Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
081910 DH Agenda
AGENDA TEMECULA PLANNING DIRECTOR'S HEARING REGULAR MEETING August 19, 2010 1:30 P.M. TEMECULA CITY HALL MAIN CONFERENCE ROOM 43200 Business Park Drive Temecula, CA 92590 CALL TO ORDER: Patrick Richardson, Planning Director PUBLIC COMMENTS A total of 15 minutes is provided so members of the public can address the Planning Director on items that are not listed on the Agenda. Speakers are limited to three (3) minutes each. If you desire to speak to the Planning Director about an item not listed on the Agenda, a white "Request to Speak" form should be filled out and filed with the Planning Director. When you are called to speak, please come forward and state your name and address. Item No. 1 1:30 p.m. Project Number: PA10 -0161 Project Type: Home Product Review Project Title: Scott Hansen, KB Homes Applicant: Jarnne Valdez, Lennar Homes Project Description: A Home Product Review to construct 118 single - family homes in . Tract 24188 -2 of Paseo del Sol consisting of four plan types ranging in size from 1,628 to 2,241 square feet, with three architectural styles that include Spanish, Cottage and Italianate Location: North of Leena Way, south of Pauba Road, west of Butterfield Stage Road and east of Meadows Parkway Environmental Action: Notice of Determination will be issued in compliance with CEQA Section 15162, Subsequent EIRs and Negative Declarations Project Planner: Cheryl Kitzerow /Matt Peters The agenda packet (including staff reports) will be available for viewing at City Hall's Planning Department Public Counter located at 43200 Business Park Drive and at the Temecula Library located at 30600 Pauba Road during normal business hours. The packet will be available for viewing the Friday before the Director's Hearing after 4:00 p.m. You may also access the packet the Friday before the meeting after 4:00 p.m. on the City's website at www.cityoftemecula.org. R: \Directors Hearing\Agendas\201 0\08-19-1 0 Agenda.doc STAFF REPORT—, PLANNING CITY OF TEMECULA PLANNING COMMISSION DATE OF MEETING: August 19, 2010 PREPARED BY: Cheryl Kitzerow /Matt Peters, Case Planner APPLICANT NAME: Scott Hansen, KB Home PROJECT Planning Application No. PA10 -0161, a Home Product Review SUMMARY: Application for KB Home to construct 118 single - family homes in Tract 24188 -2 of Paseo del Sol, consisting of four plan types ranging in size from 1,628 to 2,241 square feet, with three architectural styles that include Spanish, Cottage and Italianate, generally located north of Leena Way, South of Pauba Road, West of Butterfield Stage Road. and East of Meadows Parkway Plan 1, one story, 1,628 square feet Plan 2, one story, 1,788 square feet Plan 3, two story, 1,924 square feet Plan 4, two story, 2,241 square feet CEQA: Notice of Determination Section 15162 RECOMMENDATION: Approve with Conditions BACKGROUND SUMMARY Planning Application No. PA10 -0161 was submitted by KB Home on May 21, 2010. Staff reviewed the application and provided comments on architectural design and plotting on June 14, 2010. The project was revised to address staff concerns and resubmitted on June 28, 2010. Staff has worked with the applicant to ensure that all concerns have been addressed, and the applicant concurs with the recommended Conditions of Approval. ANALYSIS The proposed project involves the construction of single family homes on 118 lots of Tract 24188 -2 within the Paseo del Sol Community. The proposed architecture and plotting was reviewed for conformance with the Paloma del Sol Specific Plan, as well as for compatibility with the existing homes in the adjacent neighborhoods. Architecture The project proposes four floor plans and three architectural styles. The architectural styles include Spanish, Cottage, and Italianate which are consistent with the Eclectic Mediterranean theme specified as the master style for the community in the Paloma del Sol Specific Plan Design Guidelines. Staff believes that, with the attached Conditions of Approval, the project meets the intent of the Paloma del Sol Specific Plan. The proposed elevations achieve a quality appearance which is compatible with the surrounding neighborhoods and provides for variety along the streetscape and within the residential area. Various materials and features proposed include the following for each architectural style: • Spanish: stucco finish, concrete 's' tile roof, 4:12 roof pitch, clay pipe accents, decorative foam trim elements, wood fascias and exposed rafter tails, arched window recesses with multi -pane windows, arched entrances, wrought iron details, decorative corbels, and decorative wood shutters. • Cottage: stucco finish, stone base, hip on gable roof at 4:12 pitch, corbels at eave, flat concrete roof tile, "cottage" style shutters, and vertical pane windows. • Italianate: stucco finish, concrete 's' tile roof, 5:12 roof pitch, column trim with keystones, decorative foam trim elements and window shutters, arched elements, and decorative foam accents. The applicant has provided specific details which are unique to each proposed architectural style and elevation. Articulation is provided on all sides of the homes so that each side of each product provides specific features of the proposed architectural style. Each of the three proposed architectural styles is defined from the others through the use of door and window types, window and door trim, garage door design, materials such as stone, roof type and pitch, shutters and the overall silhouette. Two -story elevations that are visible from a public street or an open space area have been designed to incorporate architectural enhancements which include second story enhancements at windows and pop -out on the side and rear elevations, including wrought iron pot shelves and decorative corbels. Building Elements /Mass, Height and Scale The proposed project includes 2 one -story floor plans and 2 two -story floor, plans with three elevations. The Paloma del Sol Specific Plan requires single story volumes at front setbacks and street corners. The units provide adequate articulation in roof forms and offsets to reduce massing and the elevations are visually broken up with offset facades, changes in materials, architectural details and /or sloping roof lines. Units include second story and single -story roofline fagade elements, decorative wood details, stone veneer, window shutters, and window and door trim. Staff believes the proposed standard and enhanced elevations meet the requirements of the Paloma del Sol Specific Plan. Each elevation provides careful articulation and architectural enhancements. Visual interest is achieved through the use of varied wall planes, projections and recesses to provide shadow and depth. Varying roof forms, floor plans, and changes in colors and materials accentuate the various architectural styles. The proposed units include well pronounced front entries with the use of arched entries, extended porches, and the use of different materials around the entry: Garage and front doors are distinct and compatible with the architectural style of the home. In, addition, the units include architecture forward to reduce the prominence of the garage doors on the streetscene. The proposed roof pitches provide variety in the street scene and they are representative of the architectural styles. 2 Additionally, reversed floor plans are encouraged to help achieve a distinctive street scene in the community. The applicant has incorporated the above mentioned elements and will plot a distinctive combination of regular and reversed floor plans to provide variety along the streetscape and variation throughout the development. The proposed elevations for this development meet the intent of the Architectural Design Guidelines contained within the Paloma del Sol Specific Plan. Materials and Colors The Paloma del Sol Specific Plan encourages use of stucco, plaster, and masonry, as primary wall materials with light earth tone colors on primary wall surfaces and contrasting trim colors. The project includes twelve different combinations of building materials and colors for the three elevation styles. The color variation, stucco, and cultured stone materials serve to break up the massing of the two -story units as required by the Paloma del Sol Specific Plan. The variation of material and colors helps individualize each home and creates character in the neighborhood. Each proposed architectural style has four distinct color schemes that customize the style. The materials include a variety of roof types, stucco and trim colors, and decorative features. The intent of the Paloma del Sol Specific Plan has been achieved by ensuring a continuity of colors, materials and textures throughout the entire development. Product Placement Plan The project proposes a "Pick -a -Lot' plotting concept that allows the future homebuyer to purchase a desired lot and then choose the floor plan and elevation style of their choice within the rules specified below. In addition, the building footprints have been plotted during the review of the application to determine which plans can be plotted on which lots depending on lot size and setbacks (this information has been included on the Product Placement Plan for each lot). The rules are as follows: 1. No identical floor plans will be plotted directly adjacent to another 2. No identical floor plan and elevation will be plotted within two lots of another or directly across the street 3. No more than two of the same elevations will be plotted in a row 4. Or as approved by the City of Temecula (staff will review plotting as phases are constructed) While the "Pick -a -lot" concept is new for the City, staff believes that the concept with proposed rules will result in a project that will conform to the requirements in the Architectural Design Guidelines of the Paloma del Sol Specific Plan. The rules will ensure a varied and visually interesting street scene be achieved through creative product placement and alternately reversed floor plans throughout the development. The units will be plotted to avoid repetition in plan and elevation type to meet the intent of the design guidelines. The Specific Plan requires architectural enhancements to all elevations, especially where prominently visible. As mentioned above, the Product Placement Plan identifies elevations that are visible from a public street or an open space area to incorporate architectural enhancements. A Condition of Approval has been included to require these enhanced lots to be clearly identified on the Precise Grading Plan and Building Plans. 3 LEGAL NOTICING REQUIREMENTS Notice of the public hearing was published in the Californian on August 7, 2010 and mailed to the property owners within the required 600 -foot radius. ENVIRONMENTAL DETERMINATION The proposed project has been determined to be consistent with the previously approved Paseo del Sol Specific Plan EIR and is exempt from further environmental review (CEQA Section 15162 Subsequent EIRs and Negative Declarations). FINDINGS Development Plan (Code Section 17.05.0101) 1. The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City.. The proposed single- family homes are permitted in the land use designation standards contained in the Paloma del Sol Specific Plan. The project is also consistent with the Low Medium Residential land use designation contained in the General Plan. The site is properly planned and zoned, and as conditioned, is physically suitable for the type and density of residential development proposed. The project, as conditioned, is also consistent with other applicable requirements of State law and local ordinances, including the California Environmental Quality Act (CEQA), the Citywide Design Guidelines, and fire and building codes. 