Loading...
HomeMy WebLinkAboutParcel 35 Geotechnical Report & Compaction Results Precise Grading II~ ..... .'.d' .,' ~ EN I .-- I I I I I I I I I I I I I Coq~oration -Soil EngineeringandConsullinllServices-Engine€ringGeoloqy -CompactionTestinll -Inspections .ConstruclionMaterialsTeslinll.laborato~Testinll.PercolalionTesling -Geolagy.WalerResourceSludies . PI\ase 1&11 Environmenlal SileAssessmenls ENVIRONMENTAL & GEOTECHNIC~ECIEfVEb JAN 051999 CITY OF TEMt:\';ULk ENGINEERiNG DEPARTMEl. i GeOTECHNICAL REPORT AND COMPACTION TEST RESULTS PRECISE GRADING OPERATIONS Zevo-Sorrento Development Lot 35 of Parcel Map 28471-1, Zevo Drive City of T emecula, County of Riverside, California Project Number: T1521C January 5, 1999 Prepared for: Sorrento Development 674 Via Del La Valle, Suite 207 olana Beach, California 92075 I _' _ , . , , \ ~ ~ ' \,,' - I I I I I I I I I I I I '. I I I I I II Sorrento Development Project Number: T1521C TABLE OF CONTENTS , SECTION NUMBER AND TITLE PAGE '1~0 PROJECT LOCATION AND DESCRIPTION ....................................................................1 1.1 PROJECT LOCATION ................................................................................................ 1 1.2 PROJECT DESCRIPTION ...........................................................................................1 1.3 SITE DESCRIPTION ... ............................................................................................... 2 : 2.0 SCOPE OF WORK ....................................................................................................2 ,2: 1 TIME OF GRADING ....................................................................................................2 ,2: 1 CONTRACTOR AND EQUIPMENT................................................................................. 2 ,2.2 GRADING OPERATIONS............................................................................................ 2 '3.0 TESTING ..................... ........ ... ........... ................................................ ............... .......2 '3.1 FIELD TESTING PROCEDURES................................................................................... 2 3.1.1 LABORATORY TESTING .............................................................................. 3 3.1.2 MOISTURE-DENSITY RELATIONSHIP TEST ................................................... 3 :3.2 EXPANSION INDEX TEST...........................................................................................3 14.0 EARTH MA TERIALS.................................................................................................. 3 '5.0 FOUND~TION DESIGN RECOMMENDATIONS.................................................3 ;6.0 CLOSURE ............................................................................................................4 ~APPENDIX ITEST RESULTS 'DRAWINGS 1--- EnGEN Corporation :~EN ,January 5, 1999 I I I B I I I I R I I I I CO!poration -Soil Engineering and ConsullingServices-EngineeringGeology -Compaction Testing -lnspeclions-ConstruclionMaterialsTeSlinll-LaboraloryTesling .PercolalionTesling . Geology. Water Resource Studies . Phase I & II Environmental Sile Assessments ENVIRONMENTAL & GEOTECHNICAL ENGINEERING NETWORK 'Mr. Mike Reeves, !Sorrento Development '674 Via Del La Valle, Suite 207 'Solana Beach, California 92075 (619) 793-9472 I FAX (619) 793-9276 'Regarding: GEOTECHNICAL REPORT AND COMPACTION TEST RESULTS PRECISE GRADING OPERATIONS levo-Sorrento Development Lot 35 of Parcel Map 28471-1, levo Drive City of Temecula, County of Riverside, California Project Number: T1521C 'References: 1. EnGEN Corporation, Updated Geotechnical Study, Proposed Structure, Parcel 35 of P.M. 28471-1, City of Temecula, County of Riverside, CA Project Number: T1521-UGS, report dated September 8, 1998. 2. New Venture Design Inc., Preliminary Site Plan, Lot 39, levo Drive, plans dated August 11, 1998. Schaefer Dixon Associates, Geotechnical Mass Grading, Report No. 1 Parcel Map 21383 (Core I, Phase I), City of Temecula, County of Riverside, California, report dated August 1, 1991. 3. :Dear Mr. Reeves: :According to your request and signed authorization, EnGEN Corporation has performed field observations, sampling, and in-place density testing at the above referenced site. :Submitted, herein, are the test results and the supporting field and laboratory data. 11:0 PROJECT LOCATION AND DESCRIPTION 11.1 PROJECT LOCATION The subject site consists of approximately 2.5 acres, located on levo Drive, City of Temecula, County of Riverside, California. inIDum-mlni. I I :1 I I I I I I I I I I ~., I I I I I I 1,1, - ,J- Sorrento Development Project Number: T1521 C January 1999 Page 2 1.3 SITE DESCRIPTION Prior to grading operations, topography and surface conditions of the site were relatively'f1at with surface drainage to the north at a gradient of less than 6 percent. 2.0 SCOPE OF WORK 2.1 TIME OF GRADING This report represents geotechnical observations and testing during the construction operations' from December 16, 1998 through December 22, 1998. 