!REP0RT OF OBSERVATION AND FIELD DENSITY TESTING
ROUGH GRADING
Single Family Residential Development
Lot 19, Tract 3929, APN 921-11Hl04
28920 \1"18 Norte
Temecula, California
PROJECT NO. 22131-01
Feb.ruary 22, 2002
Prepared For:
Mr. Kenneth Murphy
520 Roosevelt Avenue
Corona, California 92879
f
. .
.Earth TAr.hnj~~ P(:,); R,.w AQ10ao,. T........................ .1":' ',...._I:I.___~..:.. ,..."'............
February 22, 2002
Project No. 22131-01
Mr. Kenneth Murphy
520 Roosevelt Avenue
Corona, California 92879
SUBJECT: REPORT OF OBSERVATION AND FIELD DENSITY TESTING
ROUGH AND FINE GRADING
Single Family Residential Development
Lot 19, Tract 3929, A.P.N. 921-111-004
28890 Via Norte
Temequla, California
Reference: "Preliminary Geotechnical Investigation, Lot 19,
Tract 3929, 28890 Via Norte, A.P.N. Temecula,
California", Report Dated September 28, 2001, by
Earth Technics, Proj. No. 21315-01
1.0 INTRODUCTION
This report presents the results of our observation and testing
:performed during construction and grading for the single-family
residential development with attached garage, circular access
:driveway, and appurtenances.
Grading was performed on the north side of Via Norte, an improved
paved road in the city of Temecula. The results of our Field
Density Tests obtained during grading are tabulated in Table I,
Results of Compaction Tests. The approximate locations of the
tests are shown,on the Plot Plan, Plate 1. The 20-scale Grading
Plans were prepared by Lakeshore Engineering, Canyon Lake, dated
April 10, 2001, land were used to plot our data and guide the
grading, along with field staking.
1.1 pro;ectDescriDtion
The proposed development consisted of constructing the house and
attached garage pad, with cut and fill grading. Cuts to a
maximum of 8 feet were made on the south and placed as fill to a
maximum of 12 feet on the north. The access driveway to the main
house was constructed in cuts and fills to a maximum depth of 3-4
feet. The main house pad was designed in cut and fill transition,
and the transition was removed by overexcavation. All cut and
fill slopes ,were constructed at finished face inclinations of 2:1
(horizontal to v,ertical) or flatter.
-z....
INDEX MAP
~?frJ/;rc5:C:jd)d)Vb/lj-3r!4Jr(U /f a""' ,,00 -I .J>-~O'-
~ I" )'0.~ if/VJI"oO J: /---.. . '.' .- / I f=1(;J(
~. ,'f/r;;,~~O?~ C? /~~ "', \.~<. .:c,:,,: 1[)~ ~tV' '100
//o.'I~:OO?:1r3/)q/ 'f/ ......' ~,5':, 0.. ~
? j~ o;!J'V'f"..~:;-! if,~W ~/., ,,;"'.0 . ~ ~;:;?'/0 ~
I~". ~~ 1(1 'I.,;", @ ~\" ri. .~: ~ ~,
,1 ///'~"; 'J 'I. M" ,\.J' ~' "".' '/'~
' - ((<'<@,'L( .:-,,:: 'i ~ ,'g;;> (( c
. (L!"'fi!Jo'~'" '....'. ", '.' /(l :::::;~. ~ v: ,;,/ 'a.e<
) ~~~ A C2 ~.! / o Well}..: <V. j?;?'O;J'- Ps '" ~ '" ","''Ie
~" i7. ( ';;;l , . '. ' b ~ ~ ~F ,;o',...Ji ~
(I :'\.v-:-'- ~ 7fM ,/ ~ /i oo:tl '05' ~ ;7 ~\ ~ "j"
1:1" " 1'(" - ." :~^. ;' t _\N$\~ '" It;) . : /cr-:~2:-....~",~
j / <> ~o~.../ -, "1Ir!J/))) ~/~ , ..y-- ~~r~
~. /;?'l.,..~, . '''"')~ ~.~~~
o."~"~ ". 'V ~,. ~~~
... ". ('.. r_J -.~'V ~~ ~
~~ .. . ). .....;:. J;i.j~' 0dt ,,?~ ~ &6 ~~
' <:l.,.", ~~. C ~ ~).~;;::; J>;l~ 0: ~~l
~ ri' . Q . 'J.
