HomeMy WebLinkAbout110590 PC MinutesMINUTES OF A REGULaR MEETING
OF THE PY.~.I~ING COHMISSION
OF THE CITY OF TF~ECULA
HELD NOVEMBER 5v 1990
A regular meeting of the Temecula Planning Commission was called to
order at Vail Elementary School, 29915 Mira Loma Drive, Temecula,
at 6:15 P.M. The meeting was called to order by Chairperson Dennis
Chiniaeff.
PRESENT: 3 COMMISSIONERS: Fahey, Hoagland, Chiniaeff
ABSENT:
2 COMMISSIONERS: Blair, Ford
Also present were Assistant City Attorney John Cavanaugh, Gary
Thornhill, Acting Planning Director, John Middleton, Senior Project
Manager, Doug Stewart, Deputy City Engineer and Gail Zigler, Minute
Clerk.
PUBLIC COI~IENT
COMMISSIONER CHINIAEFF opened the meeting for public comment at
6:20 P.M.
FRANK KLEIN, 30180 Santiago Road, Temecula, addressed the
Commission with his concerns in regards to the increased incident
of crimes related to high density housing. He read a brief
statement from Police Captain Rick Sayre in which he commented on
the increase of drug related crimes in high density housing
developments.
1. MINUTES
1.1 MINUTES OF OCTOBER 15v 1990
COMMISSIONER CHINIAEFF entertained a motion to approve the
minutes of October 15, 1990.
COMMISSIONER HOAGLAND moved to approve the minutes of
October 15, 1990, seconded by COMMISSIONER FAHEY.
AYES: 3
NOES: 0
ABSENT: 2
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
Fahey, Hoagland, Chiniaeff
None
Blair, Ford
GARY THORNHILL stated that the following items would be continued
to the regularily scheduled meeting of November 19, 1990:
Item No. 2, Item No. 3, Item No. 5 and Item No. 9
PCMINll/5/90 -1- NOVEMBER 16, 1990
PL~I~ING COI.~ISSION MINUTES NOVEMBER 5~ L990
COMMISSIONER HOAGLAND moved to continue Item Nos. 2,3,5 and 9 to
the meeting of November 19, 1990, seconded by COMMISSIONER FAHEY.
AYES: 3
NOES: 0
ABSENT: 2
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
Fahey, Hoagland, Chiniaeff
None
Blair, Ford
PUBLIC HEARING ITEMS
4. PARCEL NAP NO. 25212/CHANGE OF ZONE NO. 5663
4.1
Proposal to sub-divide 5.02 acre lot into 4 residential
parcels and to change the existing R-R 2.1/2 to R-R
located at the northeast corner of Nicholas and Liefer
Roads.
OLIVER MUJICA provided the staff report on this item.
DOUG STEWART indicated the following modifications to the
Engineering Department Conditions of Approval Nos. 23 and
24, adding "or bonds for the street improvements may be
posted"; No. 26, delete street light and medians as
required improvements; No. 38, delete street lights and
side walks as required improvements.
COMMISSIONER CHINIAEFF opened the public hearing on this
item at 6:25 P.M.
TIM CROUGH, Durango Development, 41815 Hawthorne Street,
Murrieta, applicant, concurred with the findings in the
staff report; however, objected to the following
Engineering Conditions of Approval: Nos. 23, 24, 26, 29,
30, 32, 33, 34, 35, 36, 37, 38, 40, 41, 42, and 45. Mr.
Crough stated that he felt that these conditions were
excessive and the the improvements which are being
required were not consistent with the Subdivision Map Act.
He stated that he felt that the County Road Department
Conditions were more suitable for the area. He stated
that the cost of the improvements would exceed the lot
value. The applicant requested that the Commission
adopt the County Road Department conditions for street
improvements in-lieu of the Engineering Department street
conditions.
PCMINll/5/90 -2- NOVEMBER 16, 1990
PLi%NNING COl~ISSION MINUTES
NOVF~BER 5, 1990
COMMISSIONER FAHEY questioned the proposed density in
relation to the surrounding area and stated that they
applicant should expect to do street improvements due
to the increase in density.
TIM CROUGH stated that he had no negative comments on
the proposed density. He added that they were not
opposing street improvements; however, they did disagree
with the magnitude of the improvements requested by the
Engineering Department.
COMMISSIONER HOAGLAND stated that a dirt road cul-de-sac
was not appropriate and the higher density for this area
was an important issue.
COMMISSIONER CHINIAEFF expressed concern for future
spliting of these lots and asked the applicant if they
would consider a minimum lot size for this area.
