Loading...
HomeMy WebLinkAbout12-006 CC Resolution RESOLUTION NO. 12-06 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA10-0146, A HOME PRODUCT REVIEW APPLICATION FOR WALCOTT ESTATES LOCATED EAST OF WALCOTT LANE AND WEST OF BUTTERFIELD STAGE ROAD APPROXIMATELY 1,500 FEET NORTH OF LA SERENA WAY AND 1,100 FEET SOUTH OF CALLE CHAPOS (APNS 957-170-032 THROUGH -036) Section 1. Procedural Findings. The City Council of �he City of Temecula does hereby find, determine and declare that: A. On May 12, 2010, Mr. Steve Galvez filed Planning Application Nos. PA10- 0145, Tentative Tract Map 36295; PA10-0146, Home Product Review; PA10-0147, Zone Change to PDO; and PA10-0148, General Plan Amendment in a manner in accord with the City of Temecula General Plan and Development Code. B. On November 16, 2011, the Planning Commission recommended approval of Planning Application Nos. PA10-0145, Tentative Tract Map 36295; PA10- 0146, Home Product Review; PA10-0147, Zone Change to PDO; and PA10-0148, General Plan Amendment. C. The Project was processed including, but not limited to a public notice, in the time and manner prescribed by State and local law, including the California Environmental Quality Act. D. A Mitigated Negative Declar:;�t;Qn �vas prepared for the Project in accordance with the California Envir�nm�i�tal �uality Act and the California Environmental Quality Act Guidelines ("����") ar�' circulated for public review from August 8, 2011 through September 7, 2011 fnr ;� 30-c?�y public review. E. On November 16, 2011, at a duiy r;oticed public hearing as prescribed by law, the Planning Commission considered the Project and any comments received prior to or at the public hearing on November 16, 2011, ar which time the City staff presented its report, and interested persons had an opportunity to and did testify either in support or in opposition to the Project and the Mitigated Neg�tiUe Declaration. F. Following consideration of the entire record before it at the public hearing and due consideration of the proposed Project the Planning Commission recommended that the City Council adopt the Mitigated Negative Declaration prepared for the Project. R:/Resos 2012/Resos 12-06 � G. At the conclusion of the Planning Commission hearing and after due consideration of the entire record before the Planning Commission hearing, and after due consideration of the testimony regarding the proposed Project, the Planning Commission recommended that the City Council approve the Project including Planning Application Nos. PA10-0145, Tentative Tract Map 36295; PA10-0146, Home Product Review; PA10-0147, Zone Change to PDO; and PA10-0148, General Plan Amendment in a manner in accord with the City of Temecula General Plan and Development Code. H. On January 10, 2012, the City Council of the City of Temecula considered the Project and the Mitigated Negative Declaration, at a duly noticed public hearing at which time all interested persons had an opportunity to and did testify either in support or in opposition to this matter. The Council considered all the testimony and any comments received regarding the Project and the Mitigated Negative Declaration prior to and at the public hearing. I: Following the public hearing, the Council adopted Resolution No. 12-03 adopting the Mitigated Negative Declaration and Mitigation Monitoring Program. J. All legal preconditions to the adoption of this Resolution have occurred. Section 2. Legislative Findings. The City Council in approving the Home Product Review hereby finds, determines and declares that: � A. The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City; This application is accompanied by a Tentative Tract Map 36295, General Plan Amendment and Zone Change to a PDO. The General Plan Amendment and Zone Change to a PDO establish the density and design framework for the proposed cluster subdivision development. The proposed design preserves approximate/y 13 acres of the 25 gross acre site in permanently preserved open space, thereby promoting the goals of the Genera/ Plan to preserve habitat and provide additiona/ trails and active parkland. The project has been designed to ensure compliance with the General Plan and all applicable requirements of State law and other Ordinances of the City. B. The overall development of the land is designed for the protection of the public health, safety, and general welfare; The project is consistent with all applicable building, development and fire codes, which inc/ude provisions to safeguard the health, safety, and general welfare of the community. Section 2. Home Product Review Approval. The City Council hereby approves Planning Application No. PA10-0146, a Home Product Review Application for Walcott Estates located east of Walcott Lane and west of Butterfield Stage road approximately 1,500 feet north of La Serena way and 1,100 feet south of Calle Chapos R:/Resos 2012/Resos 12-06 2 (APNS 957-170-032 through -036) subject to the conditions of approval attached hereto as Exhibit A and incorporated herein as though set forth in full. Section 3. The City Clerk shall certify to the adoption of this Resolution and it shall become effective upon its adoption. PASSED, APPROVED, AND ADOPTED by the City Council of the City of Temecula this 10 day of January, 2012. -. �� :- • , -. %� � � � �/ ,%� / % ,,' �%` --_ � � � -� � �� ;'� Chuck Washington, Mayor ATTEST: , Gt%l.iv�.