Loading...
HomeMy WebLinkAbout052809 PTS AgendaIn compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the office of the City Clerk's Department at 951-694-6444. Notification 48 hours prior 10 a meeting will enable the City to make reasonable arrangements to ensure accessibility to that meeting 128 CFR 351 02.35A 04 ADA Title II] MEETING AGENDA TEMECULA PUBLIC/TRAFFIC SAFETY COMMISSION TO BE HELD AT CITY HALL COUNCIL CHAMBERS 43200 Business Park Drive Temecula, California Thursday, May 28, 2009 at 6:00 P.M. CALL TO ORDER: FLAG SALUTE ROLL CALL: COMMISSIONERS: Arbogast, Curran, Hagel, Ramos, Youmans PRESENTATIONS: Introduction of New Temecula Police Chief - Andre O'Harra Youth Court Program - Overview PUBLIC COMMENTS A total of 15 minutes is provided so members of the public can address the Commission on items that are not listed on the Agenda. Speakers are limited to two (2) minutes each. If you desire to speak to the Commission about an item not listed on the Agenda, a yellow "Request to Speak" form should be filled out and filed with the Commission Secretary. When you are called to speak, please come forward and state vour name and address. For all other agenda items, a "Request to Speak" form must be filed with the Recording Secretary before the Commission gets to that item. There is a three (3) minute time limit for individual speakers. NOTICE TO THE PUBLIC All matters listed under Consent Calendar are considered to be routine and all will be enacted by one vote. There will be no discussion of these items unless members of the Public/Traffic Safety Commission request that specific items be removed from the Consent Calendar for separate action. Any public writings distributed by the City Staff to at least a majority of the Public/Traffic Safety Commission regarding any item on this regular meeting agenda will be made available at the City Clerk's Office at Temecula City Hall, 43200 Business Park Drive, Temecula, California 92589, during normal business hours. COMMISSION REPORTS Reports by the Commissioners on matters not on the agenda will be made at this time. A total, not to exceed, ten (10) minutes will be devoted to these reports. COMMISSION CONSENT CALENDAR Action Minutes of Aoril 23. 2009 RECOMMENDATION: 1.1 Approve the Action Minutes of April 23, 2009. COMMISSION BUSINESS TRAFFIC ENGINEER'S REPORT POLICE CHIEF'S REPORT FIRE CHIEF'S REPORT ADJOURNMENT The next regular meeting of the City of Temecula Public/Traffic Safety Commission will be held on Thursday, June 25, 2009 at 6:00 P.M., Temecula City Hall, Council Chambers, 43200 Business Park Drive, Temecula, California. NOTICE TO THE PUBLIC The agenda packet (Including staff reports) will be available for viewing at the Main Reception City Hall (43200 Business Park Di ive. Temceula) or the Temecula Library (30600 Pauha Road, Temecula) after 4:00 PM the Friday before the Temecula Public/Traffic Safety Commission erecting. At than time, the puck,( may as well be accessed on the City's webshe - www.cilvoftemeculu.ar! Supplemental material received after the posting of the Agenda Any supplentenwl nmterial distributed to a majority of the Temecula Public/Traffic Safety Commission regarding anv item on the Agenda. after the posting of the Agenda, will be available for public review at the Main Reception at City Hall (43200 Business Park Drive. Temecula-8:00 AM to 5:00 PM). In addition, such material will be made available on the City's web -ww,v cavnflemecula.ora- and will be available for public review W the respective meeting. If you have any questions regarding any item of business on the Agenda fnt this meeting. please contact City Clerk's Depuruncm - 951 6946444. ITEM NO. I Action Minutes of April 23, 2009 ACTION MINUTES OF CALL TO ORDER: FLAG SALUTE: ROLL CALL: PRESENTATIONS: TEMECULA PUBLIC/TRAFFIC SAFETY COMMISSION CITY HALL COUNCIL CHAMBERS 43200 BUSINESS PARK DRIVE TEMECULA, CALIFORNIA THURSDAY, APRIL 23, 2009 6:00 PM Chairperson Youmans Commissioner Curran Arbogast, Curran, Hagel, Ramos, Youmans Certificate of Distinguished. Service - Bill Hughes Certificate of Distinguished Service - Ali Moghadam PUBLIC COMMENTS: COMMISSION REPORTS: COMMISSION CONSENT CALENDAR Action Minutes of March 26, 2009 Approved staff recommendation - (5-0-0) - Commissioner Curran made the motion; it was seconded by Commissioner Hagel; and voice vote reflected unanimous approval. RECOMMENDATION: 1.1 Approve the Action Minutes of March 26, 2009. COMMISSION BUSINESS 2. Multi-Wav Stoo Sian Installation Policv for Residential Streets Received and filed the report. RECOMMENDATION: 2.1 Receive and file the report. 3. Proposed Capital Improvement Proaram - Fiscal Years 2010-2014 Reviewed and discussed. 3.1. Review and discuss the proposed Capital Improvement Program (CIP) Circulation Projects for Fiscal Years 2010-2014. TRAFFIC ENGINEER'S REPORT POLICE CHIEF'S REPORT FIRE CHIEF'S REPORT ADJOURNMENT At 7:19 P.M., Commissioner Arbogast moved, seconded by Commissioner Curran, to adjourn the Public Traffic Safety Commission meeting to May 28, 2009, at 6:00 PM. Gary Youmans Dan York Chairperson City Engineer TRAFFIC ENGINEER'S REPORT MEMORANDUM TO: Public/Traffic Safety Commission FROM: Daniel A. York, City Engineer DATE: May 18, 2009 SUBJECT: Activity Report - Calendar Year 2008 Prepared By: Jerry Gonzalez, Associate Engineer - Traffic The following is a list of activities performed by the Traffic Engineering Division performed from January 1, 2008 through December 31, 2008. • Using the CCTV cameras, monitored traffic signal coordination conditions on the City's arterials from City Hall and implemented temporary traffic signal timing to modify signal operation during traffic incidents and provided response assistance to Police Department, Public Works, and CIP • Installed and upgraded CCTV communication equipment at various locations to monitor and improve traffic signal coordination conditions on City arterials including Temecula Parkway and the Promenade Mall. • Installed and upgraded traffic signal equipment at various intersections to improve traffic signal operation and optimize the operation of the intersection • Refined and implemented traffic signal coordination timing plans at various intersections on City arterials. • Implemented special time of day plans at various intersections adjacent to elementary, middle, and high school sites throughout the City. • Developed and installed a working traffic signal lab in the City yard to be used for performing diagnostic testing of traffic signal controllers and equipment. • Implemented geometric improvements at various locations to mitigate traffic circulation • Implemented geometric improvements at various locations to mitigate traffic circulation • Installed traffic signals and multi-way stop signs at various locations to improve traffic safety • Performed on-going routine maintenance of 117 signalized locations throughout the City • Collected traffic data at numerous intersections to improve traffic signal coordination timing and improve traffic circulation along City arterials • Provided technical assistance for special events to ensure mitigation measures were implemented to enhance safety and traffic circulation • Conducted traffic investigations related to citizen concerns and implemented appropriate action • Performed review of traffic signal operation related to citizen concerns and implemented appropriate action • Revised City's Neighborhood Traffic Calming Program policies and added traffic calming measures to the program to enhance neighborhood traffic safety • Performed the review of traffic signal plans, signing and striping plans, street improvement plans, traffic control plans, and development site plans • Performed the review of traffic impact analysis reports for proposed developments R..\GONZALJ\TRAFFIMFORMSACTIVITY REPORT (YEARLY-2000). DOG • Citizen generated traffic investigations Work orders resulting from investigations • Days to complete traffic investigations • Traffic signal operation investigations • Number of traffic/construction plans reviewed • • Days to complete plan reviews • Number of traffic census locations monitored • Number of traffic signals installed • Traffic signals reviewed for timing • Citizen Web Contact Requests 157 54 10 234 237 6 150 3 100% 68 R WNZAL\TRAFFICTORMSWCTIVITY REPORT (YEARLY-2008). DOG MEMORANDUM TO: Greg Butler, Director of Public Works FROM: Rodney Tidwell, Maintenance Supervisov DATE: May 8, 2009 SUBJECT: Monthly Activity Report - April, 2009 The following activities were performed by Public Works Department, Street Maintenance Division in-house personnel for the month of April, 2009: 1. SIGNS A. Total signs replaced B. Total signs installed C. Total signs repaired it. TREES A. Total trees trimmed for sight distance and street sweeping concerns III. ASPHALT REPAIRS A. Total square feet of A. C. repairs B. Total Tons IV. CATCH BASINS A. Total catch basins cleaned V. RIGHT-OF-WAY WEED ABATEMENT A. Total square footage for right-of-way abatement VI. GRAFFITI REMOVAL A. Total locations B. Total S.F. VII. STENCILING A. 72 New and repainted legends B 50.138 L.F. of new and repainted red curb and striping 27 4 45 16 11.307 105 342 43.260 132 10.945 UMAINTAIN 10 ACrRFI' Also, City Maintenance staff responded to 44 service order requests ranging from weed abatement, tree trimming, sign repair, A.C failures, litter removal, and catch basin cleanings. This is compared to 38 service order requests for the month of March . 2009. The Maintenance Crew has also put in 86 hours of overtime which includes standby time, special events and response to street emergencies. The total cost for Street Maintenance performed by Contractors for the month of April, 2009 was $24.330.90 compared to $101.532.00 for the month of March. 2009. Account No. 5402 Account No. 5401 Account No. 999-5402 Electronic Copies: Amer Attar - Dan York - Jerry Gonzalez - $ 16,525.00 $ 7,805.90 $ -0- Principal Engineer (CIP) City Engineer Associate Engineer (Traffic) RAMAINTAIMMOA(TRPI' 4tit QUARTER':..... SCOPE OF-WORK- DEPARTMENT OF PUBLIC WORKS MONTHLY ACTIVITY REPORT STREET MAINTENANCE FISCAL YEAR 2008 - 2009 T+r ,,.ay WORK ,COS pFORx"APR s~ COMPLETED MAY '09 ' . Z ; j M~,~r~ t ASPHALT AC c wC<,~~ ' tae i'Si .'yak r`aa„, Square Footage: w1~7, 307.,E '$33581"79 Tons: `~.