Loading...
HomeMy WebLinkAboutHarveston Drainage Study (Sept.20,2001) I I I I I I I I I I I I I I I I I I I Preparedfor: DRAINAGE STUDY REPORT Tract 29639: Harveston Infrastructure City of Temecula, California September 20, 2001 Lennar 24800 Chrisanta Drive Mission Viejo, California Prepared by: ~ [:; CJ N 5 U LTI N G Contact Person: RBF CONSULTING 27555 Ynez Road, Suite 400 Temecula, California 92591-4679 909.676.8042 telephone 909.676.72400 fax Ejaz Mohammad, RCE 58580 RBF IN 15-100181.002 RECEIVED SEP 2 4 ZOOl CITY OF TEMECULA ENGINEERING DEPARTMENT RECEIVED DEe 3 ~ 2001 CITY OF TEMECULA ENGINEERING DEPARTMENT / : ~-~ \'.. ,f'/ . ,'\. ;; '\.,' " . , v ') \,>. ~ v \ I I I I I I I II I I I I I I I I I I I I TABLE OF CONTENTS STUDY SUMMARY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . 1 1.1 Background. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Drainage Pattern .................................... . . . . . . . . . . . . 1 1.3 Hydrology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . , . . 2 1.4 Hydraulics. . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 TABLE OF APPENDICES Appendix A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . Figures Appendix B ...................................,................ . . . . .. Exhibits Appendi)( C . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Hydrologic Calculations ~pe'ridix W . , . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Hydraulic Calculations /1~Of' E: _" ~- () tl'.~"'" {/("'f;: / TABLE OF FIGURES ~ " \ ". .' . . -: ov-, '1 c-"v-C-\.L L...' ) ... ,. Figure 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . , . , , , . , . . . . Harveston Vicinity Map Figure 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . .. Infrastructure Storm Drain Figure 3 . . . . . . . . . . . . . . . . . . . . , . . . , . , . . . , . . . . . . . . . . . . . . . Hydrologic Soils Group Map ~ 1.\.. TABLE OF EXHIBITS Exhibit A Proposed Condition ~~~._'~. ---, ...- QY\ \\.\ c. '6 h,\ A \ l ,-, \. l,\..\N,...., t'- . J ' , r'. " "', '.... ( I..l'-..l . " " ? \ ,i\~ 1 {. It\'; 2\', " , e...., , I '- " D J ,L ., . l... ~ l... J " Ol--~ ' .. ,\ /. . {J ..1. \ ' , <I :iC>\/\o\.!i, \"'il~ ',' .' ,. "''1l\i'vn "f-hc"t '" l,.b \:';,{ c~. ~ -Lt~.. ,; ,.,- .V\\ ~ I:.......{_ :. -rY r' , H:lpdata\15100181\DWGlhydroJogy\181/nfO01.wpd , '. i _':. ,,' ,,~ ., . , r I -, ~,v.,..,,: .~ j:__ i- -J' _," "" - . ,',t'. .1 '. ". t' ~ 1\ I( 7.' rf ~, ~ ~d ~\cr~)_/-- ~ 1/ , ...- TRACT 29639'INFRASTRUCTURE STORMDRAIN DESIGN REPORT HARVESTON SPECIFIC SITEPLAN _---/ i - -- .........---- - - I I I I I I I I I I I I I I I I I I I STUDY SUMMARY 1.1 Background The proposed tract (Tract 29639) is located in the County of Riverside within the corporate boundary of the City of Temecula, The tract is a master community development plan project known as Harveston. The project consists of about 520 acres of commercial, business park and residential uses. The site is currently undeveloped and is bounded by Interstate 15 to the west, the Winchester Highlands Business Park and Santa Gertrudis Creek to the South, Warm Springs Creek and the Warm Springs Specific Plan area to the north and east. Figure 1 indicates the site vicinity and its relationship to the surrounding area, Overall land gradients are moderate, averaging from about 1 to 5 percent in stream courses, Ground cover is indigenous grass with fair coverage, and erosion does not appear to be a problem in the streams or on the adjacent hillsides. Over 70 percent of the site is tributary to Santa Gertrudis Creek, either directly via Assessment District 161 (A.D. 161) improvements or by local storm drain systems. The remaining portion of the site is tributary to Warm Springs Creek, Runoff from a majority of the site passes beneath Interstate 15 to local facilities in the Northstar Business Park and the Signal Landmark Business Park which ultimately discharge to either Santa Gertrudis Creek or Warm Springs Creek. Smaller portions of the site are directly tributary to Santa Gertrudis Creek and Warm Springs Creek. An infrastructure storm drain system was designed that carries drainage water from the Phase I of the project. The largest drainage is carried by the infrastructure system that carries drainage through closed pipes to the existing 84" diameter pipe at the north end of Ynez Road. The design and analysis of part of this system, that was to be maintained by the Riverside County Flood Control & Water Conservation District (RCFC & WCD,) was presented earlier in a report to the RCFC & WCD, The other infrastructure pipes and inlets, which are to be maintained by the City of Temecula, is presented in this report. This includes drainage pipes on Harveston Way, Village Road, and at the Intersection of Date Street with Lakeview Road. Figure 2 identifies the infrastructure stormdrain system that is being designed and analyzed in this report. The purpose of this report is to report the hydrologic analysis, and preliminary pipe sizes for the pipes and inlets identified in Figure 2, 1.2 Drainage Pattern The infrastructure storm drain system designed in this study drain to different systems. They are being discussed here, for each system. Exhibit A shows each of the storm drain system in detail with outlet nodes and drainage areas. A. Drainage system starting from West end of Township Road: Drainage from south side of Ysabel Barnett Elementary School is picked up by a catchbasin and is transported through RCP pipe southerly on Village Road and Westerly on Landings Road. The two inlets on the north and south side of Landings Road catch flows from the lots 8 & 9 and carry flow through RCP pipes to outlet into RCP pipe in Landings Road, Finally, the pipe drain to drainage pipes in Tract 29929-1, which drains to infrastructure stormdrain system on TRACT 29639 INFRASTRUCTURE STORMDRAIN DESIGN REPORT HARVESTON SPECIFIC SITE PLAN 1 ~ '7 I I I I I I I II I I I I I I I I I I I STUDY SUMMARY Harveston Drive, The infrastructure stormdrain system on Harveston Drive join the existing drainage pipe at the north end of Ynez Road. B. Stormdrain system located at the east end of Harveston Way: The flow is captured by catch basins and risers and is carried by RCP pipe to existing stormdrain system in Margarita Road near Harveston Way. This flow eventually drains to Santa Getrudis Creek. C, Storm drain system starting at the north side of Village Road near west end of Harveston Way: This stormdrain system captures flows from the tracts at the west side of Village Road, and outlets to an existing ditch south of Harveston Way. Outlet Point is node 410, D. Drainage system at the intersection of Date Street and Lakeview Road drain westerly to southwest end of Lakewview Road: The outlet for this system is node 504 shown in Exhibit A. E. Inlet at the South side of Date Street west of Margarita Road: The inlet is located at Node 505 in Exhibit A. Flow picked up from this inlet drains to an existing pipe which will connect to the infrastructure storm drain pipe draining to Ynez Road. 1.3 Hydrology The total drainage area is less than 300 acres, therefore Rational Method was used in estimating the peak flow per Riverside County Flood Control Hydrology Manual. Discharges have been computed for 1 O-year and 1 OO-year hypothetical storm return frequencies. Rainfall used in the studies was taken from the Riverside County Hydrology Manual for the "Murrieta - Temecula and Rancho California" areas. The hydrologic soils group was based on Plate C-1.52 of RCFC & WCD Hydrology Manual. Figure 3 shows the hydrologic soils group over the project site. Basic assumptions and criteria for use in runoff computations are: . Soil Group 8; . Initial area is generally less than about 10 acres and flow path lengths less than 1,000 feet. Appendix C includes a summary report of hydrology calculations performed for the basins in this study, Exhibit A shows the basins along with 100-year peak flows, Table A. B, C, and D show the 10 and 100-year peak flows with time of concentration for each sub-basins, A.. TRACT 29639 INFRASTRUCTURE STORMDRAIN DESIGN REPORT HARVESTON SPECIFIC SITE PLAN 2 ~ I I I I I I I ~~~ ~~ ~,:. I ~ 'Table B: Drainage System Starting at the East End of Harveston Way at Margarita Rd ~ Peak Flow Summary for the Proposed Condition J : \ I ~ I I I I I I I I STUDY SUMMARY Table A: Drainage System Starting at the West End of Township Road Peak Flow Summary for the Proposed Condition - Drainage Time of apeak (cfs) Sub-basin Name Area (ac.) Concentration (min.) 10-Year 100-Year 161 1.9 8.4 4.2 6.3 162 0.8 7.8 1.9 2.8 163 2,3 8.9 5.0 7,3 - 164 0.7 10.8 1.4 -(1.2' jj /-, .\ l f.l.^ 166 0,8 11.6 1.5 2.3 I' 167 5.7 9,7 12.1 17.8 1/ '- J ~, ,Nv( JrJ Drainage Time of apeak (cfs) Sub-basin Name Area (ac.) Concentration (min.) 10-Year 100-Year ' ...------... , \ 343 ) 15.9 10,3 32.5 47.8 ./ '347 2.4 11.5 4.6 6.8 u ~ 0.8 6.5 2,1 3.1 Table C: Drainage System Starting at Village Road at the West End of Harveston Way Peak Flow Summary for the Proposed Condition Drainage Time of apeak (cfs) Sub-basin Name Area (ac.) Concentration (min.) 10-Year 100-Year 411 0.5 10.5 1.0 1.5 412 0.1 6.1 0,3 0.4 413 1.1 7.5 2.7 4.0 414 0,2 8.4 0.5 0.7 415 2.6 8.1 6.1 8,9 416 1.7 8.3 3,9 5,8 ~ TRACT 29639 INFRASTRUCTURE STORMDRAIN DESIGN REPORT HARVESTON SPECIFIC SITE PLAN 3 ~ I I I I I I I I I I I I I I I I I I I STUDY SUMMARY Table 0: Drainage System on Date Street Peak Flow Summary for the Proposed Condition Drainage Time of Qpe.k (cfs) sub-basin Name Area (ac.) Concentration (min,) 10-Year 100-Year 501 / 0.3 5.7 0.9 1,3 502 / 1.5 9.4 3.2 4,7 505 I' 2.8 13,0 5,0 7.4 1.4 Hydraulics Inlet sizes were calculated for the calculated 1 OO-year flows. Pipe hydraulic calculations were not performed in the current submittal study report. This will be performed after the pipes are designed, Appendix 0 shows the catch basin sizing hydraulic calculations, TRACT 29639 INFRASTRUCTURESTORMDRAIN DESIGN REPORT HARVESTON SPECIFIC SITE PLAN 4 ~ ft, 1 II I 1 I I I I I I 1 I 1 I li. I: " b I ~ ~ ~ ~ ~ I~ ~ I ~ ~ ~ ~ I % ~ PLANN'NO . DES' ON . CONSTR'100N 27555 'fI\EZ ROAD, SUITE 400 , ... Ta.EClLA, CALIFORNIA 92591-46]9 C eNS U L TI N G 909.676.8042 . FAX 909.676.7240. www.A8F.c:om ~-I'l_...,.,...._.~ I ." TRACT 29111 . CCNllIT"'UCTlgN "--.., --'t--'--.,'- ~. -""'", (" I 1 r-~--.\ \ i TRACT 281 84! j M,B, 26174-rO, !1 I! '''.. .. _/ r I I ,!. UJ UJ a: >- '" UJ >- .. Cl i j i .....---,-----' / / --/.. TRACT 29111 I() , --' ..- FIGURE 2 INTRASTRUCTUREEST~~~V~~~b~ PROJECT NAM '. 15-100181 PROJECT NO" :c" ',....1:--- -------l- ~ r'..- . , ;, JTEMECULA - -ir M.S. _~~o=_:_~,_ ~__ [~EVI~W ..- RI:lf PLANNINlJ . OIl:III(1N LAND &: WATER 8/359 S.D, co, LOT 144 2755.5 YNEZ ROAD, SlXL'E 400 lEMECUA CALFOANlA 92591-4&79 909.676.8042 . FAX 909.676.7240. _.R8F.com CONSULTING I 9/20/01 g. 45 am ' R' SD\181F'G-2,DWG 0 , t OLOGY\INFRASTRUCTU t. H: \PDA fA \15100181 \DWC\HYDR I ./ 'D 0 l> J -< l> ..-:; (J1 ,Q 0 CXl ./ 0 :;f C) ./ CD l> U1 [Tl :s;: l> -0 ..-:; CXl I U1 C) :s;: l> -0 0 :;f C) 0 co ~ tv 0 ~ 0 CO tv 0 :3 ;~'~ :r~" .; "''''"" ~4, '"\ ><>i., .. "\ """-'" i\"",_ _ \"-.f/!' '",\." .;j;. ...... ".~...., ,,,,,. , boo -".,,'''', ';:, -:it,:' ',_ 'tt(" ,_}-,'* ,~_... -;,.....~ -",\ -i/~ "-- ,~:'~,~' "~~_.. "~",i " ''':ciTe 'co>._ 1000 [:;ONSULTING 27555 YNEZ ROAD, SUITE 400 lEMECUlA. CAUFORNIA 92591-4679 909.676.8042 . FAX 909.676.7240 . www.ABF.com FIGURE 3 HYDROLOGIC SOILS HARVESTON MASTER GROUP PLAN MAP ~ PLANNING . DESIGN . CONSTRUCTION ~ SOURCE: PLATE C-1 .52 RCFC & WCD HYDROLOGY MANUAL . I (0 - 1riA'fZ I 81INF10.RES I *~************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT (RCFC&WCD) 1978 HYDROLOGY MANUAL (C) Copyright 1982-2000 Advanced Engineering Software (aes) Ver. I.SA Release Date: 01/01/2000 License 10 1264 I Analysis prepared by: I REF & Associates 14725 Alton Parkway Irvine, CA 92618 I FILE NAME: 81INFIO.DAT TIME/DATE OF STUDY: 16:02 09/18/2001 I USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: I USER SPECIFIED STORM EVENT(YEAR) = 10.