HomeMy WebLinkAbout110496 PC AgendaCALL TO ORDER: ROLL CALL: .:.. ~.' Fahey, Miller, Slaven:' S'oltysiak and Webster :"'= ~': :';::~:!: ::!~=!i!!'ii;~?=~: :!:~: :~!~ '~: :'!! "'! '! :'~:= ~::::~:~ '!~:!:i~ = not lis~ on ~e Ag~. S~rs a~ limi~ ~ ~e (3) ~nu~s ~ch. If Commis~o~ a~ ~c A~, a pink out a~ fil~ wi~ ~e ~. When you are For all other Commission filed with lhe Planning Sec.~'etary before ~" time limit for individual speakers. r:...th,e.:~!ntta'seeti,m or PUBI.IC HEARING ITEMS Case N0: Applicant: Location: PropoSal: Environmental Action: Planner: . . RecOmmendation: Cose No: App!i~ant: .: Location; P~opbsa. h "' :,,.' ~-;'~,~,r~." ;, ':'..~. ' . City-Vfide Design Guidelines '~i~' ~Ov'-l of comiO~rcial, i~d~strial and residential di:'~Hnpn~ent in Temecula. They will be used to provide direction to pe, rsom' in the .devebpmeat community with the minimum · ' ': .- . development standards in the City. .. EnVii~ohmental~Actien: .. . EXempt ' ' '. .... '-' :*' *Pk,;.,i~,~i. ~.. ::"...C.d~ ~ui~ RecommendatiOt~: Recommend Approval to the City Council CONTL%~_,D FRO~,! OCTOBER 7, 1~ PLANNING MANAGIM~ RE~ORT OTHER Next meeting: Regular Plnnning Commi.~fion Meeting. P ~L ITEM #2 lVlEIVIORANDUM TO: FROM: ~l~b~gUbC~2~ng Manager DATE: November 4, 1996 SUBJECT: Status of landscaping for Unocal (southeast comer of Rancho California Road and Front Street) and Timing of Traffic Signal at the intersection of Margarita Road and Solana Way At the October 21, 1996 Planning Commission meeting, the Commission requested Staff provide the status of the landscaping for Unocal (located at the southeast comer of Rancho California Road and Front Street) and the Timing of Traffic Signal at the intersection of Margarita Road and Solana Way. The status of these items are discussed below. L~ndscaping for Unocal Landscaping has been installed for the project per the landscape plans approved by the Planning Commission. During the construction of the project, the contractor mistakenly deleted four feet of landscaping along the Front Street frontage. They were informed to rectify this situation. Because this error was detected after much of the hardscape had been installed, Staff allowed them to ereate the retaining wall along Front Street. This allowad them to rupture the four feet of landscaping which was lost due to the error. Timing of Traffic Signal at the intersection of Margarita Road and Solana Way The preliminary design for the signal has been completed and the final design is underway. The signal is expected to be in operation in'February, 1997. ITEM #3 TO: FROM: DATE: SUBJECT: MEMORANDUM November 4, 1996 Finding of Public Convenience or Necessity for Payless Drug Store located at 31797 Highway 79 South Prepared by: Craig Ruiz, Assistant Planner EXISTING ZONING: Community Commercial (CC) SURROUNDING ZONING: North: South: East: West: Highway Tourist Commercial/Professional Office (HTC\O) Open Space (OS) Highway Tourist Commercial (HTC) Medium Density Residential (M) GENERAL PLAN DESIGNATION: Community Commercial (CC) SURROUNDING GENERAL PLAN DESIGNATION: North: South: East: West: Highway Tourist Commercial/Professional Office (HTC\O) Open Space (OS) Highway Tourist Commercial (HTC) Medium Density Residential (M) BACKGROUND The applicant is requesting the Planning Commission make a finding of public convenience or necessity for their business. The finding is required because the applicant is requesting a license from the California Alcoholic Beverage Control (ABC). The business is a drug store that will sell alcohol for off-site consumption. The drug store will be located in the Vail Ranch Commercial Center that is currently under construction. ANALYSIS The Planning Commission has developed criteria to either justify or not justify making a finding of Public Convenience and Necessity pursuant to State Law. These criteria and Staff's preliminary responses are found below. Criteria to Justify Making a Finding of Public Convenience or Necessitv Q. Does the proposed establishment have anyunique features which are not found in other similar uses in the community (i.e. types of games, types of food, other special services)? No. Does the proposed establishment cater to an under-served population (i.e. patrons of a different socio-economic class)? No. Does the proposed establishment provide entertainment that would fill a niche in the community (i.e. a comedy club, jazz club, etc.) No. Would the proposed mode of operation of the proposed establishment (i.e. sales in conjunction with gasoline sales, tours, etc.) be unique or differ from that of other establishments in the area? No. Are there any geographical boundaries (i.e. rivers, hillsides) or traffic barriers (i.e. freeways, major roads, major intersections) separating the proposed establishment from other establishments? Yes. The project is bordered by Temecula Creek which provides a physical barrier for the residents of Redhawk to the south. Highway 79 South provides a traffic barrier to the north. The license would be a convenience to residents to the south and west who would not be required to enter or cross the Highway. Q; Is the proposed establishment located in an area where there is a significant influx of population during certain seasonal periods? No. Criteria to Not Justify Making a Finding of Public Convenience or Necessity Is there a proliferation of licensed establishments within a quarter mile of the proposed establishment? No. Currently there is one (1) licensed establishment within a quarter mile of the proposed establishment. However, the Commission has previously made findings of public necessity for two other businesses located within this center, Albertson's and Chevron. Neither of these businesses have yet to be constructed. Q; Are there any sensitive uses (i.e., schools, parks, hospitals, churches) in close proximity (600 feet) to the proposed establishment? No. Would the proposed establishment interfere with these sensitive uses? No. R:~STAFFRFI~pAyI~S,~.ALC 10/30/96cgr 2 Would the proposed establishment interfere with the quiet enjoyment of their property by the residents of the area? No. There is a residential development adjacent to the shopping center. However, this development is a gated community and it is not anticipated that the residents would be impacted by this use. Will the proposed establishment add to law enforcement problems in the area? No. Staff contacted the Temecula Police Department regarding the proposed liquor license. Based upon our conversation with the Police Department, the proposed establishment will not add to law enforcement problems in the area. Number of similar uses within the City There are two (2) other drug stores within the City that also offer alcohol sales (Sav On and Long's Drug Store). Number of other licensed establishments within 1 mile and 3 miles There is one (1) licensed establishments within one (1) mile of the subject establishment. This licensed establishments is a gas station with beer and wine sales. There are 21 licensed establishments within a three (3) mile radius of the subject establishment which include restaurants, nightclubs, bars, mini-marts and grocery stores. Conclusion Staff recommends the Commission review the information included in this report and make the appropriate finding. Attachments: Exhibits - Blue Page 4 A. Vicinity Map, including 1/4 mile radius B. General Plan Map C. Zoning Map ATTACHMENT NO. 1 EXHIBITS CITY OF TEMECULA LCASE NUMBER: N/A ~,XI-IrRIT- A ~'LANNING COMMISSION DATE - NOVEMBER 4, 1996 CITY OF TEMECULA LM CO \_ BP \ /. /" LM · LM EXHIBIT B - ZONING MAP DESIGNATION - COMMUNITY COMMERCIAL (CC) EXHIBIT C o GENERAL PLAN DESIGNATION -COMMUNITY COMMERCIAL (CC) CASE NUMBER: N/A PLANNING COMMISSION DATE - NOVEMBER 4, ITEM #4 MEMORANDUM TO: FROM: Planning Commissi~D~ Debbie Ubnoske,f~lanning Manager DATE: November 4, 1996 SUBJECT: Finding of Public Convenience or Necessity for Rustler's, Inc. (The Beach Club) located at 27780 Front Street Prepared by: Matthew Fagan, Associate Planner EXISTING ZONING: Community Commercial (CC) SURROUNDING ZONING: North: Community Commercial (CC) South: Service Commercial (SC) East: Service Commercial (SC) West: Community Commercial (CC) GENERAL PLAN DESIGNATION: Community Commercial (CC) SURROUNDING GENERAL PLAN DESIGNATIONS: North: Community Commercial (CC) South: Service Commercial (SC) East: Service Commercial (SC) West: Community Commercial (CC) BACKGROUND The applicant is requesting the Planning Commission make a public convenience or necessity finding for their business. The finding is required because the applicant is requesting a new type of license from the California Alcoholic Beverage Control (ABC). Previously the applicant had received a license from ABC as a bonafide restaurant; however it has been determined they do not meet the food requirements under their previous license. Since it has been determined they no longer fall within this category, they are requesting a Type 48 (on-sale General Public Premises) license. This license is to serve alcohol to patrons over 21 years in age. Under the current ownership, the facility has been operating for four (4) years. ANALYSIS The Planning Commission has developed criteria to either justify or not justify making a finding of Public Convenience or Necessity pursuant to State Law. These criteria and Staff's preliminary responses are found below. Criteria to Justifv Making a Finding of Public Convenience or Necessitv Q; Does the proposed establishment have any unique features which are not found in other similar uses in the community (i.e. types of games, types of food, other special services)? No. Does the proposed establishment cater to an under-served population (i.e. patrons of a different socio-economic class)? No. Does the proposed establishment provide entertainment that would fill a niche in the community (i.e. a comedy club, jazz club, etc.) The establishment provides live musical entertainment on Friday and Saturday. According to the current owner, he will be attempting to feature nationally known artists at the facility in the near future. Two (2) other establishments offer regular live entertainment in the community (Sefior Shakespeare's and the Temecula Stampede). Would the proposed mode of operation of the proposed establishment (i.e. sales in conjunction with gasoline sales, tours, etc.) be unique or differ from that of other establishments in the area? No. Are there any geographical boundaries (i.e. rivers, hillsides) or traffic barriers (i.e. freeways, major roads, major intersections) separating the proposed establishment from other establishments? No. Is the proposed establishment located in an area where there is a significant influx of population during certain seasonal periods? No. Criteria to Not Justify Making a Finding of Public Convenience or Necessity Is there a proliferation of licensed establishments within a quarter mile of the proposed establishment? Currently there are seven (7) licensed establishments within a quarter mile of the proposed establishment. All seven licensed establishments are located to the west of I-15 and the establishment is the only bar/nightclub within the quarter mile. Are there any sensitive uses (i.e., schools, parks, hospitals, churches) in close proximity (600 feet) to the proposed establishment? One sensitive use is located within 600 feet of the proposed establishment. A church facility is located in the building immediately to the south of the subject establishment. The church is open on Sunday mornings and on Thursday evenings. The bar has been located in the area longer than the church facility. Would the proposed establishment interfere with these sensitive uses? It is unlikely that the proposed establishment will interfere with the sensitive use. The only time for potential conflict is Thursday evening and it is anticipated that the church facility will not be in operation at the peak demand time for the proposed establishment. Would the proposed establishment interfere with the quiet enjoyment of their property by the residents of the area? No. There are no residences in the area. Will the proposed establishment add to law enforcement problems in the area? Staff contacted the Temecula Police Department regarding the proposed liquor license. Based upon our conversation with the Police Department, the proposed establishment will not add to law enforcement problems in the area. The change of license is not likely to have an impact to law enforcement. Number of similar uses within the City Approximately two (2) other establishments also offer regular live entertainment in the community (Sefior Shakespeare's and the Temecula Stampede). Number of other licensed establishments within 1 mile and 3 miles There are sixty-one (61) licensed establishments within one (1) mile of the subject establishment. These licensed establishments include restaurants, nightclubs, bars, mini-marts and grocery stores. The three mile radius encompasses the reminder of the licensed establishments within the City of Temecula. Conclusion Staff recommends the Commission review the information included in this report and make the appropriate finding. Attachments: Exhibits - Blue Page 4 A. Vicinity Map, including 1/4 mile radius B. General Plan Map C Zoning Map ATTACHMENT NO. 1 EXHIBITS R:~TAFFRFI~BAJA.ALC 10/30/96mf 4 CITY OF TEMECULA CASE NUMI}ER: N/A ~XIHRIT- A PLANNING COMMISSION DATE - NOVEMBER 4, 1996 CITY OF TE~IECULA m EXHIBIT B - ZONING MAP DESIGNATION - COMMUNITY COMMERCIAL (CC) ~P CC 0 BP EXHIBIT C - GENERAL PLAN DESIGNATION -COMMUNITY COMMERCIAL (CC) CASE NUMBER: N/A PLANNING COMMISSION DATE - NOVEMBER 4, 1996 CC CC '~ r'. H /P ITEM #5 TO: FROM: DATE: SUBJECT: MEMORANDUM Planning Commission Debbie Ubnoske, Planning Manager November 4, 1996 Consideration of an Ordinance for the City of Temecula Amending the Development Code to Create Provisions and Requirements for the Approval of Master Development Plans Prepared By: Debbie Ubnoske, Planning Manager RECOMMENDATION: Provide Direction on the Establishment of an Ordinance for the City of Temecula Amending the Development Code to Create Provisions and Requirements for the Approval of Master Development Plans for Industrial Projects BACKGROUND In early 1996, the City of Temecula met with Snyder Langston to discuss a public\private partnership with the goal of developing an industrial facility plan dedicated to providing designed and approved facilities for users than have a desire to locate within the boundaries of a planned industrial park in the City. Snyder Langston is a company which has a reputation as a Manager and Builder of distinguished public and private developments in Southern California. Snyder Langston will work with MacHutchin Development to form the "Development Team" for the express goal of planning and developing industrial facilities for qualified firms having a need for those facilities in the City of Temecula. The City of Temecula will provide the 'Development Team" the necessary governmental approvals to accelerate the final permit process. The "Development Team" will provide for the marketing and design required to obtain approval for the Master Development Plan on a non site specific industrial project, as well as, financing and construction. The City of Temecula will provide the planning review, plan check, and all other necessary governmental reviews for the project to allow for the approval. The "Development Team" proposes to initially submit schematic design drawings and elevations for a prototype industrial project of approximately 50,000 square feet. A site plan and elevations are provided in your packet. A representative of Snyder Langston will make a brief presentation at the Planning Commission meeting of November 4, 1996 MASTER DEVELOPMENT PROPOSAL SNYD6R IJ~NGSTQN PROPOSAL FOR PREAPPROVED INDUSTRIAL FACILITIES TEMECULA, CALIFORNIA OBJECTIVE: Develop a industrial facility plan specifically dedicated to providing designed and approved facilities for "Users" that have a desire to locate within the boundaries of the City of Temecula. PROGRAM: Snyder Langston, MacHutchin Development and Austin Design Group will form "Development Team" for the express goal of planning and developing industrial facilities for qualified firms having a need for those facilities in the City of Temecula. The City of Temecula will provide the "Development Team" the necessary government approvals to limit the final permit process to thirty (30) days. COMMITMENT: The "Development Team" will provide the design services required to get preapprovat for the development on a non site specific industrial project, financing, and construction. The City of Temecula will provide the planning review, plan check, and all other necessary governmental agency review of the project to allow the preapproval. Delaying payment for those services, (i.e plan check fees, permit fees, traffic fees, etc.) until an individual project has final approval on a specific site. PROPOSED PROJECT TYPE: The "Development Team" proposes to initially submit documents for a prototype industrial project of approximately 50,000 SF, This facility will be designed for single users. Our plan will take into consideration the local design requirements, current CC&R's for the industrial parks in the area, and our collective experience in the development and construction