.5 114.7 7.0 95
S-5 2/1 A -1.0 116.5 6.7 97
S-6 2/1 A -2.0 115.S 7.S 96
S-7 2/1 A -1.5 116.9 7.6 97
S-S 2/1 A -0.5 115.2 7.9 96
S-9 2/1 A -0.5 114.0 7.7 95
S-lO 2/1 A -1.0 114.1 7.5 95
S-l1 2/1 A -1.0 117.3 6.3 96
S-12 2/1 A -1.5 113.9 7.3 95
S-13 2/1 A -0.5 114.0 6.9 95
ALLOWABLE SOIL BEARING VALUES
The typical earth materials on the site were procured for
laboratory analysis and, based on saturated direct shear tests,
an allowable soil bearing pressure was determined. The results
of laboratory analysis and direct shear testing on the typical
\~
.
.
Job No. F99-11B
January 4, 1999
Page 5
FLOOR SLABS
Minimum floo~ slab reinforcement would be 6" x 6" -'10/10
wBlded wire mesh or the equivalent.
As an alternate to mesh,
#3 steel bars could be placed on 20 to 24-inch centers each way
.and centered vertically within the slab.
MOISTURE BARRIER
A 6-mil visqueen moisture barrier is recommended beneath
all living area floor slabs; the barrier should be lapped at all
joints.
UTILITY TRENCHES
All underground trenching and/or excavations within the
building pad area should be properly and thoroughly recompacted
using optimum moisture and appropriate compacting (90%).
DRIVEWAYS AND PARKING AREAS
All trenches in the subgrade area must be properly back-
filled, (I-foot vertical lifts) and compacted, resulting in a
firm, compact, uniform surface.
PROPOSED PAVEMENT DESIGN:
SURFACE
SUB-GR!\'DE
COMPACTION (%)
SUB-GRADE
MATERIAL
COMPACTION
METHOD
Concrete
95
Native Soil
l'Iheel-roll
Asphal t
90
3/4" base (4")
l-lheel-roll
\-)
.
.
Job No. F99-15B
February 1, 1999
Page 6
DRAINAGE AND SLOPE PROTECTION
All slopes should be planted with a deep-rooting ground
cover which can be maintained with minimum irrigation a
Burrowing
rocents should also be controlled to prevent excessive soil
saturation and subsequent slumping.
All drainage waters should
be diverted from structure~ and fast flowing runoff should be
controlled by "damming" or "puddling".
CONCLUSIONS
All compaction testing in these newly graded areas indicate
relative compaction values equal to or exceeding the required
90% relative compaction minimum values.
Allowable bearing values
are in accordance with the information presented in this report.
We are prepared to explain any portion of this study, and we
thank you for this opportunity to be of service.
Respectfully submitted,
ENGINEERING VENTURES
~-t- v-0. _I!-_ .
(/~ - --
Peter H. Buchanan,
Geological Engineer, M.S.
R.C.E. 45687~\rL~
,/ 0\,U ,-,,, ,:; './
. 0, \ ~- __' i(
in..\-v ,?\\ F. 10, '... ,-S.\
v(........~ Q'v <.." . ".. \
,<..J ^ '.'
..... "':::..V Or _ \
. c.., .... . '._ \
-...; '{" ,,~.
: ~ '" No. C 045687. c.' ) S; I
\ k Exp (;Z.~3(-t)2-), f~
. 0;.,. C /,,1 '. \:/ .'\,\ /
",Ji-.-- -0"'" \~
'.' ("II . \ '\ .... ..."/