Loading...
HomeMy WebLinkAboutTract Map 21675-5 Project Grading Report• �Z Z :6'15 g._.. PACIFIC SOILS ENGINEERING, INC. L.A. COUNTY OFFICE 7370 OPPORTUNITY ROAD, SUITE "N". SAN DIEGO, CALIFORNIA 921111402 W. 240th Street Harbor City, CA 90710-1307 TELEPHONE: (619) 560.1713, FAX:(619) 560.0380 (213) 325-7272 or 775.6771 • FAX: (213) 325-8854 ORANGE COUNTY OFFICE 10653 Progress Way P.O. Be. 2249 Cypress, CA 90630 (714)220.0770 FAX: (714) 220-9589 • Mesa Homes 28765 Single Oak Drive - Suite 100 Temecula, CA 92390 January 30, 1990 Work Order 400095H Log No.470423 Attention: Mr. Bill Richardson, •1 Vice President, Construction Subject: Project Grading Report for Tract 21675-5, Lots 1 thru 63, inclusive, Rancho California, in the County of Riverside, California • Reference: Geotechnical Grading Plan Review, Tract 21675-1 thru 6 (Margarita Village), dated October 1, 1987 by Pacific Soils Engineering, Inc. (W.0.400085) • Gentlemen: • This report presents geotechnical data and testing results per- taining to the completion of earthwork for Tract 21675-5, Lots 1 thru 63, inclusive, located in the Rancho California community, in the County of Riverside, California. This grading was con- ducted from September, 1988 thru January, 1989. n u 0 Data developed during this phase of project grading is summar- ized in the text of this report, on the enclosed 40 -scale grad- ing plans (sheets 1, 6, 7 and 8 of 11), prepared by Robert Bein, William Frost and Associates, Table I and Table II. Also pre- sented herein are the foundation and slab design recommendations based upon field and laboratory testing of as -graded soil conditions. I• �0 0 Work Order 400095H January 30, 1990 Page 2 All cuts, fills and processing of original ground covered by this report have been completed under our observation and/or accepted by this firm and are in compliance with the County of Riverside grading code criteria. Completed work has been reviewed and is considered suitable for the construction now planned. All slopes are considered sur- ficially and grossly stable and should remain so under normal conditions. owing to the granular nature of the on-site mater- ials, graded slopes will be subject to ravelling and a fairly high erosion potential. Landscaping of all graded slopes should be accomplished as soon as possible as well as establishing and maintaining drainage berms and swales for long term slope protection. PACIFIC SOILS ENGINEERING, INC. I• Work Order 400095H January 30, 1990 I• I• ENGINEERING GEOLOGY Page 3 Surficial Units Surficial units encountered during grading include soil, • alluvium and minor colluvium. The soil consists of a dark to medium brown sandy clay to clayey sand. This unit was stripped from or benched into Pauba Formation prior to fill placement. The alluvial/colluvial soils consist of light to medium brown • silty to clayey sand. These materials were removed to Pauba Formation. Bedrock Units • Bedrock underlying Tract 21675-5 consists of a light brown to red -brown clayey sandstone assigned to the Pauba Formation. The Pauba Formation is generally massive and flat -lying. • Faults Faults and shears were not found during grading of Tract 21675-5. • Subdrains Subdrains were not recommended in the reference preliminary report, nor were deemed necessary during project grading. This is due to the granular nature of on-site geologic units. • Corrective Grading Corrective grading such as buttress or stabilization fills were not required. • Conclusions From an engineering geologic viewpoint, Lots 1 thru 63, inclu- sive, of Tract 21675-5, are suitable for the intended use. 3 • PACIFIC SOILS ENGINEERING, INC. i• I• 1• Work Order 400095H January 30, 1990 A. PROJECT GRADING SOIL ENGINEERING Page 4 • 1. Compaction test results are presented in Table I and approxi- mate locations of tests are shown on the accompanying 40 - scale plan by Robert Bein, William Frost and Associates, Inc. (sheets 6, 7 and 8 of 11). • 2. Cleanouts were accomplished to bedrock or native soils deem- ed competent for support of fill. Prior to placement of compacted fill the exposed compacted fill surface was scari- fied, watered as necessary and compacted in-place to project specifications. 