of industrial facilities. CORPORATE PROFILE 5,' DER In 1959, Snyder Langston began building a reputation as a Manager and Builder of distinguished public and private developments in Southern California. The trademark of our work: superior quality and timely completion, consistently within budget. As our reputation grew, so did the size and complexity of our projects increasing our construction volume alone to over ~ 120,000,000 per year. The continued growth of Snyder Langston has resulted from our repeat clientele and strong relationships with our existing clients. These clients continue to use our services due to our planning and management capabilities, attention to detail, cost control, and overall performance, assuring the success of each and every project. We have developed an outstanding reputation throughout the real estate industry as a provider of superior services. Our highly motivated and experienced team of professionals is deeply involved in each phase of your project - from business planning, use programming, initial design, financial planning, and entitlements, through construction, marketing, interior improvements and move-in. Our proven leadership and expertise in management, estimating, value engineering and scheduling[ enable you to have control of the entire process from start to finish. Our reputation for producing top quality, cost efficient products & services continues to grow. We do it all... and we do it right. It is a simple philosophy, one which guides us still at Snyder Langston. SNYDER LANGSTON CAPABILITIES SNYDER LANGSTON APPROACH S DER LANGS'TON We define our core competency as "Process Management", It is our goal to manage each phase of the process. Our measure of success is the ultimate delivery of the project to our client with no unmet expectations. VALUE BASED MANA CEMENT PROJECT DELIVERY PROCESS COMMUNICA T/ON THE SERVICE GOAL At Snyder Langston, the core values which guide our actions are CREATIVITY, EMPLOYEE QUALITY OF LIFE, PROCESS EXCELLENCE, INTEGRITY, SUCCESS, COMMITMENT and COMMUNITY. Our Continuous Improvement Program measures our success at nurturing the culture created by this Management system. The delivery of any project involves the manage- ment of a large number of activities by many people and companies. We define our core competency as "Process Management". We divide the Project Delivery Process into five phases. Each phase is a building block for the others, and each must be understood, organized, and managed. It is our goal to manage each phase of the process, and deliver every project to our clients with no unmet expectations. Historically, the Project Delivery Process has been ill-defined and difficult. Unaligned goals, inappropriate and inconsistent compensation systems and the resulting multiple agendas are a few of the basic issues that need to be addressed amongst all team members in a candid and straightforward fashion. Communication is the solution, and we have geared all of our efforts and systems at eliminating miscommunication and poor timing in order to make the process a successful team effort. To provide the highest quality services to our clients through a motivated, well-aligned staff of professionals assuring the success of every project and achievement of our service goal: "A DELIGHTED CUSTOMER 100% OF THE TIME". Whether managing the entire Project Delivery Process, providing segmented Consulting or General Contracting, our approach provides us the overall perspective which will make the difference on your project. SNYDER LANGSTON CAPABILITIES 5NYDER LAN~S'FON INDUSTRIAL FACILITIES EXPERIENCE OAKLEY ENTERPRISES Foothill Ranch, California Construction Management services for a new 400,000 square foot corporate headquarters facility. Snyder Langston's involvement includes assisting with land purchase negotiations, governmental relations, all entitlement and permit processing, coordination with developer during their infrastructure improvement work, selection of professional service firms and design management for the project. The facility will include office, manufacturing, assembly and distribution areas, as well as an Oakley museum, boutique and hellstop. Employee amenities include a NBA regulation basketball court, fitness center, full service cafeteria and a 450 seat "team auditorium ". Architectural features consist of a forty foot stainless steel round structure above the building's entrance. The entrance to the 40- acre, fully finished site will be via a dramatic drive bordered by di Giacomo (simulated sculptured rock) faced retaining wails. ST. JOHN Irvine, California Project Management services for the renovation of an existing 164,000 SF building into a new manufacturing facility for the high-end clothing designer. Services included design coordination, value engineering, governmental negotiations and relations and contracting. Work included site and interior improvements as well as exterior skin renovation and new state- of- the-art mechanical and electrical systems TOYOTA MOTOR SALES North American Parts Logistics Division Ontario, California A 760,000 square foot North American Logistics Center, including administration offices, regional teleconferencing center, distribution and a full-service cafeteria. The project was designed to reflect Toyota's interest in quality and beauty both in the buildings and on site. The surrounding 94 acre site is covered with decorative colored stone, olive trees and traditional Japanese flora. The facility is constructed of concrete tilt wails with a steel-framed roof. Work included site preparation and infrastructure improvements. SNYDER LANGSTON CAPABILITIES SNYDER LANESTON Real Estate and Cons/ructjon 5En4CES MICRO TECHNOLOGY Anaheim, California A 2-story corporate headquarters providing 131,500 SF of administrative offices, production/manufacturing, assembly and distribution for an electronics manufacturer. The shell was concrete tilt-up construction with full tenant improvement build- out. A.S.T. RESEARCH Fountain Valley, California A new 247,000 SF build-to-suit facility on fully improved 13 acre site. This computer manufacturing facility and corporate headquarters includes specialty HVAC and control systems, "world class" conveyor driven fabrication and assembly systems for AST computer system products, and support administrative areas. KRAUSE'S SOFA FACTORY Brea, California One building remodel of 246,000 square feet as well as two new buildings totaling 172,000 square feet. SUBARU OF AMERICA Irvine, California Construction of a 220,000 square foot office and parts distribution center. MALLINCKRODT MEDICAL, INC. Irvine, California Complete design/build responsibility for a 110,000 SF medical manufacturing facility, warehousing and offices, Work includes installation of MEP systems, interior improvements, and shell and core modifications. CORPORATE POINT Irvine, California Construction of five 2-story office and research & development buildings. SNYDER LANGSTON CAPABILITIES SNYDeR LANGSTON TOASTMASTERS Rancho Santa Margarita, California Build-to-suit project consisting of concrete tilt-up construction totaling 40,000 square feet. ALPHA MICRO Santa Ana, California 180,000 SF build-to-suit computer manufacturing facility and corporate headquarters, including cleanroom areas, computer rooms and Halon system. SOUTHPARK Fountain Valley, California Construction of seven concrete tilt-up buildings which totaled 312,000 square feet, SCHICK MOVING & STORAGE El Toro, California Build-to-suit project consisting of concrete tilt-up construction and totaling 40,000 square feet. FULLERTON/ACACIA Fullerton, California Construction of two office buildings and six research & development facilities, COZEN INDUSTRIAL Placantia, California Construction of a retail/commercial building which totaled 38,000 Square feet. ANAHEIM DISTRIBUTION CENTER Anaheim, California A 106,000 square foot industrial warehouse/distribution facility. SNYDER LANGSTON CAPABILITIES SNYDER LANESTON REal ~s~Z~t~ ~ ~ 5~FI~S NO-JO'S Rancho Santa Margarita, California A 2-story, 50,000 square foot office/light manufacturing facility. SAN JOAQUIN CORPORATE PARK Aliso Viejo, California Construction of a two-story office building 37,000 square feet, ONTARIO 140 Ontario, California A 140,000 square foot industrial, concrete tilt-up building. MISSION LINEN Chino, California Construction of a 187,504 square foot new linen/laundry cleaning facility. FREEWAY SHOWROOMS San Bernardino, California Construction two concrete tilt-up retail buildings totaling 46,500 square feet. SAN BERNARDINO AUTO CENTER San Bernardino, California Construction of 2 concrete tilt-up buildings totaling 31,000 square feet. OTAY COMMERCE CENTER Otay Mesa, California Constructior~ of six tilt-up buildings totaling 280,000 square feet. NELLCOn San Diego, California Preconstruction services to furnish cost analysis, design development review, value engineering, and schedule owner FFE and move-in for a 90,000 SF build-to-suit facility. Construction of one 1-story, 90,000 SF build-to-suit facility. Tenant improvements include medical instrument manufacturing and assembly areas with administrative offices and warehouse. SNYDER LANGSTON CAPABILITIES 5NYDER LAN STON POMERADO BUSINESS PARK Poway, California Two industrial buildings and four multi-tenant industrial buildings consisting of 240,000 square feet. CENTRAL PURCHASING Camarillo, California A 155,000 square foot distribution warehouse addition to an existing facility. EASTON COMPOSITES Otay Mesa, California A 2-story, 70,200 SF manufacturing and warehouse assembly facility for sports products. TROLLEY BUSINESS PARK San Diego, California One office building with mezzanine including a 104,000 square foot warehouse. SOUTHBAY INDUSTRIAL CENTER @ EASTLAKE Chula Vista, California One industrial building totaling 185,000 square feet. LARWIN-ROSEDALE CENTER Cadsbad, California Construction of two buildings, each consisting of 1-story with mezzanine in a 194,000 square foot concrete industrial complex. WILLOWCREEK PLAZA San Diego, California Construction of a 4-story office building totaling 80,000 square feet. GATEWAY AT OTAY San Diego, California Construction of four industrial buildings totaling 420,000 square feet. THE CAMPUS Cadsbad, California Construction of two research & development buildings and one 2- story office building totaling 180,000 square feet. SIVYDER LANGSTON CAPABILITIES SNYDER LANESTON MG INDUSTRIES Otay Mesa, California Design and construction of a liquid nitrogen and liquid oxygen pipeline and fill terminal which cross the Mexican/U.S. border at Otay, California. Project includes support maintenance structure, oxygen/nitrogen tanks and associated process piping. FOUR POINTS BUSINESS PARK San Diego, California One 3-story office building and two 2-story research & deveJopment/office buildings. Project consisted of 160,000 square feet. CARROLL TECHNOLOGY CENTER San Diego, California Construction of a business park consisting of four 2-story office/research & development buildings totaling 132,000 square feet. CENTERPOINTE San Diego, California Project included the construction of four 1-story office and research & development buildings, each with a mezzanine and totaling 144,000 square feet. ONTARIO 400 Ontario, California A 410,420 square foot industrial, concrete tilt-up building. AIR PRODUCTS & CHEMICAL, INC. Santa Fe Springs, California Construct[on of truck maintenance, repair and distribution terminal. Project consisted of two concrete tilt-up buildings: one 11,000 SF and one 600 SF; and three acres of parking within a secured site. Building included two locker rooms, general office space and three maintenance/washdown bays. KING BEARING Corona, California A 200,000 square foot manufacturing/distribution facility with 45,000 square feet of corporate offices. SNYDER LANGSTON CAPABILITIES SNYDER LANESTON Es~a~ and C~nstf~ RESERVOIR BUSINESS PARK Pomona, California Six concrete tilt-up industrial buildings totaling 91,800 square feet. HATHAWAY INDUSTRIAL PARK II Santa Fe Springs, California Construction of a business park consisting of eight industrial concrete tilt-up buildings and totaling 250,000 square feet. PLAZA DEL NORTE Oxnard, California Project consisted of three industrial buildings and two commercial buildings totaling 95,000 square feet. METRO CENTRE Anaheim, California Completion of a 4-story office building totaling 84,000 square feet, OCCIDENTAL BUSINESS CENTER Chatsworth, California Construction of a business park which consisted of four 2-story office buildings totaling 96,000 square feet. BIXBY RANCH Rancho Cucamonga, California Two research & development facilities totaling 60,000 square feet. GALE AVENUE City of Industry, California Construction of a 37,000 square foot industrial building and renovation of a 48,000 square foot research & development facility. HARMON BUSINESS PARK Northridge, California Office park renovation & relocation/construction of HVAC central plant. INDUSTRY HILLS I City of Industry, California Conversion of existing warehouse to COSTCO retail center. SNYDER LANGSTON CAPABILITIES SCHICK DATA STORAGE 5NYDER LANGSTON Owner: Schick Data Storage Architect: Himes, Peters, Mason Location: Tustin, California Description: 40,000 square foot facifity. concre[e tilt-up storage SNYDER LANGSTON CAPABILITIES SUBARU OF AMERICA SNYDER LANESTON EStatE and Construction S~rvicEs Owner: Architect: Location: Description: Subaru of Amenca LPA irvine, California 220,000 square foot pan's and distribution facility. ,gAI)'DER IANGSTON CAPABILITIES MacHUTCHIN DEVELOPMENT CORPORATE PROFILE Since 1979 MacHutchin Development has developed projects ranging from the $20 million Belmont Park project in San Diego to a $2 million office and warehouse for the Bureau of Land Management in El Centro. California. Graham MacHutchin, President, holds a civil engineering degree and a California Real Estate Brokers license, and has over 30 years experience in the development and construction of real estate. Specializing in the planning, site selection, financing, obtaining of governmental approvals. leasing and management of real estate, MacHutchin Development has worked for a wide spectrum of clients including the Federal Government, the City of San Diego. San Diego Gas & Electric, Mission West Properties. and San Diego Wholesale Electric. LIST OF PROJECTS Project Name Description Belmont Park Mission Beach, CA 100,000 sq. ft. retail development South Sorrento Plaza San Diego, CA 70,000 sq. ~. office building Pioneer Business Center El Cajon, CA 100,000 sq. ff. industria park Mission Commercial Center 50,000 sq. ft. commercial center Columbia Square Atrium San Diego, CA 21,000 sq. ft. office building Bureau of Land Management El Centro, CA 18,000 sq. ft. office & warehouse Palmira Village Apartments San Ysidro, CA 74 unit apartment complex INTRODUCTION CORPORATE HEAD QU ART E R ~' 9605 SCRANTON RD SUITE 200 SAN DIEGO CALIFORNIA 92121 (619)546-0110 FAX (619)546-0440 The Austin Design Group (ADG) believes in innovation. Quite simply, we are commit'red to challengfng the constraints of expectation. We strive to make the best even beffer, to create human-responsive environments which enhance the experience of those functions for which it exists. Our approach to design is interactive. It stems from the client, the site, and from ourselves in consultation with the projects users. We involve our clients In the process, often utilizing our Charrette design sessions. These are intensive, multi-day meetings in which conceptual designs evolve. Both decision makers and users participate. They see the design alternatives, discuss the factors being brought to bear, and have an immediate and powerful influence on the outcome. Led by Douglas H. Austin. FAIA, recipient of over 50 design awards, the Austin Design Group has established itself as one of Southern Callfornta's leading design firms. We offer professional services in Architecture, Planning, and Engineering. To this, we add a systematic process of project management, quality assurance, and cost control. so that budgets are met and every detail is carefully considered. Creating the best possible project for every client is our ultimate goal. ADG"s artistic and technical skills always maintain the highest of professional standards. The results of such a commitment to excellence are tangible -- inr~vafive, cost-effective solutions that are thoughtful, appropriate and thoroughly executed responses to both the ciient's and the project's needs. PHILOSOPHY DISCIPLINES A U $ T I N "In-house" services enable us to quickly and efficiently satisfy design and engineering needs for projects both large and small. These services are: Architecture Design. production of construction documents, and construction administration for all types of projects. Planning and Urban Design Land use. urban design and policy processing including site planning. environmental planning, general plan amendments, major use permits. annexations/special districts, site and project feasibility studies. and redevelopment planning. Interior Design and Space Planning Interior services include programming (needs assessment), space planning, Interior design with furniture/finish specifications, tenant improvement documents, and construction administration. Civil Engineering All major elements of the land