HomeMy WebLinkAboutHydrological Report Oct. 8, 2007HYDROLOGY STUDY
For
#2708 -01 TEMECULA WAL -MART EXPANSION
32225 Highway 79 S
Temecula, CA 92592
Prepared by:
Nasland Engineering
4740 Ruffner Street
San Diego, CA 92111
Phone 858 -292 -7770
Fax 858 -571 -3241
10108107 Page / of I/ NE Job No.: 306 - 035.13
I
DESCRIPTION
' The subject site proposes to expand the existing Wal -Mart building from the current
149,723 square feet to 205,938 square feet. The developed property is irregular in shape
' and encompasses approximately 19.96 acres. The site is located on the southwest corner
of Route 79 and Apis Road in the City of Temecula area of the County of Riverside,
California (see Vicinity Map). The majority of the site is predominately level with no
' major changes in grade. Existing drainage from the site flows southwestward into
Murrieta Creek. The area of the proposed building expansion is unpaved and graded to
drain to an existing RSD D -14 graded inlet. The inlet is connected to an existing 18" rep
' storm drain and discharged to an existing 36" rep storm drain. Drainage from the 36" rep
is discharged just southeast of the property to the existing Temecula Creek Channel. No
modifications to the existing 36" storm drain nor the Temecula Creek Channel for the
' proposed building expansion.
The proposed building expansion will be constructed at the unpaved portion of the
property. Asphalt and PCC concrete will constructed at the remaining unpaved area to
add additional parking for the proposed building expansion. This area was originally
graded and designed for this proposed building expansion; therefore, no significant
' changes in grade will be necessary for storm drain discharge. The original hydrology
report from the previous City of Temecula under Plot Plan 16535 was used as reference
for existing conditions data. The original basin at the proposed expansion site will need
to be divided into small sub basins to accompany the proposed building expansion and
parking. This will lower the discharge at the existing RSD D -14 graded inlet and benefit
t the property by reducing the chance of inlet failure. A proposed 12" by 12" graded inlet
will be installed approximately 136' upstream of the existing inlet to reduce the grade for
ADA requirements. The proposed inlet will connect to a 12" pvc storm drain inlet and
discharge to the existing drainage system. This will be done by connecting the proposed
12" pvc to the existing RSD D -14 graded inlet. Three additional storm drain pipes will
installed for discharge of the proposed loading dock and roof drains for the building
expansion. Three additional storm drains will be installed down stream and connected to
the existing 36" rep storm drain southeast of the property adjacent to the Temecula
Creek. No modifications or changes in grade will made to Temecula Creek.
1
1 10108107 Page 2 of 11 NE Job No.: 306-035.13
F
VICINITY MAP
NIN
v
WV'
"J,
. ... ......
ar
% 79
79 -n
10108107
PROJECT
LOCATION
X�
V
Qhik
Page 3 of I I
NE Job No-: 306-035.13
' METHODOLOGY
' The 100 -year storm runoffs were calculated using the Rational Formula Method, per the
Riverside County Hydrology Manual.
'
The peak flow rate formula (Q = CIA) was used to calculate the runoffs.
Q = Peak flow rate in cubic feet per second.
'
C = Runoff coefficient expressed as a percentage of rainfall which becomes
runoff.
I = Average rainfall intensity in inches per hour for a storm duration equal to
the time of concentration of the contributing drainage area.
Tc = Time of concentration — Assumed 5 minute minimum.
A = Area of basin in acres.
'
CALCULATIONS
' Site Characteristics and Assumptions:
• Hydrologic Soil Group D - See attached Soil Hydrologic Groups Map (County of
' Riverside Hydrology Manual)
• Percent Impervious = Approximately 90%
• See Attached Hydrology Maps for Basin Location and properties.
