HomeMy WebLinkAboutTract Map 9833 Lot 16 Field Density Testing c.L,co\o.j )\ -- - v . [ .:) r " REPORT of OBSERVATION and FIELD DENSITY TESTING for RESIDENTIAL GRADING Lot 16; TR 9833 APN: 950-040-015 LD99183GR LDOO-005GR February 1, 2000 Prepared for: Mr. Cecil Stralow 31275 Sierra Bonita Temecula, CA 92592-3100 Phone: 909/302-0199 Prepared by: Gunvant Thakkar, P.E. 45712 Classic Way Temecula, California 92592 909/676-7541 , TABLE of CONTENTS Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 Plate 2 - Site Location Map. . . . . . . . .. ..... .... .... 3 Site. Location and Description. . . . . . .. ..... .... ....4 Proposed Development. . . .. .... ................. 4 Document Review. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Grading and Earthwork Operations. . . . . . . . . . . . . . . . . . 5-8 Earthwork Contractor IEquipment Used . Dates of Earthwork Observation 1 Testing . Stripping and Clearing , Keyway , Benching . Fill Placement , Cut Excavations Over-Excavation . Compaction Testing and Results : Plate 1 - Test Location Plan Laboratory Testing and Results. . . . . . . . . . . . . . . . . . . . .9 i Maximum Dry Density Erosion Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . g Conclusions and Recommendations. . . . . . . . . . . . . . . . .10-11 z.. GUNVANT THAKKAR, PROFESSIONAL ENGINEER 45712 Classic Way, Temecula, California 92592 909)676-7541 INTRODUCTION In accordance with your request, the compacted fill on the subject site has been tested for compliance with applicable County specifications. The work was authorized by Mr. Cecil Stralow and included: 1. CDbserving the clearing and stripping, 2. CDbserving the necessary keyways, 3. CDbserving and testing the compacted fill, 4. Performing a laboratory Maximum Dry Density test on representative materials, and 5. Preparing this report presenting the findings, conclusions and recommendations. .3 SITE LOCATION AND DESCRIPTION The approximately 2.5-acre site is located on EI Lucero Place in the southwestern Riverside County. The access to the site is by way of EI Lucero Place. The general terrain of the site is rolling hills covered with natural vegetation. FINDINGS Proposed Development The subject site is being graded approximately 40,000 square foot to create a residential pad with attached garage and an approximately 9,000 square foot tennis court pad on the lower level. Document Review The grading plan prepared by Lakeshore Engineering was reviewed prior to the grading operation. This grading plan was used for the basis of the grading operation. The plan indicated that the driveway access to the pad is from EI Lucero Place. The residential pad is a transition pad. The estimated earthwork quantities are: 5000 cubic yards of excavation and 5000 cubic yards of embankment. The maximum cut slope height is approximately 27 feet and the maximum fill slope height-is approximately 30 feet. Gradino and Earthwork Operations Earthwork Contractor 1 Equipment Used - The earthwork was performed by One-Tractor-Doze-It-AII. The equipment used was a John Deer 8-50 and a Caterpillar D4, with moisture provided by a fire hose. - Dates of Earthwork ObservationlTesting - Grading commenced on December 14th and continued through December 28, 1999. Part-time observation/testing was performed during the keyway excavations and fill placement. " Stripping and Clearing - The vegetation was relatively sparse and was removed from the area to receive fill. Keyway - Keyways, approximately 15 feet wide and dipping into the natural slope at approximately 5 percent, were excavated along the toes of the fill slopes. The bottom of all keyways were inspected by the field ,technician and approved as being