use pran, site plan, tentative map and record map. Design and prepare all maps and improvement plans including sffeet plans, boundary/lot surveys, water and sewage systems, grading plans and earthwork. Structural Engineering Developing stable, efficient and cost-effective buildings is a pdmary concern of ADG's Structural Engineers. New structures and renovations, all forms of construction, and state-of-the-art seismic design. Computer Capabilities Our design and drafting efforts are enhanced through the use of our computer aided design and drafting (CADD) system. We have qualified CADD operators spanning all in-house disciplines. Computer systems include IBM-compatibles running AutoCAD, AutoPE. Finite Analysis software for structural calculations and networked Maclntoshes running graphics, and office automation software. Our sailware library includes MacProject and MacFlow scheduling software, and Dynaperspective 3D rendering software. We have a scanner with OCR software. a Canon C J7 color scanner/printer. loser printers and a ploffer. D E S I G N Q I~ O U P CHARRETTE PROCESS IS BASED ON: · Realization of Client Related Goa~ · Identification of Project Related Facts · Identification of Project Related Needs · Development and Analysis of Design Altemafives · Selection and Refinement of the Desfgn Solution WE USE THIS PROCESS TO: · Maximize effective communications · Focus energfes ot the entire Client/Designer team on problem- solving specific to project needs · Facilitate direct Client participation in the design process · Constantly review existing site conditions as the design solution evolves · Gain direct insight into the character and culture of the Client Utilizing a unique problem-solving process, ADG's projects are designed through the interactive participation of our multi-disciplined architectural, engineering. and Client team, rather than the individual efforts of a solo designer. At ADG, the Clfent becomes a key participant, With our on-site design sessions, concepts are developed and evaluated with the direct participation of the Owner/User to determine the most appropriate solution the first time. We call this on-site process 'charreffe' (shar-eff), a term used by the Ecole des Beaux Artes. Charreffe literally means 'cart'. In design terms, charreffe means two-way communication. During the charrette, our team places its total attention on you and your project. Ourprofessionals. working lOto 12hourdays, can accomplish more in one week"s time than most designers can in months. Your time is not wasted on unnecessary meetings. Because we have done our homework prior to the start of the charrette. we know the existing conditions. We understand the utilities, site boundaries, codes, zoning restrictions and other facts before we even start, consequenfiy, we begin making Intelligent decisions immediately. CHARRETTE PROCESS A U S T I N 0 I~ S I G N G I~ 0 U P PROJECTS A U $ T I N D E S I G N Q R O U P CROSS-SECTION PROJECT LIST Experience of ~mn Principals while woddng together ARCHITECTURE COMMERCIAL/RETAIL/MIXED-USE: WALL STREET PLAZA Three-story, 32,000 s.f. retail and office building. La Jolla. THE ANTRIUM Remodel/renovation of two-story, 110,000 s.f. office building. Orange, California. BRISTOL SQUARE Seven-story, 60,000 s.t. office and retail Front and F Streets In downtown San DIego with two underground parking levels. MARINA COURT Five-story, 80,000 s.f, mixed-use project with 40 convertible loft apartment units for artist residents. Ground-floor retail spaces and below*grade parking. Third and Market, downtown San Diego. LAUREL TRAVEL CENTER 5-story, 150,000 s.f. commercial/retail/parking center. San Diego. 5TH & BEECH 4-story, 32,EX:]O s.f. office buildfng in downtown San Diego. OCEAN TERRACE OFFICE BUILDING 29,000 s.f. office building with parking garage for 55 cars. Solana Beach, California. AIA MeritAward PACIFIC EXECUTIVE PLAZA Office complex in Solana Beach, California. Best Office Complex SAM Award/BIA: FINANCIAL PROJECTS SAN DIEGO COUNTY CREDIT UNION CORPORATE OFFICES 50,000 s.f. headquarters with leaseable space. San Diego. SAN DIEGO COUNTY CREDIT UNIONS · El Cajon Branch -- Recently finished, 6300 s.f. featuring state-oF the-art retail banking electronics · Encfnitas Branch -- 15,600 s.f., two-story with state-of-the-art banking facility, a 9,000 s.f. community room, and leaseable office space. On El Camino Real in Encinitas, California. FIRST INTERSTATE BANKS · Rancho California Branch -- 5,500 s.f. prototype design for future First Interstate Banks. · Shadow Ridge Branch, Vista, California -- 5,500 s.f. branch banking tacility. · Hornet, California -- 5,000 s.f. remodel. · Blythe, California -- 5,000 s.f. renovation. R&D/INDUSTRIAL/MANUFACTURING RESOURCE RECYCLING CENTER Fast-tracked 170,000 s.f. intensive material recovery and recycling facility for San DIego County. San Marcos. California. SAN DIEGO UNIFIED SCHOOL DISTRICT SCHOOL SUPPORT SERVICE CENTER 168,500 s.f.. maintenance, operations, transportation and warehousing for the entire school district. Programming and full architectural services. In association with Fleet Maintenance Consultants. San Diego, California. THE UPPER DECK COMPANY 246,000 s.f. manufacturing plant and corporate headquarters for a company which manufactures high quality sports trading cards. Carlsbad. California. Gold Nugget Grand Award - Best Industrial Project, 1993 DEPOSITION TECHNOLOGY 69,000 s.f. R&D facility for the manufacturing of metalized surfaces, San Diego. California. CIC/BIA Award, 1988 ELGAR CORPORATION Manufacturing plant and corporate headquarters for the makers of computer components. San Diego, California. AIA Honor Award and CIC/BIA Award, 1986 WATKINS MANUFACTURING Manufacturing and corporate offices for the largest portable spa manufacturer in the U.S. Included a separate hazardous material building. Vista, California. CROSS S~CTION page two MEDICAL, LABORATORY & BIO-MED FACILITIES EISENHOWER MEDICAL CENTER La Quinta Facilities: Immediate Care Center: 9.500 s.f, center for urgent care and occupational health. In progress. Medical Office Building: 50,000 s.f. for phys~cian"s offices. Also fncludes radiology, laboratory, industrial rehab and Patient Education Center. In progress. Rancho Mirage Campus: In-Pallent Pharmacy Center Endoscopy/G.I. Treatment Center. In progress. Pain Management Center. In progress. Campus Master Plan Medical Records Neurology Department Cafeteria Nuclear Medicine Peter lake Oncology Center: Linear Accelerator Anza Facility: Immediate Care Center: 2000 s.f, TRI CITY MEDICAL CENTER The Austin Design Group has been involved In Its on-going renovations for seven years. Completed remodels and additions Include: · Emergency Room · NeD-Natal Intensive Care Unit · In-patient and Ambulatory Surgery · Women's Center · Pediaffic Ward · Child Care Center · Administrative Office Building · New Cenffal Plant SCRIPPS MEDICAL CLINICS · Carreel Mountain Ranch. CA -- Three-story, 87,000 s.f. ambulatory health services. CIC/BIA Golden Tower Award & CCAIA Merit Award · Chula Vista, CA - Programming, space planning 34,000 s.f. · Son Diego, CA - Space planning and tenant improvements for a 30~00 s.f. clinic with complete ambulatory health services. · Del Mar, CA -- Programming, space planning and tenant Improvements for a 16,000 s.f. cllnlc. QUIDEL Two-stoW, 63,000 s.f. biDmedical facility with offices. laboratories, manufacturing and high-bay spaces for warehousing and packaging purposes. Award of Excellence - NCBC, 1990 WARING ROAD HEALTHCARE CENTER A 20Gbed Skilled nursing facility, 85,000 s.fi Oceanside. BARNES-HIND CORPORATION Programming and preliminary design for two-story, 200,000 s.f. manufacturing and administrative office building in Son Diego. SPECIALTY MEDICAL CLINICS · La Jolla, CA - 10,800 s.f, remodel of offices and laboratory. · Encinitas, CA -- New office, internal medicine, 2,000 s.f. · Son Diego, CA -- De Anza office remodel, 4,000 s.f. CROSS S~CTION page th{ee HOTEL/RESORT/HOSPITALITY ENCINITAS BEACH RESORT Master plan of a five-star luxury resort hotel project involving expansion of the 90D-acre La Costa Hotel and Spa. Encinitas. PALM BEACH PLAZA On the North Marinas Island of Solpan, 600-room resort hotel will cater to both destination resort and busineSS clientele. DHARMALA RESORT HOTEL 300-room, five-star resort hotel on the Island at Batam, Indonesia, 12 miles from Singapore. PACIFIC BEACH GRAND Three-story, 120-room hotel for Quality Suites. includes 15,000 s.f. of ground-level retail and underground garage. San Diego. TINIAN ISLAND Master plan for a new community. Five distinct villages, each with its own resort and commercial business center. Phase one Is a new madrio and government center along the waterfront. North Mariario Islands, a U.S. Commonwealth. HOTEL PALMILLA Conceptual design for a two-story hotel with conference facility on 535-acres tn Cabo San Lucas, Mexico. GROSVENOR INN/TOMATO'S RESTAURANT Exterior renovation for a 205-roorn motor hotel, and a new, 145 seat Italian restaurant. San Diego, California. SPORTS & FITNESS CENTERS SPORTING CLUB AT LAKESHaRE TOWERS 90,000 s.f, fitness facility with gymnasium, top*of-the-line free weight/Nauffius training circuit, an indoor jogging track, racquetball courts, squash courts, aeroblcs rooms, outdoor sand volleyball courts and Olympic poot, as well as spa with hydratherapy, massage, sauna and steam. Additional services include a full- service restaurant, bar and child care. Gold Nugget Grand Award for Best Specialty Project, 1993 and Athletic Business Magazlne's Facility of Merit Award, 1993 SPORTING CLUBS OF AMERICA Comprehensive fitness facilities. Programming, architectural and interior design In association with other architects; provided specifications and research for new products for clubs: *Atlanta -- 90,000 s.f., part of a mixed-use project. .Chicago _ I00,000 s.f. club, part of a mixed-use project. .La Jolla, California -- 15,650 s.f. club, part of a mixed-use project. · Montreal - 100,000 s.f., part of condominium project. .Philadelphia - 67,500 s.f. club atop of a parking garage. .Boca Raton - Design for 88,000 s.f., part of a mixed-me project. .Mission Valley (San Diego) -- Design for an 8,000 s.f. club, parr of a mixed-use project. CROss S~C11ON page four RELIGIOUS THE CHURCH OF ST. THOMAS MOORE A two-phase church complex with an 850-seat sanctuary, daily chap.r, parish hall, administrative offices, rectory and classrooms. In progress. Oceanside, California. CHURCH OF THE NATIVITY 550-seat church, rectory, parish administration building, 300- student secondary school. parish hall, and chapel in Rancho Santa Fe. Moore, Ruble, Yudell, consulting architect. 4 Orchids Orchids and Onions Awards, 1990; AIA/SD Honor Award, 1991 CAMP CEDAR GLENN 5,000 s.f. auditorium and dining hall with kitchen. Julian, California. AIA Merit Award and a Society of Registered Architects Award INTERIOR DESIGN SDG&E 200.000 s,f. consolidation of 8 locations Into one complex. Interiors, space planning and tenant improvements. San DIego. SPERRY/VAN NESS Space planning and Interiors of 6,500 s.f. real estate investment brokerage office. La Jolla, California. KENNETH C. SMITH AND ASSOCIATES 11 ~00 s.f. Advertising Agency. included programming, space planning and intedor design. La Jolla, California. ONE HARBOR DRIVE Model unit Interior design for a 42-story highdse In downtown San Diego. (Consulting artist: Joan Warren.) 1992 SAM Award Best Residential Interior Design Attached Home. MAILBOXES ETC, Space planning and Interior design of a 3-story, 60,000 s,f., corporate office and training center for international ffanchiser of MAILBOXES. ETC. stores. San Diego, California. FOOTHILL THRIFT AND LOAN 4,500 s.f. space planning and interior design of branch office in San Diego, California. PEDIATRIC SPECIALTY MEDICAL OFFICE BUILDING 80,000 s.f. space planning and interiors for doctors' offices, administrative offices and an ambulatory surgery floor for Chtldren's Hospital of San Diego, California. SINGING HILLS COUNTRY CLUB Interior design of restaurant/bar/entertainment facility. San Diego. CROSS SECTION page five MASTER PLANNING AVIARA 1,400-acre golf course oriented resort and residential community with a 280-room luxury hotel, conference center. health club, retail complex, restaurants. Developed master plan, Architectural guidelines and preliminary architectural deslgn. Carlshad. SAN MARCOS TOWN CENTRE Master plan of a 59-acre site. Includes 150.000 s.f. City Hall, library, Community Center, 22-acre park, retail. theater complex. restaurants, office plaza, hotel. senior housing. executive housing. SUTTER BAY Planning and design for a new community in South Suffer County with pedestrian-oriented planning and innovative transportation systems, Recipient of Award ln Smithsonian lnsfitute Competition "The Electric Vehicle in the American Community". SAN DIEGO STATE UNIV. FOUNDATION MP Master Plan and design of three separate sites totaling 105-acres adjacent to the SDSU main campus. Provided 3,500 units of housing. 700,000 s.f. office. 350.000 s.f. of commercial/retail. BATIQUITO$ LAGOON EDUCATIONAL PARK Master Plan and schematic design of a 220,000 s.f. graduate university, executive conference center with 330-room hotel, 1.1 million s.f. commerclal/R&D, Olympic volleyball facility and ~0 residential units. Cadsbad. California, DALEY RANCH 3.048-acre, master-planned community with vartety of housing types, four neighborhood parks, 2gO*acre nature preserve, 1B hole golf course and clubhouse, 150-suite country inn, 12-acre commercial center. swim and tennis club. elementary school. day care center and fire station. San DIego. California. URBAN DESIGN MARTIN LUTHER KING, JR, PROMENADE A linear park spanntng four major districts of downtown San Diego. Provides open/recreation space for nearby residential, and ceremonial entrance for convention center and adjacent hotels. SACRAMENTO DOWNTOWN STREETSCAPE Design guidelines for Sacramento's Central Business District. It covered public arts. paving standards, signage, street amenities and landscaping. Sacramento, California. CARLSBAD STREETSCAPE IMPROVEMENT A multi-phased sffeetscape renovation project with street furniture design and sculptural gateways for the City of Carlsbad. LANDSCAPE ARCHITECTURE UNIVERSITY COMMONS Landscape master planning of 150-acres of riparlan environment fn a 500 acre mixed use development in San Marcos, California, Landscape standards established for streetscapes, parks, pedestllan and equestrian trail system throughout the site. VANTAGE POINT A 30a-acre residential community in Escondido. landscaping was designed for retention of the native vegetation. Developed architectural. landscape architectural and siting guidelines. STATE ROUTE 15 CUT & COVER Landscape master planning for four park sites along a 2.2 mile long corridor of proposed freeway in Mid-City San Diego. CROSS SECTION page six IMAGES A U S T I N D E $ I G N G R O U P A U S t I N D E 5 I G N G R O U P Gold Nugget Merit Award. 1988 AVIARA Located on the north shore of scenic Batlquitos Lagoon. Avlara is a 1,407-acre, master-planned resori' community. At the center of the site is a world-class resort composed of a 650-room It~un/hotel. conference facility, health club. restaurants. championship golf course, and community spats center. M A 5 T E R P L A N N I N G A Lf S T t N D E S I G N G R O U P Gold Nugget Grand Award - Best Industrial Project, 1993 THE UPPER DECK COMPANY 246,(:X30 s.f. manufacturing plQnt and corporate headquarters for a company which manufactures high quality sports trading cards. Cadsbad, California. R & D / I N (:) U S T R I A L / M A N U F A C T U R I N G A U S T I N D E S { G N G ~ O U P CCAIA Honor Award, 1986 CIC/BIA Golden Tower Award, 1986 SCRIPPS CLINIC 90,000 square foot, three-story, full-service health maintenance cltnic located In the center of an industrial park. Tilt-up consffuction was utilized to meet sffingent budget requirements for both the site work and shell consffuction. A sky-tit atrium containing stairs and elevators sits at the hinge point of all fnternal circulation. M E D I C A L F A C I L I T I E $ A U S T I N D E S I G N G R O U P Pacific Coast Builders Gold Nugget Grand Award -- Best Specialty Project, 1993 Athletic Building Magazine Facility of Merit Award, 1993 SPORTING CLUB AT LAKESHORE TOWERS 525 rntllian, 90,(]:]0 s.f. state-of-the-art fitness center. AmenZties inolude squash and racquet ball courts, weight rooms, aeroblcs, Jogging track, gymhas/urn, swimming pool, health spa, a full service restaurant, bar and a child care. Klsho Kurokawa was consulting designer on building shell. S P O R T S & F I T N E S S C E N T E R S IIIIIIIIil!itJ" 'q~li:] ;" llllllallglli .,. :ili:;.:._._:..;,,.