Loading...
HomeMy WebLinkAbout061715 PC AgendaIn compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the office of the City Clerk (951) 694-6444. Notification 48 hours prior to a meeting will enable the City to make reasonable arrangements to ensure accessibility to that meeting [28 CFR 35.102.35.104 ADA Title II]. TEMECULA PLANNING COMMISSION REGULAR MEETING CITY COUNCIL CHAMBERS 41000 MAIN STREET TEMECULA, CALIFORNIA JUNE 17, 2015 — 6:00 PM Next in Order: Resolution: 15-14 CALL TO ORDER: Flag Salute: Commissioner Harter Roll Call: Guerriero, Harter, Kight, Telesio and Turley-Trejo PRESENTATIONS/PROCLAMATIONS 1 Business Spotlight Recognition Presentation, Christine Damko PUBLIC COMMENTS A total of 15 minutes is provided so members of the public may address the Commission on items that are not listed on the Agenda. Speakers are limited to three minutes each. If you desire to speak to the Commission about an item not on the Agenda, a salmon colored 'Request to Speak" form should be filled out and filed with the Commission Secretary. When you are called to speak, please come forward and state your name for the record. For all other agenda items a 'Request to Speak" form must be filed with the Commission Secretary prior to the Commission addressing that item. There is a three-minute time limit for individual speakers. NOTICE TO THE PUBLIC All matters listed under Consent Calendar are considered to be routine and all will be enacted by one roll call vote. There will be no discussion of these items unless Members of the Planning Commission request specific items be removed from the Consent Calendar for separate action.. CONSENT CALENDAR 2 Minutes RECOMMENDATION: 2.1 Approve the Action Minutes of May 20, 2015 PUBLIC HEARING ITEMS RECOMMENDATION: 2.1 Approve the Action Minutes of May 20, 2015 PUBLIC HEARING ITEMS Any person may submit written comments to the Planning Commission before a public hearing or may appear and be heard in support of or in opposition to the approval of the project(s) at the time of hearing. If you challenge any of the projects in court, you may be limited to raising only those issues you or someone else raised at the public hearing or in written correspondences delivered to the Commission Secretary at, or prior to, the public hearing. Any person dissatisfied with any decision of the Planning Commission may file an appeal of the Commission's decision. Said appeal must be filed within 15 calendar days after service of written notice of the decision, must be filed on the appropriate Planning Department application and must be accompanied by the appropriate filing fee. 1 portion of the existing Kaiser Permanente site location at 27309 Madison Avenue, Scott Cooper RECOMMENDATION: 3.1 Adopt a resolution entitled: PC RESOLUTION NO. 15- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA15-0151, A MAJOR MODIFICATION APPLICATION TO A DEVELOPMENT PLAN FOR THE CONSTRUCTION OF A 9,031 -SQUARE -FOOT MEDICAL OFFICE BUILDING ON THE FRONT PORTION OF THE EXISTING KAISER PERMANENTE SITE LOCATED AT 27309 MADISON AVENUE, AND MAKING A FINDING OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) (APN 910-272- 033) REPORTS FROM COMMISSIONERS REPORTS FROM COMMISSION SUBCOMMITTEE(S) DIRECTOR OF COMMUNITY DEVELOPMENT REPORT DIRECTOR OF PUBLIC WORKS REPORT ADJOURNMENT Next regular meeting: Planning Commission, Wednesday, July 1, 2015, 6:00 PM City Council Chambers, 41000 Main Street, Temecula, California. NOTICE TO THE PUBLIC The agenda packet (including staff reports) will be available for public viewing in the Main Reception area at the Temecula Civic Center (41000 Main Street, Temecula) after 4:00 PM the Friday before the Planning Commission meeting. At that time, the agenda packet may also be accessed on the City's website — www.cityoftemecula.oro — and will be available for public viewing at the respective meeting. Supplemental material received after the posting of the Agenda Any supplemental material distributed to a majority of the Commission regarding any item on the agenda, after the posting of the agenda, will be available for public viewing in the Main Reception area at the Temecula Civic Center (41000 Main Street, Temecula, 8:00 AM — 5:00 PM). In addition, such material may be accessed on the City's website — www.citvoftemecula.oro — and will be available for public viewing at the respective meeting. If you have questions regarding any item on the agenda for this meeting, please contact the Planning Department at the Temecula Civic Center, (951) 694-6400. ITEM I CITY OF TEMECULA COMMUNITY DEVELOPMENT MEMORANDUM TO: Planning Commission FROM: Christine Damko, Economic Development Analyst DATE: June 17, 2015 SUBJECT: Business Recognition Program — Channell Commercial Corp PREPARED BY: Christine Damko, Economic Development Analyst BACKGROUND: Channell Commercial Corporation is a designer and manufacturer of telecommunications equipment supplied to broadband and telephone network providers worldwide. Major product lines include a line of thermoplastic and metal fabricated enclosures, advanced copper termination and connectorization products, fiber-optic cable management systems for fiber to the premise networks and heat shrink products. The company's enclosure products house, protect and provide access to advanced telecommunications hardware that includes both radio frequency electronics and photonics, and transmission media that includes coaxial cable, copper wire and optical fibers used in the delivery of voice, video and data services. Channell Commercial Corporation has been headquartered in Temecula for over 25 years and is located off Ynez Road, near the Harveston community. ITEM 2 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the office of the City Clerk (951) 694-6444. Notification 48 hours prior to a meeting will enable the City to make reasonable arrangements to ensure accessibility to that meeting [28 CFR 35.102.35.104 ADA Title III. ACTION MINUTES TEMECULA PLANNING COMMISSION REGULAR MEETING CITY COUNCIL CHAMBERS 41000 MAIN STREET TEMECULA, CALIFORNIA MAY 20, 2015 — 6:00 PM Next in Order: Resolution: 15-10 CALL TO ORDER: Flag Salute: Commissioner Guerriero Roll Call: Guerriero, Harter, Kight, Telesio and Turley-Trejo PUBLIC COMMENTS A total of 15 minutes is provided so members of the public may address the Commission on items that are not listed on the Agenda. Speakers are limited to three minutes each. If you desire to speak to the Commission about an item not on the Agenda, a salmon colored "Request to Speak" form should be filled out and filed with the Commission Secretary. When you are called to speak, please come forward and state your name for the record. For all other agenda items a "Request to Speak" form must be filed with the Commission Secretary prior to the Commission addressing that item. There is a three-minute time limit for individual speakers. NOTICE TO THE PUBLIC All matters listed under Consent Calendar are considered to be routine and all will be enacted by one roll call vote. There will be no discussion of these items unless Members of the Planning Commission request specific items be removed from the Consent Calendar for separate action. CONSENT CALENDAR 1 Minutes RECOMMENDATION: 1.1 Approve the Action Minutes of April 15, 2015 and May 6, 2015 April 15, 2015 APPROVED 4-0-0-1; MOTION BY COMMISSIONER TELESIO, SECOND BY COMMISSIONER HARTER; AYE VOTES BY COMMISSIONERS HARTER, KIGHT, TELESIO, AND TURLEY-TREJO; COMMISSIONER GUERRIERO ABSTAINED MAY 6, 2015 APPROVED 3-0-0-2; MOTION BY COMMISSIONER TELESIO, SECOND BY COMMISSIONER GUERRIERO, AYE VOTE BY COMMISSIONERS GUERRIERO, TELESIO, AND TURLEY-TREJO; COMMISSIONERS HARTER AND KIGHT ABSTAINED PUBLIC HEARING ITEMS Any person may submit written comments to the Planning Commission before a public hearing or may appear and be heard in support of or in opposition to the approval of the project(s) at the time of hearing. If you challenge any of the projects in court, you may be limited to raising only those issues you or someone else raised at the public hearing or in written correspondences delivered to the Commission Secretary at, or prior to, the public hearing. Any person dissatisfied with any decision of the Planning Commission may file an appeal of the Commission's decision. Said appeal must be filed within 15 calendar days after service of written notice of the decision, must be filed on the appropriate Planning Department application and must be accompanied by the appropriate filing fee. 2. Director's Hearing Summary Report RECOMMENDATION: 2.1 RECEIVE AND FILE 3. Fiscal Year 2016 -2020 Capital Improvement Plan (CIP) General Plan Consistency, Dale West APPROVED 5-0; MOTION BY COMMISIONER GUERRIERO, SECOND BY COMMISSIONER TURLEY-TREJO; AYE VOTES FROM COMMISSIONERS GUERRIERO, HARTER, KIGHT, TELESIO AND TURLEY-TREJO RECOMMENDATION: 3.1 Staff recommends that the Planning Commission review the Fiscal Year 2016-20 Capital Improvement Program (CIP) and make a determination that the projects included in the CIP are in conformance with the adopted City of Temecula General Plan 4. Planning Application PA14-0107. a Development Plan for a 25,000 square foot medical office building on two acres located at 31775 DePortola Road, James Atkins APPROVED 5-0; MOTION BY COMMISSIONER TURLEY-TREJO, SECOND BY COMMISSIONER HARTER; AYE VOTES BY COMMISSIONERS GUERRIERO, HARTER, KIGHT, TELESIO AND TURLEY- TREJO RECOMMENDATION: 4.1 Adopt a resolution entitled: PC RESOLUTION NO. 15-10 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA14-0107, A DEVELOPMENT PLAN FOR A 25,000 SQUARE FOOT, 2 -STORY MEDICAL OFFICE BUILDING ON 2 ACRES, AND MAKING A FINDING OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA). THE SITE IS GENERALLY LOCATED ON THE SOUTH SIDE OF DE PORTOLA ROAD, APPROXIMATELY 500 FEET WEST OF MARGARITA ROAD LOCATED AT 31775 DE PORTOLA ROAD, (APN: 959-080-035) 5. Planning Application PA14-2918 a Minor Modification to update the Statement of 27911 Jefferson Avenue Scott Cooper APPROVED 5-0; MOTION BY COMMISSIONER GUERRIERO, SECOND BY COMMISSIONER HARTER; AYE VOTES BY COMMISSIONERS GUERRIERO, HARTER, KIGHT, TELESIO, AND TURLEY-TREJO RECOMMENDATION: 5.1 Adopt a resolution entitled: PC RESOLUTION