`.A`''~ rp1Y05 ,~-7 SIDEWALK CURB & GUTTER REPAIR } Square Footage:I + 0, $000 PCC Yards: ~~z,,._ nx~0 '~"x$0 00 S 'a A Date Submitted: May 8, 2009 Submitted By: Greg Butler Prepared By: Rodney Tidwell WORK TOTAL COST FOR COST FOR MAY COMPLETED COST FOR JUNE TOTAL COST FOR LAST FISCAL 109 JUNE'09 109 THIS FISCAL YEAR YEAR $181,676.21 $0.00 $23,765.00 $214,696.23 $18,620.00 $0.00 gip, STRIPING LINEAR FEET: gyp? asy 110.00 $131.385.09 $269.156.90 I" ~v'°tdo-~Odx IN-HOUSE PAINTING LEGENDS: k k$576~001 $20,800.00 $18,522.00 SIGNS REPLACED ~ Material: W27 t $135000; $28,650.00 $36,050.00 % Labor:t 12, $7,1Z53t $15,121.47 $18,185.97 =4C A SIGNS INSTALLED Oil, G^' A,"UMMaterial: z~4 rs $200 00 $3,050.00 $22,300.00 Labor: ,$105n`S6µ $1,609.40 $11,186.16 GRAFFITI 'fie y 1t''`f~I, Square Footage: 1'10 945 DRAINAGE CHANNELS CLEANED a *t""• r.,,;~„',r Basins: ' 342 $902538 E. $97,247.85 $45,941.78 Channels: °k$7 ;428:00 $65,189.78 $192,061.93 IN-HOUSE TREES TRIMMED: x..A ~fis 76 t'-._x$42224`„ $10,424.05 $5,106.68 SERVICE ORDER REQUESTS: $xhr s tr AFTER HOURS CALL OUTS: ~;....86 kxsJi53 404 74: $44,419.98 $61,986.82 R.O.W. WEED ABATEMENT: ,.,gh ~$c,., W a3 260.ci $~1 470 84t; $2,817.56 $304.32 pggg yg- TOTALS '"c. $626,156.39 $914,152.73 R:\MAINTAIN\MOACTRP-RSTREETMAINT\APRIL, MAY, JUNE DEPARTMENT OF PUBLIC WORKS MAINTENANCE WORK COMPLETED FISCAL YEAR 2008-2009 BCtiACF ,,,:,:CONTRACTORS. . JANUARY' FEBRUARY Asphalt Jobs Performed 0 0 Concrete Square Feet 0 0 Drainage Channels 0 2 TOTAL COSTS $0.00 $10,679.68 CONTRACT STRIPING Striping Linear Feet 0 0 Sandblasting Linear Feet 0 0 TOTAL COSTS $0.00 $0.00 TREE CONTRACTORS Trees Trimmed 212 540 Trees Removed 0 3 TOTAL COSTS $10,600.00 $27,976.00 R.O.W. SPRAYING - SQ. FEET 385,000 225,000 TOTAL COSTS $20,181.25 $12.731.25 CITY MAINTENANCE CREW Signs Replaced 45 34 Signs Installed 14 11 Catch Basins Cleaned 569 411 Trees Trimmed 59 14 R.O.W. Weed Abatement 2,000 28,000 New & Repainted Legends 11 0 Aker Hours Call Outs 48 66 Service Order Requests 57 39 Graffiti Removal - So Ft 10.187 4,003 TOTAL COSTS $28,027.24 $34,891.56 Date submitted: 09-May49 Submitted By: GREG BUTLER Prepared By: RODNEY TIDWELL MARCH APRIL MAY JUNE 2ND HALF TOTALS YEAR-TO=DATE 3 0 3 3 0 0 0 2,453 2 0 2 7 $79.182.00 $0.00 $89,861.80 $164,708.48 0 0 0 1,942,525 0 0 0 0 $0.00 $0.00 $0.00 $131.370.00 293 126 1,171 1,951 0 0 3 23 $14,650.00 $6,300.00 $74.176.00 $103,093.00 135,000 43,260 788,260 1,300,400 $7,700.00 $9,750.00 $50,362.50 $71,625.00 17 27 123 573 14 4 43 61 137 342 1,459 2,655 5 16 94 400 0 43,260 73,260 75,710 93 72 176 1,975 114 86 314 1,122 38 44 178 460 11,314 10,945 36,449 _ 70,016 $101,532_00 _ $24,330.90 $188,781.70 $445,649.24 rew,wrumrnvlmiw.,rvr.wwurowFno~uv roxure . - STREET MAINTENANCE CONTRACTORS - The following contractors have performed the following projects for the month of April, 2009 DATE DESCRIPTION TOTAL COST ACCOUNT STREET/CHANNEL/BRIDGE OF WORK SIZE CONTRACTOR: RENE'S.COMMERCIAL:MANAGEMENT Date 04.22.09 CITYWIDE CITY R.O W. & CITY LOTS - WEED CONTROL # 5402 TOTAL COST I $ 9,750.00 Date: TOTAL COST Date: # TOTAL COST Date: TOTAL COST CONTRACTOR: BECKER ENGINEER* ING Date: 04.29.09 ' CITYWIDE SAW CUTTING FOR ASPHALT REPAIRS # 5402 TOTAL COST $ 6,775.00 Date: 04.29.09 FELIX VALDEZ & 6T" STREET CATCH BASIN REPAIR # 5401 TOTAL COST I $ 377.90 CONTRACTOR: MONTELEONE EXCAVATING Date: 04.22.09 EMPIRE CREEK REMOVAL OF SAND & SILT CAUSED FR OM WINTER STORMS # 5401 TOTAL COST I $ 7,428.00 Date: TOTAL COST TOTAL COST ACCOUNT #5401 $ 7,805.90 TOTAL COST ACCOUNT #5402 $ 16,525.00 TOTAL COST ACCOUNT #99-5402 -0- RANIAINTAINWOAC RP}' CITY OF TEMECULA DEPARTMENT OF PUBLIC WORKS ROADS DIVISION ASPHALT (POTHOLES) REPAIRS MONTH OF APRIL, 2009 ' f C Ek DATE r I O ATION COP OF; WORK ;a 4S , i 04/01/09 SAN FERMIN PLACE I AC O/L 04/02/09 I YNEZ AT RANCHO VISTA I POTHOLE 04/02/09 I N/B MEADOWS PKWY. AT RANCHO CALIFORNIA ROAD I R & R 04/03/09 CITYWIDE POTHOLES 04/03/09 I RANCHO CALIFORNIA ROAD I POTHOLES 04/03/09 I RANCHO VISTA I POTHOLES 04/06/09 I MEADOWS PKWY. AT RANCHO CALIFORNIA ROAD I AC O/L 04/06/09 SAN FERMIN PLACE I AC O/L 04/06/09 I NICOLAS ROAD I POTHOLES 04/06/09 I YNEZ AT YNEZ COURT I POTHOLES 04/07/09 W/B WINCHESTER AT NICOLAS AC O/L 04/08/09 RANCHO CALIFORNIA ROAD AT YUKON I POTHOLE 04/08/09 WINCHESTER AT COUNTY CENTER DRIVE I POTHOLE 04/08/09 I MARGARITA AT PIO PICO I POTHOLE 04/08/09 I JEDEDIAH SMITH AT CABRILLO I POTHOLE 04/09/09 I CITYWIDE POTHOLES 04/13/09 I S/B MARGARITA AT STONEWOOD R & R 04/14/09 I SANTIAGO AT MANZANO I AC O/L 04114/09 I RANCHO CALIFORNIA RD. BTWN. YNEZ & LYNDIE LANE I POTHOLE 04/15/09 I JEDEDIAH SMITH AT PESCADO I R & R 04/16/09 I MISCELLANEOUS AREAS ON RANCHO CALIFORNIA RD. I POTHOLES 04/16/09 I JEDEDIAH SMITH AT PESCADO R & R 04/16/09 I GLEN EAGLES STREET AC O/L 04/20/09 SANTIAGO AT MANZANO AC O/L 04/20/09 I MANZANO AT MARIPOSA AC O/L 04/20/09 SANTIAGO AT MANZANO I AC 0/L 04/21/09 129820 DEL REY I R & R 04/21/09 I LOS RANCHITOS AREA I AC O/L SX. TOTAL TONS I 939 I 4 4 432 I 12 24 I TEMP 21 1 3 1 88 729 9 I 3 2 I TEMP 962 4 2 I TEMP 8 2 I 1 2 I 111 48 535 I 20 1,008 5 7 320 9 11 230 6.5 100 646 75 151 3 88 1,354 4 R WAINTAINI W KCMPUMASPHALT. RPR DATE LOCATIQN r' SCOPEOF'WORK S.P. a s 04/22/09 I S/B MARGARITA AT RANCHO VISTA I AC O/L I 20 04/22/09 I LOS RANCHITOS AREA I AC O/L I 840 04/23/09 MANZANO AT MARIPOSA PLACE I AC OIL 585 04/27/09 MARGARITA AT OVERLAND I R & R 100 04/28/09 I NICOLAS ROAD I AC O/L I 70 04/28/09 I MANZANO DRIVE I AC 0/L I 325 04/28/09 I DE PORTOLA AT CALLE RIVAS I AC O/L I 294 04/29/09 I SAN FERMIN PLACE I AC O/L I 888 04/30/09 I S/B MARGARITA AT STONEWOOD I R & R 385 TOTAL S.F. OF REPAIRS 11.307 TOTALTONS 105 TOTAL TONS 4 3 3 5 3 12 R:W AI NTAINI W KCMPLTD\ASPHALT. R PR CITY OF TEMECULA DEPARTMENT OF PUBLIC WORKS ROADS DIVISION CATCH BASIN MAINTENANCE MONTH OF APRIL, 2009 AL ' 11 11 4 r1 t tt 4 S 'S~' iv P' ` •DATE, I LOCATION' 04/01/09 I CALLE GIRASOL AT RIVERTON DRIVE 04/01/09 I AREA#4 04/01/09 I AREA #1 04/02/09 I AREA #4 04/07/09 I CITYWIDE HOT SPOTS 04/08/09 CITYWIDE HOT SPOTS 04/09/09 I AREA #4 04/13/09 I CITYWIDE HOT SPOTS 04/14/09 CITYWIDE HOT SPOTS 04/15/09 AREA #4 04/16/09 AREA #4 04/20/09 CITYWIDE HOT SPOTS 04/20/09 I CITYWIDE HOT SPOTS 04/22/09 I CITYWIDE AREAS #2, #3, #4 04/23/09 AREA #5 04/27/09 I CITYWIDE HOT SPOTS ° 'WORK COMPLETED CLEANED & CHECKED CLEANED& CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED CLEANED & CHECKED TOTAL CATCH BASINS CLEANED & CHECKED 342 1 CATCH BASINS 44 CATCH BASINS 4 CATCH BASINS 38 CATCH BASINS 5 CATCH BASINS 29 CATCH BASINS 47 CATCH BASINS 9 CATCH BASINS 22 CATCH BASINS 25 CATCH BASINS 41 CATCH BASINS 11 CATCH BASINS 4 CATCH BASINS 8 CATCH BASINS 43 CATCH BASINS 11 CATCH BASINS R \MAI NTAIN\WKCMPLEPU\CATCHB AS\ CITY OF TEMECULA DEPARTMENT OF PUBLIC WORKS ROADS DIVISION GRAFFITI REMOVAL MONTH OF APRIL, 2009 DATE ;I aLOCATION WORK COMPLETED 04/01/09 I LEENA WAY AT ABETO WAY I REMOVED 1 S.F. OF GRAFFITI 04/01/09 I SPRINGTIME AT WINCHESTER CREEK I REMOVED 3 S.F. OF GRAFFITI 04/01/09 VIA GILBERTO AT CREEK BED I REMOVED 35 S.F. OF GRAFFITI 04/01/09 I HARVESTON AT ST. AUGUSTINE I REMOVED 1 S.F. OF GRAFFITI 04/01/09 HARVESTON AT LAKE VIEW REMOVED 2 S.F OF GRAFFITI 04/02/09 NO. GENERAL KEARNY AT CAMINO CAMPOS VERDES I REMOVED 1 S.F OF GRAFFITI 04/02/09 NO. GENERAL KEARNY AT DEER MEADOW I REMOVED 2 S.F. OF GRAFFITI 04/02/09 I TANAGER STREET I REMOVED 28 S.F OF GRAFFITI 04/02/09 I MEADOWS PARKWAY AT ROYAL OAKS REMOVED 2 S.F. OF GRAFFITI 04/02/09 I MARGARITA AT STONEWOOD I REMOVED 13 S.F. OF GRAFFITI 04/02/09 I MARGARITA AT SOLANA I REMOVED 2 S.F. OF GRAFFITI 04/02/09 NO. GENERAL KEARNY AT CAMINO CAMPOS VERDES I REMOVED 6 S.F. OF GRAFFITI 04/03/09 I NO GENERAL KEARNY AT DEER MEADOWS I REMOVED 3 S.F. OF GRAFFITI 04/03/09 I WINCHESTER AT RORIPAUGH REMOVED 1 SF OF GRAFFITI 04/03/09 1 40224 WINCHESTER I REMOVED 1 S.F. OF GRAFFITI 04/03/09 1 28100 JEFFERSON I REMOVED 2 S.F. OF GRAFFITI 04/06/09 I LA PAZ AT TEMECULA PARKWAY I REMOVED 2 S.F. OF GRAFFITI 04/06/09 1 31689 BADGER WAY I REMOVED 62 S.F. OF GRAFFITI 04/06/09 1 31656 SEASTAR I REMOVED 55 S.F. OF GRAFFITI 04/06/09 AVENIDA DE MISSIONS CHANNEL REMOVED 247 S.F. OF GRAFFITI 04/06/09 I ANZA AT CORTE MISLANCA I REMOVED 1 S.F OF GRAFFITI 04/06/09 I REGINA AT TEHACHAPI I REMOVED 2 S.F. OF GRAFFITI 04/06/09 I REGINA AT GAROLI REMOVED 2 S.F. OF GRAFFITI 04/06/09 1 44834 TEHACHAPI REMOVED 2 S.F. OF GRAFFITI 04/06/09 I BUTTERFIELD STAGE ROAD AT ROYAL CREST REMOVED 18 S.F. OF GRAFFITI 04/06/09 BUTTERFIELD STAGE ROAD AT ROYAL CREST I REMOVED 15 SF OF GRAFFITI 04/06/09 I LONG VALLEY AT HUMBER I REMOVED 1 S.F OF GRAFFITI R WAIN I AIN\ W KCMPLTD\URAPFITI\ , DATE:,;I, liOCATION 04/06/09 YNEZ AT YNEZ COURT 04/06/09 I NO. GENERAL KEARNY AT SANTA GERTRUDIS CREEK 04/06/09 I N/B 1-15 FREEWAY AT TEMECULA PARKWAY 04/06/09 I NO GENERAL KEARNY AT CAMINO CAMPOS VERDE 04/06/09 MARGARITA AT WINCHESTER 04/06/09 I VIA LOBO AT DEER MEADOW 04/06/09 I PECHANGA PARKWAY BRIDGE 04/07/09 I TEMECULA CREEK AT REDHAWK 04/07/09 I BUTTERFIELD STAGE BRIDGE 04/07/09 I WINCHESTER AT NICOLAS 04/07/09 I WGASA AT AVENIDA ENRIQUE 04/07/09 I LUZON AT WALCOTT 04/08/09 1 44948 MARGE PLACE 04/08/09 1 44879 MARGE PLACE 04/08/09 S/B MARGARITA AT MORAGA 04/08/09 I LA SERENA AT SO. GENERAL KEARNY 04/08/09 I MARGARITA AT LA SERENA 04/08/09 YNEZ AT SANTA GERTRUDIS CREEK 04/08/09 SOLANA BETWEEN YNEZ AND MARGARITA 04/09/09 RORIPAUGH AT STARLING 04/09/09 SANDERLING • 04/09/09 42031 MARGARITA 04/09/09 42037 MARGARITA 04109/09 I VIA DEL CORONADO AT LOMA LINDA 04/09/09 I EDISON PLANT ON LOMA LINDA 04/09/09 I SPILLWAY ON RANCHO VISTA AT SOUTHERN CROSS 04/09/09 I RANCHO CALIFORNIA ROAD AT MORAGA 04/09/09 RANCHO CALIFORNIA ROAD AT TOWN CENTER 04/09/09 I MORAGA AT MARGARITA 04/10/09 I OLD TOWN FRONT STREET AT TEMECULA PARKWAY 04/10/09 I OLD TOWN FRONT STREET AT 3RD STREET I'. WORK COMPLETED I REMOVED 1 299 S.F OF GRAFFITI REMOVED 285 S.F. OF GRAFFITI REMOVED 44 S.F OF GRAFFITI REMOVED 3 S.F. OF GRAFFITI REMOVED 3 S.F. OF GRAFFITI REMOVED 2 S.F. OF GRAFFITI REMOVED 964 S.F OF GRAFFITI REMOVED 134 S.F OF GRAFFITI REMOVED 1,453 S.F OF GRAFFITI REMOVED 3 S.F OF GRAFFITI REMOVED 1 S.F. OF GRAFFITI REMOVED 1 S.F. OF GRAFFITI REMOVED 1 S.F. OF GRAFFITI REMOVED 3 S.F OF GRAFFITI REMOVED 4 S.F. OF GRAFFITI REMOVED 1 S.F OF GRAFFITI REMOVED 1 S.F. OF GRAFFITI REMOVED 2 S.F OF GRAFFITI REMOVED 1 S.F OF GRAFFITI REMOVED 3 S.F. OF GRAFFITI REMOVED 5 S ,F. OF GRAFFITI REMOVED 1 S ,F OF GRAFFITI REMOVED 1 S.F. OF GRAFFITI REMOVED 207 S.F. OF GRAFFITI REMOVED 147 S.F OF GRAFFITI REMOVED 58 S.F OF GRAFFITI REMOVED 4 S.F OF GRAFFITI REMOVED 3 S.F. OF GRAFFITI REMOVED 3 S.F OF GRAFFITI REMOVED 9 S.F OF GRAFFITI REMOVED 2 S.F. OF GRAFFITI R\MAINTAIN\W KCMPLTD\GRAFFIT I\ DATE I LOCATION e a) 2 W©RK COMPLETED , -It . se 04/10/09 I RAINBOW CANYON ROAD I REMOVED 24 S.F. OF GRAFFITI 04/10/09 I WOLF CREEK AT PECHANGA REMOVED 80 S.F. OF GRAFFITI 04/10/09 I DEER HOLLOW AT PECHANGA REMOVED 36 S.F OF GRAFFITI 04/10/09 I WOLF VALLEY AT PECHANGA REMOVED 15 S.F. OF GRAFFITI 04/10/09 I CAMPANULA AT PAVIA WAY REMOVED 2 S.F. OF GRAFFITI 04/10/09 OVERLAND AT NICOLE LANE REMOVED 6 S.F. OF GRAFFITI 04/10/09 NO. GENERAL KEARNY AT MARGARITA I REMOVED 1 S.F. OF GRAFFITI 04/10/09 I NO. GENERAL KEARNY AT CAMINO CAMPOS VERDES I REMOVED 2 S.F. OF GRAFFITI 04/10/09 I MARGARITA AT OVERLAND I REMOVED 3 S.F OF GRAFFITI 04/10/09 I PROMENADE WAY AT OVERLAND REMOVED 4 S.F. OF GRAFFITI 04/10/09 I JEFFERSON AT DEL RIO REMOVED 96 S.F. OF GRAFFITI 04/13/09 I AVENIDA DE MISSIONS (IN CHANNEL) REMOVED 338 S.F OF GRAFFITI 04/13/09 I CAMINO PIEDRO ROJO AT PAROWYN I REMOVED 8 S.F. OF GRAFFITI 04/13/09 I SIB 1-15 FWY AT RANCHO CALIFORNIA ROAD I REMOVED 10 S.F. OF GRAFFITI 04/13/09 I 1-15 FWY AT TEMECULA PARKWAY I REMOVED 50 S.F. OF GRAFFITI 04/13/09 I NO. GENERAL KEARNY AT NICOLAS I REMOVED 381 S.F. OF GRAFFITI 04/13/09 I TOWER PLAZA I REMOVED 8 S.F. OF GRAFFITI 04/13/09 128450 FELIX VALDEZ I REMOVED 296 S.F. OF GRAFFITI ! 