HomeMy WebLinkAboutParcel 3 Geotechnical . T. H. E. Soils Co. Inc � �
Phone: (909> 678-9669 FAX: (909) 678-9769 E-mail: tl�esoilsco�c�aol.a�m
� 3] 705 Central Street, Suite A• Wildomar, CA 92595
December 23, 2002
Mr. Art Coltrain
45338 Clubhouse Drive
Temecula, California 92592
SUBJECT: GEOTEC�-INICAL UPDATE 1NVESTIGATION
Proposed-Single-Family Residence '
� "':P � � '1_3-of-Rarcel-lVdap 24239 �
Avenida De San Pasqual
Temecula, Riverside County, California
Work Order No. 520201.00
Dear Mr. Coltra.in:
In accordance with your request, we have performed a geotechnical update investigation for the
above referenced site in Temecula, California. The purpose of our investigation was to update the
original geotechnical recommendations (see references) and to provide a seismic update based on
the 1997 Uniform Building Code (IJBC). For this investigation, we were provided with a copy of
the grading report prepared by Lakeshore Engineering (see references) and a copy of the 20-scale
"Precise Grading Plan" prepared by VSL Engineering of Temecula, California.
INTRODUCTION
Proposed Develonment and Site Descrintion
The subj ect site is currently an undeveloped mugh graded pad (Lakeshore Engineering, Inc., 1991)
located along the east side of Avenida De San Pasqual north of Santiago Road (Parcel3 of Parcel
Map 24239) in the city of Temecula in southwest Riverside County, California. Proposed
development includes the regrading of the subject site and construction of a single-family residence
with attached garage and associated driveway and landscaping.
The subject site is bordered on the east, south and west by large parcel residential development and
on the north by a church. The geographical relationships of the site and surrounding azea are shown
on our Site Location Map, Figure 1.
Topography on the ungraded portion of the subject site generally consists of moderately steep
terrain with riatural gradients of approximately 30 to 40%. Drainage on the subject pad is
accomplished by sheetflow generally to the west toward Avenida De San Pasqual and drainage on
the ungraded portion of the parcel is toward the northwest. A deeply incised drainage course is
located along the northwest boundary of the subject site. Vegetation on the subject site consisted of
a low growth of annual weeds and grasses. Overall relief is approximately 80-ft.
T.H.E. Soils Company, Inc. W.O. NO. 520201.00
� �
� 1
�� �
���/^/ � �"��4°'�` ��/ � • 1 � �- S � r
� �� � �-�-` � ���� ���}�\ ,�� � 1
�� 1t'; ����'s� - � �� � � �'. '' � °
'' �%��J�� � •��' � °� /�" �`U���� Di\`- �� . �� ;'�
o _ � �� l � ° . i� � `? i� i \ 0� � 4�� 1� . � �
-�'�._ "��,r �=,.�� fe,=+ ,�,� �,�,�'� • _ � ♦r r
� �, � _
. �� ��`�����y-= � , ���I� � � �
' ', .�� , . �� , ,�� �
� � c•� / �.�.� ���t. i �.,�,. • 1
:,�.� � ll � �`�%., � � r i �� .
' —� ` �' '� �' =� ��i� �� c
��� � -� �� �;,i , �'� ��p��.� � � �� � =-- �,r,,�, , _�s: ::
, � ,. , (� J � ,�.,. �, � ..,, ,�
. �r/-% ; , 1 v!! ^ ~ \ � \�i-d,�`���� , , / �,s�. ; r► � ( I�, \ •�%'''
.� . ,� 1 e :f � .a �� +:r. ,:^m � '7`� V �l�
� . • : %'�� �,;���) N�/a�A��v� ,� . .� � \\ , .
' • � ��.°'� ' � �°����� l��p� 1
—.�• • c� J �, � R � . y � `
_���� ;,�� � �v � , � • s �� �
�►�.�,.�,���� �-�� �' .� � II��� �
_ , ,r���,.._ , ���;��' =�_�„�� I� _�_ !�.- �r�� ,
��� _ � .. - - _ � t�
� _ _ !��-, �1
� , ,.� � v
� �� � `� , ► '"� , � , �
�%� G . � . .