NO. 15-11 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA14-2918, A MINOR MODIFICATION TO UPDATE THE STATEMENT OF OPERATIONS FOR A PREVIOUSLY APPROVED CONDITIONAL USE PERMIT, LOCATED AT 27911 JEFFERSON AVENUE, AND MAKING A FINDING OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) (APN 921-050-012) 6. Planning Application PA15-0374 a Conditional Use Permit to allow for existing Third 41915 Third Street, Scott Cooper APPROVED 5-0; MOTION BY COMMISSIONER HARTER, SECOND BY COMMISSIONER TELESIO; AYE VOTES BY COMMISSIONERS GUERRIERO, HARTER, KIGHT, TELESIO, AND TURLEY-TREJO RECOMMENDATION: 6.1 Adopt a resolution entitled: PC RESOLUTION NO. 15-12 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA15-0374, A CONDITIONAL USE 7. PERMIT TO ALLOW FOR THE EXISTING THIRD STREET SMOKEHOUSE RESTAURANT, A BONA FIDE EATING ESTABLISHMENT, TO PROVIDE INDOOR LIVE ENTERTAINMENT AND TO UPGRADE THEIR LIQUOR LICENSE FROM A TYPE 41 ABC LICENSE (ON -SALE BEER AND WINE) TO A TYPE 47 ABC LICENSE (ON SALE GENERAL -EATING PLACE), LOCATED AT 41915 THIRD STREET AND MAKING A FINDING OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) (APN 922-044- 018) Street. Scott Cooper APPROVED 5-0; MOTION BY COMMISSIONER HARTER, SECOND BY COMMISSIONER GUERRIERO; AYE VOTES BY COMMISSIONERS GUERRIERO, HARTER, KIGHT, TELESIO, AND TURLEY-TREJO RECOMMENDATION: 7.1 Adopt a resolution entitled: PC RESOLUTION NO. 15-13 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA14-0188, A MAJOR MODIFICATION TO ADD 6,657 SQUARE FEET TO AN EXISTING TWO- STORY RETAIL/OFFICE COMMERCIAL STRUCTURE LOCATED AT 28475 OLD TOWN FRONT STREET, AND MAKING A FINDING OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) (APN 922-026-015) REPORTS FROM COMMISSIONERS REPORTS FROM COMMISSION SUBCOMMITTEE(S) DIRECTOR OF COMMUNITY DEVELOPMENT REPORT DIRECTOR OF PUBLIC WORKS REPORT ADJOURNMENT Next regular meeting: Wednesday, June 3, 2015, 6:00 PM City Council Chambers, 41000 Main Street, Temecula, California. 4 ITEM 3 STAFF REPORT — PLANNING CITY OF TEMECULA PLANNING COMMISSION DATE OF MEETING: June 17, 2015 TO: Planning Commission Chairperson and members of the Planning Commission FROM: Stuart Fisk, AICP, Senior Planner PREPARED BY: Scott Cooper, Case Planner PROJECT Planning Application No. PA15-0151, a Major Modification SUMMARY: Application to a Development Plan for the construction of a 9,031 square -foot medical office building on the front portion of the existing Kaiser Permanente site located at 27309 Madison Avenue RECOMMENDATION: Adopt a Resolution approving the project subject to Conditions of Approval CEQA: Categorically Exempt Section 15332, Class 32, In -Fill Development Projects PROJECT DATA SUMMARY Name of Applicant: Skyler Denniston General Plan Service Commercial (SC) Designation: Zoning Designation: Service Commercial (SC) Existing Conditions/ Land Use: Site: Parking Lot, Existing Medical Offices, Vacant Land / Service Commercial (SC) North: Sanborn Avenue, Madison Avenue, Vacant Land/ Service Commercial (SC) South: Drainage Channel/Open Space Conservation (OS -C) East: Madison Avenue, Existing Office Buildings/Community Commercial (CC) West: Vacant Land, Existing Bank/Service Commercial (SC) Existing/Proposed Min/Max Allowable or Required Lot Area: 2.94 Acres 0.92 Acres Minimum Total Floor Area/Ratio: 32,541 Square Feet of 0.30 Proposed & Existing / 0.25 Landscape Area/Coverage: 21.6% 20.0% Minimum Parking Provided/Required: 158 Parking Spaces 124 Parking Spaces BACKGROUND SUMMARY On February 2, 2015, Skyler Denniston submitted Planning Application PA15-0151, a Major Modification to a Development Plan to construct a 9,031 square -foot medical office building on the front portion of the existing Kaiser Permanente site located at 27309 Madison Avenue. Medical offices are a permitted use in the service commercial zone. The existing Kaiser Permanente building was originally approved under PA05-0101 on July 20, 2005 to construct a 23,510 square -foot medical office building. Staff has worked with the applicant to ensure that all concerns have been addressed, and the applicant concurs with the recommended Conditions of Approval. ANALYSIS Site Plan The project is located in the Service Commercial (SC) district at 27309 Madison Avenue on a developed lot. The building would contain medical offices, exam rooms, and a patient waiting area. A plaza located in between the existing building and the proposed building has been designed to include benches for patients and employees along with bike racks and landscaping. There are two points of vehicular access to the project site with an access point on Sanborn Avenue and an access point within the cul-de-sac of Madison Avenue. The project would replace an existing trash enclosure with a new covered trash enclosure. The location of the trash enclosure would be in the same location as the existing enclosure. Per Section 17.24.040 of the Municipal Code, gross floor area for the purposes of calculating parking requirements includes the total horizontal area of floors, less the area devoted to hallways, atriums, stairways, electrical and mechanical rooms, and elevator rooms, and elevator shafts. The project, as a whole, contains 24,706 square feet of gross floor area. A medical office building is required to provide one space for every 200 square feet of gross floor area. The project is required to provide 124 parking spaces and is proposing 158 parking spaces, which exceeds the development code requirements. Architecture The architectural design of the building is in conformance with the existing building on the project site. The colors and materials of the proposed building would match and complement the existing building including the concrete tilt up panels. Slate stone is used at the entry of the proposed building along with a steel canopy. A trespa panel wall system is used on the east elevation which would be the interior wall of the plaza. The trespa panels are French walnut in color and bring an architectural element to the project which is unique and original for this type of development within the City. Landscaping The project, when combined with the previously approved medical office building, would provide 21.6% landscaping which exceeds the minimum landscape requirements of the development code. The project would also provide landscaping within the plaza area between the existing building and the proposed building. Plant types include muskogee crape myrtles, Chinese pistaches, coastal live oaks, fornight lilies, and rosemary which will complement and match the existing landscape currently located on the project site. LEGAL NOTICING REQUIREMENTS Notice of the public hearing was published in the U -T San Diego on June 4, 2015 and mailed to the property owners within a 1,500 -foot radius. ENVIRONMENTAL DETERMINATION In accordance with the California Environmental Quality Act, the proposed project has been deemed to be categorically exempt from further environmental review (Section 15332, Class 32, In -Fill Development Projects). The project meets all General Plan and Zoning policies and regulations and is located within City limits on a site of no more than five acres. The project site has no value as habitat for endangered, rare or threatened species. The site is also surrounded by development and is able to be serviced by all required utilities and public services. The project is not anticipated to result in any significant effects relating to traffic, noise, air quality, or water quality. FINDINGS Modification (Code Section 17.05.010F The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City. Medical offices are an allowable use within the Service Commercial zone. Therefore the use will be consistent with the General Plan for Temecula as well as the requirements for State law and other Ordinances of the City. The overall development of the land is designed for the protection of the public health, safety, and general welfare. The project has been reviewed and conditioned to ensure conformance with the Development, Building, and Fire codes. These codes contain provisions designed to ensure the protection of the public health, safety, and general welfare. ATTACHMENTS Vicinity Map Plan Reductions Resolution Exhibit A - Draft Conditions of Approval Notice of Public Hearing VICINITY MAP City of Temecula Protect site 15C �C 6G0 Feat This map was made by the Cay of Temeloila Geogrsl IMonnation System The map is derweol from base data produced by Ilse Rival County Assessor s Detainment and the Transportahon and Lal Management Agency of Re arae \� Coumy The City of Temecula assumes ra warranty or legal responsidldy for the information contained on this map Data and iMormatmn represented on this map we aiblect to update and mliticatton The Geographic Information System and Other s roes shil be queried for the most turn iMormalmn This map is hol for fwM or resale PLAN REDUCTIONS .y�_ f* 4t� S Ji. 4- - 141 tllll I I I I I I A I I I L1I I I I I I. I I 1 I I I I 1 1 • A�a. 04 K415ER PERMANEMI �� - � _ �MAUISON AVENUE :_•.•_.•••�•..._. �cmtlonb e�m�i»e I Asloa.F FF 104LIO I� n _ LIONAKIS rl.rrrrr �,7 '�•'-•• ,�,,,,,� LEGEND LIONAKIS OWL.111 l.l.11..L I IJ111 S,M SF 2.105 SF n . aY� !l MOB1 -SECOND FLOOR PLAN —41 i1 MOB 2 - F RST FLOOR PLAN ,7R /1 MOB 1 - FIRBT FLOOR PLAN LEGEND KAM PFBMMIPMb GFA CALCULATION rlmrv.de�s.�.o ✓il Olb � 1A16 '_ �VYd CVbn\9®\ Y�OVW_YCIY IOC\C\TC .� LIONAKIS I I I I 1 1 I I 1 llllli I 1 I i Li 1 1 1 1 1 1 1 IQ I I i i I I I I i i i ,Q I , I 1 i I I i I • ,�.,x,e„r. (`�� (`I{� QI 0 Q O IWSER PFRMIIIiNiE. .� .., .__-_ � i x.eornmr sno ro+Gl,r+aw OIY�EVbIlYM101 o-.r. I i � x•mw LIONAKIS _,_.,* W,..- I � ----- ---- ------- -------------- ------ ----o I .w-- .. 1 J --.BALL ----- .- 1 I 4 — �, 0 NTe uv� - .i.. .�� _•Mem � ..• r!l_FLQ4$_PLAN - LEVEL I A-",-PP ---- -- - -- ---___----------------- KAISER PERMANENTS. -- - - -- - „ . ... 1 I I 1 15' - N __ iiJF•tr� 7LIONA4KIS . IN ` BII 1511m S • \ .:,. V ... I % i S p III TAIT PROP0I Iw i SI r • ti v... .. .. ' s ' EDID 1 4TORY IIN S.F. Ion. �Ir� I �. ' • ' 1047 PAD 11 • ` WWI I V1 4� 1 - I .lam •\ 1 LEGEND I -- ,Wmit�56 .GYM Tym.m.. • v i¢-v^-�� i �m AGN �- •. TYPICAL SECTION GC TYPICAL SECTION A•A NIS �. �w jp,�-,',+- °'-`• NIS _ 5iC1Y CPIlY4'StEMNG1E5 iGfV[IUGIIC gDUgGE __ I •la--��" 1 ror. mw..m-_ Gi:;ii".M:i.. mm. � e� .