Loading...
HomeMy WebLinkAboutParcel Map 30404 Parcel 2 Hydrology (Oct.25,2006)~ ~ VANDENBERG CIVIL CONSULTING 31582 RAILROAD CANYON ROAD CANYON LAKE, CALIFORNIA 92587 (714) 392-1219 Chuck Delgado 30270 Santiago Road Temecula, CA 92592 October 25, 2006 Subject: Hydrology and Hydraulic Study for Santiago Road and Ormsby Road Street Improvement Plan for Tentative Parcel Map 30404 City of Temecula, California Dear Mr. Delgado, Pursuant to your request and authorization, the following calculations have been prepared to support the design of improvements of Santiago Road from Sta 42+04.97 to Sta. 45+10.57. This study was directed to determine the Q,oo and Qio at the end of curb return and at the downhill end of our improvements. The rational method from Riverside County Flood Control and Water Conservation DistricYs Hydrology Manual was used to calculate these values. Attached are supporting calculation details. HYDROLOGY CALCULATION SUMMARY: 10-YEAR 100-YEAR AT ORMSBY/SANTIAGO ECR 4.5 cfs 8.1 cfs NEAR STATION 41+50 12.5 cfs 22.3 cfs The opportunity to be of service is appreciated. Should questions or comments arise pertaining to this document, please contact the undersigned, in writing, for clarification. Respectfully Submitted, VANDENBERG CIVIL CONSULTING Qv.°Y88gt°~,~ oa~r ~uffi,Yx v ~ Ja y -O'Bryan, 55601 mr ~ il Engineer '~~1~CA1~14~g~ v ~ • SANTIAGO ROAD NEAR STA 41+50 Sewer Pipes -- English Units Ci4il Too/s forWindows (10-25-2006, 19:14:59) Flowrate Diameter Friction Slope Velocity (cfs) (in) O (8) (fps) 22.35 29.00 0.015 1.30 7.12 ~ i ~ Riverside County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2001 Version 6.9 Rational Hydrology Study Date: 08/08/06 File:Ormsbyl0.out Ormsby 10 year storm Western side of Ormsby and North side Santiago - - ------- ********* Hydrology Study Control In£ormation ********** English (in-lb) Onits used in input data file Vandenberg Civil Consulting, Corona, CA - S/N 970 ------------------------------------------------------------------------ Rational Method Hydrology Program based on Riverside County F1ood Control & Water Conservation District 1978 hydrology manual Storm event (year) = 10.00 Antecedent Moisture Condition = 2 Standard intensity-duration curves data (Plate D-4.1) For the [ Murrieta,Tmc,Rnch CaNorco ] area used. 10 year storm 10 minute intensity = 2.360(In/Hr) 10 year storm 60 minute intensity = 0.880(In/Hr) 100 year storm 10 minute intensity = 3.980(In/Hr) 100 year storm 60 minute intensity = 1.300(In/Hr) Storm event year = 10.0 Calculated rainfall intensity data: 1 hour intensity = 0.880(Zn/Hr) Slope of intensity duration curve = 0.5500 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process £rom Point/Station 1.000 to Point/Station 2.000 **** INITIAL AREA EVALUATION **** Initial area flow distance = 720.000(Ft.) Top (of initial area) elevation = 1176.000(Ft.) Bottom (of initial area) elevation = 1101.160(Ft.) Cifference in elevation = 74.890(Ft.) Slope = 0.10399 s(percent)= 10.39 TC = k(0.480)*[(length^3)/(elevation change)]^0.2 Initial area time of concentration = 10.991 min. Rainfall intensity = 2.296(In/Hr) for a 10.0 year storm SINGLE FAMILY (1 Acre Lot) Runoff Coefficient = 0.679 Decimal fraction soil group A= 0.000 Decimal fraction soil group B= 1.000 Decimal fraction soil group C= 0.000 Decimal fraction soil group D= 0.000 ~ ~ ~ RI index for soil(AMC 2) = 56.00 Pervious area fraction = 0.800; Impervious fraction = 0.200 Initial subar ea runoff = 4.522(CFS) Total in itial stream area = 2.920(Ac.) Pervious area fraction = 0.800 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.000 to Point/Station 4.000 **** STREET FLOW TRAVEL TIME + SOBAREA FLOW ADDITION **** Top of street segment elevation = 1101.160(Ft.) End of street segment elevation = 1098.300(Ft.) Length of street segment = 310.500(Ft.) Height of curb above gutter flowline = 6.0(In.) Width of half street (curb to crown) = 39.000(Ft. ) Distance from crown to crossfall grade break = 32 .000(Ft.) Slope from gutter to grade break (v/hz) = 0.080 Slope £rom grade break to crown (v/hz) = 0.020 Street flow is on [1] side(s) of the street Distance from curb to property line = 10.000(Ft.) Slope from curb to property line (v/hz) = 0.020 Gutter width = 2.000(Ft.) Gutter hike from flowline = 0.000(In.) Manning's N in gutter = 0.0150 Manning's N from gutter to grade break = 0.0150 Manning's N from grade break to crown = 0.0150 Estimated mean flow rate at midpoint of street = 8.936(CFS) Depth of flow = 0.312(Ft.), Average velocity = 2.925(Ft/s) Street£low hydraulics at midpoint of street travel: Halfstreet flow width = 17.593(Ft.) Flow velocity = 2.92(Ft/s) Travel time = 1.77 min. TC = 12.26 min. Adding area flow to street SINGLE FAMILY (1 Acre Lot) Runoff Coefficient = 0.661 Decimal fraction soil group A= 0.000 Decimal fraction soil group B= 1.000 Decimal fraction soil group C= 0.000 Decimal fraction soil group D= 0.000 RI index for soil(AMC 2) = 56.00 Pervious area fraction = 0.800; Impervious fractio n = 0.200 Rainfall intensity = 2.108(In/Hr) for a 10. 