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00 SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE 0.55 IO-YEAR STORM IO-MINUTE INTENSITY (INCH!HOUR) = 2.360 10-YEAR STORM 60-MINUTE INTENSITY (INCH!HOUR) = 0.880 100-YEAR STORM 10-MINUTE INTENSITY(INCH!HOUR) = 3.480 100-YEAR STORM 60-MINUTE INTENSITY (INCH!HOUR) = 1.300 SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = 0.5505732 SLOPE OF 100-YEAR INTENSITY-DURATION CURVE = 0.5495536 COMPUTED RAINFALL INTENSITY DATA: STORM EVENT = 10.00 I-HOUR INTENSITY(INCH!HOUR) = 0.889 SLOPE OF INTENSITY DURATION CURVE = 0.5506 RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: COMPUTE CONFLUENCE VALUES ACCORDING TO RCFC&WCD HYDROLOGY MANUAL AND IGNORE OTHER CONFLUENCE COMBINATIONS FOR DOWNSTREAM ANALYSES *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING WIDTH CROSS FALL IN- ! OUT-!PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE! SIDE! WAY CFT) (FT) (FT) (FT) (n) I I I 1 30.0 20,0 0.018/0.018/0,020 0.67 2.00 0.0313 0.167 0.0150 I GLOBAL STREET FLOW-DEPTH CONSTRAINTS: 1. Relative Flow-Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top-of-Curb) 2. (Depth) * (Velocity) Constraint = 6.0 (FT*FT!S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* I **************************************************************************** FLOW PROCESS FROM NODE 502.50 TO NODE 502.00 IS CODE = 21 I >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ---------------------------------------------~-----------------~------------ ---------------------------------------------------------------------------- ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[ (LENGTH**3)!(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 552.00 UPSTREAM ELEVATION = 1122.33 DOWNSTREAM ELEVATION = 1116.54 ELEVATION DIFFERENCE = 5.79 TC = 0.303*[( 552.00**3l!( 5.79)]**.2 9.424 10 YEAR RAINFALL INTENSITY (INCH!HOUR) = 2.463 USER-SPECIFIED RUNOFF COEFFICIENT = .8731 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF{CFS) 3.23 TOTAL AREA(ACRESl = 1.50 TOTAL RUNOFF (CFS) = 3.23 I I I **************************************************************************** FLOW PROCESS FROM NODE 502.00 TO NODE 503.00 IS CODE = 31 I >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ trK..fQ U6'V't7 I Page 1 of 18 \0 I I I I I I I I I I I I I I I I I I I 81INF10.RES ELEVATION DATA: UPSTREAM (FEET) = 1113.50 DOWNSTREAM (FEET) 1113.00 FLOW LENGTH(FEET) = 50.00 MANNING'S N 0.015 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 8.8 INCHES PIPE-FLOW VELOCITY(FEET!SEC.) 3.78 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 3.23 PIPE TRAVEL TIME(MIN.) = 0.22 TC(MIN.) = 9.64 LONGEST FLOWPATH FROM NODE 502.50 TO NODE 503.00 602.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 503.00 TO NODE 503.00 IS COOE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) 9.64 RAINFALL INTENSITY(INCH/HR) = 2.43 TOTAL STREAM AREA (ACRES) = 1.50 PEAK FLOW RATE (CFS) AT CONFLUENCE = 3.23 **************************************************************************** FLOW PROCESS FROM NODE 501. 50 TO NODE 501.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*( (LENGTH**3)/(ELEVATION CHANGE))**.2 INITIAL SUBAREA FLOW-LENGTH = 140.00 UPSTREAM ELEVATION = 1115.17 DOWNSTREAM ELEVATION = 1114.00 ELEVATION DIFFERENCE = 1.17 TC = 0.303*[( 140.00**3)/( 1.17) ]**.2 10 YEAR RAINFALL INTENSITY (INCH/HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8781 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) TOTAL AREA (ACRES) = 0.86 0.30 TOTAL RUNOFF(CFS} = 0,86 **************************************************************************** FLOW PROCESS FROM NODE 501.00 TO NODE 503.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1113.90 DOWNSTREAM (FEET) 1113.70 FLOW LENGTH (FEET) = 40.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER(INCH} INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 5.2 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 2.04 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW(CFS) = 0.86 PIPE TRAVEL TIME(MIN.) = 0.33 Tc(MIN.) = 6.02 LONGEST FLOWPATH FROM NODE 501.50 TO NODE 503.00 180.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 503.00 TO NODE 503.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) 6.02 RAINFALL INTENSITY (INCH/HR) = 3.15 TOTAL STREAM AREA (ACRES) = 0.30 PEAK FLOW RATE(CFS) AT CONFLUENCE 0.86 ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 3.23 2 0.86 Tc (MIN.) 9.64 6.02 INTENSITY ( INCH/HOUR) 2.432 3.151 AREA (ACRE) 1.50 0.30 \\ Page 2 of 18 I I I I I I I I I I I I I I I I I I I 81INF10.RES *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK STREAM NUMBER 1 2 FLOW RATE RUNOFF (CFSI 2.87 3,89 TABLE ** Tc (MIN. ) 6.02 9.64 INTENSITY ( INCH/HOURI 3.151 2.432 COMPUTED CONFLUENCE PEAK FLOW RATE(CFS) TOTAL AREA(ACRES) = LONGEST FLOWPATH FROM ESTIMATES ARE 3.89 1. 80 NODE AS FOLLOWS: Tc{MIN.l :::: 9.64 502,50 TO NODE 503.00 602.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 503.00 TO NODE 504.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ---------~------------------------------------------------------------------ ---------------------------------------------------------------------------- ELEVATION DATA: UPSTREAM (FEET) = 1113.50 DOWNSTREAM (FEET) 1112.00 FLOW LENGTH (FEET) = 150.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER (INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 9.8 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 3.96 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFSI ~ 3.89 PIPE TRAVEL TIME(MIN.) = 0.63 Tc(MIN.) = 10.28 LONGEST FLOWPATH FROM NODE 502.50 TO NODE 504.00 752.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 504.00 TO NODE 504.00 IS CODE = 13 >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<< ---------------------------------------------------------------------------- --------------------------------------------------------------~------------- **************************************************************************** FLOW PROCESS FROM NODE 505.50 TO NODE 505.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[ (LENGTH**3)/(ELEVATION CHANGElJ**.2 INITIAL SUBAREA FLOW-LENGTH = 1000.00 UPSTREAM ELEVATION = 1122.33 DOWNSTREAM ELEVATION = 1115.60 ELEVATION DIFFERENCE = 6.73 TC = 0.303*[( 1000.00**31/( 6.73)J**.2 10 YEAR RAINFALL INTENSITY (INCH/HOURl = USER-SPECIFIED RUNOFF COEFFICIENT = .8696 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) TOTAL AREA(ACRES) = 13.061 2.058 5.01 2,80 TOTAL RUNOFF (CFS) = 5.01 **************************************************************************** FLOW PROCESS FROM NODE 505.00 TO NODE 505.00 IS CODE = 13 ---------------------------------------------------------------------------- >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 416.50 TO NODE 416.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL \'2..- Page 3 of 18 I I I I I I I I I I I I I I I I I I I 81INF10.RES TC = K*[ (LENGTH**3)/{ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 250.00 UPSTREAM ELEVATION = 1118.00 DOWNSTREAM ELEVATION = 1117.00 ELEVATION DIFFERENCE = 1.00 TC = 0.303*[( 250.00**3)/( 1.00)]**.2 8.324 10 YEAR RAINFALL INTENSITY (INCH/HOUR) = 2.637 USER-SPECIFIED RUNOFF COEFFICIENT = .8744 SOIL CLASSIFICATION IS "8" SUBAREA RUNOFF (CFS) 3.92 TOTAL AREA (ACRES) "" 1.70 TOTAL RUNOFF(CFS) "" 3.92 **************************************************************************** FLOW PROCESS FROM NODE 416.00 TO NODE 414.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ELEVATION DATA: UPSTREAM (FEET) = 1117.00 DOWNSTREAM (FEET) 1113.00 FLOW LENGTH{FEET) = 400.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 9.8 INCHES PIPE-FLOW VELOCITY{FEET/SEC.) 3.96 ESTIMATED PIPE DIAMETER{INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 3.92 PIPE TRAVEL TIME(MIN.} = 1.68 Tc{MIN.) = 10.01 LONGEST FLOWPATH FROM NODE 416.50 TO NODE 414.00 650.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 414.00 TO NODE 414.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION{MIN.) 10.01 RAINFALL INTENSITY (INCH/HRj = 2.38 TOTAL STREAM AREA(ACRES} = 1.70 PEAK FLOW RATE(CFS) AT CONFLUENCE = 3.92 **************************************************************************** FLOW PROCESS FROM NODE 414.50 TO NODE 414.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3)/{ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 400.00 UPSTREAM ELEVATION = 1117.00 DOWNSTREAM ELEVATION = 1113.00 ELEVATION DIFFERENCE = 4.00 TC = 0.303*[( 400.00**3)/( 4.00)]**.2 8.364 10 YEAR RAINFALL INTENSITY (INCH/HOUR) = 2.630 USER-SPECIFIED RUNOFF COEFFICIENT = .8744 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) 0.46 TOTAL AREA (ACRES) = 0.20 TOTAL RUNOFF (CFS) = 0.46 **************************************************************************** FLOW PROCESS FROM NODE 414.00 TO NODE 414.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION{MIN.) 8.36 RAINFALL INTENSITY(INCH/HR) = 2.63 TOTAL STREAM AREA(ACRES) = 0.20 PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.46 **************************************************************************** FLOW PROCESS FROM NODE 415.50 TO NODE 415.00 IS CODE = 21 ---------------------------------------------------------------------------- \"? >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< Page 4 of 18 I I I I I I I I I I I I I I I I I I I 811NF10,RES ~=========================================================================== ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*((LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 410.00 UPSTREAM ELEVATION = 1115.00 DOWNSTREAM ELEVATION = 1110.00 ELEVATION DIFFERENCE = 5.00 TC = 0.303*[( 410.00**3)/( 5.00)J**.2 10 YEAR RAINFALL INTENSITY(INCH/HOUR} = USER-SPECIFIED RUNOFF COEFFICIENT = .8747 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) TOTAL AREA (ACRES) = 8.118 2.674 6,08 2.60 TOTAL RUNOFF (CFSj = 6.08 **************************************************************************** FLOW PROCESS FROM NODE 415.00 TO NODE 414.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< =============================================================~============== ELEVATION DATA: UPSTREAM (FEET) = 1110.00 DOWNSTREAM (FEET) 1109.00 FLOW LENGTH(FEET) = 50.00 MANNING1S N = 0.015 DEPTH OF FLOW IN 18.0 INCH PIPE IS 10.4 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 5.73 ESTIMATED PIPE DIAMETER {INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLON(eFS) = 6.08 PIPE TRAVEL TIME(MIN.) = 0.15 TC(MIN.) = 8.26 LONGEST FLOWPATH FROM NODE 415.50 TO NODE 414.00 460.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 414.00 TO NODE 414.00 IS CODE = ---------------------------------------------------------------------------- 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 3 ARE: TIME OF CONCENTRATION(MIN.) 8.26 RAINFALL INTENSITY (INCH/HR) = 2.65 TOTAL STREAM AREA(ACRES) = 2.60 PEAK FLOW RATE(CFS} AT CONFLUENCE = 6.08 ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 3.92 2 0,46 3 6,08 Tc (MIN. ) 10.01 8.36 8.26 INTENSITY ( INCH/HOUR) 2.383 2,630 2.647 AREA (ACRE) 1. 70 0.20 2,60 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** i:": (" RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 3 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN. ) ( INCH/HOUR) 1 9.77 8.26 2.647 2 9,78 8.36 2.630 3 9.81 10.01 2.383 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) 9,77 TC(MIN. ) = 8.26 TOTAL AREA (ACRES) = 4.50 LONGEST FLOWPATH FROM NODE 416.50 TO NODE 414.00 650.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 414.00 TO NODE 412.00 IS CODE ~ 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< 1,\ Page 5 of 18 I I 81INF10.RES I >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW}<<<<< =========================================:================================== 'I I I ELEVATION DATA: UPSTREAM (FEET) = 1109.00 DOWNSTREAM (FEET) 1107.00 FLOW LENGTH(FEETJ = 200.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 21.0 INCH PIPE IS 16.5 INCHES PIPE-FLOW VELOCITY{FEET/SEC.) 4.82 ESTIMATED PIPE DIAMETER{INCH) = 21.00 NUMBER OF PIPES 1 PIPE-FLOW{CFS) = 9.77 PIPE TRAVEL TIME(MIN,) = 0.69 Tc(MIN.) = 8.96 LONGEST FLQWFATH FROM NODE 416.50 TO NODE 412.00 850.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 412.00 TO NODE 412.00 IS CODE = 1 ---------------------------------------------------------------------------- I >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ I TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) 8.96 RAINFALL INTENSITY(INCH/HR} = 2.53 TOTAL STREAM AREA(ACRES) = 4.50 PEAK FLOW RATE (CFS) AT CONFLUENCE = 9.77 **************************************************************************** I FLOW PROCESS FROM NODE 413.50 TO NODE 413.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ I ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*( (LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 300.00 UPSTREAM ELEVATION = 1106.00 DOWNSTREAM ELEVATION = 1103.00 ELEVATION DIFFERENCE = 3.00 TC = 0.303*[{ 300.00**3)/( 3.00)]**.2 10 YEAR RAINFALL INTENSITY(INCH/HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8755 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) TOTAL AREA (ACRES) = 7.455 2.802 I I 2.70 1.10 TOTAL RUNOFF (CFS) = 2.70 **************************************************************************** I FLOW PROCESS FROM NODE 413.00 TO NODE 412.