�� b ti , o ,
i a �� \ �> / � �
' ` ! ` / � � �
����b � I .. I / II
�,� ., y r � , ., . , �
�, �� y,. � , � �
•, b� ��-� �_ �
� �.�� , , � � . .
. ,• t. 1 �
�� „� � �� � — , . `�,
c.�' � ����� ,�►� --\� � ��' / �t�
� � � � \1 e �" �
t �� � _ , ,,,.�' �
.�� �''� , -' ° �-' �'�=' ,�
- �. �� i _�,. �j . �
� ' .-- I �`\ � ' `� � ' % -r=''�.f'_"', �. �
_._ I � � � ` �� .i � �� -�,� l �1, �
' � -� �.--� `�� �,�'���:� ..
� — — ���ti `�� ' v� .� `�� 1 �I � '�
; • i � �. �°�(� ��.-�� \\ �� � �/ \� �.
.�� ' ��yypp�� �-L � ��-'�� ,•
, � ' I����� ' ��p y � ' � ` �`�� 1� ��
�1 ..--+,4..6�`_`��/^ ��:`�� •, �� � /�����
�*. ' a � � �r l �1 � J � •
�
. � � - . � � —°�,-.� �` �' �f�. - ` : - __�-
.,
� l
� : - '�,� � l �,,-�,"
� >—�� „
� �, � -� �:� �-T r-_ 1
� � ; � , � _ f �� l �� r�'i��� —
� � . � � � "'�` .. ��'+3� � � L °'� ,� �� �• �
� , N � � ` ` � _ �-
\ �(��.� °`•�'' \ � - —_ =
"� _ � � �� O �� \� '�' �� v �\ � .- .,i� il � � � -
�\� /°"��� � �� � a � �.\ r '� � � \��
" , � ...` '°\_ � , � • � /� ��, ,: � , • � .% '��
� �� � • � / � � �\\ � � �� l �-
, �~ « :�y-� r �--
�r �� � , �� ��;� .
b �
��� � �.�.
� • N`��; � � ��, , � i � �
� .-
� ��� ��� ��� .���
�
� , � ,.
� . � � �� �� , � ��
+ . •
Mr. Art Coltrain
December 23, 2002
Page 2
SITE INVESTIGATION
Back,.,�round Research and Literature Review
Several published and unpublished reports and geologic maps were reviewed for the purpose of
preparing this report. A complete list of these publications and reports is presented in Appendiz A.
Field Investigation
No subsurface exploration was performed as part of our update investigation. Our senior geologist
conducted a field reconnaissance and geologic mapping of the subject site on December 16, 2002.
SUBSURFACE CONDTTIONS
Based on our literature review and site reconnaissance, locally, the majority of the subject site is
underlain by upper Pleistocene sedimentary deposits of the Pauba Formation (Kennedy, 1977) with
minor alluvial soils (American/Pacific Soils Labs, Inc. [AM/PAC], 1990) that are restricted to the
undeveloped portion of site along the northwest boundary. Reportedly, the northern slope of the
existing pad has been constructed of engineered fill (Lakeshore Engineering, 1991).
SEISNIICII'Y
1997 UBC Seismic Update
Factors specific to the subject site are as follows:
The site is located approximately 3.1-kilometers to the northeast from the Elsinore fault
(Glen ivy) (ICBO, 1998).
The Elsinore fault (Glen ivy) is reported as a Type B fault (ICBO, 1998; and 1997 UBC
Table 16-L� in the vicinity of the subject site.
The site is within Seismic Zone 4(1997 UBC Figure 16-2, Table 16-1).
The near source acceleration (Na) and velocity (N�) with respect to the subject site are 1.2
and 1.47, respectively (1997 UBC Tables 16-5 and 16-`1�.
The soil profile for the site is SD (1997 UBC Table 16-J).
The site seismic coefficients of acceleration (Ca) and velocity (C�) aze 0.44Na and 0.64N�,
respectively (1997 UBC Tables 16-Q and 16-R).
T.H.E. Soils Company, Inc. W.O. NO. 520201.00
. . �
Mr. Art Coltrain
December 23, 2002
Page 3
Based on the above values, the coef�icient of acceleration (Ca) is 0.52 and a coefficient of
velocity (C„) is 0.94 for the subject site.