2. The overall development of the land is designed for the protection of the public health, safety and general welfare. The overall design of the single- family homes, including the site, building, parking, circulation and other associated site improvements, is consistent with, and intended to protect the health and safety of those working and living in and around the site. The project has been reviewed for, and as conditioned, has been found to be consistent with all applicable policies, guidelines, standards and regulations intended to ensure that the development will be constructed and function in a manner consistent with the public health, safety, and welfare. ATTACHMENTS Vicinity Map Plan Reductions DH Resolution Exhibit A - Draft Conditions of Approval Notice of Public Hearing 4 VICINITY MAP _ ... - ----- , RO ROYAL CREST PL ,..... ,. �. •THENBERG ' Q _ 4 , { i Y i • , { \ w t \ i . r \ , — - m G t ADEN \ , i\ : - =- PA 10 01 i e F 0 CS T \ , \ 9 v I �D C" I SA C a k 00 T Na J , { tY .. 4 O U -COR CT. RIGAN - C> • ��M V_ ° -,. U i q CT._.." w p, co Q I O � _ Z D >, '• e t ..w .....- ..pALACIO ST � S i . NF PN .t T�, "D w. ci , RO SAD D t O \ \ \ \ \ \ < : „ ti J P S T / \ TAR ..... •' ' i 0, 100 _ -" 200',,�, `�- 400" 600 800 �•, � � � � � /�P ` � + .... Feet '•,. r i /... i'i /�� i � '; i, r PLAN REDUCTIONS PASEO DEL SOL HOUSE PLOTTING EXHIBIT TRACT NO. 24188 -2 \ CITY OF TEMECULA, CA =::•�: ; -•_» "° T - -� TRACT 23143 - 1 r - - \; n ' / 128; 1 �, f` _____ __ ___ •- •_�- __ -- "_ _ ^� ° i ;30' ., ___ _ -- T E `�' __ E ROAD •::- ._. ` PROJECT ' � µ . Y �'�; i 5j ;' __•ti__" .._:- -__:._-___ ---- ___ -_ SITE - VI CINITY I' / [ 21 ' 7 __� ] _ - __ f 64 1 59 ` ^- ,il '. ' - ........ _= MAP o xALE PM 23432 VALLEY 4TH' ,� (.. - -_ / • \�\\\ / ONER /APPLICANT 1 13 -A 8a W j; 91 ,,_ - ( <; ri•,5.- l BO. \ 111 r NaAC m 11, INC. OVERFLM 1-1. FOR NB 4\]OELS - ' ', �`. - -� _ 1 I 38]10 II— IXt. ( _ -- 93' i 79 ]� .; .� 111 IlDW S A 82595 .. r 15 - 17 ,• '[. -, 115 114 Y13 112 ,111, l71, •> - 75, 1`\` SPECIFIC PLAN LOT s q e ,i08 - \ J. 108. M•'73,`•7 SPE 1— RAN 1x19 L 11 719 ' ` 107,• ^ - F - � \� \\ A 11�M o w.. ocNO E Lu 1 121 1 \\ n \ - 4�, .'�•, Yom- A \ LO . ' \ Si /,( � • � 106 100: , - o 1 - 95 . 123 \ 1 TRACT 24188 -1 ACREAQE IuMY PA. I. ?m LenELS _ OW ' 97, - \\ moss 33.106 c. ` NET. 23.611 a ;£ TRACT 24187 -2 \'•\ 101 100 1`1,( 87 -�' \\\ LEGAL DESCRIPTION \�/ \ \ ,� -,'� \ BEIRS A 91BOIV SIGN OF A PORTION OF PARCELS \ , \� qiN 31 iOC£ 'Kft WIrH PORT OF 121 / `, 99 - i \ N \ LETiER LOTS 'u LE PARCEL YAP IS \ / • -� \ pN33 A5 Ew•N BY YAP W FILE IN B?JW 159 Ar �E5 bF0.p1 6t 1451E R PM£ uPS. 1 \ \\I 11 ` t • - C '. m, ,\ •\ ` i \ , ; 89 OFFICE OF C TT RECm[EI OF RI4FRSIOE ( -� SinrE 7 <ALIFgMIn. ' vv l4`/ A -- F •, 91 .; vv 11A UTILITIES NER: SO)TIR CALIFORNIA FDISON (e00> 655 -.555 Po 0 2W 1\ 1 \ TE H 83 LE, VER IZO! (6W) ] -.966 \ A \ \ EA &E: I.. PAR— CABLE (666) 892 -2353 xALE o l'•1ao' NnTFN: ANaocn T i�irwNi A A o sralcr (E 292e�smw xPER: EASTER II u CIPAL WATER DI9iq ICY (600) A26 -J693 SCHOOL DISTRICT IE]ECL 1 VALLET .11.10 xHaaL 01STRICI sz.sr THOMAS BROS MAP tam EDI ii[N: PAGE 959, F - 6 z 9 s` SSOR PAR . RS MRU 029 �L`"�I',-T3�J,"LL..JII'I]] I g 'I I �y 911 955 - 542 -001 THRV 004 RAN 1 RAN 3A "� L VATI RAN z 8 .Iii z I 955 - 551 -001 THRU OJ9 - f� awTKR ATPE � al g J 9ss- 5so -ao1 rHau ol. RAN PO K -A OT (PA ) R 1 c RAN I Rnu 3 RAN 3 RAN . _ _ w ICENff ELOm BANS DIRECTLY AD 11 10 1,515 50. FT. 1,]93 W. FL. 1,88] x. FT 2,225 50. FT. R/W 3. w T Ill BOOR PUNS 1 T I STFEEL ELFVAT MS WI THIN 3 LOTS A m Aw ARRE m TIRE III A- i NmE TN 2 OF THE SAW ELEVAT IONB IN AIM A. m PP As ATMEO Br TK CITY OF TE—A a B • FTSNDI f C ITALIANTE g TYPICAL FOOTPRINTS TYPICAL l0T TYPICAL CORNER LOT 5 SULE: 1` -AO' - xALE: t •.0' SCALE t' �0 �F•�� OE—O) BT WN 9T - CITY OF TEMECULA 9ai ru»..i »v • viceiv. • cv »••.uvrv» AS ND Eo 4 I - s_ R TnwAVm urun TK sF SI. rs' RECODUEwFD 1 DI-1. OT IC W0a[S CO N S,.I N DAT E: OEPARIYENT OF Pu6U[ WPMS = ACC "'0 ATE: a "„' DATE T TRACT 24188 -2 PLOTTING EXHIBIT C9 Iel()OlOAi F AAWAXn ..•1ePwe t [rmlx /m a WT il N /A AL F [A R.C.E. w. 60.2 API W /b /10 R.C.E. w. %TIFFS ai/Jt /f0 a 9 yEE 3 .. j� — — �____ ---- - -_�-- - -- ------------ - - - --. _ — __ - \\ \ \ BUTTERF IELD STAGE ROAD _ E.. cIIRe . wr>ER� — —� — — — — — — — — m I / I I 124 ----------- �'------- - - - -�" /l a l - I 1 1 1 �. 1 i � � � 1 I 1 1' 1 f ,- I 1 I I I 1 I 1 1 1 I I � I 1 1 I �m � " u I I I I 1 I I 19..' Q _ Q �E —E —E� // I 1 - 1 ___ _ - ____ __ - ___ �[ —E —E� f I I 1 f 1 I r E —[ —E� - - ' C —E —E� 48 I I 1 1 1 Ir C— E —E —E� �E —E —E� j \f � .J � I � I I 1 I j`� j I I I I I I I I I I j j f — _�_ I I I I I I I I I I \� I iL_�I i I Iw I I I I I I � � I I 28 29 30 31 32 33 C , PLANE iR,2R,JR,AR 0.AN5 I,x.J.1 0.P125 1, 2.J.A 0.AN5 t,2.].A BANS IR.zF..3N,M I 0.AN5 1, 2,J,A 34 / f I I I PE =12fi2.1 PE•1266.6 PE•t2fi5.6 PF- 1266.J PE- 126..6 � PE 126..2 j I— IR,]R, AR \ C \ �J / PE- 126J.fi / / / / C� 25.66' 1 I I I II I I I � I s' I IS � r6'I I �� /� / / v 1 I I l I 1. I / 1 I I . I 1 _______ I S 6'I L______ J .32: 1 ./9'\ / / � �3. I I 1 1 I Iw L-- - - - - -- .2 .\ s. ; 35 // 45 I� I I _ 1 1 L__ _____J L______ _J Q �. PE- IxsJ.2 I I 1., I I /y./ � j � I I II I £ a Q I I I I I r5 rg' 1 I 1 I ` LL _ - \\ 1 I I I - \ 1 1 I 1 P 44 1 I 1 \ ��. �\ — — -- — - -— - -— 1 38 \ / \� /� I \ � � \\ PUNS 1R,2a.Ja, ui 1\ )I i O � `� BEAVEN COURT �� 1 11 PE•Ix6Ja ,) l 7 ,, / / / / 4�- ________ / 43 / / I I I / / Q i f --- - - - __� 11 T - C— E— C —E —E-� 1 37 I I I / / OQ- %/ \ � �. I I � I I� � � I PLANS 1,z,J,. I III E PE- 1263.2 / / / / � I I I I�' I I / / / i 22 1 j I 1 1 $ 23 � 1 �w PLANS 1.1. ` 1 I I / r / / / / /� / zi __ -___ y _ __ 24 1 y 0.AN53,. I PE•t262.A I fl W I L______ ________J / / \` \ _, _____ pL NS J.A , PE- 1265.. I > I o I j o � / � / /sz/ R y .1 I 1 _. / / / 27 IJ' P-...i I r J I o - -- ----- - - - - -- - ---- / , / PLANS 1.2.3., / A 1 1 _ , -- — ul - -- _- __ -�" - -- i ` - -- - -- / / / PE -IM2.2 / ly PE- 1266.0 E —E —E -1 / / - _- ___ -___- A l i / iv, i I 28 I y' 25 116. ------ ---- - ----- I ` 1 , / / / // / 1 RANS IR,.IN, AR I 1 0.AN53.1 LE —E —E —I r jI 1 m 1 @ / / / 1 1 1 -- - - - - -- 1 PICX-A-LOT (PAL) RULES Y l i f PE•IZ6].0 1 PE•1266.2 9 21 I ` 1. ND IOEMff FLODR PLUS DIRECTLY AWAUNT TO AN3TKR i j % b \ \f \ / I 1 1 I w I j PLANS IR,Ia,3R,M 2. NOA BNTIICCALDIfLLOOR LNN D�T1EL5 ATIIWS wITNIN 2 LOTS 6 / 1 PE•11fi 1.2 1 / C / t 1 I J. NO WIE TNAN 2 6 TIE — EL TIOS IN A Row & 1 _ }•... I I a. OV AS APPROVED fiY IK CITY 6 TElE0.lA _ .\ -` 1 i I 1 1 N2o.06 I i -� -- N E— INDICATES — SICE OF RESIOEIRE S 1- RE— ARCHITECTURAL ENIW{EIENT d -v± _ - _-- -_ -__^ 3 ALE -20' __-- - - - - -- r _ g �••�� .LE noEl� RECAII�NDED 6T: D ATE:_ CITY OF TEMECULA " •..•.:.• • ecs: tlmmum e caiEn rm2 IaiED �,` '` 0. PRNpuen OnER TK sV[R+ISia s ALCCPIED OT: OENrt OiTeciav O IVBUI[ wgttsE LOT I ING O HIBI turns - e „ Dorf. TRACT 24188 -2 PLOTTING E %HIBIT ...SULTINO M.SRWY sAx l0.en2�i.o •••rsmo ilc [III U - i �ry /A� nP cAUnn R.L.E. NO. P xPIRES W /b /10 R.L.E. W. NP11SS 0.J/]t /t0 s SEE 3 38 i RArv51.]A I 27 I )1 1 �E — E —E — E — E f ✓/ 23 , 21 I 1 . _ 28 24 25 r / az,'s 17 — ry 11 1 20 1 rot _ I 1 E -1259.1 40 I PE- 1258.3 % \ 12 - -- I 1 I 11 0.u6 I.1.3.t R•11sB.3 39 I 1 - L -' _�'- ,5 \ IO 1 t + f R•1151.t 1 1 1 1 1 RHO 13 \ I \\ 1 �\ . FS \ \ 18 \\ 1 RAR63 0.AAH�IR P,aR,aR \ is PICK-A- LOT (PA ) RL 1 n0 DERLICAL BOgV RAT6 DIRECLLY ADJACFNL TO A— \ LRE nO IEERLCAL BOOR 0. uq ET ELALId3 6 xlrRlu 2 LOTS \ Q \ 1 \ \\ \ \\ \ '� ,a �• / / AW T( O R OR DIRECiIT ACRO56 $LREEL ] tai BORE LN.w z ff rRE Su[ RS Iry A POI) t Olt AS APPgOTE➢ RT ilE Citt 0' 6 TE iEIECLLA _ 18 1 11 LDis 6 -BD I I \\ 9)Z \�.� \ \ n < PLANS 11 .1 K-1255.5 C/ / LEGEND P DTERBOw PAMIrvD PDR umEls M A—L SITE \ \ —'2 \\` « __- '� / —E —E— IrDICAlES MICR 510E 6 RESIOEef£ 8 � 1 \\ \ , � \ \� °ILL FE0.1TE ARbIi iECiIAAL ENUNCE,EM 11 1 \ 5 RooBS 1-1. / \ SO m 10 Il f \\ \ \ \ SGILpI'•10' \ "\ /� °JOELS O\ERRO° PAR.IN: LOCAr 1Tn 3 11 .ATE .1 B D1111D CITY OF TEMECULA FEET D Oy .u�.r.�wo • oc�� eo.ec.�a.�o.. As O. OAy� NRPA4n vaRn ttE 6v 1". L< 0.CORUEIIXD OC OIRECLp1 R RRiC AMCSALE: OEPARruErvi M weuC wpm5 - IW -',`� ® L ACCEPTED BT: o AiE:_ � ++ +a,m... — '" R AZE: TRACT 24188 -2 PLOTTING EXHIBI NSULTIN T COCR am�elD11 Pu 9Ram11a �wlawm — IABNER �ry /Aµ R.C.E. rv0. XPIRES: 05 /.w /lo R. .E. M WIRES: /]t /t0 /]t /ta g v 9 scc � 1 6 I � I 1 I I I i I 15 I \ ° \ \ \... PRDSEO I.pL£L \ \ /\ \PE 2557 \, �' •.rl np 1 17 T. v v A rt v vvA� v I . v `\ \ �Oa 4 SeD mix +Rr / \f\ t\ \\ I s C O — \\ 1 \ \ 1 — .2 1 1 51 PLANS SR.xR I \ 1 1 m \\ \ ``n 3 1 1 PE•I255.r \ 11 iE je�-1 - x 1 \ s..t I II ' C AE - 1 1 119 1 C E 1 0 .i \ \. � ...✓ RE rIDx ARE :- - ...• \ `�[� -" I 1 E ` �I f 1• I 1 yy h 1 -' i PI K -A- OT (PA -1 PIT! c . ,. 1 PLANS O W I ICENr1 FLOOR OR IPEERY TIONS NI r0 A L x 2 LOTS ' \\ EENL D T LY PUNS S E S LEVei IONS —H IN 3 ois ff .UgiKR IXt OIf 0 ' SS rHE rFEEi i a As wP er rN 111 c11c 6FV. rI - . as — 1 I I I P —HY PARKING FOR NODELS SM —1 E— IIDIGES xwl(H SIDE lx RES IOEIAT E 'ILL FECEI4E -NIT.— —A--T & \ \` I.pDEL Lanrla+ zo o p [o SO \ \ i BY suLE: I- -xo' y !� �..: xmELS RtiRARY vArxlw LOEAiIRI o j lEei[SSIxA[` DE—E0 BY BY BY -E1 M { REwec B ��lY Dl�o,oR o B io —S E CITY OF TEMECULA I. IT AEEFPiE o R�LNI o wB O xoft : ' "/■ D B Y DAiE:_ xw I . DAre TRACT 24188 -2 PLOTTING EXHIBIT CONSEI LTINO O0.x)xxxtl •P YOlan.w ric �[IYI� n —.E. NO. %PIKES 06�]D�iD ft.E.E. !» F ItPIISS _ /Ol- R 9 sx 1 39 ' II II II 38 I I 35 \ II I 40 36 y ♦ -;� - PLANS .,., > 37 m II II ` 41 -__- _- ___ - -- - P- - - - - -- - / ♦,.. � :' "° ~<� — '= I I I m l II 1 z l i a3 ' Tr' I I 9' ♦� \ °�\\ ♦ v m -' \ \ \ r _____ __, r _ ______, i i s.i ' 0.26 i 11 � I 48 I ii ' /// , �� ♦ ♦ \\ ` ♦ ♦♦ ''1j x.• BANS 1, 2, J.! J \ \ �5 II 45 FE- 1263.8 �I (5 116 \ \ \ \ \\ PE- 125fi.] y.l BANS 1.2.,.! 1.J.. ♦) ♦` \\ "�'\ \\ ` i RAtS ,4 'PLANS IR�.za.]R.w z6J.1 PE- 125.6 \ ♦ " Y ° \ I PE -t26L, , I .1262.2 , I , I I I I I \\ ♦\\ , � 125] ] � -- - _ a 117 \ �� / R PE•1256.1 ! � y'' \ \ \ ^\ \♦ c�" — J - - -_ —_' — — — 1 u II � II II BOOLEY COURT 118 / I 1.z.],4 1 � I� 111 II II II m 115 r-- - - - - -- Q T R ' ii I I II BANS ,.2.].. 1 _ Ei I ... \ / E \\ 1 I it \\ \ \\ PE- 1256.8 RA1.2 \ \ \ \ \\ I r________ — _______ N6 ii11 �L............11 I \ \ J.! \ 11 II 1 \\ \\ 1� I `\ PE•1260.5 \ . ` \ 1 \ 49 IS' 48 47 I 11 II II PE•116z.2 Is' PLMS 1.2. II ( PUNS , a.2R._S R I 1 11 II - 126,.1 J,. 1 5' PE- 126].6 114 i \\ 1 11 PE•IM0.2 1 2T 1 11 1 ,,05 ________J PLAro512.,.! 