' • Assume Tc = 5.00 minutes minimum
Calculation: Proposed Basin 1
4E =0.70'
L =272'
From County of Riverside Hydrology Manual Plate D -3 Time of Concentration with DE
and L,
T,= 9.30minutes
From County of Riverside Hydrology Manual Rainfall Isopluvials:
100 Year Rainfall Event - 24 hour precipitation, P14 = 4.5 in/hr
' 100 Year Rainfall Event - 6 hour precipitation, P6 = 2.5 in/hr
From County of Riverside Hydrology Manual D -4.1 with T,
I10 =2.50 inches/hour
Iiou =3.69 inches /hour
' From County of Riverside Hydrology Manual Plate D -5.1,
C =0.87
' Q =CIA
Q16= (0.87)(2.50 inches /hour)(0.60 Acres) =1.30 ft -/s
QIOO= (0.87)(3.69 inches/hour)(0.60 Acres) =1.93 ft ;/s
' 10108107 Page 4 of 11
NE Jab No.: 306 - 035.13
Calculation: Proposed Basin 2
AE =1.9'
L=376'
'
From County of Riverside Hydrology Manual Plate D -3 Time of Concentration with AE
and L,
T,= 9.26minutes
From County of Riverside Hydrology Manual Rainfall Isopluvials:
100 Year Rainfall Event - 24 hour precipitation, P24 = 4.5 in/hr
100 Year Rainfall Event - 6 hour precipitation, P6 = 2.5 in/hr
From County of Riverside Hydrology Manual D -4.1 with T,
I10=2.36 inches/hour
Ilo()=3.48 inches/hour
'
From County of Riverside Hydrology Manual Plate D -5.1,
C =0.87
Q =CIA
Qio= (0.87)(2.36 inches/hour)(1.60 Acres) =3.28 W/s
Q100= (0.87)(3.48 inches/hour)(1.60 Acres) =4.84 W/s
Calculation: Proposed Basin 3
'
AE =3.19'
L=98'
From County of Riverside Hydrology Manual Plate D -3 Time of Concentration with AE
and L,
T,= 3.72minutes
From County of Riverside Hydrology Manual Rainfall Isopluvials:
'
100 Year Rainfall Event - 24 hour precipitation, P?4 = 4.5 in/hr
100 Year Rainfall Event - 6 hour precipitation, P6 = 2.5 in/hr
'
From County of Riverside Hydrology Manual D -4.1 with T,
I1(j=3.45 inches/hour
I10c,=5.10 inches /hour
From County of Riverside Hydrology Manual Plate D -5.1,
C =0.87
'
Q =CIA
Qi6= (0.87)(3.45 inches/hour)(0.10 Acres) =0.30 W/s
'
Q100= (0.87)(5.10 inches /hour)(0.10 Acres) =0.44 W/s
' 10108107 Page 5 of 11 NE Job No.: 306- 035.13
Calculation: Proposed Basin 4
DE =3.00'
Lr 176'
' From County of Riverside Hydrology Manual Plate D -3 Time of Concentration with DE
and L,
Tc= 5.35minutes
From County of Riverside Hydrology Manual Rainfall Isopluvials:
100 Year Rainfall Event - 24 hour precipitation, P24 = 4.5 in/hr
' 100 Year Rainfall Event - 6 hour precipitation, P6 = 2.5 in/hr
From County of Riverside Hydrology Manual D -4.1 with T,,
I10=3.12 inches/hour
I100=4.61 inches/hour
' From County of Riverside Hydrology Manual Plate D -5.1,
C =0.87
' Q =CIA
Qlo= (0.87)(3.12 inches /hour)(0.40 Acres) =1.08 ft3 /s
' Qioo= (0.87)(4.61 inches/hour)(0.40 Acres) =1.60 ft3A
Calculation: Proposed Basin 5
' AE =2.42'
L=208'
From County of Riverside Hydrology Manual Plate D -3 Time of Concentration with AE
and L,
Tc= 6.18minutes
From County of Riverside Hydrology Manual Rainfall Isopluvials:
' 100 Year Rainfall Event - 24 hour precipitation, P24 = 4.5 in/hr
100 Year Rainfall Event - 6 hour precipitation, P6 = 2.5 in/hr
' From County of Riverside Hydrology Manual D -4.1 with T,,
h0=2.87 inches/hour
hoo =4.24 inches/hour
' From County of Riverside Hydrology Manual Plate D -5.1,
C =0.87
' Q =CIA
Qio= (0.87)(2.87 inches/hour)(0.80 Acres) =2.00 ft3A
Q100= (0.87)(4.24 inches /hour)(0.80 Acres) =2.95 ft3A
10108107 Page 6 of 11 NE Job No.: 306 - 035.13
ICalculation: Proposed Basin 6
' AE =1.26'
L=104'
'
From County of Riverside Hydrology Manual Plate D -3 Time of Concentration with AE
and L,
=4.64 minutes
tTe
From County of Riverside Hydrology Manual Rainfall Isopluvials:
'
100 Year Rainfall Event - 24 hour precipitation, P24 = 4.5 in/hr
100 Year Rainfall Event - 6 hour precipitation, P6 = 2.5 in/hr