CONCLUSIONS
Based on our document review and site reconnaissance, no significant changes to the subject site
have occurred since the completion of rough grading (Lakeshore Engineering Inc., 1991). It is our
opinion, the recommendations presented in the Lakeshore Engineering report are still applicable to
the subject site, except where specified in this report.
RECOMIl�NDATIONS
General Earthwork
Recommendations for site development and design are presented in the following sections of this
report. The recommendations presented herein are preliminary and should be confirmed during
constn�ction.
Prior to the commencement of site development, the site should be cleared of any vegetation
existing walkways, concrete foundations, electric lines, etc., which should be hauled off-site. The
client, prior to any site preparation, should arrange and attend a meeting among the grading
contractor, the design engineer, the soils engineer and/or geologist, a representative of the
appropriate governing authorities as well as any other concemed parties. All parties should be
given at least 48 hours notice.
Preparation of Eacisting Ground
Fill slopes should be properly keyed and benched in accordance with the UBC. The keyway should
extend a minimum of 1 ft. into either competent bedrock material or engineered fill materials and
tilted a minimum of 2% into the hillside. Any colluvium or loose soils should be completely
removed during benching operations. A qualified the soil engineer and/or geologist should be on-
site during slope construction and earthwork operations to assure that proper grading techniques,
keyway development, and benching are accomplished
Prior to placement of fill materials, the exposed earth materials should be scarified, moisture
conditioned, and recompacted to a minimum of 90-percent of the maximum dry density (as
determined by ASTM D-1557).
Fill Placement
On-site sedimentary bedrock and compacted fill are expected to be suitable for use as structural fill
provided they are non-expansive. A qualified soil engineer should test import materials to
determine their feasibility for use as structural fill.
T.H.E. Soils Company, Inc. W.O. NO. 520201.00
• �
Mr. Art Coltrain
December 23, 2002
Page 4
Approved fill material should be placed in 6 to 8-inch lifts, brought to at least optimum moisture
content, and compacted to a minimum of 90 percent of the maximum laboratory dry density, as
determined by the �ASTM D 1557 test method. No rocks, chunks of asphalt or concrete larger than
6 inches in diameter should be used as fill material. Rocks larger than 6 inches should either be
hauled ofF site or crushed and used as fill material.
Ezpansion Indez Testing
The on-site soils are anticipated to exhibit very low expansion potential (Lakeshore Engineering,
1991). Expansion index testing should also be performed at the completion of grading and on
imported soils prior to their approval as structural fill material. Final recommendations should be
presented at the completion of grading.
Soluble Sulfate Content
Based on our past soluble sulfate content testing of similar soils on adjacent sites, it is anticipated
that, from a corrosivity standpoint, Type II Portland Cement can be used for construction. Sulfate
content testing should be conducted within the building pads at the completion of grading and on
imported soils prior to their approval as structural fill material. Fina1 recommendation should be
presented at the completion of grading.
Cut-to-Fill Transition
Based on our review of the proposed undated grading plan (VSL Civil Engineering), we anticipate a
cut-to-fill transition across the proposed structure. 'The cut portion of the building pad should be
overexcavated a minimum of 3-ft below the ground surface and extend a minimum of 5-ft beyond
the building pad. Prior to placement of fill materials, the exposed earth materials should be
scarified, moisture conditioned, and recompacted to a minimum of 90-percent of the maximum dry
density (as determined by ASTM D-1557).
Foundation Svstem Design
It is anticipated that the foundation elements should be founded entirely in compacted fill materials.
T.H.E. Soils Company should perform a footing inspection, prior to placement of reinforcement, to
insure the proposed footing excavations are in conformance with the job specifications.
The structural engineer should design all footings and concrete slabs in accordance with the
allowable foundation pressures and lateral bearing pressures presented for Class 3 soils on Table
18-1-A of the 1997 Uniform Building Code (UBC). The allowable foundation and lateral
pressures shall not exceed the values set forth in Table 18-1-A for Class 3 soils unless data to
substantiate the use of higher values are submitted.