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ I ELEVATION DATA: UPSTREAM (FEET) = 1107.00 DOWNSTREAM (FEET) 1106.50 FLOW LENGTH(FEET) = 50.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER(INCH} INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 7.9 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 3.60 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW(CFS) = 2,70 PIPE TRAVEL TIME(MIN.) = 0.23 Tc(MIN.) = 7.69 LONGEST FLOWPATH FROM NODE 413.50 TO NODE 412.00 350.00 FEET. I I **************************************************************************** FLOW PROCESS FROM NODE 413.00 TO NODE 412.00 IS CODE = 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< I ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- I TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) 7.69 RAINFALL INTENSITY (INCH/HR) = 2.76 TOTAL STREAM AREA (ACRES) = 1.10 PEAK FLOW RATE(CFS} AT CONFLUENCE = 2.70 **************************************************************************** I FLOW PROCESS FROM NODE 412.50 TO NODE 412.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< \-5 ========================-=================================================== I Page 6 of 18 I II I I I I I I I I I I I I I I I I I 81INF10.RES ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 150.00 UPSTREAM ELEVATION = 1106.00 DOWNSTREAM ELEVATION = 1105.00 ELEVATION DIFFERENCE = 1.00 TC = 0.303*[ (150.00**3)/( 1.00)]**.2 10 YEAR RAINFALL INTENSITY (INCH/HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8774 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) TOTAL AREA(ACRES) = 6.127 3,122 0.27 0.10 TOTAL RUNOFF (CFS) = 0.27 **************************************************************************** FLOW PROCESS FROM NODE 412.00 TO NODE 412.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 3 ARE: TIME OF CONCENTRATION(MIN.) 6.13 RAINFALL INTENSITY(INCH/HR) = 3.12 TOTAL STREAM AREA(ACRES) = 0.10 PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.27 ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (crs) 1 9.77 2 2.70 3 0.27 Tc (MIN.) 8.96 7.69 6.13 INTENSITY ( INCH/HOUR) 2.533 2.755 3.122 AREA (ACRE) 4.50 1.10 0.10 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 3 STREAMS. ** PEAK STREAM NUMBER 1 2 3 FLOW RATE RUNOFF (CFS) 9.11 11.33 12.47 TABLE ** Tc (MIN.) 6.13 7.69 8.96 INTENSITY ( INCH/HOUR) 3.122 2.755 2.533 COMPUTED CONFLUENCE PEAK FLOW RATE(CFS) TOTAL AREA(ACRES) = LONGEST FLOWPATH FROM ESTIMATES ARE 12.47 5.70 NODE AS FOLLOWS: Tc(MIN,} = 8.96 416.50 TO NODE 412.00 850.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 412.00 TO NODE 411.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1105.00 DOWNSTREAM (FEET) FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 27.0 INCH PIPE IS 17.7 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 4.51 ESTIMATED PIPE DIAMETER(INCH) = 27.00 PIPE-FLOW (CFS) = 12.47 PIPE TRAVEL TIME(MIN.) = LONGEST FLOWPATH FROM NODE 1104.00 NUMBER OF PIPES 1 0.55 TC(MIN.) = 416.50 TO NODE 9,51 411. 00 1000.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 411.00 TO NODE 411.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< \~ =====================~=============:====~================================-== Page 7 of 18 I I 81INF10.RES I TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.} 9.51 RAINFALL INTENSITY (INCH/HR) = 2.45 TOTAL STREAM AREA (ACRES) = 5.70 PEAK FLOW RATE(CFS) AT CONFLUENCE = 12.47 I **************************************************************************** FLOW PROCESS FROM NODE 411.50 TO NODE 411.00 IS CODE = 21 I ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ I ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3l/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 700.00 UPSTREAM ELEVATION = 1115.00 DOWNSTREAM ELEVATION = 1108.00 ELEVATION DIFFERENCE = 7.00 TC = 0.303*[ (700.00**3)/( 7.00)]**.2 10.462 10 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.325 USER-SPECIFIED RUNOFF COEFFICIENT = .8720 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) 1.01 TOTAL AREA (ACRES) = 0.50 TOTAL RUNOFF (CFS) = 1.01 I I **************************************************************************** FLOW PROCESS FROM NODE 411. 00 TO NODE 411.00 IS CODE = 1 I ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ I TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION{MIN.) 10.46 RAINFALL INTENSITY(INCH/HR) = 2.33 TOTAL STREAM AREA(ACRES) = 0.50 PEAK FLOW RATE(CFS) AT CONFLUENCE = 1.01 I ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER ICFS) 1 12.47 2 1. 01 Tc IMIN.I 9,51 10.46 INTENSITY I INCH/HOUR) 2,450 2.325 AREA (ACRE) 5.70 0.50 I *********************************WARNING********************************** I IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. I ** PEAK STREAM NUMBER 1 2 FLOW RATE RUNOFF (CFS) 13.40 12.85 TABLE ** Tc IMIN,) 9.51 10.46 INTENSITY I INCH/HOUR) 2.450 2.325 I COMPUTED CONFLUENCE ESTIMATES ARE PEAK FLOW RATE(CFS) = 13.40 TOTAL AREA (ACRES) = 6.20 LONGEST FLOWPATH FROM NODE AS FOLLOWS: Tc (MIN.) = 9,51 416.50 TO NODE 411.00 1000,00 FEET, **************************************************************************** I FLOW PROCESS FROM NODE 411. 00 TO NODE 410.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ I ELEVATION DATA: UPSTREAM (FEET) = 1108.00 DOWNSTREAM (FEET) FLOW LENGTH(FEET) = 125.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 27.0 INCH PIPE IS 17.5 INCHES PIPE-FLOW VELOCITY(FEET/SEC.l = 4.92 1107.00 n I Page 8 of 18 I I I I I I I I I I ,I I I I I I I I I 81INF10.RES ESTIMATED PIPE DIAMETER (INCH) = 27.00 NUMBER OF PIPES 1 PIPE-FLQW(CFS) = 13.40 PIPE TRAVEL TIME(MIN,) = 0.42 Tc{MIN.) = 9.93 LONGEST FLOWPATH FROM NODE 416.50 TO NODE 410.00 1125.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 410.00 TO NODE 410.00 IS CODE = 13 >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 349.50 TO NODE 349.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[{LENGTH**3l!(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH ~ 525.00 UPSTREAM ELEVATION = 1115.80 DOWNSTREAM ELEVATION = 1083.50 ELEVATION DIFFERENCE = 32.30 TC = 0.303*(( 525.00**3)!( 32.30))**.2 6.484 10 YEAR RAINFALL INTENSITY (INCH/HOUR) = 3.026 USER-SPECIFIED RUNOFF COEFFICIENT = .8769 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFSl 2.12 TOTAL AREA (ACRES) = 0.80 TOTAL RUNOFF (CFS) = 2.12 **************************************************************************** FLOW PROCESS FROM NODE 349.00 TO NODE 345.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1083.50 DOWNSTREAM (FEET) 1082.00 FLOW LENGTHIFEETI = 70.00 MANNING'S N = 0,015 ESTIMATED PIPE DIAMETER (INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 5.7 INCHES PIPE-FLOW VELOCITY{FEET!SEC.} 4.45 ESTIMATED PIPE DIAMETER{INCH} = 18.00 NUMBER OF PIPES 1 PIPE-FLOW(CFS) = 2.12 PIPE TRAVEL TIME(MIN.) = 0.26 Tc(MIN.) = 6.75 LONGEST FLOWPATH FROM NODE 349.50 TO NODE 345.00 595.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 345.00 TO NODE 345.00 IS CODE = 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATIONIMIN.) 6.75 RAINFALL INTENSITY (INCH!HR) = 2.96 TOTAL STREAM AREA(ACRES) = 0.80 PEAK FLOW RATE(CFS) AT CONFLUENCE = 2.12 **************************************************************************** FLOW PROCESS FROM NODE 347.50 TO NODE 347.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3)!(ELEVATION CHANGE}] **.2 INITIAL SUBAREA FLOW-LENGTH = 1000.00 UPSTREAM ELEVATION = 1097.00 DOWNSTREAM ELEVATION = 1084.00 ELEVATION DIFFERENCE = 13.00 TC = 0.303*[( 1000.00**3}!( 13.00)]**.2 10 YEAR RAINFALL INTENSITY (INCH!HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8711 SOIL CLASSIFICATION IS "BOO SUBA~EA RONOFF(CFS) = 4.63 11.450 2.212 \% Page 9 of 18 I I 81INF10.RES TOTAL AREA(ACRES) = 2.40 TOTAL. RUNOFF (CFSj = 4.63 I **************************************************************************** FLOW PROCESS FROM NODE 347.00 TO NODE 345.00 IS CODE = 31 ---------------------------------------------------------------------------- I >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ I ELEVATION DATA: UPSTREAM (FEET) = 1084.00 DOWNSTREAM (FEET) FLOW LENGTH(FEET) = 25.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER (INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 8.8 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 5.36 ESTIMATED PIPE DIAMETER (INCH) = 18.00 PIPE-FLOW(CrS) = 4.63 PIPE TRAVEL TIME(MIN.) = LONGEST FLOWPATH FROM NODE 1083.50 NUMBER OF PIPES 1 I 0.08 Tc(MIN.) = 347.50 TO NODE 11.53 345.00 1025.00 FEET. **************************************************************************** I FLOW PROCESS FROM NODE 345.00 TO NODE 345.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ I TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM TIME OF CONCENTRATION(MIN.) 11.53 RAINFALL INTENSITY (INCH/HR) = 2.20 TOTAL STREAM AREA (ACRES) = 2.40 PEAK FLOW RATE(CFS) AT CONFLUENCE = 4.63 2 ARE: I ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 2.12 2 4.63 Tc (MIN. ) 6,75 11. 53 INTENSITY ( INCH/HOUR) 2.960 2.204 AREA (ACRE) 0,80 2.40 I *********************************WARNING********************************** I IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. I ** PEAK STREAM NUMBER 1 2 FLOW RATE RUNOFF (CFS) 4,83 6.21 TABLE ** Tc (MIN. ) 6.75 11.53 INTENSITY ( INCH/HOUR) 2.960 2.204 I COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE (CFS) 6.21 Tc(MIN.). 11.53 TOTAL AREA(ACRES) = 3.20 LONGEST FLOWPATH FROM NODE 347.50 TO NODE 345.00 1025.00 FEET. I **************************************************************************** FLOW PROCESS FROM NODE 345.00 TO NODE 341.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< I ==============================~==========================;================== I ELEVATION DATA: UPSTREAM (FEET) = 1083.50 DOWNSTREAM (FEET) 1083.00 FLOW LENGTH(FEET) = 30.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 18.0 INCH PIPE IS 11.2 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 5.36 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 6.21 PIPE TRAVEL TIME(MIN.) = 0.09 TC(MIN.) = 11.62 LONGEST FLQWPATH FROM NODE 347.50 TO NODE 341.00 1055.00 FEET. I **************************************************************************** FLOW PROCESS FROM NODE 341. 00 TO NODE 341.00 IS CODE = 1 V\ ---------------------------------------------------------------------------- I Page 10 of 18 I ! I I , I I I I I I I I I II I I I I I I I 81INF10.RES >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ~=;:;=;===================================================================== TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION (MIN. ) 11.62 RAINFALL INTENSITY (INCH!HRj = 2.19 TOTAL STREAM AREA(ACRES) = 3.20 PEAK FLOW RATE (CFS) AT CONFLUENCE = 6.21 **************************************************************************** FLOW PROCESS FROM NODE 343.50 TO NODE 343,00 IS CODE: 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3)/(ELEVATION CHANGE)] **.2 INITIAL SUBAREA FLOW-LENGTH = 1000.00 UPSTREAM ELEVATION = 1118.00 DOWNSTREAM ELEVATION = 1096.00 ELEVATION DIFFERENCE = 22.00 TC = 0.303*[( 1000.00**3)/( 22.00)]**.2 10 YEAR RAINFALL INTENSITY(INCH/HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8722 SOIL CLASSIFICATION IS "a" SUBAREA RUNOFF (CFS) TOTAL AREA (ACRES) = 10.306 2,344 32.51 15.90 TOTAL RUNOFF (CFS) = 32,51 **************************************************************************** FLOW PROCESS FROM NODE 343.00 TO NODE 341.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1096.00 DOWNSTREAM (FEET) FLOW LENGTH(FEET) = 40.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 30.0 INCH PIPE IS 19.9 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 9.39 ESTIMATED PIPE DIAMETER(INCH) = 30.00 PIPE-FLOW (CFS) = 32.51 PIPE TRAVEL TIME(MIN.) = LONGEST FLOWPATH FROM NODE 1095.00 NUMBER OF PIPES 1 0.07 TC(MIN.) ~ 343.50 TO NODE 10,38 341.00 1040.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 341. 00 TO NODE 341.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATIONIMIN.) 10.38 RAINFALL INTENSITY (INCH/HR) = 2.34 TOTAL STREAM AREA(ACRES) = 15.90 PEAK FLOW RATE{CFS) AT CONFLUENCE = 32.51 ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 6.21 2 32,51 Tc IMIN.) 11. 62 10.38 INTENSITY (INCH/HOUR) 2.194 2,335 AREA (ACRE) 3.20 15.90 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK STREAM NUMBER 1 FLOW RATE RUNOFF ICFS) 38.05 TABLE ** Tc IMIN.) 10.38 INTENSITY IINCH/HOUR) 2.335 1P Page 11 of 18 I I I 81INF10.RES 2 36.75 11,62 2.194 I COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) 38.05 TC(MIN.) = 10.38 TOTAL AREA (ACRES) = 19.10 LONGEST FLOW PATH FROM NODE 347.50 TO NODE 341.00 1055.