04/13/09 28400 FELIX VALDEZ I REMOVED 656 S.F OF GRAFFITI 04/13/09 I UNDER OVERLAND BRIDGE I REMOVED 280 S.F. OF GRAFFITI 04/13/09 I SIB MARGARITA AT LA SERENA I REMOVED 1 S.F. OF GRAFFITI 04/13/09 I MARGARITA AT STONEWOOD I REMOVED 2 S.F. OF GRAFFITI 04/13/09 I MARGARITA AT HARVESTON I REMOVED 2 S.F. OF GRAFFITI 04/13/09 I MARGARITA BRIDGE AT WINCO FOODS I REMOVED 294 S.F. OF GRAFFITI 04/13/09 I LIEFER BRIDGE AT NICOLAS I REMOVED 92 S.F. OF GRAFFITI 04/13/09 I NO. GENERAL KEARNY AT NICOLAS I REMOVED 294 S.F. OF GRAFFITI 04/13/09 I NO. GENERAL KEARNY AT SALERNO REMOVED 4 S.F. OF GRAFFITI 04/13/09 BEHIND TARGET CENTER REMOVED 6 S.F. OF GRAFFITI 04/14/09 I MARGARITA AT STONEWOOD REMOVED 3 S.F OF GRAFFITI 04/14/09 1 29766 RANCHO CALIFORNIA ROAD I REMOVED 24 S.F. OF GRAFFITI 04/14/09 I MARGARITA BRIDGE AT SANTA GERTRUDIS CREEK I REMOVED 400 S.F. OF GRAFFITI K'.\MAINTAIN\ W KCMFI:I MliiKAFFITI\ DATE J~ Ai f9 F LOCATION a bhp >Ya~ ,~WORK`COMPLETED 04/14/09 31026 SHABA CIRCLE I REMOVED 4 S.F. OF GRAFFITI 04/14/09 DE PORTOLA AT MEADOWS PARKWAY REMOVED 1 S.F. OF GRAFFITI 04/14/09 I DEL REY AT PINA COLADA REMOVED 3 S.F OF GRAFFITI 04/14/09 ANTELOPE PLACE AT MANATEE REMOVED 66 S.F. OF GRAFFITI 04/15/09 I MARGARITA AT AVENIDA SONOMA I REMOVED 1 S.F. OF GRAFFITI 04/15/09 MARGARITA AT YMCA I REMOVED 2 S.F OF GRAFFITI 04/15/09 VIA PUERTA AT CAMINO DEL ESTE I REMOVED 36 S.F OF GRAFFITI 04/16/09 I VIA NORTE AT CALLE PIMA COLADA I REMOVED 7 S.F. OF GRAFFITI 04/17/09 I SO GENERAL KEARNY AT BIG SAGE REMOVED 1 S.F OF GRAFFITI 04/17/09 I OLD TOWN AREA REMOVED .550 S.F. OF GRAFFITI 04/20/09 I PECHANGA PARKWAY AT LOMA LINDA REMOVED 31 S.F OF GRAFFITI 04/20/09 I AVENIDA DE MISSIONS AT VIA RIO TEMECULA REMOVED 2 S.F OF GRAFFITI 04/20/09 I LOMA LINDA AT VIA DEL CORONADO I REMOVED 68 S.F. OF GRAFFITI 04/20/09 I EAST END OF DE PORTOLA I REMOVED 55 S.F. OF GRAFFITI 04/20/09 I AGENA AT SOUTHERN CROSS I REMOVED 18 S.F. OF GRAFFITI 04/20/09 I 1-15 FWY AT TEMECULA CREEK I REMOVED 33 S.F. OF GRAFFITI 04/20/09 1-15 FWY AT TEMECULA PARKWAY OFF RAMP I REMOVED 320 S.F. OF GRAFFITI 04/20/09 I TARGET CENTER I REMOVED 2 S.F OF GRAFFITI I 04/20/09 WINCHESTER AT SANTA GERTRUDIS CREEK REMOVED 233 S.F. OF GRAFFITI 04/20/09 I NO. GENERAL KEARNY AT SANTA GERTRUDIS CREEK REMOVED 10 S.F. OF GRAFFITI 04/20/09 I SANTA GERTRUDIS CRFEEK AT HENRY'S MARKET REMOVED 211 S.F. OF GRAFFITI 04/20/09 I MIRA LOMA AT RANCHO VISTA I REMOVED 5 S.F. OF GRAFFITI 04/21/09 I BOYS & GIRLS CLUB AT KENT HINTERGARDT I REMOVED 32 S.F. OF GRAFFITI 04/22/09 PECHANGA PARKWAY AT TEMECULA CREEK I REMOVED 490 S.F. OF GRAFFITI 04/23/09 I GOLDS GYM AT 1-15 FWY I REMOVED 135 S.F OF GRAFFITI 04/25/09 I END OF DE PORTOLA ROAD I REMOVED 8 S.F OF GRAFFITI 04/27/09 I RANCHO CALIFORNIA ROAD AT YUKON REMOVED 10 S.F OF GRAFFITI 04/27/09 I LONG VALLEY AT YUKON REMOVED 50 S.F OF GRAFFITI 04/27/09 I WINCHESTER AT SANTA GERTRUDIS CREEK [REMOVED 127 S.F. OF GRAFFITI 04/27/09 I NO. GENERAL KEARNY BRIDGE I REMOVED 298 S.F. OF GRAFFITI 04/27/09 I NO. GENERAL KEARNY AT SALERNO WAY I REMOVED 2 S.F. OF GRAFFITI R:WAINTAI N\ W KCMPLTMGRAFFI I I\ - " DATE...; I, 4LOCATION 04/27/09 I DEL REY ROAD AT CALLE PINA COLADA 04/27/09 I AVENIDA DE MISSIONS AT VIA RIO TEMECULA 04/27/09 VIA LA COLORADA AT CAMINO SAN DIMAS 04/27/09 RAINBOW CANYON AT CITY LIMITS 04/27/09 VIA CORDOBA AT VIA OLIVERA 04/27/09 MARGARITA AT RANCHO CALIFORNIA ROAD 04/27/09 I RANCHO CALIFORNIA ROAD AT MARGARITA 04/28/09 I LONG VALLEY AT ROANOAKE 04/28/09 I CALLE PINA COLADA AT DEL REY 04/28/09 I MEADOWS PARKWAY AT RANCHO VISTA 04/28/09 I CALLE MADUSA AT CALLE KATERINE WORK COMPLETED REMOVED 80 S ,F OF GRAFFITI REMOVED 115 S.F OF GRAFFITI REMOVED 1 S.F. OF GRAFFITI REMOVED 2 S.F OF GRAFFITI REMOVED 2 S.F. OF GRAFFITI REMOVED 40 S.F. OF GRAFFITI REMOVED 150 S.F. OF GRAFFITI REMOVED 4 S.F OF GRAFFITI REMOVED 65 S.F OF GRAFFITI REMOVED 1 S.F. OF GRAFFITI REMOVED 2 S.F OF GRAFFITI TOTAL S.F. GRAFFITI REMOVED 10.945 TOTAL LOCATIONS 131 R:\MAINTAlM W KCMPLLTMGRAFPITI\ CITY OF TEMECULA 2009 GRAFFITI REMOVAL SOUARE FOOTAGE TOTAL CALLS January 10,187 January 37 February 4,003 February 30 March 11,314 March 167 April 10,945 April 132 May May June June July July August August September . September October October November November December December JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC SQ FT Totals for the Year To Date: May 1, 2009 Sq. Foot 36,449 Calls 366 CITY OF TEMECULA DEPARTMENT OF PUBLIC WORKS ROADS DIVISION RIGHT-OF-WAY TREE TRIMMING MONTH OF APRIL, 2009 ~ ~ I. DATE I 04/06/09 ALCC 04/07/09 YNEZ I 04/07/09 2791 f 04/21/09 I I PAUE r ,s tt t k7,aV,. bM' 'Y .5' r r rr Y: LOCATION. -WOl 3A DRIVE AT DE PORTOLA TRIMMED AT OVERLAND TRIMMED JEFFERSON I TRIMMED 3 AT LA PRIMAVERA I TRIMMED TOTAL R.O.W. TREES TRIMMED tK COMP,LETED 5 R.O.W TREES 5 R.O.W TREES 1 R.O.W. TREES 5 R.O.W TREES 16 R AMAINTAIM W RKCOMPUFMTREES CITY OF TEMECULA DEPARTMENT OF PUBLIC WORKS ROADS DIVISION RIGHT-OF-WAY WEED ABATEMENT MONTH OF APRIL, 2009 DATE L°OGATIONr W ORIC CO MPLETED . 04/01/09 DIAZ ROAD AT RANCHO CALIFORNIA ROAD ABATED 3.000 S.F. R.O.W WEEDS 04/07/09 MADISON LOT ABATED 35,000 S.F. R.O.W. WEEDS 04/08/09 I VIA LA VIDA AT VIA RENATE ABATED 60 S.F. R.O.W. WEEDS 04/15/09 VIA LA VIDA AT VIA RENATE ABATED 1,200 S.F. R.O.W. WEEDS 04/21/09 PAUBA AT LA PRIMAVERA I ABATED 2,000 S.F. R.O W WEEDS 04/29/09 1 I ~ 6T" STREET AT FELIX VALDEZ ABATED I 2.000 S.F R.O W. WEEDS TOTAL S.F. R.O.W. WEEDS ABATED 43.260 R %MAINTAIMWKCOMPLTMWEEDS CITY OF TEMECULA DEPARTMENT OF PUBLIC WORKS ROADS DIVISION DATE REC'D 03/27/09 03/30/09 03/30/09 03131/09 04101/09 04/01/09 04/02/09 04/02/09 04/06/09 04/06/09 04/06/09 04/06/09 04/07/09 04/09/09 04/09/09 04/10/09 04/13/09 04/14/09 04/14/09 04/14/09 04/15/09 04/16/09 04/16/09 04/16/09 04/17/09 04/17/09 04/17/09 SERVICE ORDER REQUEST LOG MONTH OF APRIL, 2009 LOCATION REQUEST 3027 CAPRICE COURT CINON WAY AT VOLTERRA STREET 30486 DEER MEADOW ROAD JEREZ AT SUNNY MEADOWS LAMA COURT AT CAMPO DRIVE RANCHO CALIFORNIA ROAD TEMECULA ELEMENTARY 45644 RAINBOW CANYON DRIVE REDHAWK PARKWAY AT VIA PUEBLA MARGARITA AT AVENIDA CIMA DEL SOL MARGARITA AT STONEWOOD 44887 MARGE PLACE 33350 LA SERENA WAY 30101 MIRA LOMA DRIVE 32628 LEENA MANCHESTER AT FOX GLENEAGLES COURT 30714 CENTAUR COURT 44730 CUPA LANE VIA RENATE AT VIA LA VIDA CORTE PERGAMINO AT CORTE MAREA MORAGA 32031 CALLE CABALLOS 29820 - 29830 DEL REY ROAD 44840 MUIRFIELD RANCHO CALIFORNIA ROAD & YNEZ 30006 MIRA LOMA TREE FENCE REPAIR TREE SIGN REPAIR SIGN REPAIR CONCRETE REPAIR GRAFFITI POTHOLE DEBRIS CATCH BASIN DEBRIS CONCRETE REPAIR TREE I TREE SIGN REPAIR DEBRIS PICK-UP ASPHALT REPAIR TREE TREE WEED ABATEMENT SIGNAL REPAIR I DEBRIS PICK-UP SIGN REPAIR ASPHALT REPAIR DEBRIS REMOVAL DEBRIS PICK-UP TREE DATE WORK COMPLETED 04/07/09 04/03/09 04/01/09 04/01/09 04/02/09 04/03/09 04/02/09 04/02/09 04/06/09 04/06/09 04107/09 04/08/09 04/07/09 04/09/09 04/09/09 04/13/09 04/16/09 04/14/09 04/15/09 04/15/09 04/15/09 04/16/09 04/17/09 04/17/09 04/20/09 04/17/09 04/20/09 R'.\MAINTAW\WRKCOMFLTMSORS\ DATE REC'D LOCATION REQUEST 04/20/09 I PALMA DRIVE AT VALLEJO I SNS 04/21/09 I RANCHO CALIFORNIA ROAD AT HOPE WAY I DEBRIS PICK-UP 04/22/09 39818 CAIMBRIDGE I TREE 04/22/09 I MARGARITA AT RANCHO VISTA I SINKHOLE 04/22/09 I CORTE PERGAMINO AT CORTE MAR I EA SIGN REPAIR 04/22/09 I YNEZAT PAUBA I DEBRIS 04/22/09 I GEORGETOWN I ASPHALT 04/23/09 132830 WOLF STORE ROAD I DEBRIS PICK-UP 04/23/09 130862 WILLOW RUN I SIGN REPAIR 04/23/09 30344 SIERRA MAREE DRIVE I CONCRETE REPAIR 04/27/09 I RANCHO CALIFORNIA ROAD AT HOPE WAY I DEBRIS 04/27/09 I CHANTEMAR WAY AT CALLE PIMA COLADA I SNS 04/28/09 I BUTTERFIELD STAGE ROAD AT RANCHO CALIFORNIA RD I . DEBRIS 04/28/09 142037 SWEET SHADE LANE I TREE 04/28/09 I RAINBOW CANYON ROAD POTHO LES 04/30/09 I RANCHO CALIFORNIA ROAD AT HOPE WAY I DEBRIS 04/30/09 143046 CAMINO CASILLAS DEBRIS TOTAL SERVICE ORDER REQUESTS 44 DATE WORK COMPLETED 04/27/09 04/21/09 04/22/09 04/22/09 04/22/09 04/22/09 04/27/09 04/23/09 04/30/09 04/27/09 04/28/09 04/27/09 04/28/09 04/28/09 04/28/09 04/30/09 05/01/09 RAMAI NTAIM W R KCOMPLTMSORS\ CITY OF TEME CULA DEPARTMENT OF PUB LIC WORKS ROADS DIVIS ION SIGNS MONTH OF APRI L, 2009 DATE LOCATION COMPLETED 04101/09 JEREZ AT SUNNY MEADOWS I REPAIR R1-1 04/01/09 I W/B WINCHESTER AT WINCHESTER CREEK I REPAIR CITY LIMIT SIGN 04/01/09 I HARVESTON AT TOWNSHIP I REPAIR I R26 i 04/01/09 HARVESTON AT TOWNSHIP REPAIR R2-25 04/01/09 I HARVESTON AT WELLSLEY I REPAIR I R1-1 04/01109 I HARVESTON AT WELLSLEY I REPAIR I R2-26 04101109 YNEZ AT PREECE REPAIR I 91-1 04/01/09 I VILLA ALTURAS AT PAUBA I REPAIR I R1-1 04/01/09 YNEZ AT VIA HALCON I REPAIR R1-1 04/02/09 I CAMPO DRIVE AT LAMA COURT I REPAIR I SNS 04/03/09 I RANCHO VISTA AT BUTTERFIELD STAGE I REPAIR I R-26 04/03/09 I YNEZ AT LA PAZ I REPAIR I RI-1 04/06/09 I VIA LOBO CHANNEL REPLACED NO TRESPASSING 04/07/09 I PALM PLAZA AT YNEZ I REPAIR I W73-1 04/07/09 I PALM PLAZA AT YNEZ I REPAIR I W73-1 04/07/09 I OVERLAND AT YNEZ I REPAIR I R3-7 04/07/09 I LUZON AT WALCOTT I REPAIR I RI-1 04/07/09 I SIMI COURT AT HEITZ LANE I REPAIR I R1-1 04/07109 I CHARDONNAY AT HEITZ LANE I REPAIR R1-1 04/08/09 I YNEZ AT LA PAZ I REPAIR RI-1 04/08/09 I JEFFERSON AT WINCHESTER I REPLACED I R4.7 04/08/09 I YNEZ AT SOLANA I REPAIR R-26A 04/08/09 I VIA LA VIDA AT VIA SEVILLA I REPAIR I Rl-1 R' W AINTAIMW KCMf6TM51GN5\ DATE LOCATION `I' `r . ,:WORK COMPLETED 04/09/09 LA SERENA AT CEBU REPAIRED 2R1-1 04/09/09 I PROMENADE AT CHARDONNAY HILLS I REPAIRED I R1-1 04/09/09 I PROMENADE AT CHENIN CLINET I REPAIRED I R1-1 04/09/09 I MEADOWS PARKWAY AT CASSINIO COURT I REPAIRED I R1-1 & R4-7 04/10/09 I BUTTERFIELD STAGE ROAD AT WOLF STORE ROAD REPAIRED 12 R4-7 04/10/09 I TEMECULA PARKWAY AT MAHLON VAIL REPAIRED I R-26 (A) 04/10/09 I TEMECULA PARLWAU AT OLD TOWN FRONT STREET I REPLACED 13 DELINEATORS 04/10'/09 I RAMSEY COURT AT MARGARITA ROAD I REPAIR I 1 SNS 04/14/09 I BUSINESS PARK DRIVE AT DIAZ ROAD I INSTALL R3-2 04/14/09 I TEMECULA PARKWAY AT OLD TOWN FRONT STREET 04/14/09 DE PORTOLA AT MEADOWS 04/15/09 TEMECULA PARKWAY AT BEDFORD 04/15/09 LA PAZ AT TEMECULA PARKWAY 04/15/09 I LA PAZ AT TEMECULA PARKLWAY 04/15/09 I PERGAMINO AT CALLE RESACA 04/16/09 I E/B TEMECULA PARKWAY AT MARGARITA ROAD 04/16/09 E/B TEMECULA PARKWAY AT CAMINO DEL SOL 04/16/09 E/B TEMECULA PARKWAY AT BUTTERFIELD STAGE RD. 04/16/09 E/B TEMECULA PARKWAY AT BUTTERFIELD STAGE RD. 04/16/09 I E/B TEMECULA PARKWAY AT BUTTERFIELD STAGE RD. 04/16/09 E/B TEMECULA PARKWAY AT BUTTERFIELD STAGE RD. 04/16/09 I E/B TEMECULA PARKWAY AT KEVIN LANE 04/16/09 E/B TEMECULA PARKWAY AT JEDEDIAH SMITH 04/16/09 E/B TEMECULA PARKWAY AT PECHANGA PARKWAY 04/16/09 E/B TEMECULA PARKWAY AT PECHANGA PARKWAY 04/20/09 VALLEJO AT PALMA 04/21/09 28069 DIAZ REPAIR R26 (A) REPAIR RI-1 INSTALL R-26 INSTALL PARK-N-RIDE INSTALL R-26 REPAIR I SNS REPAIR I R-2-55 REPAIR I W3-3 REPAIR I W3-3 REPAIR I R2-55 REPAIR I R3-2 REPAIR I W3-3 REPAIR I W3-3 REPAIR I W3-3 REPAIR I W2-2 & W3-3 REPAIR I W3-3 W1-7 REPAIR I R26 REPLACED -I 3 DELINEATORS R WAINTAIMWKCMPLTMSIGNS\ DATE R'r4r1'\ .y.