�- • `YiytyO Susan W Jones, M �C [S EAL] R:/Resos 2012/Resos 12-06 3 STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss CITY OF TEMECULA ) I, Susan W. Jones, MMC, City Clerk of the City of Temecula, do hereby certify that the foregoing Resolution No. 12-06 was duly and regularly adopted by the City Council of the City of Temecula at a meeting thereof held on the 10 day of January, 2012, by the following vote: , AYES: 4 COUNCIL MEMBERS: Comerchero, Edwards, Roberts, Washington NOES: 0 COUNCIL MEMBERS: None ABSENT: 1 COUNCIL MEMBERS: Naggar ABSTAIN: 0 COUNCIL MEMBERS: None , Susan . Jones, MMC City Clerk R:/Resos 2012/Resos 12-06 4 EXHIBIT A CITY OF TEMECULA DRAFT CONDITIONS OF APPROVAL Planning Application No.: PA10-0146 Project Description: A Residential Home Product review for 45 lots to be created with TTM 36295 (PA10-0145) for 3 floor plans ranging in size from 2,235 to 2,956 square feet with three elevation types each - Craftsman, Spanish and Tuscan. The project site is located west of Butterfield Stage Road, east of Walcott Lane, north of La Serena Way and south of Calle Chapos. (Associated applications: PA10-0145, TTM 36295; PA10-0147, Zone Change for PDO; and PA10-0148, General Plan Amendment for PDO/cluster development). Assessor's Parcel No.: 957-170-032, -033, -034, -035, and -036 MSHCP Category: Single Family Residential (less than 8 du/ac) DIF Category: Residential - Detached TUMF Category: Single Family Residential Approval Date: January 10, 2012 " Expiration Date: January 10, 2014 PLANNING DEPARTMENT Within 48 Hours of the Approval of This Project PL-1. The applicant/developer shall deliver to the Planning Department a cashier's check or money order made payable to the County Clerk in the amount of Two Thousand One Hundred and Eight Dollars ($2,108.00) which includes the Two Thousand Forty-Four Dollar ($2,044.00) fee, required by Fish and Game Code Section 711.4(d)(3) plus the Sixty-Four pollar ($64.00) County administrative fee, to enable the City to file the Notice of Determination for the Mitigated Negative Declaration required under Public Resources Code Section 21152 and California Code of Regulations Section 15075. If within said 48-hour period the applicanU developer has not delivered to the Planning Department the check as required above, the approval for the project granted shall be void due to failure of condition [Fish and Game Code Section 711.4(c)]. General Requirements PL-2. The applicant and owner of the real property subject to this condition shall hereby agree to indemnify, protect, hold harmless, and defend the City with Legal Counsel of the City's own selection from any and all claims, actions, awards, judgments, or proceedings against the City to attack, set aside, annul, or seek monetary damages resulting, directly or indirectly, from any action in furtherance of and the approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board or legislative body including actions approved by the voters of the City, concerning the Planning Application. The City shall be deemed for purposes of this condition, to include any agency or instrumentality thereof, or any of its elected or appointed officials, officers, employees, consultants, contractors, legal counsel, and agents. City shall promptly notify both the applicant and landowner of any claim, action, or proceeding to which this condition is applicable and shall further cooperate fully in the defense of the action. The City reserves the right to take any and all action the City deems to be in the best interest of the Ciry and its citizens in regards to such defense. PL-3. The permittee shall obtain City approval for any modifications or revisions to the approval of this project. PL-4. This approval shall be used within two years of the approval date; otherwise, it shall become null and void. By use is meant the beginning of substantial construction contemplated by this approval within the finro year period, which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval. PL-5. The Planning Director may, upon an application being filed prior to expiration, and for good cause, grant a time extension of up to 3 one-year extensions of time, one year at a time. PL-6. The development of the premises shall substantially conform to the approved site plan and elevations contained on file with the Planning Department. PL-7. The project and all subsequent projects shall comply with all mitigation measures identified in the Mitigated Negative Declaration (MND) adopted for this project per CEQA. PL-8. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Planning Director. If it is determined that the landscaping is not being maintained, the Planning Director shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. PL-9. Other than stormwater, it is illegal to allow liquids, gels, powders, sediment, fertilizers, landscape debris, and waste from entering the storm drain system or from leaving the property. Spills and leaks must be cleaned up immediately. Do not wash, maintain, or repair vehicles onsite. Do not hose down parking areas, sidewalks, alleys, or gutters. Ensure that all materials and products stored outside are protected from rain. Ensure all trash bins are covered at all times. PL-10. The applicant shall submit to the Planning Department for permanent filing two 8" X 10" glossy photographic color prints of the approved color and