~ ,1 llilililllll~ "] 311i! IIIIIIIII!ll~i~. ,11111:~; Z o Z ITEM #6 STAFF REPORT - PLANNING CITY OF TEMECULA PLANNING COMMISSION November 4, 1996 Planning Application No. PA96-0232 (Development Plan, Fast Track) Prepared By: Carole Donahoe, Project Planner RECOMMENDATION: APPLICATION INFORMATION APPLICANT: REPRESENTATIVE: PROPOSAL: LOCATION: EXISTING ZONING: SURROUNDING ZONING: The Planning Department Staff recommends the Planning Commission: ADOPT the Negative Declaration for Planning Application No. PA96-0232; ADOPT the Mitigation Monitoring Program for Planning Application No. PA96-0232; PROPOSED ZONING: GENERAL PLAN DESIGNATION: EXISTING LAND USE: ADOPT Resolution No. 96-__ recommending approval of Planning Application No. PA96-0232 based upon the Analysis and Findings contained in the Staff Report; and subject to the attached Conditions of Approval. Four-Sher Development Company Charles Sher To construct and operate a two-story 92,182 square foot warehouse/distribution facility on 4.88 gross acres. East of Ynez Road, north of County Center Drive in the Winchester Highlands Business Park LI (Light Industrial) North: LI (Light Industrial) South: LI (Light Industrial) East: LI (Light Industrial) West: SP (Specific Plan Overlay) Not requested BP (Business Park) Vacant SURROUNDING LAND USES: North: South: East: West: Industrial building Vacant Industrial building Vacant PROJECT STATISTICS Total Area: Total Site Area: Building Footprint Area: Landscape Area: Paved Area: Proposed Uses: Warehouse/distribution: Corporate office: Parking Required: Parking Provided: Building Height: 4.88 acres net 83,882 square feet (39.5%) 71,500 square feet (33.6%) 55,268 square feet (26.0%) 69,136 square feet (75%) 23,046 square feet (25%) 146 vehicle spaces, I motorcycle space, 7 bicycle spaces 146 vehicle spaces, 16 motorcycle spaces, 8 bicycle spaces 30 feet BACKGROUND A pre-application meeting was held for this project on August 30, 1996. The application was formally submitted on September 6, 1996. The Development Review Committee (DRC) meeting was held on September 26, 1996, and the project was deemed complete on October 11, 1996. This project is a fast-track application. PROJECT DESCRIPTION Four-Sher Development Company proposes to construct a two-story 92,182 square foot industrial building within the existing Winchester Highlands Business Park. The facility is designed for warehouse and distribution uses, with approximately 25% of the interior proposed for corporate offices. Precise grading plans have already been submitted and are currently being reviewed by staff. ANALYSIS Site Design The project has two access drives off Ynez Road, one at the north end of the site, and the other at the south end. Vehicular and truck traffic can circulate the entire site perimeter. Parking spaces for vehicles, motorcycles and bicycles, surround the building on three sides, with loading/unloading docks located entirely to the rear. The design offers three employee patio areas. The applicant proposed this building on speculation, and the parking spaces provided in the proposal comply with his original estimates of uses per square foot . However, since R:~TAFFRF~232PA96.PC 10/30/96 klb 2 submitting his proposal, the applicant has entered into negotiations with a potential buyer for the finished building. If the negotiations are fruitful, the uses per square foot would be modified to the following configuration: Manufacturing Warehouse Office 37,968 square feet (41%) 42,214 square feet (46%) 12,000 (13%) Using the standard formulas in the parking code, this configuration would require an additional 25 vehicle spaces and one additional bicycle space. However, the potential buyer indicates that his current employee count is 75 for their main shift. Even if the workforce were doubled, the 146 vehicle spaces, 8 bicycle spaces and 16 motorcycle spaces provided could accommodate it. The standard formulas in the parking code are disproportionate to the needs of this particular user because they have injection molding machinery that physically occupy more than half (53%) of the area designated as manufacturing and require only a handful of employees in this area. Staff agrees with the applicant that requiring additional vehicle spaces beyond those already provided on the siteplan are unnecessary. Additionally, the 45-foot rear setback and slope area could be modified in the future should additional parking spaces be necessary. Staff estimates that this could result in an additional 40 vehicle spaces. Architecture The applicant's architect has offered a stepped building frontage along Ynez Road, to take advantage of the curved property line as well as to provide vertical lines and shadows. Entrances are articulated with an abundance of blue hued glass. Horizontal indents travel around the concrete building, and four-block tiles of marbled blue-green provide additional accents. The overall architecture is consistent with adjacent buildings, both existing and proposed. LandscaDing The applicant's landscape architect proposes over 30% of the site for landscaping. His plan is consistent with the 20% minimum requirement of the LI (Light Industrial) zone. Flowering accent trees, shrubs and groundcover create visual interest at the building entrances. Canopy trees provide shading for the parking areas, ~nd shrub massing separates the parking area from Ynez Road. Combined with the existing business park common streetscape, the applicant proposes an adequate buffer and screening from public view. EXISTING ZONING AND GENERAL PLAN DESIGNATION Existing zoning on the site is LI (Light Industrial). Warehouse/distribution uses are permitted with the approval of a development plan pursuant to Chapter 17.05 of the Development Code. The General Plan designation for the site is BP (Business Park). The project as designed is consistent with the Development Code and the General Plan. ENVIRONMENTAL DETERMINATION An initial study was prepared for the project, which determined that the proposed project could potentially affect geologic problems, water, transportation and circulation, energy and mineral resources, public services and aesthetics. However, these effects are not considered to be significant due to the mitigation measures contained in the project design and in the Conditions of Approval. Any potentially significant impacts will be mitigated and reduced to insignificant levels. SUMMARY/CONCLUSIONS The project is consistent with the City General Plan and Development Code. The applicant has been responsive to issues and concerns raised by staff, and has enhanced the project amenities and building design. FINDINGS The proposed use is in conformance with the General Plan for the City of Temecula and with all applicable requirements of State Law. The project is consistent with all City ordinances including: the City's Development Code, Ordinance No. 655 (Mt. Palomar Lighting Ordinance), and the City's Water Efficient Landscaping provisions. The overall development of the land is designed for the protection of the public health, safety and general welfare. The project as proposed complies with all City Ordinances and meets the standards adopted by the City of Temecula for the protection of the public health, safety and welfare. An Initial Study was prepared for the project and it has been determined that although the proposed project could have a significant effect on the environment, these effects are not considered to be significant due to mitigation measures contained in the project design and in the Conditions of Approval added to the project. The project will not result in an impact to endangered, threatened or rare species or their habitats, or to wildlife dispersal or migration corridors. The project site has been previously disturbed and graded, and streetscape installed on site. There are no native species of plants or vegetation at the site, nor any indication that any wildlife species exist, or that the site serves as a migration corridor. A DeMinimus impact finding can be made for this project. R:~TAFFRF1~232pA96.PC 10/30/96 klb 4 Attachments: 2. 3. 4. PC Resolution - Blue Page 6 A. Conditions of Approval - Blue Page 9 Initial Environmental Study - Blue Page 18 Mitigation Monitoring Program - Blue Page 38 Exhibits - Blue Page 46 A. Vicinity Map B. Zoning Map C General Plan Map D. Site Plan E. Landscape Plan F. Elevations G. Floor Plan ATTACHMENT NO. 1 PC RESOLUTION NO. 96- ATTACHMENT NO. 1 PC RESOLUTION NO. 96 - A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TF_31ECULA APPROVING PLANNING APPLICATION NO. PA96-0132 TO CONSTRUCT AND OPERATE A 92,182 SQUARE FOOT WAREHOUSE/DISTRIBUTION FACILITY ON A PARCEL CONTAINING 4.88 ACRES LOCATED EAST OF YNEZ ROAD, NORTH OF COUNTY CENTER DRIVE AND KNOWN AS ASSESSOR'S PARCEL NO. 910-110-042 WIWRFAS, Four-Sher Development Company fried Planning Application No. PA96-0232 in accordance with the City of Temecula General Plan and Development Code; ~, Planning Application No. PA96-0232 was processed in the time and manner prescribed by State and local law; WHEREAS, the Planning Commission considered Planning Application No. PA96-0232 on November 4, 1996, at a duly noticed public hearing as prescribed by law, at which time interested persons had an opportunity to testify either in support or in opposition; WHEREAS, at the public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, the Commission considered all facts relating to Planning Application No. PA96-0232; NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF TEMECULA DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1. That the above recitations are true and correct. Section 2. ~ The Planning Commission, in approving Planning Application No. PA96-0232 makes the following findings; to wit: A. The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other ordinances of the City. The project is consistent with all City ordinances including: the City's Development Code, Ordinance No. 655 (Mr. Palomar Lighting Ordinance), and the City' s Water Efficient Landscaping provisions. B. The overall development of the land is designed for the. protection of the public health, safety and general welfare. The project as proposed complies with all City Ordinances and meets the standards adopted by the City of Temecula for the protection of the public health, safety and welfare. Section 3. F, nvironmental Compliance. An Initial Study prepared for this project indicates that although the proposed project could have a significant impact on the environment, there will not be a significant effect in this case because the mitigation measures described in the Conditions of Approval have been added to the project, and a Negative Declaration, therefore, is hereby granted. Section 4. Conditions. That the City of Temecula Planning Commission hereby approves Planning Application No. PA96-0232 to construct and operate a 92,182 square foot warehouse/distribution facility located east of Ynez Road and north of County Center Drive and known as Assessor's Parcel No. 910-110-042 subject to Exhibit A, attached hereto, and incorporated herein by this reference and made a part hereof. Section 5. PASSF. F}, APPROVED AND ADOPTED this 4th day of November, 1996. Linda Fahey, Chairman I HERERY CERTIFY that the foregoing Resolution was duly adopted by the Planning Commission of the City of Temecula at a regular meeting thereof, held on the 4th day of November, 1996 by the following vote of the Commission: AYES: NOES: PLANNING COMMISSIONERS: PLANNING COMMISSIONERS: ABSENT: PLANNING COMMISSIONERS: Debbie Ubnoske, Secretary R:~STAFFRFI'~32PA96.PC 10/30/96 EXHIBIT A CONDITIONS OF APPROVAL CITY OF TEMECULA CONDITIONS OF APPROVAL Planning Application No. PA96-0232 - Development Plan, Fast Track Project Description: A Development Plan to construct and operate a 92,182 square foot warehouse/distribution facility on 4.88 gross acres. Assessor's Parcel No.: 910-110-042 Approval Date: November 4, 1996 Expiration Date: November 4, 1998 PLANNING DEPARTMENT Within Forty-Eight (48) Hours of the Approval of this Project The applicant/developer shall deliver to the Planning Department a cashier's check or money order made payable to the County Clerk in the amount of Seventy-Eight Dollars ($78.00) for the County administrative fee, to enable the City to file the Notice of Determination with a DeMinimus Finding required under Public Resources Code Section 21108(b) and California Code of Regulations Section 15075. If within said forty-eight (48) hour period the applicant/developer has not delivered to the Planning Department the check as required above, the approval for the project granted shall be void by reason of failure of condition, Fish and Game Code Section 711.4(c). General Requirements The developer/applicant shall indemnify, protect, defend, and hold harmless, the City and any agency or instrumentality thereof, and/or any of its officers, employees and agents from any and all claims, actions, or proceedings against the City, or any agency or instrumentality thereof, or any of its officers, employees and agents, to attack, set aside, void, annul, or seek monetary damages resulting from an approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board or legislative body including actions approved by the voters of the City, concerning Planning Application No. PA96-0232 (Development Plan, Fast Track). City shall promptly notify the developer/applicant of any claim, action, or proceeding brought within this time period. City shall further cooperate fully in the defense of the action. Should the City fail to either promptly notify or cooperate fully, developer/applicant shall not, thereafter be responsible to indemnify, defend, protect, or hold harmless the City, any agency or instrumentality thereof, or any of its officers, employees, or agents. This approval shall be used within two (2) years of the approval date; otherwise, it shall become null and void. By use is meant the beginning of substantial construction contemplated by this approval within the two (2) year period which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval. The development of the premises shall conform substantially with Exhibit "D" approved with Planning Application No. PA96-0232, or as amended by these conditions. R:~STAFI~,FI'X232pA~6.PC 10/30~6 klb 10 a. A minimum of one hundred forty-six (146) parking spaces shall be provided. b. A minimum of five (5) handicapped parking spaces shall be provided. c. A minimum of seven (7) bicycle spaces and one (1) motorcycle space shall be provided. Landscaping shall be provided in substantial conformance with Exhibit E (Landscape Plan), or as amended by these conditions. Building construction shall conform substantially with Exhibit D (Site Plan) and Exhibit F (Color Elevations), or as amended by these conditions. Colors and material for building construction shall conform substantially with Exhibit H (Color Board and Materials), or as amended by these conditions. Concrete building base Storefront Storefront doors Colors Perma White #SW2130 by Sherwin Willlares Painted mullions to match building color Tru-Vu blue-green heat-treated high performance glass Metal rollup doors & loading docks Tile accent Reveal trim Stormy Night #SW2100 by Sherwin Williams The Tile Garden blue green marble tile No. 6UT93 Melbourne Coast #SW1475 by Sherwin Willlares The maintenance of all landscaped areas shall be the responsibility of the developer. An Administrative Development Plan application for signage shall be required if signage is proposed. Prior to the Issuance of Grading Permits 10. The applicant shall comply with the provisions of Chapter 8.24 of the Temecula Municipal Code, regarding Habitat Conservation. 11. The applicant shall demonstrate by submittal of a written report that all mitigation measures identified in the MitigatiOn Monitoring Program have been satisfied for this stage of the development. Prior to the Issuance of Building Permits 11. A Consistency Check fee shall be paid. 12. A receipt or clearance letter from the Temecula Valley School District shall be submitted to the Planning Department to ensure the payment or exemption from School Mitigation Fees. 13. Three (3) copies of Construction Landscaping and Irrigation Plans shall be submitted to the Planning Department for approval and shall be accompanied by the appropriate filing fee. The location, number, genus, species, and container size of the plants shall be P-:\STAI~I~RPT~32PA96.FC ]0/30/t~ kJb 11 shown. These plans shall be consistent with the Water Efficient Ordinance. These plans shall include planting on slopes. The cover page shall identify the total square footage of the landscaped area for the site. 14. The applicant shall demonstrate by submittal of a written report that all mitigation measures identified in the Mitigation Monitoring Program have been satisfied for this stage of the development. Prior to the Issuance of Occupancy Permits 15. Roof-mounted equipment shall be inspected to ensure it is shielded from ground view. 16. All landscaped areas shall be planted in accordance with approved landscape, irrigation plans. 17. All required landscape planting and irrigation shall have been installed and be in a condition acceptable to the Director of Planning. The plants shall be healthy and free of weeds, disease, or pests. The irrigation system shall be properly constructed and in good working order. 18. Each parking space reserved for the handicapped shall be identified by a permanently affixed reflectorized sign constructed of porcelain on steel, beaded text or equal, displaying the International Symbol of Accessibility. The sign shall not be smaller than 70 square inches in area and shall be centered at the interior end of the parking space at a minimum height if 80 inches from the bottom of the sign to the parking space finished grade, or centered at a minimum height of 36 inches from the parking space finished grade, ground, or sidewalk, A sign shall also be posted in a conspicuous place, at each entrance to the off-street parking facility, not less than 17 inches by 22 inches, clearly and conspicuously stating the following: "Unauthorized vehicles not displaying distinguishing placards or license plates issued for physically handicapped persons may be towed away at owner's expense. Towed vehicles may be reclaimed at or by telephone 19. 