113 d U I 1 54 II I I 8 52 58 1 11 1 l II a a 1 20 ID o ? m !o 60 112 PICK -A -LOT (PAL) RULE a ° 1. NO IXNifCAL FLOOR FLANS OIRECTLY ADJACENT TO ANOTEA —E—E— INDICATES WHICN SIDE pP —1— S 2. NO IDENTICAL FLOOR RAMS Aro ELEVATIONS 11- 2 LOTS OP WILL RECEIK ARCNITECTUUL EUfANC WNT o SCALE: -20 I ANOTER OR OI RECTLY ACRO65 THE ATIONS 1 J. NO 1AJRE —N 2 6 SATE ELEVATIONS IN A qpW OR AS APPROVm BY - i1E Lltt Q IEtECLLA � 153jA,,/ 11101 BY DRAWN BY T p pAiE Or RR19IX+5 PATE CC'0 SCLLE aELpWIEromR.'. p Aie- CITY OF TEMECULA .�..:.R ....: ro. R Rm T� 9R 19,a o R s p 1t ARNENT a �ED W� S 5 IM ti.`Y T. J' ALLEPrEp 9v: OAIE: iee�AA. aA�ansP� rc 'm,a Dorf: ARIR Oiacrw E , TRACT 24188 -2 PLOTTING EXHIBIT CON S ULTINp IWLW161lAE •aA%I0.Wn22,a•...�mn 411,1 ♦�e Y ` R .C.E. IS. WPI R.L.E. NO. %PIPES _O]/3111p v 9 sNa � 49 51 11 48 47 I I ii I II II II 113 \ 11 52 1 1 ^ r - - - - -- . 1 1 P1.N51, 2.3.♦ 1 11 II 1 I ' 1 1 1 11 PE•1261.3 11 I r____ - -__ i I I m l I II 55 { 1 1 I I I I I I II yy it 58 .. ............... s1 I 112 1 - I , ff ' '! 1,x --- - - -- -- `T it 54 %. ,2.].. PLA151,Z],. Gal II 1 II 1 1 11 I 0.ub PE- 1x63.1 PE- 1x63.5 20' - II II 1 1 PE•1161.5 1 1 I 1 111 R- 1263.6 IS I I 1 m i II II 11 11^ 1 'J I 11 53 ^II I1 S.I II L._........ii I j 1 ___ -" -� I 1 1 I PLAM 1,x.].• II II I I � I I I 1 m l II II I I m� -- 1 PE- 1261.5 I II I L________ 1 II o - _______ 32.06 1 1 E __E� -- -- 1� —, I li °.4 -- - - - - -- '$ w I II II II II o l ii "- j ii E II I PLANS tR,2R,3R,W ; 11 I 15.01 R- 126t.J I I ` - tr _- _______ I _____.,� -- - ♦ I II I _____ , II w II II I m DRISCOLL COURT ---------- - - - - -- ;;_ �- .._.. _.. _ ...... ......._.....� IW 110 - I - 3 121 19.2J' I w PLAN52,J.. 124 � I I ... ................ ...... II __ x � WWQ I I I E E E [�I 21.68'1 •I S. 109 1 m , I I I 50 . w l ' 1 r - - - - -- b " I 1 II PLnNS t,R.l.6 1 Rub I,Z.].• II I , R " I 116' 12' S5 AJ I 1 PE- 1260.6 ' I PE- 1261.1 w I 1 _ - -___ I � -- r --- - - - - -� ' .. ..... ....... II I II II II ' I II I II y I 1 I I I 2 � - - - - - '- FE- 1262 I fi PANS t, 2, J,• I I I I /u5 I I II I ,' I ..................� --� 1 1 81 I I ; PE 126].6 I 58 15 PL 1 I II I tub Lxa.. II g I PE- 126J 108 ' le.s• 'W I I PLAN6 Z I II i II I's 1.2,3,. � C —C — E _.. g ----- - - - -- - 1 a / 62 ii 1N II II 107 s 1 , 85 66 11 II it I II � II I PICK -A -LOT (PAL) RULE 10 0 ZO 60 10 IDENI IEI ELOOR PLANS DIRECTLY --I TO AOTHER 20 A 2. NO IOENTICAL PLOLA Rub AIU EIEVATIOS •ITHIN 2 LOTS ff _ I.,CATES .1. SI[C 0' RE 1.— S ANOT— OR DIRECTLY AO1055 TE STISET •ILL RECEIVE — 1TECTUUL E1iwl£IENT SCN.L x0 ,. NO a THAN 2 6 THE — ETEYATIOS iN A R01T . Ot AS APPROKp 9Y 1NE CITY 6 TCKCLLA nL " " :" EDDY y CITY OF TEMECULA T. RBF e....i.e • eee�� • . ns NOT 6 u '` PL OCPU® urOLn Trc srtnv151Ox v RECOHNE r D UNCCTOI 6 PLRIC •OttTE oF➢nRTUENT o< w6uC eaRxS - xw a T ACCEPTED HT: DATE:_ To�ciaw cusrna•Irrsrm DATE: TRACT 24188 -2 PLOTTING EMBIT v CO N S u LTI NO 16LPAl0a fM IgtOa2ua•w•lla me Kn /A � .[.E. N0. ExP fRES: � /]0 /1D R.C.E. N0. hPiRES: O] /] / o O 9 s1EF . — --------- _ ------ ---—-- _____ n , Exls *. a.M Y rIIiRER BUTTERFIELD STAGE ROAD — \ \\ _ \ L _ _ _ _ _ _ _ — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _ — _ 124 - - °--- - - - - -- 124 -------- -------- --- - - - - -- --- ------ - - - --- 57 66 I I E \f�� �W FE- 126J.6 I l ; E �, 87 79 W n.. I I \ \ I X3 ^ \ 78 �IR 80 \ \I 0.S 1.2.] I I , , ; 88 ; ;' ! /-_ \\ FE- 12518', PE- 1M2.6' PLAN- 1363.3' // /A, 59 r �__ J 6.1J. PLANS i RLIN5 8 1 4 .z.a.x ° ' / i 89 l i f / 2 0 PL.m \ 2J ? 1 20' I R NS 1.2.J,. J \ E- 1262.6 , 22 -BI' .b 76 1 1 a )' 70 i i 1 ` . PLNA IN.2R.JR.aR 0..1251.6 \ \ 61 \\ 81 I I I 7 82 / / 0.S 5.1 83 6 ' 71 ,��,, 75 I c^ w '� _ `\ ALS 1.3.2.♦ f . % J .J i i vE- 1261.1 // PE•uv.z 1 \ a 73 RULEI 8 2. NO IOENTICIL BOOR MANS AND ELEVITI AITRIN 2 O 5 6 °� / C , rRER OR o1 RELTLT .CROSS r11E STI / J MW AS THAN a TAE I ELEVIT 101A IN PD. 2 . aR Is IPPROVEC BY mf C OF TEICLUI ♦ 74 �E / 30 t0 O 20 b ' 1 FCFNfI S OI/Rj W N RE E51MICR I STE CE I ENAI / MLL RECEIVE CH S 1 . OF IL I DENCE 4Ni DAM BY .lE xo1c :116�� ocvc"E6 e" D C.. roEO er: TEMECULA AEt vO - ........,. e....,,..,.. w 6LN.. 612L A : 6 IL a«6f CITY OF 6 ,R REM o P 9 IL b 9 - ICCEPTED BY: DA TE: RW catxncaRa ome TEO ® CITE: T TRACT 24188 -2 PLOTTING EXHIBIT NIAAACP CONSII -ING 9ue2en.x ~ in mow. rlu K N /I E .L.E. N0. ExA IRfS: 06 /]0 /f0 R.C.E. N0. 2 P WIRES: _0J /31 /t0 D 9 s¢ 75 70 - - - -- -- -- --------------- �–J-6 - - -6 -- -- __ 1 / l a � I I I I n I ____ ___ ii 71 J, 72 d.x' 73 74 Z 0.AN5 A j 61 AN5 1,2,].1 1 0.AN5 J,A RAM 1.2.3.1 �• I I / Q / 98 l] I PE- 1259.] I I 0. PE- 125B.B I 6. ]i R.Ix58.1 I � PE•1158.0 � / ; \` I 4 I I I `• I I I I L X 97 I / BEAMER COURT /`•/ JJ i R R n R R m R 100 -- - - - - -- - - - - -- r - - - -- - -� - -- -- r - - - - -- I - , \ .\ RAN91.2.5.1 f\ / I I I I I I I I I I ` PE- 1257.1 i5 i s.i6'•' ` 121 a i 101 107 108 e' 105 6 . 104 . 103 I 102 I PLANS 1.2.3.. ` 1 BANS tR, Tt.JR,AR , 6 P—I 1.2.3.A 1 R.u6 1,2,J,A 1.2.3.1 BANS 1.2.3 I 1 BANS 1.1 5 ` \ f R•Ix5x.9 /�/ / 108 I PE =u6o.o I R•12 ».2 rc•1zs9 PLANS .. i PT- IxSe.B PE-58.1 PE -¢sa.o E_E_ I I I 0 - -- -- z 121 PICK –A –LOT (PALI RL6 –ES M IOENt ICAL FLOOR BANS DIRECIII ADJACENT r0 ANOTHER � 2. W IpFNi ICAL FLOOR BANS AND ELEVATIONS —KIN 2 LOTS CI 8 •. __ __ _______ ____ _ - - - - - APOW _ _ _ J. NO AWMR W DIRECTLY AppSS IND STREET Wit TNAB 2 CT SA irE AE REVAiIOd In OR AS APPROVED BY TIE CITY OF TEAECO-A - -- n - __ -_ -- - -_ SwF I'• x0' i� -� r ......_ .... ..._..... UNNY MEADOWS DRIVE .- ......'_.. D - l0 6o LEGEND � 30 10 0 2 —E —E— INDICATES w 104 SIDE OF RESIDENCE GILL PIECE- --C-1 EHwN —I SCALE: i'•20' - ES :Ill oEg0 6Y oR ANN BY CITY OF TEMECU�A rl[ lo RECOMRENDED BY: DATE:_ .Aaw..i.o • oca QOC • al o xl o v s Ce�lamR IS WIID !rt¢yAr¢n uan M ANENrVlslw a ACCEPTED ¢Nrt otrEClCa Ic RwtsE oEPARnENi a wBUC Wg65 - ,��]N.L CAUanN.emrn .m o6rE: PBa TRACT 24188 - 2 PLOTTING EXHIBIT C O N S U LT, N D Clf101Otl AX IataNanp aaal�ma I,C uAllw� 1 R.C.E. NO. EXPIRES: 06 /]0/ 10 R.C.E. ND. XPIRES: OJ/] /10 O 9 9EE ,q v 122 --r _ ____ _ _ -_ 121 0 \ ___ 1 1 93 // � � / BANS 1.3. }.. �(� �� Hy I � m 10.15 1I ➢ I ! .I � 1 t16�� p I 122 5.1 i -- - - - - -- i 94 { / i 1 95 I i }s•i { 1 1 I 1µ5 3,4 / I � pLAtK IR.N-,.R PE -12N.0 / it R- 1235.0 j 96 X5 97 it 98 1 1 I RAM tR.2R.Y°,wR BANS S.. / / I I . / / R•1240.9 I PE•12.J.5 PE- 1]44.6 --Ax _ I � I 1 f GREENS CIRCLE 11 I I R� i I R I I I I I 1 j / � - - - - - -- r-- - - - - -- - - - -- r - - - - -- -"7 - - - - - -- IS r - - - -- - - 1 - - - -- - 1 �� I r - - - - -- - 1 r'� I r 1 I I I r --- - - - - - 1 I I r --- - - - - - 1 I 1 r --- - - - - - 1 a I 1 1 I 1 I I I I II I II I IIII IIII I III I III 1 1 1 I^ I 1 I I I I I I I I I I I I I I I I I I I I I I Ig l I I I I I 1 1 1 122 ( a . I 19 1 9 1 5'1 I-J I1 1 915' 5'I 1 1 1 5 ,1 I5 'I IJ I 1 I5'I 1 i 92 .ml 91 1 90 89 5 88 1 i i5' 87 1 5 ,1 86 1 — i 85 8q 83 82 1 1 1 } I 2.J Rµ5 1,2.J.t PLANS 1.2.J,A 1 BANS 1,2,1.. I 1 Rµ5 , z,J.. l l n / I BANS t.A].. BANS w,xA,JR,AR RAVS I, 1 I I I RAM 1.2. 3,. BANS t,2.3,° I BANS L2.3A 1 1 Rµ5 t,2, J.A I I I I 81 / II PE- 1231.9 1 PE•t2]I .9 1 PE- 1212.9 • 1 PE•12]..0 I R•IZJS.z I I 1 R•t z]a.a 1 1 1 R•12]9.0 1 1 1 1 R =12.1.5 1 1 K•1z.3.s 1 1 I PE- txA6.] 11 1 PE•t2Aa.9 1 1 1 1 I I 1 1 1 1 1 1 1 1 1 1 m -- \ 1 _� I E —E —E CE____ E —E —E 1 11 CE____ E —E —E � C� E —E —E 1 C� 1 1 1 o I I I I I I I I I I I LL —E —E � � —C —C - - - - -- � —C —C C __ - - -_ I - — E —E- - E —C —E _ _ - E —E —E CE_[ —E.� J { / - -J H / / m ^. a L__- _____- II _ _ m a 123 & PICK-A-LOT (PAL) RULES LEGEND k Ip IOENi1CAL PLOIX1 RAMS "N" ADJACENT TO Aro 1 ' 20 d0 NO IDENTICAL FLOOR BANS Pro ELEVATIRRS wI TNIN 2 Lars C< —C —E— CATE5 *H- S a< RESIOERCE ANOiRR OR 01 RECTLY ACR055 rK STR£Ei '1 LL RECEIVE A-1—AL EMUKENfNT g J. ND R01E TNµ 2 6 TIE — LCVAM IN A ROw SCALE I 20 A. µ AS APPROVED BY ilE CITY Ov TEt4PLA j S CIE " " /eA RECa«am ArE. CITY OF TEMECULA 9 t 0 .L,,,,....E.,.. , ,e..,. o.,o. e.0 R� n D R Y� 9f R tat« a DtRECT� s aIL .aNT D PAR ENr a aLIL wDRwS ACCEPTED BY: OATS:_ w �aN r® BY: D ArE: TRACT 24188 -2 PLOTTING E%HIBIT CONSULTINC3 vRfAtlY fAx °alan>HR .wl4mn TI[ fltlL W. AAL \ R.L.E. M. vIRES x/ R.C.E. NO. 22 E APITES: _.LQ /Jt /O a 9 s¢ 1 1 11 LANDSCAPE ARCHITECTURAL CONSTRUCTION DOCUMENTS FOR Paseo de( So TR. 24188 -2 HOME REVIEW CITY OF TEMECULA, CALIFORNIA KB HOME SLOPE REFERENCE A Aq b L -1 TITLE SHEET SEE SHEET L.4 _ I PE I PREPARED PE REFERENC µ M � - SEE PLANS A LOT11 - wa �� L -2 TYPICAL FRONT YARD PLANTING PLAN LO SHEETS P�9THROUGH P -18 ' L -3 TYPICAL FRONT YARD PLANTING PLAN i 20 1 S ERIMETEfl REP REDBY"NflEFERENCE L -4 EROSION CONTROL PLANTING PLAN SEE PLANS PREPARED BY LAND CONCERN SHEETS L5 THROUGH L] L -5 WALL AND FENCE LAYOUT PLAN L -6 WALL AND FENCE LAYOUT PLAN L -7 CONSTRUCTION DETAILS SLOPE REFERENCE IAI 1 G E lnn "�• SEESHEETL4 IG O 9 LOT 38 LOT 39 LOT118 �. • § u. xr. u..n LOT 40 ~ n IN G PERIMETER FENCE AND WALL REFERENCE SEE PLANS PREPARED BY LAND CONCERN T ^• u,. e•.•.a m SHEETS L-5 THROUGH L] CI s° E m•N .w wa PERIMETER LANDSCAPE REFERENCE i SEE PLANS PREPARED BY IANp CONCERN ° 11 T I G SHEETS P 9 THROUGH P1 B SLOPE REFERENCE SEE SHEET L xs w � y � LOT 74 LOO T LOT 75 LOT 78 LOT ]fi S S \ m � Q 5 AB T ApESrW �NER aBEBrc R rFES TN sGN,pDALSAro ST H e EBEx a �, D o TIIE OT UAUDS ARLNIIERN RWPGWNpi -P-M •,i-.i '1 OFLMSTPUL1pN W1ALU OR MAx1EW.NCE Of NPBOVEYEMS ° R � ` N DELG6EDU9gB5PELFF ➢HERENAW04GAnA5ANr N1LAEW.BUTY EBULi NG EBpM pEVNTpN4 APO4TEPRA pEBiGx GRWP IS HOT RESPOH584E — ^ W t NODONSTRJGTIGNORRTHEREA"ERw R.IPPUEDiOME PRGIELi SLOPE REFERENCE SEE SHEET L -4 a T 86 n n _ C LO -. f !Fs....._._. LO 97 O LOT 98 BMITTAL- UBM WID—STT RIB HOME COASTAL RBFCONSULTING S.3101NLAND VALLEY DRIVE 21555 YNEZ ROAD, SUITE 400 ELONDBUBM TTAL 00 LT8UB p 6 MA CA 92595 TEMECULA, CA 92591 es a TH SUBMITTAL 1 91 -5239 TEL 19096]6 -8042 FAX TRACT zal4e -1 " E { 1 CON (951 —SO FAX '1909 6]6 -]240 M AL WILD 1 1 T1 SUBMITTAL T :SCOTT HANSEN CONTACT PERSON: TOM BURNSIDE Underground Service Alert n ARCHITERRA DESIGN GROUP, INC. 1.11-2 Call: TOLL FREE t ,. ♦ n 5'S!t / \ 1 - 800 LANDSCAPE ARCHITECTURE e • a IeEEp SITE PLANNING 422 - 4133 ° PROJECT LOCATION /\ A RANCHO CUCAMONGA CALICALIFORNIA 91]30 L -1 • / TEL.: OX 484 -2800 FAX 19091 484-2802 TwO wORNiNG DAYB BEFORE YOU DIG J \ �\ CON TACT: DAWN ROURK 1 pF 1 exEET9 PLANTING NOTES Pi. w... w. ww�+ n.. s.. c.« r.., w ,wn..,o «n..+w.as..�wr.sr,.N[°a. • ` a xo LANO6DAPE I ♦ . ARCHITECTURE El + ^, x wrunrmu,n cwxrtrtrucr,4m,, anxm[cs°x[mw wswm.rrnmmn. B I T E PLANNING + AIM �AaF RNGAE ❑ ° R17 M TYPICAL FRONT YARD PLANT LEGEND: i + } .W .. ° ° I I El + / -.W, ¢ y o r. ww.+..m., rao..� sH mRa ,^ 1—I N W H O O D O O r. r d¢ O LL p } O ❑ ~_ Ej e - O p O + „w .` + ,00 ° „ w O I i ❑ ❑• ❑_ + o� Q O :: a P n a o ° O o - ° maarwa,.r N o0 0 ° 08 Wa� Z ° o; — oI Q J EROSION CONTROL PLANTING LEGEND (SEE SHEET L -4): �PLAN 1634 -C — CUL DE SAC PLAN 2255 -RC - CORNER CONDI ON O �w SCALE nre -,n it .�. n , O Ye a A n JOG RR TO. xwc,[elw[crxix,wre. ® ys r�ar.x a.e. id.nam. 1°n. see.,, JRC xN� ema Na,wwsrnnab W fasn OvtwtO Underground Service Alert " [R Call: TOLL FREE ota -2 1-800 SYMBOL LEGEND PLAN CROSS REFERENCES 422 -4133 FOR NOTES AND LEGENDS, SEE THIS SHEET -^ TWO WORKING OAVS BEFORE YOU Olp r� FOR ADDITIONAL TYPICAL FRONT YARD PLANTING PLANS. SEE SHEET L-3 L i " FOR TYPICAL PL EHOSION CONTROL PLAN ScA`E. ,re TING PLAN, SEE SHEET L4 . e.p — s ua r FOR WALL AND FENCE PLANS, SEE SHEET L -5 AND L-6 . ................... __._...._............