Loading...
HomeMy WebLinkAboutGeotechnical Report Utility Trench Curb Sidewalk I o PETRA OFFICES THROUGHOUT SOUTHERN CALIFORNIA '1 I I I I I I I I I I I I I I I I March 5, 2002 J.N. 107-01 RILINGTON COMMUNITIES 277 Rancheros Drive, Suite 303 San Marcos, California 92690 Attention: Mr. Bob Reynolds Subject: Geotechnical Report of Observation and Testing for Utility-Trench Backfill, Curb and Gutter, Sidewalk and Aggregate Base for Tract 25892, Pauba Road, City of Temecula, Riverside County, California Reference: Petra Geotechnical, Inc., 200 I, Geotechnical Report of Rough Grading, Lots I through 8, II through 22 and 25 through 32, Tract 25892, City of Temecula, Riverside County, California, IN. 107-0 I, dated November 3, 2001. Submitted herewith is a summary of the observation and testing services provided by Petra Geotechnical, Inc. (Petra) pertaining to the placement and compaction of backfill within utility trenches and preparation of curb and gutter, sidewalk and aggregate base within Tract 25892 located in the City of Temecula, California. Conclusions relative to the suitability of the trench backfill and street improvements for the proposed residential development are included herein. All utility-trench backfill, curb and gutter, sidewalk and aggregate base under the purview of this report have been completed under the observation and with selective testing by Petra. Based on the results of our full-time observation and with selective testing for trench backfill, Petra hereby verifies that the backfill has been placed in accordance with the recommendations of the geotechnical consultant and the geotechnical requirements of the City of Temecula and Eastern Municipal Water District. The curb and gutter, sidewalk and aggregate base were tested on a part-time basis as requested by the site superintendent. The earthwork was found to be in PETRA GEOTECHNICAL, INC. 41640 Corning Place . Suite 107 . Murrieta . CA 92562 . Tel: (909) 600-9271 . Fax: (909) 600-9215 \ . I I . I I I I I I I I I I I I I I I RILINGTON COMMUNITIES TR 25892ffemecula March 5, 2002 IN. 107-01 Page 2 general compliance with the City of Temecula guidelines. The completed work has been reviewed and is considered adequate for the construction now planned. Utility-trench backfill an~ aggregate base testing commenced in September 2001, and was completed in February 2002. SUMMARY OF OBSERVATIONS AND TESTING Utility Trench Backfill/Curt and Gutter/Sidcwalk/Aggregate Base Preparation Trenches were backfilled with onsite soils. Backfill materials were watered or air-dried as necessary to achieve optimum or near-optimum moisture conditions prior to and/or during fill placement. These soils were then compacted in 121o-inch thick lifts with either a pneumatic tamper or a compacting wheel connected to a backhoe to a minimum relative compaction of 90 percent. The depth of