HomeMy WebLinkAboutTract Map 3883 Lot 153 Field Density Testing
.
REPORT of OBSERVATION
and FIELD DENSITY TESTING
for RESIDENTIAL GRADING
Lot 153; TR 3883
APN: 919-131-005
Temecula, California
LD01-069GR
July 24, 2001
Prepared for:
Mr. & Mrs. Tim Hilt
41308 Yuba Court
Temecula, CA 92590
(909) 676-2979
Prepared by:
Gunvant Thakkar, P.E.
45712 Classic Way
Temecula, California 92592
909/676-7541
.
l'il. ~"..,.
I-\t), \~
\
.
.
GUNVANT THAKKAR,
PROFESSIONAL ENGINEER
45712 Classic Way, Temecula, California 92592 909)676-7541
July 24, 2001
Mr. :&.Mrs. Tim Hilt
41308 Yuba Court
Temecula, CA 92590
(909) 676-2979
Project:
Compaction Testing
Lot 153; TR 3883
APN: 919-131-005
Temecula, California
Dear Mr. and Mrs. Hilt:
In accordance with your request, we have prepared this compaction report for the subject property.
The report represents a summary of the observations and compaction testing of the fill placed on
the proposed grading pad. Field testing and observations indicate the compaction and grading of
the soil was performed properly. The soil should perform satisfactorily for the expected usage. The
included findings and recommendations have been derived in accordance with generally accepted
professional principles and practices in the fields of soil mechanics and foundation engineering.
This warranty is in lieu of all other warranties, either expressed or implied.
Z-
.
.
INTRODUCTION
'\.-1
In accordance with your request, tests have been performed on the fill placed on the rough graded
residential pad. The excavation, fill placement, compaction and testing associated with this phase
of tlile grading was performed from May 30 through June 28, 2001. This report presents a summary
of the testing services provided.
PROJECT DESCRIPTION
The site will have a single family residence with attached garage constructed on it with associated
landscaping and access drive. This structure could consist of a one or two story, wood framed
residence founded on a continuous perimeter footings foundation system.
GRADING PROCEDURES
The observations and test results indicated that the grading was performed in the method
consistent with the U.B.C. as amended by Ordinance 457. All areas to receive fill were stripped and
cleared of vegetation and soft soil prior to placement of soil fill.
Keying and benching into natural ground was completed in general compliance with the Uniform
Building Code, Appendix Chapter 33.
The minimum acceptable degree of compaction was 90 percent of the maximum density.
FIELD DENSITY TESTING
Field density testing was performed in accordance with ASTM D1556-64 (Sand Cone Method). The
results of the field density tests are presented in Table I of this report. The approximate location of
the tests are shown on the Plot Plan, Plate 1.
MAXIMUM DENSITY DETERMINATIONS
Maximum density 1 optimum moisture determinations were made from representative samples of
on-site soils used in the fill operations. The tests were performed in accordance with ASTM D1557-
78 Method.
-3
.
.
LIMITATIONS
The findings and recommendations of this report were prepared in accordance with contemporary
principles and practices in the field of geotechnical engineering. No other warranty or guarantee is
either. expressed or implied. Only a portion of the subsurface soils and conditions were evaluated or
observed and the conclusions are based upon an interpretation of the soils conditions encountered
in the field tests. Conclusions are also based on the assumption that these findings do not vary
appreciably in the adjacent areas. However, minor variations may occur: should soil conditions
significantly different be encountered in the future, an assessment of the impact on subsequent
recommendations should be made.
All future grading and fill placement should be performed under the inspection and testing of a
registered civil engineer.
SUMMARY
Our description of grading and backfill operations, as well as testing services, were limited to those
grading operations performed from May 30 through June 28, 2001. The conclusions and
recommendations contained herein have been based upon our observation and testing as noted.
To the best of my knowledge, the work within my area of responsibility is in accordance with
applicable provisions of U.B.C. as amended by Ordinance 457.
Due to periodic site inspections and testing, footing excavations should be inspected by a registered
civil!engineer prior to concrete placement to verify proper embedment entirely into competent soils.