TIM CROUGH stated that they feel their proposal is a
suitable buffer.
COMMISSIONER HOA~LAND moved to close the public hearing
at 6:45 PM and adopt Resolution No. 90-(next) denying
adoption of a Negative Declaration for Change of Zone
No. 5663 and Parcel Map No. 25212; not approve Change of
Zone No. 5663 and not approve Parcel Map No. 25212,
seconded by COMMISSIONER FAHEY, based on their concerns
of setting a precedent of the entire area, for smaller
lot sizes. The Commission felt that the improvements
being requested by staff were appropriate for the
proposal.
AYES: 3
NOES: 0
ABSENT: 2
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
Fahey, Hoagland, Chiniaeff
None
Blair, Ford
6. APPEAL NO. 7/PLOT PLAN 11149
6.1
Proposal to appeal County Road Condition No. 8 requiring
street lights on the project located on the west side of
Jefferson Avenue, south of Overland Road.
STEVE JIANNINO provided the staff report on this item.
PCMINll/5/90 -3- NOVEMBER 16, 1990
PL~NN~N~ CO~I~SS[ON H~NUTES NOVEMBER $~ L990
COMMISSIONER HOAGLAND asked staff if they anticipated
future street lighting.
DOUG STEWART stated that it was a capital improvement
project for the City and could be implemented in the
future.
COMMISSIONER CHINIAEFF opened the public hearing at 7:00
P.M.
JOSEPH SAPP, 1660 Hotel Circle North, #720, San Diego,
applicant, advised the Commission that the County Road
Department had stated that this was an error and should
not have been included in the Conditions.
COMMISSIONER FAHEY moved to close the public hearing at
7:02 P.M. and uphold the applicant's request for deletion
of Condition No. 8 of the County Road Department Letter
for Plot Plan No. 11149 dated December 26, 1989, seconded
by COMMISSIONER HOA~LAND.
AYES: 3
NOES: 0
ABSENT: 2
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
Fahey, Hoagland, Chiniaeff
None
Blair, Ford
7. SUBSTANTIAL CONFORMANCE NO. 2 FOR SP NO. 164
7.1
Proposal to modify the location of the Class 1 bike trail
which traverses the park and open space area located
adjacent to Residential Planning Area No. 4 of the
Roripaugh Estates Specific Plan located at the southwest
corner of Roripaugh and Nicolas Roads.
STEVE JIANNINO provided the staff report.
COMMISSIONER CHINIAEFF opened the public hearing at 7:05
P.M.
DAVE JAMES, RanPac Engineering, 27447 Enterprise Circle
West, Temecula, representing the applicant concurred with
the findings and recommendations in the staff report.
PCMINll/5/90 -4- NOVEMBER 16, 1990
PLAIq~ING COIO~ISSION HIIQUTES NOVEHBER 5, L990
GEORGE WALKER, Davidson Communities, 12520 High Bluff
Drive, San Diego, applicant advised the Commission that
the area in question went nowhere and provided nothing
for the project. He stated that this area was part of an
existing slope on the property line of lots 67 and 68 and
would be used as a maintenance area only.
COMMISSIONER HOAGLAND questioned if the applicant was
going to fence off this area. The applicant indicated
that they could fence it along the back side of the slope.
COMMISSIONER CHINIAEFF suggested that the applicant Quit-
Claim the easements to each property owner adjacent to the
area if it was not going to be used. JOH~ CAVANAUGH
advised the Commission that they were limited to agreeing
or disagreeing with the proposal.
COMMISSIONER HOAGLAND advised the applicant that the
Commission strongly urged him to discuss the idea of
vacation with the Homeowners Association.
CONNISSIONER HOAGLAND moved to approve Substantial
Conformance No. 2 for Specific Plan No. 164, seconded by
COIOfISSIONER FANEY.
AYES: 3
NOES: 0
ABSENT: 2
COMMISSIONERS:
COMMISSIONERS'
COMMISSIONERS:
Fahey, Hoagland, Chiniaeff
None
Blair, Ford
8. PLOT PLAN NO. 20
8.1
Proposal to construct a 160,561 square foot industrial
building with 128,345 square feet of warehouse, 26,850
square feet of office space and 5,366 square feet of
manufacturing. Project is located north of Rancho
California Road, Business Park Drive.
OLIVER MUJICA provided the staff report on this item.
He stated that Condition No. 1 should be amended to
reflect the above stated square footages and Condition
No. 10 amended to reflect the total requirement for
parking spaces as 246 with 5 handicapped parking spaces.