T.H.E. Soils Company, lnc. W.O. NO. 520201.00
. •
Mr. Art Coltrain
December 23, 2002
Page 5
Where the site is prepared as recommended, the proposed structures may bear on continuous and
isolated footings. The footings should have a minimum width of 12-inches, and be placed at least
12-inches below the lowest final adjacent grade for one-story houses, with a minimum width of 12-
inches, and be placed at least 18-inches below the lowest final adjacent grade for two-story houses.
Footings may be designed for a maximum safe soil bearing pressure for Class 4 soils as per Table
18-1-A of the 1997 UBC for dead plus live loads.
Concrete slabs, in moisture sensitive areas, should be underlain with a vapor barrier consisting of a
minimum of six mil polyvinyl chloride membrane with all laps sealed. A 2-inch layer of clean sand
should be placed above the moisture barrier. The 2-inches of clean sand is recommended to protect
the visqueen moisture barrier and aid in the curing of the concrete.
Footings should be set back from the top of all cut or fill slopes a horizontal distance equal to at
least'/Z the vertical slope height with a minimum setback of at least 5-ft.
Total settlements under static loads of footings supported on in-place bedrock materials and sized
for the allowable bearing pressures are not expected to exceed about 1/2 to 3/4 of 1 inch.
Differential settlements under dynamic loads of footings supported on properly compacted fill
materials and sized for the allowable bearing pressures aze not expected to exceed 1/4-inches for a
span of 40-ft. These settlements are expected to occur primarily during construction. Soil
engineering parameters for imported soil may vary.
Utilitv Trench Bacl�ill
Utility trench backfill should be compacted to a minimum of 90 percent of the maximum dry
density determined in laboratory testing by the ASTM D 1557 test method. It is our opinion that
utility trench bacicfill consisting of on-site or approved sandy soils can best be placed by mechanical
compaction to a minimum of 90 percent of the ma�cimum dry density. All trench excavations
should be conducted in accordance with Cal-OSHA standards as a minimum.
Surface Drainage
Surface drainage should be directed away from foundations of buildings or appurtenant structures.
All drainage should be directed toward streets or approved permanent dra.inage devices. Where
landscaping and planters are proposed adjacent to foundations, subsurface drains should be
provided to prevent ponding or saturation of foundations by landscape urigation water.
Construction Monitoring
Continuous observation and testing under the direction of qualified soils engineers and/or
engineering geologists is essential to verify compliance with the recommendations of this report
and to confirm that the geotechnical conditions found aze consistent with this investigation.
T.H.E. Soils Company, Inc. W.O. NO. 520201.00
. •
Mr. Art Coltrain
December 23, 2002
Page 6
Construction monitoring should be conducted by a qualified engineering geologisdsoil engineer at
the following stages of construction:
• During grading operations.
• Following excavation of footings for foundations.
• During utility trench backfill operations.
• When any unusual conditions are encountered during grading.
Our investigation was performed using the degree of care and skill ordinarily exercised, under
similar circumstances, by reputable Geotechnical Engineers and Geologists practicing in this or
similar localities. No other wazranty, expressed or implied, is made as to the conclusions and
professional advice included in this report.
The samples taken and used for testing and the observations made are believed representative of the
entire project; however, soil and geologic conditions can vary significantly between test locations.
The findings of tlus report are valid as of the present date. However, changes in the conditions of a
properly can occur with the passage of time, whether they be due to natural processes or the works
of man on this or adjacent properties. In addition, changes in applicable or appropriate standards
may occur, whether they result from legislation or the broadening of knowledge.
Accordingly, the findings of this report may be invalidated wholly or partially by changes outside
our control. Therefore, this report is subject to review and revision as changed conditions are
identified.
T.H.E. Soils Company, Inc. W.O. NO. 520201.00
. • �
Mr. Art Coltrain
December 23, 2002
Page 7
This oppqrtunity to be of service is sincerely appreciated. If you have any questions, please call.
Very truly yours,
T.H.E. Soils Company, Inc.
