HomeMy WebLinkAbout98_004 PC Resolution ATTACHMENT NO. 1
PC RESOLUTION NO. 98-004
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
OF TEMECULA APPROVING PLANNING APPLICATION NO.
PA97-0431 (DEVELOPMENT PLAN) TO CONSTRUCT AND
OPERATE TWO TWO-STORY, TILT-UP INDUSTRIAL
BUILDINGS, ONE TOTALING APPROXIMATELY 38,289
SQUARE FEET AND ANOTHER TOTALING APPROXIMATELY
28,713 SQUARE FEET, ON A PARCEL CONTAINING 3.59
ACRES LOCATED ON THE EAST SIDE OF BUSINESS PARK
DRIVE, AT THE INTERSECTION OF SINGLE OAK, NORTH OF
RANCHO CALIFORNIA ROAD, IN THE RANCHO CALIFORNIA
BUSINESS PARK, AND KNOWN AS ASSESSOR'S PARCEL NO.
921-020-076
WHEREAS, Four-Sher Development filed Planning Application No. PA97-0431
(Development Plan) in accordance with the City of Temecula General Plan and Development
Code;
WHEREAS, Planning Application No. PA97-0431 (Development Plan) was processed
in the time and manner prescribed by State and local law;
WHEREAS, the Planning Commission considered Planning Application No. PA97-
0431 (Development Plan) on February 23, 1998, at a duly noticed public hearing as
prescribed by law, at which time interested persons had an opportunity to testify either in
support or in opposition;
WHEREAS, at the public hearing, upon hearing and considering all testimony and
arguments, if any, of all persons desiring to be heard, the Commission considered all facts
relating to Planning Application No. PA97-0431 (Development Plan);
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF TEMECULA
DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1. That the above recitations are true and correct.
Section 2. Findings. The Planning Commission, in approving Planning Application
No. PA97-0431 {Development Plan) makes the following findings; to wit:
The project is in conformance with the General Plan and with all applicable
requirements of State law and other Ordinances of the City. The project
meets the intent and is consistent with the business park designation of the
General Plan. The project is also consistent with Ordinance No. 655 (Mt.
Palomar Lighting Ordinance) and the City's Water Efficient Landscaping
provisions.
R:\S, TA~R_PT~431PA97.PC 3/2/98 vgw 7
The project is consistent with the LI - Light Industrial Zoning on the site,
which permits manufacturing, warehousing, distribution and corporate office
uses.
The development of the site is designed for the protection of the public
health, safety and welfare. The project complies with the development
standards of the LI - Light Industrial zone adopted to protect the public health,
safety and welfare of the community.
The project is suitable for the site because it accommodates all structures,
right-of-way, parking, landscaping and circulation for the site.
An Initial Study was prepared for the project and it has been determined that
although the project could have a significant impact on the environment,
these effects are not considered to be significant due to the mitigation
measures contained in the project design and in the Conditions of Approval
added to the project.
The project will not result in an impact to endangered, threatened or rare
species or their habitats, or to wildlife dispersal or migration corridors. The
project site has been previously disturbed and graded, and streetscape
installed on site. There are no native species of plants or vegetation at the
site, nor any indication that any wildlife species exist, or that the site serves
as a migration corridor. A DeMinimus impact finding can be made for this
project.
The project utilizes a second floor for additional square footage but the small
building footprint provides more landscaping area and creates a more open
design for the project. The architecture is above average and meets the
criteria that allow for an increase in the floor area ratio to 42.8%, with four-
sided building reveals and accents, extensive use of glass, building indents
that provide shadows and interest.
Section 3. Environmental Compliance. An Initial Study prepared for this project
indicates that although the proposed project could have a significant impact on the
environment, there will not be a significant effect in this case because the mitigation
measures described in the Conditions of Approval have been added to the project, and a
Negative Declaration, therefore, is hereby granted.
Section 4. Conditions. That the City of Temecula Planning Commission hereby
approves Planning Application No. PA97-0431 (Development Plan) to construct and operate
two two-story, tilt-up industrial buildings, one totaling approximately 38,289 square feet
and another totaling approximately 28,713 square feet, located on the east side of Business
Park Drive, at the intersection of Single Oak, north of Rancho California Road, in the Rancho
California Business Park, and known as Assessor's Parcel No. 921-020-076 subject to
Exhibit A, attached hereto, and incorporated herein by this reference and made a part
hereof.
R:\STAFFRPT~I.31PA97.PC 3/')/98 vgw 8
Section 5. PASSED, APPROVED AND ADOPTED this twenty-third day of February,
1998.
~~Linda Fale~man
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Planning
Commission of the City of Temecula at a regular meeting thereof, held on the twenty-third
day of February, 1998 by the following vote of the Commission:
AYES: 4
NOES: 0
ABSENT: 1
PLANNING COMMISSIONERS:
PLANNING COMMISSIONERS:
PLANNING COMMISSIONERS:
FAHEY, MILLER, SLAVEN,
SOLTYSIAK
NONE
GUERRIERO
Debbie Ubnoske, Secretary
R:\$TAFFRPT~31PA97.PC 30-/98 vgw 9