Loading...
HomeMy WebLinkAbout08_005 PC Resolution . PC RESOLUTION NO. 08-05 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA RECOMMENDING THAT THE CITY COUNCIL APPROVE A RESOLUTION ENTITLED "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TEMECULA APPROVING A DEVELOPMENT PLAN TO CONSTRUCT A 408,160 SQUARE FOOT HOSPITAL, A HELlPAD, TWO MEDICAL OFFICE BUILDINGS TOTALING 140,000 SQUARE FEET, A 10,000 SQUARE FOOT CANCER CENTER AND AN 8,000 SQUARE FOOT FITNESS REHABILITATION CENTER ALL TOTALING APPROXIMATELY 566,160 SQUARE FEET ON 35.31 ACRES, LOCATED ON THE NORTH SIDE OF TEMECULA PARKWAY (HIGHWAY 79 SOUTH), APPROXIMATELY 700 FEET WEST OF MARGARITA ROAD, KNOWN AS ASSESSORS PARCEL NUMBERS 959-080-001 THROUGH 959-080-004 AND 959-080-007 THROUGH 959-080-010 (PA07-0200)" Section 1. Procedural FindinQs. The Planning Commission of the City of Temecula does hereby find, determine and declare that: A. Universal Health Services of Rancho Springs, Inc. ("UHS") filed Planning Application Numbers PA04-0462, General Plan Amendment; PA05-0302, Zone Change to PDO-9 (Planned Development Overlay-9); PA04-0463, Conditional Use Permit and Development Plan; and PA04-0571, Tentative Parcel Map in a manner in accord with the City of Temecula General Plan and Development Code, which applications are hereby incorporated by reference, for the property consisting of approximately 35.31 acres generally located on the north side of Highway 79 South, approximately 700 feet west of Margarita Road, known as Assessors Parcel Numbers 959-080-001 through 959-080-004 and 959-080-007 through 959-080-010 ("Project"). B. The Project was processed including, but not limited to, public notice in the time and manner prescribed by State and local law, including the California Environmental Quality Act ("CEQA"). C. On April 6, 2005, the Planning Commission considered the Project at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to, and did testify either in support of or opposition to this matter. D. The Planning Commission, based on testimony presented by the general public, determined that an Environmental Impact Report would be required for this Project. G:\Planning\2007\PA07-0198 Temecula Regional Hospital GPA, SEIR\Planning\Planning Commission\Draft Resolutions\PC\Dev Plan Resolution (01-09-200B).OOC . E. On April 20, 2005, a scoping session was held before the Planning Commission to determine the extent of issues to be addressed in the Environmental Impact Report for the Project. F. A Draft Environmental Impact Report was prepared in accordance with the California Environmental Quality Act and the California Environmental Quality Act Guidelines and circulated for public review from September 28, 2005 through October 28, 2005. G. On November 16, 2005, and again on January 5, 2006, the Planning Commission considered the Project at duly noticed public hearings as prescribed by law, at which time the City staff and interested persons had an opportunity to, and did testify either in support of or opposition to this matter. H. Following consideration of the entire record of information received at the public hearings, the Planning Commission adopted Resolution No. 06-01 recommending that the City Council certify the Final Environmental Impact Report for the Project and approve a Mitigation Monitoring Program for the Project. I. Following consideration of the entire record of information received at the public hearings and due consideration of the proposed Project, the Planning Commission adopted Resolution No. 06-04, recommending approval of the Conditional Use Permit and Development Plan for the Project (PA04-0463). J. On January 24, 2006, the City Council held a duly noticed public hearing as prescribed by law on the Final Environmental Impact Report at which time all persons interested had the opportunity to present oral and written evidence on the Final Environmental Impact Report. K. On January 24, 2006, following consideration of the entire record of information received at the public hearings before the Planning Commission and the City Council and due consideration of the Project, the City Council adopted Resolution No. 06-05, entitled "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TEMECULA CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT PREPARED FOR PLANNING APPLICATION NUMBERS PA04-0462 (GENERAL PLAN AMENDMENT) PA05-0302 (ZONE CHANGE), PA04-0463 (CONDITIONAL USE PERMIT AND DEVELOPMENT PLAN) AND PA04-0571 (TENTATIVE PARCEL MAP) AND RELATED ACTIONS, AND ADOPTING THE FINDINGS PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, A STATEMENT OF OVERRIDING CONSIDERATIONS, AND A MITIGATION MONITORING AND REPORTING PROGRAM IN CONNECTION THEREWITH FOR THE PROPERTY CONSISTING OF APPROXIMATELY 35.31 ACRES GENERALLY LOCATED ON THE NORTH SIDE OF HIGHWAY 79 SOUTH, APPROXIMATELY 700 FEET WEST OF MARGARITA ROAD, KNOWN AS ASSESSORS PARCEL NUMBERS 959-080-001 THROUGH 959-080-004 AND 959-080-007 THROUGH 959-080-010 (PA04-0462, PA05-0302, PA04-0463, PA04-0571)." G:\Planning\2007\PA07~0198 Temecula Regional Hospital GPA, SEIR\Planning\Planning Commission\Draft Resolutions\PC\Dev Plan Resolution (01-09-200B).DOC . 2 . L. On January 24, 2006, the City Council considered the Conditional Use Permit and Development Plan for the Project (PA04-0463) at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to, and did testify either in support of or opposition to this matter. M. Following consideration of the entire record of information received at the public hearings and due consideration of the proposed Project, the City Council adopted Resolution No. 06-07, approving the Conditional Use Permit and Development Plan for the Project (PA04-0463). N. On February 24, 2006, the California Nurses Association and Citizens Against Noise and Traffic each filed a separate petition challenging the City of Temecula's approval of the Temecula Regional Hospital project proposed by Universal Health Services, Inc. O. On May 3, 2007, the Riverside County Superior Court ordered that the City of Temecula set aside its approval of the Project, including without limitation, its certification of the Final Environmental Impact Report and all related approvals and permits, until the City of Temecula has taken the actions necessary to bring the Project into compliance with the California Environmental Quality Act ("CEQA"). The Riverside County Superior Court ruled in favor of the California Nurses Association and Citizens Against Noise and Traffic, holding that: (1) the MTBE plume was not properly analyzed in the Final Environmental Impact Report; (2) the siren noise at the hospital was significant and should have been mitigated; and (3) not all feasible traffic mitigation measures were adopted for cumulative traffic impacts. P. The Riverside County Superior Court also held that the Final Environmental Impact Report properly addressed: (1) cumulative noise, light and glare, and aesthetic impacts; (2) landscaping mitigation deferral; (3) biological resources; (4) geology and soils mitigation: and (5) land use consistency. Q. On July 12, 2007, another scoping session was held to determine the extent of issues to be addressed in the new Environmental Impact Report for the Project. R. In response to the Riverside County Superior Court's decision, a new Draft Environmental Impact Report was prepared in accordance with the California Environmental Quality Act and the California Environmental Quality Act Guidelines and circulated for public review from November 5,2007 through December 5, 2007. S. On January 9, 2008, the Planning Commission considered Planning Application Numbers PA07-0198 (General Plan Amendment), PA07-0199 (Zone Change), PA07-0202 (Conditional Use Permits), PA07-0200 (Development Plan), PA07-0201 (Tentative Parcel Map) in a manner in accordance with the City of Temecula General Plan and Development Code, which applications are hereby incorporated by reference, for the property consisting of approximately 35.31 acres generally located on the north side of Highway 79 South, approximately 700 feet west of Margarita Road, G:\Planning\2007\PA07-0198 Temecula Regional Hospital GPA, SEIR\Planning\Planning Commission\Draft Resolutions\PC\Dev Plan Resolution (01-09-200B).DOC 3 . known as Assessors Parcel Numbers 959-080-001 through 959-080-004 and 959-080- 007 through 959-080-010 Project, at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to, and did testify either in support of or opposition to this matter. T. Following consideration of the entire record of information received at the public hearing, the Planning Commission adopted Resolution No. 08-01 recommending that the City Council certify the new Final Environmental Impact Report for the Project and approve a Mitigation Monitoring Program for the Project. U. At the conclusion of the Planning Commission hearing and after due consideration of the testimony, the Planning Commission recommended that the City Council approve the proposed Development Plan, Planning Application No. PA07-0200, subject to and based upon the findings set forth hereunder. V. All legal preconditions to the adoption of this Resolution have occurred. Section 2. Further Findinqs. The Planning Commission, in recommending approval of the Development Plan, Planning Application No. PA07 -0200, as required by Section 17.05.010.F of the Temecula Municipal Code hereby finds, determines and declares that: A. The proposed use is in conformance with the General Plan for the City of Temecula and with all the applicable requirements of State law and other ordinances of the City. The proposed use is in conformance with the goals and policies in the General Plan for the City of Temecula, the Development Code and with all applicable requirements of State law and other ordinances of the City of Temecula because the Project has been reviewed and as designed and conditioned, it has been determined that the Project is consistent with all applicable zoning ordinances, State law and the General Plan. B. The overall development of the land is designed for the protection of the public, health, safety and general welfare. The overall development of the land has been designed for the protection of the pUblic health, safety, and general welfare, because the Project has been designed to minimize any adverse impacts upon the surrounding neighborhood and the Project has been reviewed and conditioned to comply with the uniform building and fire codes. Section 3. Recommendation. The Planning Commission of the City of Temecula recommends that the City Council approve the proposed Development Plan to construct a 408,160 square foot hospital, a helipad, two medical office buildings totaling 140,000 square feet, a 10,000 square foot cancer center and an 8,000 square foot fitness rehabilitation center all totaling approximately 566,160 square feet on 35.31 acres, located on the north side of Highway 79 South, approximately 700 feet west of Margarita Road, known as Assessors Parcel Numbers 959-080-001 through 959-080- 004 and 959-080-007 through 959-080-010 as set forth in Application No. PA07-0200, subject to the specific Conditions of Approval set forth in Exhibit A, Draft City Council G:\Planning\2007\PA07-0198 Temecula Regional Hospital GPA, SEIR\Planning\Planning Commission\Draft Resolutions\PC\Dev Plan Resolution (Ol-09-200B).DOC 4 . Resolution, attached hereto and incorporated herein by this reference as though set forth in full. Section 4. PASSED, APPROVED AND ADOPTED by the City of Temecula Planning Commission this 9th day of January 2008. " \ I --- -..." ( , John Telesio, Chairman ATTEST: 7Ir!J?/A/~ ~}L- Debbie Ubnoske, Secretary - ".., --..;~ . ., - [S~bl -":. '::' ~ -0.. ~ -- ." . .... '......... v ....,.,.