3. Fill consisting of the soil types indicated in Table I was then placed in thin lifts, watered as necessary and compact- ed in-place to a minimum of 90 percent of the laboratory standard (ASTM:D 1557) utilizing self-propelled rubber - tired compactors, sheepsfoot compactors and heavy earth moving equipment. Each fill lift was treated in a like manner. 4. Fill placed on slope gradients steeper than 5 -horizontal to • 1 -vertical was keyed and benched into bedrock. The upper soils were stripped off or benched out on the shallower slopes in such a manner that all compacted fill is in con- tact with intact bedrock and/or competent materials. • 7 PACIFIC SOILS ENGINEERING, INC. • Work Order 400095H Page 5 January 30, 1990 • 5. All removals, excavations, cleanouts and processing in pre- paring fill areas were observed by this firm's representa- tive prior to placement of any fill. Based on those observa- tions, all fills are deemed to be supported by bedrock or competent material. • 6. Compaction tests were taken for each one (1) to two (2) feet of placed fill. The maximum vertical depth of fill placed at this time is on the order of fifty-four (54) feet on Lot '• 27. The approximate depth of fill on individual lots is summarized in Table II. The cut portion of transition lots within structural areas • was overexcavated to a minimum depth of 36 -inches and re- placed as compacted fill. This occurred on Lots 1, 2, 5, 6, 8 thru 13, 15, 16, 23, 24, 43 thru 48, 50 and 56. • 7. The fill slopes were over -built approximately four (4) feet during rough grading operations. Upon mass grading comple- tion, the slopes were trimmed back to the compacted core to achieve design grade. • Finish slope surfaces have been probed and/or tested and the slopes are considered to satisfy the project requirements and grading codes of the County of Riverside. All slopes • should be planted as soon as practical and maintained for proper growth. Landscaping and irrigation management are important elements in the long term performance of the slopes. l PACIFIC SOILS ENGINEERING. INC. I• I• I• n u Work Order 400095H January 30, 1990 Page 6 8. Cut slopes were examined by an engineering geologist and are considered grossly and surficially stable. B. PROPOSED DEVELOPMENT The subject tract is scheduled for construction of sixty- three (63) one and two-story single family dwelling units, which will be constructed utilizing wood frame and slab - on -grade construction techniques. Conventional spread and continuous footings are to be utilized. C. DESIGN RECOMMENDATIONS • Material encountered in cut and utilized for compacted fill ranged from very low to high in expansion potential. An evaluation of the post -grading soil conditions was conducted to classify materials per ASTM:D 442 and to determine the • Expansion Index per UBC Standard No. 29-2. That evaluation revealed predominantly very low to low expansive materials exposed at the surface of each building lot. Laboratory test data is presented in Table A. • TABLE A Expansion Expansion Lot Hydrometer Analysis Index Potential No. (%Sand,%Silt,%Clay) (UBC Table 29-C) • 1-5,7,8,10 66 18 16 25 Low 6,9,11,12,47, 49 & 50 56 23 21 62 Medium 13-20 70 19 it 17 Very Low 21-30 74 16 10 * Low 31-40 68 17 15 23 Low • 41-46 _ 71 11_ _ 2_0_ Very Low �1-63_ --- _18 77 13 _ 10 - *__ Low 48 45 27 _ 28 95 High • * Not Determined. PACIFIC SOILS ENGINEERING, INC. 0 I• I• I• Work Order 400095H January 30, 1990 Page 7 Based on this data, the following design is presented: 1. Foundations may be designed based upon the following values: Allowable Bearing: 2000 lbs./sq.ft. • Lateral Bearing: 250 lbs./sq.ft. at a depth of 12 -inches plus 150 lbs./sq.ft. for each additional 12 -inches embedment to a maximum of 2000 lbs./sq.ft. Coefficient of Lateral Sliding: 0.40 • The above values may be increased as allowed by code to re- sist transient loading conditions, such as wind or seismic. 