R' �o ���;'�,�
Jo P. Frey Jo . inhart, RCE 23464 �g ���
. �
P ject Geologist Registration Expires 12/31/ > .+�.`��� � • � � � �; �'a�
�`�� �� g �� L " 0° ta
�� �. F�"� ����4 �
�� ��
�cpir�ew: �L..-�—
�� �ll/�/ � `o�,, �,�'�
s R. Harrison �:;�• �
Project Manager � ��fi G� d.!�� ��
��:ti��
JPF/JTR/JRH:jek
ACCOMPANYING MAPS, ILLUSTRATIONS, AND APPENDICES
Figure � - Site Location Map (2,000-scale)
APPENDIX A - References
T.H.E. Soils Company, Inc. W.O. NO. 520201.00
. . . �
APPENDIX A
References
T.H.E. Soils Company, [nc. W.O. NO. 520201.00
�
• � �
REFERENCES
American/Pacific Soils Labs, Inc., March 21, 1990, "Percolation Investigation, Tentative Parcel
Map 24239, Being a Division of Parcel 1 of Parcel Map 9428, APN 923-410-004", Project # 90-
4065.
California Division of Mines & Geology, 1997, "Guidelines for Evaluating and Mitigating Seismic
Hazards in California", Special Publication 117.
California Division of Mines & Geology, 1996, "Probabilistic Seismic Hazard Assessment for the
State of California", DMG Open File Report 96-08, USGS Open File Report 96-706.
�
California Division of Mines & Geology, 1990, "State of California Special Studies Zone —
Murrieta, California Quadrangle", Revised Official Map — Effective January l, 1990, Scale: 1-inch
= 2,000-ft. �
Coduto, Don, P., 1994, "Foundation Design Principles and Practice", Prentice Hall, pages 637-655.
Department of Water Resources, August 1971, "Water Wells and Springs in the Western Part of the
Upper Santa Margarita River Watershed, Riverside and San Diego Counties, California", Bulletin
No. 91-20.
Hart, E.W., 1994, "Fault-Rupture Hazard Zones in California", California Division of Mines and
Geology Special Publication 42.
Houston, S. L., 1992, "Partial Wetting Collapse Predictions", Proceedings of the 7th International
Conference on Expansive Soils, Vol. I, pages 302-306.
Intemational Conference of Building Officials (ICBO), February 1998, "Maps of Known Active
Fault Near-Source Zones in California and Adjacent Portions of Nevada to be Used with 1997
Uniform Building Code" prepared by California Department of Conservation Division of Mines
and Geology.
International Conference of Building Officials, 1997, "Uniform Building Code".
Jennings, C.W., 1975, Fault Map of California, California Division of Mines and Geology,
Geologic Data Map No. 1.
Kennedy, Michael P., 1977, "Recency and Character of Faulting Along the Elsinore Fault Zone
in Southern Riverside County, California", California Division of Mines and Geology, Special
Report 131.
Lakeshore Engineering, Inc., January 14, 1991, "Supplemental Compaction Testing Report Rough
Grade, Parcel 1, P.M. 9428, Corner of Avenida De San Pasqual and Sierra Bonita, Rancho
California, Riverside County, California", Project No. 90-24.
T.H.E. Soils Company, Inc. W.O. NO. 520201.00
' � �
REFERENCES (continued)
Lakeshore Engineering, Inc., March 5, 1990, "Compaction Testing Report, Proposed Single Family
Dwelling, Parcels 1, 2, & 3 of P.M. 24238 Riverside County Records, Corner of Avenida De San
Pasqual and Sierra Bonita, Rancho California, Riverside County, California", Project No. 90-24.
Ploessel, M.R., Slosson, J.E., September, 1974, Repeatable High Ground Accelerations from
Earthquakes, California Geology.
Proceedings of the 7th International Conference on Expansive Soils, Volume I, "Foundations on
Hydro-collapsible Soils, Pages 256-261.
Rodgers, Thomas H., 1965 (fifth printing 1985), Geologic Map of California, Santa Ana Sheet",
California Division of Mines & Geology, Sca1e: 1:250,000.
U.S. Geological Survey, 1997, 7.5 Minute Quadrangle Map, Bachelor Mountain, California, scale
1" = 2,000'.
VSL Civil Engineering, undated, "Pazcel No. 24239, Precise Grading Plan"; 20-scale, Sheet 1 of 1.
T.H.E. Soils Company, Inc. W.O. NO. 520201.00