HomeMy WebLinkAboutTract Map 9833-2 Lot 19 Compaction Results . ALPINE ENGINEERING P.O. Box 2155 Alpine, California 91903 Technical Assistance (619) 445-2024 \\'4 q ~~ - z.. L...c'll'l SOIL ENGINEERING CIVIL ENGINEERING Surveyi"9 SubdIViSIons California Civil Engineer RCE 27697 Apr il 1, 2004 ,Gary & Linda Hum 44768 Rhiannon Way Temecula, Ca. 92592 RE: Hum Residence 43330 San Fermin Place, Temecula A~P.N. 945 - 020 - 013 In accordance with your request, this report has been prepared to present the results of the field observations and relative compaction tests performed at the subject site by this firm. These services were per formed between March 25, 2004 and April 1, 2004. .SITE DESCRIPTION The Subject site is an irregularly shaped 2 plus acre parcel ,of land located on the Northerly end of San Fermin Place and bounded on the North by Santiago Road in the City of Temecula ICa1ifornia. The house pad on said property is located in the Northeasterly portion of the parcel approximately 60 feet from the edge of Santiago Road. Prior to the grading operation presented in this report the grading area was a vacant portion of the property with sloping terrain of about 1% to 20%, with no rock out croppings in the pad area. Existing vegetation prior to grading consisted of Brush and low Grass. \ . . 43330 San Fermin Place Page 2 April 1, 2004 iPROPOSED GRADING AND CONSTRUCTION The subject site is being developed to receive a one and or two story single family residence, Swimming Pool, septic area ,and associated parking. It is anticipated that the proposed residence will be of Wood frame construction founded on shallow foundations and a conventional slab-on-grade floor system. ,AVAILABLE PLANS To assist in determining the location and elevations of our field density tests and to define the general extent of the ,site grading for this phase of work, we used a Grading Plan ,prepared by Manning Engineering and approved by the City of Temecu1a, by the issuance of a Grading Permit. ,FIELD OBSERVATION AND TESTING .Observations and field density tests were performed by a representative of Alpine Engineering, during the mass grading ,operations perform by Bill Lackey Grading. The density tests ,were taken ,according to A.S.T.M. Test 1556-91 and the results of these tests are shown on the attached plates. ,PREPARATION OF AREAS TO RECEIVE FILL All vegetation, brush, trees and debris derived from clearing operations were removed, and disposed of Legally. Soils were removed to firm natural ground which possesses an in-situ 'density of :at least 90% of its maximum dry density. All ,Rocks over '8" in diameter were removed from the compacted pad :area. The original ground was stepped or benched. Benches were cut into firm competent soil conditions. The lower bench or ,keyway was ,graded and sloped back into the hillside at a ,gradient of not less than two percent. The horizontal ,portion of :the bench was compacted prior to receiving fill as specified herein for compacted natural ground. 7- . . .43330 San Fermin Place Page 3 April 1, 2004 CONCLUSIONS The following conclusions and recommendations have been based upon our analysis of the data available from the testing of t,he soils compacted on this site. Included in these analysis ,are our visual inspection of the grading operation while in ,progress, field and laboratory testing of the typical bearing soil and our general knowledge and experience with the natural ground soils and compacted fill soils on this site. 1. The soils material utilized for the grading operation were from existing on-site materials excavated, placed and compacted. These materials consist primarily of Silty, fine to Coarse Sandy D.G. The soils in the vicinity of the foundation has an expansive index of 7.0, which falls in to the low classification for expansive potential. The expected total settlement is 0.5 inches and the differential settlement is 0.5 inches. 2. Shallow foundations may be used for the support of the proposed structure. The footings should have a minimum depth below Pad Grade of 12 x 12 inches for one story and 15 x 18 inches for two story structure. A minimum width of 12 inches for continuous footings and 24 X 24 X 18 inches for isolated footings is recommended. A bearing capacity of 2400 psf may be assumed for said footings. This bearing capacity may be increased by one-third when considering wind and/or seismic fores. Footings located adjacent or within slopes should be extended to such that a minimum distance of seven feet exists between the face of the slope and the footing. Retaining wall footings adjacent or within slopes should be individually reviewed by this office. 2> . . 43330 San Fermin place Page 4 April 1, 2004 3. The concrete slab-on-grade should be a minimum of 4 inches in thickness of 2500 psi, Type II Cement in the Foundation and be underlain by a 4 inch blanket of clean Poorly Graded Sand or Clean Native Material. Both exterior and interior continuous footings should be reinforced with one #5 bar positioned near the bottom of the footing and one #5 bar positioned near the top of the footing. The slab should be reinforced with No.3 bars @ 24" O.C. in each direction. However, it is imperative that the rebar be placed approximately at the middle of the slab. The reinforcement is based on soil characteristics and is not intended to be in lieu of reinforcement necessary to satisfy structural considerations. Where moisture sensitive floor coverings are planned, a visqueen barrier should be placed in the middle of a blanket of clean Poorly Graded Sand or Clean Native Material. 