2.1 CONTRACTOR AND EQUIPMENT The grading operations were performed by Del Rio Enterprises through the use of one (1) CAT 980 Loader, and one (1) water truck. :2~2 GRADING OPERATIONS Grading within the subject site consisted of an over-excavation and replacement operation. Over-excavation was performed in the building pad area to a depth of 3.5 feet below finish grade elevation and to a distance of 5.0 feet outside the proposed structure. The exposed bottoms were scarified and moisture conditioned to a depth of 12 inches then compacted to 90 percent. Fill was placed in lens thicknesses of 6 to 8 inches, thoroughly moisture conditioned to near optimum moisture content, then compacted to a minimum of 90 percent relative compaction. Moisture conditioning of the on-site soils was performed during the compaction process, through the use of a water truck. The pad area was generally graded to the elevations noted on the Grading Plan. However, the actual pad location, dimensions, elevations, slope locations and inclinations, etc. were surveyed and staked by others and should be verified by the Project Civil Engineer. :3:0 TESTING !3.1 FIELD TESTING PROCEDURES Field in-place density and moisture content testing were performed in general accordance with ASTM-D-2922-81 (90) and ASTM-D-3017-88 procedures for determining in-place density and moisture content, respectively, using nuclear gauge ~ EnGEN Corporation . . . . I I . I . I I I "~I I I . I . I Sorrento Development Project Number. T1521C January 1999 Page 3 equipment. Relative compaction test results were within the 90 percent required for all material placed and compacted. Test results are presented in the Appendix of this report. Fill depths and test locations (by station numbers when applicable) were determined from review of the referenced grading plans. 3.1.1 LABORATORY TESTING The following laboratory tests were performed as part of our services during the grading of the subject site. The test results are presented in the Appendix of this report. 3.1.2 MOISTURE-DENSITY RELATIONSHIP TEST Maximum dry density - optimum moisture content relationship tests were conducted on samples of the materials used as fill. The tests were performed in general accordance with ASTM D1557-91 procedures. The test results are presented in the Appendix (Summary of Optimum Moisture Content I Maximum Dry Density Relationship Test Results). 3.2 EXPANSION INDEX TEST A soil sample was obtained for expansion potential testing from the building pad area upon completion of precise grading of the subject site. The expansion test procedure utilized was the Uniform Building Code Test Designation 18-2. The material tested consisted of silty sand with gravel and trace silt, which has an Expansion Index of 3 which is classified as very low expansion potential. The results are presented in the Summary of Expansion Index Results in the Appendix of this report. 4.0 EARTH MATERIALS The natural earth materials encountered on-site, generally consisted of brown to red brown silty sand with gravel and trace silt. 5.0 FOUNDATION DESIGN RECOMMENDATIONS No conditions were encountered which would cause a change in the previously provided design and construction recommendations. As a result, design and construction should adhere to the recommendations provided in the Referenced No. ..s 1. "Updated Geotechnical Study". EnGEN Corporation I I I I I I I I I 1 I I '1 !~ ~ I I I I I .JI Sorrento Development Project Number: T1521C January 1999 Page 4 6:0CLOSURE This report has been prepared for use by the parties or project named or described above. It mayor may not contain sufficient information for other parties or purposes. The findings and recommendations expressed in this report are based on field and laboratory testing performed during the precise grading operation and on generally accepted engineering practices and principles. No further warranties are implied or expressed beyond the direct representations of this report. Thank you for the opportunity to provide these services. If you should have any questions regarding this report, please do not hesitate to contact this office at your convenience. JDG/OB:rr Distribution: (4) Addressee FILE: EnGEN/ReportingCfT1521C Sorrento Development, Precise Grading ~ EnGEN Corporation -_..~> ., _..._~.~._-~._.._---_._- I I I I '. I . I I I I I '. . . I I . rl -1 '" Sorrento Development Project Number: T1521 C Appendix Page 1 APPENDIX TEST RESULTS 1 EnGEN Corporation I I I Sorrento Development Project Number: T1521 C Appendix Page 2 FIELD TEST RESULTS (SUMMARY OF FIELD IN-PLACE DENSITY TEST RESULTS) (NUCLEAR GAUGE TEST METHOD) I Test No. Test 0ate (1998) Depth Soil Max Moisture Dry Relative Required Elev. Type Density Content Density Compaction Compactio (FT) (PCF) (%) (PCF) (%) (%) 1031 1 127.4 12.1 125.5 98.5, 90 1031 1 127.4 11.8 123.8 97.2 90 1032 1 127.4 9.2 118.4 92.9 90 1032 1 127.4 7.0 116.0 91.1 90 F.G. 1 127.4 6.1 127.0 99.7 90 F.G. 1 127.4 7.8 119.6 93.9 90 F.G. 1 127.4 9.0 120.1 94.3 90 F.G. 1 127.4 9.7 125.1 98.2 90 F.G. 2 123.5 8.5 118.9 96.3 90 Test Locations , I 1 2 I 3 4 I 5 6 7 I 8 9 ~F.G.) I I I 'I I I I I I '. ,-"J. ; 12-16 See Map 12-16 See Map 12-22 See Map 12-22 See Map 12-22 See Map 12-22 See Map 12-22 See Map 12-22 See Map 12-22 See Map I ndicates Finish Grade Elevation ~ EnGEN Corporation ~!I i. 'I 11 I I I I I II I Soil Type Soil I Type 1 -. I I I I I ,_;1, 1 2 Depth (FT) 1.5 Sorrento Development Project Number: T1521C Appendix Page 3 Sl:IMMARY OF OPTIMUM MOISTURE CONTENT I M1o.XIMUM DRY DENSITY RELATIONSHIP TEST RESULTS ASTM D1557-91 Soil Description (USCS Symbol) Silty Sand, Brown with Gravel (SM) Sand, Trace Silt, Red Brown (SP) Maximum Dry Density (PCF) 127.4 123.5 SUMMARY OF EXPANSION INDEX TEST RESULTS Dry Density (PCF) 117.2 Moisture Condition Before Test(%) 9.3 Moisture Condition After Test (%) 15.9 Optimum Moisture Content (%) 9.9 10.9 Expansion Index 3 C\ EnGEN Corporation ~I '. . . . . . . . . . . "~'I I I . I . I rl Sorrento Development Project Number: T1521 C Appendix Page 4 DRAWINGS \0 EnGEN Corporation