20. 21. 22. In addition to the above requirements, the surface of each parking place shall have a surface identification sign duplicating the Symbol of Accessibility in blue paint of at least 3 square feet in size. Performance securities, in amounts to be determined by the Director of Planning to guarantee the removal of the maintenance and operations trailers, the temporary parking, and the temporary landscaping. All of the foregoing conditions shall be complied with prior to occupancy or any use allowed by this permit. The applicant shall demonstrate by submittal of a written report that all mitigation measures identified in the Mitigation Monitoring Program have been satisfied for this stage of the development. R:~STA~pA96.PC 10/~0/96 klb 12 BUILDING AND SAFETY DEPARTMENT 23. Comply with applicable provisions of the 1994 edition of the California Building, Plumbing and Mechanical Codes; 1993 National Electrical Code; California Administrative Code, Title 24 Energy and Disabled Access Regulations and the Temecula Municipal Code. 24. Submit at time of plan review, complete exterior site lighting plan in compliance with Ordinance No. 655 for the regulation of light pollution. 25. Obtain all building plan and permit approvals prior to the commencement of any construction work. 26. Obtain street addressing for all proposed buildings prior to submittal for plan review. 27. All buildings and facilities must comply with applicable disabled access regulations (California Disabled Access Regulations effective April 1, 1994). 28. Restroom fixtures, number and type, shall be in accordance with the provisions of the 1994 edition of the Uniform Plumbing Code, Appendix C. 29. Provide an approved automatic fire sprinkler system. 30. Provide disabled access from the public way to the main entrance of the building. PUBLIC WORKS DEPARTMENT Unless otherwise noted, all conditions shall be completed by the Developer at no cost to any Government Agency. It is understood that the Developer correctly shows on the tentative site plan all existing and proposed easements, traveled ways, improvement constraints and drainage courses, and their omission will subject the project to further review and may require revision. General Requirements 31. A Grading Permit for precise grading, including all onsite flat work and improvements, shall be obtained from the Department of Public Works prior to commencement of any construction outside of the City-maintained road right-of-way. 32. An Encroachment Permit shall be obtained from the Department of Public Works prior to commencement of any construction within an existing or proposed City right-of-way. 33. All improvement plans, grading plans, landscape and irrigation plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site and shall be submitted on standard 24" x 36" City of Temecula mylars. Prior to Issuance of a Grading Permit 34. A Grading Plan shall be prepared by a registered Civil Engineer and shall be reviewed and approved by the Department of Public Works. The grading plan shall include all necessary erosion control measures needed to adequately protect adjacent public and private property. R:XSTAFFRPTX232pA96.PC 10/30/96 35. 36. 37. 38. 39. 40. 41. 42. 43. The Developer must comply with the requirements of the National Pollutant Discharge Elimination System (NPDES) permit from the State Water Resources Control Board. No grading shall be permitted until an NPDES Notice of Intent (NOI) has been filed or the project is shown to be exempt. As deemed necessary by the Department of Public Works, the Developer shall receive written clearance from the following agencies: San Diego Regional Water Quality Control Board Riverside County Flood Control and Water Conservation District Planning Department Department of Public Works A Soils Report shall be prepared by a registered Soils or Civil Engineer and submitted to the Department of Public Works with the initial grading plan check. The report shall address all soils conditions of the site, and provide recommendations for the construction of engineered structures and pavement sections. The Developer shall have a Drainage Study prepared by a registered Civil Engineer in accordance with City Standards identifying storm water runoff expected from this site and upstream of this site. The study shall identify all existing or proposed public or private drainage facilities intended to discharge this runoff. The study shall also analyze and identify impacts to downstream properties and provide specific recommendations to protect the properties and mitigate any impacts. Any upgrading or upsizing of downstream facilities, including acquisition of drainage or access easements necessary to make required improvements, shall be provided by the Developer. The Developer shall post security and enter into an agreement guaranteeing the grading and erosion control improvements in conformance with applicable City Standards and subject to approval by the Department of Public Works. The Developer shall comply with all constraints which may be shown upon an Environmental Constraint Sheet (ECS) recorded with any underlying maps related to the subject property. The Developer shall obtain any necessary letters of approval or slope easements for offsite work performed on adjacent properties as directed by the Department of Public Works. An Area Drainage Plan fee shall be paid to the Riverside County Flood Control and Water Conservation District prior to issuance of any permit. The Developer shall accept and properly dispose of all off-site drainage flowing onto or through the site. In the event the Department of Public Works permits the use of streets for drainage purposes, the provisions of Section XI of Ordinance No. 460 will apply. Should the quantities exceed the street capacity, or use of s~reets be prohibited for drainage purposes, the Developer shall provide adequate facilities as approved by the Department of Public Works. R:\STAFFRFI~232pA~.PC 10/30/96 tlb 14 44. Easements for sidewalks for public uses shall be submitted to and approved by the Department of Public Works for dedication to the City where sidewalks meander through private property. Prior to Issuance of a Building Permit 45. Improvement plans and/or precise grading plans shall conform to applicable City Standards subject to approval by the Department of Public Works. An Encroachment Permit will be required for any work performed within the City right-of-way. The following design criteria shall be observed: a. Flowline grades shall be 0.5% minimum over P.C.C. and 1.00% minimum over A.C. paving. b. Driveways shall conform to the applicable City of Temecula Standard No. 207A. c. Street lights shall be installed along the public streets adjoining the site in accordance with Ordinance 461 and shall be shown on the improvement plans as directed by the Department of Public Works. d. All street and driveway centerline intersections shall be at 90 degrees or as approved by the Department of Public Works. e. Landscaping shall be limited in the corner cut-off area of all intersections and adjacent to driveways to provide for minimum sight distance and visibility. f. All concentrated drainage directed towards the public street shall be piped or conveyed through undersidewalk drains. The Developer shall construct or post security and an agreement shall be executed guaranteeing the construction of the following public improvements in conformance with applicable City Standards and subject to approval by the Department of Public Works. a. Street improvements, which may include, but not limited to: drive approaches and street lights The building pad shall be certified to' have been substantially constructed in accordance with the approved Precise Grading Plan by a registered Civil Engineer, and the Soils Engineer shall issue a Final Soils Report addressing compaction and site conditions. The Developer shall deposit with the Engineering Department a cash sum as established per acre as mitigation for traffic signal impact. The Developer shall pay any capital fee for road improvements and public facilities imposed upon the property or project, including that for traffic and public facility mitigation as required under the EIR/Negative Declaration for the project. The fee to be paid shall be in the amount in effect at the time of payment of-the fee. If an interim or final public facility mitigation fee or district has not been finally established by the date on which the Developer requests its building permit for the project or any phase thereof, the Developer shall execute the Agreement for payment of Public Facility fee, a copy of 46. 47. 48. 49. R:\STAFFRPT~32pA~6.1~ 10/30/96 ~b 15 which has been provided to the Developer. Concurrently, with executing this Agreement, the Developer shall secure payment of the Public Facility fee. The amount of the security shall be $2.00 per square foot, not to exceed $10,000. The Developer understands that said Agreement may require the payment of fees in excess of those now estimated (assuming benefit to the project in the amount of such fees). By execution of this Agreement, the Developer will waive any right to protest the provisions of this Condition, of this Agreement, the formation of any traffic impact fee district, or the process, levy, or collection of any traffic mitigation or traffic impact fee for this project; ~ that the Developer is not waiving its right to protest the reasonableness of any traffic impact fee, and the amount thereof. 50. The Developer shall record a written offer to participate in, and wave all rights to object to the formation of an Assessment District, a Community Facilities District, or a Bridge and Major Thoroughfare Fee District for the construction of the proposed raised landscaped median on Ynez Road in accordance with the General Plan. The form of the offer shall be subject to the approval of the City Engineer and City Attorney. Prior to Issuance of a Certificate of Occupancy 51. As deemed necessary by the Department of Public Works, the Developer shall receive written clearance from the following agencies: Rancho California Water District Eastern Municipal Water District Department of Public Works 52. All necessary certifications and clearances from engineers, utility companies and public agencies shall be submitted as required by the Department of Public Works. 53. All public improvements shall be constructed and completed per the approved plans and City standards to the satisfaction of the Director of Public Works. 54. The existing improvements shall be reviewed. Any appurtenance damaged or broken shall be repaired or removed and replaced to the satisfaction of the Department of Public Works. OTHER AGENCIES 55. The applicant shall comply with the recommendations set forth in the County of Riverside Department of Environmental Health's transmittal dated October 22, 1996, a copy of which is attached. 56. The applicant shall comply with the recommendations set forth in the Rancho California Water District's transmittal dated September 19, 1996, a copy of which is attached. 57. The applicant shall comply with the recommendations set forth in the Eastern Municipal Water District's transmittal dated September 24, 1996, a copy of which is attached. R:\STA~2PA96,FC 10~30/~ kl~ 16 58. The applicant shall comply with the recommendation set forth in the California Historical Resources Information System transmittal dated October 2, 1996, a copy of which is attached. 59. The applicant shall comply with the recommendations set forth in the County of Riverside Fire Department transmittal dated October 24, 1996, a copy of which is attached. R:~STA~2PAg~.PC 10/30/96 klb 17 TO: FROM RE: County of Riverside DEPARTMENT OF ENVIRONMENTAL HEALTH DATE: October 22, 1996 CITY OF TEMECULA PLANNING DEPARTMENT ATTN: Carole Donahoe ~GOR DELLENBACH, Environmental Health Specialist IV PLOT PLAN NO. PA96-0232 1. Department of Environmental Health has reviewed the Plot Plan No. PA96-0232 and has no objections, 2. PRIOR TO PLAN CHECK SUBMITTAL ISSUANCE: a) "Will-serve" letters from the appropriate water and sewering districts. b) If there are to be any food establishments, (including vending machines), three complete sets of plans for each food establishment will be submitted including a fixture schedule. a finish schedule and a plumbing schedule in order to ensure compliance with the California Uniform Retail Food Facilities Law 2. c) If there are to be any hazardous materials, a clearance letter from the Department of Environmental Health Hazardous Materials Management Branch (358-5055) will be required indicating that the project has been cleared for: · Underground storage tanks. Ordinance # 617.4. · Hazardous Waste Generator Services, Ordinance # 615.3. · Hazardous Waste Disclosure (in accordance with Ordinance # 651.2). · Waste reduction mana/gement. GD:dr (909) 285-8980 cc: Doug Thompson. Hazardous Materials Branch John F, Hennigar PhiHip L Forbes Kenneth C. Dealy Linda M. Fregoso September 19, 1996 Ms. Carole Donahoe, Case Planner City of Temecula Planning Department 43174 Business Park Drive Temecula, CA 92590 SUBJECT: Water Availability Parcel 10 of Parcel Map 21361 APN 910-110-042 Planning Application No. PA96-0232 Dear Ms. Donahoe: Please be advised that the above-referenced property is located within the boundaries of Rancho California Water District (RCWD). Water service, therefore, would be available upon completion of financial arrangements between RCWD and the property owner. If fire protection is required, customer will need to contact RCWD for fees and requirements. Water availability would be contingent upon the property owner signing an Agency Agreement which assigns water management rights, if any, to RCWD. If you have any questions, please contact an Engineering Services Representative at this office. Sincerely, RANCHO CALIFORNIA WATER DISTRICT Steve Brannon, P.E. Development Engineering Manager %ISB:mg2161FOI21FEF cc: Laurie Williams, Engineering Services Supervisor Carole Donahoe City of Temecula P.O. Box 9033 Temecula, CA 92589-9033 1996 I SEP Z ? 1998 By SUBJECT: PA96-0232 (Four-Sher) - Agency Case Transmittal Dear Mrs. Donahoe: We have reviewed the materials transmitted by your office which describe the subject project. Our comments are outlined below: Our understanding is the proposed subject project will develop a 92,182 sq. ft. warehouse and distribution facility for Four-Sher Development on 4.88 gross acres in Parcel 10 of PM 21361 (APN 910- 110-042). The subject project is located on the east side of Ynez Road, north of County Center Drive in the City of Temecula. The subject project is within the District's sewer service boundary. A matter of importance which must be understood is the available service capabilities of the District's systems are constantly changing due to the continuous development within the District and the improvement of District facilities. Hence, the service for the subject project will be dependent upon the available capacity of the District's systems at the time service agreements are made with the District. DOMESTIC WATER The subject project is outside of EMWD's water service area. Any potable water service must be arranged with the Rancho California Water District. Mail to: Post Office Box 8300 San Jacinto, California 92581-8300 Telephone (909) 925-7676 Fax (909) 929-0257 Main Office: 2045 S. San Jacinto Avenue, San Jacinto Customer Service / Engineering Annex: 440 E. Oak]and Avenue, Hemct, CA Operations & Maintenance Center: 2270 Trumble Road, Perris, CA 92571 Telephone (909) 928-3777 hx (909) 928-6177 Carole Donahoe PA 96-0232 Page 2 SANITARY SEWER The subject project is tributary to the District's Temecula Valley Regional Water Reclamation Facility. A 12-inch VCP sewer is in Ynez Road (SD-6375). The 12-inch gravity sewer main is adequate to serve the subject project. Three 6-inch sewer laterals extend from the 12-inch main to the subject project. The laterals are located at 717 feet, 733 feet and 1265 feet north of the centerline of County Center Road. Any of these laterals may be used to serve the project site. However, the subject project must be reviewed by the District's Source Control Division to determine the need for grease traps, sand traps, sampling boxes or other provisions. RECLAIMED WATER The project is outside of EMWD's water service area. Reclaimed water usage must be arranged with Rancho California Water District. ADDITION~T. INFORMATION Additions or improvements to off-site facilities are not required to adequately serve the subject project. This transmittal serves as the plan-of-service for this project. The project will be processed through the Customer Service Department for determination of appropriate fees and Source Control requirements. Tracking of the project shall be coordinated through the "One-Stop" program by Ms. Judith Conacher at (909) 766-1810, ext. 4409. Thank you for soliciting our