~_~ J STATE OF CALlFORKl{A ) COUNTY OFRIV~R-SIDE ) ss CITY OF TEMEGULA ) I, Debbie Ubnoske, Secretary of the Temecula Planning Commission, do hereby certify that the forgoing PC Resolution No. 08-05 was duly and regularly adopted by the Planning Commission of the City of Temecula at a regular meeting thereof held on the 9th day of January 2008, by the following vote: AYES: 4 PLANNING COMMISSIONERS: Carey, Guerriero, Harter, Telesio NOES: 0 PLANNING COMMISSIONERS: None ABSENT: 0 PLANNING COMMISSIONERS: None ABSTAIN: 1 PLANNING COMMISSIONERS: Chiniaeff ~/;;~. ~ >z- Debbie Ubnoske, Secretary G:\Planning\2007\PA07-0198 Temecula Regional Hospital GPA, SEIR\Planning\Planning Commission\Draft Resolutions\PC\Dev Plan Resolution (01-09-200B).DOC 5 . EXHIBIT A CITY COUNCIL RESOLUTION 08-_ G:\Planning\2007\PA07.0198 Temecula Regional Hospital GPA, SEIR\Planning\Planning Commission\Draft Resolutions\PC\Dev Plan Resolution (01-09-200B).DOC 6 . RESOLUTION NO. 08- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TEMECULA APPROVING A DEVELOPMENT PLAN TO CONSTRUCT A 408,160 SQUARE FOOT HOSPITAL, A HELlPAD, TWO MEDICAL OFFICE BUILDINGS TOTALING 140,000 SQUARE FEET, A 10,000 SQUARE FOOT CANCER CENTER AND AN 8,000 SQUARE FOOT FITNESS REHABILITATION CENTER ALL TOTALING APPROXIMATELY 566,160 SQUARE FEET ON 35.31 ACRES, LOCATED ON THE NORTH SIDE OF TEMECULA PARKWAY (HIGHWAY 79 SOUTH), APPROXIMATELY 700 FEET WEST OF MARGARITA ROAD, KNOWN AS ASSESSOR'S PARCEL NUMBERS 959-080-001 THROUGH 959-080-004 AND 959-080-007 THROUGH 959-080-010 (PA07-0200) THE CITY COUNCIL OF THE CITY OF TEMECULA DOES HEREBY RESOLVE AS FOLLOWS: Section 1. Procedural Findinqs. The City Council of the City of Temecula does hereby find, determine and declare that: A. Universal Health Services of Rancho Springs, Inc. ("UHS"), filed Planning Application Numbers PA04-0462, General Plan Amendment; PA05-0302, Zone Change to PDO-9 (Planned Development Overlay-9); PA04-0463, Conditional Use Permit and Development Plan; and PA04-0571, Tentative Parcel Map in a manner in accord with the City of Temecula General Plan and Development Code, which applications are hereby incorporated by reference, for the property consisting of approximately 35.31 acres generally located on the north side of Highway 79 South, approximately 700 feet west of Margarita Road, known as Assessor's Parcel Numbers 959-080-001 through 959-080-004 and 959-080-007 through 959-080-010 ("Project"). B. The Project was processed including, but not limited to, public notice in the time and manner prescribed by State and local law, including the California Environmental Quality Act ("CEQA"). C. On April 6, 2005, the Planning Commission considered the Project at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to, and did testify either in support of or opposition to this matter. D. The Planning Commission, based on testimony presented by the general public, determined that an Environmental Impact Report would be required for this Project. . E. On April 20, 2005, a scoping session was held before the Planning Commission to determine the extent of issues to be addressed in the Environmental Impact Report for the Project. F. A Draft Environmental Impact Report was prepared in accordance with the California Environmental Quality Act and the California Environmental Quality Act Guidelines and circulated for public review from September 28, 2005 through October 28, 2005. G. On November 16, 2005, and again on January 5, 2006, the Planning Commission considered the Project at duly noticed public hearings as prescribed by law, at which time the City staff and interested persons had an opportunity to, and did testify either in support of or opposition to this matter. H. Following consideration of the entire record of information received at the public hearings, the Planning Commission adopted Resolution No. 06-01 recommending that the City Council certify the Final Environmental Impact Report for the Project and approve a Mitigation Monitoring Program for the Project. I. Following consideration of the entire record of information received at the public hearings and due consideration of the proposed Project, the Planning Commission adopted Resolution No. 06-04, recommending approval of the Conditional Use Permit and Development Plan for the Project (PA04-0463). J. On January 24, 2006, the City Council held a duly noticed public hearing as prescribed by law on the Final Environmental Impact Report at which time all persons interested had the opportunity to present oral and written evidence on the Final Environmental Impact Report. K. On January 24, 2006, following consideration of the entire record of information received at the public hearings before the Planning Commission and the City Council and due consideration of the Project, the City Council adopted Resolution No. 06-05, entitled "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TEMECULA CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT PREPARED FOR PLANNING APPLICATION NOS. PA04-0462 (GENERAL PLAN AMENDMENT) PA05-0302 (ZONE CHANGE), PA04-0463 (CONDITIONAL USE PERMIT AND DEVELOPMENT PLAN) AND PA04-0571 (TENTATIVE PARCEL MAP) AND RELATED ACTIONS, AND ADOPTING THE FINDINGS PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, A STATEMENT OF OVERRIDING CONSIDERATIONS, AND A MITIGATION MONITORING AND REPORTING PROGRAM IN CONNECTION THEREWITH FOR THE PROPERTY CONSISTING OF APPROXIMATELY 35.31 ACRES GENERALLY LOCATED ON THE NORTH SIDE OF HIGHWAY 79 SOUTH, APPROXIMATELY 700 FEET WEST OF MARGARITA ROAD, KNOWN AS ASSESSORS PARCEL NO(S). 959-080-001 THROUGH 959-080-004 AND 959-080-007 THROUGH 959-080-010 (PA04-0462, PA05-0302, PA04-0463, PA04-0571 )." . L. On January 24, 2006, the City Council considered the Conditional Use Permit and Development Plan for the Project (PA04-0463) at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to, and did testify either in support of or opposition to this matter. M. Following consideration of the entire record of information received at the public hearings and due consideration of the proposed Project, the City Council adopted Resolution No. 06-07, approving the Conditional Use Permit and Development Plan for the Project (PA04-0463). N. On February 24, 2006, the California Nurses Association and Citizens Against Noise and Traffic each filed a separate petition challenging the City of Temecula's approval of the Temecula Regional Hospital project proposed by Universal Health Services, Inc. O. On May 3, 2007, the Riverside County Superior Court ordered that the City of Temecula set aside its approval of the Project, including without limitation, its certification of the Final Environmental Impact Report and all related approvals and permits, until the City of Temecula has taken the actions necessary to bring the Project into compliance with the California Environmental Quality Act ("CEQA"). The Riverside County Superior Court ruled in favor of the California Nurses Association and Citizens Against Noise and Traffic, holding that: (1) the MTBE plume was not properly analyzed in the Final Environmental Impact Report; (2) the siren noise at the hospital was significant and should have been mitigated; and (3) not all feasible traffic mitigation measures were adopted for cumulative traffic impacts. P. The Riverside County Superior Court also held that the Final Environmental Impact Report properly addressed: (1) cumulative noise, light and glare, and aesthetic impacts; (2) landscaping mitigation deferral; (3) biological resources; (4) geology and soils mitigation; and (5) land use consistency. Q. On July 12, 2007, another scoping session was held to determine the extent of issues to be addressed in the new Environmental Impact Report for the Project. R. In response to the Riverside County Superior Court's decision, a new Draft Environmental Impact Report was prepared in accordance with the California Environmental Quality Act and the California Environmental Quality Act Guidelines and circulated for public review from November 5,2007 through December 5,2007. S. On January 9, 2008, the Planning Commission considered Planning Application Numbers PA07-0198 (General Plan Amendment), PA07-0199 (Zone Change), PA07-0202 (Conditional Use Permits), PA07-0200 (Development Plan), PA07-0201 (Tentative Parcel Map) in a manner in accordance with the City of Temecula General Plan and Development Code, which applications are hereby incorporated by reference, for the property consisting of approximately 35.31 acres generally located on the north side of Highway 79 South, approximately 700 feet west of Margarita Road, . known as Assessor's Parcel Numbers 959-080-001 through 959-080-004 and 959-080- 007through 959-080-010 ("Project"), at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to, and did testify either in support of or opposition to this matter. T. Following consideration of the entire record of information received at the public hearing, the Planning Commission adopted Resolution No. 08-01 recommending that the City Council certify the new Final Environmental Impact Report for the Project and approve a Mitigation Monitoring Program for the Project. U. Following consideration of the entire record of information received at the public hearings and due consideration of the proposed Project, the Planning Commission adopted Resolution No. 08-04, recommending approval of the Development Plan (PA07-0200). V. On January 22, 2008, the City Council rescinded and invalidated its approvals of Planning Application Nos. PA04-0462, General Plan Amendment; PA05- 0302, Zone Change to PDO-9 (Planned Development Overlay-9); PA04-0463, Conditional Use Permit and Developrnent Plan; and PA04-0571, Tentative Parcel Map for the property consisting of approximately 35.31 acres generally located on the north side of Highway 79 South, approximately 700 feet west of Margarita Road, known as Assessors Parcel No(s). 959-080-001 through 959-080-004 and 959-080-007 through 959-080-01 O. W. On January 22, 2008, the City Council considered the Development Plan (PA07-0200) at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to, and did testify either in support or opposition to this matter. X. Following consideration of the entire record of information received at the public hearings before the Planning Commission and the City Council, and due consideration of the proposed Project, the City Council adopted Resolution No. 08- , entitled "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TEMECULA CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT PREPARED FOR PLANNING APPLICATION NOS. PA07-0198 (GENERAL PLAN AMENDMENT), PA07-0199 (ZONE CHANGE), PA07-0202 (CONDITIONAL USE PERMITS), PA07-0200 (DEVELOPMENT PLAN), PA07-0201 (TENTATIVE PARCEL MAP) AND RELATED ACTIONS, AND ADOPTING THE FINDINGS PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, A STATEMENT OF OVERRIDING CONSIDERATIONS, AND A MITIGATION MONITORING AND REPORTING PROGRAM IN CONNECTION THEREWITH FOR THE PROPERTY CONSISTING OF APPROXIMATELY 35.31 ACRES GENERALLY LOCATED ON THE NORTH SIDE OF HIGHWAY 79 SOUTH, APPROXIMATELY 700 FEET WEST OF MARGARITA ROAD, KNOWN AS ASSESSOR'S PARCEL NUMBERS 959-080-001 THROUGH 959-080-004 AND 959-080-007 THROUGH 959-080-010 (PA04-0462, PA05-0302, PA04-0463, PA04-0571 )." The new Final Environmental Impact Report . (FEIR) and mitigation monitoring reporting program accurately addresses the impacts associated with the adoption of this Resolution. Y. All legal preconditions to the adoption of this Resolution have occurred. Section 2. Further FindinQs. The City Council hereby makes the following findings as required by Section 17.05.010.F of the City of Temecula Municipal Code for a development plan: A. The proposed use is in conformance with the General Plan for the City of Temecula and with all the applicable requirements of state law and other ordinances of the City. The proposed use is in conformance with the goals and policies in the General Plan for the City of Temecula, the Development Code and with all applicable requirements of state law and other ordinances of the City of Temecula because the project has been reviewed and as designed and conditioned, it has been determined that the project is consistent with all applicable zoning ordinances, state law and the General Plan. B. The overall development of the land is designed for the protection of the public, health, safety and general welfare. The overall development of the land has been designed for the protection of the public health, safety, and general welfare, because the project has been designed to minimize any adverse impacts upon the surrounding neighborhood and the project has been reviewed and conditioned to comply with the uniform building and fire codes. Section 3. Conditional Approval. The City Council of the City of Temecula hereby approves the Development Plan to construct 408,160 square foot hospital, a helipad, two medical office buildings totaling 140,000 square feet, a 10,000 square foot cancer center and an 8,000 square foot fitness rehabilitation center all totaling approximately 566,160 square feet on 35.31 acres, located on the north side of Highway 79 South, approximately 700 feet west of Margarita Road, known as Assessors Parcel Numbers 959-080-001 through 959-080-004 and 959-080-007 through 959-080-010 as set forth in Application No. PA07 -0200, subject to the specific Conditions of Approval set forth in Exhibit A, attached hereto and incorporated herein by this reference as though set forth in full. Section 4. The City Clerk shall certify to the adoption of this Resolution. . PASSED, APPROVED AND ADOPTED this 22nd day of January, 2008 Michael S. Naggar, Mayor ATTEST: Susan W. Jones, MMC City Clerk [SEAL] STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss CITY OF TEMECULA ) I, Susan W. Jones, MMC, City Clerk of the City of Temecula, do hereby certify that Resolution No. 08- was duly and regularly adopted by the City Council of the City of Temecula at a regular meeting held on the 22nd day of January, 2008 by the following vote: AYES: NOES: COUNCIL MEMBERS: COUNCIL MEMBERS: COUNCIL MEMBERS: COUNCIL MEMBERS: ABSENT: ABSTAIN: Susan W. Jones, MMC City Clerk . EXHIBIT A DRAFT CONDITIONS OF APPROVAL SCANNED: G DRIVE: PERMITS PLUS: INITIALS: PLANNER: Papp