materials board and the colored architectural elevations. All labels on the color and materials board and Elevations shall be readable on the photographic prints. PL-11. The Conditions of Approval specified in this resolution, to the extent specific items, materials, equipment, techniques, finishes or similar matters are specified, shall be deemed satisfied by staff's prior approval of the use or utilization of an item, material, equipment, finish or technique that City staff determines to be the substantial equivalent of that required by the Conditions of Approval. Staff may elect to reject the request to substitute, in which case the real party in interest may appeal, after payment of the regular cost of an appeal, the decision to the Planning Commission for its decision. PL-12. The following lots shall include enhanced elevations on all 4 sides: 1, 12, 13, 17, 18, 23, 24, 27, 28, 32, 37, 38, 42, and 45. The following elevations shall include enhanced rear elevations: 2— 11. Lots 1 and 12, and at least half of lots 2— 11 shall include the optional decks shown on the elevations. All enhanced elevation locations shall be shown on the Precise Grading Plans with an asterisk, and on the Building Plans with a note. PL-13. The developer shall contact the City's franchised solid waste hauler for disposal of construction and demolition debris. Only the City's franchisee may haul demolition and construction debris. PL-14. The applicant shall comply with the Public Art Ordinance. PL-15. All parkways, including within the right-of-way, entryway median, landscaping, walls, fencing, recreational facilities, on-site lighting, streetlights on private streets, and Class 1 trail shall be maintained by the property owner or maintenance association. PL-16. All costs associated with the relocation of any existing streetlights shall be paid for by the developer. Prior to Issuance of Grading Permit(s) PL-17. The following shall be included in the Notes Section of the Grading Plan: "If at any time during excavation/construction of the site, archaeological/cultural resources, or any artifacts or other objects which reasonably appears to be evidence of cultural or archaeological resource are discovered, the property owner shall immediately advise the City of such and the City shall cause all further excavation or other disturbance of the affected area to immediately cease. The Planning Directorat his/hersole discretion may require the property owner to deposit a sum of money it deems reasonably necessary to allow the City to consult and/or authorize an independent, fully qualified specialist to inspect the site at no cost to the City, in order to assess the significance of the find. Upon determining that the discovery is not an archaeological/cultural resource, the Planning Director shall notify the property owner of such determination and shall authorize the resumption of work. Upon determining that the discovery is an archaeological/cultural resource, the Planning Director shall notify the property owner that no further excavation or development may take place until a mitigation plan or other corrective measures have been approved by the Planning Director." PL-18. If cultural resources are discovered during the project construction (inadvertent discoveries), all work in the area of the find shall cease, and a qualified archaeologist and representatives of the Pechanga Tribe shall be retained by the project sponsor to investigate the find, and make recommendations as to treatment and mitigation. PL-19. A 30-day preconstruction survey, in accordance with MSHCP guidelines and survey protocol, shall be conducted prior to ground disturbance. The results of the 30-day preconstruction survey shall be submitted to the Planning Department prior to scheduling the pre-grading meeting with Public Works. PL-20. The following shall be included in the Notes Section of the Grading Plan: "No grubbing/clearing of the site shall occur prior to scheduling the pre-grading meeting with Public Works. All project sites containing suitable habitat for burrowing owls, whether owls were found or not, require a 30-day preconstruction survey that shall be conducted within 30 days prior to ground disturbance to avoid direct take of burrowing owls. If the results of the survey indicate that no burrowing owls are present on-site, then the project may move forward with grading, upon Planning Department approval. If burrowing owls are found to be present or nesting on-site during the preconstruction survey, then the following recommendations must be adhered to: Exclusion and relocation activities may not occur during the breeding season, which is defined as March 1 through August 31, with the following exception: From March 1 through March 15 and from August 1 through August 31 exclusion and relocation activities may take place if it is proven to the City and appropriate regulatory agencies (if any) that egg laying or chick rearing is not taking place. This determination must be made by a qualified biologist." PL-21. A copy of the Rough Grading Plans shall be submitted and approved by the Planning Department. Prior to Issuance of Building Permit(s) PL-22. Four copies of Construction Landscaping and Irrigation Plans shall be reviewed and approved by the Planning Department. These plans shall conform to the approved conceptual landscape plan, or as amended by these