REGOMMENDA TIONS
1. A minimum of three-feet over-excavation has been performed five feet outside proposed building
limits to ensure a uniform blanket of a minimum of 90 percent compaction under structures.
2. A safe allowable bearing value for foundations embedded a minimum of 12" below lowest
adjacent grade into competent ground is 1,500 psf. Continuous footings should have a minimum
width of 12 inches. The isolated column footings should have a minimum embedment of 18
inches below lowest soil grade.
3. Allcancrete slabs an grade shauld be 4" thick. They shauld be underlain by 3" .of sand .or gravel.
Areas that are to be carpeted or tiled, or where the intrusion of moisture is objectionable, should
be underlain by 6 mil visqueen properly protected from puncture with an additional 1 " of sand
over it. This arrangement of materials wauld result in a profile downward .of cancrete, 1" of sand,
6 mil visqueen, 3" .of sand and subgrade sail. Cantractars shauld be advised that, when pouring
during hot or windy weather conditions, they should provide large slabs with sufficiently deep
weakened plane joints ta inhibit the development of unsightly and irregular cracks.
A...
.
.
4. All faatings far single story canstruction shall be a minimum of 12" in width and 12" in depth,
measured below the lowest adjacent campacted or firm grade. For two story construction, the
faatings shall be a minimum .of 15" in width and 18" in depth. All foatings shall incorporate a
minimum .of one # 4 bar running cantinuausly through the foatings. The bars shall be lapped a
minimum .of 30 bar diameters and shall be placed appraximately 3" from the battom. All footings
shall be extended ta a depth sufficient ta provide a minimum setback from the battam of the
footings to the daylight in any adjacent slope in accardance with U.B.C.
5.
"'5
.
.
GUNVANT THAKKAR, PROFESSIONAL ENGINEER
45712 Classic Way, Temecula, California 92592 (909) 676-7541
Mr. & Mrs. Tim Hilt
Maximum Density Optimum Maisture Cantent
(pcf) (%)
130.5 9.0
Eleva-
Tion
(Feet)
Max. Dry
Density
(pcf)
Water
Content
(%)
Dry
Density
(pcf)
Relative Method
Com pac-
tian (%)
1. 63 130.5 9.5 120.1 92 SC
2. 61 130.5 9.2 118.8 91 SC
3. 62 130.5 9.8 120.1 92 SC
4. 63 130.5 9.5 117.5 90 SC
5. 65 130.5 9.1 120.1 92 SC
6. 66 130.5 8.9 121.4 93 SC
7. 66 130.5 9.2 120.1 92 SC
8. 71 130.5 9.8 117.5 90 SC
9. 70 130.5 10.0 117.5 90 SC
10. 74 130.5 10.1 118.8 91 SC
11. 79 130.5 9.8 121.4 93 SC
12. 81 130.5 9.9 120.1 92 SC
13. 85 130.5 9.5 118.8 91 SC
14. 89 130.5 9.2 117.5 90 SC
15. 92 130.5 9.8 120.1 92 SC
16. 92 130.5 9.9 118.8 91 SC
17. 92 130.5 9.8 120.1 92 SC
~
.
.
\
\ cI/Yd'CI ~ :s>-'
\ ~"
J>' .'
~k.
.
!~.
>J&."".
.1>8
..">e \
, ~/
I '"
I
I
I
I
I
,Ill
"-
~\p.
''"
"
Ii::
I
I
I
'<',
,
j \
1(.
~t
--
....
. ,.
f.~
'.
/
I
,
LEGEND
. APPROXIMATE TEST LOCATION
DATE
TEST LOCATION PLAN
1
.
~ . . .
~ ~
q., ~
(>'//1 --
<:
~ <::::
<;(" ,'<::.
~ -l...
"-
'-oJ
<t
~ \..,
l-...: <:
\J ~ '\)
~~ 'oJ ~
\) \;
t,-, <:
~'-
QC'v'I 't
~
.
'(/0' B.Y.N/(
If'
~
-- -
.
DATE
SITE LOCATION PLAN
PLATE 2
~
'"