PCMINll/5/90 -5- NOVEMBER 16, 1990
PLANNING COMMISSION MINUTES NOVEMBER 5v 1990
COMMISSIONER HOAGLANDquestioned the surface requirements
for the parking area in Condition No. 10. GARY THORNHILL
advised the Commission to disregard the interior sentences
beginning with "Decomposed granite".
COMMISSIONER CHINIAEFF opened the public hearing at 7:20
P.M.
CRAIG WULFEMEYER, 43225 Business Park Drive, Temecula,
applicant, advised the Commission that this would be a
distribution building for medical products.
COMMISSIONER HOAGL]%ND questioned the requirements for
Condition No. 31. GARY THORNHILL stated that this was a
standard condition.
COMMISSIONER HOAGLAND moved to close the public hearing
at 7:25 P.M. and adopt Negative Declaration for Plot Plan
No. 20 and recommend that the City Council adopt
Resolution No. 90-(next) approving Plot Plan No. 20,
seconded by COMMISSIONER FAHEY.
AYES: 3
NOES: 0
ABSENT: 2
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
Fahey, Hoagland, Chiniaeff
None
Blair, Ford
10. CHANGE OF ZONE 5613/VTTM 25082
10.1
Proposal to change zone from R-R 1/2 to R-1 and create
109 signle family lots at the northeast corner of Calle
Medusa and Nicholas Road.
STEVE JIANNINO provided the staff report on this item.
GARY THORNHILL advised the Commission that this was a
difficult case for staff to work on. He stated that the
applicant was relying on information from the county
when they began processing this application. He advised
the Commission that approving this project as submitted
would set precedent for this entire area.
COMMISSIONER HOAGLAND asked staff if other densities
had been proposed to the applicant.
PCMINll/5/90 -6- NOVEMBER 16, 1990
PL~NNIN~ COlO~ISSlON HINUTES
NOVEMBER 5; 1990
GARY THORNHILL stated that the applicant felt that this
was the project design their client needed to make it
work.
DOUG STEWART advised the Commission that the flooding
issues addressed in the flood control letter are
serious issues which the applicant still needs to
address before the Engineering Department could approve
the Tract.
COMMISSIONER CHINIAEFF opened the public hearing at
7:35 P.M.
GARY KOONTZ, CM Engineering, 41593 Winchester Road,
Temecula, applicant, stated that they have worked with
staff at County and City levels to plan this project.
He said that the project had gone through the County
planning process and all pertinent studies had been
performed and approved by all agencies except for flood
control. Prior to the public hearing the project was
then transferred to the City. Mr. Koontz said that they
have understood all along that staff wanted half-acre
lots; however, this is unacceptable to their client.
Mr. Koontz said that the Flood Control District has
requested that the applicant form an Assessment District
prior to approval of this project; however, they have
had difficulty getting other property owners to
participate. He did state that their applicant was
willing to participate in an Assessment District.
COMMISSIONER HOAGLAND questioned the applicant if they
had received a 404/1601 permit.
GARY KOONTZ stated that they had not attempted to get
those permits yet; however, they were aware that this
was an issue.
COMMISSIONER HOAGLAND asked if the applicant had
discussed alternative densities that might include some
mixture of lot sizes.
GARY KOONTZ stated that this would not be economically
feasible to go to much smaller or larger lots.
PCMINll/5/90 -7- NOVEMBER 16, 1990
PLANNING COMMISSION MINUTES NOVEMBER 5, 1990
COMMISSIONER FAHEY asked the applicant if they would
be willing to go back to staff and address some of the
density and flood control issues as opposed to a denial.
GARY KOONTZ advised the Commission that they would be
willing to go back and address the flood issues with
staff.
ROBERT PACK, President, Pavilion Homes, 30181 Verdugo,
Laguna Hills, addressed the Commission and stated that
the developers position has been well presented by Gary
Koontz. He stated that at the time of preparing this
project their only guide was the SWAP plan which had
been developed for the City. Based on the input from
their staff and engineers they processed the Vested
Tentative Map in accordance with SWAP.
ROBERT PACK questioned the Deputy City Attorney John
Cavanaugh on the ability of staff and the Commission
to inadvertently change their requirements of what
should be developed as opposed to what SWAP proposes.
COMMISSIONER CHINIAEFF advised Mr. Pack that the City
has a time period in which they can adopt a General
Plan and they had the ability to adopt or interpret
the SWAP plan. He stated that the City Council had
stated that they would use the SWAP as a guideline.