�..�.�... •+m w. �/41lr-I- •+.. r..e�wr� BEIlDiIUM TYPICAL SECTION B -S 6 nim ��•°•-•' YS` a•'Y•W�••••T- NIS •.gym-m.amm G, Nln� FFrJIw 9FiK�F nrar.w.>ow orre. tren. aFan � NORTH EXTERIOR ELEVNTION Q Q Q Q Q Q Q Q Q EXT. FINISHES ' -=---- -- I GENERAL NOTES Wr" PERMANENTE ------------- f -f..-f. LIONAM SHEET KEYNOTES WEST EXTERIOR ELEVATION - RENDERED EXT, FINISHES ------------------------ ---------------•-------- ------------ ------------- t -------------------- t ------------ 1--- .... .. PRYTH EXTERIOR ELEVATION RENDERED X212-PP.1 IYYi i I I I I I i i luui i l i i Li iiiiiiiilii i, i. i i,i i.i i i i Ii 1 i i i I i i 1 i ^T"!r;�.�r I I O I I ♦"'-.WN➢�_.—.�--.—. .— — — — — _— — — -- Jj I — — — � — _ I I —. _--_.--�.—. moi."u,W4Y GENERAL NOTES 04 KMSB KRMANM. vs�wnav iieic orrs uw�. mew LIONAKIS •• rl -- -- - - - - - t - - - MiUTSEWPERMATdPNTE — — r &I1EET KEYNOTES LA"T S _ `frr....W _.--------- �""'�'f -- —.— --------t ---------------- —'t--------�-- .—.—.—.—.—. 4 Q _ ..' ate..• EXT. FINCUES .... ��........ ..�.. - ---------------- ill SOUTH EXTERIOR ELEVATION A,212 PP 4 4 4 4 4 -- o, KAISER PERM, i !1 NORTH E%TERbR ELEVATbN I I I �L EAST EXTERIOR - ELEVATION L` 1 1 i PROTECT TRPEs, PROTECT IN EES N EXISTING HI. SI NESS ASSOCIATION LANDSCAPE EXISTING- - - MONUMENI SICN EXISTING BUSINESS ASSOCIATION EXISTING BUSINESS FXISTING ADA RAMP \ ASSOCIATION EXISTING MONUMENT SIG LANDSCAPE MODULAR WETLAND I. MADISON AVE SYSILM EXISTING MOB I —SEE ENLARGEMENT SHT L-002 FOR PLAZA ENLARGEMENT M BYIIBRIIOR B Idm ro LW BIS M . M 6YBTEM WlL KBO YE eB]NIEp fOR RATA Bo1REl,c_E,�. II I I I I L. L� I i SII I I E1I 1 LANDSCAPE N 1` �] ] MODULAR WETLAND EXIST"INGHARDSC'APE& SYSTEM PLANING SHALL REMAIN PLANT MATERIALS BE PROTECTED LB LEGEND SCALA: 1"=20 NBIfilllm a mAaLra Y Ex Yt• a va aNWLR1IR mRollrle a ffi aalaA t aoN IKES Y m NVERBTROEMM MuONOOEE GIAPE TO. • LEDEIM 111 . A99FONN D 3BGOLOR FpLINGNI LILY !OK 1.I MEOYM 74H Td WgG'Mu01tODEEMYRTLE 1TW TdW MEM[ROGlLB 1FlMBEI YFIEOW EIffi EN YELLOW MIM, ION qD LEOBM Tdn T PIBTACM CMWE— -NIEEE PBTN%IE U'BO% 9 I. ZTn. A58MFNM 7. 1. I9J3'W HEIRMIOF PMVFICM TIED •MCTA pWl q LON r.Iw ?d S mJ.T,WUI ACERIFOLM BLOOOODOO ]I'BOX N MEDIUM gd H MlNOWII ZW "'OOCGM. LWIOOM PUKE yFAD. Ly LAMRNA MONTEVIDENSB TARTLETS IAMNN pGN 91 LOW S F]O W TREB NEHEMHRSONIIYAMEMTA' WNBI dm aGAL E AEdLM ldH fd ld W P WERGA WRFOLM GOF.ITLNE OMt H'W% p LOW � ;NW /391gwN NµD11M WLE9iIG TNNA' HEAVENLY 9VlCOM 0,,A) ' aGAL y LOW IN T TW INIMiAL181/ YOROLNYM NO pQ' ! � a �� RHAPHIDLFPIS IrgIu sRRBGTwE' PWRIHOM MAwrHDRH oN LOW :� r .LB! ROBE 1110R10 CARPET FLOWER ROY M1M' ]GAL 0 WOEM IN ]' 4AK ATTEAVATA FO%T.LAGVE 9W 15 101Y !dX ! IORGN YW fdW rIOB WNWY90.IMF`L4B YNWEWE' ROBEIMRY IGAL !1 LOX 14N TS AN OOI/IMMC® IMAM'WY pANONMO SWL 90o MEOAM 1 1 S RUVRMONY' PAW fdW 5KcTRWM ROCHPWBUNE LMl 51 LOW 1S.1B'M Y VIBVRNUMTINVS IAURUlIINUB VWVILNVM !ON 90 MEgIM Cr,,A.dr BPECT%&LA ]'W EIPWrtR9 P'BW GLLBIEMON G1RW1,3 LITRE NXN UWNIF !GN IM LOW S 4.4W CALL N MEEDE ME%IGN RNIE BVeN 1s GN M TR LOW S VTIIE AIN IOTTLEM1rlR 'd CKLEJ FSAEOMLiB CLWTEREDFIEW 'GN M MEOVM 1'H 1!' G_ROIM_MRS TW _AVE ,M I'dW MYOgUM PMVIFOMM MEEPNGMYDPORW Mng ml LOW 1'M r DMNEIIAREV0.UTA LITTLE RN !ML 310 LOW Td'N I'8 2' OX 11111E REY FLµ My 11 14 Mme. RMLWMF%aWIW Bs,. vRM oER. eR. agile oMugn�BleoL UONAKIS Loom L K 0 v I a 111111111 HIIII I 1 1 1 W11111111111 l.l.l.l.l.l.l - SON AVE _ VIER ------- ,'� s 1.1.1.1.1 1 1 1 I 1 1 1 1 I '"�. e�.r "�•�� ® WFIERMANEW MODULAR WETLAND L\POAFD AGGREGATE SYSILM MMlsr R..aa, wa., Mal Ofs b IAH OalalfilYriY M01 LIONAKIS BENCH 74 _. BIKE NA('K heli 1.1±111 MODULAR WETLAND OVERALL SITE AREA. SYSTEM EXISTING LANDSCAPE AREA. PROPOSED LANDSCAPE AREA. SLOPED LANDSCAPE AREA. LANDSCAPE AREA IN RIGHT-OF-WAY: RETENTIONIBIOSWALE BASIN AREA'. TOTAL LANDSCAPE AREA LITTER RECEPI:ACLL 1Z8.178 SF 15,130 S.F. (MOBI ONLY) 12,587 S.F. (MOB 2ONLY) D D D (MODULAR WETLAND SYSTEM INLET 12)) 27.717 S.F. PC DRAFT RESOLUTION PC RESOLUTION NO. 15- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA15-0151, A MAJOR MODIFICATION APPLICATION TO A DEVELOPMENT PLAN FOR THE CONSTRUCTION OF A 9,031 -SQUARE -FOOT MEDICAL OFFICE BUILDING ON THE FRONT PORTION OF THE EXISTING KAISER PERMANENTE SITE LOCATED AT 27309 MADISON AVENUE, AND MAKING A FINDING OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) (APN 910-272- 033) Section 1. Procedural Findings. The Planning Commission of the City of Temecula does hereby find, determine and declare that: A. On February 2, 2015, Skyler Denniston filed Planning Application No. PA15-0151 a Major Modification, in a manner in accord with the City of Temecula General Plan and Development Code. B. The Application was processed including, but not limited to a public notice, in the time and manner prescribed by State and local law. C. The Planning Commission, at a regular meeting, considered the Application and environmental review on June 17, 2015, at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to and did testify either in support or in opposition to this matter. D. At the conclusion of the Planning Commission hearing and after due consideration of the testimony, the Planning Commission approved Planning Application No. PA15-0151, subject to and based upon the findings set forth hereunder. E. All legal preconditions to the adoption of the Resolution have occurred. Section 2. Further Findings. The Planning Commission, in approving the Application hereby finds, determines and declares that: Modification, Development Code Section 17.05.010.F A. The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City; Medical offices are an allowable use within the Service Commercial zone. Therefore the use will be consistent with the General Plan for Temecula as well as the requirements for State law and other Ordinances of the City. B. The overall development of the land is designed for the protection of the public health, safety, and general welfare; The project has been reviewed and conditioned to ensure conformance with the Development, Building, and Fire codes. These codes contain provisions designed to ensure the protection of the public health, safety, and general welfare. Section 3. Environmental Findings. The Planning Commission hereby makes the following environmental findings and determinations in connection with the approval of the Major Modification: A. In accordance with the California Environmental Quality Act, the proposed project has been deemed to be categorically exempt from further environmental review (Section 15332, Class 32, In -Fill Development Projects); 1. The project meets all General Plan and Zoning policies and regulations and is located within City limits on a site of no more than five acres. The project site has no value as habitat for endangered, rare or threatened species. The site is also surrounded by development and is able to be serviced by all required utilities and public services. The project is not anticipated to result in any significant effects relating to traffic, noise, air quality, or water quality. Section 4. Conditions. The Planning Commission of the City of Temecula approves Planning Application No. PA15-0151, a Major Modification Application to a Development Plan for the construction of a 9,031 -square -foot medical office building on the front portion of the existing Kaiser Permanente site located at 27309 Madison Avenue, and making a finding of exemption under the California Environmental Quality Act (CEQA) (APN 910-272-033), subject to the Conditions of Approval set forth on Exhibit A, attached hereto, and incorporated herein by this reference. Section 5. PASSED, APPROVED AND ADOPTED by the City of Temecula Planning Commission this 17th day of June, 2015. Pat Kight, Chairman ATTEST: Stuart Fisk, AICP Secretary [SEAL] STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE )ss CITY OF TEMECULA ) I, Stuart Fisk, Secretary of the Temecula Planning Commission, do hereby certify that the forgoing PC Resolution No. 15- was duly and regularly adopted by the Planning Commission of the City of Temecula at a regular meeting thereof held on the 17th day of June, 2015, by the following vote: AYES: PLANNING COMMISSIONERS: NOES: PLANNING COMMISSIONERS: ABSENT: PLANNING COMMISSIONERS: ABSTAIN: PLANNING COMMISSIONERS: Stuart Fisk, AICP Secretary DRAFT CONDITIONS OF APPROVAL Planning Application No. Project Description Assessor's Parcel No. MSHCP Category: DIF Category: TUMF Category: Quimby Category: Approval Date: Expiration Date: PLANNING DIVISION EXHIBIT A CITY OF TEMECULA DRAFT CONDITIONS OF APPROVAL PA15-0151 A Major Modification Application to a Development Plan for the construction of a 9,031 -square -foot medical office building on the front portion of the existing Kaiser Permanente site located at 27309 Madison Avenue 910-272-033 Commercial Service Commercial Service Commercial N/A (Commercial Project) June 17. 2015 June 17, 2017 Within 48 Hours of the Approval Filing Notice of Exemption. The applicant/developer shall deliver to the Planning Division a cashiers check or money order made payable to the County Clerk in the amount of Fifty Dollars ($50.00) for the County administrative fee, to enable the City to file the Notice of Exemption as provided under Public Resources Code Section 21152 and California Code of Regulations Section 15062. If within said 48-hour period the applicant/ developer has not delivered to the Planning Division the check as required above, the approval for the project granted shall be void by reason of failure of condition (Fish and Wildlife Code Section 711.4(c)). General Requirements 2. Indemnification of the Citv. The applicant and owner of the real property subject to this condition shall hereby agree to indemnify, protect, hold harmless, and defend the City with Legal Counsel of the Citys own selection from any and all claims, actions, awards, judgments, or proceedings against the City to attack, set aside, annul, or seek monetary damages resulting, directly or indirectly, from any action in furtherance of and the approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board or legislative body including actions approved by the voters of the City, concerning the Planning Application. The City shall be deemed for purposes of this condition, to include any agency or instrumentality thereof, or any of its elected or appointed officials, officers, employees, consultants, contractors, legal counsel, and agents. City shall promptly notify both the applicant and landowner of any claim, action, or proceeding to which this condition is applicable and shall further cooperate fully in the defense of the action. The City reserves the right to take any and all action the City deems to be in the best interest of the City and its citizens in regards to such defense. 