_.. ...... __...........___........_........._........_................................,.............._......_..._.._._—_._........-_.........._... ._...._...._ ....... ..... ....._. z OF T ..._ ..................... _........................._._ —. 6HT6. . El I r LA NOS CA P El ARCHITECTURE! SITE PLANNING' L i E : El i V I I ` jj 1 I � a _ U ❑' — J i n c b ELI uj ww ° k79. xO Ts t ... ............ O� U y , y y ` PLAN 1634 -C PLAN 1793 -B A PLAN 1833 -B - SCALE In =r -o SCALE. ire I V SCALE.ere .I.V aw�ws. w ss.... ewsw ams Q J D_ Q i i O A A A A A JRC GG € - a O _ -- OEe n v ruc rEU UU0 v ry u vurrt se oeu •r LLBE NSi4lE0wnv,w.sNOUnrC Underground Service Alert Call: TOLL FREE -- SYMBOL LEGEND PLAN CROSS REFERENCES 016 2 1 -800. PLAN 2255 -C yes ynn FOR NOTES AND LEGENDS. SEE SHEET L-2 � a0 OR ADDITIONAL TYPICAL FRONT YARD PLANTING PLANS. SEE SHEET L -2 422 -4133 L -J SCALE: IR -IP.� FOR EROSION CONTROL PUNTING PLAN. SEE SHEET L< Im =ea J FOR WALL AND FENCE PLANS„ SEE SHEETS LS ANp Lb 1W0 WORKING DAYS 0 O 111G S -- - - - - -- - --------- ------ --------- ----- ------------- — ----- ----- - - - - -- — ------ - - - - -- -- ------ 0= a- 1-4=1. ---------- 0 0 1 11 n L A N 0 0 CA E� ARCHITECTUW - - - - - - - - - - SITE PLANNING i. LOT 11 LOT 12 LOT 38 LOT 97 LOT 76 S—E: SCALE: I SCALE: ,' =.1 V O DO > ILI A LL, 0 l� c 0 LL 0 =0 L C) % 0z i < LOT 39 LOT 40 LOT 98 LOT 20 LOT 78 Z a_ .—E-- I'=— SCALE:I—W 0 q z Z O Z U)¢ cc 0- ui A aa A --- A A JGG imc LOT 96 SCALE:1'=X-' ------- M—D O I Underground Se -2V-D. rvice Alert LO 118 L01 L5 LOT 77 LOT 74 Call: TOLL FREE I__ SCALE: I'— SCILE I-MW 1014-2 1-800 SYMBOL LEGEND PLAN GROSS REFERENCES j 'Ca Emu cx ,a 'c' PE-1— I.E 1-T A . E M.'. I A I ZZ M. D 422-4133 F OR NOTES AND LEGENDS. SEE SHEET L-2 L-4 SHE C _�1 ' I 1L1111L*1 TWD WMKING DAYS MFORE YOU DIq D�— — —E — wxcxmxixsr OR EROSION CONTROL REFERENCE, SEE SHEET KEY AP, SHEET L-I FOR WALL AND FENCE PLANS, SEE SHEET L-5 AND L-6 .............. .................. ................. ....................... . . . .............. .... ... ....... ........ . ...... .................. ..... .... ...... ............ . ... ... . . . .................... ......................................... - ......... . ......................... . ............. ... . ... .................. .............. . ....... . ...... .............. .......... .......... ... . ............................... . .... ........ . ... ....... ............ ---- ............... . ............. . ........ ........ ............... . ...... . ..... . ............. ---------- - — — ---------- ----------- . ....... . . ....... ------------------ - - - - - - - - - - - - - - - - — - — - — - — - — - — - — - — - — CONSTRUCTION NOTES - — - — - — - — - — - — - — - — - — - — - — - — - — - — - BUTTERFIELD STAGE ROAD — - — - — - — - — - — - %1= XMOtr _'M B ITE PLANNING . ... ... ... ... ... ... ... O ER-M.. AL 10 G�r_ _V� YOU pp., T F : 28 _ :,I� 2n9 'is miff 3 3� 1,2 a,l -H, �r- I�D C�--AT�l PRI S� -AT- 1A11. - - - - - - - A, A. D _ To M4 - - - - L 1, T _ A � J I ...... . ... A 3S F � Y 4� 10 L�� AL " W" -DE- A-ALL5,1HA-AVEA 74 � _ =. AL, _., ,T 0 1 w P r -1-1- - 1 7 — - —BEAVEN COURT— 0 z 11 12.3.4 111. - Fl D.—I --1 - -TE-- ........... -7-1 -1- ELIYA- - T.1 -1-1 I j- 52, 0 1 z 7 71 i U) CONSTRUCTION LEGEND "Al (D Z- 41 0 34 12- 4 Lea 0 1,2,3.4 L) Lit Mr > w Lu > J o 1.3,4 r 272 A ...... CD tz sm- C) 1x2. t N C, W _ 6 �lXg�� E .- U) 0 LL o - _2�L 21 11 -COUR T 0 (D ED 1234'�% D 1214 I*p 12 -31 G) 4 E, 3,1 Q T_ ' 7 1,2,1,4 2.1.4 LP AA P N A Uj C) z 2 1 z M DRIVE W < CL l , '0 0,Ns KEY MAP LL z Z) -T T—E 1 2 4 M M , 4 2 \4 Y A A A T A mpw X jFc Underground Service Alert Call: TO LL FREE 1014-2 o AD 1 1-800 PLAN CROSS REFERENCES A� . Aa TRACT 24188-1 422-41S3 FOR NOTES AND LEGENDS, SEE THIS SHEET L-5 TWO KING DAYS BEFORE YOU DIO F OR TY P ICAL FRONT YARD PLANTING PLANS. SEE SHEET w FOR ERO SION CONTROL PLANTING PLAN, SEE SHEET L 4 FOR ADDITIONAL WALL AND FENCE PLAINS, SEE SHEET L-6 1 01 1 .................. . . . .............. ............. . ... . .. - ..... . ......... . ..... . . ................. . . ......... ........... .. ............... . . . .. ... ............. - .................. . . . .......... - ... . .... . .... . ............. ...... . ....... - . . . ........ . ........ ........... .. . .................... .... .. . .. . ........ . .. ............... .. .... .. . .. ............... .................... i ---- --------- — -------------- --------- ------ — — -- ---- LIMIT OF WORK - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - — - — - — - — - — - — - — - - — — - — - CONSTRUCTION LEGEND - - — - — - — - — - — - — - — - — - — - — - — - LAND 8 CAPEI UF g%�w% M BITE PLANNING ARCHITECTURE I Q .. ... ... ... ... .. ... ... ... VkrCD-SCAP-1S1.-1- jt� 12,JA Z) mumn"- A,- w 0 -,A ... .... ;Bi 0 8 1 77 0 7 7� - - - - - - --- i / 62/ U / ,..` - ` _ _ / So', S� AS tc 12S < 1,2,3 1,4 1 J, TRACT 24188-1 0 > W 0 w . t 75 Y c) N ujLU 72 1 MSR- 12.34 0 LL 0 1:0 It, CO UR 1,4 1.2A,4 BT 1.2,3,. 1 0 IGI 97 81 .2. 4 .1 10 Z' ti 3.4 B"?! 1,23,4 LU 0 z j Z' IN i. S UNNY "A' k w LL KEY MAP Z:D ANA 2a. I \� \ < 0 rc J C ' , A A MPW JRr Underground Service Alert -40 0' C,II: TOLL FREE 1-800 1 PLAN CROSS REFERENCES VY 422-4133 TRACT 24188-1 FOR NOTES AND LEGENDS, SEE THIS SHEET TWO WORKING DAYS BEFORE YOU DIG F TYPICAL FRONT YARD PLANTING PLANS, SEE SHEET L-2 AND L-3 -LE: L-6 FOR E CONTROL PUNTING PLAN SEE SHEET L-4 FOR A OORIONAL WALL AND FENCE PLAINS, SEE SHEET L 5 OF , SH- ................ - ...... . . ..... ............................ ....... . ................ ..... ............. ... . ....... - ..... . ..... . ....... ... .. .. . ......... . ..... ......................... . . .. .... .......... ................. ................... .... . ....... . . ............... . .. ..... . . . . . ..... ..... . . ..... .... ..................................................... - ...... . .. . ......... ................ - ........... ........... ......... . ....................... . ....... ......... .... ... --------------------- ------------- --------- ---------- C) o x. r L A N 0 6 0 A P E 6 o'.. P & ARCHITECTURE (D ITE PLANNING T, =AT �A�lffll.I AL METAL CO "TTl.... ( D mwTmal " T==TYZT.' 11-A .1 .1 111 T. T 11 El) -.1. TTE. I T T. �l ET D � �.� S I ED, ' A ' � xe -.E T� E..._T -TAIL p _ GA E IE ,.EAIO ,T, 5'-6" HIGH PRECISION BLOCK WALL TUBULAR STEEL SIDEYARD GATE 5' HIGH TAN VINYL SIDEYARD FENCE S-LE w i Q > W 0 LL o To . NOT USED NOT USED NOT USED NOT USED NOT USED SCALE: � SCALE: SCALE: SCALE: SCALE: Lu C) Z Lu U) LL z 1 < w AM NOT USED NOT USED R IOT USED NOT USED NOT USED E: E: E: A A A A A A mpw JRC AS SHOWN NOT USED ^ NOT USED Al NOT USED d%. NOT USED Aft NOT USED T LE LE: 1077_F L-7 ....... . ....................... . . ............. . . .... . . ...... . . . ........... . . . ........... . ......... . Elevation 'A' ., f - _ I -1 an ■a■ �,. - I I —1 Y .aw Elevation'B' Elevation'C'. , PLAN I C pl ume r SOL ,,,., °"° PASEO DEL -2 TEMECU TRACT #24189- LA. CA .ur aouo Left Elevation'A' Front Elevation'A' W. • Right Elevation'A' Rear Elevation 'A' PLAN l PASEO DEL SOL TO ORDER_ " TRACT 424188 -z —._ TEMECULA, CA Mnr I .a -r.e wxxi T9 7 7 — I 777 — I Left Elevation 'B' Front Elevation'B' Ri t E evahon 'B' Rear Elevation S' PLAN I PASEO DEL SOL t �l1 wiew.exuyom. we.c�van ,n w.: anwe T ORDER TRACT 824186.2 emir: smav TEMECULA, CA eux ixeoie ■ Left Elevation'C' Front Elevation'C' 11 s ■ Right Elevation 'C' Rear Elevation 'C' PLAN I er.,y'. PASEO DEL SOL /, L�1' - NR ca�Ym4,4mmut Ww Vnv ._. Wi.1.fl UNv � TRACT A 2418N TO ORDER TEMECULA. CA J r 5 / , s�,�'umo�aa w.o[ oow Elevation 'A' ZrI u w.nK ----- - - - - -- Elevation 'B' Elevation'C' ""cvu`°e nooaruv PLAN 2 PASEO DEL SOL • • T ORDER '°" "°° TRACT 424188.2 .,., __ TEMECULA. CA TrTrml --6tVtrtmtM*Yj in h. 1.1312 be • • Left Elevation'A' Front Elevation'A' • • Rightight E1�ion 'A' Rear Elevation 'A' r" PLAN 2 PASEO DEL SOL w. w,ua,.�e'viws ` N TRACT #2 418 8 .2 EL S ME& T -0 ORDER TEMECULA, CA Left Elevation'B' Front Elevation '13' Right EBB' Rear Elevadon'B' PLAN 2 PASEO DEL SOL TO ORDER lr,m°° TRACT #24188 -2 TEMECULA. CA rnr ¢nw w�nw r w au � -� Left Elevation'C' Front Elevation'C' ■ 11 11 11 �� Rt t ovation C' Rear Elevation'C' PLAN 2 PASEO DEL SOL TO ORDER rvEM C TRACT 424189.2 TCMECUI.A, CA F • Elevation 'A' CM MI u ,fd JoCf e/ O< .Z� ■ � ■ ■ 9ViR. f,Y tt N fNLCO e/ [CO e/ UNMI� 4lYnnq fTM �RM[II • f[CTdu a,..a oao, � QMhY ttV. Elevation'B' Elevation'C' nfr.YF_.fY. acfxrtw._ PLAN PASEO DEL SOL _ nwxw: axles W MY�1 V�4 p�.a TRACT#2419 &2 spar: afvr WY Ix>OM TEMECULA, CA i oa, :r Ilium — MEIN ,. m =.. aµ .. Avg Left Elevation'A' i Front Elevation'A' •• • Rtght levatton A' Rear Elevation'A' pe ���""" PLAN 3 PASEO DEL SOL • TO ORDER TRACrr a2418K -2 ..no �I t .w Left Elevation'B' Front Elevation 'B' Ul ■ Right m El B' Rear Elevation'B'a>. AOVO°"° PLAN3 q*ia�® �� �...e..rv. PASEO DEL SOL � wie biW VYgoia ri n.... SJf w:. TO ORDER " "°° TRACT M24186 -2 TLMGCULA. CA i T , ^j, Left Elevation'C' Front Elevation'C' Right 'Elevation Rear Elevation 'C' amenwn "uvm naanw PLAN 3 PASEO DEL SOL �. MIWmv.f "1If% TRACT #24198.2 TO ORDER ' " " "' TEMECULA,CA • Flevation 'A' ■ .'f mmmm u Elevation 'B' Elevation 'C' PLAN 4 PASEO DEL SOL Kb 1M+a S.YeCWbey('a.�i / w IL NI�/VY►r p,w V,u4Y ISTCRY ' ! TO ORDER fiucrxzainn z M,,V ii.IDlo reMSCUU.cn �.4x Now s Left Flevation 'A' Front Elevation 'A' • • ■ Right Elevation Rear Elevation 'A' PLAN 4 PASEO DEL SOL Wr.fAO=„ l TO ORDER "' " »',°° TRACT 424188-2 TEMECl1LA, CA cuh m'".�txr ■ ro:Y rxwx mom m m � Left Elevation '13' Front Elevation 'B' ■■ Rt t evah' n V Rear Elevation 'B' PLAN 4 PASEO DEL SOL TO ORDER TRACT #24189 -2 °x tectn� CA ■ _ Q Left Elevation'C' Front Elevation'C' Ri t evaUon C' Rear Elevation'C' ♦woo.wusw PLAN 4 PASEO DEL SOL Lsj O O R DE� TRACT 0241884 `xmo TEMECULA, CA Elevation'A' Elevation 'B' Elevation 'C' .nevixse ruwnri.�n•� " "' PLAN I / 6 Iw ; '°'' "ohs ", °�• PASEO DEL SOL �R ' °" TRACT #24188-2 TO ORDE M *�avi m s *gas TEMECU ' LA.CA ' f weo ew "• P M. BA. P O M. BORM. I �I _ I 1 Y T -__- - A ,I BA. 2 ( n BORM. 2 u �LJ ? I - z _ I GREAT ROOM M•e 1.•s acre � LAU, 5 Rv�Mr o e o M• -n }• I I I L ? I I - GARAGE ENT b KITCHEN .. w. O '� ' I I POR d'� ; o ! SQUASH POOTA08 FIAN 071621 n,NN noon A,en 1e2e isle 1e2e 6a r. A— 1629 1— - OTAL 50'FT. NmE: Floor Plan 'A' ` ` N PLAN I Oul @ ,e,lehl.e�,ol�,l,�. PASEO DEL SOL ITO ORDER °30` "'° raACrnzaiss -z n TEMECULA, CA e16Y I I I I I I - BDRM. c.rwe* LAU. �� III ,o -e it CrAU. I II • GARAGE ENTRY KITCHEN KITCHEN O ^ GARAGE ENTRY a PORCH e o - o PORCH 1 I ,r - r cue. 1 „�. Partial Floor Plan 'C' Partial Floor Plan 'B' PLAN i _e PASEO DEL SOL T ORDE TRACT #24188 -2 o sroar" M v,:.min TEMECULA•CA S " i i 1 n I , r k. y . — _____ 1 I ;_ _____I I I 1 I 1 I fK�NOxbm n n n n n I I r✓ai man I I k � � c I I 6 I I I I I I o c o c c o o c N��owreix I I I I I Y � 42 n/ yy I ----------- Roof Plans D PLAN 1 1�� w'Iao md�w l PASEO DEL SOL �a TO ORDER f9n >91 TRACT #24188-2 oR ;. TEMECULA. CA ev u m n ®o Left Elevation 'A' Front Elevation 'A' • i Rig it E evahon A Rear Elevation 'A' aiv'rase aouRVUn`�� PLAN I a .... _9. PASEO DEL SOL 1 �i l 5v J ('A 92595 S100.Y ISf[1RY' � (("' T ''°' O ' � ORDER 195n 9 50o TaACTnzaias -z ® t_. _._ k_____..._....