\ hPi - ~LOCATION~ k 5 'S.. - 1 N i I N I WORKGOMPLETED_.. 04/21/09 JEFFERSON N/0 WINCHESTER REPLACED 1 3 DELINEATORS 04/21/09 MARGARITA AT PAUBA I REPLACED 2 DELINEATORS 04/21/09 MARGARITA AT PIO PICO I REPLACED 2 DELINEATORS 04/21/09 MARGARITA AT PIO PICO REPAIR 1 5 DELINEATORS 04/21/09 OLD TOWN FRONT STREET AT TEMECULA PARKWAY I REPAIR 1 2 DELINEATORS 04/21/09 I RANCHO CALIFORNIA ROAD AT PROMENADE REPLACE 3 DELINEATORS 04/21/09 PAUBA AT VIA RAMI I REPLACE 1 5 DELINEATORS 04/21/09 PAUBA AT VIA RAM[ I REPAIR 5 DELINEATORS 04/21/09 REDHAWK AT OVERLAND TRAIL I REPLACE 2 DELINEATORS 04/22/09 28069 DIAZ I REPAIR I 1 DELINEATOR 04/22/09 I YNEZ AT YNEZ COURT REPAIR 1 R3-2 04/22/09 DEL RIO AT VIA MONTEZUMA REPAIR I SNS WINCHESTER 04/24/09 (CHANGE I HANGE FROM WOODEN POLES TO METAL) REPAIR 6 MISC. SIGNS 04/25/09 JEREZ AT SUNNY MEADOWS I REPAIR I SNS 04/27/09 I MARGARITA AT WINCHESTER REPAIR R4-7 04/27/09 MARGARITA AT WINCHESTER REPAIR R4-7 04/27/09 MARGARITA AT WINCHESTER REPLACED 1 DELINEATOR 04/27/09 OLD TOWN FRONT STREET AT TEMECULA PARKWAY REPAIR R2-26 04/27/09 I MARGARITA AT SOLANA I REPAIR I R4-7 I TOTAL SIGNS R EPLACED 27 TOTAL SIGNS INSTALLED 4 TOTAL SIGNS REPAIRED 45 R:\M AI NTAI N\N' KCMPLI'D\S IG NS\ CITY OF TEMECULA DEPARTMENT OF PUBLIC WORKS ROADS DIVISION STENCILS / STRIPING MONTH OF APRIL, 2009 DATE OC T I . ION y L A a ~ WOR K COMPLETED 04/01/09 I FIRE STATION #73 I I 75 SQ. FT. YELLOW BAR i 04/01/09 I AREA #1 RED CURB I REPAINTED I 1,702 SQ. FT. 04/01/09 I YNEZ AT PROMENADE MALL NO. I REMOVED I I LEDGER 04/02/09 I AREAS #1 & #2 I REPAINTED 5,610 SQ. FT RED CURB 04/06/09 I AREA #2 I REPAINTED I 6,136 SQ. FT RED CURB 04/07/09 I AREA #2 I REPAINTED I 6,103 SQ. FT RED CURB 04/08/09 I AREAS #1 & #2 I REPAINTED I 5,541 SQ. FT RED CURB 04/09/09 I AREA #2 I REPAINTED I 6,529 SQ. FT. RED CURB 04/13/09 I AREA #2 I REPAINTED I 4,525 SQ. FT RED CURB 04/14/09 I AREA #3 I REPAINTED I 2,988 SQ. FT. RED CURB 04/15/09 I AREAS #2 & #3 I REPAINTED I 1,019 SQ. FT. RED CURB 04/16/09 I AREAS #3 & #4 I REPAINTED I 3,638 SQ. FT. RED CURB 04/20/09 I AREAS #4 & #5 I REPAINTED I 2,012 SQ. FT RED CURB 04/21/09 I AREAS 44 & #5 I REPAINTED I 1,998 SQ. FT RED CURB 04/22/09 I AREAS #3, #4, & #5 I REPAINTED I 885 SQ. FT. RED CURB 04/28/09 I RED CURB I REPAINTED 1,377 SQ. FT. RED CURB 04/29/09 I AREA #5 BIKE LANES I REPAINTED I 42 SQ. FT 04/30/09 I AREA #5 BIKE LANES I REPAINTED I 29 SQ. FT. TOTAL NEW & REPAINTED LEGENDS NEW & REPAINTED RED CURB & STRIPING L.F. 72 50,138 RAMAI NTAIN\ W RKCOMPUDWI'R I PI NG PAGE 1 OF 11 CITY OF TEMECULA 511 3120 0 9 CAPITAL IMPROVEMENTS PROJECTS - MONTHLY WORK PROGRESS SHEET %TIME % PROJECT NAME, DESCRIPTION, PROJECT COMPLETE CONTRACT comp.l EER (Est D PROJECT PRIORITY CONTRACTOR & CONTRACT $'s . PAI ( ENGIN bid date) NO PROJECTS UNDER CONSTRUCTION Roripaugh Ranch Fire Station Inc Contractor: Tovey Shultz Construction, 93% 97%W09) i Contract Amount: $3,298,000 de David McBr PW03-01 I Approved Change Orders: $212,71 Account No. 210-165-741 City Property at Diaz Road and Dendy Parkway (Northwest RDA Property)- Rough Grading 100°/ David McBride Complete Contractor Skanska pW06-03 I Fin, Contract Cost$5,948,799.71 tourists Creek Multi Purpose T211 Contractor: IAC Engineer ng, Inc. 14848 308 $1 Jon Salazarl 100%(02/09) 95% r tt PW01-27 I , , Contract Amount: Approved Change Orders N-1 t): $21265709 a Amer A Account NO 210-190-142-58XX Old Town Infrastructure Project -Town Sq-,ce and Mercedes & Main Street r: LH Engineering Contract Amt'. t o Contrac 45839500 $3 g3°% ° David McBride 90%(6109) PW06 07 I , Appfoved Change Orders} $ 218.743 55 (1C & 1E) Account Nos.'. 210-165-636 , 210-165-643 Pechanga parkway Phase II Street Improvements to City Lim is @ Pechanga k way from Temecula Par Marra De 70% ° PW99-1t I Road. Contractor: All American Asphalt / Towel Amer er 80 Attar (Ph II) Contract Amount 58,131 964 98 Account l 210-165-668-58XX Old Town Infrastructure Projects -Parking Structure & Office/Retail Frontage Contractor: pC_ Construction SA 1 David 32% MLBfldei Bill 43°1 (12109) (I D) p (1 D) Conrad r ge Orders 1$368.630.69) Approved Change Chang McAteer Account No. 210-155-644 CURRENT STATUS & PROGRESS The majority of work was completed by April of 2006. The remaining work will be completed when the mainline utilities are installed, which the City is undertaking - start, 2 rlso estimated start in June of /06) will be installed when the Contracto9 re-mobilizes, this Go st is also included de hen approved change order total. This project provided for the rough grading of the vacant city property at Diaz Road and cluding Dandy Parkway. All work was completed ,,amber March 28, 20 tic Site restoration, in eed a prP hydro eedii Councsl at he completed in meeting o 9oog9 maintenance explentses wa ill be the City incurred for NPDES measures until such rime the property is developed. This project will build equestr,an, pedestrian and bike trails between Murrieta Creek and ontract Diaz Road from Rancho Gahote nane to VVinchostr period effective 4/111 9 ongo ng hrough Junete The project is in the 90-day mai 2009. of the Town Square and street improvements 2008 AT storm drain, This project involves construction rch Mercedes & Main Streets. The project was awarded on Ma 16, sewer, and water improvements are complete aid all the roadways are paved. Work is in the Town Square. The redesigned fountain is being constructed. The granite duled for de'iverJ the week of ongoing tiles are being Installed in the fountain and the bowl s sche may ISth. Delays in de ivery of specialty items for the fountain will extend the completion date until June 2009. This project widens Pechanga Pkwy to its ultimate width from Temecula Pkwy to Pechanga Rd. The contractor cmpleted the base paving for the entire project and all o median curbs have been installed. Gapping the pavement is scheduled to begin on May 291 Construction work yet to be done include pavement cap, striping, traffic loops, landscaping and irrigation, and utilities. Completion of the project is scheduled for the end of June 2009. )he Civic retai ruture project site ae well as cons9ructi 9 oand f a pa k, iggstructurer Including office frontage she' Parking Str . The grading for the Civid Center Pad is 100% complete and was turned over space to and aCivic long lent a Contractor O ",col s ie are completes The a storm drain has been North end 418log The site ong the relocated. The third e heated slab concrete placerlent has been completed and the walls and Cenci are now visible above Mercedes Sheet exterior . Structure retaining wall footings is in progress. The excavation of the Parking PAGE 2 OF 11 5113/20N9 CITY OF TEMECULA CAPITAL IMPROVEMENTS PROJECTS -MONTHLY WORK PROGRESS SHEET STATUS & PROGRESS % TIME DESCRIPTION' NAME PROJECT ENGINEER COMPLETE (Est. comp'I PROJECT CONTRACTOR & CONTRACT $'s PROJECT PRIORITY bid date) NO ld Reagan Sports Park Channel Sill Remava & ' Rona Desl n Pontl Malek Sear r William Bgcerral Alin, 0"0 umot : Contracto I Engineering Contract Amount: $315510 ar Odvi PW05-13 Account No. 210-190-107-58XX - pW0647 Ph2 PW06-05 -Old Town cMc Center Contractor Edge Development Contract Amount: I ,555,500 Approved change orders: $A6.156 Account Ne, 210-165-751-SBXX - ula Community Center Expansion Temec company Contractor: Erickson-H84 000.00 chrnr ID Contract Amount:$1. Bill McAleerl 8%(9110) David McBride - William 41% Becerral David McBride Account No. 210-190-197 t Renabilltaiion Project De Portola Road Pavemen (from Jedediah Smith to Margarita) ,ton Salazar' 40% Contractor Hardy & BP r, h a Amer Attar Contract Amount. $ ODD Account No. 210_161-656-58" f CONTRACT PAID 0°7 7°! 32% 1°/0 PW06-10 PWOB-14 Pavement Rehabilitation RSTP`Prpelm nia Road Kendra Hannah- 0% 0% (Ynez to east c ty Limit' - MeistrelllAV{in Contractor: All Amoroso Asphalt Odvlo , - Contract Amt 53,666,00425 2'0-165-657 t No ' . Accoun Signal Installation-Citywide , Bu¢efeltl Stage lf Kendra v h C Tra Rd at Weller Sl) Channel S\ Morales, Inc, . - o Hanna I Con. Christopher 69 unt, $323&9300 Avlln Odvlar pW07.09 I ConjeGI, tract Amo . Account No. 210-165-669-58XX adow$ Pkwy a d ' - Signal instal lotion -C~tywide, Me T[affc r Ken Hannah- 0% at McCabe or 0 es, ' no . Contractor' Cnr stnDher Meistrell I lln Ocilla' A pW07-10 930 I Contract Amount$323. v Account No. 210-165-672-58XX L...~ized Storm Drain Improvements ement of a Fa. ed Storm Drain 100% Emergency Rep ac aroa Road Marg Amer Altar _ Litter pipe Monteleone Contractors pWD9A5 Col Corlett A Amount: $123.618 .16 Account No.. 210-185-7'5-58XX CURRENT m of theWO StorMPm)watander This project Inc odes restoring the Best Manageent Practices (BM oot Park. 401 the Water Quality Management Plan ( Pollution prevention plan (SWP of $1 been been the requirements of RWQCB by deRing the eosin of located near the P of Nationwide dinlg nfiever Certification, b Alteration Ag'Bement, an ded en acquired. Bids s were were Opened on 08126108 and will be awar p FEMA reimbursement funding. city council awarded the contract to th e Old Town civic Center This Project will construct began work on as 4009 begun Site RF1 a d Submittal round Edge Development, Inc. on 09I09I06. Edge complete as well a. the anld strucctural steel fis m fabricator. processing is ongoing - Work currently being framed. The anticipated began on January 13, 2009. The building is completion date of the pro}ect is October 2009. avemeni from Jad t he week of 3116109 rehabilitating De Portola R p and act involves cl. Construction beg This pro} . is is a d federally storm dfundedrain apple work, which reveale roX. 3-week delay due to Margarita Rd -This begin on with potho~ing for undergrounworkns ' set tot phone lines . Contract wor ly comp k resumed on 4(20109 after an aP complete: roadway utility conflicts. Storm drain work is near 5118109. 