G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 1 . ~ ~ <J~b 1989 ~~ '1h oO~ ONS.NEWOV' ACCEPTANCE OF CONDITIONS OF APPROVAL I, (print name) understand that Planning Application No. PA07-0200 has been approved with Conditions of Approval which are set forth in Exhibit A. I have read the Conditions of Approval contained in CC Resolution No. 08- and understand them. Through signing this ACCEPTANCE OF CONDITIONS OF APPROVAL, I agree and commit to the City of Temecula that I will implement and abide by the Conditions of Approval, including any indemnification requirements imposed by those conditions. SIGNA TURE DATE G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA~DP.doc 2 . EXHIBIT A CITY OF TEMECULA DRAFT CONDITIONS OF APPROVAL Planning Application No.: PA07-0200 Project Description: A Development Plan to construct a 320-bed hospital facility, approximately 408,160 square feet in size, two medical office buildings totaling 140,000 square feet, a 10,000 square foot cancer center and an 8,000 square foot fitness rehabilitation center, all totaling approximately 566,160 square feet, located on the north side of Highway 79 South, approximately 700 feet west of Margarita Road Assessor's Parcel No. 959-080-001 through 959-080-004 and 959-080-007 through 959-080-010 MSHCP Category: DIF Category: TUMF Category: Commercial Office Service Commercial/Office Approval Date: Determined by City Council Action Expiration Date: Determined by City Council Action WITHIN 48 HOURS OF THE APPROVAL OF THIS PROJECT Planning Department 1. The applicant/developer shall deliver to the Planning Department a cashier's check or money order made payable to the County Clerk in the amount of Two Thousand Six Hundred Seventy Dollars and seventy-five cents ($2,670.75) which includes the Two Thousand Six Hundred Six Dollar and seventy-five cents ($2,606.75) fee, required by Fish and Game Code Section 711.4(d)(3) plus the Sixty-Four Dollar ($64.00) County administrative fee, to enable the City to file the Notice of Determination for the Environmental Impact Report required under Public Resources Code Section 21152 and California Code of Regulations Section 15904. If within said 48-hour period the applicant/developer has not delivered to the Planning Department the check as required above, the approval for the project granted shall be void by reason of failure of condition (Fish and Game Code Section 711.4(c)). 2. The applicant shall review and sign the Acceptance of Conditions of Approval document that will be provided by the Planning Department staff and return the document with an original signature to the Planning Department. G:\Planning\2007\PA07~0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 3 GENERAL REQUIREMENTS G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 4 . Planning Department 3. The applicant and owner of the real property subject to this condition shall hereby agree to indemnify, protect, hold harmless, and defend the City with Legal Counsel of the City's own selection from any and all claims, actions, awards, judgments, or proceedings against the City to attack, set aside, annul, or seek monetary damages resulting, directly or indirectly, from any action in furtherance of and the approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board or legislative body including actions approved by the voters of the City, concerning the Planning Application. The City shall be deemed for purposes of this condition, to include any agency or instrumentality thereof, or any of its elected or appointed officials, officers, employees, consultants, contractors, legal counsel, and agents. City shall promptly notify both the applicant and landowner of any claim, action, or proceeding to which this condition is applicable and shall further cooperate fully in the defense of the action. The City reserves the right to take any and all action the City deems to be in the best interest of the City and its citizens in regards to such defense. 4. The permittee shall obtain City approval for any modifications or revisions to the approval of this project. 5. This approval shall be used within two years of the approval date; otherwise, it shall become null and void. By use is meant the beginning of substantial construction contemplated by this approval within the two-year period, which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval. 6. The Director of Planning may, upon an application being filed within 30 days prior to expiration, and for good cause, grant a time extension of up to 3 one-year extensions of time, one year at a time. 7. A separate building permit shall be required for all signage. 8. Prior to the approval and issuance of any permanent signs, a sign program shall be submitted for review and approval for the project site. 9. The development of the premises shall substantially conform to the approved site plan and elevations contained on file with the Planning Department. 10. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Planning Director. If it is determined that the landscaping is not being maintained, the Planning Director shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. 11. The applicant shall paint a 3-foot x 3-foot section of the building for Planning Department inspection, prior to commencing painting of the building. 12. The applicant shall submit to the Planning Department for permanent filing two 8" X 10" glossy photographic color prints of the approved Color and Materials Board and the colored architectural elevations. All labels on the Color and Materials Board and Elevations shall be readable on the photographic prints. G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Ptanning\COA~DP.doc 5 . 13. The Conditions of Approval specified in this resolution, to the extent specific items, materials, equipment, techniques, finishes or similar matters are specified, shall be deemed satisfied by staffs' prior approval of the use or utilization of an item, material, equipment, finish or technique that City staff determines to be the substantial equivalent of that required by the Condition of Approval. Staff may elect to reject the request to substitute, in which case the real party in interest may appeal, after payment of the regular cost of an appeal, the decision to the Planning Commission for its decision. Material Color Stucco Color NO.1: Stucco Color NO.2: Tile Base: Aluminum Panel: Ceramic Roof Tile: Tinted Glass: Window Frame: Senergy, Parchment, # 342 Senergy, Walden, # 3104 Daltile, 12" x 12" Continental Slate, Indian Red CS51 Centria, 9910 L T Seawolf Monier Lifetile, Terra Cotta Flashed Viracon, Bronze VE 4-2M Kawneer, Medium Bronze Kynar 500 Fluorocarbon 14. Trash enclosures shall be provided to house all trash receptacles utilized on the site. These shall be clearly labeled on site plan. 15. The Condition of Approval specified in this resolution, to the extent specific items, materials, equipment, techniques, finishes or similar matters are specified, shall be deemed satisfied by staff prior to approval of the use or utilization of an item, material, equipment, finish, technique that City staff determines to be the substantial equivalent of that required by the Condition of Approval. Staff may elect to reject the request to substitute, in which case the real party in interest may appeal, after payment of the regular cost of an appeal, the decision to the Planning Commission for its decision. 16. All utilities shall be screened from view. Landscape construction drawings shall show and label all utilities and provide appropriate screening. A three foot clear zone shall be provided around fire check detectors as required by the Fire Department before starting the screen. Utilities shall be grouped together in order to reduce intrusion. Screening of utilities shall not look like an after-thought. Planting beds shall be designed around utilities. All light poles shall be located on the landscape plans and the applicant shall insure that there are no conflicts with trees. 17. The applicant shall insure that mature plantings will not intertere with utilities, adjacent site existing structures and landscaping and traffic sight lines. 18. All requirements of Development Code Chapter 17.32 (Water Efficient Landscape Design) are required to be met. 19. The applicant shall comply with the Mitigation Monitoring Program for the project as attached. G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 6 Police Department 20. Graffiti: Any graffiti painted or marked upon the building shall be removed or painted over within twenty-four (24) hours of being discovered. Notify the Temecula Police Department immediately so a report can be taken. 21. Crime Prevention: Any business desiring a business security survey of their location can contact the crime prevention unit of the Temecula Police Department. 22. Public Telephones: Any public telephones located on the exterior of the building should be placed in a well-lighted, highly visible area, and installed with a "call-out only" feature to deter loitering. This feature is not required for public telephones installed within the interior of the building. 23. Landscaping: Applicant shall ensure all landscaping surrounding the building are kept at a height of no more than three feet or below the ground fioor windowsills. Plants, hedges and shrubbery should be defensible plants to deter would-be intruders from breaking into the building utilizing lower level windows. a. The placement of all landscaping should comply with guidelines from Crime Prevention Through Environmental Design (CPTED). 24. Lighting: All parking lot lighting surrounding the complex should be energy-saving and minimized after hours of darkness and in compliance with the State of California Lighting Ordinance. Furthermore, all exterior lighting must comply with Mt. Palomar Lighting Requirements. 25. All exterior doors should have their own vandal resistant fixtures installed above. The doors shall be illuminated with a minimum one foot candle of light at ground level, evenly dispersed. Building Department 26. Trash enclosures, patio covers, light standards, and any block walls if not on the approved building plans, will require separate approvals and permits. 27. Signage shall be posted conspicuously at the entrance to the project that indicates the hours of construction, shown below, as allowed by the City of Temecula Ordinance No. 0- 90-04, specifically Section G (1) of Riverside County Ordinance No. 457.73, for any site within one-quarter mile of an occupied residence. Monday-Friday 6:30 a.m. - 6:30 p.m. Saturday 7:00 a.m. - 6:30 p.m. No work is permitted on Sundays or Government Holidays Community Services Department 28. The developer shall contact the City's franchised solid waste hauler for disposal of construction debris. Only the City's franchisee may haul construction debris. G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 7 . 29. All trash enclosures shall be large enough to accommodate a recycling bin, as well as a regular solid waste container. 30. The property owner or private maintenance association shall maintain all parkways, perimeter landscaping, trail, walls, fences and on site lighting. 31. The developer shall comply with the Public Art Ordinance. Fire Prevention 32. Final fire and life safety conditions will be addressed when building plans are reviewed by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC), and related codes which are in force at the time of building plan submittal. 33. The Fire Prevention Bureau is required to set a minimum fire flow for residential land division per CFC Appendix liLA, Table A-III-A-1. The developer shall provide for this project, a water system capable of delivering 4,000 GPM at 20-PSI residual operating pressure with a 4 - hour duration. The required fire flow may be adjusted during the approval process to reflect changes in design, construction type, or automatic fire protection measures as approved by the Fire Prevention Bureau. The Fire Flow as given above has taken into account all information as provided (CFC 903.2, Appendix III-A). 34. The Fire Prevention Bureau is required to set minimum fire hydrant distances per CFC Appendix III-B, Table A-III-B-1. Super fire hydrants (6" x 4" x 2-2 1/2" outlets) shall be located on Fire Department access roads and adjacent public streets. Hydrants shall be spaced at 350 feet apart, at each intersection and shall be located no more than 210 feet from any point on the street or Fire Department access road(s) frontage to a hydrant. The required fire flow shall be available from any adjacent hydrant(s) in the system (CFC 903.2, 903.4.2, and Appendix III-B). . 35. All traffic calming devices that could impede or slow emergency vehicle access are prohibited, except those expressly approved by the fire prevention bureau individually on a case by case basis when they maintain the required travel widths and radii. 