shading materials (sand) placed above pipes in the trenches varied from approximately 8 to 12 inches. Trenches backfilled consisted of sewer, water and storm drain. The approximate depths of the trenches varied from 3 to 10 feet. Sidewalk areas were prepared by wheel-rolling. Curb and gutter and aggregate base areas were prepared using a vibratory steel-drum roller. Field Testing Field density tests were performed using nuclear gauge test methods (ASTM Test Methods D2922 and D30 17). Test results are shown on the attached Table 1. z, ~ ~ I I I I I I . I I I I o o II I I I I I RILINGTON COMMUNITIES TR 25892ffemecula March 5, 2002 J.N. 107-01 Page 3 The compacted-trench backfills, curb and gutter and aggregate-base materials were tested at the time of placement to ascertain that the specified moisture content and relative compaction were achieved. Field density tests were taken at vertical intervals of approximately 1 to 2 feet in the trench backfilL When field density tests indicated a relative compaction of less than 90 percent (95 percent for portions of the aggregate base), the approximate limits of the substandard backfill and base were established, the substandard area was reworked, moisture- conditioned and recompacted as necessary under the observations of our engineering technician or the substandard materials were removed, moisture-conditioned and replaced as properly compacted filL Visual classification of earth materials in the field was the basis for determining which maximum density value summarized in the following Laboratory Testing Section was applicable for a given density test. One-point checks were performed to supplement visual classifieation. Laboratorv Testing The laboratory maximum dry density and optimum moisture content for each major soil type encountered during backfilling and aggregate base preparation were determined in accordance with ASTM Test Method D1557. The attached Table II presents the pertinent test values. REPORT LIMITATIONS This report has been prepared consistent with the level of care being provided by other professionals providing similar services at the same locale and in the same time period. The contents of this report are professional opinions and as such are not to be considered a guaranty or warranty. j> ~ ~ I I I I I I I I B I I B I I I I I I I I I RILINGTON COMMUNITIES TR 25892ffemecula March 5, 2002 J.N. 107-01 Page 4 This report has not been prepared for use by parties or projects other than those named or described herein. This report may not contain sufficient information for other parties or other purposes. This report is subject to review by the controlling authorities for this project. We appreciate this opportunity to be of service. If you have any questions, please contact this office. Respectfully submitted, PETRA GEOTECHNICAL, INC. ~ftiL Gregory E. Uecker Field Operations manager GEU/SMP/keb Attachments: Table I - Field Density Test Results Table II - Laboratory Maximum Dry Density Distribution: (6) Addressee ~ tIz ~ - '-=~~ --::-=..