2. a) VERY LOW TO LOW EXPANSION POTENTIAL - LOTS 1- Footina Denth (Minimum): Exterior One -Story - 12 -inches below lowest adja- cent finished grade. • Two -Story - 18 -inches below lowest adja- cent finished grade. Interior One & Two -Story - 12 -inches below lowest adja- cent finished grade. Footing Reinforcement: All continuous; two No.4 re- bars,one on too, one on bottom. Slab Reinforcement: Livina Areas 61Ix 6",No.10 by No.10 welded wire mesh • OR No.3 rebars spaced at 21 -inches on center. "Fibermesh" concrete additive may be used in lieu of the wire mesh or rebars to control thermal cracking and shrinkage. • • PACIFIC SOILS ENGINEERING, INC. I • Work Order 400095H Page 8 January 30, 1990 • Subgrade Moisture: Building pads should be at or near • optimum moisture prior to concrete placement. b) MEDIUM EXPANSION POTENTIAL - LOTS 6,9,11,12,47,49 & 50 • Footing Depth (Minimum): Exterior One -Story - 18 -inches below lowest adja- cent finished grade. Two -Story - 18 -inches below lowest adja- cent finished grade. Interior ',• One & Two -Story - 12 -inches below lowest adja- cent finished grade. Footing Reinforcement: All continuous; four No. 4 re - bars; two on top, two on bottom OR two No.5 rebars, one on top, one on bottom. • Slab Reinforcement: Living Areas 6"x 6t1,No.6 by No.6 welded sire mesh OR No. 3 rebars spaced 18 -inches on center. Subgrade Moisture: Minimum of optimum moisture plus 50 • by dry weight at least 24 hours prior to concrete placement. C) HIGH EXPANSION POTENTIAL - LOT 48 Footing Depth (Minimum): Exterior 41 One -Story - 24 -inches below lowest adja- cent finished grade. Two -Story - 24 -inches below lowest adja- cent finished grade. • Interior One & Two -Story - 12 -inches below lowest adja- cent finished grade. Footing Reinforcement: All continuous; four No.4 re - bars; two on top, two on bottom OR two No.5 • rebars, one on top, one on bottom. NO - PACIFIC SOILS ENGINEERING, INC. I• 10 is 1• I9 I• Work Order 400095H January 30, 1990 Page 9 Slab Reinforcement: Living Areas 6"x 611,No.6 by No.6 welded wire mesh or No. 3 rebars spaced 18 -inches on center. Subgrade Moisture: Minimum of optimum moisture plus 5% by dry weight at least 48 hours prior to concrete placement. Moisture content should be inspected by the project geo- technical engineer prior to the placement of polyvinyl membrane. Continuous footings shall have a minimum width of 12 -inches for one-story and 15 -inches for two-story. All slabs shall have a thickness of four (4) inches. If exterior footings adjacent to drainage swales are to exist within three (3) feet horizontally of the swale, the footing should be em- bedded sufficiently to assure embedment below swale bottom is maintained. Footings adjacent to slopes should be embedded sufficiently that at least five (5) feet is pro- vided horizontally from the bottom edge of footing to face 0 of slope. J In lieu of conventional slab and foundation system a post - tensioned foundation can be used for the medium to high potential expansive lots. This post -tensioned foundation should be designed to resist a highly expansive soil. A 10 -mil membrane covered with two (2) inches of sand shall be incorporated into the design along with thickened edges along the perimeter of the slab. 3. Under -Slab Treatment a) VERY LOW AND LOW EXPANSIVE LOTS A 10 -mil polyvinyl membrane (minimum) should be placed below all slabs -on -grade within living areas. This PACIFIC SOILS ENGINEERING, INC. 0 U Work Order 400095H January 30, 1990 I• Page 10 membrane should be covered with a minimum of two (2) • inches of sand to protect it and to aid in curing of the concrete. b) MEDIUM EXPANSIVE LATS • The same criteria as 3a, except the 10 -mil polyvinyl membrane should be underlain with three (3) inches of sand for a capillary rise break. C) HIGH EXPANSIVE LOTS The same criteria as 3a, except the 10 -mil polyvinyl membrane should be underlain with four (4) inches of sand for a capillary rise break. • 4. Garages a) All garage slabs shall have a minimum thickness of four • (4) inches and need not be underlain with any sand or polyvinyl membrane. These slabs should contain control joints at approximately ten (10) foot spacing. I• b) Footing embedment, footing reinforcement and subgrade moisture shall be as recommended in Section C-2. 