conditions. The location, number, height and spread, water usage or KC value, genus, species, and container size of the plants shall be shown. The plans shall be consistent with the Water Efficient Ordinance and Water Storage Contingency Plan per the Rancho California Water District. The plans shall be accompanied by the appropriate filing fee (per the City of Temecula Fee Schedule at time of submittal) and one copy of the approved Grading Plan. PL-23. The Landscaping and Irrigation Plans shall include a note on the plans stating that "The contractor shall provide two copies of an agronomic soils report at the first irrigation inspection." PL-24. The Landscaping and Irrigation Plans shall include water usage calculations per Chapter 17.32 of the Development Code (Water Efficient Ordinance), the total cost estimate of plantings and irrigation (in accordance with approved plan). Applicant shall use evapotranspiration (ETo) factor of 0.70 for calculating the maximum allowable water budget. PL-25. A landscape maintenance program shall be submitted for approval, which details the proper maintenance of all proposed plant materials to assure proper growth and landscape development for the long-term esthetics of the property. The approved maintenance program shall be provided to the landscape maintenance contractorwho shall be responsible to carry out the detailed program. PL-26. The Landscaping and Irrigation Plans shall include a note stating that "Three landscape site inspections are required. The first inspection will verify irrigation installation with open trenches. The second inspection will verify that all irrigation systems have head- to-head coverage, and to verify that all planting have been installed consistent with the approved construction landscape plans. The third inspection will verify proper landscape maintenance for release of one year landscape maintenance bond." The applicanUowner shall contact the Planning Department to schedule inspections. PL-27. Specification of the landscape maintenance program shall indicate that "Three landscape site inspections are required. The first inspection will verify irrigation installation with open trenches. The second inspection will verify that all irrigation systems have head-to-head coverage, and to verify that all planting have been installed consistent with the approved construction landscape plans. The third inspection will verify proper landscape maintenance for release of one year landscape maintenance bond." The applicant/owner shall contact the Planning Department to schedule inspections. PL-28. Automatic irrigation shall be installed for all landscaped areas and complete screening of all ground mounted equipment from view of the public from streets and adjacent property for private common areas; front yards and slopes within individual lots; shrub planting to completely screen perimeter walls adjacent to a public right-of-way equal to 66 feet or larger; and, all landscaping excluding Temecula Community Services District (TCSD) maintained areas and front yard landscaping which shall include, but may not be limited to, private slopes and common areas. PL-29. If any phase or area of the project site is not scheduled for development within six months of the completion of grading, it shall be temporarily landscaped and irrigated for dust and soil erosion control. PL-30. The plans shall include all hardscaping for pedestrian trails within private common areas. PL-31. Wall and fence plans shall be consistentwith the Conceptual Landscape Plans showing the height, location and the following materials for all walls and fences: a. Decorative block for the perimeter of the project adjacent to a public right-of-way equal to 66 feet or larger and the side yards for corner lots. b. Wrought iron or decorative block and wrought iron combination to take advantage of views for side and rear yards. c. Wood fencing shall be used for all side and rear yard fencing when not restricted/conditioned outlined above. PL-32. Precise Grading Plans shall be consistent with the approved rough grading plans including all structural setback measurements. PL-33. All WQMP treatment devices, including design details, shall be shown on the construction landscape plans. If revisions are made to the WQMP design that result in any changes to the conceptual landscape plans after entitlement, the revisions will be shown on the construction landscape plans, subject to the approval of the Planning Director. PL-34. Roof-mounted mechanical equipment shall not be permitted within the subdivision; however, solar equipment or any other energy saving devices shall be permitted with Planning Director approval. PL-35. All utilities shall be screened from public view. Landscape construction drawings shall show and label all utilities and provide appropriate screening. Provide a three-foot clear zone around fire check detectors as required by the Fire Department before starting the screen. Group utilities together in order to reduce intrusion. Screening of utilities is not to look like an after-thought. Plan planting beds and design around utilities. Locate all light poles on plans and insure that there are no conflicts with trees. PL-36. Building Construction Plans shall include detailed outdoor areas (including but not limited to trellises, decorative furniture, hardscape, and mailboxes) to match the style of the