----==-' --- ---=-=~:=::::- -- -- ---- - - --- - ---- .il.. ;--~~ : IIrl_~~' . ." ~--u-' _.. .n,. ----...-- ...- , -..--..-.._-" .. ~l RI~ ~u -_ ~~ ill :. I~.~ ~~~. ElI---- ,511 ~-- !~?---"- ji~ iil IfE~~ . II ~'-"'---, .~c 'I~~-I'~'. i- ~t - -,-;" !~:::- ~-;;, 'ial~' I: p Iftl-~ L.~I~;' :::::J;;;: ," E?Y: L It: ~. """I' fF4~ :i iI TABLE I FIELD DENSITY TEST RESULTS ':'_ .:...... ....~~....,'----~.---'._c:c:-=--=-._:...,'~-'=c:-__--,-;..-_._ _ _ __...___ _ o PETRA .s -...--- .. - - .. ~."... . -.- . . ..- __.-'------c-___u_, "',u_' ._-..," _ _.._--~~._...._.. --'-.- -,......--. .~.,.._--- ~ - ---'-:'~ ~ -:1: ~ C"':Cu--"-.. -. _ _..~.___ '<~H , .' .--'".---.. '-----c._, ,'~ I 1 I'.'.'.'" ;:., TABLE I Field Density Test Results mES:riTESTt ??m!tEST. . .DEPTH*MOISTURE 'DENSITY€OMP ".,.."",.,,'....'.i'.i'.'. '.??.....'.ii",.i....'........,.....'?",,'........'" ;;:"@",,.iiiii;.i.;i.i'iiiiiiiiii;iii;,..,......i,.....;;...."i;......;.'...',...,....,.....i,;i....,.,.....,....,;.,.";...',..,..,i.,..,,,..'..i.,....i,.,...,.,;;,'.'.,'?.."'...".'..~....'...}...i..,...,..,,;i...,... .'mmm?m(.ii.......~?r;;? ,..,'.:.;;'.;' ;n~;i:;ijl";NQi ;,':i;;;;'~QGA:HON .'"m,.'t;;;'i(.t},. ... .............~~~..?????;...pc.,', """"""".,fn!l, ..--.--.-.".".......-.----.. .??jSOn;mi' .,.,.....,.........,-...-.......-..,.,.......,.,..........','" ;!;ii~~ Sewer Line 10/24/01 S-1 20' W sewer easement 6.0 10.5 119.0 90 1 10/24/0 I S-2 20' W sewer easement 2.5 8.3 121.0 92 1 1 10/24/01 S-3 20' W sewer easement 5.0 10.1 118.0 92 2 10/24/01 S-4 20' W sewer easement 8.0 9.4 117.0 91 2 10/24/01 S-5 20' W sewer easement 2.5 9.0 122.5 90 3 I 10/24/0 I S-6 20' W sewer easement 9.0 7.8 119.0 90 I 10/25/01 S.7 Calle Camellia/Sta 6+00 nth 5.0 9.3 124.0 91 3 10/25/01 S-8 Calle Camellia/Sta 5 + 50 6.0 7.9 123.0 90 3 I 10/25/0] S-9 Calle Camellia/Sla 6+70 3.0 11.3 12.8 93 4 10/25/01 S-1O Calle Camellia/Sta 7+05 nth 4.0 11.8 110.0 91 4 I 10/25/0 ] S-11 Calle Camellia/Lot 6 lateral 3.0 10.4 117.3 91 2 10/25/0 ] S-12 Calle Camellia/Lot 7 lateral 5.0 12.3 116.0 90 2 10/25/0] 5-13 Calle Camellia/Sta 8 + 15 mh 5.0 ]1.8 ] 16.5 91 2 I 1O/25/OJ S-14 Calle Camellia/Sta 8+42 mh 4.0 12.1 109.8 90 4 10/25/0 I S-15 Calle Camellia/Lot 9 lateral 3.0 9.0 107.8 89 4 10/25/0 I S-]6 RT No. S-]5 12.6 111.5 92 4 I 10/26/0 I S-17 Calle Ventura/Sta 5 + 70 4.0 10.7 ] ]8.5 90 8 10/26/0 ] 5-]8 Calle Ventura/Sla 6 + 65 5.0 9.9 ] 13.] 