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 341. 00 TO NODE 341.00 IS CODE = 13 I ---------------------------------------------------------------------------- >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 167.50 TO NODE 167.00 IS CODE = 21 I ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[ (LENGTH**3)!(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 550.00 UPSTREAM ELEVATION = 1120.00 DOWNSTREAM ELEVATION = 1115.00 ELEVATION DIFFERENCE = 5.00 TC = 0.303*[( 550.00**3)!{ 5.00)]**.2 10 YEAR RAINFALL INTENSITY (INCH!HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8729 SOIL CLASSIFICATION IS "E" SUBAREA RUNOFF(CFS) TOTAL AREA(ACRES) = 9.683 2.426 I I I 12.07 5.70 TOTAL RUNOFF (CFS) = 12.07 **************************************************************************** FLOW PROCESS FROM NODE 167.00 TO NODE 165.00 IS CODE = 31 I ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< I ----------------------~--------------------------------~--------------~----- --~--------------------------------------------~---------------------------- ELEVATION DATA: UPSTREAM (FEET) = 1115.00 DOWNSTREAM{FEETJ 1111.00 FLOW LENGTH (FEET) = 378.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 24.0 INCH PIPE IS 16.3 INCHES PIPE-FLOW VELOCITY{FEET!SEC.) 5.30 ESTIMATED PIPE DIAMETER (INCH) = 24.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 12.07 PIPE TRAVEL TIME{MIN.) = 1.19 Tc{MIN.) = 10.87 LONGEST FLOWPATH FROM NODE 167.50 TO NODE 165.00 928.00 FEET. I I **************************************************************************** FLOW PROCESS FROM NODE 165.00 TO NODE 165.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) 10.87 RAINFALL INTENSITY (INCH!HR) = 2.28 TOTAL STREAM AREA{ACRES) = 5.70 PEAK FLOW RATE(CFS) AT CONFLUENCE = 12.07 I I **************************************************************************** FLOW PROCESS FROM NODE 166.50 TO NODE 166.00 IS CODE = 21 I ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3)!(ELEVATION CHANGE}]**.2 INITIAL SUBAREA FLOW-LENGTH = 700.00 UPSTREAM ELEVATION = 1115.30 DOWNSTREAM ELEVATION = 1111.20 ELEVATION DIFFERENCE = 4.10 TC = 0.303*[( 700.00**3)!{ 4.10)]**.2 11.644 10 YEAR RAINFALL INTENSITY (INCH!HOUR) = 2.192 USER-SPECIFIED RUNOFF COEFFICIENT = .8709 SOIL CLASSIFICATION IS nB" 'Z-\ I I I Page 12 of 18 I I I I I I I I I I I I I I I I I I I 811NF10,RES SUBAREA RUNOFF(CFS) TOTAL AREA(ACRES) = 1.53 0.80 TOTAL RUNOFF (CFS) = 1. 53 **************************************************************************** FLOW PROCESS FROM NODE 166.00 TO NODE 165:00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM{FEET) = 1111.20 DOWNSTREAM (FEETj 1110.80 FLOW LENGTH(FEET) = 80.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 7.0 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 2.40 ESTIMATED PIPE DIAMETER (INCH) : 1B.00 NUMBER OF PIPES 1 PIPE-FLOW{CFS) = 1.53 PIPE TRAVEL TIME(MIN.) = 0.55 Tc(MIN.) = 12.20 LONGEST FLOWPATH FROM NODE 166.50 TO NODE 165.00 780.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 165.00 TO NODE 165.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ---------------------------------------------------------------------------- ------~---------------------------------------------------~----------------- TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) 12.20 RAINFALL INTENSITY{INCH/HR) = 2.14 TOTAL STREAM AREA(ACRES) = 0.80 PEAK FLOW RATE(CFS) AT CONFLUENCE = 1.53 ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (crs) 1 12,07 2 1. 53 Tc (MIN. ) 10.87 12.20 INTENSITY ( INCH/HOUR) 2.276 2.137 AREA (ACRE) 5.70 O.BO *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK STREAM NUMBER 1 2 FLOW RATE RUNOFF (CFS) 13.43 12,86 TABLE ** Tc (MIN. ) 10.87 12.20 INTENSITY ( INCH/HOUR) 2.276 2,137 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) 13.43 Tc(MIN.) = 10.87 TOTAL AREA(ACRES) = 6.50 LONGEST FLOWPATH FROM NODE 167.50 TO NODE 165.00 928.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 165.00 TO NODE 160.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ================================~=========================================== ELEVATION DATA: UPSTREAM (FEET) = 1110.80 DOWNSTREAM (FEET) 1109.80 FLOW LENGTH(FEET) = 55.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 21.0 INCH PIPE IS 16.8 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 6.51 ESTIMATED PIPE DIAMETER (INCH) = 21.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 13.43 PIPE TRAVEL TIME{MIN.) = 0.14 Tc(MIN.) = 11.01 LONGEST FLOWPATH FROM NODE 167.50 TO NODE 160.00 983.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 10 ~ 160.00 TO NODE 160.00 IS CODE Page 13 of 18 I I I I I I I I I I I I I I I I I I I 81INF10.RES ---------------------------------------------------------------------------- >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 1 <<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 164.50 TO NODE 164.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC; K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH; 700.00 UPSTREAM ELEVATION = 1116.00 DOWNSTREAM ELEVATION; 1110.00 ELEVATION DIFFERENCE = 6.00 TC = 0.303*[ (700.00**3)/( 6.00}]**.2 10 YEAR RAINFALL INTENSITY (INCH/HOUR) ; USER-SPECIFIED RUNOFF COEFFICIENT; .8717 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) TOTAL AREA (ACRES) = 10.790 2.286 1.39 0,70 TOTAL RUNOFF(CFS) = 1.39 **************************************************************************** FLOW PROCESS FROM NODE 164.00 TO NODE 164.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) 10.79 RAINFALL INTENSITY(INCH/HR) = 2.29 TOTAL STREAM AREA(ACRES) = 0.70 PEAK FLOW RATE (CFSJ AT CONFLUENCE; 1.39 **************************************************************************** FLOW PROCESS FROM NODE 163.50 TO NODE 163.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS APARTMENT TC = K*[(LENGTH**3)/(ELEVATION CHANGE}]**.2 INITIAL SUBAREA FLOW-LENGTH = 400.00 UPSTREAM ELEVATION = 1120.00 DOWNSTREAM ELEVATION = 1116.00 ELEVATION DIFFERENCE = 4.00 TC = 0.323*[( 400.00**3)/( 4.00)]**.2 8.905 10 YEAR RAINFALL INTENSITY (INCH/HOUR) = 2.541 USER-SPECIFIED RUNOFF COEFFICIENT = .8474 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) 4,95 TOTAL AREA (ACRES) = 2.30 TOTAL RUNOFF(CFS) = 4.95 **************************************************************************** FLOW PROCESS FROM NODE 163.00 TO NODE 164.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< =======:================================================================:=== ELEVATION DATA: UPSTREAM (FEET) = 1116.00 DOWNSTREAM (FEET) 1115.80 FLOW LENGTH(FEET) = 20.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 18.0 INCH PIPE IS 11.4 INCHES PIPE-FLOW VELOCITY (FEET/SEC. ) 4.18 ESTIMATED PIPE DIAMETER{INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW(CFS) : 4.95 PIPE TRAVEL TIME(MIN.) = 0.08 Tc(MIN.) = 8.98 LONGEST FLOWPATH FROM NODE 163.50 TO NODE 164.00 420.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 164.00 TO NODE 164.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ~ =========================================================:================== Page 14 of 18 I II I I I I I I I I I I I I I I I I I I 81INF10.RES TOTAL NUMBER OF STREAMS: 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) 8.98 RAINFALL INTENSITY (INCH/HR) = 2.53 TOTAL STREAM AREA(ACRES) = 2.30 PEAK FLOW RATE(CFS) AT CONFLUENCE = 4.95 ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 1. 39 2 4.95 Tc (MIN. ) 10.79 8.98 INTENSITY ( INCH/HOUR) 2,286 2.528 AREA (ACRE) 0.70 2.30 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN.) ( INCH/HOUR) 1 6.11 8,98 2,528 2 5,87 10,79 2.286 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) 6.11 TC(MIN.) ~ 8,98 TOTAL AREA(ACRES) ~ 3.00 LONGEST FLOWPATH FROM NODE 164.50 TO NODE 164.00 700.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 164.00 TO NODE 160.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1115.80 DOWNSTREAM (FEET) 1115.60 FLOW LENGTH(FEET) = 20.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 18.0 INCH PIPE IS 13.4 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 4.33 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 6.11 PIPE TRAVEL TIME(MIN.) = 0.08 TC(MIN.) = 9.06 LONGEST FLOWPATH FROM NODE 164.50 TO NODE 160.00 720.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 160.00 IS CODE = 11 ---------------------------------------------------------------------------- >>>>>CONFLUENCE MEMORY BANK # 1 WITH THE MAIN-STREAM MEMORY<<<<< ============================================================================ ** MAIN STREAM NUMBER 1 LONGEST STREAM CONFLUENCE DATA ** RUNOFF Tc INTENSITY (CFS) (MIN.) (INCH/HOUR) 6.11 9,06 2.516 FLOWPATH FROM NODE 164.50 TO AREA (ACRE) 3.00 NODE 160.00 720.00 FEET. ** MEMORY STREAM NUMBER 1 LONGEST BANK # 1 CONFLUENCE DATA ** RUNOFF Tc INTENSITY (eFS) (MIN.) (INCH/HOUR) 13.43 11.01 2.260 FLOWPATH FROM NODE 167.50 TO NODE AREA (ACRE) 6.50 160,00 983.00 FEET. *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** ** PEAK STREAM NUMBER FLOW RATE RUNOFF (CFS) TABLE ** Tc (MIN. ) INTENSITY (INCH/HOUR) -JA Page 15 of 18 I I 81INF10.RES I 1 2 17.17 18.92 9.06 11.01 2,516 2.260 I COMPUTED CONFLUENCE PEAK FLOW RATE(CFS) TOTAL AREA (ACRES) = ESTIMATES ARE 18.92 9.50 AS FOLLOWS: Tc (MIN.) = 11. 01 **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 160.00 IS CODE = 12 I >>>>>CLEAR MEMORY BANK # 1 <<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 160.00 IS CODE = 10 I >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 1 <<<<< ============================================================================ II **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 160.00 IS CODE = 13 >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- I **************************************************************************** FLOW PROCESS FROM NODE 162.50 TO NODE 162.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< I I ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[ (LENGTH**3)/(ELEVATION CHANGE)] **.2 INITIAL SUBAREA FLOW-LENGTH = 270.00 UPSTREAM ELEVATION = 1112.50 DOWNSTREAM ELEVATION = 1110.80 ELEVATION DIFFERENCE = 1.70 TC = 0.303*[( 270.00**3l/{ 1.70)]**.2 10 YEAR RAINFALL INTENSITY(INCH/HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8750 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) TOTAL AREA(ACRES) = 7.840 2.725 I 1. 91 0,80 TOTAL RUNOFF(CFS) = 1. 91 I **************************************************************************** FLOW PROCESS FROM NODE 162.00 TO NODE 162.00 IS CODE = 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< I TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) 7.84 RAINFALL INTENSITY (INCH/HR) = 2.73 TOTAL STREAM AREAIACRESI = 0.80 PEAK FLOW RATE(CFS) AT CONFLUENCE = 1.91 I **************************************************************************** I FLOW PROCESS FROM NODE 161.50 TO NODE 161.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< I ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS APARTMENT TC = K*[(LENGTH**3l/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 365.00 UPSTREAM ELEVATION = 1120.00 DOWNSTREAM ELEVATION: 1116.00 ELEVATION DIFFERENCE = 4.00 TC: 0.323*[( 365.00**3)/( 4.00)]**.2 10 YEAR RAINFALL INTENSITY (INCH/HOUR) : USER-SPECIFIED RUNOFF COEFFICIENT = .8486 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) TOTAL AREA (ACRES) = 8.429 2.619 I I 4.22 1. 90 TOTAL RUNOFF(CFS) 4.22 ~ I Page 16 of 18 I" I I I I I I I I I I I II I I I I I I 81INF10.RES **************************************************************************** FLOW PROCESS FROM NODE 161.00 TO NODE 162.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1116.00 DOWNSTREAM (FEET) 1112.00 FLOW LENGTH (FEET) = 15.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 4.2 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 13.34 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 4.22 PIPE TRAVEL TIME{MIN.) = 0.02 Tc(MIN.) = 8.45 LONGEST FLOWPATH FROM NODE 161.50 TO NODE 162.00 380.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 162.00 TO NODE 162.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< =========================~================================================== TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.} 8.45 RAINFALL INTENSITY (INCH/HRJ = 2.62 TOTAL STREAM AREA (ACRES) = 1.90 PEAK FLOW RATE(CFS) AT CONFLUENCE = 4.22 ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 1. 