From County of Riverside Hydrology Manual D -4.1 with T,
I10=3.45 inches/hour
Iioo =5.10 inches/hour
'
From County of Riverside Hydrology Manual Plate D -5.1,
C=0.87
'
Q =CIA
Qlo= (0.87)(3.45 inches /hour)(0.30 Acres) =0.90 W/s
'
Qioo= (0.87)(5. 10 inches /hour)(0.30 Acres) =1.33 W/s
Calculation: Proposed Basin 7
AE =0.40'
L=75'
From County of Riverside Hydrology Manual Plate D -3 Time of Concentration with AE
and L,
T, =4.80 minutes
From County of Riverside Hydrology Manual Rainfall Isopluvials:
100 Year Rainfall Event - 24 hour precipitation, P24 = 4.5 in/hr
100 Year Rainfall Event - 6 hour precipitation, P6 = 2.5 in/hr
From County of Riverside Hydrology Manual D -4.1 with T,
Iio =3.45 inches /hour
IIoo =5.10 inches /hour
From County of Riverside Hydrology Manual Plate D -5.1,
C =0.87
' 10/08/07
1
Qlo= (0.87)(3.45 inches /hour)(0.20 Acres) =0.60 W/s
Qloo= (0.87)(5.10 inches /hour)(0.20 Acres) =0.88 ft3 /s
Page 7 of ] ] NE Job No.: 306 - 035.13
SUMMARY OF RESULTS FOR EXISTING CONDITIONS (City of Temecula Plot
Plan 16535)
BASIN
AREA SQ.FT.
AREA ACRE
Q CFS
1
21,138
0.50
6.50
2
126,391
2.90
5.28
3
24,879
0.60
1.94
6"
49143.96
4.00
13.72
INLET DATA TABLE
Inlet
Type
Inlet
Capacity
Q
(cfs)
A
12" x 12"
1.56
1.33
B
12" x 12"
1.56
0.88
C
24" x 24"
4.56
2.95
(For Locations of Basins and Inlets see Hydrology Map)
(See Inlet Capacity Calculation attached)
STORM DRAIN DATA TABLE
Line
Pipe Size
Slope
Q
(cfs)
% Full
1
8"
2.0%
1.33
65.04
2
12"
2.0%
2.21
61.51
3
6"
2.0%
0.44
61.51
4
6"
2.0%
0.44
69.36
5
12"
2.0%
2.42
19.39
6
12"
2.0%
2.42
60.77
(See Manning Pipe Calculations attached)
10108107 Page 8 of 11 NE Job No.: 306 - 035.13
'
Circular
Solving for .....................
Depth of Flow
Pipe 1 Manning Pipe Calculator
'
Given Input Data:
2.2100 cfs
Slope ...........................
Shape ...........................
Circular
0.0130
Solving for .....................
Depth of Flow
'
Diameter ........................
8.0000 in
46.3421 %
Flowrate ........................
1.3300 cfs
Slope ...........................
0.0200 ft/ft
Manning's n .....................
0.0130
Computed Results:
'
Depth ...........................
5.3058 in
Area ............................
0.3491 ft2
Wetted Area .....................
Wetted Perimeter ................
0.2458 ft2
15.2268 in
Perimeter .......................
25.1327 in
Velocity ........................
5.4116 fps
'
Hydraulic Radius ................
2.3242 in
Percent Full ....................
66.3230
Full flow Flowrate ..............
Full flow
1.7090 cfs
4.8958 fps
velocity ..............
1
11
Pipe 2 Manning Pipe Calculator
Given Input Data
Shape ...........................
Circular
Solving for .....................
Depth of Flow
Diameter ........................
12.0000 in
Flowrate ........................
2.2100 cfs
Slope ...........................
0.0200 ft/ft
Manning's n .....................
0.0130
Computed Results:
Depth ...........................
5.5611 in
Area ............................
0.7854 ft2
Wetted Area .....................
0.3562 ft2
Wetted Perimeter ................
17.9709 in
Perimeter .......................
37.6991 in
Velocity ........................
6.2052 fps
Hydraulic Radius ................
2.8538 in
Percent Full ....................
46.3421 %
Full flow Flowrate ..............
5.0386 cfs
Full flow velocity .............. 6.4153 fps
tmn100YA
Page 9 of]]
NE Job No.: 306- 035.13
' Pipe 3 Manning Pipe Calculator
'
Given Input Data:
Shape ...........................
Circular
Solving for .....................
Depth of Flow
'
Diameter ........................
6.0000 in
Flowrate ........................
0.4400 cfs
Slope ...........................
0.0200 ft/ft
'
Manning's n .....................