c6ncerns. If you have any questions regarding the above matter, please call me at (909) 766-1810. Sincerely, EASTERN MUNICIPAL WATER DISTRICT Mike Gow Civil Engineer Customer Service Department cc: Judy Conacher, EMWD Development Coordinator CALIFORNIA HISTORICAL RESOURCES INFORMATION SYSTEM INYO RWERSIDE Eastern Information Center Department of Anthropology UniverSity of California Riverside, CA 92521-O418 Phone (909) 787-5745 Fax (909) 787-5409 CULTURAl, RESOURCE REVIEW DATE: ~e~' ILE: Case Transmittal Reference Designation: Records at the Eastern Information Center of the California Historical Resources Information System have been reviewed to determine if this project would adversely affect prehistoric or historic cultural resources: The proposed project area has not been surveyed for cultural resources and contains or is adjacent to known cultural resource(s). A Phase I study is recommended. Based upon eating data the proposed project area Ms the potential for containing cultural resources. A Phase I study is recommended. A Phase I cultural resource study (MF # ) identified one or more cultural resources. The project area contains, or has the possibRity of containing, cultural resources. However, due to the nature of the project or prior data recovery studies, an adverse effect on cultural resources is not anticipated. Further study is not recommended. A Phase I cultural resource study (MF # ~$7~ ) identified no cultural resources. Further study is not recommcnded. There is a low probability of cultural resources. Further study is not recommended. If, during construction, cultural resources are encountered, work should be halted or diverted in the immediate area while a qualified archaeologist evaluates the finds and makes recommendations. Due to the arehaeclogical sensitivity of the area, earthmoving during constr~ctinn should be monitored by a professional archaeologist. The submission of a cultural resoumc management report is recommended following guidelines for Archaeological Resource Management Reports prepaM by the California Office of Historic Preservation, Preservation Planning Bulletin 4(aj. December 1989. Phase I Phase 11 Phase Ill Phase IV Records search and field survey Testing Evaluate resource significance; propose mitigation measures for "significant" sites.] Mitigation [Data recovery by excavation, preservation in place, or a combination of the two .l Monitor earthmoving activities COMMENTS: If you have any questions, please contact us. Eastern Information Center City of Temecula 43200 I~slne~ Park Drh,'e · Temecula, CA 92590 - iv~lllng Adc~r P 0, BOx 9033 · Ternecula, CA 92589-9033 19091694do444 · FBX [9091694-1999 October 24, 1996 TO: A~I~: RE: PLANNING DEPARTMENT CAROLE DONAHOE PA 96-0232 With respect to the conditions of approval for the above referenced plot plan, the Fire Department recommends the following fire protection measures be provided in accordance with Temecula Ordinances and/or recognized fire protection standards: The fire Department is required to set a minimum fire flow for the remodel or construction of all commercial building using the procedures established in Ordinance 546. A fire flow of 4000 GPM for a 3 hour duration at 20 PSI residual operating pressure must be available before any combustible material is placed on the job site. A comb'mation of on.site and off-site super fire hydrants, on a looped system (6"x4"x2-2 xh "), will be located not less than 25 feet or more than I65 feet from any portion of the building as measured along approved vehicular travelways. The required fire flow shall be available from any adjacent hydrant(s) in the system. Applicant/developer shall furnish 9n~"~.opy of the water plans to the Fire Department for review. Plans shall be signed by-a registered civil engineer, containing a Fire Department approval signature block, and shall conform to hydrant type, location, spacing and minimum fire flow. Once the plans are signed by the local water company, the originals shall be presented to the Fire Department for signature. The required water system, including fire hydrants, shall be installed and accepted by the appropriate water agency prior to any combustible building materials being placed on the job site. Prior to the issuance of building permits, the developer shall pay $.25 per square foot as mitigation for fire protection impacts. Prior to the issuance of building permits, the applicant/developer shall be responsible to submit a plan check fec of $582.00 to the City of Temecula. THE FOLLOWING CONDITIONS MUST BE MET PRIOR TO OCCUPANCY. 10. 11. 12. 13. 14. 15. 16. Install a complete fire sprinkler system in all buildings. The post indicator valve and FIre department connection shall be located to the front of the building, within 50 feet of a hydrant, and a minimum of 25 feet from the building(s). A statement that the building will be automatically fire sprinkled must be included on the title page of the building plans. Install a supervised waterflow monitoring fire alarm system. Plans shall be submitted to the Fire Department for approval prior to installation. Knox Key lock boxes shall be installed on all buiMings/suites. If building/suite requires H~nrdous Mamrial Reporting (h~aterial Safety Data Sheets) the Knox HAZ MAT Data and key storage cabinets shall be installed. If building/suites are protected by a fire or burglar alarm system, the boxes will require "Tamper" monitoring. Plans shall be submitted to the Fire Department for approval prior to installation. All exit doors shall be openable without the use of key or special knowledge or effort. Occupancy separation walls will be required as per the Uniform Building Code, Section 503. Install portable fire extinguishers with a minimum rating of 2AIOBC. Fire extinguishers located in public areas shall be in recessed cabinets mounted 48" (inches) to center above floor level with a maximum 4' projection from wall. R is prohibited to usedprocess or store any materials in this occupancy that would classify it as an "H' occupancy per Chapter 9_, 9f the Uniform Building Code. Blue dot reflectors shall be motm~ed in private streets and driveways to indicate location of fire hydrants. They shall be mounted in the middle of the street directly in line with fire hydrant. Street address shall be posted, in a visible location, minimum 12 inches in height, on the street side of the building with a contrasting background. All buildings shall be constructed with fire retardant roofing materials as described in The Uniform Building Code. Any wood shingles or shakes shall be a Class 'B" rating and shall be approved by the fire department prior to installation. 17. Final conditions will be addressed when building plans are reviewed in the Building and Safety Office. 18. Please contact the Fire Department for a final inspection prior to occupancy. All questions regarding the meaning of these conditions shall be referred to the Fire Department Planning and engineering section (909)694-6439. Laun Cabral Fire Safety Specialist ATTACHMENT NO. 2 INITIAL ENVIRONMENTAL STUDY R:\STAFFRIq'X232PA96.1~ 10/30~96 klb 18 CITY OF TEMECULA Environmental Checklist Amended October 29, 1996 2. 3. 4. 10. Project Title: Lead Agency Name and Address: Contact Person and Phone Number: Project Location: Project Sponsor's Name and Address: General Plan Designation: Zoning: Description of Project: Surrounding Land Uses and Setting: Other public agencies whose approval is required: Planning Application No. PA96-0232 (Development Plan - Fast Track) City of Temecula, 43174 Business Park Drive, Temecula, CA 92590 Carole Donahoe, Project Planner (909) 694- 6400 East of Ynez Road, north of County Center Drive, In the Winchester Highlands Business Park Four-Sher Development Company, 990 Highland Drive, Suite 202, Solana Beach, CA 92075 BP (Business Park) LI (Light Industrial) To construct and operate a two-story, 92,182 square foot warehouse/distribution facility on 4.88 gross acres. Vacant parcels to the west and to the south, industrial buildings to the north and east Riverside County Fire Department, Riverside County Department of Environmental Health, Temecula Police Department, Eastern Municipal Water District, Rancho California Water District, Southern California Gas Company, Southern California Edison Company, and General Telephone Company. R:tSTAFFRFB232PA~.I~C 10/30/96 {LIb 19 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. [ ] Land Use and Planning [ ] Hazards [ ] Population and Housing [ ] Noise iX] Geologic Problems iX] Public Services iX] Water [ ] Utilities and Service Systems [ ] Air Quality iX] Aesthetics iX] Transportation/Circulation [ ] Cultural Resources [ ] Biological Resources [ ] Recreation iX} Energy and Mineral Resources [ ] Mandatory Findings of Significance AMENDED ASSESSMENT Additional information was considered subsequent to the preparation of the Environmental Assessment for this project. This information, noted below, has resulted in an Amended Environmental Assessment dated October 29, 1996. While the project site is located within the designated Stephen's Kangaroo Rat Habitat Fee Area, the site has been previously disturbed and graded, and streetscape has already been installed in the entire area known as Winchester Highlands Business Park. There are no native species of plants or vegetation at the site, nor any indication that any wildlife species exist, or that the site serves as a migration corridor. Transportation/Circulation mitigation measures that require the payment of Public Facility Fees and Traffic Signal Mitigation Fees are required prior to the issuance of a building permit. Mitigation measures that address the project's impacts to aesthetics include architectural enhancements to the building design, location of loading bays, and conformance with the submitted Color and Materials Board, Landscaping Plans and Elevations. R:~STAFFRPT~32pA~6.PC 10/30/~6 klb 20 DETERMINATION On the basis of this initial evaluation I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the mitigation measures described on an attached sheet have been added to the project. A NEGATIVE DECLARATION will be prepared. Signature Date: October 29, 1996 Printed Name: Carole K. Donahoe For: City of Temecula R:L~TAFFRFB232PA~.PC 10/30/~ klb 21 · ' ........ . SIgnificant .'. Mitigation ' Significant. . N~ ISsues.and 'SuppORing:Information SoUrces ...'i,,p,ct .. ":.lncorlar=ted':' ...'4n~act :.. Impact 1. LAND USE AND PLANNING. Would the proposal: a. Conflict with general plan designation or zoning? (Source 1, Figure 2-1, Page 2-17} Conflict with applicable environmental plans or policies adopted by agencies with jurisdiction over the project? c. Be incompatible with existing land use in the vicinity? (Source 1, Figure 2-1, Page 2-17) Affect agricultural resources or operations (e.g. impacts to soils or farmlands, or impacts from incompatible land uses)? (Source 1, Figure 5- 4, Page 5-17) Disrupt or divide the physical arrangement of an established community (including low- income or minority community)? 2. POPULATION AND HOUSING. Would the proposal: a. Cumulatively exceed official regional or local population projections? Induce substantial growth in an area either directly or indirectly (e.g. through project in an undeveloped area or extension of major infrastructure)? c. Displace existing housing, especially affordable housing? GEOLOGIC PROBLEMS. Would the proposal result in or expose people to potential impacts involving: a. Fault rupture? (Source 1, Figure 7-1, Page 7- 6) b. Seismic ground shaking? (Source 1, Figure 7- 1, Page 7-6) c. Seismic ground failure, including liquefaction? (Source 1, Figure 7-2, Page 7-8) d, Seiche, tsunami, or volcanic hazard? e. Landslides or mudflows? X X X X X X X X X X X X X I R:~STAFFRPT~232pA96.1~C 10/30/9~ kJb 22 '. ·IssUes and' Supporting:Information Sources f. Erosion, changes in topography or unstable soil conditions from excavation, grading or fill? g~ Subsidence of the land? (Source 1, Figure 7- 2, Page 7-8) h. Expansive soils? I. Unique geologic or physical features? 4. WATER. Would the proposal result in: a. Changes in absorption rates, drainage patterns, or the rate and mount of surface runoff? b. Exposure of people or property to water related hazards such as flooding? (Source 1, Figure 7-3 and Figure 7-4, Pages 7-10 and 7- 12) c. Discharge into surface waters or other alteration of surface water quality (e.g. temperature, dissolved oxygen or turbidity)? d. Changes in the amount of surface water in any water body7 e. Changes in currents, or the course or direction of water movements? f. Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations or through substantial loss of groundwater recharge capability? g. Altered direction or rate of flow of groundwater? h. Impacts to groundwater quality? I. Substantial reduction in the amount of groundwater otherwise available for public water supplies? 5. AIR QUALITY. Would the proposal: a. Violate any air quality standard or contribute to an existing or projected air quality violation? (Source 5, Table 6-2, Page 6-10) Potentially Impact · SIgnificant: · Mitigation....' .. SlOnlficant '.lncorporstsd "'|rnpsct X X X X X X X X X Impact X X X X X R:~STAI~R~Y~32PA96.l~C 10/30/~ klb 23 · Issues and 'Sup'p0r;~ing ·Information· SOurces b. Expose sensitive receptors to pollutants? c. Alter air movement, moisture or temperature, or cause any change in climate? d. Create objectionable odors? TRANSPORTATION/CIRCULATION. Would the proposal result in: a. Increase vehicle trips or traffic congestion? b. Hazards to safety from design features (e.g. sharp curves or dangerous intersection or incompatible uses (e.g. farm equipment)? c. Inadequate emergency access or access to nearby uses? d. Insufficient parking capacity on-site or off-site? (Source 2, Table 17.24(a), Page 17.24-9) e. Hazards or barriers for pedestrians or bicyclists? f. Conflicts with adopted policies supporting alternative transportation (e.g. bus turnouts, bicycle racks)? (Source 2, Chapter 17.24, Page 12) g. Rail, waterborne or air traffic impacts? BIOLOGICAL RESOURCES. Would the proposal result in impacts to: a. Endangered, threatened or rare species or their habitats (including but not limited to plants, fish, insects, animals and birds)? (Source 1, Figure 5-3, Page 5-15) b. Locally designated species (e.g. heritage trees)? (Source 1, Figure 5-3, Page 5-15) c. Locally designated natural communities (e.g. oak forest, coastal habitat, etc.)? (Source 1, Figure 5-3, Page 5-15) d. Wetland habitat (e.g. marsh, ripanan and vernal pool)? (Source 1, Figure 5-3, Page 5- 15) X X X X X X X X X X X X X X R:%STAFFRPT%232pA96.PC 10/30/96 kib 24 Issues and Supporting Information Sources e. Wildlife dispersal or migration corridors? 8. ENERGY AND MINERAL RESOURCES. Would the proposal: a. Conflict with adopted energy conservation plans? b. Use non-renewable resources in a wasteful and inefficient manner? c. Result in the loss of availability of a known mineral resource that would be of future value to the region and the residents of the State? 9. HAZARDS. Would the proposal involve: a. A risk of accidental explosion or release of hazardous substances (including, but not limited to: oil, pesticides, chemical or radiation)? (Source 1, Figure 7-5, Page 7-14) b. Possible interference with an emergency response plan or emergency evacuation plan? co The creation of any health hazard or potential health hazard? d. Exposure of people to existing sources of potential health hazards? e. Increase fire hazard in areas with flammable brush, grass, or trees? 10. NOISE. Would the proposal result in: a. Increase in existing noise levels? b. Exposure of people to severe noise levels? (Source 1, Figures 8-3, 8-4, and 8-5, Pages 8- 11, 8-12 and 8-14) 11. PUBLIC SERVICES. Would the proposal have an effect upon, or result in a need for new or altered government services in any of the following areas: a. Fire protection? b. Police protection? Potendally Significant Implct X I' X X X X X X No Impact X X X X X X R:~STAFFRFI'~32PA~.PC 10/30/96 klb 25 · issues· and"Suppo~in9 informatiOn:SourceS . ...s~...,~ ..:..M.~.t~ c. Schools7 X d. Maintenance of public facilities, including roads7 e. Other governmental services? 12, UTILITIES AND SERVICE SYSTEMS. Would the proposal result in a need for new systems or ~pplies, or substantial alterations to ~e following utilizes: a. Power or natural gas? b. Communications systems7 c. Local or regional water treatment or distribution facilities7 d. Sewer or septic tanks? e. Storm water drainage? f. Solid waste disposal? g. Local or regional water supplies? 13. AESTHETICS. Would the proposal: a. Affect a scenic vista or scenic highway? b. Have a demonstrable negative aesthetic X effect? c. Create light or glare? X 14. CULTURAL RESOURCES. Would the proposal: 8. Disturb paleontological resources? (Source 1, Figure 5-7, Page 5-22 and Source 4) b. Disturb archaeological resources? (Source 1, Figure 5-6, Page 5-21 and Source 4) c.Affect historical resources? (Source 3, Page 281) d. Have the potential to cause a physical change which would affect unique ethnic cultural values? Le$8 Then · Significant X X X X X X X X X X X X X X R:~TAFFRlri~232PA96.PC 10/30/96 lr. lb 2~ Issues .and" suppo'rting Information. sources' '.'