building subject to the approval of the Planning Director. PL-37. The developer shall provide the Planning Department verification of arrangements made with the City's franchise solid waste hauler for disposal of construction and demolition debris. PL-38. Prior to the first building permit or installation of additional streetlights on Walcott Lane or Butterfield Stage Road, whichever occurs first, the developer shall complete the Temecula Community Services District application, submit an approved Edison Streetlight Plan, and pay the advanced energy fees. PL-39. The developer shall satisfy the City's parkland dedication (Quimby) requirement through the payment of in-lieu fees equivalent to 0.64 acres of parkland, based upon the City's then current land evaluation. PL-40. The developer shall post security and enter into an agreement to install the landscaped parkway. PL-41. As per the City of Temecula's Multi-Use Trails and Bikeways Master Plan a Class I Trail and Class II Bike Lane shall be installed along Walcott Lane. A public access easement shall be dedicated on the Final Map for the Class I Trail. PL-42. The wall and fence plans shall be consistent with the height and location specified in the Noise Study prepared by Kunzman Associates, 2010. PL-43. The applicant shall provide more detail with regard to screening of the lift station. Specifically, trees to screen views from the street, vines to cover the wall, and a potential trellis roof to screen views from residential neighbors above looking down into the lift station. PUBLIC WORKS DEPARTMENT General Requirements PW-1. Unless otherwise noted, all conditions shall be completed by the developer at no cost to any Government Agency. It is understood that the developer correctly shows on the site . plan all existing and proposed property lines, easements, traveled ways, improvement constraints and drainage courses, and their omission may require the project to be resubmitted for further review and revision. PW-2. A Grading Permit for precise grading, including all on-site flat work and improvements, shall be obtained from the Department of Public Works prior to commencement of any construction outside of the City-maintained street right-of-way. PW-3. An Encroachment Permit shall be obtained from the Department of Public Works prior to commencement of any construction within an existing or proposed City right-of-way. PW-4. All grading plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site and shall be submitted on standard 24" x 36" City of Temecula mylars. PW-5. The project shall include construction-phase and permanent pollution prevention controls into the design of the project to prevent non-permitted runoff from discharging off site or entering any storm drain system or receiving water. PW-6. All conditions of approval for Tentative Tract Map No. 36295 shall apply. Prior to Issuance of Grading Permit(s) PW-7. A finalized WQMP must be accepted by the City prior to issuance of any grading permits. PW-8. As deemed necessary by the Department of Public Works, the developer shall receive written clearances from the following agencies a. San Diego Regional Water Quality Control Board b. Army Corps of Engineers c. California Department of Fish and Game d. Riverside County Flood Control and Water Conservation District e. Planning Department f. Department of Public Works, or other affected agencies PW-9. A grading plan shall be prepared by a registered civil engineer in accordance with City of Temecula standards, and shall be reviewed and approved by the Department of Public Works prior to the commencement of grading. The grading plan shall include all necessary erosion control measures needed to adequately protect the site (public and private) and adjoining properties from damage due to erosion. PW-10. The developer shall post securiry and enter into an agreement guaranteeing the grading and erosion control improvements in conformance with applicable City Standards and subject to approval by the Department of Public Works in accordance with Grading Ordinance Section 18.24.120. PW-11. A Soils Report shall be prepared by a registered soil or civil engineer and submitted to the Department of Public Works with the initial grading plan check. The report shall address all soil conditions of the site, and provide recommendations forthe construction of engineered structures and pavement sections. PW-12. Construction-phase pollution prevention controls shall be consistent with the City's Grading, Erosion and Sediment Control Ordinance and associated technical manual and the City's standard notes for Erosion and Sediment Control. � PW-13. The project shall demonstrate coverage under the State NPDES General Permit for Construction Activities by providing a copy of the Waste Discharge Identification Number (WDID) issued by the State Water Resources Control Board (SWRCB). A Stormwater Pollution Prevention Plan (SWPPP) shall be available at the site throughout the duration of construction activities. PW As deemed necessary by the Department of Public Works, the developer shall receive written clearance from the Planning Department, or other affected agencies. PW-15. The developer shall comply with all constraints which may be shown upon an Environmental Constraint Sheet (ECS) recorded with any underlying maps related to the subject property. Prior to Issuance of Building