— ._..,......,� TEM ECULA. CAe i I ------------- Left Elevation 'B' Front Elevation'B' I - RightEeva[ioii'B' RearElevation'B' PLAN 1 P rur+n .ibze ASEO DEL SOL u WR STOar o ORDER TRACT #24198-2 e„' TEMECULA. CA l Y' S 1 • � ra W �n IIIt_lll L I e� ooaR 1 Left Elevation 'C' Front Elevation 'C' .. g girl F evat on 'C' Rear Elevation 'C' PLAN 1 PASEO DEL SOL 1' TO ORDER 991691 �0o s TRACT g24183 -2 n ^ oai 3016 isroar TEMECULA,CA I I I I ;I YI YI Y BEDROOM 3 A DRY RE RD M� Typical Building Section ky« rLeyl ...., A . " P PLAN 1 ® -_ PASEO DEL SOL TO ORDER 0 ° °'s TRACT #24188 so ^ TEMECULA. CA ^Y i o AN D ® ❑ ❑❑❑ LI 11 Elevation 'A' M1nr rae u � - roi.n mm ° ❑❑oLA ❑❑❑❑ Elevation'B' Elevation 'C' nr`ti" PLAN 2 PASEO DEL SOL � [TO ORDERS raACrazaias -z MAY1 z TEMECULA, CA MAC' =i � p x I o 4 I li pi I I p R a� ao x 6REA � I �I I I OOM ✓ oD KITC II • S I 1 f p - - -- BDRM.. 2 • I u h. ^II II p - BDR FOY a6 � II __ II o o - L I » .._ ...... _.. ENTRY BA`L2 u u P T I GARAGE w. a. I � PORGH _ I BDRM.3 6QUA88 lO0fA68 PLAN UID79 _________ wcc ___ _ __ x .. .. . n T01 —AREA ID]O IDS° W. >°'IT. 3 . ;. ,. sore FloorPlan'A' "' PLAN2 ._ ..... , .� ^ PASEO DEL SOL I [ ` alt t'x °° TaacT nzaiss -z p Isrpa TEMECULA, CA r - - -_ BDRM. 2 - - - - -J BDRM. 2 n ii u u io -i. DEN /OPT. DEN /OPT. BDRM 4 FOYER BDRM 4 FOYER �3 .eb LA . N .. ENTRY S O BA. 2 : ENTRY } GARAGE i GARAGE PORCH i 1 PORCH i BDRM. 3 BDRM. 3 V P o - o Partial Floor Plan'C' Partial Floor Plan '13' PASEO DEL SOL P u m • ' "�" TO ORDER 95 raACraza�ss -z ;�a+ TEMECULA. CA 's A `s i '1 J: f --7 I al oHram I — a.ia I I — I [ n I '� n' I I P- i i � �,o f f � a " _________ ___ _____ _ I u c� [� I I !� I I ^ I �. I I wu eean I 1 rwu man I V � I rr4[ aeon _emu u I I I u I M�w I I T� � I � I I u u n•�owrein 1 I I I I I I I I I I I I I I I I I I I I I 1 I I I I I 1 I 1 I i I I A I I I I I I I I I I I p I I ____ y I I I I 'A' 'B' 'C' Roof Plans xis a. PLAN 2 PASEO DEL SOL a� .1. 9 :s9s 1.11 12 TO ORDER TRACT #24188-2 «�R TEMECULA. CA i e�� me • .. • w.r nre ' eo..ry raaee • Left Elevation 'A' Front Elevation'A' a� R,g it E evaUon'A' Rear Elevation'A' s 'ACrurt'rury PLAN 2 7 1 ���t��il:n. C.If muTw.r+l vl.0 IIHHH PASEO DEL SOL TRACT #24188 -z Mar. !s *off C TEMEC " °` ULA. CA .'i 'l. i i i i ea +ns eo.er� - siwco aces !. Left Elevation'B' Front�Elevation'B' r a `i Rig It ovation 'B' Rear Elevation '13' ev %ese iiuon`e �.v` "� PLAN 2 PASEO DEL SOL aw ; o� � (TO ORDER TaACTazaixx -z MA TEMECULA, CA m i x c nar LtL Left Elevation 'C' Front Elevation 'C' — Rear Elevation ' ' C NOTE Riglit evatic'n" PLAN 2 ............ ...... .... . . ............. . ........... .. . ........... . . . ... ... ..... ... ...... . . ........... ............. . . . . ................ . . — . ........... . ... .... . F M [ wv- PASEO DEL SOL TRACT 424198-2 TEMECULA,CA 1', F P �I rl YI �I zi k� DEN HALL BEDROOM 2 � W. s TyVica Building Section a E: asED PLAN 2 PASEO DEL SOL � � Q ww ps JO n ORDER "" "' TitacTnza1ss -z i' MAY1 s m oar TEMECULA•CA MAY i Y y . a t �j 5 i i r Elevation 'A' C' F F air. m. ara +. m El >nrm rmn+ l rra+ 00 ia wen Elevation 'B' Elevation �nwEwsF'ti Wa a.tvr PLAN 3 PASEO DEL SOL I ZIJ A 3.95 1O .: i�•�wp TO ORDER 9' raACrazaisa -z M oa+ 98MECULA, CA tI - ° M. BDRM Q ii T BDRM. 2 O r.; li ss s O GREAT ROOM - - M. BA. ? ° 4 o KITCHEN 1 01 (1 o r a n BA. z 0 LAU. - n HALL L...i I I ,. ',.. b I. GARAG Ti� o ENTRY 4 � I °- LOFT /OPT. e * - BDRM. S _ POWDE BDRM. I I - 9 - 1 �.7I/I7I/IUI/I�01/ITiIl - - -a-�- PORCH 4 �s o a - - - - -- - - --- ------ - - - - -� ` lLLOl� °PZl7 SQUARE FOOTAGE _KAN 277.Uf1 r � w.1 ,xs I — Da'FT. r nnr O �8 NNEP0.LSCNl' Second Floor Plan 'A' First Floor Plan 'A' "''`.. PLAN 3 mm�Ml ® PASEO DEL SOL a PLAI 1— 1 C Ivzlinal mm 23 >' TRACT #24188 -2 I srono I TO ORDER I TEMECULA, CA MAY Iz ol° BA. 2 LAUN r i - 4 i i GARAGE a ENTRY LOFT /OPT. - BORM.5 ® POWDER BDRM. 3 BDRM. 4 n 00 - 'J1.7../IJI/III/III/II�7 _ IL - - - -- --------- 1 . Partial Second Floor Plan 'C' Partial First Floor PIa u C tl ____, A. _.i LAUN. - i i L-J i f .... _.... GARAGE . ENTRY LOFT /OPT. -_ BORM.S ` POWDER BDRM. 3 BDRM. 4 1 O� lI/IlDll/I//Il/✓Ill1 "�' PORCH FLW0.1'I.AR' ' Partial Second Floor Plan 'B Partial First Plan'B' PLA ,:, c.rJ�m�:✓c,,.,mi PASEO DEL SOL o � [TO ORDER r9s'a9� TRACT #24188-2 Y IoRy ORY TEML ULA, CA v u min t 0 0 I ` I m I I •r, i I I ,. I e � r I o [ I I I c [ m I I I worts I I .� ^ I I I is�e veers � m ttr I I I I i is rt .a e N orneiry 'A' '$' 'C' Roof Plans ..___. . -.... _. e "' PLAN 3 PASEO DEL SOL TRACT #24188 -2 � TO ORDERRI T> M> cu�A, CA °� t cv. noe • wood r�scin • �.. 4 a - s Left Elevation'A' Front Elevation'A' Er Q • Riga E evarion'A' Rear Elevation 'A' vies¢ ii:oon ��.nn PLAN 3 `mom °' PASEO DEL SOL /' TO ORDER 'von imoo zsys N. TRACT #24188 -2 °° v c mm t TEM ECULA. CA Left Elevation 'B' Front Elevation 'B' E t • t Rig ahon'B' Rear PLAN 3 t ev / E; wow n r m�K.�i r�nrvn ® Ss PASEO DEL SOL ; • TO ORDEF2� "'" " "°° TRACT #24188-2 M�m'ar roa TEMECULA, CA ��' " WE I o Left Elevation 'C' Front Elevation 'C' rill] Rig evation Ic Rear Elevation'C" NOT VT ' i 0 N PLAN 3 .. ... ..... ------- ............ - ............. - -- - - ---- - ----- ------ -, ......... . ..... ..... . ....... . ... . . ............... .......... . .......... ....... . ............... ... ....... . ...... . .... . ........ ... PASEO DEL SOL ro To ORDER TRACT #24188-2 MAY 12.2- TEMECULA, CA I I �I I I - I I LAUNDRY HALL 641' IY I I GARAGE ENTRY I,o ul u � TMI I Typical Buis tng Sed -E chon A E PLAN 3 PASEO DEL SOL H r 1 ER " " rRncTazaiss -z ... TEMrCULA, CA i p Elevation 'A' F 4 F ® i�iii iii i®t iom ®.i«o siiiii LLI. - - r . ❑ ©❑ ,r��R = :r Dili �� �� � �� �� — �1� ; -�:� ❑ ❑� ❑� ❑ ❑❑ Elevation 'B' Elevation 'C' x a, RS PLAN 4 PASEO DEL SOL ' TO ORDERS ' ° v aa zsys TRACT 424188 -2 s �a" M „ zR c TEMECULA, CA o 4 P M. BATH rje ® PANTRY n z - � w. ®I I - L -- — GREAT ROOM F ..r I e 93 ss cA„�. r s YJ BDRM. � • - - -- o e" C Y7 � e- cu. I n � - �1_ DEN /OPT. - gq �O r BDRM 5 n z LAU. ' ` z �7lJ , a I F ....'.i q O o a 4 To LOFT /OPT. • BDRM. 4 - _ q 3 o e o s" ENTRY BDRM. 3 •- '.a }. s., }• a -e }- - I I ioo . a-o 70,o rx I GARAGE /---------- - F. - I I o POR - I I — � - + L - - - - -- - - - - -- - --- - - - -- - I/I/Il/I s' -i }• s' -3} , -s }• _ - - [QUABB POOTAOB PUN 2353215 . . , }- _ e} . ARGA .+tF.. 1393 2293 3333 9p' IT. j ° 1N Stn'i' �ntvmsF. a(nIR ALA.. PLAN Second Floor Plan'A' First Floor Plan'A' p "`,' "a`"" °' PASEO DEL SOL FE "b., " 's i ono " - ru _ zi +i TO ORDER 5D "oon TRACT #24188-2 STORY TEMECULA, CA �'� "' I I I LOFT /OPT. _.' BDRM.4 e: ^ • ue. f I e e � ENTRY � I _ BDRM. 3 ° L GARAGE o .- h_.........._ n b I I t !/ / -------------- I PORCH I L----------------- __ ___ ____� / ...... UUUI/UIUU // // O1L 1J� %' l/JO� V _ Partial S econd Floor Pl an 'C' Partial First F loor P lan 'C' IC LOFT /OPT. t BDRM 4 E j ENTRY ' �e z• c wer GARAGE T mo .iao • - ; us. , � i PORGH I I � reeo ^ UUI/IUUIUT/IUU�U I � " Partial Second Floor Plan 'B' Partial First Floor Plan 'B' PLAN 4 PASEO DEL SOL 1' �TO RDER., 19snnsi:i °i.as TRACT 424188 -2 srortr: is nas TEMECULA, CA MA ) 12,201D ; f . I I wu emn -'j .wi �ic — 'i a n► 1- I I r i / � ► `1 r� / � n �► F- - - I ___ _ _____ /, ,► o Roof Plans s PLAN 4 .maur �,r�wwl PASEO DEL SOL PTO ORDER ..... °°92595 TRACT #24188-2 TEMECULA, CA Mn. • ® I x�x+� oron eraroe oaoR ❑ ..I eww nxiex 7 II I� Fix -- E EO© Left Elevation'A' Front EIevation'A' in �t EI vat on'A' Rear Elevation "A' PLAN 4 y ru���s.�m�r„armmr.T..wai w�J °„u "'������yrM.� PASEO DEL SOL � FTO ORDER TELACTg24188 -2 TBMECULA. CA �'� "� 1 1 � - �� Left Elevation '13' Front Elevation'B' TIT r im" - g RE M Right Elevation'B' Rear Elevation'B' 0 . PLAN 4 I S G I't :oa✓fww.l _ ..... ..� «« N u.: l 1b1 PASEO DEL SOL . b 4k," ? 1n n15n5 TO I DER ] TE mn TRACT k241riri -2 r a in s rnn TEMECULA. CA �. . IMP IJ o ®�o� Left Elevation 'C' Front Elevation 'C' t Right E evation'C' Rear Elevation'C' PLAN 4 .5 PASEO DEL SOL z� 5 r u.i 1' 1 w� "6 � " TRACT #24188-2 TO o ' isroav ' ORDER TEMECULA, CA I I I I I I ROO 3 LOFT I GARAGE ENTRY I TypicarBui1 mg Section x �r uNw mks PLAN 4 PASEO DEL SOL � F1 KII S 'f mK'w,.l °TSaMI / Y Y :: 1 J1 ml . E TO ORDER I TRACT #24188 -2 oRJ € TEMECULA. CA �� PASEO DEL SOL PTO O RDER SOUTHERN CALIFORNIA DIVISION June 14, 2010 PAGE 1 SPANISH ELEVATIONS SCHEME 1 SCHEME 2 SCHEME 3 SCHEME I Hoof Roos � na icswsa iwcaol3l tvrwsw nsoxnx soot stucco eruacn srucoo swexs sirens ev/fl9a swan F�acN canncE Erscu coact: F�scla oa swiall F�croRY eROr`Yr -1.1 F TORre+onu swawT Fncro Ya— racrara moan Trill FRONT ERTRYnehITTEF9 R10RT B�TRYNM1iTFA9 TWIT FROOR p1TRYpWITTHi9 TRIG FROMFMRY9RUl- 8w1a5) a 7 9W ]e3a swum SW 3eae Sw1SW aw 3131 pAY LOOKERS 0.AY lDO1fER5 4AY La01Q:it9 �AYIOOIfB18 9W BA) SW 9lB) SW 80B] awY/ KB Home reserves the right to modify or diawntinue any products, colors or styles at arty time vdthout prior notice. Displays of options, colors. textures, brick stone, ale. shutters. roofing materials, siding, surfaces, scan and material mbi ccnabons vrsved on a sample color board may differ from the appearances Of the options on homes when vi—d In person. Please visit a KB Home model home —unity to view actual colors textures. materials and comGnahons. h PASEO DEL SOL • TO ORDER SO UTHERN CALIFORNIA DIVISION June 14, 2010 PAGE 2 FRENCH COUNTRY ELEVATIONS SCHEME 5 SCHEME 6 SCHEME 7 SCHEME B HO S�uaea \ s-132a STUCCO SNQ:O 9TUCW 547722 SW 70a5 9W 1523 FNSVIA6aC1®i8 FM19CVuleClt6H?RIM . D �_,�- , GARAGE Fh9L4AtICl�R3ngIY GI�MGE - 7 - i t f, 8n61n - 9n8b5 —T-1 —D SW 7r „_ FACfORV BROMI SW1At FhCfOfiYKNOND -M - _'. -::.. FgONi EMRYaOIJilEa9 FaONTB17NY9NT7EN3 FltONT ENrttYbNUnBle 9W 1588 9n>8K 9l. 6158 8W 7062 G6as END —E END c.latF ElD ..... scams sw7a7 ev7aao STONE STONE VWTAGE NINEIID(.ESTONE .. .. . r._ ,, .,, TTT fJ1hRGgLL MI3TlIDGE3rONE .- h3YEN GOIINTRYlIDGE3IONE KB Home rassnes the ngM to modify or o5aconCnue any produces, colon or styles at any time without prior notice. Displays of optione, colon, textures, bricK stone, tile, shutters, roofing matenale, aiding, surfaces, stain and matenel comWnations viewed on a sample color board may dlfw from the appearanoss of the options an homes when viewed in parson. Please vl.h a KB Hame model home rxanmunty to view actual colas textures. material.. and combination. R PASEO DEL SOL • P TO ORDER SOUTHERN CALIFORNIA DIVISION June 14, 2010 PAGE 3 ITALIANATE ELEVATIONS SCHEME 9 SCHEME 1g SCHEME ll SCHEME 12 v�icw, e.6s vl�cea3+ ' t n v OO rs F Vw � v�icaotst BOOr STUCCO arum 31116LO svv7sa sw 7es7 swvw swmes F0.9CN —E FASCaFRONi FT'TRY GMAGE F0.SYM?RINMILRE GPIUGE - WN(iE 9w6151 F6CTORY andal --ow, F6CfORY ,L 0 S.1 .... FIiOrORYMMpO TntIWSTUCCO Htl.RE FRONT ENTRY9HUTTERS LCCO.