HomeMy WebLinkAboutTract Map 9833 Lot 8 Compaction Report Driveway Paving
. J
.
.
I"R q~
\....c\ g
1\LPINE ENGINEERING
P.O. Box 2155
i\lpine, California 91903
Technical Assistance (619) 445-2024
SOIL ENGINEERING
CIVIL ENGINEERING
Surveyin9
Subdivisions
California Civil Engineer RCE 27697
January 12, 2006
Rob Connors
31011 Jedediah Smith Road
Temecula, Ca.
Dear Mr. & Mrs. Connors;
Subject: COMPACTION REPORT for Driveway Paving
31011 Jedediah Smith Road
Temecula
Lot No. B of Tract Map No. 9833
In accordance with your request, this report has been prepared
to present the results of the field observations and relative
compaction tests performed at the subject site by this firm.
These services were per formed between January 10, 2006 and
January 12, 2006.
SITE DESCRIPTION
The Subject site is an irregularly shaped 3 plus acre parcel of
land locat.ed on the Easterly side of Jedediah Smith Road in the
City of Temecula, California. The house on said property is
located in the Easterly central portion of the parcel
approximately 200 feet from the edge of Jedediah Smith Road.
Prior to the grading operation presented in this report the
grading area was a vacant portion of the property with sloping
terrain of about 5%, with no rock outcroppings in the pad area.
No Existing vegetation exists in the driveway area because of
the prior grading of the existing house is currently under
construction.
\
--~,._.
,
,
'.
.
31011 Jedediah Smith Road
Page 2
January 12, 2006
PROPOSED GRADING AND CONSTRUCTION
This report is to address the compaction of the Driveway and
associated parking. All Grading and trench backfill was
complete prior to this engineers arrival on-site.
FIELD OBSERVATION AND TESTING
Observations and field density tests were performed by a
representative of Alpine Engineering, to verify the Compaction
of utility trench back fill and driveway surface compaction.
The density tests were taken according to A.S.T.M. Test 1556-91
and the results of these tests are shown on the attached plates.
CONCLUSIONS
The following conclusions and recommendations have been based
upon our analysis of the data available from the testing of
the soils compacted on this site. Included in these analysis
are our visual inspection of the grading operation while in
progress, field and laboratory testing of the typical bearing
soil and our general knowledge and experience with the
natural ground soils and compacted fill soils on this site.
1. The soils material utilized for the grading
operation were from existing on-site materials
that may have been imported during the original grading
of the house pad. These materials consist primarily of
Silty, Coarse Sandy D.G.
2. Shallow foundations may be used for the support of
the proposed structure. The footings should have a
minimum depth below Pad Grade of *12 inches for one
story structure and 16 inches for a two story
structure. A minimum width of 12 inches for
continuous footings and 24 X 24 X 18* inches for
isolated footings is recommended.
fF- ~-.~~--:--l-
,
.
.
31011 Jedediah Smith Road
Page 3
January 12, 2006
A bearing capacity of 2000 psf may be assumed for
said footings. This bearing capacity may be
increased by one-third when considering wind and/or
seismic forces. Footings located adjacent or within
slopes should be extended to such that a minimum
distance of seven feet exists between the face of
the slope and the footing. Retaining wall footings
adjacent or within slopes should be individually
reviewed by this office.
3. The concrete slab-on-grade should be a minimum of
5 inches in thickness of 2500 psi mix and be
underlain by a 4 inch blanket of clean Poorly Graded
Sand or Clean Native Material.
The slab or driveway should be reinforced with No. 3
bars @ 24" O.C. in each direction. However, it is
imperative that the rebar be placed approximately at
the middle of the slab. The reinforcement is based on
soil characteristics and is not intended to be in lieu
of reinforcement necessary to satisfy structural
considerations. Where moisture sensitive floor
coverings are planned, a visqueen barrier should be
placed in the middle of a blanket of clean Poorly
Graded Sand or Clean Native Material.
4. It is our understanding that any building will be
constructed utilizing conventional type foundations,
footings and conventional type building materials
in conformance with the Uniform Building Code, 1997
edition.
5. Compacted fill soils that occur within 7 feet of
the face of slope possess poor lateral stability,
even though they have been certified to a relative
compaction of 90 percent or better. Proposed
structures and other improvements that are located
within 7 feet of the face of compacted fill slopes
could suffer differential movement as a result of
the poor lateral stability of these soils.
z.
".~~ '
.
.
31011 Jedediah Smith Road
Page 4
January 12, 2006
6. Therefore, foundations and footings for the proposed
structures or other improvements should be placed
at least 7 feet back from the top of these slopes.
Foundations placed closer to the top of slope than 7
feet should be deepened such that the face of
foundation at the level of the bottom is at least 7
feet back from the face of slope at that level.
7. Adequate measure shall be undertaken to properly
finish grade the site after the structures and other
improvements are in place, such that the drainage
waters from within the site and the adjacent higher
properties are directed away from the foundations,
footings, floor slabs and tops of slopes via surface
swales and subsurface drains towards the lower level
of the building site onto the natural drainage
direction for this area. Proper surface and
subsurface drainage will insure that no water will
seek the level of the bearing soils under the
foundations, footings and floor slabs which could
result in undermining and differential settlement to
the structures and other improvements.
8. Drainage should be maintained such that surface
waters are not permitted to flow over the top of
exposed fill slopes.
9. Water should not be allowed to pond adjacent to
footings. The site should be graded and maintained
such that surface drainage is directed away from the
structures and the top of slopes into swales or
other controlled drainage devices.
10. The results of our test and observations indicate
that the fill soils placed on the subject site have
been compacted to at least 90 percent of maximum dry
density.
3
r
.
.
31011 Jedediah Smith Road
Page 5
January 12, 2006
12. All statements, recommendations and conclusions made
in this report are applicable only for grading
operation which we inspected and are representative
of the site at the time our report was prepared.
The Engineer is not to be responsible for fill
soils placed at a future time or subsequent changes
to the site by others which directly or indirectly
cause poor surface or subsurface drainage and/or
water erosion which could alter the strength of the
compacted fill soils.
If you have any question concerning this letter, please feel
free to call me at your earliest convenience.
Sincerely,
~~~~
Wallace M. Beron
Civil Engineer
R.C.E. 27697
~
,
.
.
31011 Jedediah Smith Road
Page A-I
January 12, 2006
LABORATORY TEST RESULTS
The maximum dry densities and optimum moisture contents of
the fill materials as determined by the A.S.T.M. 1557-91,
Method A, which uses 25 blows of a 10 pound hammer falling
from a height of 18 inches on each of 5 layers in a 4 inch
diameter 1/30 cubic foot compaction cylinder, are presented
as follows:
Soil Description
Maximum
Dry Density
Optimum
Moisture
1. Light-Brownish, Silty
Coarse Sandy D.G.
138.0
7.0
s
,-
,
.
.
31011 Jedediah Smith Road
Compaction/Inspection
Report Continued:
January 12,2006
PAGE "A-2"
TABLE OF FIELD DENSITY TEST RESULTS
A.S.T.M. 1557-91
Soil Elevation Field Moisture Maximum Dry Percent
Test Type Of Fill at % dry Wt. Dry Density Compaction
No. test In Density Lb./ Cll.ft.
feet Lb./ Cll.ft.
I 1 -2 8.7 138.0 133.2 96.5
2 1 F.G. 7.1 138.0 134.6 97.5
.
3 1 -2 9.6 138.0 132.3 95.9
4 1 F.G. 7.8 138.0 134.0 97.1
<e