Permit(s) PW-16. Prior to issuance of the first building permit: a. Tract Map No. 36295 shall be approved and recorded b. The City is currently working on a Capital Improvement Project (CIP) No. PW09-02 to design and construct Butterfield Stage Road from Murrieta Hot Springs Road to just north of La Serena Way. i. In the event that PW09-02 is completed prior to the developer starting their project, the developer shall install sidewalk and parkway improvements along its property frontage. The developer shall complete this work prior to the issuance of the first building permit. ii. In the event that the developer's project occurs prior to the completion of PW09-02, the developer shall construct Butterfield Stage Road (Principal Arterial (6 lanes divided) Highway Standard No. 100-110' R/W) to include the dedication of half-width street right-of-way, the installation of half width street improvements, paving, curb and gutter, sidewalk, streetlights, drainage facilities, signing and striping, utilities including, but not limited to, water and sewer, and the raised landscaped median. The developer shall complete this work prior to the issuance of the first building permit. PW-17. The building pad shall be certified to have been substantially constructed in accordance with the approved Precise Grading Plan by a registered civil engineer, and the soil engineer shall issue a Final Soil Report addressing compaction and site conditions. PW-18. The Developer shall pay to the City the Public Facilities Development Impact Fee as required by, and in accordance with, Chapter 15.06 of the Temecula Municipal Code and all resolutions implementing Chapter 15.06. PW-19. The developer shall pay to the City the Western Riverside County Transportation Uniform Mitigation Fee (TUMF) Program as required by, and in accordance with, Chapter 15.08 of the Temecula Municipal Code and all resolutions implementing Chapter 15.08. � Prior to Issuance of Certificate of Occupancy PW-20. Prior to the first certificate of occupancy, the developer shall ensure that the WQMP measures associated with this development have been installed and ready for implementation. PW-21. As deemed necessary by the Department of Public Works the developer shall receive written clearance from Rancho California Water District, Eastern Municipal Water District, or other affected agencies. PW-22. The existing improvements shall be reviewed. Any appurtenance damaged or broken shall be repaired or removed and replaced to the satisfaction of the Department of Public Works. PW-23. All necessary certifications and clearances from engineers, utility companies and public agencies shall be submitted as required by the Department of Public Works. PW-24. The Developer shall ensure that BMPs are installed to delineate befinreen construction zones and occupied zones. BUILDING AND SAFETY DEPARTMENT General Conditions/Information B-1. Obtain street addressing for all proposed buildings. B-2. All design components shall comply with applicable provisions of the 2010 edition of the California Building, Plumbing and Mechanical Codes; 2010 California Electrical Code; California Administrative Code, Title 24 Energy Code, California Title 24 Disabled Access Regulations, and the Temecula Municipal Code. B-3. A receipt or clearance letter from the Temecula Valley School District shall be submitted to the Building and Safety Department to ensure the payment or exemption from School Mitigation Fees. B-4. Obtain all building plans and permit approvals prior to commencement of any construction work. B-5. Signage shall be posted conspicuously at the entrance to the project that indicates the hours of construction, as allowed by the City of Temecula Municipal Ordinance 9.20.060, for any site within one-quarter mile of an occupied residence. The permitted hours of construction are Monday through Friday from 7:00 a.m. to 6:30 p.m., and Saturday from 7:00 a.m. to 6:30 p.m. No work is permitted on Sundays and nationally recognized Government Holidays. B-6. The City of Temecula adopted an ordinance on March 31, 2003 to collect fees for a Riverside County area wide Transportation Uniform Mitigation Fee (TUMF). This project is subject to payment of these fees at the time of building permit issuance. The fees are subject to the provisions of Chapter 15.08 of the Temecula Municipal Code and the fee schedule in effect at the time of building permit issuance. B-7. Provide an approved automatic fire sprinkler system. At Plan Review Submittal B-8. Provide electrical plan including load calculations and panel schedule, plumbing schematic and mechanical plan applicable to scope of work for plan review. B-9. Provide a Sound Transmission Control Study in accordance with the provisions of the Section 1207, of the 2010 edition of the California Building Code. B-10. Provide number and type of restroom fixtures, to be in accordance with the provisions of the 2010 edition of the California Plumbing Code. B-11. Provide truss calculations that have been stamped by the engineer of record of the building and the truss manufacturer engineer. Prior to Issuance of Building Permit(s) B-12. Provide appropriate stamp of a registered professional with original signature on plans. Prior to Beginning of Construction B-13. A pre-construction meeting is required with the building inspector priorto the start of the building construction. �