3. Expiration. This approval shall be used within two years of the approval date; otherwise, it shall become null and void. By use is meant the beginning of substantial construction contemplated by this approval within the two year period, which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval, or use of a property in conformance with a Conditional Use Permit. 4. Time Extension. The Director of Community Development may, upon an application being filed prior to expiration, and for good cause, grant a time extension of up to 3 one-year extensions of time, one year at a time. 5. Conformance with Approved Plans. The development of the premises shall substantially conform to the approved site plan and elevations contained on file with the Planning Division. 6. Signage Permits. A separate building permit shall be required for all signage. 7. Landscape Maintenance. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Director of Community Development. If it is determined that the landscaping is not being maintained, the Director of Community Development shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. 8. Water Quality and Drainage. Other than stormwater, it is illegal to allow liquids, gels, powders, sediment, fertilizers, landscape debris, and waste from entering the storm drain system or from leaving the property. To ensure compliance with this Condition of Approval: a. Spills and leaks shall be cleaned up immediately. b. Do not wash, maintain, or repair vehicles onsite. c. Do not hose down parking areas, sidewalks, alleys, or gutters. d. Ensure that all materials and products stored outside are protected from rain. e. Ensure all trash bins are covered at all times. 9. Paint Inspection. The applicant shall paint a three -foot -by -three-foot section of the building for Planning Division inspection, prior to commencing painting of the building. 10. Photographic Prints.. The applicant shall submit to the Planning Division for permanent filing two 8" X 10" glossy photographic color prints of the approved color and materials board and the colored architectural elevations. All labels on the color and materials board and Elevations shall be readable on the photographic prints. 11. Materials and Colors. The Conditions of Approval specified in this resolution, to the extent specific items, materials, equipment, techniques, finishes or similar matters are specified, shall be deemed satisfied by staff's prior approval of the use or utilization of an item, material, equipment, finish or technique that City staff determines to be the substantial equivalent of that required by the Conditions of Approval. Staff may elect to reject the request to substitute, in which case the real parry in interest may appeal, after payment of the regular cost of an appeal, the decision to the Planning Commission for its decision. Material Exterior Paint Exterior Paint Exterior Paint Slate Tile Trespa Panel Cornice Mechanical Screen Steel Canopy Color Avenue Tan (Sherwin Williams SW7543) Ivory Lace (Sherwin Williams SW7013) Well Bred Brown (Sherwin Williams SW 7027) California Gold (Daltile) French Walnut (Meteon) Well Bred Brown (Sherwin Williams (SW7027) White (Kalwall) 12. Modifications or Revisions. The permittee shall obtain City approval for any modifications or revisions to the approval of this project. 13. Trash Enclosures. The trash enclosures shall be large enough to accommodate a recycling bin, as well as regular solid waste containers. 14. Trash Enclosures. Trash enclosures shall be provided to house all trash receptacles utilized on the site. These shall be clearly labeled on the site plan. 15. Covered Trash Enclosures. All trash enclosures on site shall include a solid cover and the construction plans shall include all details of the trash enclosures, including the solid cover. 16. Construction and Demolition Debris. The developer shall contact the City's franchised solid waste hauler for disposal of construction and demolition debris and shall provide the Planning Division verification of arrangements made with the City's franchise solid waste hauler for disposal of construction and demolition debris. Only the City's franchisee may haul demolition and construction debris. 17. Public Art Ordinance. The applicant shall comply with the requirements of the City's Public Art Ordinance as defined in Section 5.08 of the Temecula Municipal Code. 18. Property Maintenance. All parkways, including within the right-of-way, entryway median, landscaping, walls, fencing, recreational facilities, and on-site lighting shall be maintained by the property owner or maintenance association. 19. Previous Conditions of Approval. All previous Conditions of Approval from PA05-0101 shall remain in full effect unless superseded herein. Prior to Issuance of Grading Permit 20. Placement of Transformer. Provide the Planning Division with a copy of the underground water plans and electrical plans for verification of proper placement of transformer(s) and double detector check prior to final agreement with the utility companies. 21. Placement of Double Detector Check Valves. Double detector check valves shall be installed at locations that minimize their visibility from the public right-of-way, subject to review and approval by the Director of Community Development. 22. Rough Grading Plans. A copy of the Rough Grading Plans shall be submitted and approved by the Planning Division. Prior to Issuance of Building Permit 23. Parking Area Landscaping. The Landscaping and Irrigation Plans shall provide a minimum five-foot wide planter to be installed at the perimeter of all parking areas. Curbs, walkways, etc. are not to infringe on this area. 24. Downspouts. All downspouts shall be internalized. 25. Development Impact Fee (DIF). The developer shall comply with the provisions of Title 15, Chapter 15.06 of the Temecula Municipal Code and all its resolutions by paying the appropriate City fee. 26. Photometric Plan. The applicant shall submit a photometric plan, including the parking lot, to the Planning Division, which meets the requirements of the Development Code and the Riverside County Palomar Lighting Ordinance 655. The parking lot light standards shall be placed in such a way as to not adversely affect the growth potential of the parking lot trees. 27. Construction Landscaping and Irrigation Plans. Four (4) copies of Construction Landscaping and Irrigation Plans shall be reviewed and approved by the Planning Division. These plans shall be submitted as a separate submittal, not as part of the building plans or other plan set. These plans shall conform to the approved conceptual landscape plan, or as amended by these conditions. The location, number, height and spread, water usage or KC value, genus, species, and container size of the plants shall be shown. The plans shall be consistent with the Water Efficient Ordinance and Water Storage Contingency Plan per the Rancho California Water District. The plans shall be accompanied by the appropriate filing fee (per the City of Temecula Fee Schedule at time of submittal) and one copy of the approved Grading Plan. 28. Landscapina Site Inspections. The Landscaping and Irrigation Plans shall include a note stating, "Three landscape site inspections are required. The first inspection will be conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection will verify property landscape maintenance for release of the one-year landscape maintenance bond." The applicant/owner shall contact the Planning Division to schedule inspections. P9. Agronomic Soils Report. The Landscaping and Irrigation Plans shall include a note on the plans stating, 'The contractor shall provide two copies of an agronomic soils report at the first irrigation inspection." 30. Water Usage Calculations. The Landscaping and Irrigation Plans shall include water usage calculations per Chapter 17.32 of the Development Code (Water Efficient Ordinance), the total cost estimate of plantings and irrigation (in accordance with approved plan). Applicant shall use evapotranspiration (ETb) factor of 0.70 for calculating the maximum allowable water budget. 31. Landscape Maintenance Program. A landscape maintenance program shall be submitted to the Planning Division for approval. The landscape maintenance program shall detail the proper maintenance of all proposed plant materials to assure proper growth and landscape development for the long-term esthetics of the property. The approved maintenance program shall be provided to the landscape maintenance contractor who shall be responsible to carry out the detailed program. 32. Specifications of Landscape Maintenance Program. Specifications of the landscape maintenance program shall indicate, 'Three landscape site inspections are required. The first inspection will be conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection will verify property landscape maintenance for release of the one-year landscape maintenance bond." The applicant/owner shall contact the Planning Division to schedule inspections. 33. Irrigation. The landscaping plans shall include automatic irrigation for all landscaped areas and complete screening of all ground mounted equipment from view of the public from streets and adjacent property for (private common areas; front yards and slopes within individual lots; shrub planting to completely screen perimeter walls adjacent to a public right-of-way equal to 66 feet or larger; and, all landscaping excluding City maintained areas and front yard landscaping which shall include, but may not be limited to, private slopes and common areas). 