,0 . " :A>> '-'1 ~ .:N ~., ~_ . ~
,0 '. .:, ., .."" ..' o. .~ I rv,..J...... ~. ~~,
"'>>( '.? ff' _ - -<.\;,W /V>i\yJ R:7(~~ ,;;=~
"., ..... -!'1z2.\~ ~ ~~C)O ~ __?? ~(
~{ao> ~.. B ;JfZJm(1!?i) ~~ ff:i~d1.~
~~0 ~~ ~. ....... \),/VQ a ..~&I g~nyo~
...'.:... y ;:~ '0 ;:<.:., Y', ;;, --' ~ ~ ~1 ROAD".)'
~'..":::\ ~.;;:~.~~ ..~ . ":.; ~~~;~~ V~:"O-?rA~~0j
~>-;<\;""~7'''''~ .. ~~~Sl/)Oar~C~'_=<-::"Cl~~~i l
~,",\ ~..'\ .,. /~..~~\ ~.\. ~ .. l'\.l " --' = ~~~ (5(
\/ .,<\, J>.. ','\1 ."~~.:>. /'~~::~'" .c:: ~~~~"~
~;eT" Ranc~t.:'~" __ .... \\ \;I'D. ':'. . ""j'>, .~~~.. ~ III ^ /
}:.~~ri~~o~n~~~\" '; ~ ~ ". "~~ t~=.>\~' / "-. "I'<.' '.,.. r.c~
.~. ".", '. \~ ~~ '1/('/1(~ ~o_ '\ ' \, ""/
,~~\:,' ~'\::/./>( A)~;~'1r~d' ". ~ l,J\'
ld"l~~, 1,.~ ~ ~~,\>: "'" n. ~JP.Ifl;jgI~r:r.II:l:;~~
o
I,
2000
4000
N
I SCALE
INDEX MAP
feel OF
LOT 19, TRACT 3929
28890 VIA NORTE
TEMECULA, CALIFORNIA
- 2 -
S0URCE: U.S.G.S. 7>, MIN. QUAD. t1URRIETA 1953 (1979)
3
22131-01
Page 3
1.2 puroose of Gradinq
The purpose of:the grading was to prepare a building pad for the
1 & 2-story residential house and attached garage, and to provide
driveway access to the pad from Via Norte.
2.0 GRADING PROCEDURES
2.1 Gradinq Procedures
The area of the main house, and the entire alignment of the
driveway, was cleared and grubbed of moderately heavy brush and
weeds and the material removed off-site. The fill on the north
required keys as shown on Plate 1, and the keys were excavated
through the near-surface colluvium to a maximum depth of 3.6 feet
until the dense (relative compaction of 90%+) underlying
,sedimentary bedrock was encountered. The fill materials were
,brought to near optimum moisture utilizing a 2-inch fire hose
,when necessary" and benched as placed to remove all remaining
:soft colluvium. The fill was compacted with a Caterpillar D4H
Ibulldozer. Approximately 750 yards of import material was
I required, which was approved by Earth Technics prior to
:placement.
The main bu.ilding pad was designed in transition from cut to
Ifill, and the transition was removed by overexcavating the cut
portions of the: pad to a depth of 3 feet over the entire pad and
'recompacting.
IThe grading contractor was GSI Grading, Temecula.
3.0 TESTING
13.1 Field Densitv Testinq
Field density testing was performed in 'accordance with ASTM
D1556-64 (Sand Cone Method). The elevations and the results of
the field density tests are presented in Table I of this report.
The approximate, location of the tests are shown on the Grading
Plan, Plate 1.
3;2 Maximum Densitv Determinations
Maximum density/optimum moisture determinations were made from
representative samples of on-site soils used in the fill
operations. The tests were performed in accordance with ASTM D
1557-00 which consist of compacting 5 equal layers of soil in a
1/30 cubic foot volume mold with 25 blows of a 10 pound hammer
falling 18 inches. The results of the Maximum density/optimum
determination are presented herein as Table II, Laboratory Test
Results.
~
22131-01
Page 4
3.3 EXPansion Testinq
A finished grade sample was obtained and tested for expansion
utilizing the U.B.C. 29-2 method. The test yielded an expansion
index (E.I.) of 27 which is low per UBC Table 18-1-B.
3.4 SulfatEI Testinq
A finished grade sample was obtained and tested for water
soluable sulfate. The results yielded a value of 54ppm indicating
normal Type II - 2500 psi concrete maybe used for foundations
and slabs.
,3.5 Settlement
!.