. e. Restrict existing religious or sacred uses within the potential impact area? 15. RECREATION. Would the proposal: a. Increase the demand for neighborhood or regional parks or other recreational facilities7 Potentlily . . .~rde~..'.' ... .Lea~ Than ' · Signlficar~ · Mitigation. ' ~nfficant. Implc~ 'Incorporated Impact X X b. Affect existing recreational opportunities? 16. MANDATORY FINDINGS OF SIGNIFICANCE. Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number of restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? Does the project have the potential to achieve short-term, to the disadvantage of long-term, environmental goals? Does the project have impacts that area individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects). Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly7 17. EARLIER ANALYSES. None X X X X X SOURCES: 1. City of Temecula General Plan 2. City of Temecula Development Code R:~STAFFRPT~32pA96.PC 10/30/96 klb 27 · ..: ....... Issues 'and :.sUppOrting :i~iformation :.s0'L,:~eS 'i..'.:.';5 .s~.m..t. ;. EMitiglltlon:':: :: ~llgntfldam:'." No . '. · . · . .Impact.....:: :."lheorporated":' L:':'lmplct.. '. :.impact 3. City of Temecula General Plan Final Environmental Impact Report 4. University of California, Riverside, Eastern Information Center Cultural Resource Review, dated October 2, 1996 5. South Coast Air Quality Management District CEQA Air Quality Handbook R:\STAFFRFr~32pA96.pC 10/30/96 k~ 28 DISCUSSION OF THE ENVIRONMENTAL IMPACTS Land Use and Planning 1.b. The project will not conflict with applicable environmental plans or policies adopted by agencies with jurisdiction over the project. The project is consistent with the City's General Plan land use designation of BP (Business Park) as well as the zoning of LI (Light Industrial). Impacts from all General Plan land use designations were analyzed in the Environmental Impact Report (EIR) for the General Plan. Agencies with jurisdiction within the City commented on the scope of the analysis contained in the EIR and how the land uses would impact their particular agency. Mitigation measures approved with the EIR will be applied to this project. Further, all agencies with jurisdiction over the project are also being given the opportunity to comment on the project, and it is anticipated that they will make the appropriate comments as to how the project relates to their specific environmental plans or policies. The project site has been previously graded and services have been extended into the area. There will be limited, if any, effects on adopted environmental plans or policies. No significant effects are anticipated as a result of this project. The project will not disrupt or divide the physical arrangement of an established community (including low-income or minority communities). The project is a warehouse and distribution facility within the already existing Winchester Highlands Business Park. Similar uses already surround the project site. There is no established residential community (including low-income or minority communities) at this site. No significant effects are anticipated as a result of this project. Pooulation and Housing 2.a. The project will not cumulatively exceed official regional or local population projections. The project is a warehouse and distribution facility consistent with the City's General Plan land use designation of LI (Light Industrial). Since the project is consistent with the City's General Plan, and does not exceed the floor area ratio for Light Industrial, it will not be a significant contributor to population growth which will cumulatively exceed official regional or local population proiections. No significant effects are anticipated as a result of this project. 2.b. The project will not induce substantial growth in an area either directly or indirectly. The project site is within the Winchester Highlands Business Park which is partially developed, and infrastructure exists to the site. 2.c. The project will not displace housing, especially affordable housing. The project site is vacant. No significant effects are anticipated as a result of this project. R:~STAFFRFI'~232pA96.PC 10/30/96 Geologic Problems 3.b,c, f,h. The project may expose people to potential impacts involving seismic ground shaking, seismic ground failure and expansive soils, and less than significant impacts involving erosion, changes in topography or unstable soil conditions from excavation, grading or fill. The project is located in Southern California, an area which is seismically active. The site lies within Ground shaking Zone II which is expected to vary from moderate to intense in the event of an earthquake, depending on the composition of underlying geologic formations, the earthquake's epicenter and the order of magnitude of the seismic event. The site is located near the Santa Gertrudis Creek which is an area of potential liquefaction. Potentially significant impacts will be mitigated through building construction consistent with the most recent Uniform Building Code seismic design standards. Furthermore, preliminary soils reports are required and reviewed as part of the application submittal, and recommendations contained in these reports are used to determine appropriate conditions of approval for the project. The soils reports will also contain recommendations for the compaction of the soil which will serve to mitigate any potentially significant impacts from seismic ground shaking, seismic ground failure (including liquefaction), erosion, changes in topography or unstable soil conditions from excavation, grading or fill and expansive soils. Increased wind and water erosion of soils both on and off-site may occur during the construction phase of the project, and the project may result in changes in siltation, deposition or erosion. Erosion control techniques will be included as a condition of approval for the project. In the long-run, hardscape and landscaping will serve as permanent erosion control for the project. Modification to topography and ground surface relief features will not be considered significant since modifications will be consistent with the surrounding development. Potential unstable soil conditions from excavation, grading or fill will be mitigated through the use of landscaping and proper compaction of the soils. After mitigation measures are performed, no impacts are anticipated as a result of this project. 3.d. The project will not expose people to a seiche, tsunami or volcanic hazard. The project is not located in an area where any of these hazards could occur. No significant effects are anticipated as a result of this project. 3.e. The project will not expose people to landslides or mudflows. The Final Environmental Impact Report (EIR) for the City of Temecula General Plan did not identify any known landslide or mudslide hazard areas on or near the project site. No significant impacts are anticipated as a result of this project. 3.i. The project will not impact unique geologic or physical features. No unique geologic features or physical features exist on the site. No significant impacts are anticipated as a result of this project. R:\STAFFRPT~?32pA96.~C 10/30/96 klb 30 4.c. 4.d,e. 4.f,g,h. 4.1 The project will result in changes in absorption rates, drainage patterns, and the rate and amount of surface runoff; however, these changes are considered less than significant. Previously permeable ground will be rendered impervious by construction of buildings, accompanying hardscape and driveways. While absorption rates and surface runoff will change, potential impacts shall be mitigated through site design. Drainage conveyances will be required for the project to safely and adequately handle runoff which is created. After mitigation measures are performed, no significant impacts are anticipated as a result of this project. The project may have a potentially significant effect on discharge into surface waters and alteration of surface water quality. Prior to issuance of a grading permit for the project, the developer will be required to comply with the requirements of the National Pollutant Discharge Elimination System (NPDES) permit from the State Water Resources Control Board. No grading shall be permitted until an NPDES Notice of Intent has been filed or the project is shown to be exempt. By complying with the NPDES requirements, any potential impacts can be mitigated to a level less than significant. After mitigation measures are performed, no significant impacts are anticipated as a result of this project. The project will have a less than significant impact on changes in the amount of surface water in any water body and on changes in currents, or the course of direction of water movements. Additional surface runoff will occur because previously permeable ground will be rendered impervious by construction of buildings, accompanying hardscape and driveways. Due to the limited scale of the project, however, the additional amount of drainage of drainage into Murrieta Creek or Santa Gertrudis Creek will not be considered significant. No significant impacts are anticipated as a result of this project. The project will have a less than significant change in the quantity, direction or rate of flow, or the quality of ground water. Limited changes will occur; however, due to the minor scale of the project, it will not be considered significant. Construction on the site will not be at depths sufficient to have a significant impact on ground water. No significant impacts are anticipated as a result of this project. The project will not result in a substantial reduction in the amount of ground water otherwise available for public water supplies. According to information contained in the Final Environmental Impact Report (EIR) for the City of Temecula General Plan, "Rancho California Water District indicates that they can accommodate additional water demands." Water service currently exists in the immediate vicinity of the project site. Water service will be provided by Rancho California Water District upon completion of financial arrangements between the District R:\STA~2PA~6.~ 10/30/~ kl~ 3 1 and the property owner. No significant impacts are anticipated as a result of this project. Air Quality 5.b. The project will not expose sensitive receptors to pollutants. The project is not located near sensitive receptors, and is not projected to generate significant pollutants. No significant impacts are anticipated as a result of this project. 5.c. The project will not alter air movement, moisture or temperature, or cause any change in climate. The limited scale of the project precludes it from creating any significant impacts with regards to climatic conditions in the area. No significant impacts are anticipated as a result of this project. 5.d. The project will create some objectionable odors during the construction phase of the project. These impacts will be of short duration and are not considered significant. No other objectionable odors are anticipated as a result of this project. Transportation/Circulation 6,a. The project will result in a less than significant increase in vehicle trips, but will add to traffic congestion. It is anticipated that this project will contribute 55 to 185 vehicle trip ends per day. Congestion at the intersection of Ynez Road and County Center Drive, as well as the intersection of Ynez Road and Winchester Road will increase. However, Ynez Road and Winchester Road in the vicinity of the project is designated and designed to handle the built-out of the industrial park. The applicant will be required to provide facilities for motorcycle parking and bicycle racks, and to pay traffic signal mitigation fees and public facility fees as conditions of approval for the project. After mitigation measures are performed, no significant impacts are anticipated as a result of this project. 6.b. The project will not result in hazards to safety from design features. The project is designed to current City standards and does not propose any hazards. No significant impacts are anticipated as a result of this project. 6.c, The project will not result in inadequate emergency access or inadequate access to nearby uses. The project is designed to current City standards and has adequate emergency access. The project does not interfere with access to nearby uses, which are similar business park/industrial uses. No significant impacts are anticipated as a result of this project. R:~TAFFRPT~32PA96.l~C 10/30/~ k~ 3~ 6.e. The project will not result in hazards or barriers for pedestrians or bicyclists. Hazards or barriers are not proposed for the project. The project is designed to current City standards requiring sidewalks and bicycle racks, No significant impacts are anticipated as a result of this project. 6.g, The project will not result in rail, waterborne or air traffic impacts. Rail, waterborne or air traffic do not exist in the immediate proximity of the project site. No significant impacts are anticipated as a result of this project. Biological Resources 7.a,e. The project will not result in an impact to endangered, threatened or rare species or their habitats, or to wildlife dispersal or migration corridors. The project site has been previously disturbed and graded, and streetscape installed on site. There are no native species of plants or vegetation at the site, nor any indication that any wildlife species exist, or that the site serves as a migration corridor. The project site is located within the Stephen's Kangaroo Rat Habitat Fee Area, however, and Habitat Conservation fees will be required to mitigate the effect of cumulative impacts to the species. and Mineral Resources The project will affect adopted energy conservation plans. The project will be reviewed for compliance with all applicable laws pertaining to energy conservation during the plan check stage of development. No permits will be issued unless the project is found to be consistent with these applicable laws. After mitigation is performed, no significant impacts are anticipated as a result of this project. The project will result in a less than significant impact upon the use of non-renewable resources. There will be an increase in the rate of use of natural resources and in the depletion of construction materials, fuels for daily operation, asphalt, and lumber, However, because of the scale of the proposed project, these impacts are seen as less than significant. No significant impacts are anticipated as a result of this project. The project will not result in the loss of the availability of a known mineral resource that would be of future value to the region and the residents of the State. No known mineral resource that would be of future value to the region and to the residents of the State are located at this project site. No significant impacts are anticipated as a result of this project. Energy 8.a. 8.b. R:~TAFFR]~T~32PA96.PC 10/30/9~ lab 33 9.b. 9.c,d,e. Noise lO.a. The project will result in a less than significant impact due to risk of explosion, or the release of any hazardous substances in the event of an accident or upset. The applicant may sell or distribute hazardous substances. However, they are regulated by both the Fire Department and the Department of Environmental Health. The applicant must receive clearance, including any storage or use of hazardous materials, from the Department of Environmental Health prior to any plan check approval, and clearance from the Fire Department prior to the issuance of a building permit. No significant impacts are anticipated as a result of this project. The project will not result in possible interference with an emergency response plan or emergency evacuation plan. The subject site is not located in an area which could impact an emergency response plan. The project will take access from a maintained street and will not impede any emergency response or emergency evacuation plan. No significant impacts are anticipated as a result of this project. The project will not result in the creation of any health hazard or potential health hazard, nor expose people to existing sources of potential health hazards, nor increase fire hazard in areas with flammable brush, grass or trees. The project will be reviewed for compliance with all applicable health laws during the plan check and occupancy stages of development. No permits will be issued unless the project is found to be consistent with these laws. No health hazards are known to be in proximity to the project site. The project site is not located within or proximate to a fire hazard area. No significant impacts are anticipated as a result of this project. The project will result in a less than significant increase to existing noise levels. The site is currently vacant and development of the land logically will result in increases to noise levels during construction phases as well as increases to noise in the area over the long run. Long-term noise gene?ated by this project would be similar to existing and proposed business park uses and expected in the area. No significant noise impacts are anticipated as a result of this project, either short or long-term. 10.b. The project will result in some severe noise levels. The project may expose people to severe noise levels during the construction phase of development. Construction machinery is capable of producing noise in the range of 100+ dBA at 100 feet which is considered very annoying and can cause hearing damage from steady eight-hour exposure. However, the source of such noise at the project site will be of short duration, and not considered significant. There will be no long-term exposure of people to severe noise. No significant impacts are anticipated as a result of this project. R:\STAl~RFI'~2pA96.