34. Hardscaping. The landscape plans shall include all hardscaping for equestrian trails and pedestrian trails within private common areas. 35. Precise Grading Plans. Precise Grading Plans shall be consistent with the approved rough grading plans including all structural setback measurements. 36. Building Construction Plans for Outdoor Areas. Building Construction Plans shall include detailed outdoor areas (including but not limited to trellises, decorative furniture, fountains, hardscape (choose or add to as appropriate) to match the style of the building subject to the approval of the Director of Community Development. 37. WQMP Treatment Devices. All WQMP treatment devices, including design details, shall be shown on the construction landscape plans. If revisions are made to the WQMP design that result in any changes to the conceptual landscape plans after entitlement, the revisions will be shown on the construction landscape plans, subject to the approval of the Director of Community Development. 38. Roof -Mounted Mechanical Equipment. Roof -mounted mechanical equipment shall not be permitted within the subdivision; however, solar equipment or any other energy saving devices shall be permitted with Director of Community Development approval. 39. Utility Screening. All utilities shall be screened from public view. Landscape construction drawings shall show and label all utilities and provide appropriate screening. Provide a three-foot clear zone around fire check detectors as required by the Fire Department before starting the screen. Group utilities together in order to reduce intrusion. Screening of utilities is not to look like an after -thought. Plan planting beds and design around utilities. Locate all light poles on plans and ensure that there are no conflicts with trees. Prior to Release of Power, Building Occupancy or Any Use Allowed by This Permit 40. Screening of Loading Areas. The applicant shall be required to screen all loading areas and roof mounted mechanical equipment from view of the adjacent residences and public right-of-ways. If upon final inspection it is determined that any mechanical equipment, roof equipment or backs of building parapet walls are visible from any portion of the public right-of-way adjacent to the project site, the developer shall provide screening by constructing a sloping tile covered mansard roof element or other screening reviewed and approved by the Director of Community Development. 41. Landscape Installation Consistent with Construction Plans. All required landscape planting and irrigation shall have been installed consistent with the approved construction plans and shall be in a condition acceptable to the Director of Community Development. The plants shall be healthy and free of weeds, disease, or pests. The irrigation system shall be properly constructed and in good working order. 42. Performance Securities. Performance securities, in amounts to be determined by the Director of Community Development, to guarantee the maintenance of the plantings in accordance with the approved construction landscape and irrigation plan, shall be filed with the Planning Division for a period of one year from final Certificate of Occupancy. After that year, if the landscaping and irrigation system have been maintained in a condition satisfactory to the Director of Community Development, the bond shall be released upon request by the applicant. 43. Installation of Site Improvements. All site improvements, including but not limited to, parking areas and striping shall be installed. 44. Compliance with Conditions of Approval. All of the foregoing conditions shall be complied with prior to occupancy or any use allowed by this permit. Outside Agencies 45. Compliance with EMWD. The applicant shall comply with the recommendations set forth in the Eastern Municipal Water District's transmittal dated April 6, 2015, a copy of which is attached. 46. Compliance with RCWD. The applicant shall comply with the recommendations set forth in the Rancho California Water District's transmittal dated February 25, 2015, a copy of which is attached. 47. Compliance with the County Geologist. The applicant shall comply with the recommendations set forth in the County Geologist transmittal dated April 29, 2015, a copy of which is attached. PUBLIC WORKS DEPARTMENT General Requirements 48. Conditions of Approval. The developer shall comply with all Conditions of Approval, the Engineering and Construction Manual and all City codes/standards at no cost to any governmental agency. 49. Entitlement Approval. The developer shall comply with the approved site plan, the conceptual Water Quality Management Plan (WQMP) and other relevant documents approved during entitlement. Any significant omission to the representation of site conditions may require the plans to be resubmitted for further review and revision. 50. Precise Grading Permit. A precise grading permit for onsite improvements (outside of public right-of-way) shall be obtained from Public Works. 51. Encroachment Permits. Prior to commencement of any applicable construction, encroachment permit(s) are required; and shall be obtained from Public Works for public offsite improvements. 52. Storm Drain Improvement Plans. The developer shall submit storm drain improvement plans if the street storm flows exceeds top of curb for the 10 -yr storm event and/or is not contained within the street right-of-way for the 100 -yr storm event. A manhole shall be constructed at right-of-way where a private and public storm drain systems connect. The plans shall be approved by Public Works. Prior to Issuance of a Grading Permit 53. Environmental Constraint Sheet (ECS). The developer shall comply with all constraints per the recorded ECS with any underlying maps related to the subject property. 54. Grading/Erosion & Sediment Control Plan. The developer shall submit a grading/erosion & sediment control plan(s) to be reviewed and approved by Public Works. All plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site. The approved plan shall include all final WQMP water quality facilities and all construction -phase pollution -prevention controls to adequately address non -permitted runoff. Refer to the City's Engineering & Construction Manual at: http://www.cityoftemecula.org/Temecula/Government/Pu bl ieW orks/engi neeringconstman ual. ht m 55. Erosion & Sediment Control Securities. The developer shall comply with the provisions of Chapter 24, Section 18.24.140 of the Temecula Municipal Code by posting security and entering into an agreement to guarantee the erosion & sediment control improvements. 56. NPDES General Permit Compliance. The developer shall obtain project coverage under the State National Pollutant Discharge Elimination System (NPDES) General Permit for Construction Activities and shall provide the following: a. A copy of the Waste Discharge Identification Number (WDID) issued by the State Water Resources Control Board (SWRCB); b. The project's Risk Level (RL) determination number; and c. The name, contact information and certification number of the Qualified SWPPP Developer (QSD) Pursuant to the State Water Resources Control Board (SWRCB) requirements and City's storm water ordinance, a Storm Water Pollution Prevention Plan (SWPPP) shall be generated and submitted to the Board. Throughout the project duration, the SWPPP shall be routinely updated and readily available (onsite) to the State and City. Review www.cabmphandbooks.com for SWPPP guidelines. Refer to the following link: http://www.waterboards.ca.gov/water_issues/programs/stormwate r/construction. shtm I 57. Water Quality Management Plan (WQMP) and O&M Agreement. Water Quality Management Plan (WQMP) and O&M Agreement. The developer shall submit a final WQMP (prepared by a registered professional engineer) with the initial grading plan submittal, based on the conceptual WQMP from the entitlement process. It must receive acceptance by Public Works. A copy of the final project -specific WQMP must be kept onsite at all times. In addition, a completed WQMP Operation and Maintenance (O&M) Agreement shall be submitted for review and approval. Refer to the WQMP template and agreement link below: http://www.cityoftemecula.org/Temecula/Government/PublicWorks/W QMPandN PDES/W QMP. htm 58. Drainage. All applicable drainage shall be depicted on the grading plan and properly accommodated with onsite drainage improvements and water quality facilities, which shall be privately maintained. Alterations to existing drainage patterns or concentration and/or diverting flows is not allowed unless the developer constructs adequate drainage improvements and obtains the necessary permissions from the downstream property owners. All drainage leaving the site shall be conveyed into a public storm drain system, if possible. The creation of new cross lot drainage is not permitted. 59. Drainaoe Study. A drainage study shall be prepared by a registered civil engineer and submitted to Public Works with the initial grading plan check in accordance with City, Riverside County and engineering standards. The study shall identify storm water runoff quantities (to mitigate the 100 -year storm event) from the development of this site and upstream of the site. It shall identify all existing or proposed offsite or onsite, public or private, drainage facilities intended to discharge this runoff. Runoff shall be conveyed to an adequate outfall capable of receiving the storm water runoff without damage to public or private property. The study shall include a capacity analysis verifying the adequacy of all facilities. Any upgrading or upsizing of drainage facilities necessary to convey the storm water runoff shall be provided as part of development of this project. 60. Soils Report. A soils report, prepared by a registered soil or civil engineer, shall be submitted to Public Works with the initial grading plan submittal. The report shall address the site's soil conditions and provide recommendations for the construction of engineered structures and preliminary pavement sections. 