Based on the g~ading performed, the compaction and soil strength
values, total settlement would be less than 1 inch with less than
1/2 inch diffe~ential settlement between footings of similar size
,construction and loads over a horizontal distance of 50 feet.
,3.6 Foundation Recommendations
The main house footings will be founded entirely within dense low
lexpansion engineered fill. Accordingly, the structures may
iutilize continuous or isolated pier footings with an allowable
,maximum bearing, capacity of 1800 psf for 15" wide footings. All
!exterior footings should be founded a minimum of 12 inches for 1-
:story and 18 inches for 2-story buildings as measured from
,nearest adjacent grades.
This value may be increased by one-third for short term wind and
'seismic loading: conditions.
:The foundation should have a minimum of one No. 4 bar top and
bottom, for a total of 2 bars, as reinforcement. The 4-inch
:thick slab may utilize 6 x 6 -6/6 welded wire as reinforcement. A
'moisture barrier should consist of a 10-mil polyethylene vapor
barrier sandwiched between a 2-inch layer of sand top and bottom
to prevent puncture of the barrier and enhance curing of the
concrete.
-
:::.
22131-01
Page 5
4.0 SUMMARY
Our description of grading and backfill operations, as well as
observations and testing services, were limited to those grading
operations performed between February 5 and 20, 2002. The
conclusions and recommendations contained herein have been based
upon our observation and testing as noted. To the best of our
knowledge, the ,work preformed in the areas denoted, has been
accomplished in accordance with the recommendations of the
referenced report, U.B.C. Appendix Chapter 33, and the City of
Temecula grading specifications, and the requirements of the
regulating agencies and is acceptable for its intended purpose.
,
"
The cut and fill slopes are stable as constructed. The cut slopes
are composed of sedimentary bedrock to a height of 8 feet, and
are stable 'as constructed.
:No conclusions or warranties are made for areas not tested or
,observed. This ,report should be considered subject to review by
'the controlling authorities.
This opportunity to be of service is sincerely appreciated. If
:you have any qu~stions, please call.
~
22131-01
Page 6
Warren L Sherling
Director of Geotechnical Services
I FJ/WLS:ss
iAttachments:
Index Map (2000-scale) - Page 2
Plate 1 - Test Location Plan (In Pocket)
Table I - Results of Compaction Tests
Table II - Summary of Maximum Density Testing
'Distribution: Addressee (3)
1
TABLE I
~~.
RESULTS OF COMPACTION TESTS
JOB 'NO. 22131-01
NAME: MURPHY
DATE: 2/21/02
TEST DATE DEPTII MOI&TURE UNIT DRY RELATIVE SOIL DESCRIPI10N
NO CONTENT DENSITY COMPACfION TYPE
(%) (PCF) (%)
1 2/5/02 1077 0.3 131.1 99.6 A KEY, BOTIOM
,
12 2/6/02 1079 9.8 126.6 96.2 A FILL
:3 2/6/02 1081 8.9 124.6 94.7 A FILL
14 2/7/02 1082 9.1 122.1 92.8 A FILL
. 1
:5 I 2/7/02 1084 10.2 130.5 99.1 A FILL
i6 I 2/11/02 1085 9.8 128.3 97.5 A FILL
,
,
17 ' 2/11/02 1087 10.1 125.2 95.1 A FILL
,
18 ' 2!l3/02 1089 9.1 120.4 93.8 B FILL
19 ' 2!l3/02 1090 8.7 II6.7 90.9 B FILL
10 .2/15/02 1091 9.5 130.4 99.1 A FILL
II 2/16/02 1090 9.8 125.7 95.5 A FILL, OVER-X
12 2/16/02 1091 9.4 128.4 97.6 A FILL, OVER-X
,
J3 2/20/02 1092 6.8 120.4 91.5 A PAD OVER FlNlSH
S~ plan for test locations.
S<C-Sand Cone ASTM 01556-64
*'ITestFailed. See Retest.
OC-OriveCylinder ASTM 02937-71
N-Nuclear ASTM 3017-78
8
TABLE II
Ea1:chnll
;CI
I LABORATORY TEST RESULTS
JOB 'NO. 22131-01
NAME: MURPHY
DATE: 2/21/02
SOIL TYPE . CLASSIFICATION MAXIMUM OPTIMUM
DENSITY (pFC) MOISTURE (%)
A ON-SITE LIGHT BROWN SILTY WITH 131.6 10.2
GRAVEL
B IMPORT YELLOW BROWN SILTY 128.4 10.1
SAND
q