91 2 4,22 Tc IMIN,} 7.84 8,45 INTENSITY I INCH/HOUR} 2.725 2.616 AREA IACRE} 0,80 1. 90 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK STREAM NUMBER 1 2 FLOW RATE RUNOFF ICFS} 5.83 6.05 TABLE ** Tc (MIN. ) 7.84 8.45 INTENSITY ( INCH/HOUR) 2.725 2.616 COMPUTED CONFLUENCE PEAK FLOW RATEICFS} TOTAL AREA (ACRES) = LONGEST FLOWPATH FROM ESTIMATES ARE 6,05 2.70 NODE AS FOLLOWS: Tc(MIN.) = 8.45 161. 50 TO NODE 162.00 380.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 162.00 TO NOOE 160,00 IS CODE: 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ELEVATION DATA: UPSTREAM (FEET) = 1112.00 DOWNSTREAM (FEET) 1110.00 FLOW LENGTH (FEET) = 20.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER{INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 6.6 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 10.40 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOWICFS) : 6.05 PIPE TRAVEL TIME(MIN.) ~ 0.03 Tc(MIN.) = 8.48 LONGEST FLOWPATH FROM NODE 161.50 TO NODE 160.00 400.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 160.00 IS CODE = 11 2f; ---------------------------------------------------------------------------- >>>>>CONFLUENCE MEMORY BANK * 1 WITH THE MAIN-STREAM MEMORY<<<<< Page 17 of 18 II" I I I I I I i I I I II I I I I I I I I 81INF10.RES ============================================================================ ** MAIN STREAM NUMBER 1 LONGEST ** MEMORY STREAM NUMBER 1 LONGEST STREAM CONFLUENCE DATA ** RUNOFF Tc INTENSITY (CFSI (MIN. I (INCH/HOURI 6.05 8.48 2,610 FLQWPATH FROM NODE 161.50 TO AREA (ACRE) 2.70 NODE 160.00 400.00 FEET. BANK # 1 CONFLUENCE DATA ** RUNOFF Tc INTENSITY (CFSI (MIN. I (INCH/HOURI 18.92 11,01 2.260 FLQWPATH FROM NODE 167.50 TO NODE AREA (ACRE I 9.50 160.00 983.00 FEET. *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** ** PEAK STREAM NUMBER 1 2 FLOW RATE RUNOFF (CFSI 20.62 24.17 TABLE ** Tc (MIN. ) 8.48 11. 01 INTENSITY ( INCH/HOURI 2.610 2.260 COMPUTED CONFLUENCE PEAK FLOW RATE(CFS) TOTAL AREA(ACRES) = ESTIMATES ARE 24.17 12.20 AS FOLLOWS: Tc(MIN.) = 11. 01 ***************************************************************.************ FLOW PROCESS FROM NODE 160.00 TO NODE 153,80 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW}<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1106.00 DOWNSTREAM (FEET) FLOW LENGTH(FEET) = 540.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 33.0 INCH PIPE IS 22.9 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 5.50 ESTIMATED PIPE DIAMETER(INCH} = 33.00 PIPE-FLOW (CFS) = 24.17 PIPE TRAVEL TIME(MIN.) = LONGEST FLOWPATH FROM NODE 1102.00 NUMBER OF PIPES 1 1.64 Tc(MIN.) = 167.50 TO NODE 12.65 153.80 1523.00 FEET. ============================================================================ END OF STUDY SUMMARY: TOTAL AREA (ACRES) PEAK FLOW RATE(CFS) 12.20 TC(MIN.) = 24.17 12.65 ============================================================================ ============================================================================ 1 END OF RATIONAL METHOD ANALYSIS -z.\ Page 18 of 18 1 I v-o ~ 'I e.-t7-/L I 81INF1DD.RES I **************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM BASED ON RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT (RCFC&WCD) 1978 HYDROLOGY MANUAL (C) Copyright 1982-2000 Advanced Engineering Software (aes) Ver. I.SA Release Date: 01/01/2000 License 1D 1264 I Analysis prepared by: I RBF & Associates 14725 Alton Parkway Irvine, CA 92618 I FILE NAME: 81INFIOO.DAT TIME/DATE OF STUDY: 07:58 09/18/2001 I USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: I USER SPECIFIED STORM EVENT (YEAR) = 100.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00 SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE 0.55 10-YEAR STORM lO-MINUTE INTENSITY (INCH/HOURj = 2.360 10-YEAR STORM 60-MINUTE INTENSITY (INCH/HOURj = 0.880 lOO-YEAR STORM 10-MINUTE INTENSITY(INCH/HOUR} = 3.480 100-YEAR STORM 60-MINUTE INTENSITY (INCH/HOUR) = 1.300 SLOPE OF 10-YEAR INTENSITY-DURATION CURVE = 0.5505732 SLOPE OF lOO-YEAR INTENSITY-DURATION CURVE = 0.5495536 COMPUTED RAINFALL INTENSITY DATA: STORM EVENT = 100.00 I-HOUR INTENSITY(INCH/HOUR) = 1.300 SLOPE OF INTENSITY DURATION CURVE = 0.5496 RCFC&WCD HYDROLOGY MANUAL "C"-VALUES USED FOR RATIONAL METHOD NOTE: COMPUTE CONFLUENCE VALUES ACCORDING TO RCFC&WCD HYDROLOGY MANUAL AND IGNORE OTHER CONFLUENCE COMBINATIONS FOR DOWNSTREAM ANALYSES *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPE FLOW AND STREETFLQW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING WIDTH CROSSFALL IN- 10UT-/PARKj- HEIGHT WIDTH LIP HIKE FACTOR NO. 1FT) 1FT) ,'SIDE / SIDEI WAY 1FT) 1FT) 1FT) 1FT)' In) :LOB::' :TR:::;::::1:::~:~:::2:::l-~~~;- ~ . D~ :, ._O~,lJ : " ~,' 67 ~,=.' ~~';~, = 1. Relative Flow-Depth--:---O.OO FEET r I ~ -' _ :.A as (Maximum Allowable Street Flow Depth) - (Top-of-Curb) 2. (Depth) * (Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* I I I I I **************************************************************************** FLOW PROCESS FROM NODE 502.00 IS CODE = 21 502.50 TO NODE I >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[ (LENGTH**3) 1 (ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 552.00 UPSTREAM ELEVATION = 1122.33 DOWNSTREAM ELEVATION = 1116.54 ELEVATION DIFFERENCE = 5.79 TC = 0.303*[( 552.00**3)/( 5.79)]**.2 9.424 100 YEAR RAINFALL INTENSITY (INCH!HOUR) = 3.595 USER-SPECIFIED RUNOFF COEFFICIENT = .8797 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) 4.74 TOTAL AREA(ACRES) = 1.50 TOTAL RUNOFF (CFS) = 4.74 I I I **************************************************************************** FLOW- PROCESS FROM NODE 502.00 TO NODE 503.00 IS CODE = 31 I >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< pf/..IF() t/ p{e/. ~1vU) Yfr'-h'1 ~ ".,WI. /L..J-~J \~ 011<, . -' 1/b I Page 1 of 18 I I 811NF100.RES ELEVATION DATA: UPSTREAM (FEET) = 1113.50 DOWNSTREAM (FEET) 1113.00 FLOW LENGTH(FEET) = 50.00 MANNING'S N 0.015 DEPTH OF FLOW IN 18.0 INCH PIPE IS 11.1 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 4.14 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW(erS) = 4.74 PIPE TRAVEL TIME{MIN.l = 0.20 Tc(MIN.) = 9.62 LONGEST FLQWPATH FROM NODE 502.50 TO NODE 503.00 602.00 FEET. I I I **************************************************************************** FLOW PROCESS FROM NODE 503.00 TO NODE 503.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- I TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) 9.62 RAINFALL INTENSITY (INCH/HR) = 3.55 TOTAL STREAM AREA(ACRES) = 1.50 PEAK FLOW RATE(CFS) AT CONFLUENCE = 4.74 I **************************************************************************** FLOW PROCESS FROM NODE 501. 50 TO NODE 501.00 IS CODE = 21 ---------------------------------------------------------------------------- I >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- I ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 140.00 UPSTREAM ELEVATION = 1115.17 DOWNSTREAM ELEVATION = 1114.00 ELEVATION DIFFERENCE = 1.17 TC = 0.303*[( 140.00**3)/( 1.17)J**.2 5.697 100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 4.741 USER-SPECIFIED RUNOFF COEFFICIENT = .8837 SOIL CLASSIFICATION IS "8" SUBAREA RUNOFF (CFS) 1.26 TOTAL AREA (ACRES) = 0.30 TOTAL RUNOFF (CFS) = 1.26 I I **************************************************************************** FLOW PROCESS FROM NODE 501.00 TO NODE 503.00 IS CODE = 31 ---------------------------------------------------------------------------- I >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SU8AREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ I ELEVATION DATA: UPSTREAM (FEET) = 1113.90 DOWNSTREAM (FEET) 1113.70 FLOW LENGTH(FEET) = 40.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER (INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 6.3 INCHES PIPE-FLOW VELOCITY (FEET/SEC. } 2.28 ESTIMATED PIPE DIAMETER(INCHI = 18.00 NUMBER OF PIPES 1 PIPE-FLOW(CFS) = 1.26 PIPE TRAVEL TIME(MIN.) = 0.29 Tc(MIN.} = 5,99 LONGEST FLOWPATH FROM NODE 501.50 TO NODE 503.00 180.00 FEET. I **************************************************************************** I FLOW PROCESS FROM NODE 503.00 TO NODE 503.00 IS CODE = 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ---------------------------~~----------------------------------------------- ---------------------------------------~------------------------------------ I TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM TIME OF CONCENTRATION (MIN.) 5.99 RAINFALL INTENSITY (INCH/HR) = 4.61 TOTAL STREAM AREA (ACRES) = 0.30 PEAK FLOW RATE (CFS) AT CONFLUENCE = 1.26 2 ARE: I ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 4.74 2 1.26 Tc (MIN. ) 9.62 5.99 INTENSITY { INCH/HOUR} 3.554 4.612 AREA (ACRE) 1. 50 0.30 -z,'\ I I Page 2 of 18 I I 81INF1DD.RES I *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE 0-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. I ** PEAK STREAM NUMBER 1 2 FLOW RATE RUNOFF (CFS) 4.21 5,71 TABLE ** Tc (MIN. ) 5.99 9,62 INTENSITY ( INCH/HOUR) 4.612 3.554 I COMPUTED CONFLUENCE ESTIMATES ARE PEAK FLOW RATE(CFS) 5.71 TOTAL AREA(ACRES) = 1.80 LONGEST FLOWPATH FROM NODE AS FOLLOWS: Tc(MIN.l = 9.62 502.50 TO NODE 503.00 602.00 FEET. I **************************************************************************** FLOW PROCESS FROM NODE 503.00 TO NODE 504.00 IS CODE = 31 I >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< I ELEVATION DATA: UPSTREAM (FEET) = 1113.50 DOWNSTREAM (FEET) 1112.00 FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 18.0 INCH PIPE IS 12.7 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 4.29 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 5.71 PIPE TRAVEL TIME(MIN.) = 0.58 Tc(MIN.) = 10.21 LONGEST FLOWPATH FROM NODE 502.50 TO NODE 504.00 752.00 FEET. I **************************************************************************** FLOW PROCESS FROM NODE 504.00 TO NODE 504.00 IS CODE = 13 I >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<< **************************************************************************** FLOW PROCESS FROM NODE 505.50 TO NODE 505.00 IS CODE = 21 I >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< I ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[ (LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 1000.00 UPSTREAM ELEVATION = 1122.33 DOWNSTREAM ELEVATION = 1115.60 ELEVATION DIFFERENCE = 6.73 TC = 0.303*[( 1000.00**3)/( 6.73) ]**.2 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8767 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) TOTAL AREA(ACRES) = 13 ,061 3.005 I I 7.38 2.80 TOTAL RUNOFF (CFS) = 7.38 **************************************************************************** FLOW PROCESS .FROM NODE 505.00 TO NODE 505.00 IS CODE = 13 I >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<< **************************************************************************** I FLOW PROCESS FROM NODE 416.50 TO NODE 416.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< I ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3)/(ELEVATION CHANGE))**.2 INITIAL SUBAREA FLOW-LENGTH = 250.00 ?;P I Page 3 of 18 I I 811NF100.RES I UPSTREAM ELEVATION = 1118.00 DOWNSTREAM ELEVATION 1117.00 ELEVATION DIFFERENCE 1.00 TC = 0.303*[( 250.00**3lj( 1.00)]**.2 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8807 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) TOTAL AREA (ACRES) = 8.324 3.849 I 5.76 1. 70 TOTAL RUNOFF (CFS) = 5.76 I **************************************************************************** FLOW PROCESS FROM NODE 416.00 TO NODE 414.00 IS CODE = 31 I >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< I ELEVATION DATA: UPSTREAM (FEET) = 1117.00 DOWNSTREAM (FEET) 1113.00 FLOW LENGTH(FEET) = 400.00 MANNING1S N = 0.015 DEPTH OF FLOW IN 18.0 INCH PIPE IS 12.8 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 4.29 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW(CFS) = 5.76 PIPE TRAVEL TIME(MIN.) = 1.55 Tc(MIN.) = 9.88 LONGEST FLOWPATH FROM NODE 416.50 TO NODE 414.00 650.00 FEET. I **************************************************************************** FLOW PROCESS FROM NODE 414.00 TO NODE 414.00 IS CODE = 1 I >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< II TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION{MIN.) 9.88 RAINFALL INTENSITY (INCH/HR) = 3.50 TOTAL STREAM AREA(ACRES) = 1.70 PEAK FLOW RATE(CFS) AT CONFLUENCE = 5.76 **************************************************************************** I FLOW PROCESS FROM NODE 414.50 TO NODE 414.