Loading...
HomeMy WebLinkAboutTract Map 21760 GeotechReport(Oct.12,1993)Geotechnical Report of Precise Grading, Lots 17 through 23 60 through 62, and 78 through 81, Tract 21760, Temecula Riverside County, California for Terra Nova Construction Company P.O. Box 612 Corona del Mar, California 92625 October 12, 1993 W. O. 589 -B -RC GeoSoils, Inc. I F - v Geotechnical Engineering • Engineering Geology 24890 Jefferson Avenue • P.O. Box 490 • Murrieta, California 92564 • (714) 677-9651 • FAX(714)677-9301 October 12, 1993 W.O. 589 -B -RC Terra Nova Construction Company P.O. Box 612 Corona del Mar. California 92625 Attention: Mr. Jim Rossman ' Subject: Geotechnical Report of Precise Grading, Lots 17 through 23, 60 through 62, and 78 through 81, Tract 21760, Temecula, Riverside County, California Reference: "Geotechnical Evaluation of Hydroconsolidation and Settlement Potential, ' Tract 21760, Temecula, County of Riverside, California," W.O. 589 -A -RC, by GeoSoils, Inc., dated June 7, 1993. ' In accordance with your request, this final geotechnical report of precise grading is provided for Lots 17 through 23, 60 through 62, and 78 through 81 in Temecula, Riverside County. The site was previously graded under the observation and testing ' services of Soil Tech, Inc. (1990). Precise grading within the subject project, under purview of this report, began on August 9, 1993, and was completed on August 20, 1993. Unless superseded by recommendations presented herein, the recommendations ' contained in our previous report (GeoSoils, Inc., 1993) remain pertinent and applicable and should be appropriately implemented. ' PREPARATION OF EXISTING GROUND 1. Major vegetation was stripped and cleared from the entire site prior to grading. 2. On lots 62, 78, 79, 80, and 81: The pad areas and at least 5 feet beyond in each ' direction were overexcavated 36 inches and the bottom was then scarified 12 inches, brought to at least optimum moisture content, then compacted to obtain a minimum relative compaction of 90 percent of the laboratory standard ASTM D ' 1557. 3. On lots 60 and 61: The pad areas and at least 5 feet beyond in each direction ' were overexcavated 30 inches and the bottom was then scarified 12 inches, brought to at least optimum moisture content, then compacted to obtain a minimum relative compaction of 90 percent of the laboratory standard ASTM D 1557. ' Los Angeles Co. (818) 785-2158 • Orange Co. (714) 647-0277 • San Diego Co. (619) 438-3155 [l 1 I Terra Nova Construction Company Tract 21760, Temecula Lots 17-23, 60-62, and 78-81 W.O. 589 -B -RC October 12, 1993 Page 2 3. On lots 17, 18, 19, 20, 21, 22, and 23: The exposed subsoils were scarified to a depth of about 12 inches, brought to at least optimum moisture content, then compacted to a minimum relative compaction of 90 percent of the laboratory standard. Fill Placement Fills consisted of native onsite materials that were placed in thin 6- to 8 -inch lifts, brought to at least optimum moisture content, then compacted to obtain a minimum relative compaction of 90 percent of the laboratory standard. Field Testing Field density tests were performed using nuclear densometer-methods ASTM D 2922-90 and D 3017-81 and sand -cone method D 1556-90. The test results are presented in the enclosed Table I. The estimated locations of the field density tests are shown on the enclosed Field Density Test Location Map, Plates 1 through 3. 2. Field density tests were taken at periodic intervals and random locations to check the compactive effort provided by the contractor. Based upon the grading operations observed, the test results presented herein are considered representative of the compacted fill. 3. Visual classification of the soils in the field was the basis for determining which maximum dry density value to use for a given density test. 4. Compaction tests have been numbered in a continuous sequence for the tract. Only tests taken on the subject lots are presented herein on Table I. GeoSoills, Inc. 3 iI I r H Terra Nova Construction Company W.O. 589 -13 -RC Tract 21760, Temecula