competent, prior to the placement of the fill materials. Benching - In order to construct the fill slope for the pad, the materials were benched minimum of 4 feet into the existing native material. Fill Placement - The fill materials were obtained from the cut areas of the project. The compacted soils consisted of decomposed granite and were placed in lifts of 6 to 8 inches in uncompacted thickness, moistened and compacted to a minimum of 90 percent relative compaction. All fill material was less than 12 inches in diameter. The maximum fill slope height (toe to top elevation) is 30 feet on the easterly side of the pad. All slopes. were graded to a ratio of approximately 2: 1 (horizontal to vertical). Cut Excavations - A maximum depth of approximately 5 feet of material was excavated from the proposed residential pad area. Over-Excavation - All house and garage sits on the cut area; therefore, no over-excavation was recommended. Compaction Testing & Results - A total of 25 tests were performed in accordance with ASTM 1556-90 (Sand Cone Test Method). The unweighted average relative compaction of the passing tests is 91 percent with an average moisture content of 9.5 percent. The test locations are shown on the Test Location Plan and the results are summarized below. ,.. :> Max,Dry Water Dry Relative Com- Method Elevation Density (pen Content (%) Density (pen Paction (%) 1. 1170 131.5 10.2 118.8 91 SC 2. 1156 131.5 10.1 120.1 92 SC 3. 1174 131.5 9.8 118.8 91 SC 4. 1163 131.5 9.7 121.4 93 SC 5. 1180 131.5 9.5 120.1 92 SC 6. 1179 131.5 9.4 121.4 93 SC 7. 1168 131.5 9.2 118.8 91 SC 8. 1180 131.5 9.7 121.4 93 SC 9. 1183 131.5 9.5 120.1 92 SC 10. 1184 131.5 9.8 120.1 92 SC 11. 1185 131.5 9.1 121.4 93 SC 12. 1184 131.5 9.3 120.1 92 SC 13. 1165 131.5 9.7 121.4 93 SC 14. 1174 131.5 9.8 118.8 91 SC 15. 1170 131.5 9.5 120.1 92 SC 16. 1168 131.5 9.5 120.1 92 SC 17. 1178 131.5 9.4 121.4 93 SC 18. 1175 131.5 9.2 118.8 91 SC 19. 1183 131.5 9.7 121.4 93 SC 20. 1184 131.5 9.5 120.1 92 SC 21. 1185 131.5 9.8 118.8 91 SC 22. 1185 131.5 9.1 121.4 93 SC 23. 1183 131.5 9.3 120.1 92 SC 24. 1174 131.5 9.7 118.8 91 SC 25. 1162 131.5 9.8 120.1 92 SC (p LEGEND . APPROXIMATE TEST LOCATION u,.u} K lEY U/A ARM DATE: 2-1 -00 TEST LOCATION PLAN STRIKO 6J PLATE: I 1 ......, , Pi"' ~. :r ';- " ....J;. 'r'" .' .... ' .".;.:t'. ';:1-'--- ,',',:' ,~'F . , . ~ ., . ., .r........~- " .'. ,;~,l: bJ -' ,', ~. .;~ ~' ~.... '-. ~ ..:>..../ "'. ~ .4.... ,. ~'iP o ~.;\. ". -" ......,. "",~7~ ~~?-/~ -.---=':'--'~ V --<'~~ . -; '" ~ -..~--. ". \)~ ~ --<,""" DlAn+ ",/' -----=~ -~~ .....-:-- /'" &;"'" -~:. ,.... ~ , ':.~~L___ :. !DATE: 2-1- 00 ',- ..~ - ?;....,- .-- ,.- " ~ ," . .. .., '" .; ~". '..J .~.\. .. , ":-",,. .. . J._~ , " ;",11;;; ~,: -" ._~~ ~,.:. -;. .. , ::;. ::. " , ,~- ~2' ! SITE LOCATION PLAN 'STf<,ALOGJ PLATE: 'Z €> Test Location Plan - The basis of the test location plan is Plate 1 of the As-Built Grading Plan prepared by Lakeshore Engineering. The changes made during the grading operation and pad dimensions are presented on this plan. Laboratory Testinq and Results Maximum Dry Density - A representative sample of the compacted material was tested to determine the Laboratory Maximum Dry Density in accordance with ASTM D1157 -91, Method A. The results are as follows: Location Material Classification Maximum Dry Densitv. pcf Optimum Moisture, % ; Native SM 131.5 10.0 Erosion Control In the event of adverse weather conditions, measures should be taken to minimize erosion damage, Should damage occur (Le" gullies, washed out slope, erosion scars, etc.), please contact this firm, or a: Registered Geotechnical Engineer, to inspect and recommend corrective measures towards