09 Pre ect will rehabilitate Rancho California Road from Ynez Road to the 25 2limits 009.0 This prot . - the east. The project was awarded 10 12009. Antcipat construction ad sta date his May 20 meeting was held April Road at Welton Street I nal oo Butterfield Stage This project will install a new traffic sig The prefect w Opening was on 03/17109. as awarded to C nstruction meeting was held 0510510 Channel Street. The bud op 9 hristopher R. Morales, Inc. on 0404109. Pre-co Anticipated start date Is August 2009. be Drive. The 0°I The Project was awarded to Chrstopher R. start Morales. 'nc This project will install new traffic sign Wlas meadows 05105109( Ant c paled date is August . bid opening was on ,,1'7109 ion meeting 0% by 04114;09 . P'e-construct 2009. arita Road . jus Tnis project will repla t south of Rancho Vista the tai ad CMP under erg 11 Tce he emergency work commenced on April 29. 2009. It was Road Will an RCPlete by the end of the week of May 2009 substanhalN comp 0% PAGt o - 511312009 SHEE PROGRESS CITY OF TENIECULA PROVEMENTS PROJECTS - MONTHLY WORK STATUS CAPITAL IM CURRENT & PROGRESS Ty TIE PROJECT COMPLETE l ENGINEER (Est, comp) PROJECT NAME, DESCRI CT $'a bid date) PROJECT PRIORITY CONTRACTOR & CONTRA No be La 100% Site Demo➢bon at 45351 ArmIrc ada Place Mayra D Torre Contractor: Veznln$ 8 210 00 P Contract AmoPill 723-SBXX • Gnris white! U"ro Account No. 210-165- Mayne be La - - ,.,do Slurry Seal Prolect, Con'pant Torre - l m nq CoolraoloAmount:$32391717 c' Pw o9-of FOR BIDJ QVERTISED PROJECTSBEING A Chds Cityw varirovemeois vihilelMayra RPa'lrs FY Im 0 sidewa pe ide Concrete ous imP lk, La Torre Removing Ord replacing urh & 9tiiter. but not "mired to. a crass mcmoing, under sidewal orains, s CONTRACT PAID t the NE corner of Satterfield a opened " A.129109. a 2 houses a were op lelion is In eG adcvertised ..plate and and the bids Notice of Comp project consists of the demo d p °rotact Was RoadlRancho Califomla Road. P his Poll 0°7 Workraalo ttlbein09 fled Work on Temeku Hills. Contract to be the p slurry Seal 01 local alias 2009 Pil mee6 g Sol an o% awarded on May 26th, . I) June 2 advertisin95or bid opening o, 2009 • is currently being ouncil meeting C. • Citywide Concrete Repairs Award contract at the June 23, 2009 PW09.03 rive ApD ache . and local depresslon . ULTANTS SIGNED By CONS PROJE BEING DE CTS anes from Pecha 9a to B Kendra 50% Stripe Route 79 South Hannah- 60 % (071091 R, Parkway to 1-t 5 Masao I Avlln Odvlar Consultant JMD 210.00 $29 t pW07-OB . , Amoun - Account No. 210-165-676-58X% rm Cl Improvements - pechanga Parkway Sto vimnmentalMitigation 98°to En Malin) De La 9g°lo Warks Design munity' Torre Consultants'. com unt. $29 640 PW99- 1 Contract Amo d1EM ount No. 210-165-668-5H%X Acc rid0 e and Ove•'and D°ve EAenaon 90% i to Creek B Chris White 1 90% no Daz Rd La from om Comorerce Cente Mal be n consultants ect Des.9 Torre Consultant. Prol t $466940 pw00-26 Contract Amoun 210-'65-602-SBXX l No . ➢ccajn Temecula Parkway (formerly State City is working to meet Caltrans This project will provide tour lanes In ea a ch parkway direction The he I Route 79 Sault)) from -15 to Pechang requirements to do the striping. Creek ClVipo k of Temecula e 1. The wetlan h the construction of new This project includes the construction of new wetl t d ands thro(9 for the Woli a ds will be creae the north bar agencies have 9 bid Improvements-Stag stems. The site 15 loca I'd ln a and irrigation Sy areas). The environm for Sig ,gOpnaturel The co l Creek (within floo d-plainlwaY an' are ready new rrltb9 ation area. My' orate all ofed the Resolution of ffers or Landscape approved this Councl adop docu d improvements ,ant was reviewed anW e e madeVThe CitY~rP ThePropose . ro erties arty e their 11!25108 meetingro peril e p P purchase of the uire the ProP obtain possession of th Diaz Necessity to acq ~r,Tt the City ante Center Drive to lemented Comm Army cannot be ImA of Overland Drive from & WCO' U S . The 90 T he project includes the extension regulatory agencies is required. Road with a bridge over Mllrtieta Creak- Coordination with ecf ns The call has e currency reviewing their o` Engineers and the state en we ar Corps plan comments have been returned to the ante! the consultant for Submitted e proposal for additional scope of work; proposal. 51T~ ~ CITY OF TE M C%JL i f WogK PRO RES-~ ET TS 9R03 EGTS ~ PROGRESS E% CURRENT STATES $ VEM ~ Geep nibe° CAP►Tp'~IMPRO i TiM TE N. - epVe.M meta coonu+n9 he e nfsdln9 [ Id9a I PROJECT COMPLE I CON TRAislC-f Main Street Bnd Gity ar v f ivad GRIPYIO gNG1NEER lEhtd da 1 1 PAID .ect Sim 1 replace tEn9Xtstir9 SWE~ and the with P °ce k r N, wl meenn9 ( issues assoc~ateE Gores° h~'lgcal reef dR NAME DES CT s•s This v- on consultar Wong and coord,nanon PROJECT TOR & CONTRA van 9 crate from the Army ental tec esuom tta g nsultant o PS&E packa e see environm co `~CONTRAG lanvironmeertrtal as perm ap rol°°t rrents or the addressed the e w b sta e PROJECT PRIORITY ases 1 re9'acem ect. GO and are being y N i 87°lo iPh96°!o 1mPi°vement P rot4I2g109, anti's aced the week of an 15 under rev O ualete CfeeF nl - Galtrans on Ga,trans r 2117!0 a ove t Bitd9o Over M 92 161091 rsultant o adfbike bodge ° icn w Main Sireo Engineering in' Salazar) (Phase3) f[om technical the da5ign - foX. 150' P ' ant) rep°iom to o° ded protect' wh IReP'ecem Simon Wor+9 Pmer Attar eeefved of an app was' Ludy IPES} form s ~as 15 eralY Consultant' .$31771 ,9 nsin Contact amount. rpnatru°tipn Thfa 15 a f IronmentalS he n I Codrac. term e,ens~on roject includestheChapafral H.`J pdv to Gd desig Amendment No.. Contract term -thlsP foved Prellmtnm sslo 1 Amendment No 23 $322,305 RCWD weteline) - Gen ndis Creek near n of technical rep°rts PW03 Pans were received from n -05 AmenQmentNo. A'. $24.053 ( docamen[' The a°p1210310 QO%bdesi9 nstr a new NEPA Galtrans f ion Amendment 43 66XX eek of 5111100Under staff review _ uctio d 65-7 s nd are an exte s 0 210- amtl, 70°Jo received from the w of West an aced urt N nta Ge g5./ 16109) anticip 2123109 a ental clearanc ed co ff'ByPass as the southeny Acco d"e' Sa Salazad envifonm Inus ill serve Pmer Attar consultant on vi",61,C0, design, westeriY term c1ed, this Wit Pedes ge Jon roject Involves the aI the Once cons[N ode ay. Geotechnical Creek This P Creek mice pesign 's , fete. Consultant. N°he $132 607s - over Murrieta not, stm Corridor design 1, '0" P to pudsalary bridge ° I Contract Arno of Pulol Stree the e k,rn Bypass '0 the ace, 10-t s5-738.58%% go% on inttiated and - the Redha years. M foethe 2 wu 1 ' pccovat NO' Creek 500/, connecu avon ark sites in over a n mbeaof over tln f nes to four P an a to Do nwt sk etbaU court, u rieta Wlt0am Investigationsh Into Phases roved gecerral P" 1 _ ecl wilt add accent s divided haff court ba ass 6nd9a G ruciion Council S9 . Include parK a seatwal'. and nu- Western BYP Intamation pavlar a' This PfO' the City which unity ConsuftanC TYUN 77620 7 meetlng' menities' Gofnm drawing`' °ontie= r 5378. 480 constraint5.ti,e 2p0nst tRedha s[NCtion Contract w t' $244 a2 pece'be of [he chose ark a wk he con e kw 2 la t pmendment Art,. doge aration of Tem cu Pa APg or PWfp6.04 210^65660-58XX B0% const, dctfon dre ark wirgs ing. and fk, The Prep u Icendrs p accessible at Sunset Pa ~k and ride facilitye being ref rued to cha 9e wed and m p tp,;count No. rovemerts Hannah- 95°t0 tilwo) Ap structure re Y I Parxlm4 roue no. shade nand cnstN 71j /Pdesign drawtn oemg rove roject is ho t Redhawk Design G Meistrelll Ill des.g y n his P currecl ° . nr. $164, 7a Avn Odviar - eat w to Pazo .~QMP port p 1 „onsuuaN RJM This PtOI at l Th _ erly 79 S°uth) This ro ect is Contract Pmo¢ 144-58XX _ (form and resubmitta. is Na. barns. t 210-190- -evisi°n a at the detention Account t easfbou he conti91ration I Prtlp6.06 75% 1' 1 79 5ellin f, ht-turn lanes e nd Ride ( ° g odes the Bill McPteet l 75°to _ oject inc tleeS g~ P °in9 a cula wk a ride ign and GO Ins P' ra, poles. A00% David Mce Pecnan9a Pkw n I tra`f c rig w41 be t Teme ment PPE Vie Iretudes the des & relocation ° , co This ntractor is tf'e 'o of nttaG The City DeaeloP Pkwy to southboua Pkwy rovemen[e Resoiutt r then Design 109085 I Temecula Pkwy at Peorang changa rto Council adopted a plw~ aY de 9 eded nh. as ,e St Ima ee t Gonttact ey 600 Temecula cnang or The P,N06.09 evil ff lete. The Pe 0... the ne Amendm f wa meetin ,6°5-747-56XX are come "Joan fn's wo eQUSre at th t o 9 2->•' - oral to p rIg their t it25106 the f IpccouN NO. nt T„rn tares tram q9°f0 prof of purchasin9he willPropeberty 'Idled. R79S1 process to acqute - PkI0y, no 00 °!o d f ?c9a a Parkway I Matra ne I-a 1 Necessity Terne, cOp'n"nor 5°he Cozad & Fox Torte is acgJ~r=~ Go Tome G, nt, $2g pr 0 Contract Ar^ou 1 paouM No 21pt65-637-58XX _ PW06A 51'IS -1 5S SHEET ClTY QF TE M~plTH~Y W RQGRE S 8, pRpGRESS ROJECTIpRIORITY NO QW06.12 pW08.15 I- pW07AA pW07- 5CS0 {i-a Roete 79 NoM state lautificaticn RBF 17991600 Amount. $ EWPS. $61X10 It C n an the sou ecifi° on PROJECT (Est. comp., pAlo lodes t" d act wi4 ENGINEER bid datel This w act inc It Wee os5, islOAppa design Plans anoatiein9 uPdateda tPe Pro} X Road. aye i0 the Process Onafiza a sin ( prsm Y menu will be detento pv baanue and ial reports bid docu Va9et The erviron"" no specs, the and irrigation ez ians a 95°(° complete. of the P la ` gmpiehoo dents. nstructndsctafgoadbetween vn duPoo La 95°f. bid. docu des+9n and cA 1009 Winchester reviewed an Matra De o "Ito eclwiL e has been authorization Torre funded Pr°i Medians design Packa as pntil the next nnptbegin federaLy he existi09 raisT„e 100 A to Calua for con ~honk David ;ountNa 210-165-638 verCrossi^9 encn VaOeY PalmProvemanis t Pha O 1 (P5&Ei sd lnterchaa9'"ed & Nichol OnsullanT. Mo 861.00 ,mend. N" i $ 632 05BA0 No. d. No. $1 087 300 00 a g 8 amend orginal a9'eemant 4. Notes. , Amend. No' .1 L an. Podson "def "merit amounts levies a ,,e rated sor PW07-0 Account No. 2' 0-165-719.58XX _ OI GYmnasi ,hgec Cons'~tanC Wun A Contract Amounts 8307 590 00 210-. y0-186 Account No Thrs a an ants 0 1 City limits. Itted t eGt c enhance the eastedY will be subm tease of the Poi s~ o t nstruction p - bridge ov 1 (Road and of these revr$1O th s mPIa0l) obtlgafions the co and widening tte .'ants, of 99°t° t Due to funding auxiliary 130"0 -ramp are the comp I 991° -(scat year -to Jetfersorl, an southbound, follows. wnets waliam 051101 Becodvfari 60°t° t Avlin Amer Attar Bill McAteer)' 1p°(° (1?1091 David McBride 00°1° David McBrde 0 _ ~ent Mana9en'¢nt Pre9mm Update sAdan 866955 ~J Gonsuaanf. W 1 g9reement Amount. pW07.11 1 PW00-06 NTS PRQJE`~ CURRENT STATD lion basin. he Pro n TIME CAPITA~IMPRQ EME TE NT9- th side of Santaa9° Road 990/ pMPI-E CO constrection t a a0ons are PROJECT TOR & CONTRRP'C O~ s CpµTRAC Santiago Detention Oas+n Consaltam Kim,t S5250 Contract Pmou 65-66658XX 1. 