36. If construction is phased, each phase shall provide approved access and fire protection prior to any building construction (CFC 8704.2 and 902.2.2). This will include all internal roads, connecting roads between phases, and construction gates. All required access must be in and available prior to and during ALL construction. Phasing is approved on a separate map, and is ultimately subject to final approval in the field. Public Works Department 37. A Grading Permit for either rough and/or precise grading, including all on-site flat work and improvements, shall be obtained from the Department of Public Works prior to commencement of any construction outside of the City-maintained street right-of way. 38. An Encroachment Permit shall be obtained from the Department of Public Works prior to commencement of any construction within an existing or proposed City right-of-way. G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 8 - 39. All improvement plans and grading plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site and shall be submitted on standard 24" x 36" City of Temecula mylars. 40. All on-site drainage facilities shall be maintained by a private maintenance association or property owner. 41. All utilities, except electrical lines rated 34kv or greater, shall be installed underground. 42. The driveway on De Portola Road will be restricted to right-in/right-ouVleft-in movements. G:\Planning\2007\PA07.0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 9 . PRIOR TO ISSUANCE OF GRADING PERMITS G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 10 . Planning Department 43. The applicant shall submit seven complete sets of final approved plans to the Planning Department with the following revisions shown on the plans. Planning staff will stamp these plans as approved for distribution to each department and the applicant. 44. The Landscape plan shall be revised as follows: a. The applicant shall provide a vines on the screening wall at the loading dock area, subject to the approval of the Planning Director. b. The landscape plan shall provide shrubs, vines and/or other acceptable screening methods to screen the oxygen storage container in the loading dock area, subject to the approval of the Planning Director. c. The applicant shall revise the landscape plan to show final color and finish details for all decorative hardscape throughout the project site. Decorative hardscape shall be provided at all primary building entrances and outdoor gathering areas (including the hospital, medical office buildings, cancer center and fitness rehabilitation center). d. A minimum of one broad canopy type tree shall be provided per every four parking spaces. The tree shall be provided in close proximity to the parking spaces it is to shade. e. One landscape finger shall be provided per 10 parking spaces. The interior finger planting width shall be a minimum of five feet wide with the length equal to the adjoining parking space. Curbs and concrete walks shall not infringe on this five foot width. The planter shall contain a minimum of one tree with surrounding groundcover or shrubs or both. The grading plans shall be revised as necessary to reflect this requirement. 45. The elevations for all buildings shall be revised in a manner that all exterior ladders are screened from the public view of Highway 79 South. 46. The applicant shall submit a separate plan, entitled outdoor furniture detail plan, showing details of all outdoor furniture, subject to the approval of the Director of Planning. Outdoor furniture shall be decorative and of high quality appearance. 47. The applicant shall provide a detailed elevation drawing of the water and boulderfeature at the main entrance, near the porte-cochere. Said feature shall be subject to the approval of the Director of Planning. 48. The applicant shall submit cross section verifying that all roof mounted equipment will be screened from public view as determined acceptable by the Director of Planning. 49. The elevations and roof plans shall show internalized downspouts for all buildings and structures, excluding trash enclosures. 50. Trash enclosures shall be shown on the site plan, landscape plan and elevations and shall comply with the following: a. Trash enclosures shall be provided to house all trash receptacles utilized on the site. b. All trash enclosures shall blend with the architecture of the overall center and include a decorative roof type feature as approved by the Director of Planning. G:IPlanningI2007\PA07-0200 Temecula Regional Hospital DPIPlanningICOA-DP.doc 11 . c. Trash enclosures shall be screened from view. The applicant shall provide shrubs and wall vines on three sides of enclosures as required to provide screening. 51. The elevations shall be revised to show decorative lighting fixtures at the primary entry of each building/structure, subject to the approval of the Director of Planning. Details of all light fixtures, including decorative entry lighting and wall mounted lighting shall be provided on the plans. 52. The Applicant shall revise the site plan and provide a detailed elevation drawing to show a decorative fence no less than four feet in height around the helipad, subject to the approval of the Pianning Director. Said fence shall be constructed in a manner that deflects horizontal wind velocities caused by the rotation of rotor blades, providing all FAR Part 77 imaginary surfaces and the surface of the area remain obstruction free, per Section 1710.020.P of the City of Temecula Development Code. 53. Provide the Planning Department with a copy of the underground water plans and electrical plans for verification of proper placement oftransformer(s) and double detector check prior to final agreement with the utility companies. 54. Doubie detector check valves shall be either installed underground or internal to the project site at locations not visible from the public right-of-way, subject to review and approval by the Director of Planning. 55. The following shall be included in the Notes Section of the Grading Plan: "If at any time during excavation/construction of the site, archaeological/cultural resources, or any artifacts or other objects which reasonably appears to be evidence of cultural or archaeological resource are discovered, the property owner shall immediately advise the City of such and the City shall cause all further excavation or other disturbance of the affected area to immediately cease. The Director of Planning at his/her sole discretion may require the property to deposit a sum of money it deems reasonably necessary to allow the City to consult and/or authorize an independent, fully qualified specialist to inspect the site at no cost to the City, in order to assess the significance of the find. Upon determining that the discovery is not an archaeological/cultural resource, the Director of Planning shall notify the property owner of such determination and shall authorize the resumption of work. Upon determining that the discovery is an archaeological/cultural resource, the Director of Planning shall notify the property owner that no further excavation or development may take place until a mitigation plan or other corrective measures have been approved by the Director of Planning." 56. CR-1 Prior to the issuance of grading permits, the developer is required to enter into a Cultural Resources Treatment Agreement with the Pechanga Tribe. This Agreement will address the treatment and disposition of cultural resources and human remains that may be impacted as a result of the development of the Project, as well as provisions for tribal monitors. 57. CR-2 If cultural resources are discovered during the project construction (inadvertent discoveries), all work in the area of the find shall cease, and a qualified archaeologist and representatives of the Pechanga Tribe shall be retained by the project sponsor to investigate the find, and make recommendations as to treatment and mitigation. G:\Planning\2007\PA07~0200 Temecula Regional Hospital DP\Planning\COA.DP,doc 12 . 58. CR-3 A qualified archaeological monitor will be present and will have the authority to stop and redirect grading activities, in consultation with the Pechanga Tribe and their designated monitors, to evaluate the significance of any archaeological resources discovered on the property. 59. CR-4 Tribal monitors from the Pechanga Tribe shall be allowed to monitor all grading, excavation and ground breaking activities, including all archaeological surveys, testing, and studies, to be compensated by the developer. 60. CR-5 The landowner agrees to relinquish ownership of all cultural resources, including all archaeological artifacts that are found on the Project area, to the Pechanga Tribe for proper treatment and disposition. 61. CR-6 All sacred sites are to be avoided and preserved. 62. A qualified paleontologist/archaeologist shall be chosen by the developer for consultation and comment on the proposed grading with respect to potential paleontological! archaeological impacts. A meeting between the paleontologist/ archaeologist, Planning Department staff, and grading contractor prior to the commencement of grading operations and the excavation shall be arranged. The paleontologist/archaeologist or representative shall have the authority to temporarily divert, redirect or halt grading activity to allow recovery of fossils. The applicant shall provide written verification that services for on-site professional archaeological and paleontological monitoring has been contracted during all phases of earthmoving activities. 63. The Pechanga Band of Luiseno Indians shall be contacted to afford the Band an opportunity to monitor ground-disturbing activities and participate in the decisions regarding collection and curation of any such resources. The applicant shall submit correspondence to the Planning Department that confirms that such contact has been made prior to the issuance of a grading permit. 64. The Applicant shall enter into a pre-construction agreement/treatment plan with the Pechanga Band of Luiseno Indians, prior to the issuance of grading permits, that sets forth and contains the terms and conditions for the treatment of discoveries of Native American cultural resources. The agreement/treatment plan shall contain provisions for the treatment of all Native American cultural items, artifacts, and human remains that may be uncovered during the project. The agreement/treatment plan may allow for the presence of Pechanga tribal monitors during any ground-disturbing activities. The applicant shall submit a signed copy of the pre-construction agreement/treatment plan to the Planning Department prior to the issuance of a grading permit. 65. The Applicant and!or landowner agrees to relinquish all cultural resources, including all archeological artifacts, that are found on the Project area to the Pechanga Band of Luiseno Indians for proper treatment and disposition. This mitigation measure shall be placed on the grading plan as a note prior to issuance of a grading permit. 66. Prior to any ground disturbance activities a qualified archaeological monitor will be present and will have the authority to stop and redirect grading activities, in consultation with the Pechanga Band of Luiseno Indians and their designated monitors, to evaluate the significance of any archaeological resources discovered on the property. This mitigation measure shall be placed on the grading plan as a note prior to issuance of a grading permit. G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA.DP,doc 13 . 67. If any human remains are encountered on the project site, all ground disturbing activities in the vicinity of the discovery will be terminated immediately and the County Coroner's office and the Pechanga Band of Luiseno Indians will be contacted to arrange for the treatment of such remains. This mitigation measure shall be placed on the grading plan as a note prior to issuance of a grading permit. 68. The applicant must enter into a written pre-excavation agreement with the Pechanga Band of Luiseno Indians that addresses the treatment and disposition of all cultural resources, human resources and human remains discovered on-site. A copy of the signed document shall be submitted to the Planning Department. 69. The grading plan shall be revised to include the following: a. Earth berms as required along the northern property lines and along Highway 79 South as discussed in these Conditions of Approval. b. A note on the plans indicating all areas not proposed for development within 100 days shall be tufted, seeded and irrigated for soil and dust erosion. c. Show the five-foot landscape dimension for all parking islands, including the 1-foot concrete landing strip (seven feet total width). One parking island is required per ten parking spaces. Public Works Department 70. A copy of the grading, improvement plans, along with supporting hydrologic and hydral:Jlic calculations shall be submitted to the Riverside County Flood Control and Water Conservation District for approval prior to the issuance of any permit. A permit from Riverside County Flood Control and Water Conservation District is required for work within their right-of-way. 71. A Grading Plan shall be prepared by a registered Civil Engineer and shall be reviewed and approved by the Department of Public Works. The grading plan shall include all necessary erosion control measures needed to adequately protect adjacent public and private property. 