0 year storm Subarea runoff = 7.940(CFS) for 5.700(Ac. ) Total runoff = 12.462(CFS) Total area = 8.620(Ac. Street flow at end of street = 12.962(CFS) Ha1f street flow at end of street = 12.962(CFS) Depth of flow = 0.358(Ft.), Average velocity = 3.180(Ft/s) Flow width (from curb towards crown)= 19.897(Ft.) End of computations, total study area = 8.62 (AC.) The following figures may be used for a unit hydrograph study of the same are a. Area averaged pervious area fraction(Ap) = 0.800 Area averaged RI index number = 56.0 ~ ~ • Riverside County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c) 1989 - 2001 Version 6.9 Rational Hydrology Study Date: 08/15/06 File:Ormsbyl00.out Ormsby 100-year Hydrology Western side of street --------- -------- - ********* Hydrology Study Control Information ********** English (in-1b) Units used in input data file -------------------------------------------------- Vandenberg Civil Consulting, Corona, CA - S/N 970 -------------------------------------------------------------- Rational Method Hydrology Program based on Riverside County F1ood Control & Water Conservation District 1978 hydrology manual Storm event (year) = 100.00 Antecedent Moisture Condition = 3 Standard intensity-duration curves data (Plate D-9.1) For the [ Murrieta,Tmc,Rnch CaNOrco ] area used. 10 year storm 10 minute intensity = 2.360(In/Hr) 10 year storm 60 minute intensity = 0.880(In/Hr) 100 year storm 10 minute intensity = 3.980(In/Nr) 100 year storm 60 minute intensity = 1.300(In/Hr) Storm event year = 100.0 Calculated rainfall intensity data: 1 hour intensity = 1.300(In/Hr) Slope of intensity duration curve = 0.5500 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.000 to Point/Station 2.000 **** INITIAL AREA EVALUATION **** Initial area flow distance = 730.000(Ft.) Top (of initial area) elevation = ll76.000(Ft.) Bottom (of initial area) elevation = 1099.980(Ft.) Difference in elevation = 76.020(Ft.) Slope = 0.10419 s(percent)= 10.91 TC = k(0.480)*[(length^3)/(elevation change)]^0.2 Initial area time of concentration = 10.595 min. Rainfall intensity = 3.383(In/Hr) for a 100.0 year storm SINGLE FAMILY (1 Acre Lot) Runoff Coefficient = 0.816 Decimal fraction soil group A= 0.000 Decimal £raction soil group B= 1.000 Decimal fraction soil group C= 0.000 Decimal fraction soil group D= 0.000 RI index £or soil(AMC 3) = 74.80 Fervious area fraction = 0.800; Impervious fraction = 0.200 ~ ~ ~ Initial subarea runoff = 8.056(CFS) Total initial stream area = 2.920(Ac.) Pervious area fraction = 0.800 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.000 to Point/Station 4.000 **** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION **** Top of street segment elevation = 1099.980(Ft.) End of street segment elevation = 1097.690(Ft.) Length of street segment = 325.790(Ft.) Height of curb above gutter flowline = 6.0(In.) Width of half street (curb to crown) = 39.000(Ft.) Distance from crown to crossfall grade break = 32. 000(Ft.) Slope from gutter to grade break (v/hz) = 0.080 Slope from grade break to crown (v/hz) = 0.020 Street flow is on [1] side(s) of the street Distance from curb to property line = 10.000(Ft.) Slope from curb to property line (v/hz) = 0.020 Gutter width = 2.000(Ft.) Gutter hike from flowline = 0.000(In.) Manning's N in gutter = 0.0150 Manning's N from gutter to grade break = 0.0150 Manning's N from grade break to crown = 0.0150 Estimated mean flow rate at midpoint of street = 15.891(CFS) Depth of flow = 0.926(Ft.), Average velocity = 2 .952(Ft/s) Streetflow hydraulics at midpoint of street travel: Halfstreet flow width = 23.286(Ft.) Flow velocity = 2.95(Ft/s) Travel time = 1.89 min. TC = 12.38 min. Adding area flow to street SINGLE FAMILY (1 Acre Lot) ~ Runoff Coefficient = 0.809 Decimal fraction soil group A= 0.000 Decimal £raction soil group B= 1.000 Decimal fraction soil group C= 0.000 Decimal fraction soil group D= 0.000 RI index for soil(AMC 3) = 74.80 Pervious area fraction = 0.800; Impervious £raction = 0.200 Rainfall intensity = 3.096(In/Hr) for a 100.0 year storm Subarea runof£ = 19.224(CFS) for 5.680(AC.) Total runoff = 22.280(CFS) Total area = 8.600(Ac.) Street flow at end of street = 22.280(CFS) Half street flow at end of street = 22.280(CFS) Depth of flow = 0.488(Ft.), Average velocity = 3.214(Ft/s) F1ow width (from curb towards crown)= 26.407(Et.) End of computations, total study area = 8.60 (Ac.) The following figures may be used for a unit hydrograph study of the same area. Area averaged pervious area fraction(Ap) = O.B00 Area averaged RI index number = 56.0 1