October 12, 1993 Lots 17-23, 60-62, and 78-81 Page 3 LABORATORY TESTING Maximum Density Testing The laboratory maximum dry density and optimum moisture content for the major soil types within this construction phase were determined in general accordance with ASTM test method D 1557-91. The following table presents the results: Maximum Dry Optimum Moisture Soil Type Density pcf Content. % A - Silty Sand, Dark Brown 128.0 9.5 D - Silty Sand, Brown 124.0 12.5 E - Sandy Silt, Brownish Yellow 119.5 14.5 Expansion Index ' Expansive soil conditions have been evaluated for each lot. Representative samples of the soils near pad grade were recovered for expansion index testing. ' Expansion Index tests were performed for the typical foundation soil types exposed at pad grade in general accordance with UBC Standard #29-2 as outlined in Section 2904(b) of the Uniform Building Code. These test results are shown below: ' Lots Expansion Index UBC Classification ' 17-23 54 Medium 60-62, 78-81 33 Low I I ' GeoSoiis, Inc. 0 l Terra Nova Construction Company W.O. 589 -13 -RC Tract 21760, Temecula October 12, 1993 ' Lots 17-23, 60-62, and 78-81 Page 4 ' CONCLUSIONS AND RECOMMENDATIONS Recommendations for foundation design parameters, foundation construction, and utility ' trench backfill were presented in our referenced report, dated June 7, 1993. All findings, conclusions, and recommendations remain pertinent and applicable except as superseded herein. ' REGULATORY COMPLIANCE ' Processing of original/existing ground and placement of compacted fills under the purview of this report have been completed using the observation and selective testing ' services provided by representatives of GeoSoils, Inc. Earthwork was performed in general compliance with the Grading Code of the City of Temecula, California. ' Our findings were made in conformance with generally accepted professional engineering practices, and no further warranty is implied or made. GeoSoils, Inc. assumes no responsibility or liability for work, testing, or recommendations performed ' or provided by others. This report is subject to review by the controlling authorities for this project. ' We appreciate this opportunity to be of service. If you have any questions regarding this report, please do not hesitate to contact our office at (909) 677-9651. ' Respectfully submitted, Vq,OFESS/CN 0G. Si- qlF GeoSoils, Inc. ='' 9y2 w No.49754 M * EXR 9/30/96 ' yne C. Stoker s�q CIVIL Civil Engineer, RCE 49754 �OFCAL�FOP �� Sherry L. ton ' Project Manager Enclosures: Table I - Field Density Test Summary ' Plates 1 through 3 - Field Density Test Location Map ' Distribution: (6) Addressee GeoSoils, Inc. GeoSoils, Inc. Work Order 589-B-RC Client: Terra Nova Construction TABLE I FIELD DENSITY TEST SUMMARY Elev Moist % Test or Cont Dry Den Rel Test Soil ' No. Date Location Depth % pcf Comp Meth Type 111 9-28-93 Lot #78 -3' 11.6 117.7 92.0 N A 112 9-28.93 Lot #79 -3' 12.6 119.0 93.0 N A 113 9-30-93 Lot #80 -3' 14.1 116.6 91.1 SC A ' 114 9-30-93 Lot #81 -3' 16.0 117.7 92.0 N A 115 9.30-93 Lot #78 -1.5' 15.6 109.4 91.5 N E ' 116 9-30-93 Lot #79 -1.5' 16.1 110.2 92.2 N E 117 9-30-93 Lot #60 -2.5' 17.2 111.1 93.0 N E 91.5 SC E 118 10-1-93 Lot #61 -2.5' 15.3 109.4 ' 119 10-1-93 Lot #62 -3.0 16.2 110.1 92.1 N E 120 10-1-93 Lot #81 -1.5' 17.9 110.7 92.6 N E ' 121 10-1-93 Lot #60 -1.0' 16.6 108.6 90.9 N E 122 10-1.93 Lot #62 -1.0' 17.7 109.7 91.8 SC E ' Lot #78 F.G. 12.5 111.8 90.2 N D 123 10-6-93 ' 124 10-6-93 Lot #79 F.G. 12.6 112.2 90.5 N D 125 10-6-93 Lot #80 F.G. 12.5 113.4 91.5 N D ' 126 10.6.93 Lot #81 F.G. 14.5 112.7 90.9 N D 127 10-6-93 Lot #17 F.G. 14.6 107.6 90.0 N E ' 128 10.6-93 Lot #18 F.G. 14.5 108.0 90.4 N E 129 10.6-93 Lot #19 F.G. 14.6 108.4 90.7 N E 130 10-6-93 Lot #20 F.G. 14.5 109.3 91.5 N E ' 131 10-6-93 Lot #21 F.G. 14.5 109.0 91.2 N E 132 10-6-93 Lot #22 F.G. 14.6 109.1 91.3 N E ' 133 10-6-93 Lot #23 F.G. 14.5 108.9 91.1 N E 134 10-6-93 Lot #62 F.G. 12.6 112.4 90.6 N D Lot #61 F.G. 12.8 112.9 91.0 N D 135 10-6-93 1/ O 136 10-6-93 Lot #60 F.G. 12.7 112.7 90.9 N D GeoSoils, Inc.