72. The Developer shall post security and enter into an agreement guaranteeing the grading and erosion control improvements in conformance with applicable City Standards and subject to approval by the Department of Public Works. 73. A Soil Report shall be prepared by a registered Soil or Civil Engineer and submitted to the Director of the Department of Public Works with the initial grading plan check. The report shall address all soils conditions of the site, and provide recommendations for the construction of engineered structures and pavement sections. 74. A Geological Report shall be prepared by a qualified engineer or geologist and submitted to the Department of Public Works with the initial grading plan check. The report shall address special study zones and the geological conditions of the site, and shall provide recommendations to mitigate the impact of liquefaction. 75. The Developer shall have a Drainage Study prepared by a registered Civil Engineer in accordance with City Standards identifying storm water runoff expected from this site and upstream of this site. The study shall identify all existing or proposed public or private G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 14 . drainage facilities intended to discharge this runoff. The study shall also analyze and identify impacts to downstream properties and provide specific recommendations to protect the properties and mitigate any impacts. Any upgrading or upsizing of downstream facilities, including acquisition of drainage or access easements necessary to make required improvements, shall be provided by the Developer. 76. NPDES - The project proponent shall implement construction-phase and post-construction pollution prevention measures consistent with the State Water Resources Control Board (SWRCB) and City of Temecula (City) NPDES programs. Construction-phase measures shall include Best Management Practices (BMPs) consistent with the City's Grading, Erosion & Sediment Control Ordinance, the City's standard notes for Erosion and Sediment Control, and the SWRCB General Permit for Construction Activities. Post-construction measures shall be required of all Priority Development Projects as listed in the City's NPDES permit. Priority Development Projects will include a combination of structural and non-structural onsite source and treatment control BMPs to prevent contaminants from commingling with stormwater and treat all unfiltered runoff year-round prior to entering a storm drain. Construction-phase and post-construction BMPs shall be designed and included into plans for submittal to, and subject to the approval of, the City Engineer prior to issuance of a Grading Permit. The project proponent shall also provide proof of a mechanism to ensure ongoing long-term maintenance of all structural post-construction BMPs. 77. As deemed necessary by the Director of the Department of Public Works, the Developer shall receive written clearance from the following agencies: a. San Diego Regional Water Quality Control Board b. Riverside County Flood Control and Water Conservation District c. Planning Department d. Department of Public Works 78. The Developer shall comply with all constraints which may be shown upon an Environmental Constraint Sheet (ECS) recorded with any underlying maps related to the subject property. 79. Permanent landscape and irrigation plans shall be submitted to the Planning Department and the Department of Public Works for review and approval. 80. The Developer shall obtain any necessary letters of approval or slope easements for off-site work performed on adjacent properties as directed by the Department of Public Works. 81. A flood mitigation charge shall be paid. The Area Drainage Plan fee is payable to the Riverside County Flood Control and Water Conservation District by either cashier's check or money order, prior to issuance of permits, based on the prevailing area drainage plan fee. If the full Area Drainage Plan fee or mitigation charge has already been credited to this property, no new charge needs to be paid. 82. The site is in an area identified on the Flood Insurance Rate Map as Flood Zone X. This project shall comply with Chapter 15, Section 15.12 of the City Municipal Code which may include obtaining a Letter of Map Revision from FEMA. A Flood Plain Development Permit shall be submitted to the Department of Public Works for review and approval. G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 15 . Fire Prevention 83. Maximum cul-de-sac length shall not exceed 1320 feet. Minimum turning radius on any cul- de-sac shall be thirty-seven (37) feet for residential and forty-five (45) feet for commercial (CFC 902.2.2.3, CFC 902.2.2.4). 84. Cul-de-sacs and/or intersections with planters must maintain 24-foot clear unobstructed travel width around the planters, not including parking. Hardscape areas are permissible provided that they meet the 80,000 lb. load requirements and are at road level. 85. Private entry driveways with divider medians must be a minimum of 16 feet wide on each side unless the median is held back 30 feet from face of curb of perpendicular road. 86. Fire Department vehicle access roads shall have an unobstructed width of not less than twenty-four (24) feet and an unobstructed vertical clearance of not less than thirteen (13) feet six (6) inches (CFC 902.2.2.1). 87. Prior to building construction, dead end roadways and streets in excess of one hundred and fifty (150) feet which have not been completed shall have a turnaround capable of accommodating fire apparatus (CFC 902.2.2.4). G:\Plannjng\2007\PA07~0200 Temecula Regional Hospital OP\Planning\COA-DP.doc 16 . PRIOR TO ISSUANCE OF BUILDING PERMIT G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 17 . Planning Department 88. The applicant shall submit to the Planning Department for permanent filing two 8" X 10" glossy photographic color prints of the approved Color and Materials Board and the colored architectural elevations. All labels on the Color and Materials Board and Elevations shall be readable on the photographic prints. 89. The applicant shall submit a photometric plan, including the parking lot to the Planning Department, which meets the requirements of the Development Code and the Palomar Lighting Ordinance. The parking lot light standards shall be placed in such a way as to not adversely impact the growth potential of the parking lot trees. 90. The final construction plans shall include a photometries plan showing foot-candle illumination in the parking lot, driveways, drive aisles, pedestrian paths of travel and building entrances. A minimum of one-footcandle illumination shall be maintained throughout the site and a minimum of two foot-candle illumination shall be provided at primary building entrances. 91. Final Construction plans shall provide decorative lighting fixtures shall be provided at the primary entry of each building/structure, subject to the approval of the Director of Planning. Final construction plans shall provide details of all light fixtures, including decorative entry lighting, parking lot lighting and wall mounted lighting. 92. The applicant shall submit a detailed lighting plan for the helipad facility. 93. Three copies of Construction Landscaping and Irrigation Plans shall be reviewed and approved by the Planning Department. These plans shall conform to the approved conceptual landscape plan, or as amended by these conditions. The location, number, genus, species, and container size of the plants shall be shown. The plans shall be consistent with the Water Efficient Ordinance. The plans shall be accompanied by the following items: a. Appropriate filing fee (per the City of Temecula Fee Schedule at time of submittal). b. Provide a minimum five foot wide planter to be installed at the perimeter of all parking areas. Curbs, walkways, etc. are not to infringe on this area. c. A note on the plans stating that "Two landscape inspections are required: one inspection is required for irrigation lines and a separate inspection is required for final planting inspection". d. A note on the plans stating that "The contractor shall provide two copies of an agronomic soils report at the first irrigation inspection." e. One copy of the approved grading plan. f. Water usage calculations per Chapter 17.32 of the Development Code (Water Efficient Ordinance). g. Total cost estimate of plantings and irrigation (in accordance with approved plan). h. The locations of all existing trees that will be saved consistent with the tentative map. i. A landscape maintenance program shall be submitted for approval, which details the proper maintenance of all proposed plant materials to assure proper growth and G:IPlanningI2007\PA07-0200 Temecula Regional Hospital DPIPlanningICOA-DP.doc 18 . landscape development for the long-term esthetics of the property. The approved maintenance program shall be provided to the landscape maintenance contractor who shall be responsible to carry out the detailed program. j. Specifications shall indicate that a minimum of two landscape site inspections will be required. One inspection to verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two (2) hours without loss of pressure. The second inspection will verify that all irrigation systems have head-to- head coverage, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The applicanUowner shall contact the Planning Department to schedule inspections. 94. The final construction landscape plan shall include the following: a. A calculation indicating the percentage of the site that is to be landscaped shall be provided on the construction landscape plans. The applicant shall insure that minimum required code percentages for landscaping are provided to meet the specific zone requirements. b. The applicant shall field verify adjacent existing street plantings and coordinate proposed plantings to be compatible as approved by the Director of Planning. c. An appropriate method for screening the gas meters and other externally mounted utility equipment shall be reviewed and approved by the Planning Department. d. Street trees shall be provided along all streets at the rate of one per every 30 feet of street frontage. e. Areas proposed for development in another phase occurring not within six months of the completion of the previous phase shall be temporarily tufted, seeded and irrigated for dust and soil erosion control. A note on the grading plan and landscape plan shall be provided. f. A minimum five foot width planting area shall be provided at the ends of all parking rows. Curbs and concrete walks shall not infringe on this five foot width. The planter length shall be equal to the adjoining parking space. The planter shall contain a rninimum of one tree, shrubs and ground covers. g. Accent trees (minimum 36-inch box size) shall be installed at entries to parking areas in order to define the entry and provide a focal point. h. Indian Tribe, Faurei varieties shall be provided for Crape Myrtle. i. Additional trees shall be added on the north, east and west sides of building MOB #2 as approved by the Director of Planning. j. A combination of large (no less than 24-inch box) Afghan Pines and California Pepper trees (or other large screen trees) shall be provided along the northern perimeter of the project to screen off-site views of the development as approved by the Director of Planning. k. A landscaped berm shall be provided along the northern property lines adjacent to the residentially zoned lots and DePortola, with mature (24-inchand 36-inch box) screen trees to screen the view of the buildings and reduce the amount of glare from the project site, subject to approval by the Director of Planning. A cross section shall be provided on grading and landscape plans verifying the buffer area. G:IPlanningI2007IPA07-0200 Temecula Regional Hospital DPIPlanningICOA-DP.doc 19 . I. The landscaped area along Highway 79 South shall include a meandering berm with large shrubs to provide additional screening of the parking lot. The applicant shall provide a combination of shrub plantings and earth berms that can be maintained at a minimum height of three feet around all parking areas to screen parking from off- site views. m. All areas not designed for buildings, parking, driveways or other useable features shall be landscaped, unless approved by the Director of Planning. The area along the eastern property line, adjacent to the access driveway shall be landscaped, unless it is determined critical habitat not to be disturbed. 