Mr. Chiniaeff added that he was concerned with the
buffering of smaller to larger lots.
COMMISSIONER FAHEY added that the Commission's decision
on this project would serve as a guideline for other
developments in this area.
COMMISSION CHINIAEFF stated that with the Engineering
Department statements as well as the Flood Control
Districts comments, the Commission would not be in a
position to approve this project as submitted. He
added that he also felt that the Commission should
indicate what their preferences for densities would
be.
PCMINll/5/90 -8- NOVEMBER 16, 1990
PLANNING CO~OfISSION HINUTES NOVEHBER 5~ L990
Commissioner Chiniaeff suggested that the applicant
consider a split in the property, having the higher
elevation area be the R-1 and the lower lots be R-R 1/2.
CO~l{ISSIONER HOAGLAND expressed his desire to see the
large ridge incorporated in the project rather than
being graded down and felt that it made a natural
transition from lower to higher density housing.
Commissioner Hoagland asked if the applicant would be
willing to go back to staff and address these issues.
GARY KOONTZ requested the Commission's action and stated
that if the Commission voted on a denial they would take
the project to the City Council on an appeal.
COMMISSIONER CHINIAEFF stated that the staff and the
Commissioners have been very clear in what they are
trying to accomplish. He also added the the design
guidelines that have been submitted would apply to
anything and not directly to this project. He indicated
they still need some work.
COMMISSIONER FAHEY moved to close the public hearing
at 8:15 PM and deny Change of Zone 5613 and deny Vesting
Tentative Tract No. 25082 based on the analysis and
findings in the staff report and the Commission's
request for; adequate buffering between higher and lower
density developments, possibly using the bluff as
demarkation as well; flood plain problems have not
been adequately addressed and, the design guidelines
submitted to not appear to apply to this project.
JOHN CAVANAUGH advised the Commission that this was not
a final decision, that the item would go to the City
Council for final determination.
COMMISSIONER CHINIAEFF asked the City Attorney if the
Commission had the ability to request a zone change.
JOHN CAVANAUGH advised that the Commission had the
ability to make a suggestion to the council for a more
suitable zone change.
PCMINll/5/90 -9- NOVEMBER 16, 1990
PL~NN~N~ COl~SS~ON ~NUTES NOVEMBER $~ L990
COMMISSIONER CHINIAEFF stated that they could make a
recommendation for a zone change as a suggestion for
the upper section of the ridge being R-1 and the lower
section being R-R 1/2 giving the applicant something
to work with rather than just a denial.
JOHN CAVANAUGH stated that the Commission could make
these suggestions to the City Council which may help
them make their determination.
COMMISSIONER FAHEY amended her motion be recommending
a zone change of the upper half of the ridge being R-1
and the lower half being R-R 1/2, withdrawing the zone
change denial, seconded by COMMISSIONER HOAGLAND.
After discussion with the City Planning Director, JOHN
CAVANAUGH suggested that the Commission take action by
either denying or approving the application as submitted
and make their recommendations to the City Council.
COMMISSIONER FAHEY withdrew her amendment to the motion;
with the concurrence of second, COMMISSIONER HOAGLAND;
however, recommended that the City Council address the
options proposed by the Commission. The original motion
for denial of the Zone Change and the Tentative Parcel
Map No. 25802 was approved.
AYES: 3
NOES: 0
ABSENT:2
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
Fahey, Hoagland, Chiniaeff
None
Blair, Ford
11. PLANNING DIRECTOR REPORT
11.1 GARY THORNHILL advised the Commission on the following
items:
1)
A tentative November 16 course on preparing and
revising the General Plan.
2)
Will be handing out various articles that he comes
across he feels may be helpful to the Commission.
3)
Address comments made as to what should be used as
a guideline (i.e. zoning or a combination of zoning
requirements and SWAP designation). He also stated
that once the General Plan has been adopted then
they will do a consistency re-zoning.
PCMINll/5/90 -10- NOVEMBER 16, 1990
PL~N~ COI. fi~SS~ON ~[NUTES NOVF~BER 5~ ~990
ADJOURNMENT
COMMISSIONER FAHEY moved to adjourn the meeting at 8:20 P.M.,
seconded by COMMISSIONER HOAGLAND. Next regularily scheduled
meeting November 19, 1990, 6:00 P.M., Vail Elementary School,
29915 Mira Loma Drive, Temecula, 6:00 P.M.
DENNIS CHINIAEF~
PCMINll/5/90 -11- NOVEMBER 16, 1990