Loading...
HomeMy WebLinkAboutParcel 9 Geotechnical Report & Compaction Results Post Grading I~ .. .... .;. .... ;, .f<{t EN I '-'-- I I I I I I I I I I I I I I Cor.t~oration . Soil Engineering and Consulting Services. EngineeringGeology. CompaclionTesting -Inspections- COflSlructionMalerialsTesting- LaboratoryTesling- PercolalionTesling . Geology. Water Resource Studies . Phasel&IIErwironmenlalSileAssessmenls ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK : September 2, 1999 I BOSTIK, Inc. : 500 West 17th Street . Long Beach, California 90813 (562) 491-5240 I FAX (562) 495-1363 I Attention: Mr. Ed Lui : Regarding: GEOTECHNICAL REPORT AND COMPACTION RESULTS POST GRADING OPERATIONS Bostik Inc. Building, Phase II, Parcel 9 of Parcel Map 28471-1 City of Temecula, County of Riverside, California Project Number: T1307-C : References: 1. EnGEN Corporation, Updated Geotechnical Study, Proposed Structure, Parcel 9 of Parcel Map 28471-1, City of Temecula, County Riverside, California, Project Number: T1307-UGS, report dated December 16, 1997. Schaefer Dixon Associates, Geotechnical Mass Grading Report No.2, Parcel Map No. 21383 (Core I, Phase II), Temecula, California, report dated January 7, 1992. 2. IDear Mr. Lui: 'According to your request and signed authorization, EnGEN Corporation has performed field ; observations, sampling, and in-place density testing on an "on-call" basis at the above 'referenced site from April 26, 1999 through August 9, 1999. 'The following testing was performed during post grading operations: . On-Site Sewerline Trench Backfill. On-Site Storm Drain Trench Backfill. Driveway Subgrade. . . On-Site Curb and Gutter Subgrade. On-Site Ribbon and Cross-Gutter Subgrade. . . 'Maximum dry densityloptimum moisture content tests were conducted on samples of the native t earth materials and imported aggregate base. The tests were performed in general accordance ,with ASTM 01557-78 procedures. The results are presented in the Appendix of this report. ; Relative compaction testi . rformed in general accordance with ASTM 02992-81 and I' / '- ,- - / .... , ,_ _ _ \ '" ~ J I i.' I' \ / ~ ' - \ ~ ' - \ - ,'-- ~ ,,-,_.;..,~*~~:;~~~~~~~~~~,;,/~~~.,~;~~~=! ;............iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii ..........___......__..m-==_==:==.=:!:!:$Ii:bl=i!!iill:=.=! -----'"!!~-----_. -...."!'---_....."'::"....':'-.......~....=:::;==;;:;:::;::;:;: I I I I I I I I I I I I I I I I I I I BOSTIK, Inc. . Project No: T1307-C September 1999 Page 2 .ASTM 03017 procedures for determining in-place density and moisture content, respectively, : using nuclear density gauge equipment. Test results are presented in the Appendix and the ; approximate test locations are shown on the site plan, also presented in the Appendix of this report. In-place density test results indicate a minimum of 90 percent relative compaction for subgrade in the asphalt concrete areas of the driveway and trench backfill areas of the site, and 95 ,percent relative compaction in the aggregate base and Portland Cement