5. Retaining Wall Design • Retaining walls or other structural walls shall be designed with the following: a) Cantilevered retaining walls with a level backfill • should be designed with an equivalent fluid pressure of 32 lbs./cu.ft. Retaining walls with 2 -horizontal to IA PACIFIC SOILS ENGINEEgING, INC. kb I• 1• I• I• I• Work Order 400095H January 30, 1990 Page 11 1 -vertical slope superjacent to them should utilize an equivalent fluid pressure of 53 lbs./cu.ft. b) Foundations for retaining walls may be designed in accordance with recommendations of Paragraph C-1. C) Retaining walls should be backfilled with free draining materials (SE > 30) to within 18 -inches of grade, and compacted to project specifications. Native soils should be utilized in the upper 18 -inches. Drainage should be provided to all walls. d) All footing excavations for retaining walls should be observed by the project soil engineer or his repre- sentative. 6. Exterior Slabs and Walkways • a) It is suggested that the subgrade below sidewalks, driveways, patios, etc. should be moisture conditioned 24 hours prior to concrete placement. • b) Weakened plane joints should be considered for walkways at approximately eight (8) to ten (10) foot intervals. Other exterior slabs should be designed to withstand shrinkage of concrete. • C) The "Fibermesh" concrete additive may be considered for exterior concrete work. • • Work Order 400095H Page 12 January 30, 1990 • D. OTHER DESIGN AND CONSTRUCTION CONSIDERATIONS • 1. Positive drainage away from structures shall be provided and maintained. • 2. Utility trench backfill shall be accomplished in accordance with the prevailing criteria of the County of Riverside. 3. Seismic design should be based upon current and applicable • building code requirements. 4. Chemical analysis testing has been conducted on selected samples of on-site soils. Laboratory tests indicates the • on-site soils show no appreciable amounts of soluble sulfates and the use of sulfate resistant concrete is not required. • • :] • • `Z r Work Order 400095H Page 13 January 30, 1990 • This report presents information and data relative to the mass grading and placement of compacted fill at the subject site. A representative(s) of this firm conducted periodic tests and ob- served during the process of the construction in an effort to determine whether compliance with the project drawings, specifi- cations and Building Code were being obtained. The presence of our personnel during the work progress did not involve any direct and technical advice and suggestions were provided to the owner and/or his designated representative based upon the re- sults of the tests and observations. Completed work under the purview of this report is considered suitable for the intended use. Conditions of the reference reports remain applicable unless specifically superceded herein. Respectfully submitted, a • PACIFIC SOILS ENGINEERING, INC. No. 461 Fxv. 33193 • By: Reviewed by: �1[6k`� f �F CALIFVo REX P. KETTER, R.C.E.15251/G.E.461 Executive Vice President Reviewed by: • By: Cr� DAVID A. MURP JO A. HANSON, C.E.G.990 Staff Geologist Re4li6tration Exp: 6-30-90 • Dist: (12) Addressee (1) RBF, Rancho California, Attn: Mr. Mike Tyleman JAC/RPK/DAM/JAH:pjc/H001 FtED Gf P- Hgys�O� N0. 990 z U)CERTIFIED N ENGINEERING .A GEOLOGIST �Q OF CA CA`FFO V�� • Work Order 400095H January 30, 1990 • TABLE I • SOIL TYPE Laboratory Maximum Density per ASTM:D 1557-78 (All Soil Types). • Opt. Maximum Moist. Dry Density Soil Type and Classification (% (lbs./cu.ft.) AA - Light Brown Silty Sand 8.0 121.6 • BB - Brown Clayey Sand 8.5 130.6 CC - Medium Brown Clayey Sand 8.7 128.3 DD - Tan -Brown Clayey Sand 14.8 109.7 EE - Light Brown Silty Sand 8.4 127.3 • FF - Light Brown Silty Sand 10.8 119.5 GG - Brown Sand 9.5 116.3 HH - Light Brown Sandy Silt 12.6 114.7 II - Brown Silty Sand 9.2 125.5 • LEGEND Non -Designated Test - Test in compacted fill. Test Location - See enclosed grading plans (sheets 1,6,7,8 of • 11). Elevation - Actual field elevation (F.G. - Finish Grade). A - Indicates repeated test numbers. R1,R2, etc. - Indicates retests) of previously failing test. • TEST TYPE All tests by Campbell Pacific Nuclear Test Gauge per ASTM:D 2922, unless otherwise noted by: SC - Indicates test by Sand Cone Method per ASTM:D 1556. 