— UTTERS FRONT ENT --U— STuCCOHanE ginpi BRR." iB Sw75es 9W]e56 SYJ 75]t AV 78C Sw6110 ?Nines rAOUGHT 6iON QAY LOONERa VaUUGHT WON 0.A OOKERS IRON QAY LOd0:R9 P aw -7 ]675 38]] MM matter KB Home reserves the right to modfy a discontinue any products, Colors or styles at any time witnow prior notice. Displays of options, colors, textures, bicK stone. Ole, shutters, roofing materials. siding, surfaces, stain and material combinations viewed on a sample cola board may Wer from the appearances of the options on homes when viewed In person. Please visit a KB Home model home community to view actual colors textures, materials, and combinations. r PA5E0 DEL 501 SOUTHERN CALIFORNIA COASTAL DIVISION PROJECT # 425999 REV. 0 14/201 O 5FAN15H 'A' ELEVATIONS MATERIALS MFG. SCHEME I SCHEME 2 SCHEME 3 SCHEME 4 STUCCO OMEGA KB 2058 KB 2018 KB 2053 1 1/2 15 STUCCO SHERWIN WILLIAMS SW 6385 5W 61 19 SWI 134 SW 7555 FASCIA SHERWIN WILLIAMS SW 7034 5W 7041 SW 6097 SW 7034 WINDOW TRIM SHERWIN WILLIAMS SW 2057 5W 61 09 SW 2202 SW 7540 ACCENT SHERWIN WILLIAMS 5W 6237 SW 2838 SW 2809 5W 2731 GARAGE WAYNE DALTON FACTORY BROWN FACTORY BROWN FACTORY BROWN FACTORY BROWN CLAY OUTLOOKERS SHERWIN WILLIAMS SW 6097 SW 6097 SW 6097 SW 6097 WROUGHT IRON SHERWIN WILLIAMS SW 6258 SW 6258 SW 6258 SW 6258 GUTTERS /DOWNSPOUTS CUSTOM -GILT METALS WEATHERED BRONZE WEATHERED BRONZE BEAVER BROWN WEATHERED BRONZE ROOF TILE MONIER LOW PROFILE'S' IVIC56464 I VICSO431 IVIC53940 IVICSO141 FRENCH COUNTRY 'B' ELEVATIONS MATERIALS MFG. SCHEME 5 SCHEME 6 SCHEME 7. SCHEME 8 STUCCO OMEGA KB 1 285 KB 2086 KB 1 383 KB 2066 STUCCO SHERWIN WILLIAMS SW 7036 KB 7722 SW 7045 5W 7522 FASCIA/KICKERS SHERWIN WILLIAMS SW 61 73 KB 6385 SW 7042 SW 7571 WINDOW TRIM SHERWIN WILLIAMS SW 7566 KB 6385 SW 7042 SW 7571 ACCENT SHERWIN WILLIAMS SW 6090 KB 2846 SW 6258 SW 7062 GARAGE WAYNE DALTON FACTORY BROWN FACTORY ALMOND FACTORY BROWN FACTORY ALMOND GABLE END SHERWIN WILLIAMS SW 61 72 KB 7736 SW 7047 SW 7060 STONE PRO STONE VINTAGE WINE GLACIER VALLEY CHARCOAL MIST SMOKED OYSTER LEDGESTONE LEDGE5TONE LEDGESTONE TUSCAN COBBLE GROUT ORCO DRYSTACK DRYSTACK DRYSTACK CARAMEL GUTTERS /DOWNSPOUTS CUSTOM -BILT METALS BRONZE SATIN WHITE SATIN WHITE SATIN WHITE ROOF TILE MONIER'5LATE' TILE I1-5CS4598 ILSC51 132 I1-5C55047 IL5CS0330 ITALIANATE ITALIANATE MATERIALS MFG, SCHEME 9 SCHEME 10 SCHEME I I SCHEME 12 STUCCO OMEGA KB 1 249 KB 2014 KB 1 357 KB 1 369 STUCCO SHERWIN WILLIAMS SW 7544 SW 7697 5W2204 SW 6109 FASCIA SHERWIN WILLIAMS SW 61 51 SW 61 46 SW 7531 SW 7536 TRIM/5TUCCO HILITE SHERWIN WILLIAMS SW 7868 SW 7571 SW 7531 SW 7536 FRONT ENTRY SHERWIN WILLIAMS 5W 2856 SW 61 46 SW 7645 SW 61 87 _ SHUTTERS SHERWIN WILLIAMS SW 2856 SW 61 44 SW 7645 SW 61 87 GARAGE WAYNE DALTON FACTORY BROWN FACTORY BROWN FACTORY ALMOND FACTORY ALMOND CLAY OUTLOOKERS SHERWIN WILLIAMS 5W 2837 SW 2837 SW 2837 SW 2837 AWNING (SOLID).: 5UNBRELLA DUBONNET TWEED FERN FERN MARINE BLUE WROUGHT IRON SHERWIN WILLIAMS SW 7675 SW 7675 SW 7675 SW 7675 ROOF TILE MONIER/LIFETILE I BCC5061 69 . IBCC3940 I BCCS014 1 IBCCS7970 NOTES: "ALL COLOR LOCATIONS TO BE DETERMINED BY COLOR KEY, GENERATED BY KB HOME ARCHITECTURE. REV. 6/14/10: 5CHEME5 SELECTED FROM ALPINE AT WILLOW RANCH AND PRIMROSE BOARDS REV SCHEME 4 STUCCO AND TRIM COLOR PER CITY COMMENTS COLOR KEY LEGEND SPAMSN - 'ELEVATIONS Left Elevation'A' Front Elevation'A' F-I STUCCO v T— ■ACW ■ G,N.G ■ cur DUTLO ERE I • • • Right Flevation'A' Rear Elevation'A' PASEO DEL SOL "A""° �' TO ORDER " � 1 TRACT#241 2 ro.N� �. CA C MAY 17, 2010 r .00� rwi sou �e� COLOR KEY LEGEND FRENCH COUNTRY _ ELEVATIONS _ 0 STUCCO Left Elevation S' Front Elevation B' ■ EASC CKE Q T M C G C G M GARAGE ■ GABLE ENG r Ri t Elevation Rear Elevation W PASEO DEL SOL y�I °' 7RAMN2IM2 DER 61BlY: ala T EMECULA, CA MAY uax MAY l7, 2010 COLOR KEY LEGEND SOUTHERN ITALIAN 'C'ELEVATIONS [ STUCCO Left Elevation'C From Elevation 'C' o TRwSTUCCOHRRE 0 FRONT ENTRY W SHUTTERS M GARAGE 0 CAY OUTLOOKERS lE 10 fl I � �- — o'-cu nvu• eva on Rear Elevation'C' - wi mw ser..c��.u..l nwnw.: ur.io, P ASEO DEL SOL CA TRACT #241 W2 mow: innr YAY ¢sw TO ORDER T CA MAY 17, 2010 COLOR KEY LEGEND $GANISN 'A ELEWTIONS Left Elevation'A' Front Elevation'A' O giucrO TOM Q TRIM ACCENT GA ME OUiLDOKERS o r M, iL 11 • _III Right Elevation'A' Rear Elevation'A' PASEO DEL SOL / • vur.,Gnm sY: Ii1011' MD •1_s TO ORDER rxACrxuisas TEMEICULA, CA MAY 17, 2010 COLOR KEY LEGEND FRENCH COUNTRY 'B' ELEVATIONS O STUCCO Left Elevation'B' Front Elevation S' o TB FASCU CMRS ACCENT GARAGE ® GABLE END Rigat ev °D Rear Elevation'B' '� '•'va WCA� nwra: in.ivw PASEO DEL SOL TO ORDER MI> "wwo TRACr#24198 -2 q'Y iEMECULA, CA N� umio i.rvaY MAY 17, 2010 COLOR KEY LEGEND SOUTHERN ITALM 'C' ELEVATIONS Left Elevation'C Front Elevation 'C' i FIB ® TRIWSTUCCO HILITE FIR TENTRY SHUTTERS GARAGE CLAY W%OOKERS e' on RearElevation'C' oNrrroc+iaslcur MNNe: In.ITp 1pI01eI.J VJN, Mw PASEO DEL SOL TRACr #241W2 SlplY: I.YRMT TEMECULA, CA MAY I; }010 MAY 17, 2010 ..� ._ �. �. 2 �. 1110 �-. AXE I W COLOR KEY LEGEND SCANISN Left Elevation 'A' Front Elevation 'A' 0 Vu� FASCIA TM ACCENT GARAGE CLAY GUTLOOKERS y ITT • • • 1 IR , Right Elevation A' — Rear Elevation "A' wr.�cWr�.Ko...i N.ww: vswx. � i �I�a�rr PA TO ORDER muw iaNO TRACT 024188-2 Kew: wsw TEMP,CULA; CA eroar. IdTd1v WY U.AN MAY 17, 2010 'AL J. COLOR KEY LEGEND FRENCH COUNTRY LeftElevation'B' Front Elevation 'B' - W ELEVATIONS ❑ STUCCO FASCWKIC.ERS E3 —m ALL " G ` AR�A N fE ■ GAB E END T77 Right eEr vaTion B' Rear Elevation'B' M o�tiWSo T �� mnM wa N1-: WJW PA E DEL L R TO ORDER TRACTM2a1Raz TEMECULA, CA SiOItY: 1 -It01N MAT I ;1410 MAY 17, 2010 ME 3 COLOR KEY LEGEND �p p�r..wl. /� SOUTHERN ITALIW IA ° evatlon'C' Front Elevation' 'C' ELEVATIONS ❑ STUCCO 0 FASCU r3 TRIWSTUCC0 HILITE M FRONT ENTRY SHUTTERS C A y OE CLAY OUTLOONERS rl I Ll ev on Rear Elevation'C' 1 1 1O .oi� u m e N.VtN.: anew TRDER °'D• - Tw+cr#24188 -2 O O ,IEMHCULA. , MAY 1 MAY 17, 2010 DOLOR I(EV LEGEND $RIINISH LeR Elevation'A' Front Elevation 'A' s,ucco "ISH S FA TR M A CEW CU I Y OE • � CY OUTLOOIfERS T T T ,i �� W m 0 y IT � I - k RighfElevation'A' Rear Elevation'A' PASEO DEL SOL TO ORDER I TePo1BCULA,CA MAY 12 ]ON MAY 17, 2010 i' COLOR KEYLEGEND FRENCH COUNTRY Left Eleva tion'B' - — Front El evatlon'B' 8' ELEVATIONS ❑ STUCCO M EASCUNBCKERS cl TIM ■ ACCENT ■D EE ® GABLE END 0* � 100�- 1 m mm m in in V FF i L71 RighMevation TB --- Rear Elevation'B' PASEO DEL SOL , DAN . : Coo MNN.: Df911 TO ORDER Irsllala oo TRACPN24IM2 rmy 4my TEMECULA, CA NAY I; no MAY 17. 2010 raw A..• � [ M nGto 2a NF 0. rA . . —TOMA. aaPl 79F a+ana[aroa Left Elevation'C Front Elevation ' COLOR KEY LEGEND SOUTHERN ITALIAN 'C' ELEVATIONS [ ; STUCCO E FASCIA Q TRIWSTUCCO HILITE M FRONT ENTRY M SHUTTERS GARAGE CLAY OUTLOOKERS m M ir Right Elevation'C' - Rear Elevation'C' / u PASEO DEL SOL D R `" "• ° TRACT #2418&2 iIO�Y: IraY YAY 1 ;Ills MAY 17, 2010 DH RESOLUTION DH RESOLUTION NO. 10- A RESOLUTION OF THE PLANNING DIRECTOR OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA10 -0161, A HOME PRODUCT REVIEW APPLICATION FOR KB HOME TO CONSTRUCT 118 SINGLE - FAMILY HOMES IN TRACT 24188 -2 OF PASEO DEL SOL, CONSISTING OF FOUR PLAN TYPES RANGING IN SIZE FROM 1,628 TO 2,241 SQUARE FEET, WITH THREE ARCHITECTURAL STYLES THAT INCLUDE SPANISH, COTTAGE AND ITALIANATE, GENERALLY LOCATED NORTH OF LEENA WAY, SOUTH OF PAUBA .ROAD, WEST OF BUTTERFIELD STAGE ROAD AND EAST OF MEADOWS PARKWAY Section 1. Procedural Findings. The Planning Director of the City of Temecula does hereby find, determine and declare that: A. On January 8, 2002, the City Council approved the Paseo del Sol Specific Plan No. 219 Amendment No. 8, Environmental Impact Report No. 235 Addendum No. 4, and Vesting Tentative Tract Map No. 24188. B. On May 21, 2010, Lennar Homes, filed Planning Application No. PA10- 0161 Development Plan for Home Product Review Application in a manner in accord with the City of Temecula General Plan and Development Code. . C. The Application was processed including, but not limited to a public notice, in the time and manner prescribed by State and local law. D. The Planning Director, at a regular meeting, considered the Application and environmental review on August 19,'2010, at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to and did testify either in support or in opposition to this matter. E. At the conclusion of the Director's Hearing and after due consideration of the testimony, the Planning Director approved Planning Application No. PA10 -0161 subject to Conditions of Approval,. after finding that the project proposed in Planning Application No. PA10 -0161, conformed to the City of Temecula's General Plan and Paloma del Sol Specific Plan. Section 2. Further Findings. The Planning Director, in approving Planning Application No. PA10 -0161, hereby makes the following findings as required by Development Code Section 17.05.010.F. A. The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City; The proposed single- family homes are permitted in the land use designation standards contained in the Paloma del Sol Specific Plan. The project is also consistent with the Low Medium Residential land use designation contained in the General Plan. The site is properly planned and zoned, and as conditioned, is physically suitable for the type and density of residential development proposed. The project, as conditioned, is also consistent with other applicable requirements of State law and local Ordinances, including the California Environmental Quality Act (CEQA), the Citywide Design Guidelines, and fire and building codes. B. The overall development of the land is designed for the protection of the public health, safety and general welfare; The overall design of the single - family homes, including the site, building, parking, circulation and other associated site improvements, is consistent with and intended to protect the health and safety of those working and living in' and around the site. The project has been reviewed for, and as conditioned, has been found to be consistent with all applicable policies, guidelines, standards and regulations intended to ensure that the development will be constructed and function in a manner consistent with the public health, safety, and welfare. Section 3. Environmental Findings. The Planning Director hereby makes the following environmental findings and determinations in connection with the approval of the Development Plan Application: A. The proposed project has been determined to be consistent with the previously adopted Paloma del Sol Specific Plan EIR and is, therefore, exempt from further Environmental Review (CEQA Section 15162 subsequent EIR's and Negative Declarations). In addition, the project is consistent with the MSHCP. A Burrowing Owl Study was conducted and no burrows or owls were found. Section 4. Conditions. The Planning Director of the City of Temecula approves Planning Application No. PA10 -0161, a Home Product Review Application for KB Home to construct 118 single - family homes in Tract 24188 -2 of Paseo del Sol, generally located north of Leena Way, South of Pauba Road, West of Butterfield Stage Road and East of Meadows Parkway. The homes will consist of four plan types ranging in size from 1,628 to 2,241 square feet, with 3 architectural styles that include Spanish, Cottage and Italianate, subject to the Conditions of Approval set forth on Exhibit A, attached hereto, and incorporated herein by this reference. Section 5. PASSED, APPROVED AND ADOPTED by the City of Temecula Planning Director this 19 day of August 2010 Patrick Richardson, Planning Director I, Cynthia Lariccia, Secretary of the Temecula Director's Hearing, do hereby certify that the forgoing DH Resolution No. 10- was duly and regularly adopted by the Planning Director of the City of Temecula at a regular meeting thereof held on the 