88 2 I 10/26/0 ] S-19 Calle Ventura/Lot 20 laleral 3.0 ]1.4 ] ]7.3 91 2 10/26/0] S-20 RT No. S-18 12.3 ] ]6.7 9] 2 10/26/01 S-21 Calle Ventura/LOI 27 lateral 4.0 11.5 ]]7.0 91 2 I 10/26/01 S-22 Calle Ventura/Sta 7 + 85 3.0 10.6 ]19.8 93 2 10/26/0 I S-23 Calle Ventura/Sta 8+32 nth 6.0 9.0 117.0 91 2 10/26/0 I S-24 Calle Ventura/Lot 23 lateral 4.0 11.3 115.8 90 2 I 10/29/01 S-25 Calle Ventura/Sta 2+55 nth 4.0 9.7 117.2 9] 2 10/29/01 5-26 Calle Ventura/5ta 4+15 mh 4.0 9.3 1]5.9 90 2 I 10/29/01 S-27 Calle Ventura/Lot 3] lateral 3.0 8.5 1]6.3 91 2 10/29/01 S-28 Calle Ventura/Sta 2 + 50 nth 3.5 9.7 ]10.0 91 4 10/29/0] S-29 Calle Camellia/Lot 3 lateral 3.0 ]1.0 ]21.2 91 4 I 10/29/0 ] S-30 Calle Camellia/5ta 3+75 3.0 9.3 ] ]6.3 9] 2 10/29/0 I 5-31 Calle Camellia/Sta 4+45 5.0 10.0 t 15.7 90 2 I 10/29/01 5-32 Calle Camellia/Sta 4+00 6.5 ]1.0 ] ]2.7 93 4 11/07/01 5-33 Calle Ventura/Sta 6+00 1.0 12.5 115.5 90 5 11/07/01 5-34 Calle Ventura/Sta 5 + 60 8.0 11.3 ]]6.9 91 3 I ] 1/08/0] 5-35 Calle Ventura/Sta 2 + 90 2.0 8.6 116.5 91 5 ] ]/08/01 S-36 Calle Ventura/Sla 3 + 95 2.5 8.0 1 ]5.7 90 5 11/08/01 5-37 Calle Ventura/Sta 4 + 95 2.5 9.1 1]5.5 90 5 I ] 1/08/0] S-38 Pauba Rd/Sta 39+95 3.0 8.9 115.2 90 5 (p PETRA GEOTECHNICAL,INC. MARCH 2002 -. J.N. !107-01 * T op-of-pipe TABLE T-11 I I I'.? .. I I I I I I I I I I I I I I I I TABLE I Field Density Test Resnlts ~~~'<T~~i '-,"",'''''-''''''''-'-',' ., ""'fIES1V"" ....IIil~I~!~i IIIII.~.....*...',...."......'....'..'.....".""."..................,'......M,..........,..........,...............0...,.........,................,1..".......rr......,..........................)...p. ?.........RE.......,.,.,..............,.....'.........,....,..............'.,'......,..'.......................'..,.p...................'.....,E........,............(..N....p..........c~.............f)....'.......;rv.....,........,.'.,......,.........'........",~~!~itI.IrE........................ tiX!!) v~ . .,. . ......fZqt??t.tf..i 11/08/01 Pauba Rd/Sta 39+55 S-39 4.0 8.3 117.3 92 5 11109101 11109/01 11/09/01 11/09101 11109/01 11/09101 11109/01 11121101 11121101 11121101 11121101 11121/01 11121101 11121/01 11/21/01 11121101 11121101 09121101 09/21/01 09/21101 09/21101 09/21101 09/21/01 09121101 09/21/01 09/2110] 09/21101 12117/01 12117/01 12/17/01 12!l7/01 12/17/01 Water W-l Calle Ventura/Sta 2+00 2.0 9.5 116.3 90 2 W-2 Calle Ventura/Sta 4 + 10 2.0 10.2 116.0 90 2 W-3 Calle Ventura/Sta 6 + 50 2.0 11.0 119.5 93 2 W-4 Calle Ventura/Sta 3 +00 3.0 9.0 120.7 94 2 W-5 Calle Ventura/Sla 5+00 3.0 8.7 118.7 92 2 W-6 Calle Ventura/Lot 15 laleral 2.0 9.2 122.1 95 2 W-7 Calle Ventura/Lot 27 lateral 2.0 9.5 120.0 93 2 W-8 Calle Camellia/Lot 8 lateral 2.0 10.4 123.6 92 6 W-9 Calle Camellia/Sta 8+64.5 FH 2.0 11.4 113.3 93 4 W-lO Calle Camellia/Lot 11 lateral 3.0 11.1 118.8 88 6 W-Il RT No. W-lO 9.8 ]22.9 91 6 W-12 Calle Camellia/Sta 8+00 2.0 10.3 121.9 91 6 W-13 Calle Camellia/Sla 7 + 20 2.0 10.2 112.8 93 4 W-14 Calle Camellia ISla 6+34 2.0 ]2.7 118.0 92 5 W-15 Calle Camellia/Sta 5+00 3.0 9.8 112.3 92 4 W-16 Calle Camellia/Sta 3 + 50 2.0 11.3 115.5 90 5 W-17 Calle Camellia/Sta 2 + 25 3.0 10.3 118.8 93 5 Storm Drain SD-I LineB/Sta 10+00 