0 \'%' I• r 10 1• �• �0 • 0 • 0 Work Order 400095H January 30, 1990 TABLE I Date of Test Test Elev. Moist.Cont. Dry Density Relative Soil Test Test No. Location (ft.) %(field) (lbs./cu.ft.) % Comp. Type Type 10-14-88 488A Lot 63 1219.0 9.0 109.0 94 GG 489A Lot 27 1228.0 8.5 113.0 95 FF 490A Lot 32 1228.0 8.1 113.0 90 II 491A Lot 58 1226.0 10.0 119.0 95 II Paseo Goleta 492A Sta.22+25 1220.0 9.5 112.0 92 AA Sc 493A Lot 63 1220.0 8.9 114.3 91 II 10-18-88 532A Lot 20 1251.0 15.8 109.2 92 FF 533A Lot 21 1243.0 8.0 109.0 91 FF 535A Adj.Lot 22 1235.0 8.0 110.3 92 FF 10-19-88 Corte Padera 536A Sta.21+ 1233.0 8.2 113.8 94 AA Sc 541A Lot 21 1237.0 11.3 107.4 92 GG SC 542A Lot 29 1231.0 8.4 106.3 91 GG 543A Lot 27 1230.0 16.2 109.8 94 GG 10-20-88 590A Lot 22 1239.0 9.8 110.6 93 FF 591A Lot 21 1236.0 10.5 111.5 93 FF 592A Lot 29 1233.0 9.1 111.9 94 FF 593A Lot 32 1230.0 12.8 109.6 90 AA 10-21-88 602A Lot 22 1241.0 11.5 119.6 94 EE 603A Lot 22 1235.0 12.2 119.1 94 EE 10-24-88 623A Lot 20 1254.0 12.9 111.3 92 AA 627A Adj.Lot 22 1249.0 12.4 113.6 93 AA 628A Adj.Lot 22 1237.0 17.3 107.5 90 FF 629A Lot 21 1238.0 15.5 108.7 91 FF PACIFIC SOILS ENGINEERING. INC. l NP I• 10 U �0 9 • • J Lj Work Order 400095H January 30, 1990 TABLE I cont. Date of Test Test Elev. Moist.Cont. Dry Density Relative Soil Test Test No. Location (ft.) %(field) (lbs./cu.ft.) % Comp. Type Type 10-26-88 662A Lot 21 1239.0 8.5 110.6 93 FF 663A Lot 22 1240.0 10.4 107.7 90 FF 10-27-88 691A Lot 21 1258.0 13.7 111.6 92 AA 692A Lot 20 1252.0 11.6 111.9 92 AA 693A Lot 19 1240.0 12.0 109.6 90 AA 694A Adj.Lot 22 1241.0 8.6 110.6 91 AA 699A Lot 22 1259.0 7.7 105.1 90 GG 701A Lot 21 1241.0 7.1 112.1 96 GG 702A Adj.Lot 22 1242.0 9.2 112.2 92 AA 707A Lot 22 1261.0 10.0 111.8 92 AA 10-31-88 758A Lot 22 1262.0 12.3 112.8 93 AA 759A Lot 23 1262.0 8.6 112.0 92 AA 760A Adj.Lot 22 1263.0 7.4 115.5 95 AA 762A Lot 19 1259.0 8.9 117.5 92 II 763A Lot 22 1261.0 8.7 117.8 91 BB Corte Padera 764A Sta.21+60 1244.0 9.6 110.7 91 AA SC 765A Lot 18 1244.0 10.2 111.9 92 AA 766A Lot 18 1246.0 8.9 112.7 93 AA Corte Padera 767A Sta.22+15 1247.0 9.3 111.0 91 AA 12-8-88 101 Lot 40 1246.0 8.2 103.1 90 HH 102 Lot 37 1248.0 8.5 102.1 93 DD 103 Adj.Lot 33 1251.0 8.8 111.4 93 FF Corte Padera 104 Sta.14+30 1252.0 9.0 113.2 95 FF 105 Lot 35 1244.0 10.0 117.0 93 II 12-9-88 106 Lot 41 1253.0 7.1 110.3 92 FF 107 Lot 40 1251.0 7.2 112.1 94 FF 108 Lot 39 1247.0 7.0 112.3 94 FF PACIFIC SOILS ENGINEERING, INC. i• I* �0 Work Order 400095H January 30, 1990 TABLE I cont. Date of Test Test Elev. Moist.Cont. Dry Density Relative Soil Test Test No. Location (ft.) %(field) (lbs./cu.ft.) % Comp. Type Type PACIFIC SOILS ENGINEERING. INC. 12-9-89 cont.Corte Padera 109 Sta.14+52 1245.0 7.0 111.2 93 FF 110 Lot 37 1243.0 7.2 112.3 94 FF 111 Lot 36 1241.0 7.1 110.4 92 FF 112 Lot 35 1239.0 7.6 114.4 94 AA SC 113 Lot 34 1238.0 9.4 120.0 92 BB Sc 114 Lot 33 1235.0 9.7 121.0 93 BB 115 Lot 32 1234.0 9.1 119.7 92 BB 116 Lot 33 1237.0 11.5 117.5 92 CC 117 Lot 37 1245.0 9.7 118.2 92 CC 118 Lot 40 1253.0 8.0 110.8 86 CC 119 Lot 38 1243.0 11.6 109.6 92 FF 118R1 Lot 40 1253.0 9.3 116.4 91 CC 120 Lot 33 1239.0 8.7 113.2 88 CC 121 Lot 35 1246.0 7.6 114.0 89 CC 122 Lot 37 1250.0 8.9 116.9 91 CC 123 Lot 39 1255.0 11.8 116.1 90 CC Corte Padera 124 Sta.15+50 1250.0 9.6 112.9 88 CC 125 Sta.14+70 1257.0 7.0 108.7 85 EE 12-12-88 120Rl Lot 33 1239.0 8.3 114.9 90 CC 121R1 Lot 35 1246.0 11.7 115.4 90 CC Corte Padera 124R1 Sta.15+50 1250.0 8.2 118.5 92 CC 125R1 Sta.14+70 1257.0 7.9 115.1 90 EE 126 Lot 30 1234.0 16.4 107.0 90 FF 127 Lot 32 1236.0 8.3 111.7 92 AA 128 Lot 30 1236.0 15.5 108.4 91 FF Corte Padera 129 Sta.21+10 1230.0 9.2 118.9 95 II 130 Sta.20+45 1232.0 9.2 112.7 94 FF 131 Lot 34 1241.0 9.3 108.7 91 FF 132 Lot 35 1248.0 8.8 116.6 91 CC 133 Lot 31 1238.0 10.1 115.9 90 CC 134 Lot 29 1238.0 12.4 109.5 92 FF 135 Lot 31 1240.0 11.7 110.1 92 FF PACIFIC SOILS ENGINEERING. INC. I• Work Order 400095H January 30, 1990 is TABLE I cont. :.l PACIFIC SOIL$.ENGINEERING, INC. Date of Test Test No. Test Location Elev. Moist.Cont. (ft.) %(field) Dry Density (lbs /cu ft ) Relative % Comp Soil Test Type Type 12-13-88 136 Lot 27 1234.0 8.3 110.7 93 FF 137 Lot 26 1236.0 8.6 115.7 92 II 138 Lot 26 1239.0 9.0 115.5 92 II 139 Lot 22 1236.0 10.6 108.9 91 FF 140 Lot 36 1252.0 8.9 113.4 90 II 141 Lot 38 1254.0 10.1 109.7 92 FF 142 Lot 25 1240.0 8.6 117.1 93 II 143 Lot 28 1240.0 8.5 114.0 91 II 144 Lot 30 1242.0 6.2 113.2 