95. All utilities shall be screened from public view. Landscape construction drawings shall show and label all utilities and provide appropriate screening. Provide a three foot clear zone around fire check detectors as required by the Fire Department before starting the screen. Group utilities together in order to reduce intrusion. Screening of utilities is not to look like an after-thought. Plan planting beds and design around utilities. Locate all light poles on plans and insure that there are no conflicts with trees. 96. Building Construction Plans shall include detailed outdoor areas (including but not limited to trellises, decorative furniture, fountains, and hardscape) to match the style of the building subject to the approval of the Planning Director. 97. Building plans shall indicate that all roof hatches shall be painted "International Orange." 98. The construction plans shall indicate the application of painted rooftop addressing plotted on a nine-inch grid pattern with 45-inch tall numerals spaced nine inches apart. The numerals shall be painted with a standard nine-inch paint roller using fluorescent yellow paint applied over a contrasting background. The address shall be oriented to the street and placed as closely as possible to the edge of the building closest to the street. 99. All roof mounted equipment shall be screened from public view as determined acceptable by the Director of Planning. 100. All exterior wall mounted ladders (for all buildings) shall be located in a manner that they are not visible from Highway 79 South. Public Works Department 101. Prior to the first building permit, Parcel Map No. 32468 shall be recorded, unless otherwise approved by the Director of Public Works. 102. Improvement plans and/or precise grading plans shall conform to applicable City of Temecula Standards subject to approval by the Director of the Department of Public Works. The following design criteria shall be observed: a. Flowline grades shall be 0.5% minimum over P.C.C. and 1.00% minimum over A.C. paving. b. Driveways shall conform to the applicable City of T emecula Standard No. 207 A. c. Street lights shall be installed along the publiC streets adjoining the site in accordance with City Standard No. 800, 801, 802 and 803. G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 20 . d. Concrete sidewalks and ramps shall be constructed along public street frontages in accordance with City of Temecula Standard Numbers. 400. 401 and 402. e. All street and driveway centerline intersections shall be at 90 degrees. f. Landscaping shall be limited in the corner cut-off area of all intersections and adjacent to driveways to provide for minimum sight distance and visibility. 103. The Developer shall design the following public improvements to City ofTemecula General Plan standards unless otherwise noted. Plans shall be reviewed and approved by the Director of the Department of Public Works: a. Improve Highway 79 South (Urban Arterial Highway Standards - 134' R/W) to include installation of sidewalk, street lights, underground utilities, drainage facilities, signing and striping, utilities (including but not limited to water and sewer). b. Improve De Portola Road (Modified Secondary Arterial (4 lane separated) - 88' R1W) to include installation of pavement, street lights, drainage facilities, signing and striping, and utilities (including but not limited to water and sewer). c. State Route 79/Redhawk Parkway (Margarita Road) - Provide southbound and eastbound right turn traffic signal overlap. d. The traffic signal at the intersection of Highway 79 South and Country Glen Way shall be modified to allow a full movement intersection. 104. Private roads shall be designed to meet City public road standards. Unless otherwise approved the following minimum criteria shall be observed in the design of private streets: a. Dona Lynora (66' R/W) to include the installation of street improvements, paving, curb and gutter, utilities (including but not limited to water and sewer). b. Private 28-foot wide ingress/egress road to include installation of paving and curb per the approved site plan. 105. The Developer shall construct the following public improvements in conformance with applicable City Standards and subject to approval by the Director of the Department of Public Works: a. Street improvements, which may include, but not limited to: pavement, curb and gutter, sidewalks, drive approaches, street lights, signing, striping, traffic signal systems, and other traffic control devices as appropriate b. Storm drain facilities c. Sewer and domestic water systems d. Under grounding of proposed utility distribution lines 106. A construction area Traffic Control Plan shall be designed by a registered Civil or Traffic Engineer and reviewed by the Director of the Department of Public Works for any street closure and detour or other disruption to traffic circulation as required by the Department of Public Works. The Traffic Control Plan shall indicate that construction traffic may not use the entrance from DePortola Road to access the site. 107. All access rights, easements for sidewalks for public uses shall be submitted and reviewed by the Director of the Department of Public Works and City Attorney and approved by City Council for dedication to the City where sidewalks meander through private property. G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 21 . 108. The building pad shall be certified to have been substantially constructed in accordance with the approved Precise Grading Plan by a registered Civil Engineer, and the Soil Engineer shall issue a Final Soil Report addressing compaction and site conditions. 109. The Developer shall pay to the City the Public Facilities Development Impact Fee as required by, and in accordance with, Chapter 15.06 of the Temecula Municipal Code and all Resolutions implementing Chapter 15.06. 110. The Developer shall pay to the City the Western Riverside County Transportation Uniform Mitigation Fee (TUMF) Program as required by, and in accordance with, Chapter 15.08 of the Temecula Municipal Code and all Resolutions implementing Chapter 15.08. In addition to the above Public Works Department Conditions of Approval, THE FOLLOWING CONDITIONS OF APPROVAL SHALL BE COMPLETED PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT IN PHASE I - (A 170-bed hospital with 80,000 square feet of medical office space) 111. Parcel Map No. 32468 shall be recorded, unless otherwise approved by the Director of Public Works. 112. The Developer shall design the following public improvements to City of Temecula General Plan standards unless otherwise noted. Plans shall be reviewed and approved by the Director of the Department of Public Works: a. Highway 79 South (Urban Arterial Highway Standards - 134' R/W) to include installation of sidewalk, street lights, underground utilities, drainage facilities, signing and striping, utilities (including but not limited to water and sewer). i. Westbound a) Provide a dedicated right turn lane - 12 foot wide by 200 feet long b) Provide three (3) thru lanes c) Provide one (1) left turn lane ii. Eastbound a) Provide two (2) left turn lanes b) Provide two (2) thru lanes and c) Provide one (1) shared thru/right lane b. Dona Lynora (66' R/W) i. Installation of half-street improvements, paving, curb and gutter, utilities (including but not limited to water and sewer) ii. Restricted to right in/right out vehicular movement c. Main entry (Country Glen Way) and Highway 79 South i. Signal modification Ii. Provide a 245' continuous median from Highway 79 South to main drive aisle G:\Ptanning\2007\PA07~0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 22 . iii. Southbound (exiting site) a) Provide two (2) left turn lanes b) Provide a 20 foot wide shared thru/right turn lane iv. Northbound (entering site) - 28 foot wide d. De Portola Road (Modified Secohdary Arterial (4 lane separated) - 88' R/W) i. Installation of half-street improvements, paving, curb and gutter, utilities (including but not limited to water and sewer) ii. Provide a 28 foot wide internal ingress/egress connection to De Portola Road e. State Route 79/Redhawk Parkway (Margarita Road) i. Provide southbound and eastbound right turn traffic signal overlap. Building Department The Conditions of Approval herein (Building Department) are not applicable to the projects that fall under the jurisdiction of the State of California OSHPD. These conditions are applicable to the construction documents for projects, specifically the medical office buildings that are within the jurisdiction of the City of Temecula Building and Safety Department. 113. All design components shall comply with applicable provisions of the 2007 edition of the California Building, Plumbing and Mechanical Codes; 2007 California Electrical Code; California Administrative Code, Title 24 Energy Code 2005 Standards, California Title 24 Disabled Access Regulations, and the Temecula Municipal Code. 114. A complete exterior site lighting plans showing compliance with Ordinance No. 655 for the regulation of light pollution. All street-lights and other outdoor lighting shall be shown on electrical plans submitted to the Department of Building and Safety. Any outside lighting shall be hooded and directed so as not to shine directly upon adjoining property or public rights-of-way. 115. A receipt or clearance letter from the T emecula Valley School District shall be submitted to the Building & Safety Department to ensure the payment or exemption from School Mitigation Fees. 116. Obtain all building plans and permit approvals prior to commencement of any construction work. 117. All building and facilities must comply with applicable disabled access regulations. Provide all details on plans (California Disabled Access Regulations effective April 1. 1998). 118. Provide disabled access from the public way to the main entrance of the building. 119. Provide van accessible parking located as close as possible to the main entry. 120. Restroom fixtures. number and type, to be in accordance with the provisions of the 2007 edition of the California Building Code Appendix 29. G;\Planning\2007\PA07~0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 23 . 121. Provide appropriate stamp of a registered professional with original signature on plans prior to permit issuance. 122. Provide electrical plan including load calculations and panel schedule, plumbing schematic and mechanical plan for plan review. 123. Truss calculations that are stamped by the engineer of record and the truss manufacturer engineer are required for plan review submittal. 124. Provide precise grading plan at plan check submittal to check accessibility for persons with disabilities. 125. A pre-construction meeting is required with the building inspector prior to the start of the building construction. Community Services Department 126. The developer shall provide TCSD verification of arrangements made with the City's franchise solid waste hauler for disposal of construction debris. 127. Prior to the first building permit or installation of additional street lighting which ever occurs first, the developer shall complete the TCSD application process, submit an approved Edison Streetlight Plan and pay the appropriate energy fees related to the transfer of arterial street lighting on Hwy 79 South into the TCSD maintenance program. Fire Department 128. Prior to building permit or building construction, all locations where structures are to be built shall have approved Fire Departmeni vehicle access roads. Fire Department access roads shall be an all weather surface for 80,000 Ibs. GVW (CFC 8704.2 and 902.2.2.2). 129. Prior to issuance of building permits. the developer shall furnish one copy of the water system plans to the Fire Prevention Bureau for approval prior to installation for all private water systems pertaining to the fire service loop. Plans shall be signed by a registered civil engineer; contain a Fire Prevention Bureau approval signature block; and conform to hydrant type, location, spacing and minimum fire flow standards. Hydraulic calculations will be required with the underground submittal to ensure fire flow requirements are being met for the on site hydrants. The plans must be submitted and approved prior to building permit being issued (CFC 8704.3, 901.2.2.2 and National Fire Protection Association 241-4.1). 130. Prior to issuance of building permits, plans for structural protection from vegetation fires shall be submitted to the Fire Prevention Bureau for review and approval. The measures shall include, but are not limited to, enclosing eaves, noncombustible barriers (cement or block walls), and fuel modification zones (CFC Appendix II-A). G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Plannjng\COA~DP.doc 24 . PRIOR TO RELEASE OF POWER, BUILDING OCCUPANCY OR ANY USE ALLOWED BY THIS PERMIT G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 25 . Planning Department 131. A report of findings, including an itemized inventory of recovered specimens, should be prepared upon completion of the steps outlined the initial study, under cultural resources. The report should include a discussion of the significance of all recovered specimens. The report and inventory, when submitted to the Lead Agency (City ofTemecula), would signify completion of the program to mitigate impacts to the palentologic and archaeological resources. 