'm Nc. 210 Accoort 691 124B cad) 001-1FA- 5g58Xx sU'nt ele, tl 2tG16~ Assessment D' ciates E DE~i Va'seY - vans & Ass 8 o t 'Nsco'as awd 120 900 10 ConsuOa~f punt Cogtracl Am 65-502-Wit Account in 210 ft¢ndra Hannah Meistrel{ I IAVIIn Odviar i Am¢r Altai d off-Ram, Winches status is a Estimate. wilt) o A southboun Greek at the rk. and contirue`9 S nations, s entudis desig nso) , Speclh Santa GiFY continued th 95% p ,cation. Discussions are Phase t is oreparir9, limits of dad for th's Phase. > 9S&E - Ciry blish'n9 etric Excepeon Es~. Phase ^work . mPlete. eta, Cafuans. an > Right of W arcels wM1h roved Ms s ad. with %A'd.'. trmittal. PPE are co ores PS&E su `oi affected P nits - Cafuans APPW*0 select xistln9uteities concePtwa Struct sc Draft thetlcs tad into > DeclaraC~ Pothole 01 e elAes ncotpora firstdraft 61°f° > U611frer > Conceptual La, Se mn6 uon Was' IBC concurrence. sium hibit fot . J 5VI,, kee109I reParin9 ex 9 000 square too desst 9Y9 n scenarios re-merit - City P-talY is Murr'eta ether. ce A9 the aPPr°xim ~ still working area for the plood > Mafnienan of tless9n Street. WLC staging G°.rnty Th m Rive u ae Jthe Craek is wolecis o` & G rls Club ThePu. I land is to be utacq tired fro Staff. 111 need t° be availab'~ anuary 27, adlacent the BoY Club lan Boys and Gsds rdieat and It wThe m'd w111 not eating was held on rovements p with the current design. n com Dee s Gree k ImRGPG) for tuai desig p for the ye3 . AconceP ram (PM) staff feted . d GontroC ant Prog ect is co Manatt mp is being reviewe Proj oY 's Pavement ed sad 2009. the wy been subm, it oa•.e 2 on has 90°t° PJsP rep This 00 pr &2013 )Via . ~cornplelin9 971° and'o"3dor. i e 010 of cen ee e ibilliy uncnProved p roved all 8 06 8 CiD en an the Council aP OtY ments 1012 a t d1f~ et The . G'tY ne'd 1 s rov ea, was J ect wiV snug Ystorm rain imp pad) a-ea l and Associate atth e d Lieter R vid EVans street imp the street and'I Va1leY ( n with Da esign 0f tae withir Nicona ement desig ror [he d lans and estimate. - streets Tha kick off meeting °ro 0 Th's "'o, Y5% fps the stteti09 adng 60 , ncime, consult Prep on 1211?i06. TEN►EG11LA RY PROGRESS SNE- G pJE Ts . MpIdTNEY WG pRppRESS & MENTS PR CURREN T STATUS - 1200 off L I~PRpVE ° TIME °J° T ado & ptoremans dmoesign k c into GAPITA PRpdECT E5 comp C PAID SCl - a mg stalls or thi 9 city. provide 70100 P r ryow parking rave withthe tions are comp t` is also SCRIPTION, ENGINEER bid date) +his Proleot wi'1 library a, "a've l agree manptgeotechn,cal nvesti a outs. Ste t ha oe CONTRACT S's _ at of the exio -r` the surveying inary alternative y p 1 do, City with U-ree Prelim lot. The des'9n for this ~r OJECT NAME, l CONTRACTOR & of the Parkingheld on 1 ll In, . k+ng T pRlpRl'Ty meeting was vided Lhe the ex+stin9 pal NO 0°1° Tne consultant P;o of extending "em funcleta viol aPrin9s R PROJEC 15°t te31o9) look+ng a," e op of Bterlield skage ad 3Gonal. els ntly. staff ibta'Y Addl4o Hanal Fo "an Annual On Amer Attar I bee ended. g , n susR f '''.etting the Fire nr Fardl h issues with th R ti q1e Rodpauwd mount 566 Bast constructioRoad0nd g roes,,,, ll & Purchase Authonzat,on 2W se i include 1 South Loop Well aso of . phase nt is on hold Thou ~ c .ulla ched. X01 con A ChaPohe aid packa9a n an d - AUlhoriza' to Gallo esign lem ent is Ba 1 Pu",r'ase SaXX ' .,s working on e done b a sed i~ - pW08.OT 210-165-5aB- i"- Vyork to bm IACCOUnt No. 0°J° Phase 1. liens are sresolved an phase 0°/ GFD No. 03-02 v ea Oe La - funds to Mayr is o , IRoriPau9nRanch SYeei d ~,Iaila Attar road a Butter50 OEA) pity is the antes`' road. Floss stNCtion o AssoQates l - complete. f 1 Evans & are 90°t belore constrbct+n9 plans 8 the paNd Iced asin 2 CitYAPPrOVaI o 1 Amount - ) ,fans and so osiled vton the b - t is finaFZeo. y PW09•02 - silt dePOS around tre rolactis scheduied for the Ma 1 coMracl ultan Zjp1OXX BY STAFF axcess determination ocations - NED NIA hold Until FEM e v 26 200 ~ Will strip soi neeniGDESIG 0! cdbiddduathe Y ram i is sche led for Ma OJECTS gEiN Access Road This annual frog authonZation to 1 aid opening p Cant°n Detention basin - specifications a,noting- _ ro~ected ~on9 2009, Gnuncil m ate P accomm.,eal studies a, I cnrisw e° 1 ` Mayra p, L LZ a 79 goutP tnterchar9e m to _ eometrics, teclln I pWp4A7 l progra FY 2eo9-10 Torre the 1-151 SR o, design 9 triw111 modify Mont This prolac continued are as SractoPmounc. luture Watfic. pf outsiandin9 items Y 20 . ved Jul l vaU . reports Status o view PLANNING STAG 1 Under Galirans fa ieltrs revieof A~ep m o ~ ~dent S IN THE >Project Re0o al net-Under naiion „r noon Fact Sh fNWApeterm vironmerta PRQ~ EG > SuPRlem al , oval of the FinaylEans re 1 oWProlo Re d. -1575R 795 UIt'mate mteronan9a l co„sun'n9 95°J° > Modified ending d s . Under C Awaiting p o0 aPP'ova Project Repod(PR} $32594 051091 pnal approval royal Draw,nent - ew Consultant'. o," 98, 19600 pvfin Odvharl 95°b ( > Geom,los APP mental Ds revs conVact An No. 1342600 Amer Attar > final EnvironisUm finder Cawarns Amendme G tie Cost Analy vdork Auth- No. 2 Extra , 11,732-00 >Life Y Work Auth. No . 3 1B 42B001 Extra wool A NO. a 5032001 + p6-08 1 tExt a vger Ante Na c. 2A.140 0aid witn Uwsed' ' PW (Extra W otk AUih 4, and 5 wt" be Note: EtNA tl 3, - podron of Amend No. 1A000Unt NO. 210-1654-662-6BXX I CITY OF TEMECULA PROJECT PRIORITY NO P W 02-11 CAPITAL IMPROVEMENTS PROJECTS - MONTHLY WORK PROGRESS SHEET % TIME PROJECT NAME, DESCRIPTION, PROJECT COMPLETE CONTR% ACT CURRENT STATUS & PROGRESS CONTRACTOR & CONTRACT $'s ENGINEER (Est. comp./ PAID bid date) French Valley Parkway / Interstate 15 Over-Crossing and Interchange Improvements (PA & ED) Consultant: Moffatt & Nichol Agreement Amount: 51,091,693.00 Amend. No. 1: 202,652 40' Amend. No. 2: 21,630.00 CCO No. 1: 25.000.00 CCO No. 2: 8,000.00 CCO No. 3: 18,008.00 CCO No. 4: 11.320.00 CCO No. 5: 37,645.00 Amend. No. 3: 283,982.52 Amend. No. 4: See PW07-04 Amend. No. 5: 169,000.00 Amend. No. & 110,917.00 Amend. No. T 14,573.36 Amend. No. 8 See PW07-04 Amend. No.9 100,000.00 Notes. > Amend. No. 1 also apples to PW07-04. See PW07 -04 for add'I apport ionment. Account No. 210-165-677-58XX William Became/Avlin 90%(11109) Coll Amer Attar PAGE 7 OF 11 5/13/2009 This project will construct an interchange between Winchester Road Interchange and the 1 -15/1-215 split. City continued development of the Project Report and Environmental Document. Status is as follows: > Draft Project Report - Approved June 2006. > Project Report - Final preparation pending approval of Environmental Doc. > Draft Environmental Document - Public circulation/review 04/22/09 - 05/22/09. > New Connection Report (NCR) - Letter of Acceptability received in July 2008. > Traffic Operations Analysis -Approved 02/05/08. > Exception to 20-yr Traffic Design - Approved 12117/07 > Stormwater Data Report - City revising per Caltrans comments. > Mandatory Design Exceptions - Approved 07/18/06. > Advisory Design Exceptions - Approved 07/18/06. 88% > Exception to Ramp Metering Policy - Approved 07/05/06. > Geometric Approval Drawings - Approved 07/18/06. > Revised Geometric Approval Drawings - Approved 01/11/08. > Storm Drain Study - Approved 03/21/08. > Floodplain and Scour Analysis Report - Approved Oct 2008. Other > Declaration of Units - Request for Metric Exception denied by Caltrans. > Freeway Agreements - Execution pending approval of the Project Report. > Risk Management Plan - Updating as necessary > Project Charter - list draft is under Caltrans review > Maintenance Agreement - Preparing 1st submittal for Ca trans review. > Financial Plan - Updating as necessary. Temecula Creek Crossing - Access to Highway 79 South (Temecula Parkway) Bridge Alignment Study- Avenida de Missions over Kendra PW08-03 II Temecula Creek Hannah- 100% Consultant: Nolte Associates, Inc Meistrell/Avlin Contract Amount $87,923.00 Odviar Account No. 210-165-677-58XX Santa Gertrudis Creek Pedestrian/Bicycle Trail Extension and Interconnect Alignment Study. Design & Environmental Clearance Kendra PW08-04 II Consultant: Hall & Foreman, Inc Hannah- 30%(07109) Contract Amount. $246 865.00 Meistrell l , Avlin Odviar Account No. 210-165-739-58XX The project consists of performing an alignment study to set a specific horizontal and vertical alignment for an extension of Avenida de Missions southerly to gain vehicular access to Loma Linda Road, including a bridge crossing over Temecula Creek. Final 100% engineering report is complete. Project is pending allocation of funds for design. The project will provide a C ass bicycle trail that connects the existing Santa Gertrudis Creek Pedestrian/Bicycle Trail at Ynez Road to the Murrieta Creek Multi-Purpose Trail at 15% Diaz Road. The City Counci approved an agreement with Ha I & Foreman at the 11/25/08 meeting. The kick off meeting was held on 01/08/09. The alignment study has been completed. Extension of time for the Bicycle Transportat on Account funds was approved 05/01/09. At gnment is being se ected and design will begin mid-May CITY OF TEMECULA PAGE 8 OF 11 CAPITAL IMPROVEMENTS PROJECTS - MONTHLY WORK PROGRESS SHEET 5/1 312 00 9 PROJECT PRIORITY PROJECT NAME, DESCRIPTION, PROJECT % TIME % COMPLETE NO CONTRACTOR & CONTRACT $'s ENGINEER CONTR ACT CURRENT STATUS 8 PROGRESS (Est. comp./ PAID bid date) PROJECTS WAITING IN THE WINGS Butterfield Stage Road - Roripaugh CFD This includes planning for the construction of the City Council approved Roripaugh Ranch Mayra De La CFD No. 03-02 Street Improvements. Regulatory agencies are on board with City III Torre/ Amer ) NIA proceeding with specific road improvements. The research for (a) dry utility designs, (b) Attar plan status and (c) Pay requests review is on-going. City Attorney is working on lien/settlement analysis. Branched out "Phase I" of this project to PW09-02. PW00.29 II Citywide Master Drainage Plan ~~~??779 ) Postponed. Multi-Trails System - Margarita Road Under Crossing This project will construct a trail for bicycles and pedestrians along Santa Gertrudis Creek Consultant: LAN Engineering Contract Amount: $114 426 00 William under Margarita Road. Data regarding existing utilities are being incorporated into the PW04-13 . . I Becerra 100% 100% design. RCFC has provided an Encroachment Permit. Plans & Specs are complete. This project cannot be constructed until adequate funds are identified. An application was submitted for State Bicycle Transportation Account (BTA) funds on 12/1/06. Sam Hicks Monument Park Playground Rep acement