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< I ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 400.00 UPSTREAM ELEVATION = 1117.00 DOWNSTREAM ELEVATION = 1113.00 ELEVATION DIFFERENCE = 4.00 TC = 0.303*[ (400.00**3)/( 4.00)]**.2 8.364 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.839 USER-SPECIFIED RUNOFF COEFFICIENT = .8807 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) 0.68 TOTAL AREA{ACRES) = 0.20 TOTAL RUNOFF (CFS) = 0.68 I I **************************************************************************** I FLOW PROCESS FROM NODE 414.00 TO NODE 414.00 IS CODE = 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< I TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION (MIN. ) 8.36 RAINFALL INTENSITY (INCH/HR) = 3.84 TOTAL STREAM AREA (ACRES) = 0.20 PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.68 I **************************************************************************** FLOW PROCESS FROM NODE 415.50 TO NODE 415.00 IS CODE = 21 I >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL '?\ '. Page 4 of 18 I II 81INF1DD.RES I TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 410.00 UPSTREAM ELEVATION = 1115.00 DOWNSTREAM ELEVATION = 1110.00 ELEVATION DIFFERENCE = 5.00 TC = 0.303*[( 410.00**3)/( 5.00)]**.2 8.118 100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 3.902 USER-SPECIFIED RUNOFF COEFFICIENT = .8810 SOIL CLASSIFICATION IS "8" SUBAREA RUNOFF(CFS} 8.94 TOTAL AREA(ACRES) = 2.60 TOTAL RUNOFF(CFS) = 8.94 I I **************************************************************************** FLOW PROCESS FROM NODE 415.00 TO NODE 414.00 IS CODE = 31 I ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1110.00 DOWNSTREAM (FEET) 1109.00 FLOW LENGTH(FEET) = 50.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 18.0 INCH PIPE IS 13.8 INCHES PIPE-FLOW VELOCITY{FEET/SEC.) 6.14 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 8.94 PIPE TRAVEL TIME(MIN.} = 0.14 TC(MIN.) = 8.25 LONGEST FLOWPATH FROM NODE 415.50 TO NODE 414.00 460.00 FEET. I I **************************************************************************** FLOW PROCESS FROM NODE 414.00 TO NODE 414.00 IS CODE = 1 I ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ----~-----------------------------------------~----------------------------- ---------------------------------------------------------------------------- TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 3 ARE: TIME OF CONCENTRATION(MIN.) 8.25 RAINFALL INTENSITY (INCH/HR) = 3.87 TOTAL STREAM AREA(ACRES) = 2.60 PEAK FLOW RATEICFS) AT CONFLUENCE ~ 8.94 I I I ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 5.76 2 0.68 3 8.94 Tc (MIN,) 9.88 8.36 8.25 INTENSITY ( INCH/HOUR) 3.504 3.839 3.867 AREA (ACRE) 1. 70 0.20 2.60 I *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-l AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 3 STREAMS. I ** PEAK STREAM NUMBER 1 2 3 FLOW RATE RUNOFF (CFS) 14.42 14.43 14.48 TABLE ** Tc IMIN.) 8.25 8.36 9.88 INTENSITY ( INCH/HOUR) 3.867 3.839 3.504 I COMPUTED CONFLUENCE PEAK FLOW RATE(CFS) TOTAL AREA(ACRES) = LONGEST FLOWPATH FROM ESTIMATES ARE 14.42 4,50 NODE AS FOLLOWS: Tc (MIN.) = 8.25 416.50 TO NODE 414.00 650.00 FEET. I **************************************************************************** FLOW PROCESS FROM NODE 414.00 TO NODE 412.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< I ==c========================================================================= ELEVATION DATA: UPSTREAM (FEET) = 1109.00 DOWNSTREAM (FEET) 1107.00 7;J-- I Page 5 of 18 I I I I I I I I I I I I I I I I I I I 81INF1DD.RES FLOW LENGTH(FEET) = 200.00 MANNING'S N 0.015 DEPTH OF FLOW IN 24.0 INCH PIPE IS 19.5 INCHES PIPE-FLOW VELOCITY (FEET/SEC.1 5.28 ESTIMATED PIPE DIAMETER (INCH) = 24.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 14.42 PIPE TRAVEL TIME(MIN.) = 0.63 Tc(MIN.) = 8.89 LONGEST FLOW PATH FROM NODE 416.50 TO NODE 412.00 850.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 412.00 TO NODE 412.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.} 8.89 RAINFALL INTENSITY (INCH!HR) = 3.71 TOTAL STREAM AREA(ACRES) = 4.50 PEAK FLOW RATE(CFS) AT CONFLUENCE = 14.42 **************************************************************************** FLOW PROCESS FROM NODE 413.50 TO NODE 413.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< --------~-----------------------------------------------------------~------- ---------------------------------------------------------------------------- ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3)!(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 300.00 UPSTREAM ELEVATION = 1106.00 DOWNSTREAM ELEVATION = 1103.00 ELEVATION DIFFERENCE = 3.00 TC = 0.303*[ (300.00**3)!( 3.00)]**.2 7.455 100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 4.090 USER-SPECIFIED RUNOFF COEFFICIENT = .8816 SOIL CLASSIFICATION IS liB" SUBAREA RUNOFF (CFS) 3.97 TOTAL AREAIACRES) ~ 1.10 TOTAL RUNOFFICFS) ~ 3.97 **************************************************************************** FLOW PROCESS FROM NODE 413.00 TO NODE 412.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ELEVATION DATA: UPSTREAM (FEET) = 1107.00 DOWNSTREAM (FEET) 1106.50 FLOW LENGTH (FEET) = 50.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER (INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 9.9 INCHES PIPE-FLOW VELOCITY(FEET!SEC.) 3.97 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOWICFS) ~ 3.97 PIPE TRAVEL TIME(MIN.) = 0.21 TC(MIN.) = 7.66 LONGEST FLOW PATH FROM NODE 413.50 TO NODE 412.00 350.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 413.00 TO NODE 412.00 IS CODE = 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- TOTAL NUMBER OF STREAMS = 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) 7.66 RAINFALL INTENSITY (INCH/HR) = 4.03 TOTAL STREAM AREA(ACRES) = 1.10 PEAK FLOW RATE(CFS) AT CONFLUENCE = 3.97 **************************************************************************** FLOW PROCESS FROM NODE 412.50 TO NODE 412.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ TC ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL K*[ (LENGTH**3) ! (ELEVATION CHANGE)] **.2 ,??J Page 6 of 18 I I I I I I I I I I I I I I I I I I I 811NF100.RES INITIAL SUBAREA FLOW-LENGTH = 150.00 UPSTREAM ELEVATION = 1106.00 DOWNSTREAM ELEVATION = 1105.00 ELEVATION DIFFERENCE = 1.00 TC = 0.303*(( 150.00**3l/( 1.00))**.2 6.127 100 YEAR RAINFALL INTENSITY{INCH/HOUR) = 4.555 USER-SPECIFIED RUNOFF COEFFICIENT = .8832 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) 0.40 TOTAL AREA(ACRES) = 0.10 TOTAL RUNOFF (CFS) = 0.40 ' **************************************************************************** FLOW PROCESS FROM NODE 412.00 TO NODE 412.00 IS CODE = 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLDENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS: 3 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 3 ARE: TIME OF CONCENTRATION(MIN.) 6.13 RAINFALL INTENSITY(INCH/HR} = 4.56 TOTAL STREAM AREA(ACRES) = 0.10 PEAK FLOW RATE(CFS) AT CONFLUENCE: 0.40 ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 14.42 2 3.97 3 0,40 Tc (MIN. ) 8.89 7.66 6,13 INTENSITY ( INCH/HOUR) 3.713 4.028 4.555 AREA (ACRE) 4.50 1.10 0,10 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 3 STREAMS. ** PEAK STREAM NUMBER 1 2 3 FLOW RATE RUNOFF ICFS) 13.52 16.76 18.41 TABLE ** Tc (MIN. ) 6.13 7.66 8,89 INTENSITY ( INCH/HOUR) 4.555 4.028 3,713 COMPUTED CONFLUENCE PEAK FLOW RATE (CFS) TOTAL AREA (ACRES) = LONGEST FLOWPATH FROM ESTIMATES ARE 18.41 5.70 NODE AS FOLLOWS: Tc(MIN.} = 8.89 416.50 TO NODE 412.00 850.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 412.00 TO NODE 411.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ELEVATION DATA: UPSTREAM (FEET) = 1105.00 DOWNSTREAM (FEET) FLOW LENGTH(FEET) = 150.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 30.0 INCH PIPE IS 21.3 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 4.93 ESTIMATED PIPE DIAMETER(INCH) = 30.00 PIPE-FLOW(CFS) = 18.41 PIPE TRAVEL TIME (MIN.) = LONGEST FLOWPATH FROM NODE 1104.00 NUMBER OF PIPES 1 0.51 Tc(MIN.) = 416.50 TO NODE 9.39 411. 00 1000.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 411.00 TO NODE 411.00 IS CODE = 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ===================::===:=::==========:==================:::===============: TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) = 9.39 fA Page 7 of 18 I I I I I I I I I I I I I I I I I I I 811NF100,RES RAINFALL INTENSITY (INCH/HR) = 3.60 TOTAL STREAM AREA(ACRES} = 5.70 PEAK FLOW RATE(CFS) AT CONFLUENCE = 18.41 **************************************************************************** FLOW PROCESS FROM NODE 411.50 TO NODE 411.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< =========~================================================================== ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 700.00 UPSTREAM ELEVATION = 1115.00 DOWNSTREAM ELEVATION = 1108.00 ELEVATION DIFFERENCE = 7.00 TC = 0.303*[( 700.00**3)/{ 7.00))**.2 100 YEAR RAINFALL INTENSITY (INCH/HOURj = USER-SPECIFIED RUNOFF COEFFICIENT = .8788 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) TOTAL AREA(ACRES) = 10.462 3.395 1. 49 0.50 TOTAL RUNOFF (CFS) = 1. 49 **************************************************************************** FLOW PROCESS FROM NODE 411. 00 TO NODE 411.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ------~--------------------------------------------------------------------- ----------------------------------------------~--------~-------------------- TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM TIME OF CONCENTRATION(MIN.) 10.46 RAINFALL INTENSITY (INCH/HR) = 3.39 TOTAL STREAM AREA (ACRES) = 0.50 PEAK FLOW RATE (CFS) AT CONFLUENCE = 1.49 2 ARE: ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 18.41 2 1. 49 Tc (MIN.) 9.39 10.46 INTENSITY ( INCH/HOUR) 3.602 3,395 AREA (ACRE) 5.70 0.50 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA U SED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN,) (INCH/HOUR) 1 19.75 9,39 3.602 2 18.84 10.46 3.395 COMPUTED CONFLUENCE ESTIMATES ARE PEAK FLOW RATE(CFS) 19.75 TOTAL AREA (ACRES) = 6.20 LONGEST FLOWPATH FROM NODE AS FOLLOWS: Tc (MIN.) = 9.39 416.50 TO NODE 411.00 1000.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 411.00 TO NODE 410.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM{FEET} = 1108.00 DOWNSTREAM (FEET) FLOW LENGTH(FEET) = 125.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 30.0 INCH PIPE IS 21.0 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 5.38 ESTIMATED PIPE DIAMETER (INCH) = 30.00 NUMBER OF PIPES PIPE-FLOW (CFS) = 19.75 PIPE TRAVEL TIME(MIN.) = 0.39 TC(MIN.) = 9.78 1107.00 1 ?P Page 8 of 18 1 I I I I I I I I I I I I I I I I I I 81INF1DD.RES LONGEST FLOW PATH FROM NODE 416.50 TO NODE 410.00 = 1125.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 410.00 TO NODE 410.00 IS CODE = 13 >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 349.50 TO NODE 349.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*((LENGTH**3)!(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 525.00 UPSTREAM ELEVATION = 1115.60 DOWNSTREAM ELEVATION = 1083.50 ELEVATION DIFFERENCE = 32.30 TC = 0.303*[ (525.00**3)!{ 32.301J**.2 100 YEAR RAINFALL INTENSITY (INCH!HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8827 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) TOTAL AREA (ACRES) = 6.484 4.416 3.12 O.BO TOTAL RUNOFF (CFS) = 3.12 **************************************************************************** FLOW PROCESS FROM NODE 349.00 TO NODE 345.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM (FEET) = 1063.50 DOWNSTREAM (FEET) 1082.00 FLOW LENGTH(FEET) = 70.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER (INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 6.9 INCHES PIPE-FLOW VELOCITY(FEET/SEC,) 4,96 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW(CFS) = 3.12 PIPE TRAVEL TIME(MIN.) = 0.24 Tc(MIN.) = 6.72 LONGEST' FLOW PATH FROM NODE 349.50 TO NODE 345.00 595.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 345.00 IS CODE ~ 1 345,00 TO NODE >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) 6.72 RAINFALL INTENSITY(INCH!HR) = 4.33 TOTAL STREAM AREA(ACRES) = 0.80 PEAK FLOW RATE (CFS) AT CONFLUENCE = 3.12 **************************************************************************** FLOW PROCESS FROM NODE 347.50 TO NODE 347.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[ (LENGTH**3) ! (ELEVATION CHANGE}]**.2 INITIAL SUBAREA FLOW-LENGTH = 1000.00 UPSTREAM ELEVATION = 1097.00 DOWNSTREAM ELEVATION = 1084.00 ELEVATION DIFFERENCE = 13.00 TC = 0.303*[{ 1000.00**3l!( 13.00)]**.2 100 YEAR RAINFALL INTENSITY (INCH!HOURl = USER-SPECIFIED RUNOFF COEFFICIENT = .8780 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) TOTAL AREA (ACRES) = 11. 