mitigating any problems, The fill slopes should be planted as quickly as possible with appropriate vegetation as indicated on the Grading Plan or as recommended by a landscape architect. Any irrigation system should be adequately constructed and placed to prevent possible washouts due to line, breakage. '\ CONCLUSIONS AND RECOMMENDATIONS Conclusions 1, The area to be graded was properly stripped prior to the placement of the fill materials, 2. The vegetation was removed from the fill area and was not used in the fill materials, 3, The fills have been compacted to a minimum relative compaction of 90 percent based on ASTM D1157 -91. 4, Keyways, approximately 15 feet wide and dipping into the natural slope at approximately 5 percent, were excavated along the toes of the fill slopes. 5. The compacted fill materials were decomposed granite, 6, The maximum fill height is approximately 30 feet in vertical dimension at a slope ratio of 2: 1, 7. The maximum cut height is approximately 27 feet in vertical dimension at a slope ratio of 2: 1, 8. A fill slope was benched to a minimum of 4 feet into native soil. 9. All house and garage sits on the cut area; therefore, no over-excavation is recommended, 10.A total of 25 quality assurance tests were performed by the Sand Cone Method (ASTM D1556- 90). 11, The limits of fill certification for this report are as shown on Plate 1. Recommendations 1, All ,footings for single story construction shall be a minimum of 12 inches in width and 12 inches in depth, measured below the lowest adjacent compacted of firm grade. For two-story construction, the footings shall be a minimum of 15 inches in width and 18 inches in depth, 2, All footings shall incorporate a minimum of one No, 4 bar running continuously through the footings, The bars shall be lapped a minimum of 30 bar diameters and shall be placed approximately 3 inches from the bottom. 3. Slab-on-grade concrete construction should be 4 inches nominal thickness (3 Y, inches minimum thickness) and should incorporate 6 x 6 No. 10/No, 10 WWF or No, 3 rebar placed 30 inches on center. All steel shall be properly tied and placed on 1 Y, inch blocks, "Pulling" of the mesh during placement of the concrete shall not be permitted, \0 4. Where moisture-sensitive floor coverings are proposed, a moisture barrier, such as 6 mil Visqueen should be used. This membrane should be protected with a minimum of 1 inch of sand placed above and below. 5. ~II footings shall :be extended to a depth sufficient to provide a minimum separation from the bottom of the footings to the daylight in any adjacent slope in accordance with UBC Standards. 6. Compaction tests should be performed on backfill material placed in trenches 12 inches wide or greater following installation of the utility (except leach line) lines. 7, Cut slopes are to be protected from erosion by placement of adequate brow ditches. 8, All fill slopes should be landscaped and planted as soon after grading as feasible, 9. Erosion Control should be provided in conformance with UBC. 10. Grading observation and earth materials testing shall be performed by a Registered Soils . additional grading done on the subject site. - \\ Transmittal Letter RECEIVED ,L)qk c\, d FEB 1 2000 De) ,,,....e CllYOFTEMECULA 2/tJOO eNGINEERING DEPARTMENT Fa..){ed AGAI N '2/10/60 +0 \<esQ j;""es {" '1'1-10'/75 To: City OfTemecula Received by: t "0 J 'D".> k Date: 2/ >/n () From: Cecil J. Stralow, Owner/General 31275 Sierra Bonita Temecula, CA 92592 Project: 43978 El Lucero Place Temecula, CA 92592 APN: 959-040-015, Lot 16, Tract 9833, Thomas Register Page 97902 Enclosures: fl'''' \~ Dp~ ~ J f T-e st Comments: fv. ~~s:q, --- 00..""-p$' Delivered by: ~~ \Z-