132. The applicant shall be required to screen all loading areas and roof mounted mechanical equipment from view of the adjacent residences and public right-of-ways. If upon final inspection it is determined that any mechanical equipment, roof equipment or backs of building parapet walls are visible from any portion of the public right-of-way adjacent to the project site, the developer shall provide screening by constructing a sloping tile covered mansard roof element or other screening if reviewed and approved by the Director of Planning. 133. All required landscape planting and irrigation shall have been installed consistent with the approved construction plans and shall be in a condition acceptable to the Director of Planning. The plants shall be healthy and free of weeds, disease, or pests. The irrigation system shall be properly constructed and in good working order. 134. Performance securities, in amounts to be determined by the Director of Planning, to guarantee the maintenance of the plantings in accordance with the approved construction landscape and irrigation plan shall be filed with the Planning Department for a period of one year from final certificate of occupancy. After that year, if the landscaping and irrigation system have been maintained in a condition satisfactory to the Director of Planning, the bond shall be released upon request by the applicant. 135. Each parking space reserved for the handicapped shall be identified by a permanently affixed reflectorized sign constructed of porcelain on steel, beaded text or equal, displaying the International Symbol of Accessibility. The sign shall not be smaller than 70 square inches in area and shall be centered at the interior end of the parking space at a minimum height of 80 inches from the bottom of the sign to the parking space finished grade, or centered at a minimum height of 36 inches from the parking space finished grade, ground, or sidewalk. A sign shall also be posted in a conspicuous place, at each entrance to the off- street parking facility, not less than 17 inches by 22 inches, clearly and conspicuously stating the following: "Unauthorized vehicles parked in designated accessible spaces not displaying distinguishing placards or license plates issued for persons with disabilities may be towed away at owner's expense. Towed vehicles may be reclaimed by telephoning (951) 696-3000." 136. In addition to the above requirements. the surface of each parking place shall have a surface identification sign duplicating the Symbol of Accessibility in blue paint of at least three square feet in size. 137. All site improvements including but not limited to parking areas and striping shall be installed prior to occupancy or any use allowed by this permit. G:\Pfanning\2007\PA07.0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 26 . 138. All of the foregoing conditions shall be complied with prior to occupancy or any use allowed by this permit. Public Works Department PHASE I . A 170-bed hospital with 80,000 square foot medical office space. 139. Prior to the first Certificate of Occupancy in Phase I, the following improvements shall be constructed and operational: a. Highway 79 South i. Traffic signal modifications at the intersection of Highway 79 South and Country Glen Way ii. Roadway improvements a) Westbound (i) Provide a dedicated right turn lane - 12 foot wide by 200 feet long (ii) Provide three (3) thru lanes (iii) Provide one(1) left turn lane b) Eastbound (i) Provide two (2) left turn lanes (ii) Provide two (2) thru lanes and (iii) Provide one (1) shared thru/right lane b. Main Entry/Country Glen Way i. Provide a 245' continuous median from Highway 79 South to main drive aisle ii. Southbound (exiting site) a) Provide two (2) left turn lanes b) Provide a 20-foot wide shared thru/right turn lane iii. Northbound (entering site) - 28 foot wide c. De Portola Road (Modified Secondary Arterial (4 lane separated) - 88' R/W) i. 28-foot wide internal ingress/egress connection from project site to De Portola Road ii. Roadway improvements d. State Route 79/Redhawk Parkway (Margarita Road) i. Southbound and eastbound right turn traffic signal overlap e. Dona Lynora (66' R/W) i. Installation of half-street improvements, paving, curb and gutter, utilities (including but not limited to water and sewer) ii. Restricted to right in/right out vehicular movement G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 27 . PHASE II - Expand to a 320-bed hospital plus an additional 60,000 square foot medical office space. 140. As deemed necessary by the Department of Public Works, the Developer shall receive written clearance from the following agencies: a. Rancho California Water District b. Eastern Municipal Water District c. Department of Public Works 141. All public improvements, including traffic signal modification, shall be constructed and completed per the approved plans and City standards to the satisfaction of the Director of the Department of Public Works. 142. The existing improvements shall be reviewed. Any appurtenance damaged or broken shall be repaired or removed and replaced to the satisfaction of the Director of the Department of Public Works. Building and Safety Department 143. Developments with multi-tenant buildings or Shell Buildings shall provide a house electrical meter to provide power for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each building on the site. Developments with Single User Buildings shall clearly show on the plans the location of a dedicated panel in place for the purpose of the operation of exterior lighting and fire alarm systems when a house meter is not specifically proposed. Fire Prevention 144. Prior to Occupancy and building final, all locations where structures are to be built shall have approved Fire Department vehicle access roads to within 150 feet to any portion of the facility or any portion of an exterior wall of the building(s). Fire Department access roads shall be an all weather surface designed for 80,000 Ibs. GVW with a minimum AC thickness of .25 feet ( CFC see 902). 145. Prior to issuance of a Certificate of Occupancy or building final, "Blue Reflective Markers" shall be installed to identify fire hydrant locations (CFC 901.4.3). 146. Prior to issuance of Occupancy all manual and electronic gates on required Fire Department access roads or gates obstructing Fire Department building access shall be provided with the Knox Rapid entry system for emergency access by firefighting personnel (CFC 902.4). 147. Prior to map recordation the applicant shall submit to the Fire Prevention Bureau a georectified (pursuant to Riverside County standards) digital version of the map including parcel and street centerline information. The electronic file will be provided in a ESRI Arclnfo/ArcView compatible format and projected in a State Plane NAD 83 (California Zone VI ) coordinate system. The Bureau must accept the data as to completeness, accuracy and format prior to satisfaction of this condition. G:\Planning\2007\PA07-0200 Temecufa Regional Hospital DP\Planning\COA-DP.doc 28 . Police Department 148. Roof Hatches: All roof hatches shall be painted "International Orange." 149. Marked Parking for Disabled Vehicles: All disabled parking stalls on the premises shall be marked in accordance with section 2251'1.8 of the California Vehicle Code. G:IPlanning\2007\PA07-0200 Temecula Regional Hospital DPIPlanningICOA-DP.doc 29 - OUTSIDE AGENCIES G:\Planning\2007\PA07-0200 Temecula Regional Hospital DP\PJanning\COA-DP.doc 30 . 150. Flood protection shall be provided in accordance with the Riverside County Flood Control District's transmittal dated July 24, 2004, a copy of which is attached. The fee is made payable to the Riverside County Flood Control Water District by either a cashier's check or money order, prior to the issuance of a grading permit (unless deferred to a later date by the District), based upon the prevailing area drainage plan fee. 151. The applicant shall comply with the recommendations set forth in the County of Riverside Department of Environmental Health's transmittal dated July 7, 2007, a copy of which is attached. 152. The applicant shall comply with the recommendations set forth in the Riverside Transit Authority's transmittal dated July 21, 2004, a copy of which is attached. 153. The applicant shall comply with the recommendations set forth in the Rancho California Water District's transmittal dated July 12,2004, a copy of which is attached. G;\Planning\2007\PA07~0200 Temecula Regional Hospital DP\Planning\COA-DP.doc 31 - yy rU'\.1\.r.l" JJ. 'tV lLJ.,U"UV1" Oenen! Managcr-chiefEnginccr 1995 MARKET STREET RIVBRSIDB, CA 92501 909.955.1200 909.788.9965 FAX RIVERSIDE coUNtY FLOOD CO AND WATER CONSERV AnON DIS SlIBD.! C!IY ofTemecula Planning DeDartment Post Office Box 9033 Temecula. Califomla 92589-9033 AllenlJo~: ~ \...otJEt Ladles and GenUemen: Re: ~-C>"c..'l. J:.. p,e.. 0'1--00.1<.3 The D1slIicl does not normaRY recommend conditions for land dlvIslons or other land use cases In Inco~rated .cItles. The Dislrlct also does ~an check c;l\y land use cases, or provide Stale Division or Real Estate letters or other ftood hazard reoorts for cases. DIslilct commentslrec:iomri1endalfons for' such cases era nonnally limited to Rems of s~ Interest to the DlslIicllndudna OlslIicl Master DraInage Plan facilities, other reglorlal flood control and dtalnage faclUtles whlch.couId be CllIlSkf'ered a!oglcal COIl1pOI1enfor exlOnslon of a master plan system, and DIs1ricl Area Drainage Plan fees (development mltlgatloii fees). Iil adclillon; InfoanaUon of a general nature Is provided.. .. The District has not reviewed the ~ project In detail and the follov.i!lll checked comments do not In any way constitute or Imply DIstrlct apprbVa! or endorsement of the proposed project with respect to flood hazard. public health and safetY.or any other such Issue: . . ThIs PT9lect WOUld not be ImpaCted by Dlslrlct Master Drainage Plan facillUes nor are other facilities of reglonal,nterest proposed. . . -X- ThIs project Involves District Master Plan faaliUes. The Distrlct wfn accept ownership or such facilities on wrlllen request of the Qily. Facilities must be constructed 10 DlslIicl standards, and District Dlan check, and in~on wlIi be required for Distrlct acceptance. Plan check, Inspection end administratlve fees will be required. ". . ThIs Pl'O/ect Pfl1pOses channels, storm drains 36 inches or !!VIler in diameter. or other facilities that could be considered regiOnal In nature aildfor a 10lIIca1 extension of thli ~ Master Dralna~ Plan. The DIstrlct woulii consider acceptfpg ownership Of sucn feallties on wntlen request of the q/ty. Facintfes must be conslructed to Dlsbicl atancIliids, and Dlslrlct Plan check and InsP!lCllon will be reqUired for District acceptance. Plan check, Inspection and administrative fees wfll be required. This pro~ Is located within the limits or the DIslrlct's . Area g,~~g~ ~~e~orord~~r:r~ ~h~e:BI=,~i"alfJI=~~t':.~J~gDe..t:~d?l!l ~~s whichever comes firsl Fees to be paJd should be at the rate In effect at the time of 1Ssuai1ce ot ll1e.actuaJ pennlt. . GENERAL INFORMATION This project may regulraa NaUonal Pollutant, Discharge EfJmInaUon System (NPDESl J1IlIll)it from the State Water Resources Control Board. Clearance for .gradlng, recOrdaUon, or other final !lPProval Should not be given until the 'City has detennlned tllat.thlj project has been granted a pennll,er Is'llhown to be exempt . It this ProIect Involves a Federal ~ Management ~ncy (FEMAl Il1lIflP.ed l\ood plain, then the City should requlni .!lie applicant to P!'OVIde all stud.!~ ClIlCUIatlons, jJ!ans 8nd' other IrifoanaUon re~Ir'ed to meel FEMA requirements, 8nd should further require """ the apP!lC!lril Obtain a Conditional Leller of Mi!P Revision {CLOMR) prior tograd,ng, recordetion or olhe~ final approvaf of the project, and a Leiter or Map Revision (lOMR) prior to occupancy. . If a nalural watercourse or mapped flood plain 18 ImD8Cled !>Y this project. the City should requlre the applicant to obtain a SectIon 1601/1603 Agreement fnim the Callfomla Departmerit or Ash arid Game and a Clean Water Act 5eclIon 404 Pennlt from the U.S. Army ColpS of En~, or written cocres~ from lhesa agencies indlcating the proJect Is exemPl from these ~Is. A Cleen Water Act SectiofI 401 Water Quality CeIliflcetion may be required Trom the loCal Calltomla Re9fonal Water Quality Control Board prlor to Issuance of lhe Corps 404 pennll. X /ftJ ~!:.Jr 1'l>l4.\IT' 5rt.ft1,L. lit: tlVi,MtJe:t> fttl.. kJo( W""!'- wl"TlfiI'J r~ ])\$~ C.r \4q"" -W-.,Jff1 'p..