Loading...
HomeMy WebLinkAboutTract Map 21760 GeotechReportPreciseGrading(Jun.30,1993)1 I I ' Geotechnical Report of Precise Grading, Lots 1 through 3 and 109 through 115, ' Tract 21760, Temecula, Riverside County, California ' for Terra Nova Construction Company ' P.O. Box 612 Corona del Mar, California 92625 t June 30, 1993 W.O. 589 -B -RC 1 11, GeoSoills. Inc. 1 I 1 Il 11 A :y3 W Geotechnical Engineering • Engineering Geology 24890 Jefferson Avenue • P.O. Box 490 • Murrieta, California 92362 • (714) 677-9651 • FAX (714) 677-9301 June 30, 1993 W.O. 589 -B -RC Terra Nova Construction Company P.O. Box 612 Corona del Mar, California 92625 Attention: Mr. Jim Rossman Subject: Geotechnical Report of Precise Grading, Lots 1 through 3 and 109 through 115, Tract 21760, Temecula, Riverside County, California Reference: "Geotechnical Evaluation of Hydroconsolidation and Settlement Potential, Tract 21760, Temecula, County of Riverside, California," W.O. 589 -A -RC, by GeoSoils, Inc., dated June 7, 1993. In accordance with your request, this final geotechnical report of precise grading is provided for Lots 1 through 3 and 109 through 115, Temecula, Riverside County. The site was previously graded under the observation and testing services of Soil Tech, Inc. (1990). Precise grading within the subject project, under purview of this report, began on June 10, 1993, and was completed on June 21, 1993. Unless superseded by recommendations presented herein, the recommendations contained in our previous report (GeoSoils, Inc., 1993) remain pertinent and applicable and should be appropriately implemented. PREPARATION OF EXISTING GROUND ' 1. Major vegetation was stripped and cleared from the entire site prior to grading. ' 2. On lots 109, 110, 111, 112, 114, and 115: The pad areas and at least 5 feet beyond (see Plate 1) in each direction were overexcavated 36 inches and the ' bottom was then scarified 12 inches, brought to at least optimum moisture content, then compacted to obtain a minimum relative compaction of 90 percent of the laboratory standard ASTM D 1557. ' 3. On lots 1, 2, 3, and 113: The exposed subsoils were scarified to a depth of about 12 inches, brought to at least optimum moisture content, then compacted to a ' minimum relative compaction of 90 percent of the laboratory standard. ' Los Angeles Co. (818) 785-2158 • Omnge Co. (714) 647-0277 • San Diego Co. (619) 438-3155 f I H F t I I Terra Nova Construction Company W.O. 589 -B -RC Tract 22761, Temecula June 30, 1993 Page 2 Fill Placement Fills consisted of native onsite materials that were placed in thin 6- to 8 -inch lifts, brought to at least optimum moisture content, then compacted to obtain a minimum relative compaction of 90 percent of the laboratory standard. Field Testing Field density tests were performed using nuclear densometer- methods ASTM D 2922-90 and D 3017-81 and sand -cone method D 1556-90. The test results are presented in the enclosed Table I. The estimated locations of the field density tests are shown on the enclosed Field Density Test Location Map, Plates 1 & 2. 2. Field density tests were taken at periodic intervals and random locations to check the compactive effort provided by the contractor. Based upon the grading operations observed, the test results presented herein are considered representative of the compacted fill. 3. Visual classification of the soils in the field was the basis for determining which maximum dry density value to use for a given density test. 4. Compaction tests have been numbered in a continuous sequence for the tract. Only tests taken on the subject lots are presented herein on Table I. LABORATORY TESTING Maximum Density Testing The laboratory maximum dry density and optimum moisture content for the major soil types within this construction phase were determined in general accordance with ASTM test method D 1557-91. The following table presents the results: Soil Type A - Silty Sand, Dark Brown D - Silty Sand, Brown Maximum Dry Density pcf 128.0 124.0 GeoSoils, Inc. Optimum Moisture Content. % 9.5 12.5 3 [1 I n P 1 1 F II 1 11 Terra Nova Construction Company W.O. 589 -B -RC Tract 22761, Temecula June 30, 1993 Page 3 CONCLUSIONS AND RECOMMENDATIONS Recommendations for foundation design parameters, foundation construction, and utility trench backfill were presented in our referenced report, dated June 7, 1993. All findings, conclusions, and recommendations remain pertinent and applicable except as superseded herein. REGULATORY COMPLIANCE Processing of original/existing ground and placement of compacted fills under the purview of this report have been completed using the observation and selective testing services provided by representatives of GeoSoils, Inc. Earthwork was performed in general compliance with the Grading Code of the City of Temecula, California. Our findings were made in conformance with generally accepted professional engineering practices, and no further warranty is implied or made. GeoSoils, Inc. assumes no responsibility or liability for work, testing, or recommendations performed or provided by others. This report is subject to review by the controlling authorities for this project. We appreciate this opportunity to be of service. If you have any questions, please call us at (909) 677-9651. Respectfully submitted, GeoSoils, Inc. *JE <er eer,RCE 49754 4v j Sherry L. Eaton Project Manager Enclosures: Plates 1 & 2 - Field Density Test Location Map Distribution: (6) Addressee ' GeoSoils, Inc. WORK ORDER: 589 -B -RC TABLE I F:LELD DENSITY TEST SUMMARY TEST DATE LOCATION ELEV MOIST DRY FEST SOIL NO OR CONT DEN REL METH TYPE DEPTH PCF COMP - - - �- LOT( STATION TRACT 21760 58 6-10-93 LOT 111 1071.0 10.6 115.2 90.0 N A 59 6-11-93 LOT 112 1074.0 12.9 113.1 91.2 N D 60 6-15-93 LOT 114 1082.0 10.2 116.2 90.8 N A 61 6-15-93 LOT' 1.13 1080.0 10.1 118.6 92.7 N A 62 6-18-93 LOT 115 1085.0 7.2.5 112.4 90.6 C D 63 6-18-93 LOT 114 FG 1083.9 10.2 119.8 93.6 N A 64 6-18-93 LOT 113 FG 1080.4 9.7 117.7 92.0 N A 65 6-18-93 LOT 112 FG 1076.4 12.6 113.6 91.6 N 0 66 6-18-93 LOT 111 FG 1073.2 10.0 117.4 91.7 N A 67 6-18-93 LOT 110 FG 1070.5 10.0 119.5 93.4 N A 68 6-18-93 LOT 109 FG 1067.5 9.5 116.9 91.3 N A 69 6-21-93 LOT 115 FG 1086.9 9.7 117.7 92.0 N A 70 6-21-93 LOT 1 FG 1080.8 12.5 111.6 90.0 N D 71 6-21-93 LOT 2 FG 1081.9 12.7 113.9 91.9 SC 0 72 6-21-93 LOT 3 FG 1082.5 12.6 113.6 91.6 N D LEGEND: N - NUCLEAR DENSOMETER SC - SAND CONE FG - FINISHED GRADE III 1. G¢oSoils, Inc.