~C 10/30/96 kl~ 34 Public Services 11 .a,b. The project will have an impact upon, or result in a need for new or altered fire or police protection. The project will incrementally increase the need for fire and police protection. However, the developer will contribute his fair share of development impact fees earmarked for such services. After mitigation is performed, no significant impacts are anticipated as a result of this project. 11.c. The project will have an effect upon, or result in the need for new or altered school facilities. The project will not cause significant numbers of people to relocate within or to the City of Temecula. However, some indirect impact of business and industrial use upon school facilities is expected. The developer will contribute his fair share of development impact fees earmarked for the school district. After mitigation is performed, no significant impacts are anticipated as a result of this project. 11.d. The project will have a less than significant impact upon maintenance of public facilities, including roads. Funding for the maintenance of roads is derived from the State of California gasoline tax, which is distributed to the City of Temecula. Impacts to current and future needs for maintenance of roads as a result of the project will be incremental, and not considered significant. The gasoline tax is sufficient to provide for maintenance expenses. No significant impact is anticipated as a result of this project. 11 .e. The project will not have an effect upon, or result in a need for new or altered governmental services. The project is consistent with the General Plan designation for the area. The effect upon governmental services is expected as part of the buildout of the business park. No significant impacts are anticipated as a result of this project. Utilities and Service Systems 12.a,b. The project will not result in the need for new systems or supplies, or substantial alterations to power or natural gas or communication systems. These systems are currently being delivered in proximity to the site. No significant impacts are anticipated as a result of this project, 12.c, d,g The project will not result in the need for new systems or supplies, or substantial alterations to local or regional water treatment or distribution facilities, sewer or septic tanks, or local or regional water supplies. The Final Environmental Impact Report (FEIR) for the City of Temecula General Plan (p~ 39) states: "Both Eastern Municipal Water District and Rancho California Water District have indicated an ability to supply as much water as is required in their service areas." Furthermore (p. 40), "Implementation of the proposed General Plan would not R:~TAl~FRl~T~232PA$~.PC 10/30/96 klb :35 significantly impact wastewater services." There are no septic tanks on site or proximate to the site. Since the project is consistent with the General Plan, no significant impacts are anticipated as a result. 12.e. The project will result in a less than significant need for new systems or supplies, or substantial alterations to storm water drainage. The project will provide some additional onsite drainage systems, and tie into existing systems adjacent. No significant impacts are anticipated as a result of this project. 12.f. The project will not result in a need for new systems or substantial alterations to solid waste disposal systems. Any potential impacts from solid waste created by this development can be addressed through participation in a Source Reduction and Recycling Program implemented by the City. No significant impacts are anticipated as a result of this project. Aesthetics 13.a. The project will not affect a scenic vista or scenic highway. The project is not located in an area where there is a scenic vista. The City does not have any designated scenic highways. No significant impacts are anticipated as a result of this project. 13.b. The project will have a demonstrable negative aesthetic effect. The warehouse/distribution facility necessarily has long expanses of building walls, and loading docks for trucks. The developer has designed his building with loading bays at the rear of the building, away from the public way. He has provided architectural enhancements to emphasize the front entrance and break up the wall expanse on the other three sides. Landscaping plans also mitigate the negative aesthetic impact. After mitigation is performed, no significant impacts are anticipated as a result of this project. 13.c. The project will have a potentially significant impact from light and glare. The project will produce and resul~ in light and glare with the installation of new light sources. All light and glare has the potential to impact the Mount Palomar Observatory. The project will be conditioned to comply with Ordinance No. 655 Ordinance Regulating Light Pollution. After mitigation is performed, no significant impacts are anticipated as a result of this project. Resources The project will not cause a physical change which would affect unique ethnic cultural values or restrict existing religious or sacred uses within the potential impact area. The site has been previously graded and resources would have been disturbed at that time. No resources or religious uses exist at or are proximate to the site. No significant impacts are anticipated as a result of this project. Cultural 14.d,e. R:~STAFFRP'r~32pAg~.PC 10/30/9~ klb 36 Recreation 15.a,b. The project will have a less than significant impact on the demand for neighborhood or regional parks or other recreational facilities, or affect existing recreational opportunities. The project will not cause significant numbers of people to relocate within or to the City of Temecula. The developer has designed several outdoor lunch areas for his employees within the project site. No significant impacts are anticipated as a result of this project. R:~STA~2PA96.FC 1(F30/~6 klb 37 ATTACHMENT NO. 3 MITIGATION MONITORING PROGRAM R:\STAFF~2PA96.1'C 10/30/96 Mitigation Monitoring Program Planning Application No. PA96-0232 (Development Plan) Geologic Problems General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: General Impact: Mitigation Measures: Specific Processes: Mitigation Milestone: Responsible Monitoring Party: Expose people to impacts from seismic ground shaking. Ensure that soil compaction is to City Standards. A soils report prepared by a registered Civil Engineer shall be submitted to the Department of Public Works with the initial grading plan check. Building pads shall be certified by a registered Civil Engineer. Prior to the issuance of grading and building permits. Department of Public Works and Building and Safety Department. Expose people to impacts from seismic ground shaking. Utilize construction techniques that are consistent with the Uniform Building Code. Submit construction plans to the Building and Safety Department for approval. Prior to the issuance of a building permit. Building and Safety Department. Erosion~ changes in topography or unstable soil conditions from excavation, grading or fill. Planting of slopes consistent with Ordinance No. 457. Submit erosion control plans for approval by the Department of Public Works. Prior to the issuance of a grading permit. Department of Public Works. R:\STAFFRFI~32PA96.1:C 10/30/96 kJb 39 General Impact: Mitigation Measures: Specific Processes: Mitigation Milestone: Responsible Monitoring Party: Erosion, changes in topography or unstable soil conditions from excavation, grading or fill. Planting of on-site landscaping that is consistent with the Development Code. Submit landscape plans that include planting of slope to the Planning Department for approval. Prior to the issuance of a building permit. Planning Department. General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: Exposure of people or property to fault rupture, seismic ground shaking, seismic ground failure, landslides or mudflows, expansive soils or earthquake hazards. Ensure that soil compaction is to City standards. A soils report prepared by a registered Civil Engineer shall be submitted to the Department of Public Works with the initial grading plan check. Building pads shall be certified by a registered Civil Engineer. Prior to the issuance of grading permits and building permits. Department of Public Works and Building & Safety Department. General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: Exposure of people or property to fault rupture, seismic ground shaking, seismic ground failure, landslides or mudflows, expansive soils or earthquake hazards. Utilize 'construction techniques that are consistent with the Uniform Building Code. Submit construction plans to the Building & Safety Department for approval. Prior to the issuance of building permits. Building & Safety Department R:~STAFFRF~232pA96.pC 10/30/~6 klb 40 General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: The project will result in changes to absorption rates, drainage patterns and the rate and amount of surface runoff. Methods of controlling runoff, from site so that it will not negatively impact adjacent properties, including drainage conveyances, have been incorporated into site design and will be included on the grading plans. Submit grading and drainage plan to the Department of Public Works for approval. Prior to the issuance of grading permit. Department of Public Works. General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: Discharge into surface waters or other alteration of surface water quality (e.g. temperature, dissolved oxygen or turbidity). An erosion control plan shall be prepared in accordance with City requirements and a Storm Water Pollution Prevention Plan (SWPPP) shall be prepared in accordance with the National Pollution Discharge Elimination System (NPDES) requirements. The applicant shall submit a SWPPP to the San Diego Regional Water Quality Control Board (SDRWQCB) for their review and approval. Prior to the issuance of a grading permit. Department of Public Works and SDRWQCB (for SWPPP). R:~STAFFRPT~32PA~.PC 10/30/96 k/b 41 Transl)ortation/Circulation General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: Increase in vehicle trips or traffic congestion. Payment of Public Facility Fee for road improvements and traffic impacts. Post bond @ $2.00 per square foot, not to exceed $10,000.00 and execute agreement for payment of Public Facility Fee. Prior to the issuance of a building permit. Department of Public Works. Increase in vehicle trips or traffic congestion. Payment of Traffic Signal Mitigation Fee. Pay pro-rata share for traffic impacts (to be determined by the Director of Public Works. Prior to the issuance of a building permit. Department of Public Works. General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: Insufficient parking capacity on-site or off-site. Provide on-site parking spaces to accommodate the use. Install on-site parking spaces. Prior to the issuance of occupancy permits. Department of Public Works, Planning Department and Building & Safety Department. R:~TAFFRPT~232pA96.I,C 10/30/96 klb 42 Energy and Mineral Resources General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: Public Services General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: Affect upon energy conservation plans. Compliance with all applicable laws pertaining to energy conservation. Submit energy calculations and pertinent data for review. Prior to the issuance of a building permit. Building and Safety Department A substantial effect upon and a need for new/altered governmental services regarding fire protection. The project will incrementally increase the need for fire protection; however, it will contribute its fair share to the maintenance of service provision. Payment of Fire Mitigation Fees. Pay current mitigation fees with the Riverside County Fire Department. Prior to the issuance of building permit. Building & Safety Department General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: A substantial effect upon and a need for new/altered schools. No significant impacts are anticipated. Payment of School Fees. Pay current mitigation fees with the Temecula Valley Unified School District. Prior to the issuance of building permits. Building & Safety Department and Temecula Valley Unified School District. R:\STAFFRPTX232PA~.PC 10/30/96/c~ 43 General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: Aesthetics General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: A substantial effect upon and a need for maintenance of public facilities, including roads. Payment of Public Facility Fee for road improvements, traffic impacts, and public facilities. Post bond @ $2.00 per square foot, not to exceed $10,000.00, and execute agreement for payment of Public Facility Fee. Prior to the issuance of building permits. Department.of Public Works. The project will have a demonstrable negative aesthetic effect. No impacts are anticipated. Provide architectural enhancements to the building and design the location of loading bays entirely to the rear of the building. Building construction plans shall conform substantially with Exhibit D (Site Plan) and Exhibit F (Color Elevations). Color and materials used shall conform substantially with Exhibit H (Color Boards and Materials), or as amended by the Conditions of Approval for the project. Prior to the issuance of building permits. Department of Planning. The project will have a demonstrable negative aesthetic effect. No impacts are anticipated. Retain as much of the existing landscaping as possible. Transplant as many mature trees as possible. Prior to the issuance of grading permits. Department of Public Works. R:~STAFFRPTX232pA~.I}C 10/30/96 klb 44 General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: The project will have a demonstrable negative aesthetic effect. No impacts are anticipated, Provide landscaping that enhances front entries and buffers parking and loading areas. Landscaping shall be installed in substantial conformance with Exhibit E (Landscape Plan) or as amended by the Conditions of Approval. Plant new trees that are 24" box or larger and are consistent with the existing plantings. Prior to the issuance of certificate of occupancy. Department of Public Works and Department of Planning. General Impact: Mitigation Measure: Specific Process: Mitigation Milestone: Responsible Monitoring Party: The creation of new light sources will result in increased light and glare that could affect the Palomar Observatory. Use lighting techniques that are consistent with Ordinance No. 655. Submit lighting plan to the Building and Safety Department for approval. Prior to the issuance of a building permit. Building & Safety Department. R:\STAFFRltI~232PA~.PC 10/30/96 klb 45 ATTACHMENT NO. 4 EXHIBITS R:XSTAFFKFI~32pA96.PC 10/30/96 klb 46 CITY OF TEMECULA CENTER NOT TO SCALE Planning Application No. PA96-0232 (Development Plan, Fast Track) 'XHIBIT A VICINITY MAP jl ~'LANNING COMMISSION DATE - November 4, 1996 R:\PLANNINGQ32PA96.R.PT 10/30~6ckd CITY OF TEMECULA _ EXHIBIT B - ZONING MAP DESIGNATION - LI (Light Industrial) PROJECT SITE EXHIBIT C - GENERAL PLAN DESIGNATION - BP (Business Park) Planning Application No. PA96-0232 PLANNING COMMISSION DATE - November 4, 1996 CITY OF TEMECULA yNEZ ROAD }lanning Application No. PA96-0232 (Development Plan, Fast Track) EXHIBIT - D SITE PLAN PLANNING COMMISSION DATE - November 4, 1996 R:\PLANNING'~32pA96.P,2T 1030/96ckd CITY OF TEMECULA REAR SLOPE PLANllNG -- Planning Application No. PA96-0232 (Development Plan, Fast Track) EXHIBIT - E LANDSCAPE PLAN PLANNING COMMISSION DATE - November 4, 1996 CITY OF TEMECULA _WEST E_LEVATm~ _noR'r. ELEVATgS Planning Application No. PA96-0232 (Development Plan, Fast Track) c-XHIBIT - F ELEVATIONS PLANNING COMMISSION DATE - November 4, 1996 CITY OF TEMECULA Planning Application No. PA96-0232 (Development Plan, Fast Track) EXHIBIT - G (1AI FLOOR PLAN PLANNING COMMISSION DATE- November 4, 1996 CITY OF TEMECULA t + t ~ ~ II Planning Application No. PA96-0232 (Development Plan, Fast Track) ~XHIBIT - G (1B) FLOOR PLAN PLANNING COMMISSION DATE - November 4, 1996 R:\STAFFRIq'L?32pA~.l~3 10/30/~ {dlm CITY OF TEMECULA ® · ~ t t Planning Application No. PA96-0232 (Development Plan, Fast Track) EXHIBIT - G (2) FLOOR PLAN PLANNING COMMISSION DATE- November 4, 1996 ITEM #7 MF ~ORANDUM TO: Planning Commission~/ FROM: Debbie Ubnoske,~lanning Manager DATE: November 4, 1996 SUBJECT: Design Guidelines Prepared by: Craig D. Ruiz, Assistant Planner RECOMMENDATION: The Planning Commission: Review Chapters 4, 5, 6 , 7 and 8 of the Design Guidelines and Provide Comments and Direction to Staff BACKGROUND: This item was last heard by the Planning Commission on October 7, 1996. At that meeting, the Commission completed their review of Chapter 3. The item was continued to November 4, 1996. Attachments: 1. Design Guidelines - Blue Page 2 R:~STAFFRPT~DESIGNOL.FC5 10/28/9~edr J~ ATTACHMENT NO. 1 DESIGN GUIDELINES (SUBMITTED UNDER SEPARATE COVER)