Concrete driveway iareas. The native soils encountered on the site consisted of silty sands and sandy silts. Import tearth materials consisted of sandy gravel aggregate base. :Based on the observations and tests performed in the areas noted as test locations, the post ,grading operation has been completed in accordance with the Referenced No. 1 Updated :Geotechnical Study and grading code of the City of Temecula California. Thank you for the opportunity to provide these services. If you should have any questions regarding this report, please do not hesitate to contact this office at your convenience. Respectfully submitted, EnGEN Corporation Cf.:, /f;rn~ Field Operations Manager JOG/OB:ch Oistribution: (1) (2) Addressee City of Temecula Oepartment of Public Works BYCOR General Contractors Attention: Mr. Ray Kanter (1) FILE: EnGEN/ReportinglCrr1307C Bostik Inc. Post Grading, Phase II EnGEN Corporation 'l. -'" u' _.". ..__... ....._~". " ~~'-"'-"'-. ---- I BOSTIK. Inc. Project No: T1307-C I Appendix Page 1 FIELD TEST RESULTS I (SUMMARY OF FIELD IN-PLACE DENSllY TEST RESULTS) (NUCLEAR GAUGE TEST METHOD) II Test Test Depth Soil Max Moisture Dry Relative Required No. Date Test Locations Elev. Type Density Content Density Compaction Compaction I (1999) (FT) (PCF) ('!o) (PCF) ('!o) ('!o) 1 4-26 Bldg. Pad F.G. 2 126.7 8.8 114.0 90.0 90 I 2 4-26 Bldg. Pad F.G. 2 126.7 10.1 123.1 97.1 90 3 4-26 Bldg. Pad F.G. 2 126.7 7.6 114.7 90.5 90 I 4 4-26 Bldg. Pad F.G. 2 126.7 6.1 120.7 95.3 90 5 4-26 S.Pad F.G. 2 126.7 8.8 121.1 95.6 90 6 5-3 Drain S.G. 2 126.7 10.8 114.0 90.0 90 I 7 5-4 Sewer 2' 2 126.7 10.2 115.6 91.2 90 8 5-4 Sewer 4' 2 126.7 7.5 116.1 91.6 90 9 5-4 Sewer 1 ' 2 126.7 12.5 118.7 90.5 90 I 10 5-4 Sewer S.G. 2. 126.7 8.9 118.9 93.8 90 11 5-4 Sewer S.G. 2 126.7 10.4 117.4 92.7 90 I 12 8-4 E. Bldg. Driveway (#1) S.G. 3 116.7 11.6 112.8 96.7 95 13 8-4 E. Bldg. Driveway (#2) S.G 3 116.7 11.4 114.5 98.1 95 14 8-4 S.D. Relocation S.G. 3 116.7 12.1 112.4 96.3 95 I 15 8-4 S.D. Relocation S.G. 3 116.7 11.7 113.2 97.0 95 16 8-5 N. Bldg. Driveway(#3) S.G. 2 126.7 8.1 120.5 95.1 90 I 17 8-5 N. Bldg. Driveway(#4) S.G. 2 126.7 7.9 120.4 95.0 90 18 8-5 N. Bldg. Driveway(#4) S.G. 2 126.7 7.9 121.3 95.7 90 19 8-6 w. Half Driveway S.G. 3 116.7 11.5 113.5 97.3 95 I Repair 20 8-6 W. Half Driveway S.G 3 116.7 12.0 114.5 98.1 95 Repair '. 21 8-9 E. Half 8riveway S.G. 3 116.7 12.7 111.0 95.1 95 Repair 22 8-9 E. Half 8riveway S.G. 3 116.7 13.2 111.7 95.7 95 I Repair Indicates Sub Grade. (S.G.) IF.G.) Indicates Finish Grade. I I 3 EnGEN Corporation il ------ II I II I I Soil Tiype I 2 I 3 I I I I I I I I I I I I BOSTIK. Inc. Project No: T1307-C Appendix Page 2 SUMMARY OF OPTIMUM MOISTURE CONTENT I IMAxIMUM DRY DENSITY RELATIONSHIP TEST RESULTS ASTM 01557-91 Optimum Soil Maximum Moisture Description Dry Density Content (USCS Symbol) (PCF) (%) Silty Sand, Brown (SM) 126.7 9.1 Sandy Silt, Gray (ML) 116.7 12.8 1\. --~~~ I I I I I I I I I I I I I i I I I I I I BOSTIK, Inc. Project No: T1307-C Appendix Page 3 DRAWINGS EnGEN Corporation -s..