This project will replace the playground at Sam Hicks Monument Park to comp y with new PW06-16 0% N/A standards. The funding for this project is through Community Development Block Grant. Funding for this project has been reallocated to a future fiscal year Auxiliary Lanes on I-15 in Temecula A feasibility study will be conducted to determine if auxiliary lanes can be added between on and off ramps on 1-15 in Temecula to improve the freeway operation. An RFP to PW06-17 I Amer Attar conduct the study was published on the City's website on 02/14/07 Proposals were received on 03/16/07. The City reviewed the proposals and selected a consultant. Due to funding constraints, this project is being delayed until Fiscal Year 2009/ 2010. RIGHT OF WAY RELATED PROJECTS PW02-11 French Valley Parkway/ 1-15 Dvercrossing and I William The review appraisal is complete. Caltrans has approved the appraise s. The City Council Interchange. Project Report (PR) Becerral Amer N/A N/A . is scheduled to review this matter in Closed Session on May 26, 2009. Attar Butterfield Stage Road - Roripaugh CFD Met with all but three property owners to discuss their property concerns. Prepared a CFD 03-02 Project Description: Research to create a bid package (i.e., Plans and Specs) to construct specific Mayra De La Torre/ Amer matrix addressing owner issues/concerns to resent to City staff Work to clear all issues mprovements (BSR, MHSR, fire station, etc.) Attar related to the properties within Phase 1 of the project continues. Contractor: N/A; Contract: N/A Diaz Realignment Jon Salazar/ All required right-of-way documents have been recorded with the Count consultant PW 95-27 1 Amer Attar surveyor is in the process of recording the Record of Survey, which will complete the process Pechanga Parkway (right turn lanes) Purchase & Sale Agreement was sent to the property owner. He has not accepted the City's offer City Council adopted the Resolution of Necessity at the 11/25/08 meeting. A PW 06-11 Amer Attar check was prepared for court deposit to file eminent domain lawsuit. Lawsuit was filed in mid February The property owner has just presented the City w th a counter offer The City responded to the counter offer and awaiting the owner's response. CITY OF TEMECULA PAGE 9 OF 11 CAPITAL IMPROVEMENTS PROJECTS - MONTHLY WORK PROGRESS SHEET 5/13/2009 % TIME % PROJECT PRIORITY PROJECT NAME, DESCRIPTION, PROJECT COMPLETE NO ' CONTR ACT CURRENT STATUS & PROGRESS CONTRACTOR & CONTRACT $ s ENGINEER (Est. comp./ PAID bid date) Pechanga Parkway (mitigation land) Purchase & Sale Agreement was sent to the property owner. He has not accepted the City's offer. City Council has adopted the Resolution of Necessity at the 11/25/08 meeting. PW 99-11 Amer Attar A check was prepared for court deposit for eminent domain lawsuit. Lawsuit was filed in ' mid February The property owner has just presented the City with a counter offer. The City responded to the counter offer and awaiting the owner's response. Surplus Land Diaz Road Realignment Staff met with Outdoor Channel. City Council approved the counter offer Purchase and Sale Agreement was prepared by City and it was presented to the buyer The agreement Amer Attar has been agreed upon by the City and the buyer. It will be given to the buyer, along with the new exhibit for signature. Once signed , it will be taken to the City Council for approval of the sale. Riverside County Flood Control Parcels-Old Town Staff received Purchase Agreements from RCFC to purchase portions of six parcels. City met with Flood Control in January and asked for updated values. RCFC will revise their Beryl offers based on current sales comps. Staff is also working with RCFC to finalize the Yasinosky/ Amer Attar Purchase & Sale Agreement. RCFC requested that the City quitclaim a channel easement for another parcel (APN 922-035-024) and for City to accept the Declaration of Dedication. This matter was approved by the City Council at the 2/24109 meeting. Santa Gertrud s Ped. Bridge The City Council approved the Purchase and Sale Agreement with Rancho California PW07-05 Amer Attar Water District (RCWD) at the 10/14/08 meeting. Escrow has been opened. We received the estimated settlement statement from escrow on 1212/08. Escrow has closed and the City received the Final Settlement Statement. PW06-12 Santiago Detention Basin Amer Attar Appraisal is ready to be finalized but has been put on hold. Murrieta Creek Bridge and Overland Drive Extension To initiate this right of way work, seven title reports were ordered on 12/2/08. Canso tant is PW00-26 Amer Attar in the process of preparing Iegals/plats. Staff provided estimates for doing the appraisals of the affected properties to the Director of Public Works. Once these estimates are approved, the appraisal process can proceed. Policy re- Site Assessments Amer Attar Editing Site Assessment policy Miscellaneous Right of Way Related Items Amer Attar On-going review of Caltrans procedures; working on draft of Relocation handout required by law western Bypass Bridge Over Murrieta Creek Will Becerral City needs to accept the Offer of Dedication that was not accepted by County on Parcel PW06-04 I Beryl Map PM 8248, which was recorded on 2115/1977 Up to Twelve Iegals and plats will be Yasinosky/ prepared by the consultant. Once Iegals/p ats are received, the City will obtain appraisals. Amer Attar SPECIAL AND MISCELLANEOUS PROJECTS Ronpaugh Ranch CFO Staff reviewed the submitted Reimbursement Request for the two bridges. Comments CFO 03-02 Annie e NIA Lel Amer tr Attar were provided to Ashby USA representatives. Meetings are being held w th the developer seeking these reimbursements to finalize the numbers CFD 01-02 Harveston CFD Amer Attar NIA No activities dur ng the last period CFD 03-06 Harveston CFD Amer Attar NIA N/A No activities dur ng the last period. PROJECT PRIORITY NO CFD 03-01 CFD 03-03 CITY OF TEMECULA PAGE 10 OF 11 CAPITAL IMPROVEMENTS PROJECTS - MONTHLY WORK PROGRESS SHEET 5/13/2009 % TIME PROJECT NAME, DESCRIPTION, PROJECT COMPLETE CONTR% ACT CURRENT STATUS & PROGRESS CONTRACTOR & CONTRACT $'s ENGINEER (Est. comp./ PAID bid date) Crown Hill CFD Amer Attar N/A Wolf Creek BED Amer Attar N/A CFD 02-08 Serena Hills CFD Amer Attar NIA Quarterly Review - Tracking, preparing, and Various processing Federal, State and TUMF Funds Julie Dauer On-going Reimbursements Contract Administration Various Julie Dauer On- going Munieta Creek Multi Purpose Trail PWOt-27 I Julie Dauer NIA Surface Transportation Program (STE) - De Pouola PV/0&10 I Road Pavement Rehab itation Julie Dauer N/A Highway Bridge Replacement & Rehabilitation PW03-05 I Program (HBRR) - Main Street Bridge Julie Dauer N/A SR25- Safe Routes to School Program - PoolBicyde Br age over Santa Gertrudis Creek to Chaparral Hig PWOS-11 I Julie Dauer NIA Transponation Uniform Mitigation Fee (TUMF) Various Julie Dauer N/A TE -Transportation Enhancement Winchester Henr tale Route 79 North Corridor PW06-15 I Beautificat on Projec Julie Dauer NIA N/A During the last period, the developer submitted reimbursement request for the retention. Met with Tony Louka, Caltrans Environmental Engineering, Adam Smith, Standard Pacific, along with Matt Peters (city Planner) and Steve Beswick (Pechanga Parkway Project Manager). The meeting was to review the walls along the Wolf Creek Development. Standard Pacific is to raise them to 8' To satisfy the Federal requirements, Call will need a letter from the City for some of the open area that provide access from the trail to NIA the development. Standard Pacific is to survey adjacent property owners to see if they are OK with the openings or if they want these openings closed. The City s letter would notify Caltrans with the results and what action the City would take based on these resu is. A letter from the City to Standard Pacific detailing the wall requirements was sent on 01/06109, N/A No activities during the last period. NIA Various Projects. On-going review of OF project contracts, amendments, extra work authorizations & N/A change orders and maintaining budget accounts. Providing assistance to staff in processing invoices for all CIP division projects. N/A Project is currently in construction phase. Continue to process reimbursement requests for Caltrans submittal and approval. NIA Contract has been awarded. Federal funding reimbursement requests will be submitted to Caltrans as project progresses. $458,990 STP funds New PES form updated and submitted to Caltrans, Environmental Division to obtain NIA environmental clearances & approval to proceed with final design processes. Total HBRR funds $3,920,000. Received December 2, 2008 the approval of our PES document. Prior to obtaining the N/A Categorical Exclusion we shall provide Caltrans various technical studies. SR2S funding has been awarded in the amount of $425,520. In addition to SR25 funding we have been awarded $132,000 in SB821 funding. Quarter Ended 12131/08 - TUMF reimbursement requests to be prepared for submittal to N/A WRCOG & RCTC. Meeting with WRCOG to clear up outstanding progress billings and review of processes for future reimbursement requests. Letter to follow from City to WRCOG in summary of meeting minutes. Program funding is scheduled for FY2009-2010. Environmental clearance has been approved and project is slated for construction in the next fiscal year Currently in process NIA of preparing our Request for Allocation' through the CTC and also our RFA package to Caltrans for Authorization to Proceed with Construction' Total funds awarded per TE Funding adjustments $1,133,000. 