450 3.230 6.81 2.40 6.B1 TOTAL RUNOFF {CFSl = ?JP **************************************************************************** Page 9 of 18 I I I I I I I I I I I I I I I I I I I 811NF100.RES FLOW PROCESS FROM NODE 347.00 TO NODE 345.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ELEVATION DATA: UPSTREAM(FEET) = 1084.00 DQWNSTREAM(FEET) FLOW LENGTH(FEET) = 25.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 18.0 INCH PIPE IS 11.2 INCHES PIPE-FLOW VELOCITY{FEET!SEC.) 5.87 ESTIMATED PIPE DIAMETER (INCH) = 18.00 PIPE-FLDW(erS) = 6.81 PIPE TRAVEL TIME(MIN.) = LONGEST FLOWPATH FROM NODE 1083,50 NUMBER OF PIPES 1 0.07 Tc(MIN.) = 347.50 TO NODE 11.52 345.00 1025.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 345.00 TO NODE 345.00 IS CODE = 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 11.52 RAINFALL INTENSITY(INCH/HR) = 3.22 TOTAL STREAM AREA (ACRESj = 2.40 PEAK FLOW RATE (CFS) AT CONFLUENCE = 6.81 ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 3.12 2 6.81 Tc (MIN.) 6.72 11.52 INTENSITY (INCH/HOUR) 4,330 3.220 AREA (ACRE) 0.80 2.40 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. *' PEAK FLOW RATE TABLE *' STREAM RUNOFF Tc INTENSITY NUMBER (CFSJ (MIN.) (INCH/HOUR) 1 7.09 6.72 4.330 2 9.13 11. 52 3.220 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) 9.13 Tc(MIN.) = 11. 52 TOTAL AREA (ACRES) = 3.20 LONGEST FLOWPATH FROM NODE 347.50 TO NODE 345.00 1025.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 345.00 TO NODE 341.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1083.50 DOWNSTREAM (FEET) FLOW LENGTH(FEET) = 30.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 21.0 INCH PIPE IS 12.9 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 5.90 ESTIMATED PIPE DIAMETER (INCH) = 21.00 PIPE-FLOW{CFS) = 9.13 PIPE TRAVEL TIME(MIN.) = LONGEST FLOWPATH FROM NODE 1083.00 NUMBER OF PIPES 1 0.08 Tc(MIN.) = 347.50 TO NODE 11. 61 341. 00 1055.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 341.00 TO NODE 1 341.00 IS CODE = >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ 1>\ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: Page 10 of 18 I I 81INF1DD.RES I TIME OF CONCENTRATION(MIN.) 11.61 RAINFALL INTENSITY (INCH/HR) 3.21 TOTAL STREAM AREA(ACRES) = 3.20 PEAK FLOW RATE (CFS) AT CONFLUENCE = 9/~ " ******************************************************(********************* FLOW PROCESS FROM NODE 343.50 TO NODE( 343.00 IS CODE = 21 - , ' --~~~~~~;;;;;~-~~;~;~-;;~;~;~-;;;;;;~-~;~~~~;~;~~;;17---------------------- ==========================================~~=~======================== ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[ (LENGTH**3)/(ELEVATION CHANGEl]**.2 INITIAL SUBAREA FLOW-LENGTH = 1000.00 UPSTREAM ELEVATION = 1118.00 DOWNSTREAM ELEVATION = 1096.00 ELEVATION DIFFERENCE = 22.00 TC = 0.303*[( 1000.00**3)/( 22.00))**.2 10.306 100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 3.423 USER-SPECIFIED RUNOFF COEFFICIENT = .8789 SOIL CLASSIFICATION IS "8" SUBAREA RUNOFF (CFS) 47.83 TOTAL AREA (ACRES) = 15.90 TOTAL RUNOFF (CFS) = 47.83 I I I I I **************************************************************************** FLOW PROCESS FROM NODE 343.00 TO NODE 341.00 IS CODE = 31 I >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< -----------------~~--------------------------------------------------------- ---------------------------------------------------------------~----~------- I ELEVATION DATA: UPSTREAM (FEET) = 1096.00 DOWNSTREAM (FEET) 1095.00 FLOW LENGTH(FEET) = 40.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 33.0 INCH PIPE IS 24.2 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 10.23 ESTIMATED PIPE DIAMETER (INCH) = 33.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 47,83 PIPE TRAVEL TIME(MIN.) = 0.07 Tc(MIN.) = 10.37 LONGEST FLOWPATH FROM NODE 343.50 TO NODE 341.00 1040.00 FEET. I **************************************************************************** FLOW PROCESS FROM NODE 341. 00 TO NODE 341.00 IS CODE = 1 I >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< I TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) 10.37 RAINFALL INTENSITY (INCH/HR) = 3.41 TOTAL STREAM AREA (ACRES) = 15.90 PEAK FLOW RATE(CFS) AT CONFLUENCE = 47.83 I ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (eFS) 1 9.13 2 47.83 AREA (ACRE) 3.20 15.90 TC (MIN, ) 11.61 10.37 INTENSITY ( INCH/HOUR) 3.207 3.411 I *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN. ) (INCH/HOUR) 1 55.99 10.37 3.411 2 54.09 11. 61 3.207 I I COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE (CFS) 55.99 Tc(MIN.) = 10.37 -' , \~~ . 1..~ "" ~ ;,. - \. -' /.) " o\L /'"'"" , ...'.- . " ,J ?J> I Page 11 of 18 1 I I II I I I II ,I I I I I I I I I I I 811NF100.RES TOTAL AREA (ACRES) = 19.10 LONGEST FLOWPATH FROM NODE 347.50 TO NODE 341.00 = 1055.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 341. 00 TO NODE 341.00 IS CODE = 13 ---------------------------------------------------------------------------- >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<< ============================================================================ **************************************************************************** FLOW PROCESS FROM NODE 167.50 TO NODE 167.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3l/(ELEVATION CHANGE))**.2 INITIAL SUBAREA FLOW-LENGTH = 550.00 UPSTREAM ELEVATION = 1120.00 DOWNSTREAM ELEVATION = 1115.00 ELEVATION DIFFERENCE = 5.00 TC = 0.303*(( 550.00**31/( 5.00))**.2 100 YEAR RAINFALL INTENSITY(INCH/HOURl = USER-SPECIFIED RUNOFF COEFFICIENT = .8795 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFSl TOTAL AREA(ACRES) = 9.683 3.542 17.76 5.70 17.76 TOTAL RUNOFF(CFSl = **************************************************************************** FLOW PROCESS FROM NODE 167.00 TO NODE 165.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEETl = 1115.00 DOWNSTREAM (FEET) 1111.00 FLOW LENGTH(FEET) = 378.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 27.0 INCH PIPE IS 19.4 INCHES PIPE-FLOW VELOCITY (FEET/SEC. 1 5.80 ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES 1 PIPE-FLOW(CFS) = 17.76 PIPE TRAVEL TIME(MIN.) = 1.09 Tc{MIN.l = 10.77 LONGEST FLOWPATH FROM NODE 167.50 TO NODE 165.00 928.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 165.00 TO NODE 165.00 IS CODE = 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CQNFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) 10.77 RAINFALL INTENSITY (INCH/HR) = 3.34 TOTAL STREAM AREA (ACRES) = 5.70 PEAK FLOW RATE(CFS) AT CONFLUENCE = 17.76 **************************************************************************** FLOW PROCESS FROM NODE 166.50 TO NODE 166.00 IS CODE = 21 >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[(LENGTH**3l/(ELEVATION CHANGE}]**.2 INITIAL SUBAREA FLOW-LENGTH = 700.00 UPSTREAM ELEVATION = 1115.30 DOWNSTREAM ELEVATION = 1111.20 ELEVATION DIFFERENCE = 4.10 TC = 0.303*[( 700.00**3)/( 4.10))**.2 100 YEAR RAINFALL INTENSITY(INCH/HOUR) = USER-SPECIFIED RUNOFF COEFFICIENT = .8778 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) TOTAL AREA (ACRES) = 11. 644 3,201 2.25 0,80 2.25 b<\ TOTAL RONOFF(CFS) = **************************************************************************** Page 12 of 18 I I I I I I I I I I I I I I I I I I I 811NF100.RES FLOW PROCESS FROM NODE 166.00 TO NODE 165.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ELEVATION DATA: UPSTREAM (FEET) = 1111.20 DOWNSTREAM (FEET) 1110.80 FLOW LENGTH(FEET) = 80.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER (INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 8.7 INCHES PIPE-FLOW VELOCITY(FEET/SEC.} 2.66 ESTIMATED PIPE DIAMETER(INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 2.25 PIPE TRAVEL TIME(MIN.) = 0.50 Tc(MIN.} = 12.15 LONGEST FLOWPATH FROM NODE 166.50 TO NODE 165.00 780.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 165.00 TO NODE 165,00 IS CODE: 1 >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< :========================:================================================== TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) 12.15 RAINFALL INTENSITY(INCH/HR} = 3.13 TOTAL STREAM AREA (ACRES) = 0.80 PEAK FLOW RATE(CFS) AT CONFLUENCE = 2.25 ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 17.76 2 2,25 Tc (MIN. ) 10.77 12.15 INTENSITY ( INCH/HOUR) 3,341 3.128 AREA (ACRE) 5.70 0.80 *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK STREAM NUMBER 1 2 TABLE ** Tc (MIN.) 10.77 12.15 INTENSITY ( INCH/HOUR) 3.341 3.128 FLOW RATE RUNOFF ICFS) 19.75 18.87 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE (CFS) 19.75 Tc(MIN.) = 10.77 TOTAL AREA (ACRES) = 6.50 LONGEST FLOWPATH FROM NODE 167.50 TO NODE 165.00 928,00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 165.00 TO NODE 160.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW}<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ELEVATION DATA: UPSTREAM (FEET) = 1110.80 DOWNSTREAM (FEET) 1109.80 FLOW LENGTH(FEET) = 55.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 27.0 INCH PIPE IS 17.2 INCHES PIPE-FLOW VELOCITY(FEET/SEC.} 7.38 ESTIMATED PIPE DIAMETER(INCH} = 27.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 19.75 PIPE TRAVEL TIME(MIN.) = 0.12 Tc(MIN.) = 10.89 LONGEST FLOWPATH FROM NODE 167.50 TO NODE 160.00 983.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 160.00 IS CODE = 10 >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK * 1 <<<<< MJ ========================================:=================================== Page 13 of 18 I I I I I I I I I I I I I I I I I I I 81INF1DD.RES **************************************************************************** FLOW PROCESS FROM NODE 164.50 TO NODE 164.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*((LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 700.00 UPSTREAM ELEVATION = 1116.00 DOWNSTREAM ELEVATION = 1110.00 ELEVATION DIFFERENCE = 6.00 TC = 0.303*[( 700.00**3)/( 6.00lJ**.2 laD YEAR RAINFALL INTENSITY {INCH/HOURj = USER-SPECIFIED RUNOFF COEFFICIENT = .8785 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) TOTAL AREA (ACRES) = 10.790 3.338 2,05 0.70 TOTAL RUNOFF (CFS) = 2,05 **************************************************************************** FLOW PROCESS FROM NODE 164.00 TO NODE 164.00 IS CODE ~ 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2. CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) 10.79 RAINFALL INTENSITY(INCH!HR) = 3.34 TOTAL STREAM AREA(ACRES) = 0.70 PEAK FLOW RATE(CFS) AT CONFLUENCE = 2.05 **************************************************************************** FLOW PROCESS FROM NODE 163.50 TO NODE 163.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS APARTMENT TC = K*[(LENGTH**3)!(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 400.00 UPSTREAM ELEVATION = 1120.00 DOWNSTREAM ELEVATION = 1116.00 ELEVATION DIFFERENCE = 4.00 TC = 0.323*[( 400.00**3)!( 4.00)J**.2 8.905 100 YEAR RAINFALL INTENSITY (INCH!HOUR) = 3.709 USER-SPECIFIED RUNOFF COEFFICIENT = .8604 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) 7.34 TOTAL AREA(ACRES) = 2.30 TOTAL RUNOFF(CFS} = 7.34 **************************************************************************** FLOW PROCESS FROM NODE 163.00 TO NODE 164.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA; UPSTREAM (FEET) = 1116.00 DOWNSTREAM (FEET) 1115.80 FLOW LENGTH (FEET) = 20.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 21.0 INCH PIPE IS 13.2 INCHES PIPE-FLOW VELOCITY(FEET!SEC.) 4.61 ESTIMATED PIPE DIAMETER (INCH) = 21.00 NUMBER OF PIPES 1 PIPE-FLOW{CFS) =. 7.34 PIPE TRAVEL TIME(MIN.) = 0.07 Tc(MIN.) = 8.98 LONGEST FLOWPATH FROM NODE 163.50 TO NODE 164.00 420.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 164.00 TO NODE 164.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ============================================================================ TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) 8.98 RAINFALL INTENSITY(INCH!HR) = 3.69 A\ Page 14 of 18 I I I I 811NF100.RES TOTAL STREAM AREA(ACRES) = 2.30 PEAK FLOW RATE(CFS) AT CONFLUENCE = I ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (ers) 1 2.05 2 7.34 Tc (MIN. ) 10.79 8.98 7.34 INTENSITY (INCH/HOUR) 3.338 3.693 AREA (ACRE) 0.70 2.30 I *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. I ** PEAK STREAM NUMBER 1 2 FLOW RATE TABLE ** RUNOFF Tc (ers) (MIN.) 9,05 8.98 8.69 10.79 I COMPUTED CONFLUENCE PEAK FLOW RATE.