4. It is our understanding that any building will be constructed utilizing conventional type foundations, footings and conventional type building materials in conformance with the Uniform Building Code, 1997 edition. 5. Any backfill soils placed in utility trenches or behind retaining walls which support structures or other improvements shall be compacted to at least 90 percent relative compaction. We will accept no responsibility for damage to structures as a result of improperly backfilled trenches, etc. 6. Compacted fill soils that occur within 7 feet of the face of slope possess poor lateral stability, even though they have been certified to a relative compaction of 90 percent or better. Proposed structures and other improvements that are located within 7 feet of the face of compacted fill slopes could suffer differential movement as a result of the poor lateral stability of these soils. A . . 43330 San F,ermin Place Page 5 April 1, 2004 7. Therefore, foundations and footings for the proposed structures or other improvements should be placed at least 7 feet back from the top of these slopes. Foundations placed closer to the top of slope than 7 feet should be deepened such that the face of foundation at the level of the bottom is at least 7 feet back from the face of slope at that level. 8. Adequate measure shall be undertaken to properly finish grade the site after the structures and other improvements are in place, such that the drainage waters from within the site and the adjacent higher properties are directed away from the foundations, footings, floor slabs and tops of slopes via surface swales and subsurface drains towards the lower level of the building site onto the natural drainage direction for this area. Proper surface and subsurface drainage will insure that no water will seek the level of the bearing soils under the foundations, footings and floor slabs which could result in undermining and differential settlement to the structures and other improvements. 9. Drainage should be maintained such that surface waters are not permitted to flow over the top of exposed fill slopes. 10. Water should not be allowed to pond adjacent to footings. The site should be graded and maintained such that surface drainage is directed away from the structures and the top of slopes into swales or other controlled drainage devices. 11. The results of our test and observations indicate that the fill soils placed on the subject site have been compacted to at least 90 percent of maximum dry density, and to the best of my knowledge, the work within the area of my responsibilities is accordance with the applicable provisions of the U.B.C. D . . 1503 Riverview Drive Page 6 May 3, 2004 12. All statements, recommendations and conclusions made in this report are applicable only for grading operation which we inspected and are representative of the site at the time our report was prepared. The Engineer is not to be responsible for fill soils placed at a future time or subsequent changes to the site by others which directly or indirectly cause poor surface or subsurface drainage and/or water erosion which could alter the strength of the compacted fill soils. If you have any question concerning this letter, please feel free to call me at your earliest convenience. ,Sincerely, ~~~ ,Wallace M. :Beron Civil Engineer R.C.E. 27697 " . . ,43330 San Fermin Place Page A-I April 1, 2004 LABORATORY TEST RESULTS The maximum dry densities and optimum moisture contents of the fill materials as determined by the A.S.T.M. 1557-91, ,Method A, which uses 25 blows of a 10 pound hammer falling from a height of 18 inches on each of 5 layers in a 4 inch ,diameter 1/30 cubic foot compaction cylinder, are presented as follows: Soil Description Maximum Dry Density Optimum Moisture 1. Light~Reddish Brown Clayey, Silty, Medium Sand, Classification SM 126.4 9.3 2. Light~Brown to Tan Silty Medium to Coarse Sandy D.G. Classification SM 132.4 8.7 1 . . ALPINE ENGINEERING P.O. Box2155 Alpine, California 91903 Technical Assistance (619) 445-2024 SOIL ENGINEERING CIVIL ENGINEERING Surveyjng SubdIVisIons California Civil Engineer RCE 27697 43330 San Fermin Place CompactionlInspection Report Continued: April 1 , 2004 1 1 -11 11.2 126.4 116.9 93.6 2 I -9 10.7 126.4 118.9 92.5 3 1 -7 11.7 126.4 116.9 94.1 4 1 -5 11.4 126.4 118.9 93.8 5 1 -3 10.9 126.4 118.6 92.7 6 2 -2 10.6 132.4 124.1 94.1 7 2 -2 9.8 132.4 123.8 93.7 8 2 F.G. 9.6 132.4 124.3 93.5 9 2 F.G. 10.2 132.4 124.7 93.9 10 2 F.G. 10.4 132.4 124.2 94.2 PAGE "A-2" TABLE OF FIELD DENSITY TEST RESULTS AS T M 1557-91 8 4- . . FIeld Technician .Report tf) = TJ5.5'T L,e: TI'~ DATE' .I ./ 3,/~'~ Figure No.L Alpine Engineering FieldlLaboratory- Testing/Analyses P. O. Bclor 2155. AlpIne. CA. 91903 q