- w rrtt C>16lr1Z\ Go. FAq l..l11 '"". "f'e:~e.I^,,,,,, ("r~- ~" ~@~OW~m1 JUl 2 8 2004 W .. . c:.....t.A Very lIuIy youra, tU;4 ARl1JRODIAZ Senior CIvIl Engineer Date: ,7U/Y..21:Jtl!'J,{ . . .....0:. . ,~ ~~ i. j I I , ; i I I I I I I. I I I , I 1 i I i I I i I I J. COUNTY OF RIVERSIDE · COMMUNITY HEALTH AGENCY DEPARTMENT OF ENVIRONMENTAL HEALTH July 7, 2004 m~ ~. ~ n \'J i~ ~ l\ill JC:"" II ,~04 ~ City ofTemecula Planning Department P.O. Box 9033 Temecula, CA 92589-9033 Attention: Dan Long By RE: Plot Plan No. PA04-0462 & PA044I63 Dear Mr. Long: Department'of Environment8I Health has reviewed the Plot Plan No. PA04-0462 & PA044163 to construct T emecula Regional Hospital and has no objections. Water arid sewer services should be available in this area, although we have not iti receipt of any information concerning those services. . PRIOR TO THE ISSUANCE OF BUILDING PERMITS THE FOLLOWING SHOULD BE REQUIRED: a) "WiII-serve"letters from the appropriate water and sewering districts. b) Any food establishments, (including vending machines), shall require three complete sets of plans for each food establishment will be submitted including a fixture schedule, a finish schedule and a plumbing schedule in order to ensure compliance with the California Unifonn Retai1 Food Facilities Law 2. For specific reference, contact Food Facility Plan Examinm at (909) 600-6330. c) Any hazardous lnaterlaIs handling or stomge shall require a clearance letter from the Department of Environmental Health Hazardous Materials Management Branch (9SS- SOSS) Sincerely, Sam Martinez, Supervising Environmental Hca1tb SpeclaIlst (909) 955-8980 NOTE: Any current additional requirements not covered can be applicable at time of Building Plan review for fina1 Department ofEnv1ronmentaJ Health clearance. co: . Doug ThompsOn, Hazardous MateriaIs :Oce1 EalOIcemnt AgeDCJ . P'Q Box 1280, 1llve1side, CA 92502.1280 . (909) !/55.8982 . FAX 1909) 781.9653 . 4OBO Lemon Slreet, 9th.~ !five,.;de, CA 92501 .:..... Uoe .... Walei' fDsIa-. . P.Q Box 1206. 1lIwnIdo, CA 92502.1206 . (909) 9~ . FAX 1909l ~ . 4OBO lemon SlJeet, 2nd Floor, RIvetside. CA 92501 1 . :.., '. J , , . 1 I , I. I I i I I I I I I I ! I I I i I I ;. ....- ',' '- - · ~ r ~ July 21, 2004 R1v....kIe Transit Agency 1825 Third S_t P.O. Box 59968 RlveBIde. CA 92517-1968' Phone: (909) 56&SOOO Fax: (909) 561>6001 Mr. Dan Long, Case Planner Planning Depl, City of Temecula P.O. Box 9033 Temecula, CA 92589-9033 SUBJECT: P04.()462 and PA0400463 - Temecula Hospltal- Comments from RTA Dear Mr: long: Thank you for the opportunity to review the site plan for the proposed 535,000 sq ft medical complex at Temecula Hospital along State Route (SR) 79. A copy of RTA Planning's Intemal Development Review Memo Is enclosed and provides additional ralionale and technical detail in support of the requests for transit amenities that would expand mobility options for this project. To encourage and enhance future transit options at TemeClila Hospital, RTA recommends the site pian or street improvement plans be revised at to show the following features: · A paved, lighted, and ADA-compllant .translt bus stop with a 220 ft-fong tumout conflgura- . tion capable of accommodating two parked buses, to be Installed along the N side of SR 79, just west of the primary hospital entrance. The bus stop should Incorporate a paved passenger waiting area and space for Installation of benches and passenger shelters. .. Information note: Sufficient right-of-way appears available for this tumout without significant adjustment to sidewalks, loss of parking spaces or required landscaping and with minimum disturbance of future street trae or utility structure Installations. · RrA siaff is also recommending designation on the plans of an additional specified clear path of travel from the bus stop to the entrance of the main hospital building. · RTA staff also 'adVises that the project proponents work with the City to Installlwo new passenger shelters at the new bus Slop that are corilpllmenlary to the hospital's design and architectural themes. RTA requests Ihese recommendations be made conditions of approval for PA 04-0462 and PA04-0463. If you need further clarification or I can be of further assistance, please call me at (909) 565-5164 or conlact me onUne at mmccov/lilriversldetransilcom. Michael McCoy Senior Planner F:\dataIPlamfnglMfkeM\WordlDev Review\Temecula\2004\RTA LUhd . Temec Hosp.doc - .' . ..... '-:RrA III....w. n../I JIg-., July 21, 2004 PLANNING DEPARTMENT MEMO DEVELOPMENT~~ To: Anne Palatino, Director of Planning Michael McCoy, Senior Planner ~ City of Temecula, Cases PA0400462 & -4)463: Plot Plan review and' CUP for 535,000 sq ft of hospilal and medlcak'elated facilities, N of State Route (SR) 79 and W of Margarita Rd; RIverside Transit Agency (RTA) Comments . Bus routes inwlved: Exlsllng Route 24 and future bus routes From: Subject: Summary: UnIversal Health Care ServIces Inc proposes a site plan and conditional use pennlt for the Temecula Hospital project. 535,000 sq ft of medical facilities located on 35 now vacant acres % mile west of the SR79-Margar/ta Rd Intersection In a rapIdly expanding commercIal district of Temecula. This will be the first fulJ.faclllty medical Institution In Southwest RIverside County and will be a distinct asset to the community, challenging planners and engineers to provide II robust suite of mobility options for access to It The project Includes the following components: . · 176-bed, 6-story hospital building, Including Emergency admittance . A 5-story expansion of the hospital · Two multl-story medIcal office buildings . Cancer center · Fitness center · 1280 parking spaces The sIte plan's per/meter ahd Inter/or circulation patterns are very good, with prImary access provided dlreCtry off a signalized Intersection at SR 79 and Country Glen Wy. The hospital's main building entrance will have a covered drlve-thru loop suitable for van. pools, paratranslt and most private vehIcles. Several ADA paths-of-travel are specified on the s~e plan for connection between the main hospital and all perimeter driveways. RTA oPerates Route 24 along some portions ofSR79 but the bus currently does not stop at this site. RT A Is currently studying a general reconfiguratlon. of bus routes In South- .west RIverside County and anticipates additional bus service along SR79 and Margarita Rd In the relatively near future since It Is an Important. arterial that would serve many commercial generators of bus traffic. In considering what transit amenities would be appropriate for the Temecula HospItal site, RTA staff looked at other comparable hospItals In the Inland Counties. In some Cases, such as Route 17, the hospital Is Important enough to be the route tennlnus or name of the line as identIfied on the bus Itself. Also, several distinct transit routes often serve a sing III large hC?spltal, as listed on the next page. It was found that In general, buses would come onto the site, close to the main building, . to drop off and pick up passengers If the facility was publicly owned, such as RIverside F:ldatalPlannlnglMlkeMlWordIOev RevIew\Temecula\2004\TemeculaHosp.doc . . '. I. i , , , I I :. I , , i i j , ,. I I I I !. I , I I I ;. :. ~ County General Medical Center In Moreno Valley. For privately owned hospitals, like Kaiser or San Gorgonlo, the transit stop was always off the property along a nearby street. Some examples of transit service and stops are: -Kaiser Hosplfalln Riverside: 2 lines, with transit stops along Magnolia having multiple turnouts, benches and shelters, etc; - Loma Unda Hospital: 3 lines, with transit stops at several locations on perimeter of complex and other nearby medical facilities such as the Veterans Hospital; - Riverside General: 3 lines, with transit center and bus turn-around on site, very close and convenient to main building; - Riverside Community: 2 lines, bus stops along Magnolia, off the property; - Corona Regional Med ctr: 2 lines; bus stops along S Main St, off the property; - St. BernardIne Med Ctr: 3 lines, multiple bus stops along various perimeter sts Smaller hospitals such as Menifee Valley Med Ctr or the Inland Valley Regional Medical ctr are not expected to be comparable to the planned Temecula facility upon Its full bulld-out. RT A staff believes Riverside's Kaiser Hospital bus stop configuration would . be most comparable with the future needs of the proposed Temecula facility, since the former also has several medical towers, doctor offices and a similar perimeter access road network. No on-site access for regular transit buses Is anticipated at either site. To ensure safety and convenience' of future transit operations at the Temecula Hospital, RTA Is respectfully request/ng the site plan or ass~ated street engineering plans be amended to Include a two or three-bay bus stop and bus turnout located at: - North side of State Highway 79, on the far side (west of) the proposed signalized Intersection with Country Glen Wy and the primary hospital entrance. The stop's taper, or entrance area, should begin no closer than 50 feet from the end of the Intersect/on's radius and extend for no less than 220 ft to accommodate two parked buses. The exact position would depend on location of utility structures, commer- cial signs, street lighting, key landscaping and other factors. The minimum depth (I.e. width) of the turnout Is 10 ft, however this may be reduced to 5 ft If a designa- ted, striped bike path Is Installed along this port/on of State Highway 79. - Additionally, RTA requests the site plan specify another clear path of travel from the main building going directly out to the requested bus stop location. - RTA staff also requests that the project proponents consider Investing In some' additional architectural amenities for the bus stop,lts benches and shelters by perhaps taking this opportunity to make a positive visual statement at this site In the. Interests of maintaining the community Image of Temecula. Because this facility will be one of the most well-known and visited places In the city, Its bus stop Is deserving of a hlgh-quallty bench and shelter that are visually compatible and complimentary to the main building architectural theme. ~e applicant's architect or engineers are urged to contact RTA staff for further details. RT A staff will request the mUltl-bay bus turnout and the path of travel discussed abo.ve be made conditions of approval for Cases 04-0462 and 0400463. RTA staff will work with future dev\1lopers of the eastbound bus stop site (across SR 79) to ensure It Is comparable and compatible with the stop In front of the Hospital. INITIAL REVIEW INFORMATION - Review completed date: July 21,2004. F:ldalalPlann/ngIMlkeMlWord\Oev Review\Temeculal2OO4\TemeculaHosp.doc . @ IaDchD Water &ard ~D1ndori JohD.E.BoqIucI .......... CAhP.Ko Br.Vb~ _J........ ..... B.DaJq _B.1lnb u... D. Rum.u:a JohD.V.RoaI "",-, Ilrlu J.IIn"" GaoonI_ PbIIUp 1..1'0.... Dinctorot~'L'nulzrer E.P. "Bob" Lazavu -..."".,....... PG'lYB. I.mack "-"'" .....M._ Diotrid_.-.-"" -- 0. MIchael eo",* a...t BoIIt,. KrIep;r UP .......,"""""" " July 12, 2004 SUBJECT: 9:~;:) ,,// . I./,' 17~~' ~ v". ~-" 17' r #/. .1'~ ~.J> ~ W@ O'? ~~ WATER AVAILABILITY, TEME GIONALHOSPITAL; PARCELS NO.1, NO.2, AND NO.3 OF PARCEL MAP 13043; PARCEL 4 OF PARCEL MAP 6813; AND PARCELS NO.1, NO. 2, NO.3, AND NO.4 OF PARCEL MAP 13734; APN 959-080-001 THROUGH APN 959-080-004, AND APN 959-080-007 THROUGH APN 959-080-010; PA04-0462 AND PA04-0463 Dan Long, Project Planner' City of Temecula Planning Department Post Office Box 9033 Temecula, CA 92589 - 9033 Dear Mr. Long: Please be advised that the above-referenced property is located within the bound3ries of Rancho California Water District (RCWD). Water service, therefore, would be available upon construction of any required on-site and/or off- site water facilities and the completion of financial ammgements between RCWD and the property owner. If fire protection is required; the customer will need to contact RCWD for fees and requirements. Water availability would be contingent upon the property owner signing an Agency Agreement that assigns water management rights, if any, to RCWD. All on-site public water facilities will require public utility easements in favor of RCWD. The project proposes to relocate RCWD's 12-inch discharge pipeline and the associated easement from RCWD Well No. 120. This pipeline must be contained within a minimum 2O-foot-wide easement, which is located such that no permanent structures or trees are located within its boundaries. The projeCt proponent should s<<hedule a meeting with RCWD to confirm and detail these req~ments. If you have any questions, please contact an Engineering Services Representative at this office. Sincerely, RANCHO CALIFORNIA WATER DISTRICI' 'lrJ.:/ t7t; ~c~e;erpe;er,p Development Engineering 04\MM,m<Otll)R:P . c: Lauric Williams, Engineering Services Supecvisor Bud Iones. F.ngi-nng Project Coordinator . IIaad10 CaIIIanIIa Water Dbtdd 421S5~a-I . PcOf!bBez.SI01T . T-a.c.us.m.925B9-1iKl11 . (909):I:Il6.4l900.PAX(~)296-6S60