5f1 TEMECUI A WORK PROGRESS SNEET TS PRGJ OF TS MONTHLY & PRD~RESS - T sTATUs I CURREN bursemen funds. E PI-ti furdfn9 CAPITA~IMPRO VEMEN 71M TRACT federal r50 Samfament°' Total COMPLETE CONt51 ~enditures foCameos, ErRjG VEER (Epl date 1 Cft1PT10N, I ;L; OJECT DEOMTR ACT PRIORITY CONT--^ µ1A NO 1 rovaments Julie Dauer pecrarga porkwaY pn s F Jnderdet +mP ;m Land &Hi9hwaY NIA ~ pub' PW99-it 1 (phase lfl Bond Re{eases 1 '(ranspoda9on AccO~^t Various 'p006f078'cYde BicYo1eTrai~Eztenswr. an stk F"ds Creke Soria Gadrudls 1 Interconnect the for all PWDSA4 _ - - Standardize format of the SPeG~`caGOns pralects Circeiat'°n ElemantlmPleme~n l~ I 1 pp1O strucholl sts to r ' `evieW relmborsement Taco GoOt~ and submit _ A the Prepare a scheduled fo e. on (CW 1 ect NiA is 54,000,000. Oct bonds Work Agree n Tien of prol ow PTO, GooReratfv allow for the con 00610Y Gontlouad review f G Council for the e0 not 0nI for this PfOe BT GitV of $395 ACC NIA toyed by the original ag and total award Resolution app terms of consultant 1 To,eerin9 f 1 G`NA w+p extend the award of & preliminary sec Implementation and the Lanni f00,06 in APri12009. boiler-plate . roved for the be app dated and d NIA funds app ated updat„loand ami sended re of 'be s GWA were update Is art'ft 6ouousfy being ral Sp?0ifRoadns we eification - dry ,s con Fede Road. A'1 P led. NIA Julie Dauer On-going pavid McBride N!A Amer Attar 1 ~ effect As-Bug, GOndirons'or A11 Update Plans to R Recent Pralecis ifs re0i°~yed and upda GaLfor d Rancho r(ent Circulation 1 is also being , De- portola 30 - so that theeUdatabase is to entry into the 6a aerial mapping are µIA standard+zed °r . ' De- to 2009- dif, al, future P~ ects glediei`c d. tes Prep 'ling stage of thine update' ding On-going On-going N(A Z?????Z? Z7 ' ~nt Selecton - :onsu us t Galdamia goal Julie Dauer Rancho n' vario ant Rehabil,tatio forma Road o Ca m f Ranch tgtP1-) firadono Stage ROatl eutter4+ed ent Dauer m ad t W66.14 ju110 vem S ste o 1 Pa Ro Strom Ynaz SY^Cr "Onsanon tNetra'`+c pt da P s1z ,or4dors lemenla^a city ti9, ,'„de T[afhc install & ,n1P along stem Purci,as cnronizanon sY n 1 s,gna' sY city . the TBO _wimp o iden + is tully `t+on, , cost estlma thering tile repo a e availabitity and th Shin protect General P'an Von Ica and E'em ietteof the tasKs °f Veld anonG IS to automate lh comPleted. Tny 1twofork with "%dons for various °oh,ple. w al+been CIP staff co rotect s B µ1A have complete. ma deed w,th A forted to ire P time of i ect is 4o trans of done at the of the informanm many'onfrasthave never beenI it we -f TO s n City some of these As-Bunt condition t rove`'`s' receives blue P d for alt recen P re being mYlars a create tjst. Informal+on Projects. lens will b As.suf4 PI Coosu+t d responses ar NIA ' anl Selection how to the list an submission. created for our be Placed 0' database wa ebsite on ved. k. STP~fundir29 2009, AS Access the City s w s they are recel Oke titer a se at or w for Jan NI vary . scheduled ` avail in o the comp o the construct+on phase I A enteO red rove t0 bid. Bid Opening is _ Gal trans, Local eci Is cod P Y out Program ITLSPI 1 52,9560D0. Pro', ro e°hrori,zaUOn ended. J Light sY been susp NIA 515 000 ~n Trams nave cnrrentiY been awarded SfOr these P 9 - City has NIA Disbursements fiundln9 - POLICE CHIEF'S REPORT City of Temecula May 28, 2009 Public/Traffic Safety Commission 43200 Business Park Drive Temecula, CA 92590 Ref: Public/Traffic Safety Commission Traffic Division Activities/Events Below please find the Traffic Division activities for the month of April 2009. These activities include the following: • Citation statistics (attachment) • SLAP update • School zone report • Community Action Patrol supported call-outs: Homicide- Hwy 79 x Woodchuck Rd. Officer Involved Shooting- Pauba x Deportola. Community Action Patrol activity / patrol hours: 693. (YTD: 9954 hrs.) Special events for April • Radar Trailer Deployment - Paseo Del Sol HOA Safety Fair Carry The Cross Walk- Good Friday Margarita Rd x San Fermin N. General Kearney x Nicolas Winchester Rd x Promenade Mall Wolf Creek x Lyon Lane If you have any questions regarding this package, please do not hesitate to call me at the Temecula Police Department - (951) 696- 3042 Sincerely, Sergeant Mark Leggett Temecula Police Department Traffic Division April, 2009 Citations Total 1969 Hazardous Citations 1194 Non-Hazardous Citations 548 S.L.A.P. / Intersection 202 N.E.T. Citations 141 Parking Citations 227 School Zones 49 Seatbelts 56 Community Presentations 0 Traffic Collisions . Non-Injury 60 Injury - Complaint of Pain 20 Injury 0 Fatal 0 Total 80 D.U.1. Arrests D.U.I. Arrests 31 Cell Phone Cites Total cell phone cites 119 (23123 & 23124 CVC) 30755-A Auld Road, Murrieta, CA 92563 (951) 696-3004 To: Lt. Kubel Cc: Sgt. Leggett Fm: Marianna Davis, Crime Analyst Date: May 7, 2009 Re: Part 1 Crime for the City of Temecula April 1 - 30 2009 In response to your request to provide information in regards to Part 1 Crimes for the above time frame, I found the following: Part 1 Calls for Service Total part 1 calls for Temecula: 205 1 CRIME TOTAL Arson 1 Assaults 17 Burglary 76 Larceny Theft 79 Murder 0 Rape 2 Robbery 6 Veh Theft 24 Grand Total 205 Total Part 1 Calls For Service - By Zones ZONE 14% If you need any additional assistance in regards to this request, please do not hesitate to ask. Thanks. TEMECULA POLICE DEPARTMENT TRAFFIC DIVISION RADAR TRAILER DEPLOYMENT 2009 Januarv Primarv Street Denlovment Number Date Radar Trailer x Cross Street Duration Vehicle 01/05 No. 3 Vail Ranch Pkwy x Sunbeam 4 days 11,931 01105 No. 2 Jefferson Ave x Calle Cortez 4 days 40 01/12 No. 3 Jefferson Ave x Calle Cortez 2 days 15,058 01/26 No. 3 Winchester Rd x Nicolas 2 days 17,775 Februarv 2/02 No. 3 Winchester Rd x Ynez 2 days 15,891 2/02 No. 2 Ynez Rd x DLR Driver 2 days 9,436 2/23 No. 3 Pechanga Parkway x Via Consuelo 2 days 21,041 March 3/2 No. 3 Winchester Rd x Ynez 3 days 26,970 3/9 No. 2 Via La Colorada x San Dimas 7 days 3,301 3111 No. 3 Via Cordoba x Corte Christina 5 days 12,976 3/23 No. 3 Temecula Parkway x Country Glen 2 days 16,743 3130 No. 3 Winchester Rd x Promenade Mall 3 days 14,400 April 4/6 No.3 Margarita Rd x San Fermin 2 days 16,614 4/13 No.2 N. General Kearney x Nicloas Rd 2 days 2,761 4/20 No.3 Winchester Rd x Promenade Mall 4 days 39,941 4/27 No.3 Wolf Creek x Lyon Lane 2 days 4,207 FIRE CHIEF'S REPORT Responses Temecula Emergency April 2009 a ■ 3.05% 00.00% ■ 1.31 % 80.00% - ~ u0.65% S10.68% - 4% ■ Com Fire ■ False Alarm OFMS ■ Haz Mat ® Medical ■ Multi-Family Dwelling ■ Other Fire ❑ Other Misc ■ PSA ® Res Fire ❑Traffic Collision ■Vehicle Fire m Wildland Fire w, . v_ - Riverside County Fire Department/ CAL FIRE Emergency Incident Statistics John R. Hawkins Fire Chief 5/14/2009 Report Provided By: Riverside County Fire Department Communications and Technology Division GIS Section Incidents Reported for the month of April,2009 and Jurisdiction Agency CATMC Com Tire raise Alarm FMS Kaz Mat Medical other fire pSA Traffic Collision Vehicle Fire Wildiand Fire +5 Minutes 76 s Reported for themonth of April,2009 ana 'jut Incident i 2 2 .494 0 4% ■ Cam Fire 0 1 False Alavm 0296 • FMS 2 0.4% ■ Haz Mat 333 72.6% Medical 8 1.30,6 Other fire 14 31% ■ PSA 49 10.6° Twetic Collision 3 0.7% ~Vetvicle fire 1 D_2% is Wildland five 468 10o.o% Total: 2 49 1 2 333 6 14 48 3 1 Response Time Total o/o p to 5 min # Average 80.2% Maximum 459 +10 Minutes f20 Minutes Minimum 28.0 3.9 1.0 1 14 * *Incident Total: page 2of4 Cwt f astm --0 atanm 0 0 0 5 R p 0 0 0 ~ {t 0 0 ~ CitY of Ta neuula g~ttan 0 0 p Pachariga 1 0 1 fl 0 p Station Total 3 0 1 0 0 p 1 0 0 0 City of Temewla 3 0 gtatton 1 0 + Peahan>'ta # 2 U + 0 t Station Total + 0 t 4 14 t t 0 42 6 0 4 6 • ' 0 13 14 1 0 City of Temecula 42 g~tton 12 0 0 0 TemQCOla 0 l3 1 g p 3 station-Total .112 2 1 0 22 0 18 p 1 3 C;tyaSTernecula 112 Z Station 73 0 1 0 Ranctto 22 1 0 tarnla i p ,all 0 ion Total 7 p a a p o u 0 0 C+w of'[emeUts 7 0 Bretton 83 0 0 From,-valley 0 Station Total 1 10 0 1 city of Temecula Station 0 1 Patkytew 1 10 Station Total l mmmw~ * *lLneldent Total. Creek City of Temecula Grand Total rom Fire False Alarm City of Temecula 0 4 C!mlinn 1WRI { 0 4 0 0 82 4 3 8 0 0 0 62 4 3 8 0 1 Incidents by 3urisdiction Com Fire False FMS Haz Mat Medical Other Fire PSA Traffic Vehicle Fire Wildland Collision Fire Alarm 333 6 14 48 3 1 2 48 1 2 14 48 3 1 1 2 333 6 2 49 Incidents by Supervisorial District - Summary District 3 JEFF STONE Grand Total Com Fire False FMS Haz Mat Medical Other Fire PSA Traffic Vehicle Fire Wildland Collision Fire Alarm 333 6 14 48 3 1 2 49 1 2 3 1 2 49 1 2 333 6 14 48 Page 4 of 4 **Incident Total: 4! i..,a-A& outside of Riverside Unit Calls. Before, During and After a Wildfire Q i r What to do BEFORE a wildland fire: • Create defensible space to separate your home from flammable vegetation and materials (minimum 100ft PRC 4291). • Adhere to all local fire and building codes M 31 and weed abatement ordinances. i • Keep all trees and shrub limbs trimmed I so they do not come into contact with electrical wires or overhang your chimney. (Do not trim around live power lines yourself, call a professional). • Prune all lower branches 8 feet from the ground. • Keep trees adjacent to buildings free of dead or dying branches. • Stack firewood away from your home and other buildings. (Keep clearance around your piles). • Keep roof surfaces clear of pine needles, leaves and debris at all times. • Install spark arresters for each chimney (PRC 4291). ■ Clean chimneys and check and maintain spark arresters twice a year. • Keep rain gutters clear of debris at all times. • Use approved fire resistant materials when building, renovating or retrofitting structures. • Install electrical lines underground if possible. ■ Be sure your house numbers show clearly from the street, both day and night. • Store combustible or flammable materials in approved containers. • Store all important papers in a fireproof container or keep copies at another location. • Make evacuation plans with family members. Include several options with an outside meeting place and contact person. Practice regularly. ■ Keep battery operated radios and flashlights with additional fresh batteries on hand. What to do DURING a wildland fire: • Turn on a battery operated radio to get latest C emergency information. • If you have a ladder, prop it against the house so you and firefighters have access to roof. o• • If hoses and adequate water are available set them up. Fill buckets with water. • Remove combustible materials from the area surrounding your house. (Lawnchairs, tables, etc.) • Turn a light on in each room for visibility in case of smoke. • Close all doors and windows, but do not lock them. • Open or take down flammable drape and curtains. • Close all venetian blinds and non-flammable window coverings. • Move upholstered furniture away from windows and sliding glass doors. • Be ready to evacuate all family members and pets when requested to do so. • Turn off air conditioning/air circulation systems. • Detach electrical garage doors. Back in your car and leave the keys in the ignition. ■ Secure your pets if possible. What to do AFTER a wildland fire: • Check with fire officials before attempting to return t • Use caution when re-entering a burned area - flare-ups can occur. ■ Check grounds for hot spots smoldering stumps and vegetation. Use your buckets of water. • Check the roof and exterior areas for sparks and embers. • Check the attic and throughout the house for hidden burning sparks and embers. • Continue to check for problem areas for several days. Contact 911 if any danger is perceived. If burning outside your home was extensive, watch for soil erosion. Consult local experts on the best way to restore and replant your land with fire safe landscaping. i a rt ~0 www.fire.ca.gov www.rvcfire.org