89 EE 145 Lot 32 1242.0 8.0 111.1 89 II 146 Lot 34 1243.0 9.8 113.9 91 II 147 Lot 33 1245.0 10.1 114.4 91 II 12-14=88 144R1 Lot 30 1242.0 9.3 118.8 93 EE 145R1 Lot 32 1242.0 9.8 113.4 90 II 148 Lot 27 1242.0 6.2 112.2 89 II 149 Lot 41 1255.0 9.6 119.3 91 BB Corte Padera 150 Sta.12+30 1257.0 9.4 114.5 91 II Sc 151 Lot 10 1258.0 8.7 113.0 90 II Sc 152 Lot 38 1256.0 8.4 115.0 92 II 153 Lot 36 1254.0 10.4 116.4 93 II 154 Lot 34 1247.0 10.2 114.3 91 II 155 Lot 32 1244.0 10.5 113.0 91 II 156 Lot 20 1244.0 8.5 114.9 92 II • 148R1 Lot 27 1242.0 9.6 114.5 91 II Corte Padera 157 Sta.21+60 1242.0 10.4 116.7 93 II 158 Lot 26 1244.0 9.8 114.9 92 II 159 Lot 58 1230.0 7.1 115.2 95 AA 160 Lot 59 1227.0 8.5 114.8 94 AA • 161 Lot 60 1228.0 8.6 114.6 94 AA 162 Lot 61 1225.0 8.9 113.9 94 AA 163 Lot 62 1226.0 7.9 115.0 95 AA 164 Lot 63 1223.0 9.2 112.8 93 AA 12-16-88 169 Lot 43 1230.0 13.5 113.7 94 AA 170 Lot 43 1232.0 14.2 111.1 91 AA :.l PACIFIC SOIL$.ENGINEERING, INC. i* Work Order 400095H January 30, 1990 10 TABLE I cont. \a PACIFIC SOILS ENGINEERING, INC. Date of Test Test Elev. Moist.Cont. Dry Density Relative Soil Test Test No. Location (ft.) %(field) (lbs /cu ft ) % Como Tvpe Tvpe 12-16-88 cont. 171 Lot 43 1234.0 12.1 112.3 92 AA 172 Lot 51 1236.0 11.6 109.9 90 AA • 173 Lot 50 1238.0 13.9 114.2 94 AA 12-28-88 184 Lot 19 1240.0 10.6 103.7 90 HH 185 Lot 21 1242.0 7.4 109.1 91 FF 186 Adj.Lot 22 1240.0 8.9 107.8 90 FF • 187 Lot 20 1244.0 9.3 107.1 90 FF 188 Lot 22 1246.0 10.1 110.0 92 FF 189 Adj.Lot.22 1244.0 8.8 108.5 91 FF 12-30-88 199 Lot 19 1248.0 9.0 107.0 90 FF • 200 Lot 21 1250.0 8.8 108.9 91 FF 201 Adj.Lot 22 1252.0 8.1 111.1 93 FF 202 Lot 23 1254.0 9.1 110.7 93 FF 203 Lot 20 1256.0 10.4 109.6 92 FF 204 Lot 22 1258.0 11.1 112.1 94 FF 205 Lot 23 1260.0 9.9 110.4 92 FF . 206 Lot 19 1260.0 13.8 114.0 94 AA 207 Lot 21 1264.0 13.0 113.3 93 AA 208 Adj.Lot 22 1262.0 10.8 108.9 90 AA 209 Lot 23 1266.0 8.8 111.5 92 AA 1-3-89 217 Lot 32 1256.0 10.7 113.4 90 II Corte Padera 218 Sta.19+10 1258.0 9.0 103.4 90 JJ 219 Lot 21 1250.0 11.2 109.7 90 AA 220 Lot 24 1248.0 9.9 111.2 91 AA 1-9-89 221 Lot 19 1262.0 12.4 110.3 91 AA 222 Lot 21 1264.0 11.1 114.7 91 II 223 Adj.Lot 22 1262.0 10.1 120.0 94 CC 224 Lot 20 1264.0 11.0 112.6 93 AA 225 Lot 22 1260.0 10.9 113.3 90 II 226 Adj.Lot 22 1264.0 11.6 115.3 92 II \a PACIFIC SOILS ENGINEERING, INC. • • Work Order 400095H January 30, 1990 Date of Test Test Test No. Location TABLE I cont. Elev. Moist.Cont. Dry (ft.) %(field) (lbs./cu.ft.) Density Relative % Comp. Soil Tvpe Test Type 1-10-89 234 Lot 43 1246.0 13.6 114.9 92 II Sc 235 Lot 43 1248.0 10.1 112.7 90 II Sc • 237 Lot 19 1268.0 9.4 117.3 93 II 238 Lot 21 1270.0 10.1 116.9 93 II 239 Adj.Lot 22 1268.0 12.6 113.5 90 II 240 Lot 23 1272.0 10.7 115.5 92 II 241 Lot 20 1274.0 9.9 115.9 92 II 242 Lot 22 1272.0 10.3 116.0 92 II • 243 Lot 22 1276.0 9.7 117.7 94 II 1-11-89 259 Lot 30 1282.0 8.5 108.9 90 AA 260 Lot 32 1284.0 9.9 110.6 91 AA 261 Lot 34 1286.0 11.6 109.4 90 AA • 262 Lot 36 1284.0 8.5 108.9 90 AA 263 Lot 38 1286.0 9.2 115.1 95 AA 264 Lot 31 1286.0 9.2 112.6 93 AA 265 Lot 33 1288.0 9.3 109.7 90 AA 266 Lot 35 1286.0 10.7 111.0 91 AA 267 Lot 37 1288.0 9.1 109.6 90 AA • 1-12-89 268 Lot 33 1268.0 16.5 111.7 93 FF 271 Lot 23 1268.0 10.6 113.8 95 FF 272 Lot 22 1252.0 12.9 114.2 96 FF 273 Lot 21 1256.0 13.5 107.5 90 FF • 274 Lot 19 1258.0 12.8 113.4 95 FF 275 Lot 17 1254.0 14.3 109.6 92 FF 276 Lot 30 1286.0 9.5 110.8 91 AA 277 Lot 32 1288.0 8.8 109.7 90 AA 278 Lot 34 1286.0 7.3 108.9 90 AA 279 Lot 36 1290.0 8.7 110.3 91 AA • 280 Lot 45 1294.5 10.0 115.1 92 II 281 Lot 43 1295.2 11.0 121.5 97 II 282 Lot 31 1288.0 7.0 109.7 92 FF 283 Lot 33 1290.0 7.3 110.5 92 FF 284 Lot 35 1292.0 9.9 111.1 93 FF 285 Lot 37 1292.0 10.1 112.6 94 FF • 286 Lot 35 1252.0 15.3 111.3 93 FF Sc 287 Lot 32 1254.0 12.0 107.4 92 GG Sc 288 Lot 29 1256.0 11.5 111.7 96 GG 289 Lot 27 1258.0 11.7 109.9 94 GG n p Y • I• 1• 1• 10 10 9 LI 0 0 J Work Order 400095H January 30, 1990 TABLE I cont. Date of Test Test Elev. Moist.Cont. Dry Density Relative Soil Test Test No. Location (ft.) %(field) (lbs /cu ft ) % Como Type Type 1-13-89 Paseo Goleta 292 Sta.36+15 1273.0 14.1 119.4 95 II 293 Lot 7 1262.0 11.4 114.5 94 AA 294 Lot 7 1265.0 10.4 113.7 94 AA 295 