(CFS) TOTAL AREA(ACRES) = LONGEST FLOWPATH FROM ESTIMATES ARE 9.05 3.00 NODE I INTENSITY ( INCH/HOUR) 3,693 3.338 AS FOLLOWS: Tc(MIN.) = 8,98 164.50 TO NODE 164.00 700.00 FEET. FLOW PROCESS FROM NODE **************************************************************************** 160.00 IS CODE = 31 164.00 TO NODE ---------------------------------------------------------------------------- I >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1115.80 DOWNSTREAM (FEET) 1115.60 FLOW LENGTH (FEET) = 20.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 21.0 INCH PIPE IS 15.4 INCHES PIPE-FLOW VELOCITY (FEET/sEC. ) 4.79 ESTIMATED PIPE DIAMETER (INCH) = 21.00 NUMBER OF PIPES 1 PIPE-FLOW(CFSI = 9.05 PIPE TRAVEL TIME{MIN.) = 0.07 TC(MIN.) = 9.05 LONGEST FLOWPATH FROM NODE 164.50 TO NODE 160.00 720.00 FEET. I I FLOW PROCESS FROM NODE **************************************************************************** 160.00 IS CODE = 11 160.00 TO NODE ---------------------------------------------------------------------------- >>>>>CONFLUENCE MEMORY BANK # 1 WITH THE MAIN-STREAM MEMORY<<<<< I ============================================================================ ** MAIN STREAM NUMBER 1 LONGEST STREAM CONFLUENCE DATA ** RUNOFF Tc INTENSITY (CFS) (MIN.) (INCH/HOUR) 9.05 9.05 3.677 FLOW PATH FROM NODE 164.50 TO AREA (ACRE) 3.00 NODE 160.00 720.00 FEET. I I ** MEMORY STREAM NUMBER 1 LONGEST BANK # 1 CONFLUENCE DATA ** RUNOFF Tc INTENSITY (CFS) IMIN, I (INCH/HOURI 19.75 10.89 3.320 FLOWPATH FROM NODE 167.50 TO NODE AREA (ACREI 6,50 160.00 983.00 FEET. I *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** I ** PEAK STREAM NUMBER 1 2 FLOW RATE RUNOFF (CFS) 25.45 27.92 TABLE ** Tc (MIN. ) 9,05 10,89 I INTENSITY ( INCH/HOUR) 3.677 3,320 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: ~ I Page 15 of 18 I I I I I I I I I I I I I I I I I I I 81INF1DD.RES PEAK FLOW RATE(CFS} TOTAL AREA(ACRES) = 27.92 9.50 Tc (MIN.) 10.89 **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 160.00 IS CODE = 12 ---------------------------------------------------------------------------- >>>>>CLEAR MEMORY BANK # 1 <<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 160.00 IS CODE = 10 ---------------------------------------------------------------------------- >>>>>MAIN-STREAM MEMORY COPIED ONTO MEMORY BANK # 1 <<<<< -------------------------------------------~-------------------------------- --~~------------------------------------------------------------------------ **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 160.00 IS CODE = 13 ---------------------------------------------------------------------------- >>>>>CLEAR THE MAIN-STREAM MEMORY<<<<< ---------------------------------------------------------------------------- ------~------------------------~-------------------------------------------- **************************************************************************** FLOW PROCESS FROM NODE 162.50 TO NODE 162.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ============================================================================ ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS COMMERCIAL TC = K*[{LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 270.00 UPSTREAM ELEVATION = 1112.50 DOWNSTREAM ELEVATION = 1110.80 ELEVATION DIFFERENCE = 1.70 TC = 0.303*[( 270.00**3)/( 1.70))**.2 100 YEAR RAINFALL INTENSITY(INCH/HOUR} = USER-SPECIFIED RUNOFF COEFFICIENT = .8812 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF (CFS) TOTAL AREA(ACRES) = 7.840 3.978 2.80 0.80 TOTAL RUNOFF/CrS) = 2,80 **************************************************************************** FLOW PROCESS FROM NODE 162.00 TO NODE 162.00 IS CODE = 1 ---------------------------------------------------~------------------------ >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< --------~------------~--------~--------------------------~------------------ -~------------------------~--------~---------------------------------------- TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) 7.84 RAINFALL INTENSITY (INCH/HR) = 3.98 TOTAL STREAM AREA/ACRES) = 0.80 PEAK FLOW RATE(CFS) AT CONFLUENCE = 2.80 **************************************************************************** FLOW PROCESS FROM NODE 161. 50 TO NODE 161.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< ---------------------~------------------------------~----------------------- ---------------------------------------------------------------------------- ASSUMED INITIAL SUBAREA UNIFORM DEVELOPMENT IS APARTMENT TC = K*[ (LENGTH**3)/(ELEVATION CHANGE)]**.2 INITIAL SUBAREA FLOW-LENGTH = 365.00 UPSTREAM ELEVATION = 1120.00 DOWNSTREAM ELEVATION = 1116.00 ELEVATION DIFFERENCE = 4.00 TC = 0.323*[ (365.00**3)/( 4.00)]**.2 100 YEAR RAINFALL INTENSITY (INCH/HOURj = USER-SPECIFIED RUNOFF COEFFICIENT = .8613 SOIL CLASSIFICATION IS "B" SUBAREA RUNOFF(CFS) TOTAL AREA (ACRES) = 8.429 3,823 6.26 1. 90 TOTAL RUNOFF/CFS) = 6,26 **************************************************************************** FLOW PROCESS FROM NODE 161. 00 TO NODE 162.00 IS CODE = 31 ---------------------------------------------------------------------------- A'? >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< Page 16 of 18 I I 81INF1DD.RES I >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ I ELEVATION DATA: UPSTREAM (FEET) = 1116.00 DOWNSTREAM (FEET) 1112.00 FLOW LENGTH(FEET) = 15.00 MANNING'S N = 0.015 ESTIMATED PIPE DIAMETER (INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 5.2 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 14.94 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFSj = 6.26 PIPE TRAVEL TIME(MIN.) = 0.02 Tc(MIN.) = 8.45 LONGEST FLOW PATH FROM NODE 161.50 TO NODE 162.00 380.00 FEET. I **************************************************************************** FLOW PROCESS FROM NODE 162.00 TO NODE 162.00 IS CODE = 1 I >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< ==========~================================================================= I TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) 8.45 RAINFALL INTENSITY (INCH/HR) = 3.82 TOTAL STREAM AREA(ACRES) = 1.90 PEAK FLOW RATE(CFS) AT CONFLUENCE = 6.26 I I ** CONFLUENCE DATA ** STREAM RUNOFF NUMBER (CFS) 1 2.80 2 6,26 Tc (MIN.) 7.84 8.45 INTENSITY (INCH/HOUR) 3.978 3.819 AREA (ACRE) 0.80 1. 90 *********************************WARNING********************************** I IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** I RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. u PEAK FLOW RATE TABLE u STREAM RUNOFF Tc INTENSITY NUMBER (CFS) (MIN. ) ( INCH/HOUR) 1 8.61 7.84 3.978 2 8.95 8,45 3.819 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE (CFS) 8.95 Tc (HIN . ) = 8.45 TOTAL AREA (ACRES) = 2.70 LONGEST FLOWPATH FROM NODE 161. 50 TO NODE 162.00 380.00 FEET. I I **************************************************************************** I FLOW PROCESS FROM NODE 162.00 TO NODE 160.00 IS CODE = 31 >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- I ELEVATION DATA: UPSTREAM (FEET) = 1112.00 DOWNSTREAM (FEET) 1110.00 FLOW LENGTH (FEET) = 20.00 MANNING'S N ~ 0.015 ESTIMATED PIPE DIAMETER (INCH) INCREASED TO 18.000 DEPTH OF FLOW IN 18.0 INCH PIPE IS 8.1 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 11.55 ESTIMATED PIPE DIAMETER (INCH) = 18.00 NUMBER OF PIPES 1 PIPE-FLOW (CFS) = 8.95 PIPE TRAVEL TIME(MIN.) = 0.03 Tc(MIN.) = 8.47 LONGEST FLOWPATH FROM NODE 161.50 TO NODE 160.00 400.00 FEET. I I **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 160.00 IS CODE = 11 >>>>>CONFLUENCE MEMORY BANK * 1 WITH THE MAIN-STREAM MEMORY<<<<< I ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ** MAIN STREAM CONFLUENCE DATA ** STREAM RUNOFF Tc INTENSITY AREA M I Page 17 of 18 I I I I I I I I I I I I I I I I I I I 81INF1DD.RES NUMBER 1 LONGEST (ers) (MIN.) 8.95 8.47 FLOWPATH FROM NODE ( INCH/HOUR) 3.811 161. 50 TO (ACRE) 2.70 NODE 160.00 400.00 FEET. ** MEMORY STREAM NUMBER 1 LONGEST BANK # 1 CONFLUENCE DATA ** RUNOFF Tc INTENSITY (ers) (MIN. ) (INCH/HOUR) 27,92 10,89 3.320 FLOWPATH FROM NODE 167.50 TO NODE AREA (ACRE) 9.50 160.00 983.00 FEET. *********************************WARNING********************************** IN THIS COMPUTER PROGRAM, THE CONFLUENCE VALUE USED IS BASED ON THE RCFC&WCD FORMULA OF PLATE D-1 AS DEFAULT VALUE. THIS FORMULA WILL NOT NECESSARILY RESULT IN THE MAXIMUM VALUE OF PEAK FLOW. ************************************************************************** ** PEAK FLOW RArE TABLE U STREAM RUNOFF Tc INTENSITY NUMBER (ers) (MIN,) ( INCH/HOUR) 1 30.67 8.47 3.811 2 35.71 10.89 3.320 COMPUTED CONFLUENCE PEAK FLOW RATE (CFSl TOTAL AREA (ACRES) = ESTIMATES ARE 35.71 12.20 AS FOLLOWS: Tc (MIN.) = 10,89 **************************************************************************** FLOW PROCESS FROM NODE 160.00 TO NODE 153.80 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE-FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< ============================================================================ ELEVATION DATA: UPSTREAM (FEET) = 1106.00 DOWNSTREAM (FEET) 1102.00 FLOW LENGTH (FEET) = 540.00 MANNING'S N = 0.015 DEPTH OF FLOW IN 36.0 INCH PIPE IS 28.5 INCHES PIPE-FLOW VELOCITY(FEET/SEC.) 5.95 ESTIMATED PIPE DIAMETER (INCH) = 36.00 NUMBER OF PIPES 1 PIPE-FLOW (CFSI = 35.71 PIPE TRAVEL TIME(MIN.} = 1.51 Tc(MIN.) = 12.41 LONGEST FLOWPA~H FROM NODE 167.50 TO NODE 153.80 1523.00 FEET. ============================================================================ END OF STUDY SUMMARY: TOTAL AREA(ACRES) PEAK FLOW RATE(CFS) 12.20 TC(MIN,) = 35.71 12.41 ============================================================================ ------------------------------------------------~~-~------------------------ -~~-----------------------------------------~------------------------------- END OF RATIONAL METHOD ANALYSIS 1 J.$ Page 18 of 18 I I I I I I I I I I I I I I I I I I I Appendix D: Hydraulic Calculations , - /-- \. ' " .' \,i (/ ,.\.,\ ",., y~ \' \' , . ,:.,J \"{" f,.,S01f ~ " . \. ...i:- ~JY \ \/'"''Y;j,/ , ,"- .- -) ....\, /' ~ --- No 1 I I I I I I I I II I I I I I I I I I 1811nletsSize,xls NodelD 162 164 167 347 349 501 502 505 Notes: 1 2 Catch basin Inlet Size Design Q Inflow lcts) Length 1ft) Designed Capacity lcfs) 2,8 7 22 2.1 7 22 17,8 7 22 6,8 7 22 ,3,1 7 22 1.3 7 22 ~7 7 n ~4 7 n All inlets in sag conditions. Inlet capacity for spreda < 16' and depth <10". 9119/2001 A;'\ RBF Consulting , I I I I I I I I I I I I I I I I I I I Worksheet Worksheet for Curb Inlet In Sag Project Description Worksheet Type Solve For CB in Sag Curb Inlet In S, Spread Input Data Disoharge 22,00 cfs Gutter Width 2.00 ft Gutter Cross Slope 9.9 % Road Cross Slope 1.7 % Curb Opening Len! 7.00 ft Opening Height 0.50 ft Curb Throat Type iorizontal Local Depression 4.0 in Local Depression \ 4.00 ft &--(..... C~f A, (..r"t') ~' &--t.. U,.JC,-rH::: l Results Spread 15,95 ft Throat Incline An 30.00 degree Depth 0.77 ft Gutter Depressio 2.0 in Total Depression 6.0 in A?J Project Engineer: Ejaz Mohammad, P.E. h:\pdata\15100181\dwg\hydrolog\181cb.fm2 Robert Sain, William Frost & Associates FlowMaster va.a [614b] 09/19/01 09:47:35 AM @Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 1 !I I I I I I I I I I I I I I I I I I I Worksheet Worksheet for Curb Inlet In Sag Project Description Worksheet Type Solve For CB in Sag Curb Inlet In Si Spread Input Data Discharge 30,00 cis <--z-.- C-Mftt..-l '\ T Gutter Width 2.00 ft Gutter Cross Slope 9.9 % Road Cross Slope 1.7 % Curb Opening Len! 14,00 ft ~ lJsNc;.,1tJ ~ Opening Height 0,50 ft Curb Throat Type iorizontal Local Depression 4.0 in local Depression \ 4.00 ft \ 4-' Results Spread 17.75 ft Throat Incline An 30.00 degree Depth 0,80 ft Gutter Depressio 2.0 in Total Depression 6.0 in Project Engineer. Ejaz Mohammad, P .E. h:\pdata\15100181\dwg\hydrolog\181cb.fm2 Robert Bein, WIlliam Frost & Associates FlowMaster v6.0 [614b] 09/19/01 09:52:13 AM @HaestadMethods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 I Worksheet Worksheet for Curb Inlet In Sag I I Project Description Worksheet Type Solve For CB in Sag Curb Inlet in S; Spread I Input Data Discharge 42.00 cfs Gutter Wdth 2.00 ft Gutter Cross Slope 9.9 % Road Cross Slope 1.7 % Curb Opening Len! 21.00 ft Opening Height 0.50 ft Curb Throat Type iorizontal Local Depression 4.0 in Local Depression \ 4.00 ft I c--z- Wtl~r.rC-(X:1, 2..1' .&--z.... LftNtJ-,'f/1;. I I. I Results Spread 15,64 ft Throat Incline An ~O.OO degree Depth 0.76 ft Gutter Depressio 2.0 in Total Depression 6.0 in I . I I I I I I I I h:\pdata\151 00181\dwg\hydrolog\181 cb.fm2 09/19/01 09:52:67 AM e Haestad Methods. Inc. Robert Beln, William Frost & Associates 37 Brookside Road Waterbury, CT 06708 USA A~ Project Engineer: Ejaz Mohammad, P.E. FtowMaster va.O [614b] (203) 755-1666 Page 1 of 1