Loading...
HomeMy WebLinkAboutGeotechnical Report Sewer Pump & Sewer Force Main Utility Trench~ , .~ ~~ P~TR ~ ~ COSTA MESA • SAN DIEGO • TEMECULA • LOS ANGELES RILINGTON COMMUNITIES 277 Rancheros Drive, Suite 303 San Marcos, Califomia 92690 Attention: Mr. Bob Reynolds 'r~2 z.~t,z May 15, 2002 J.N. 107-01 Subject: Geotechnical Report of Observation and Testing for Sewer-Pump Station aud Sewer-Force Main Utility-Trench Backfill on Calle Ventura, Tract 25892, Pauba Road, City of Temecula, Riverside County, California Reference: Petra Geotechnical, Inc., 2001, Geotechnical Report of Rough Grading, Lots i through 8, 11 through 22 and 25 through 32, Tract 25892, City of Temecula, Riverside County, Califomia, J.N. 107-O1, dated November 3, 2001. Submitted herewith is a summary of the observation and testing services provided by Petra Geotechnical, Lta (Petra) pertaining to the placement and compaction of backfill around the sewer-pump station and the se~ver-force main trench on Calle Ventura within Tract 25892 located in the City of Temecula, Califomia. Conclusions relative to the suitability of the pump station and trench backfill for the proposed residential development are included herein. The sewer-pump station and force-main trench, located in front of Lots 21 and 22 on the eastside of Calle Ventura, under the purview of this report have been completed u~~der the observation and with selective testing by Petra. Based on the results of our full-time observation and with selective testing for the backfill, Petra hereby verifies that the backfill has been placed in accordance with the recommendations of the geotechnical consultant and the geotechnical requirements of the City of Temecula and Eastern Municipal Water District. The earthwork was found to be in general PETRA GEOTECHNICAL, INC. 27620 Commerce Center Orive • Suite 103 . Temewla . CA 92590 . Tel: (909) 699-6193 . Fax: (909) 699-6197 . petrate~ibm.net .~ ~ ~ RILINGTON COMMUNITIES May 15, 2002 TR 25892/Temecula JN. 107-O1 Page 2 compliance with the City of Temecula guidelines. The completed work has been reviewed and is considered adequate for the construction now planned. SUMMARY OF OBSERVATIONS AND TESTING Sewer-Pump Station and Force-Main Trench BackTill Both the sewer-pump station and force-main trench were backfilled with onsite soils. Backfill materials were watered or air-dried as necessary to achieve optimum or near- optimum moisture conditions prior to and/or during fill placement. These soils were then compacted in 12f-inch thick lifts with either a pneumatic tamper, a compacting wheel connected to a backhoe/excavator or wheel-rolled using the backhoe to a minimum relative compaction of 90 peroent The depth of shading materials (sand) placed above the pipe in the force main trench varied from approximately 8 to 12 inches. The approximate depth of the force main trench varied from 3 to 5 feet. Field Testine Field density tests were performed using nuclear gauge test methods (ASTM Test Methods D2922 and D3017). Test results are shown on the attached Table I. The eompacYed backfills were tested at the time of placement to ascertain that the specified moisture content and relative compaction were achieved. Field density tests were taken at vertical intervals of approximately 1 to 2 feet in the trench backfill. When field density tests indicated a relative compaction of less than 90 percent, the approximate limits ofthe substandard backfill were established, the substandard area was reworked, moisture-conditioned and recompacted as necessary under the observations of our engineering technician or the substandard materials were removed, moisture-conditioned and replaced as properly compacted fill. Z ~ U ~ • RILINGTON COMMUNITIES May 15, 2002 TR 25892/Temecula J.N. 107-01 Page 3 Visual classification of earth materials in the field was the basis for determining which maximum density value summarized in the following Laboratory Testing Section was applicable for a given density test. One-point checks were performed to supplement visual classification. Laboratorv Testing The laboratory maximum dry density and optimum moisture content for each major soil type encountered during backfilling and aggregate base preparation were determined in accordance with ASTM Test Method D1557. The attached Table II presents the pertinent test values. REPORT LIMITATIONS This report has been prepared consistent wiNi the level of care being provided by other professionals providing similar services at the same locale and in the same time period. The contents of this report are professional opinions and as such are not to be considered a guaranty or warranty. This report has not been prepared for use by parties or projects other than those named or described herein. This report may not contain sufficient information for other parties or other purposes. This report is subject to review by the controlling authorities for this project. 3 1 ~ ~ RILINGTON COMMUNITIES May 15, 2002 TR 25892/Temecula J.N. 107-O1 Page 4 We appreciate this opportunity to be of service. If you have any questions, please contact this office. Respectfully submitted, PETRA GEOTECHNICAL, INC. (~~~ J Gregory E. Uecker tephen M. Poo Field Operations Manager Senior Associate GE 692 GEU/SMP/keb Attachments: Table I- Field Density Test Results Table II - Labaratory Maximum Dry Density Distribution: (6) Addressee M~ ,~ * ~ ~ ' l • TABLEI • Field Density Test Restults 04/30/02 1 Seweo-pump station S/S 1162.0 9.9 119.0 92 1 04/30/02 2 Sewer-pump station S/S ll64.0 8.7 120.4 93 1 OS/O1/02 3 Sewer-pump station E/S 1165.0 92 122.3 95 1 OS/O1/02 4 Sewer-pump station N/S 1167.0 10.3 121.2 94 1 05/01/02 5 Sewer-pump station W/S 1169.0 10.8 124.3 96 1 OS/O]/02 6 Sewer-pump station W/S 1170.0 10.0 118.7 92 I OS/O1/02 7 Sewer-pump station N/S 1172.0 9.7 118.0 91 1 OS/O1/02 8 Sewer-pump station S/S 1174.0 9.5 121.7 94 1 OS/O1/02 9 Sewer-pump station N/S 1176.0 11.0 120.9 94 1 OS/02/02 ]0 Sewer-pump station N/S 1175.0 10.3 121.4 94 1 OS/02/02 I I Sewer-pump s[ation E/S slope 1177.0 7.8 113.5 88 1 OS/02/02 12 RT No. I1 -- 11.3 118.0 91 I OS/02/02 13 Sewer-pump station S/S slope 1178.0 10.1 119.8 93 I OS/02/02 14 Sewer-pump station E/S slope 1180.0 9.5 120.5 93 1 OS/02/02 15 Sewer-pump sttation NE/S slope I181.0 1 i.8 122.3 95 1 OS/]4/02 16 Sewer-force main aprx. 120' N ps -0.5 12.6 ]11.6 87 1 OS/14/02 17 Sewer-force main aprx 30' N ps -1.0 13.3 1062 83 1 OS/14/02 18 RT No. 16 -- 9.9 120.5 94 1 OS/I4/02 19 RT No. 17 -- 8.5 126.5 98 I ~~ PETRA GEOTECHNICAL, INC. TR 25892 MAY 2002 J.N. 107-01 Sewer-Pump Station Sewer-Force Main TABLE-f 1 u TABLE II Laboratorv Ma~cimum Drv Densitd ~ Sample No. Soil Ty`pe Optimum ' Moisture MaYimum Dry Density (%a) ~ ~ (pet) 1 Li ht brown-orange Silt fine to coarse SAND 9.0 128.5 Q) PER ASTM TEST METHOD D1557 PETRA GEOTECHNICAL, INC. MARCH 2O02 J. N. 107-01 ~