Lot 34 1254.0 10.6 109.8 90 AA 296 Lot 32 1256.0 10.1 111.3 92 AA 297 Lot 30 1256.0 12.0 111.2 91 AA 298 Lot 28 1258.0 11.2 109.6 90 AA 299 Lot 26 1258.0 10.5 110.6 91 AA 300 Lot 24 1256.0 12.6 110.0 90 AA 301 Lot 16 1254.0 11.4 108.6 89 AA 302 Lot 18 1258.0 8.9 111.3 92 AA 303 Lot 20 1256.0 11.2 109.7 90 AA 1-16-89 304 Lot 22 1256.0 8.3 111.7 92 AA Paseo Goleta 306 Sta.36+00 1279.0 9.9 124.1 95 BB 307 Lot 6 1272.0 8.5 116.1 93 II Paseo Goleta 310 Sta.35+40 1283.0 8.9 116.7 93 II 301R Lot 16 1254.0 11.7 110.0 90 AA 1-17-89 311 Lot 7 1276.0 10.7 118.0 97 AA 312 Lot 6 1286.0 9.4 112.3 92 AA 1-18-89 317 Lot 7 1277.0 15.4 112.1 92 AA 318 Lot 6 1281.0 11.2 112.1 92 AA Paseo Goleta 324 Sta.39+00 1303.0 8.2 111.9 92 AA 328 Lot 14 1277.0 9.1 112.1 90 AA 329 Lot 14 1279.0 10.0 109.1 90 AA 330 Lot 35 1256.0 16.2 110.3 91 AA Sc 331 Lot 33 1258.0 12.8 115.2 92 II Sc 332 Lot 31 1260.0 14.7 111.4 92 AA 333 Lot 29 1258.0 15.3 114.4 91 II 334 Lot 27 1260.0 14.9 111.2 91 AA 335 Lot 25 1262.0 12.5 113.9 91 II 337 Lot 14 1269.0 11.1 114.1 91 II Ll I• I• 1• I• • • • • Work Order 400095H January 30, 1990 TABLE I cont. Date of Test Test Elev. Moist.Cont. Dry Density Relative Soil Test Test No. Location (ft.) %(field) (lbs /cu ft ) % Comb Type Type 1-19-89 338 Lot 6 1287.0 8.5 110.2 91 AA 1-20-89 352 Lot 6 1287.0 8.7 114.7 94 AA 356 Lot 35 1265.0 14.8 112.1 92 AA 357 Lot 34 1267.0 13.3 111.1 91 AA 358 Lot 32 1266.0 12.5 112.7 93 AA 359 Lot 31 1268.0 11.9 110.6 91 AA 360 Lot 29 1262.0 15.3 111.9 92 AA 361 Lot 28 1266.0 14.4 110.9 91 AA 362 Lot 27 1264.0 10.4 110.1 91 AA 363 Lot 25 1268.0 12.1 112.0 92 AA 365 Lot 14 1281.0 12.5 105.3 87 AA 366 Lot 41 1266.0 7.2 111.7 92 AA 367 Lot 39 1264.0 9.7 112.4 92 AA 368 Lot 40 1268.0 8.8 110.6 91 AA 369 Lot 38 1266.0 10.1 112.7 93 AA 370 Lot 35 1267.0 8.1 122.3 94 BB 371 Lot 34 1269.0 9.6 117.9 90 BB 372 Lot 33 1268.0 11.2 109.3 90 AA 373 Lot 32 1270.0 10.7 115.3 95 AA 374 Lot 31 1268.0 12.0 117.6 94 II 375 Lot 30 1270.0 11.7 116.9 93 II 376 Lot 29 1269.0 12.4 113.3 94 AA 377 Lot 28 1271.0 12.1 118.0 94 II 1-23-89 365R1 Lot 14 1284.0 10.4 110.9 93 FF Sc 381 Lot 35 1270.0 8.8 112.9 94 FF Sc 382 Lot 36 1256.0 10.2 111.9 94 FF 383 Lot37/38 1260.0 9.4 109.7 92 FF 384 Lot 37 1259.0 9.8 113.1 95 FF 385 Lot 14 1285.0 10.8 113.9 95 FF 387 Lot 37 1264.0 12.6 108.2 91 FF 388 Lot 9 1266.0 12.8 110.2 92 FF 389 Lot 10 1274.0 11.9 112.6 94 FF 390 Lot 22 1273.0 10.2 111.3 93 FF 391 Lot 37 1268.0 12.1 114.0 95 FF 392 Lot 36 1267.0 10.8 113.4 95 FF 395 Lot 9 1275.0 10.5 109.5 92 FF 396 Lot 9/10 1275.0 11.6 104.3 90 GG PACIFIC SOILS ENGINEERING. INC. Zv 1• I• U 1• 1• �• J L` :l :.l Work Order 400095H January 30, 1990 TABLE I cont. Date of Test Test Elev. Moist.Cont. Dry Density Relative Soil Test Test No. Location (ft.) %(field) (lbs./cu.ft.) % Como. Type Tyne 1-23-89 cont. 397 Lot 39 1267.0 8.4 109.5 90 AA 398 Lot 40 1269.0 7.0 111.0 91 AA 399 Lot 39 1268.0 8.4 109.7 90 AA 1-24-89 403 Lot 37 1268.0 14.2 110.3 90 AA 404 Lot 36 1268.0 12.2 111.3 91 AA 405 Lot 38 1267.0 12.8 110.8 91 AA 406 Lot 47 1255.0 12.6 112.0 93 FF 407 Lot 44 1253.0 11.8 111.1 92 FF 1-25-89 Paseo Goleta 414 Sta.37+50 1300.0 12.9 111.8 92 AA 417 Lot 5 1295.0 10.5 112.7 93 AA 1-26-89 423 Lot 14 1276.0 9.6 116.0 92 II 424 Lot 1 1322.0 10.7 109.9 90 AA 425 Lot 1 1324.0 9.0 109.8 90 AA 426 Lot 2 1319.0 7.0 108.9 90 AA 427 Lot 2 1321.0 7.9 109.3 90 AA 1-27-89 428 Lot 9 1279.0 12.5 112.5 93 AA 1-30-89 436 Lot 9 1292.0 10.2 109.8 92 FF 437 Lot 10 1294.0 11.1 107.0 90 FF 447 Lot 22 1250.0 12.2 116.3 93 II 448 Lot 20 1252.0 13.1 111.2 91 AA 449 Lot 18 1264.0 12.1 117.7 94 II 2-1-89 459 Lot 21 1264.0 9.1 111.6 93 FF 2-2-89 474 Lot 16 1266.0 9.1 113.7 94 AA 475 Lot 14 1264.0 8.7 112.0 92 AA 476 Lot 12 1262.0 9.6 114.3 94 AA PACIFIC SOILS ENGINEERING, INC. I• 10 19 10 is 1* �0 [] �• 6 0 Work Order 400095H January 30, 1990 TABLE I cont. Date of Test Test Elev. Moist.Cont. Dry Density Relative Soil Test Test No. Location (ft.) %(field) (lbs./cu.ft.) % Comp. Type Tvpe 2-3-89 477 Lot 43 1260.0 11.0 106.2 91 GG 2-6-89 487 Lot 50 1226.0 10.4 107.8 90 FF 488 Lot 50 1230.0 10.1 107.9 90 FF 489 Lot 50 1234.0 9.9 108.1 90 FF 490 Lot 50 1236.0 8.7 107.9 90 FF 491 Lot 50 1238.0 10.3 109.6 92 FF 492 Lot 50 1240.0 8.7 110.1 92 FF 