19 day of August 2010. Cynthia Lariccia, Secretary EXHIBIT A DRAFT CONDITIONS OF APPROVAL EXHIBIT A CITY OF TEMECULA DRAFT CONDITIONS OF APPROVAL Planning Application No.: PA10 -0161 Project Description: A Home Product Review Application for KB Home to construct 118 single- family homes in Tract 24188 -2 of Paseo del Sol, consisting of four plan types ranging in size from 1,628 to 2,241 square feet, with three architectural styles that include Spanish, Cottage and Italianate, generally located north of Leena Way, South of Pauba Road, West of Butterfield Stage Road and East of Meadows Parkway. Tract Map No.: Tract 24188 -2 MSHCP Category: Single Family Residential (less than 8 du /ac) DIF Category: Residential - Detached TUMF Category: Single Family Residential Approval Date: August 19, 2010 Expiration Date: August 19, 2012 PLANNING DEPARTMENT Within 48 Hours of the Approval of This Project PL -1. The applicant/developer shall deliver to the Planning Department a cashier's check or money order made payable to the County Clerk in the amount of Sixty -Four Dollars ($64.00) for the County administrative fee, to enable the City to file the Notice of Determination as provided under Public Resources Code Section 21152 and California Code of Regulations Section 15062. If within said 48 -hour period the applicant/ developer has not delivered to the Planning Department the check as required above, the approval for the project granted shall be void by reason of failure of condition (Fish and Game Code Section 711.4(c)). General Requirements PL -2. The applicant and owner of the real property subject to this condition shall hereby agree to indemnify, protect, hold harmless, and defend the City with Legal Counsel of the City's own selection from any and all claims, actions, awards, judgments, or proceedings against the City to attack, set aside, annul, or seek monetary damages resulting, directly or indirectly, from any action in furtherance of and the approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board or legislative body including actions approved by the voters of the City, concerning the Planning Application. The City shall be deemed for purposes of this condition, to include any agency or instrumentality thereof, or any of its elected or appointed officials, officers, employees, consultants, contractors, legal counsel, and agents. City shall promptly notify both the applicant and landowner of any claim, action, or proceeding to which this condition is applicable and shall further cooperate fully in the defense of the action. The City reserves the right to take any and all action the City deems to be in the best interest of the City and its citizens in regards to such defense. PL -3. The permittee shall obtain City approval for any modifications or revisions to the approval of this project. PL -4. This approval shall be used within two years of the approval date; otherwise, it shall become null and void. By use is meant the beginning of substantial construction contemplated by this approval within the two year period, which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval. PL -5. The Planning Director may, upon an application being filed prior to expiration, and for good cause, grant a time extension of up to 3 one -year extensions of time, one year at a time. PL -6. This project and all subsequent projects within this site shall be consistent with Specific Plan No. 219. PL -7. The project and all subsequent projects within this site shall comply with all mitigation measures identified within EIR No. 235. PL -8. A separate building permit shall be required for all signage. PL -9. The development of the premises shall substantially conform to the approved site plan and elevations contained on file with the Planning Department. PL -10. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Planning Director. If it is determined that the landscaping is not being maintained, the Planning Director shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. PL -11. Other than stormwater, it is illegal to allow liquids, gels, powders, sediment, fertilizers, landscape debris, and waste from entering the storm drain system or from leaving the property. Spills and leaks must be cleaned up immediately. Do not wash, maintain, or repair vehicles onsite. Do not hose down parking areas, sidewalks, alleys, or gutters. Ensure that all materials and products stored outside are protected from rain. Ensure all trash bins are covered at all times. PL -12. The applicant shall submit to the Planning Department for permanent filing two 8" X 10" glossy photographic color prints of the approved color and materials board and the colored architectural elevations. All labels on the color and materials board and Elevations shall be readable on the photographic prints. PL -13. The Conditions of Approval specified in this resolution, to the extent specific items, materials, equipment, techniques, finishes or similar matters are specified, shall be deemed satisfied by staffs prior approval of the use or utilization of an item, material, equipment, finish or technique that City staff determines to be the substantial equivalent of that required by the Conditions of Approval. Staff may elect to reject the request to substitute, in which case the real party in interest may appeal, after payment of the regular cost of an appeal, the decision to the Planning Commission for its decision. PL -14. All enhanced elevation locations identified on the Product Placement Plan shall also be identified on the Precise Grading Plans ( "E ") and Building Construction Plans (note). PL -15. The developer shall contact the City's franchised solid waste hauler for disposal of construction and demolition debris. Only the City's franchisee may haul demolition and construction debris. PL -16. The applicant shall comply with the Public Art Ordinance. PL -17. All parkways, including within the right -of -way, entryway median, landscaping, walls, fencing, recreational facilities and on -site lighting shall be maintained by the property owner or maintenance association. PL -18. The developer shall contact the Temecula Community Services District Maintenance Superintendent for a pre- design meeting to discuss design perimeters and obtain Temecula Community Services District Landscape Standards. The median landscape plans submitted for consideration for Temecula Community Services District maintenance shall be in conformance with the Temecula Community Services District Landscape Standards. PL -19. Construction of the landscaped median shall commence pursuant to a preconstruction meeting with the developer, Temecula Community Services District Maintenance Superintendent, Building and Safety Inspector and Public Works Inspector. Developer shall comply with City and Temecula Community Services District review and inspections processes. PL -20. The developer, the developer's successor or assignee, shall be responsible for the maintenance of the landscaped median until such time as those responsibilities are accepted by the Temecula Community Services District or other responsible party. PL -21. All costs associated with the relocation of any existing streetlights shall be paid for by the developer. Prior to Issuance of Grading Permit(s) PL -22. The following shall be included in the Notes Section of the Grading Plan: "If at any time during excavation /construction of the site, archaeological /cultural resources, or any artifacts or other objects which reasonably appears to be evidence of cultural or archaeological resource are discovered, the property owner shall immediately advise the City of such and the City shall cause all further excavation or other disturbance of the affected area to immediately cease. The Planning Director at his /her sole discretion may require the property owner to deposit a sum of money it deems reasonably necessary to allow the City to consult and /or authorize an independent, fully qualified specialist to inspect the site at no cost to the City, in order to assess the significance of the find. Upon determining that the discovery is not an archaeological/ cultural resource, the Planning Director shall notify the property owner of such determination and shall authorize the resumption of work. Upon determining that the discovery is an archaeological /cultural resource, the Planning Director shall notify the property owner that no further excavation or development may take place until a mitigation plan or other corrective measures have been approved by the Planning Director." PL -23. A copy of the Rough Grading Plans shall be submitted and approved by the Planning Department. Prior to Issuance of Building Permit(s) PL -24. Four copies of Construction. Landscaping and Irrigation Plans shall be reviewed and approved by the Planning Department. These plans shall conform to the approved conceptual landscape plan, or as amended by these conditions. The location, number, height and spread, water usage or KC,value, genus, species, and container size of the plants shall be shown. The plans shall be consistent with the Water Efficient Ordinance and Water Storage Contingency Plan per the Rancho California Water District. The plans shall be accompanied by the appropriate filing fee (per the City of Temecula Fee Schedule at time of submittal) and one copy of the approved Grading Plan. PL -25. The Landscaping and Irrigation Plans shall include a note on the plans stating that "The contractor shall provide two copies of an agronomic soils report at the first irrigation inspection." PL -26. The Landscaping and Irrigation Plans shall include water usage calculations per Chapter 17.32 of the Development Code (Water Efficient Ordinance), the total cost estimate of plantings and irrigation (in accordance with approved plan). Applicant shall use evapotranspiration (ETo) factor of 0.70 for calculating the maximum allowable water budget. PL -27. A landscape maintenance program shall be submitted for approval, which details the proper maintenance of all proposed plant materials to assure proper growth and landscape development for the long -term esthetics of the property. The approved maintenance program shall be provided to the landscape maintenance contractor who shall be responsible to carry out the detailed program. PL -28. The Landscaping and Irrigation Plans shall include a note stating that "Three landscape site inspections are required. The first inspection will verify irrigation installation with open trenches. The second inspection will verify that all irrigation systems have head- to -head coverage, and to verify that all planting have been installed consistent with the approved construction landscape plans. The third inspection will verify proper landscape maintenance for release of one year landscape maintenance bond." The applicant/owner shall contact the Planning Department to schedule inspections. PL -29. Automatic irrigation shall be installed for all landscaped areas and complete screening of all ground mounted equipment from view of.the public from streets and adjacent property for private common areas; front yards and slopes within individual lots; shrub planting to completely screen perimeter walls adjacent to a public right -of -way equal to 66 feet