0.0130
Computed Results:
'
Depth ...........................
3.1912 in
Area ............................
0.1963 ft2
Wetted Area
0.1061 ft2
'
.....................
Wetted Perimeter ................
9.8075 in
Perimeter .......................
18.8496 in
'
Velocity ........................
Hydraulic Radius ................
4.1456 fps
1.5584 in
Percent Full ....................
53.1872%
Full flow Flowrate ..............
Full flow velocity
0.7935 cfs
4.0414 fps
..............
Pipe 4 Manning
Pipe Calculator
Given Input Data:
Shape ...........................
Circular
'
Solving for .....................
Depth of Flow
Diameter ........................
6.0000 in
Flowrate ........................
0.4400 cfs
'
Slope ...........................
0.0200 ft/ft
Manning's n .....................
0.0130
'
Computed Results:
Depth ...........................
3.1912 in
Area ............................
0.1963 ft2
'
Wetted Area .....................
0.1061 ft2
Wetted Perimeter ................
9.8075 in
'
Perimeter .......................
18.8496 in
Velocity ........................
4.1456 fps
Hydraulic Radius ................
1.5584 in
'
Percent Full ....................
53.1872%
Full flow Flowrate ..............
0.7935 cfs
Full flow velocity .............. 4.0414 fps
10/08/07
035.13
Page 10 of 11
NE Job No.: 306-
' Pipe 5 Manning Pipe Calculator
....... Circular
......... Depth of Flow
12.0000 in
........ 2.4200 cfs
...... 0.0200 ft/ft
........... 0.0130
Given Input Data:
Depth ...........................
Shape..................
Depth ...........................
Solving for ..........
'
Diameter .............
0.7854 ft2
Flowrate .............
'
Slope ...................
Manning's n
'
........
....... Circular
......... Depth of Flow
12.0000 in
........ 2.4200 cfs
...... 0.0200 ft/ft
........... 0.0130
' Pipe 6 Manning Pipe Calculator
Given Input Data
Shape ............
Solving for ....
Diameter .......
Flowrate .......
Slope .............
Manning's n ..
Circular
Depth of Flow
12.0000 in
2.4200 cfs
0.0200 ft/ft
... 0.0130
Computed Results:
Computed Results:
Depth ...........................
'
Depth ...........................
5.8603 in
Wetted Area .....................
Area ............................
0.7854 ft2
18.5700 in
Wetted Area .....................
0.3811 ft2
'
Wetted Perimeter ................
18.5700 in
2.9549 in
Perimeter .......................
37.6991 in
Full flow Flowrate ..............
Velocity ........................
6.3508 fps
'
Hydraulic Radius ................
2.9549 in
Percent Full ....................
48.8355%
Full flow Flowrate ..............
5.0386 cfs
'
Full flow velocity ..............
6.4153 fps
' Pipe 6 Manning Pipe Calculator
Given Input Data
Shape ............
Solving for ....
Diameter .......
Flowrate .......
Slope .............
Manning's n ..
Circular
Depth of Flow
12.0000 in
2.4200 cfs
0.0200 ft/ft
... 0.0130
Computed Results:
Depth ...........................
5.8603 in
Area ............................
0.7854 ft2
Wetted Area .....................
0.3811 112
Wetted Perimeter ................
18.5700 in
Perimeter .......................
37.6991 in
Velocity ........................
6.3508 fps
Hydraulic Radius ................
2.9549 in
Percent Full ....................
48.8355%
Full flow Flowrate ..............
5.0386 cfs
Full flow velocity .............. 6.4153 fps
10108107 Page 11 of 11 NE Job No.: 306-
035.13
L
1000
900
800
M
6=0
m
m
400
,-350,--
r -.-
0
°— 300
c
J 250
d�200
J
••
TC'
100
90
60
70
nA
m 35
CL
S 30
w
m 25
K
Good Cover
Undeveloped
Fair Cover
, _ .�n�cvmvycu,
c_ 20 Poor Cover
19
18 ( Single Family
12 :-17 (1/4 Acre)
L=
930' >T�-
9.6
LIMITATIONS:
Ca
14
I. Maximum length = 1000'
TC
2. Maximum area = 10 Acres
5
13,'`
a
o Fi
6
C
U
400
v
Q
•
p tr 300
P
> 200
7
C
O
N
V O
E 100
C
o`
BO
p
0 0 50
'• 8
0
E
30
° 9
C 20
9
0
>
T
K
Good Cover
Undeveloped
Fair Cover
, _ .�n�cvmvycu,
c_ 20 Poor Cover
19
18 ( Single Family
12 :-17 (1/4 Acre)
E 9
8
7
6
5
L 4
RCFC 8t WCD
HYDROLOGY MANUAL
e 2
w
1.0
- .8
.3
0 2
`o
> L �Lo
Z
v v
C
O
i
KEY _
1-4 Tc —K —Tc
E
0
u_
II
d
12 �
0
14
15 m
16 C
17 E
18--E
19 F
20 12
C
O
O
`c
25 v
0
O
U
30
EXAMPLE:
(1)L =550', H= 5.O,K=Single Family(1 /4Ac.) 35
Development , Tc = 12.6 min.