2-7-89 499 Lot 16 1270.0 7.1 104.1 91 HH 500 Lot 14 1269.0 12.8 115.3 92 II 501 Lot 12 1268.0 13.3 113.0 93 AA 502 Lot 10 1268.0 11.0 108.9 90 AA 504 Lot 43 1270.0 10.9 112.4 92 AA 510 Lot 8 1268.0 9.9 110.7 91 AA 511 Lot 9 1268.0 16.0 105.9 91 GG 2-13-89 523 Lot 23 1273.0 9.9 109.9 92 FF Sc 524 Lot 23 F.G. 10.4 108.3 91 FF 525 Lot 26 F.G. 12.0 114.6 96 FF 526 Lot 29 F.G. 13.3 112.3 95 FF 527 Lot 32 F.G. 13.1 111.3 93 FF 528 Lot 35 F.G. 16.3 112.5 94 FF 529 Lot 38 F.G. 14.8 113.6 95 FF 530 Lot 41 F.G. 14.5 108.9 91 FF 531 Lot 63 F.G. 18.5 114.4 91 II 532 Lot 61 F.G. 12.5 111.9 92 AA Sc 533 Lot 59 F.G. 18.0 104.3 91 HH 534 Lot 57 F.G. 14.6 121.7 93 BB 535 Lot 56 1232.0 13.0 122.3 94 BB 536 Lot 56 F.G. 12.7 123.9 95 BB 2-14-89 542 Lot 47 1241.0 10.0 111.0 91 AA 2-15-89 543 Lot 46 1247.0 13.6 108.6 91 FF 544 Lot 46 F.G. 11.6 106.3 91 GG PACIFIC SOILS ENGINEERING, INC. 7A i• Work Order 400095H January 30, 1990 1• TABLE I cont. Date of Test Test Test No. Location Elev. Moist.Cont. (ft.) %(field) Dry Density (lbs./cu.ft.) Relative % Comp. Soil Test Type Type 2-15-89 cont. AA 563 Lot 21 1268.0 545 Lot 47 F.G. 10.3 105.3 91 GG Sc 546 Lot 45 1252.0 11.2 108.6 91 FF Sc • 547 Lot 44 1258.0 10.8 115.1 92 II 548 Lot 43 1266.0 11.7 114.3 91 II 549 Lot 45 F.G. 14.0 110.5 91 AA 550 Lot 44 F.G. 9.9 112.6 93 AA 551 Lot 43 F.G. 10.0 113.3 93 AA 0 2-16-89 PACIFIC SOILS ENGINEERING, INC. 562 Lot 5 1298.0 13.3 111.7 92 AA 563 Lot 21 1268.0 13.8 110.3 91 AA 564 Lot 19 1270.0 12.1 111.9 92 AA 565 Lot 17 1270.0 12.9 109.9 90 AA 566 Lot 15 1268.0 10.2 108.9 90 AA 567 Lot 13 1267.0 13.3 111.1 91 AA 568 Lot 11 1268.0 13.0 113.7 94 AA 569 Lot 9 1267.0 14.6 114.0 91 II 570 Lot 21 1270.0 12.7 111.7 92 AA 571 Lot 22 1272.0 11.1 112.6 93 AA 572 Lot 20 1271.0 12.2 115.3 92 II 573 Lot 18 1270.0 12.7 111.7 92 AA 2-17-89 579 Lot 43 1274.0 13.3 113.3 93 AA 581 Lot 43 1278.0 13.0 112.7 93 AA 584 Lot 47 F.G. 10.9 112.1 92 AA 585 Lot 48 F.G. 11.3 114.0 91 II 586 Lot 7 F.G. 11.4 109.5 90 AA 587 Lot 6 F.G. 11.6 111.9 92 AA 588 Lot 5 F.G. 10.9 110.1 91 AA 2-20-89 . 593 Lot 43 1279.0 10.9 116.6 96 AA 2-21-89 596 Lot 8 F.G. 7.6 107.5 90 FF 597 Lot 10 F.G. 8.0 109.3 91 FF 598 Lot 12 F.G. 9.0 116.3 97 FF • 599 Lot 14 F.G. 7.8 108.7 91 FF 600 Lot 16 F.G. 7.9 118.7 99 FF PACIFIC SOILS ENGINEERING, INC. i• Work Order 400095H January 30, 1990 1• TABLE I cont. • Date of Test Test Elev. Moist.Cont. Dry Density Relative Soil Test Test No Location (ft.) %(field) (lbs./cu.ft.) % Como. Type Type 2-21-89 cont. 601 Lot 18 F.G. 8.1 108.1 90 FF 602 Lot 20 F.G. 8.0 112.2 94 FF • 603 Lot 22 F.G. 8.0 110.7 93 FF 2-22-89 6045 Lot 7 1273.0 8.2 107.7 90 FF 605S Lots 9/10 1284.9 8.6 118.4 97 AA 6065 Lot 14 1291.1 8.5 112.6 94 FF • 607S Lot 17 1287.2 8.0 110.7 93 FF 608S Lot 21 1293.4 7.9 115.8 97 FF Corte Padera 6095 Lot 23 1279.0 7.8 109.6 92 FF 6105 Lot 38 1262.5 10.6 112.7 93 AA 611S Lot 34 1261.7 8.6 109.8 90 AA • 612S Lot 32 1270.4 14.5 112.6 93 AA 6135 Lot 28 1258.6 12.6 109.1 90 AA 6145 Lot 30 1238.0 8.5 117.7 97 AA 6155 Lot 26 1231.0 14.8 102.2 93 DD 2-27-89 • 620 Lot 40 F.G. 8.0 118.9 95 II 621 Lot 36 F.G. 8.7 119.2 95 II 622 Lot 34 F.G. 7.7 125.2 98 EE 623 Lot 31 F.G. 6.2 113.1 90 II 624 Lot 27 F.G. 5.7 113.4 90 II 625 Lot 24 F.G. 7.9 119.6 95 II • I• I• 1• PACIFIC SOILS ENGINEERING, INC. FM 10 I* 10 I• 10 19 10 U El • Work Order 400095H January 30, 1990 TABLE II DEPTH OF FILL (Ft.) Lot Approx. Depth Lot Approx. Depth No. of Fill (ft.)_ No. of Fill (ft.) 1 * 8.5 33 52.0 2 * 6.5 34 46.5 3 cut 35 46.5 4 cut 36 46.5 5 * 15.5 37 40.8 6 * 25.0 38 35.5 7 19.5 39 30.5 8 * 8.0 40 29.0 9 * 15.0 41 29.5 10 * 15.0 42 19.0 11 * 15.0 43 * 35.0 12 * 15.5 44 * 25.0 13 * 21.0 45 * 19.5 14 21.0 46 * 19.3 15 * 21.5 47 * 15.5 16 * 17.0 48 * 8.0 17 25.0 49 cut 18 33.0 50 ** 4.0 19 37.5 51 cut 20 43.0 52 cut 21 43.5 53 cut 22 43.5 54 cut 23 * 19.0 55 cu 24 * 24.5 56 * 8.5 25 41.5 57 11.5 26 52.0 58 14.5 27 54.0 59 15.5 28 53.5 60 18.5 29 53.0 61 17.5 30 53.0 62 18.0 31 46.5 63 17.5 32 50.5 * - Cut/Fill transition lots overexcavated and capped with compacted fill ** - Transition lot created during grading capped with compacted fill.. Za �ti...."yam., - f t ° �«,......,-►r•. r �F �.,. {� 'may Ws7,,IWW Tlrti'W.,jrTrTIN wow TV W. wPAT" � ti y 4r .10ol, a