61. Letter of Permission/Easement. The developer shall obtain documents (letters of permission or easements) for any offsite work performed on adjoining properties. The document's format is as directed by, and shall be submitted to, Public Works for acceptance. The document information shall be noted on the approved grading plan. 62. Ingress/Egress Easement. The developer shall provide an easement for ingress and egress over adjacent properties. The easement information shall be noted on the approved grading plan. 63. Sight Distance. The developer shall limit landscaping in the corner cut-off area of all street intersections and adjacent to driveways to provide for minimum sight distance and visibility. Prior to Issuance of Encroachment Permit(s) 64. Public Utility Agency Work. The developer shall submit all relevant documentation due to encroaching within City right-of-way; and is responsible for any associated costs and for making arrangements with each applicable public utility agency. 65. Traffic Control Plans. A construction area traffic control plan (TCP) will be required for lane closures and detours or other disruptions to traffic circulation; and shall be reviewed and approved by Public Works. The TCP shall be designed by a registered civil or traffic engineer in conformance with the latest edition of the Caltrans Manual on Uniform Traffic Control Devices (MUTCD) and City standards. 66. Street Trenching. All street trenches shall conform to City Standard No. 407; refer to the City's Paving Notes. Prior to Issuance of Building Permit(s) 67. Certifications. Certifications are required from the registered civil engineer -of -record certifying the building pad elevation(s) per the approved plans and from the soil's engineer -of -record certifying compaction of the building pad(s). Prior to Issuance of a Certificate of Occupancy 68. Completion of Improvements. The developer shall complete all work per the approved plans and Conditions of Approval to the satisfaction of the City Engineer. This includes all onsite work (including water quality facilities), public improvements and the executed WQMP Operation and Maintenance agreement. 69. Utility Agency Clearances. The developer shall receive written clearance from applicable utility agencies (i.e., Rancho California and Eastern Municipal Water Districts, etc.) for the completion of their respective facilities and provide to Public Works. 70. Replacement of Damaged Improvements/Monuments. Any appurtenance damaged or broken during development shall be repaired or removed and replaced to the satisfaction of Public Works. Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professional Code Section 8771. 71. Certifications. All necessary certifications and clearances from engineers, utility companies and public agencies shall be submitted as required by Public Works. BUILDING AND SAFETY DIVISION General Requirements 72. Final Building and Safety Conditions. Final Building and Safety conditions will be addressed when building construction plans are submitted to Building and Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. 73. Compliance with Code. All design components shall comply with applicable provisions of the 2013 edition of the California Building, Plumbing and Mechanical Codes; 2013 California Electrical Code; California Administrative Code, 2013 California Energy Codes, 2013 California Green Building Standards, California Title 24 Disabled Access Regulations, and City of Temecula Municipal Code. 74. Disabled Access. Applicant shall provide details of all applicable disabled access provisions and building setbacks on plans to include: a. All ground floor units to be adaptable. b. Disabled access from the public way to the main entrance of the building. c. Van accessible parking located as close as possible to the main entry. d. Path of accessibility from parking to furthest point of improvement. e. Path of travel from public right-of-way to all public areas on site, such as club house, trash enclose tot lots and picnic areas. 75. County of Riverside Mount Palomar Ordinance. Applicant shall submit, at time of plan review, a complete exterior site lighting plan showing compliance with County of Riverside Mount Palomar Ordinance Number 655 for the regulation of light pollution. All streetlights and other outdoor lighting shall be shown on electrical plans submitted to the Building and Safety Division. Any outside lighting shall be hooded and aimed not to shine directly upon adjoining property or public rights-of-way. 76. Street Addressing. Applicant must obtain street addressing for all proposed buildings by requesting street addressing and submitting a site plan for commercial or multi -family residential projects or a recorded final map for single-family residential projects. 77. Clearance from TVUSD. A receipt or clearance letter from the Temecula Valley School District shall be submitted to the Building and Safety Department to ensure the payment or exemption from School Mitigation Fees. 78. Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work. 79. Obtaining Separate Approvals and Permits. Trash enclosures(solid covered), patio covers, light standards, and any block walls will require separate approvals and permits. 80. Demolition. Demolition permits require separate approvals and permits. 81. Sewer and Water Plan Approvals. On-site sewer and water plans will require separate approvals and permits. 82. Hours of Construction. Signage shall be prominently posted at the entrance to the project, indicating the hours of construction, as allowed by the City of Temecula Municipal Ordinance 9.20.060, for any site within one-quarter mile of an occupied residence. The permitted hours of construction are Monday through Saturday from 7:00 a.m. to 6:30 p.m. No work is permitted on Sundays and nationally recognized Government Holidays. 83. House Electrical Meter. Provide a house electrical meter to provide power for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each building on the site. Developments with single user buildings shall clearly show on the plans how the operation of exterior lighting and fire alarm systems when a house meter is not specifically proposed. At Plan Review Submittal 84. Submitting Plans and Calculations. Applicant must submit to Building and Safety four (4) complete sets of plans and two (2) sets of supporting calculations for review and approval including: a. An electrical plan including load calculations and panel schedule, plumbing schematic, and mechanical plan applicable to scope of work. b. A Sound Transmission Control Study in accordance with the provisions of the Section 1207, of the 2013 edition of the California Building Code. c. A precise grading plan to verify accessibility for persons with disabilities. d. Truss calculations that have been stamped by the engineer of record of the building and the truss manufacturer engineer. Prior to Issuance of Grading Permit(s) 85. Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted separately from the building plans, shall be submitted to Building and Safety for review and approval. 87. Demolition Permits. A demolition permit shall be obtained if there is an existing structure to be removed as part of the project. Prior to Issuance of Building Permit(s) 88. Plans Require Stamp of Registered Professional. Applicant shall provide appropriate stamp of a registered professional with original signature on the plans. Prior to Beginning of Construction 90. Pre -Construction Meeting. A pre -construction meeting is required with the building inspector prior to the start of the building construction. FIRE PREVENTION General Requirements 92. Fire Hydrants. The Fire Prevention Bureau is required to set minimum fire hydrant distances per CFC Appendix C. Standard fire hydrants (6" x 4" x (2) 2'/2" outlets) shall be located on fire access roads and adjacent public streets. For all Commercial and multi -family projects hydrants shall be spaced at 350 feet apart, and shall be located no more than 210 feet from any point on the street or Fire Department access road(s) frontage to a hydrant. The required fire flow shall be available from any adjacent hydrant(s) in the system. The fire line may be required to be a looped system. The upgrade of existing fire hydrants may be required (CFC Appendix C and Temecula City Ordinance 15.16.020). 93. Fire Hydrant Clearance. As required by the California Fire Code, when any portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet from a hydrant on a fire apparatus road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. (CFC Chapter 5). 94. Fire Dept. Plan Review. Final fire and life safety conditions will be addressed when building plans are reviewed by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC), and related codes which are in force at the time of building plan submittal. 95. Fire Flow. The Fire Prevention Bureau is required to set a minimum fire flow for the remodel or construction of all commercial and residential buildings per CFC Appendix B. The developer shall provide for this project, a water system capable of delivering 4,000 GPM at 20 -PSI residual operating pressure for a 4 -hour duration for commercial projects. The fire flow as given above has taken into account all information as provided. (CFC Appendix B and Temecula City Ordinance 15.16.020). Prior to Issuance of Grading Permit(s) 96. Access Road Widths. Fire Department vehicle access roads shall have an unobstructed width of not less than 24 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches (CFC Chapter 5 and City Ordinance 15.16.020). 97. Gradient Of Access Roads. The gradient for fire apparatus access roads shall not exceed 15 percent (CFC Chapter 5 and City Ordinance 15.16.020). 98. Fire Dept. Turnaround. Dead end roadways and streets in excess of 150 feet which have not been completed shall have a turnaround capable of accommodating fire apparatus (CFC Chapter 5 and City Ordinance 15.16.020). 