3.0 9.3 118.9 90 8 SD-2 Line. B/Sta 10 + 70 2.0 8.4 121.4 92 8 SD-3 LineB/Sla 9+50 4.0 9.5 125.0 93 6 SD-4 LineB/Sla 9+55 6.0 8.6 125.0 93 6 SD-5 LineB/Sla 9+60 8.0 8.8 ]23.9 92 6 SD-6 LineB/Sta 9+00 3.0 8.2 124.0 92 6 SD-7 Line A/Sta 9+60 2.0 9.0 120.4 91 8 SD-8 Line A/Sta 8 + 20 3.0 9.8 121.1 92 8 SD-9 LineA/Sta 8+50 5.0 8.0 122.4 91 6 SD-lO Line A/Sta 9+00 7.0 8.8 124.6 93 6 Curb and Gutter CG-I Calle Camellia/Sta 2+30 e/s FSG 8.2 117.8 92 2 CG-2 Calle Camellia/Sla 3 +00 e/s FSG 7.6 118.0 92 2 CG-3 Calle Camellia/Sla 3+90 e/s FSG 7.7 117.0 91 2 CG-4 Calle Camellia/Sla 4+95 e/s FSG 7.1 123.3 94 I eG-5 Calle Camellia/Sta 6+ 75 e/s FSG 10.3 119.3 91 1 PETRA GEOTECHNICAL"INC. J.N.107-01 * Top-of-pipe MARCH 2002 1 TABLE T-/2 . I.......~~~~. I'PAft'& I I I I I I I I I I I 01/@4/02 I 01/@4/02 o 1/@4/02 '1 01/04/02 01/~)4/O2 01/04/02 I 01/04/02 01/04/02 01/04/02 '. 01/04/02 .1 TABLE I Field Density Test Results .;.:.:.:.:.;.;.;.,-,-.',-,-,----'--,--'------,-;;;;.:;; ''''E''''' :~:~:':~:;:;:~:~:!:::.:. "d:J.'::::::~::::'::; ..-----..-,-.".,.".",........ ..........-.............---.-.----.-. ... ...... ... .... -----............-....... ......... .. II.NQ.i;.; i'."I Il.I.Iir. E.... S. T............IiI.....I .............'...'...-'....-..-...-..-..... ',",' ._.,-.-,-.-,..-...-.....-,-.-,-.-............,..._._...........-..,......,....,.,-..,.......,...,.,..,..:.. ._._._._...,.............,...,.......,..._w,....._._._._._..__._._._.__._.__..__..._.__...,_.._.......... ....................iV'>.......................... ..... I,LvltATIQNi IlIIIItil111tllill1flf ~~I~j il~~""..,. ...............". .......~gII;. (.}...}~E..................( ;:::::;::::::{::::::~::::~::.of::,_.:.:.::;:;:;:::\:: 12/17/01 CG-6 Calle Camellia/Sta 7 + 15 els FSG 10.6 115.5 90 2 12/17/01 CG-7 Calle Camellia/Sla 2+ 75 e/s FSG 8.5 118.0 92 2 12/17/01 CG-8 Calle Camellia/Sta 3 + 15 w/s FSG 8.8 108.5 91 7 12/17/01 CG-9 Calle Camellia/Sta 4+50 w/s FSG 9.7 110.0 92 7 12/17/01 CG-IO Calle Camellia/Sta 5+50 w/s FSG 9.7 120.0 93 2 12/17/01 CG-ll Calle Camellia/Sta 7 +00 w/s FSG 11.8 116.8 91 2 12/17/01 CG-12 Calle Camellia/Sta 7 + 25 w/s FSG 10.3 116.0 90 2 12/17/01 CG-13 Calle Camellia/Sta 2+00 els FSG 8.2 125.3 93 6 12/17/01 CG-14 Calle Ventura/Sta 3 + 10 els FSG 10.3 121.8 91 6 12/17101 CG-15 Calle Ventura/Sla 4+75 e/s FSG 10.6 122.5 91 6 12/17/01 CG-16 Calle Ventura/Sta 5+85 e/s FSG 9.1 123.2 92 6 12/17/01 CG-17 Calle Ventura/Sta 7 + 35 e/s FSG 8.7 117.2 91 2 12117/01 CG-18 Calle Camellia/cul-de-sac e/s FSG 11.4 120.7 92 I 12/ 1710 I CG-19 Calle Camellia/cul-de-sac w/s FSG 10.5 119.0 90 I 12/17/01 CG-20 Calle Ventura/Lot 27 FSG 8.1 115.2 90 5 12/17/01 CG-21 Calle Ventura/Lot 29 FSG 7.5 115.3 90 5 12117/01 CG-22 Calle Ventura/Lot 31 FSG 7.6 117.0 91 5 12/17/01 CG-23 Pauba Rd/Lot 32 FSG 9.3 123.5 91 3 12/17101 CG-24 Pauba Rd/Lot 32 FSG 8.0 115.5 90 5 12/17/01 CG-25 Pauba