or larger; and, all landscaping excluding Temecula Community Services District (TCSD) maintained areas and front yard landscaping which shall include, but may not be limited to, private slopes and common areas. PL -30. If any phase or area of the project site is not scheduled for development within six months of the completion of grading, it shall be temporarily landscaped and irrigated for dust and soil erosion control. PL -31. The plans shall include all hardscaping for equestrian trails and pedestrian trails within private common areas. PL -32. Wall and fence plans shall be consistent with the Conceptual Wall and Fence Plans, revised to include pilasters at all property line corners as required by the Paloma del Sol Specific Plan. PL -33. Precise Grading Plans shall be consistent with the approved rough grading plans including all structural setback measurements. PL -34. All WQMP treatment devices, including design details, shall be shown on the construction landscape plans. If revisions are made to the WQMP design that result in any changes to the conceptual landscape plans after entitlement, the revisions will be shown on the construction landscape plans, subject to the approval of the Planning Director. PL -35. Roof - mounted mechanical equipment shall not be permitted within the subdivision; however, solar equipment or any other energy saving devices shall be permitted with Planning Director approval. PL -36. The developer shall provide the Planning Department verification of arrangements made with the City's franchise solid waste hauler for disposal of construction and demolition debris. PL -37. Prior to the first building permit or installation. of additional streetlights, whichever occurs first, the developer shall complete the Temecula Community Services District application, submit an approved Edison Streetlight Plan, and pay the advanced energy fees. PL -38. The landscape construction drawings for the landscaped median shall be reviewed and approved by the Director of Community Services. PL -39. The developer shall post security-and enter into an agreement to install the landscaped median. Prior to Release of Power, Building Occupancy or Any Use Allowed by This Permit PL -40. An applicant shall submit a letter of substantial conformance, subject to field verification by the Planning Director or his /her designee. Said letter of substantial conformance shall be prepared by the project designer and shall indicate that all plant materials and irrigation system components have been installed in accordance with the approved final landscape and irrigation plans. If a certificate of use and occupancy is not required for the project, such letter of substantial conformance shall be submitted prior to scheduling for the final inspection. PL -41. All required landscape planting and irrigation shall have been installed consistent with the approved construction plans and shall be in a condition acceptable to the Planning Director. The plants shall be healthy and free of weeds, disease, or pests. The irrigation system shall be properly constructed and in good working order. PL -42. Front yard and slope landscaping within individual lots shall be completed for inspection. PL -43. _HOA landscaping shall be completed for inspection for those lots adjacent to HOA landscaped area. PL -44. Performance securities, in amounts to be determined by the Planning Director, to guarantee the maintenance of the plantings in accordance with the approved construction landscape and irrigation plan shall be filed with the Planning Department for a period of one year from final Certificate of Occupancy. After that year, if the landscaping and irrigation system have been maintained in a condition satisfactory to the Planning Director, the bond shall be released upon request by the applicant. PL -45. All of the foregoing conditions shall be complied with prior to occupancy or any use allowed by this permit. PL -46. The landscaped median shall be completed to the satisfaction of the Director of Community Services. PUBLIC WORKS DEPARTMENT General Requirements PW -1. Unless otherwise noted, all conditions shall be completed by the developer at no cost to any Government Agency. It is understood that the developer correctly shows on the site plan all existing and proposed property lines, easements, traveled ways, improvement constraints and drainage courses, and their omission may require the project to be resubmitted for further review and revision. PW -2. A Grading Permit for precise grading, including all on -site flat work and improvements, shall be obtained from the Department of Public Works prior to commencement of any construction outside of the City- maintained street right -of -way. PW -3. An Encroachment Permit shall be obtained from the Department of Public Works prior to commencement of any construction within an existing or proposed City right -of -way. PW -4. All grading plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site and shall be submitted on standard 24" x 36" City of Temecula mylars. PW -5. The project shall include construction -phase and permanent pollution prevention controls into the design of the project to prevent non - permitted runoff from discharging off site or entering any storm drain system or receiving water. PW -6. The Applicant shall comply with all underlying Conditions of Approval for Paseo Del Sol Specific Plan and all subsequent amendments as approved on January 8, 2002. PW -7. The Applicant shall comply with all underlying Conditions of Approval for Vesting Tentative Tract Map No. 24188 and all the subsequent amendments as approved on January 8, 2002. Prior to Issuance of Grading Permit(s) PW -8. A finalized WQMP must be accepted by the City prior to issuance of any grading permits. PW -9. A grading plan shall be prepared by a registered civil engineer in accordance with City of Temecula standards, and shall be reviewed and approved by the Department of Public Works prior to the commencement of grading. The grading plan shall include all necessary erosion control measures needed to adequately protect the site (public and private) and adjoining properties from damage due to erosion. PW -10. The developer shall post security and enter into an agreement guaranteeing the grading and erosion control improvements in conformance with applicable City Standards and subject to approval by the Department of Public Works in accordance with Grading Ordinance Section 18.24.120. PW -11. A Soils Report shall be prepared by a registered soil or civil engineer and submitted to the Department of Public Works with the initial grading plan check. The report shall address all soil conditions of the site, and provide recommendations for the construction of engineered structures and pavement sections. PW -12. Construction -phase pollution prevention controls shall be consistent with the City's Grading, Erosion and Sediment Control Ordinance and associated technical manual, and the City's standard notes for Erosion and Sediment Control. PW -13. The project shall demonstrate coverage under the State NPDES General Permit for Construction Activities by providing a copy of the Waste Discharge Identification Number (WDID) issued by the State Water Resources Control Board (SWRCB). A Stormwater Pollution Prevention Plan (SWPPP) shall be available at the site throughout the duration of construction activities. PW -14. As deemed necessary by the Department of Public Works, the developer shall receive written clearance from the Planning Department, or other affected agencies. PW -15. The developer shall comply with all constraints which may be shown upon an Environmental Constraint Sheet (ECS) recorded with any underlying maps related to the subject property. Prior to Issuance of Building Permit(s) PW -16. The building pad shall be certified to have been substantially constructed in accordance with the approved Precise Grading Plan by a registered civil engineer, and the soil engineer shall issue a Final Soil Report addressing compaction and site conditions. PW -17. The Developer shall pay to the City the Public Facilities Development Impact Fee as required by, and in accordance with the Development Agreement between the City and Developer dated August 28, 2001. Prior to Issuance of Certificate of Occupancy PW -18. Prior to the first certificate of occupancy, the developer shall ensure that the WQMP measures associated with this development have been installed and ready for implementation. PW -19. As deemed necessary by the Department of Public Works the developer shall receive written clearance from Rancho California Water District, Eastern Municipal Water District, or other affected agencies. PW -20. The existing improvements shall be reviewed. Any appurtenance damaged or broken shall be repaired or removed and replaced to the satisfaction of the Department of Public Works. PW -21. All necessary certifications and clearances from engineers, utility companies and public agencies shall be submitted as required by the Department of Public Works. PW -22. The Developer shall ensure that BMPs are installed to delineate between construction zones and occupied zones. NOTICE OF PUBLIC HEARING Notice of Public Hearing 1989`' "$' A PUBLIC HEARING has been scheduled before the City of Temecula PLANNING DIRECTOR to consider the matter described below: Case No: PA10 -0161 Applicant: Scott Hansen, KB Home Proposal: A Home Product Review Application for KB Home to construct 118 single - family homes in Tract 24188 -2 of Paseo del Sol, consisting'of four plan types ranging in size from 1,628 to 2,241 square feet, with three architectural styles that include Spanish, Cottage and Italianate, generally located north of Leena Way, South of Pauba Road, West of Butterfield Stage Road and East of Meadows Parkway Environmental: In accordance with the California Environmental Quality Act (CEQA), the proposed project is exempt from further environmental review and a Notice of Determination will be filed in compliance with CEQA Section 15162, Subsequent EIR's and Negative Declarations Case Planner: Cheryl Kitzerow /Matt Peters, (951) 694 -6409 Place of Hearing: City of Temecula, Main Conference Room Date of Hearing: August 19, 2010 Time of Hearing: 1:30 p.m. Ru r' PA10- 0 1,150 2 t}G np[I Fi Any person may submit written comments to the Planning Director before the hearing or may appear and be heard in support of or opposition to the approval of the project at the time of the hearing. Any petition for judicial review of a decision of the Planning Director shall be filed within the time required by, and controlled by, Sections 1094.5 and 1094.6 of the California Code of Civil Procedure. In any such action or proceeding seeking judicial review of, which attacks or seeks to set aside, or any decision of the Planning Director, shall be limited to.those issues raised at the hearing or in written correspondence delivered to the City Clerk at, or prior to, the public hearing described in this notice. The proposed project application may be viewed at the City of Temecula Planning Department, 43200 Business Park Drive, Monday through Friday from 8:00 a.m. to 5:00 p.m. Questions concerning the project may be addressed to the case planner at (951) 694 -6409.