99. Two Point Access. This development shall maintain two points of access, via all-weather surface roads, as approved by the Fire Prevention Bureau (CFC Chapter 5). Prior to Issuance of Building Permit(s) 100. Required Submittals (Fire Underground Water). The developer shall furnish three copies of the water system plans to the Fire Prevention Bureau for approval prior to installation for all private water systems pertaining to the fire service loop. Plans shall be signed by a registered civil engineer, contain a Fire Prevention Bureau approval signature block, and conform to hydrant type, location, spacing and minimum fire flow standards. Hydraulic calculations will be required with the underground submittal to ensure fire flow requirements are being met for the on-site hydrants. The plans must be submitted and approved prior to building permit being issued (CFC Chapter 33 and Chapter 5). 101. Required Submittals (Fire Sprinkler Systems). Fire sprinkler plans shall be submitted to the Fire Prevention Bureau for approval. Three sets of sprinkler plans must be submitted by the installing contractor to the Fire Prevention Bureau. These plans must be submitted prior to the issuance of building permit. 102. Required Submittals (Fire Alarm Systems). Fire alarm plans shall be submitted to the Fire Prevention Bureau for approval. Three sets of alarm plans must be submitted by the installing contractor to the Fire Prevention Bureau. The fire alarm system is required to have a dedicated circuit from the house panel. These plans must be submitted prior to the issuance of building permit. Prior to Issuance of Certificate of Occupancy 103. Hydrant Verification. Hydrant locations shall be identified by the installation of reflective markers (blue dots) (City Ordinance 15.16.020). 104. Knox Box. A "Knox -Box" shall be provided. The Knox -Box shall be installed a minimum of six feet in height and be located to the right side of the fire riser sprinkler room (CFC Chapter 5). 105. Addressing. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Commercial buildings shall have a minimum of 12 -inch numbers with suite numbers being a minimum of six inches in size. All suites shall have a minimum of 6 -inch high letters and/or numbers on both the front and rear doors. (CFC Chapter 5 and City Ordinance 15.16.020). 106. Site Plan. The applicant shall prepare and submit to the Fire Department for approval, a site plan designating fire lanes with appropriate lane painting and/or signs (CFC Chapter 5). POLICE DEPARTMENT General Requirements 107. Landscape Height. The applicant shall ensure all landscaping surrounding all buildings are kept at a height of no more than three feet or below the ground floor window sills. Plants, hedges and shrubbery shall be defensible plants to deter would-be intruders from breaking into the buildings utilizing lower level windows. 108. Tree Pruning. The applicant shall ensure all trees surrounding all building rooftops be kept at a distance to deter roof accessibility by "would-be burglars." Since trees also act as a natural ladder, the branches must be pruned to have a six-foot clearance from the buildings. 109. Berm Height. Berms shall not exceed three feet in height. 110. Exterior Building Lighting. All lighting affixed to the exterior of buildings less than 8 feet high shall be vandal resistant. 111. Parking Lot Lighting. All parking lot lighting shall be energy saving and minimized after hours of darkness and in compliance with Title 24, Part 6, of the California Code of Regulations. 112. Exterior Door Lighting. All exterior doors shall have a vandal resistant light fixture installed above the door. The doors shall be illuminated with a minimum one -foot candle illumination at ground level, evenly dispersed. 113. Outdoor Lighting During Non -Business Hours. The applicant shall comply with the Governor's order to address the power crisis. This order became effective March 18, 2001 calling for a substantial reduction from businesses to cut usage during non -business hours. The order, in part, states, "All California retail establishments, including, but not limited to, shopping centers, auto malls and dealerships, shall substantially reduce maximum outdoor lighting capability during non -business hours except as necessary for the health and safety of the public, employees or property." Failure to comply with this order following a warning by law enforcement officials shall be punishable as a misdemeanor with a fine not to exceed $1,000 in accordance with Title 24, Part 6, of the California Code of Regulations. 114. Commercial or Institution Grade Hardware. All doors, windows, locking mechanisms, hinges, and other miscellaneous hardware shall be commercial or institution grade. 115. Graffiti Removal. Any graffiti painted or marked upon the buildings must be removed or painted over within 24 hours of being discovered. Report all such crimes to the Temecula Police 24-hour dispatch Center at (951) 696 -HELP. 116. Alarm System. Upon completion of construction, the buildings shall have a monitored alarm system installed and monitored 24 hours a day by a designated private alarm company to notify the Temecula Police Department of any intrusion. All multi -tenant offices/suites/businesses located within a specific building shall have their own alarm system. This condition is not applicable if the business is opened 24/7. 117. Roof Hatches. All roof hatches shall be painted "International Orange." 118. Disable Parking. All disabled parking stalls on the premises shall be marked in accordance with Section 22511.8 of the California Vehicle Code. 119. Public Telephones. Any public telephones located on the exterior of the buildings shall be placed in a well -lit, highly visible area, and installed with a "call -out only" feature to deter loitering. This feature is not required for public telephones installed within the interior of the buildings. 120. Emplovee Training. Employee training regarding retail/credit card theft, citizens' arrest procedures, personal safety, business security, shoplifting or any other related crime prevention training procedures is also available through the Crime Prevention Unit. 121. Crime Prevention Through Design. Crime prevention through environmental design, as developed by the National Crime Prevention Institute (NCPI), supports the concept that "the proper design and effective use of the built environment can lead to a reduction in the fear and incidence of crime and an improvement in the quality of life." The nine primary strategies that support this concept are included below: 1. Provide clear border definition of controlled space. Examples of border definition may include fences, shrubbery, or signs in exterior areas. Within a building, the arrangement of furniture and color definition can serve as a means of identifying controlled space. 2. Provide clearly marked transitional zones. Persons need to be able to identify when they are moving from public to semi-public to private space. 3. Gathering or congregating areas to be located or designated in locations where there is good surveillance and access control. 4. Place safe activities in unsafe locations. Safe activities attract normal users to a location and subsequently render the location less attractive to abnormal users due to observation and possible intervention. 5. Place unsafe activities in safe locations. Placing unsafe activities in areas of natural surveillance or controlled access will help overcome risk and make the users of the areas feel safer. 6. Redesign the use of space to provide natural barriers. Separate activities that may conflict with each other (outdoor basketball court and children's play area, for example) by distance, natural terrain or other functions to avoid such conflict. 7. Improve scheduling of space. The timing in the use of space can reduce the risk for normal users and cause abnormal users to be of greater risk of surveillance and intervention. 8. Redesign space to increase the perception of natural surveillance. Abnormal users need to be award of the risk of detection and possible intervention. Windows and clear lines -of -sight serve to provide such a perception of surveillance. 9. Overcome distance and isolation. This strategy may be accomplished through improved communications (portable two-way radios, for example) and design efficiencies, such as the location of restrooms in a public building. 122. Business Security Survey. Businesses desiring a business security survey of their location can contact the Crime Prevention and Plans Unit of the Temecula Police Department at (951) 695-2773. 123, Questions Regarding Conditions. Any questions regarding these conditions should be directed to the Temecula Police Department Crime Prevention and Plans Unit at (951) 695-2773. Board of Directors President Randy A. Record lice President David J. Slawson Directors Joseph J. Koehler, CPA Philip E. Paule Ronald W. Sullivan General Manager Paul D. Jones II, P.E. Treasurer Joseph J. Kuchler, CPA Chairman of the Board, The Metropolitan Water District of So. Calif. Randy A. Record EASTERN MUNICIPAL W ATER D IS T R I C T April 6, 201 City of Temecula Planning Department 41000 Main Street Temecula, CA 92590 SINCE 1950 ZQ�S RE: Project Plan Number: PA15-0151 Project Name: Kaiser Building II MOD Project Description: Modification to Allow Kaiser to Construct Office Bldg. Project Location: 27309 Madison Avenue Assessor's Parcel No.: 910-272-033 Parcel Map. 23561-1; Parcel 7 Thank you for the opportunity to review the above -referenced project. The subject project requires water, recycled water and sewer service from EMWD. The detail of the proposed development requires a submittal to EMWD by the project proponent. Upon receipt of submittal, EMWD will review further and provide requirements for obtaining service(s) which include but not limited to: Legal Counsel 1. Discuss potential candidacy for recycled water service Lemieux & O'Neill 2. Review of the project within the context of existing infrastructure 3. Evaluation of the project's preliminary design and points of connections 4. Formal Application for Service detailing applicable fees and deposits to proceed with EMWD approved service connections. To begin the submittal process the project proponent may contact EMWD's New Development Department at: Eastern Municipal Water District New Business Development 2270 Trumble Rd Perris CA 92570 (951) 9283777 Extension 2081 Again, EMWD appreciates the opportunity to comment on this project. Sincerely, Elena Navarre Administrative Assistant New Business Development Engineering Department Mailing Address: Post Office Box 8300 Perris, CA 92572-8300 Telephone: (951) 928-3777 Fax: (951) 928-6177 Location. 