Rd/Lot 17 FSG 8.1 115.8 91 5 12/17101 CG-26 Pauba Rd/Lot I FSG 7.7 1]5.7 90 5 Sidewalk 02/11/02 SW-I Pauba Rd/Lot 17 handi ramp FSG 7.5 118.1 92 2 02/1 1/02 SW-2 Pauba Rd/Lot 32 FSG 8.9 110.7 91 4 02/11/02 SW-3 Pauba Rd/Lot 16 handi ramp FSG 9.1 111.5 92 4 02/11/02 SW-4 Pauba Rd/Lot I FSG 7.8 117.3 91 2 Al(l(rel(te Base AB-I Calle Ventura/Sta 2+00 FSG 11.0 124.8 97 9 AB-2 Calle Ventura/Sta 2 + 90 FSG 11.2 125.4 97 9 AB-3 Calle Ventura/Sta 4+00 FSG 11.8 122.5 95 9 ABA Calle Venrnra/Sta 5+00 FSG 10.8 122.3 95 9 AB-5 Calle Ventura/Sta 6+05 FSG 10.1 122.6 95 9 AB-6 Calle Ventura/Sta 6+90 FSG 10.9 ]22.6 95 9 AB-7 Calle Camellia/Sta 1+50 FSG 9.3 124.9 97 9 AB-8 Calle Camellia/Sta 2 + 35 FSG 11.7 124.4 96 9 AB-9 Calle Camellia/Sta 4+ 10 FSG 10.2 122.5 95 9 AB-IO Calle Camellia/Sta 5+00 FSG 11.6 ]24.6 97 9 PETRA GEOTECHNICAL, INC. J.N. 107-01 * T op-of-pipe MARCH 2002 'b TABLE T-13 I It I I'........ .. I I I I I I I I I I I !I I I I I TABLE I Field Density Test Results mE$j) IWESWi ...._,;:;;~:::;:':.;;:;::;::-:-;.;;;':.;': ....x,:"",:,:",,;:,:,':',:,:::;:,:,:,:.., u\\ilmt i%NOIT .........,i;I......m,E$j)iI ...........i....;i~.ft~.I~~~I~~~~!;~;~ CQM1I!Lsomi . ...;;;;i~Qg!\octo'Nt......tliiI(f*). II...i(tf4)It(p~QiM(1!!i)..!~~i!i 01104/02 01104/02 0]104/02 01104/02 01104/02 01/07/02 01/07/02 01107/02 01/07/02 01107/02 01/07/02 AB-ll Calle Camellia/Sta 6+ 75 AB-12 Calle Camellia/Sta 8+30 AB-13 Pauba Rd/Sta 47+00 AB-14 Pauba Rd/Sta 46+45 AB-15 Pauba Rd/Sta 43+50 AB-16 RT No. AB-13 AB-17 RT No. AB-14 AB-18 RT No. AB-15 AB-19 Pauba Rd/Sta 41 +40 AB-20 Pauba Rd/Sta 39+95 AB-21 Pauba Rd/Sta 39+05 FSG FSG FSG FSG FSG FSG FSG FSG PETRA GEOTECHNICAL; INC. 'J.N. 107-01 * T op-of-pipe 11.0 124.8 97 9 12.2 125.2 97 9 9.6 120.0 93 9 9.4 120.2 93 9 ]1.7 1]9.5 93 9 8.3 ]22.8 95 9 8.9 123.5 96 9 10.1 123.5 96 9 9.2 123.6 96 9 8.6 123.8 96 9 9.3 122.6 95 9 MARCH 2002 '\ TABLE T-14 ~I' Illf I~~,- -- ~.~.:_- II" rl~'"~-':~" 11.,'-:';- I~-I-^"--" ~ ; ~. , ilE ~I;---I-:;:: ~_. :.:, ;~___ .f lit II ~,,~ ~.~C:- rl"- ~ ~ ~_-c-__. li~, ~I'- ~ :: ~'~ ,- ~I-" ~,cc" ai' ~- ~-"- ijl.. ~,-J lil r.": il ~. TABLE II lABClRFATORY MAXIMUM DRY DENSITY _ _':'-=':;;'_'<'i-_:~".'-=-_..:.'.'.-_- o PETRA \0 :;:::,0--.,:0 -~~ --~-- ~ -~-~~~- - ~~-- - - =-:::,--~:::----::-- - ---- - ---=' -~ ~ --_..............:~ -..-- .....- I I I I I I I I I I I I I I I I I I -I T ABLE II Laboratorv Maximum Drv Densityl Il,11111111,IJI.1 1 2 3 4 5 6 7 8 9 Dark brown Silty fine SAND 8.0 131.5 Light brown.orange Silty fine to coarse SAND 9.0 t28.5 Brown to dark brown Silty fine to medium SAND 7.0 t36.0 Light brown Silty very fine SAND/Sandy SILT to.O 121.5 Dark brown Silty tine SAND 8,5 128.0 Brown Silty SAND 7.5 134.5 Light brown Clayey SILT 10.0 t19.0 Reddish-brown Sitty SAND 8.5 132.0 A re ate base 9.0 t29.0 (I) PER ASTM TEST METHOD DI557 PETRA GEOTECHNICAL, INC. J.N. 107-01 MARCH 2002 \\