2270 Trumble Road Perris. CA 92570 Internet: www.emwd.oro February 25, 2015 Board of Directors John E. Hoagland Scott Cooper President James "Stew"Stewart City of Temecula Sr. Vice President 41000 Main Street Stephen J. Corona Temecula, CA 92590 Ben R. Drake Lisa D. Herman SUBJECT: WATER AVAILABILITY William E. Plummer 27309 MADISON AVENUE; PARCEL NO. 7 OF PARCEL Roger C. ziemer MAP NO. 23561-1; APN 910-272-033 Ofeeers [SKYLER DENNISTON] Matthew G. Stone General Manager Dear Mr. Cooper: Richard S. Williamson, P.E. Assistant General Manager Jeffrey D. Armstrong Please be advised that the above -referenced project/property is located within CFO)Trensarer the service boundaries of Rancho California Water District (RCWD/District). Fred F. Edgecomb, MPA The subject project/property fronts an existing 12 -inch diameter water pipeline Director of Operations& 1laintenance within Sanborn Avenue and an existing 12 -inch diameter water pipeline within Andrew L. Webster, P.E. Madison Avenue (both 1305 Pressure Zone). Chief Engineer Belli E. Garcia District Secretary Water service to the subject project/property exists (under Account No. James B. Gilpin 3004547, Location No. 2003616). Additions or modifications to water/sewer Best Best & Krieger LLP General Counsel service arrangements are subject to the Rules and Regulations (governing) Water System Facilities and Service, as well as the completion of financial arrangements between RCWD and the property owner. Water service to individual lots will require the extension of water facilities within dedicated public and/or private right-of-ways. Individual water meters will be required for each lot and/or project unit, including separate water meters for landscape irrigation, as applicable. Where private on-site water facilities (for water service, fire service, irrigation, or other purpose) will cross or will be shared amongst multiple lots/project units (only by special variance of the Rules and Regulations), and/or where such `common' facilities will be owned and maintained by a Property Owners' Association, RCWD requires execution and recordation of a Reciprocal Easement and Maintenance Agreement or equivalent document of covenants, codes. and restrictions. Rancho California Water District 42135 Winchester Road • Post OBice Bax 9017 - Temecula. California 92589-9017 - (951) 2966900 • FAX (951) 2966860 Scott Cooper/City of Temecula February 25, 2015 Water availability is contingent upon the property owner(s) signing an Agency Agreement that assigns water management rights, if any, to RCWD. In addition, water availability is subject to water supply shortage contingency measures in effect (pursuant to RCWD's Water Shortage Contingency Plan or other applicable ordinances and policy), and/or the adoption of a required Water Supply Assessment for the development, as determined by the Lead Agency. In accordance with Resolution 2007-10-5, the project/property may be required to use recycled water for all landscape irrigation, which should be noted as a condition for any subsequent development plans. Recycled water service, therefore, would be available upon construction of any required on-site and/or off-site recycled water facilities and the completion of financial arrangements between RCWD and the property owner. Requirements for the use of recycled water are available from RCWD. As soon as feasible, and prior to the preparation of California Environmental Quality Act (CEQA) documents, the project proponent should contact RCWD for a determination of existing water system capability, based upon project -specific demands and/or fire flow requirements, as well as a determination of proposed water facilities configuration. if new facilities are required for service, fire protection, or other purposes, the project proponent should contact RCWD for an assessment of project -specific fees and requirements. Please note that separate water meters will be required for all landscape irrigation. Sewer service to the subject project/property, if available, would be provided by Eastern Municipal Water District. If no sewer service is currently available to the subject project/property, all proposed waste discharge systems must comply with the State Water Resources Control Board and/or health department requirements. If you should have any questions or need additional information, please contact an Engineering Services Representative at the District office at (951) 296-6900. Sincerely, RANCHO CALIFORNIA WATER DISTRICT Erica Peter Engineering Services Representative cc: Corey Wallace, Engineering Manager -Design Warren Back, Engineering Manager -Planning Heath McMahon, Construction Contracts Manager Corry Smith, Engineering Services Supervisor Phillip Dauben, Associate Engineer Skyler Denniston, Kaiser Permanente 1 SEP: hab002\F450TEG Rancho California Water District 42135 Winchester Read • Post Office 13os 9017 - Temecula, California 92.589-9017 • (961) 296-6900 - FAX (951) 296-6860 A: Steven Weiss Planning Director April 29, 2015 RIVERSIDE COUNTY PLANNING DEPARTMENT City of Temecula Planning Department FAX: (951) 694-6477 Attention: Scott Cooper RE: GE002431 Conditions of Approval Temecula Medical Office Building 2 City of Temecula Case No. PA15-0151 Pages 2 (including this cover) County Geologic Report (GEO) No. 2431, submitted for this project (PA15-0151) in the City of Temecula was prepared by Southern California Geotechnical and is entitled: "Geotechnical Investigation Temecula Medical Office Building 2 23709 Madison Avenue, Temecula, California for Layton Construction Company" dated January 8, 2015. In addition, Southern California Geotechnical submitted the following: "Infiltration Testing, Temecula Medical Office Building 2, 23709 Madison Avenue, Temecula, California", dated January 6, 2015. This document is herein incorporated in GE002431. GE002431 Concluded: 1. The subject site is not located within an Alquist-Priolo Earthquake Fault Zone. 2. There was no evidence of faulting. 3. The possibility of significant fault rupture on the site is considered to be low. 4. On-site soils are not subject to liquefaction. The potential for other geologic hazards such as seismically induced settlement, lateral spreading, tsunamis, inundation, seiches, flooding and subsidence affecting the site is considered to be low. 6. The on-site soils have been determined to possess a low expansive potential. GE002431 Recommended: 1. Initial site preparation should include removal of any surficial vegetation. 2. The existing soils within the areas of any proposed retaining walls should be overexcavated to a depth of 3 feet below foundation bearing grade and replaced as compacted structural fil. It should be noted that no engineering review of this report or formal review of provided building code information are a part of this review. Formal review of engineering design and code data will be made by the City of Temecula, as appropriate, at the time of grading and/or building permit submittal to the city. Riverside Office • 4080 Lemon Street, 12th Floor Desert Office . 77588 EI Duna Court P.O. Bene 1409, Riverside, California 92502-1409 Palm Desert, California 92211 (951) 955-3200 • Fax (951) 955-1811 (760) 8638277 Fax (760) 8637555 GEO No. 2431 satisfies the requirement for a geologic/geotechnical study for Planning/CEQA purposes. GEO No. 2431 is hereby accepted for Planning purposes. Engineering and other Uniform Building Code parameters were not included as a part of this review or approval. This approval is not intended and should not be misconstrued as approval for grading permit. Engineering and other building code parameters should be reviewed and additional comments and/or conditions may be imposed by the City upon application for grading and/or building permits. Thank you for the opportunity to review this case for the City of Temecula. Please call me at (951) 955-6863 if you have any questions. Sincerely, RIVERSIDE COUNTY PLANNING DEPARTMENT Steven Weiss, Planning Director L. Uones, CEG No. 2283 Engineering Geologist, TLMA-Planning cc: Temecula File: PAI 5-0151 So Califomia Geotechnical, Fax: (714)685-1118 GE002431 B:\Geology\Temecula Reviews`,GE02431 Approval for PA15-0151.docx NOTICE OF PUBLIC HEARING Case No Applicant: Proposal Notice of Public Hearing A PUBLIC HEARING has been scheduled before the City of Temecula PLANNING COMMISSION to consider the matter described below: PA15-0151 Skyler Denniston A Major Modification Application for the construction of a 9,031 -square -foot medical office building on the front portion of the existing Kaiser Permanente site located at 27309 Madison Avenue Environmental: In accordance with the California Environmental Quality Act (CEQA), the proposed project is exempt from further environmental review and a Notice of Exemption will be adopted in compliance with CEQA (15332, Class 32, In -Fill Development Projects) Case Planner: Scott Cooper, (951) 506-5137 Place of Hearing: City of Temecula, Council Chambers Date of Hearing: June 17, 2015 Time of Hearing: 6:00 p.m. Project Site 1b mP 375 15p 3.500 'JJ The agenda packet (including staff reports) will be available for viewing in the Main Reception area at the Temecula Civic Center (41000 Main Street, Temecula) after 4:00 p.m. the Friday before the Planning Commission Meeting. At that time, the packet may also be accessed on the City's website — www.cityoftemecula.oro. Any Supplemental Material distributed to a majority of the Commission regarding any item on the Agenda, after the posting of the Agenda, will be available for public review in the Main Reception area at the Temecula Civic Center (41000 Main Street, Temecula), 8:00 a.m. — 5:00 p.m. In addition, such material will be made available on the City's website — www cityoftemecula org — and will be available for public review at the respective meeting. If you have any questions regarding any item of business on the Agenda for this meeting, please call the Planning Department, (951) 694-6400.