(2) L =550', H =5.0', K= Commercial 40
Development , Tc = 9.7 min.
Reference: Bibliography item No. 35.
PLATE D -3
16
o
IS
Ca
14
E
13,'`
C�
12
C
'
S
E 9
8
7
6
5
L 4
RCFC 8t WCD
HYDROLOGY MANUAL
e 2
w
1.0
- .8
.3
0 2
`o
> L �Lo
Z
v v
C
O
i
KEY _
1-4 Tc —K —Tc
E
0
u_
II
d
12 �
0
14
15 m
16 C
17 E
18--E
19 F
20 12
C
O
O
`c
25 v
0
O
U
30
EXAMPLE:
(1)L =550', H= 5.O,K=Single Family(1 /4Ac.) 35
Development , Tc = 12.6 min.
(2) L =550', H =5.0', K= Commercial 40
Development , Tc = 9.7 min.
Reference: Bibliography item No. 35.
PLATE D -3
n- :v
v c?
L)
0
D /cwD
L \/
I-
Z
rn
c z
(f) U)
<
rrl
U) z
Q
° D
m D
o D �
� O
Z
A
m == m= s� m m m= m= m m
MIRA LOMA
DURATION FREQUENCY
MINUTES
10 100
YEAR YEAR
5
2.84
4.46
6
2.58
4.07
7
2.37
3.75
6
2.21
3.49
9
2.08
3.26
10
1.96
3.10
11
I.ST
2.95
12
1.78
2.82
13
1.71
2.70
14
1.64
2.60
15
1.58
2.50
16
1.53
2.42
17
1.46
2.34
IB
1.44
2.27
19
1.40
2.21
20
1.36
2.15
22
1.29
2.04
24
1.24
1.95
26
1.18
1.87
28
1.14
1.80
30
1.10
1.73
32
1.06
1.67
34
1.03
1.62
36
1.00
1.57
38
.97
1.53
40
.94
1.49
45
.89
1.40
50
.84
1.32
55
.80
1.26
60
.76
1.20
65
.73
1.15
70
.70
1.11
75
.68
1.07
60
.65
1.03
as
.63
1.00
SLOPE _ .530
RAINFALL INTENSITY - INCHES PER HOUR
MURRIETA
- TEMECULA
6 RANCHO
CALIFORN14
MINUTES
DURATION
FREQUENCY
MINUTES
10
100
100
10
100
5
YEAR
YEAR
5
3.45
5.10
6
3.12
4.61
7
2.87
4.24
8
2.67
3.94
9
2.50
3.69
10
2.36
3.48
11
2.24
3.30
12
2.13
3.15
13
2.04
3.01
14
1.96
2.89
IS
1.89
2.79
16
1.82
2.69
17
1.76
2.60
IB
I.11
2.52
19
1.66
2.45
20
1.61
2.39
22
1.53
2.26
24
1.46
2.15
26
1.39
2.06
28
1.34
1.98
30
1.29
1.90
32
1.24
1.84
34
1.20
1.78
36
1.17
1.72
38
1.13
1.67
40
1.10
1.62
45
1.03
1.52
50
.97
1.44
55
.92
1.36
60
.88
1.30
65
.84
1.24
70
.91
1.19
75
.78
1.15
80
.75
1.11
05
.73
1.07
SLOPE = .550
NORCO
SPRINGS
DURATION
FREQUENCY
MINUTES
MINUTES
7
2,24
10
100
100
YEAR
YEAR
5
2.77
4.16
6
2.53
3.79
7
2.34
3.51
8
2.19
3.29
9
2.07
3.10
10
1.96
2.94
11
1.87
2.80
12
1.79
2.68
13
1.72
2.58
14
1.66
2.48
IS
1.60
2.40
16
1.55
2.32
17
1.50
2.25
16
1.46
2.19
19
1.42
2.13
20
1.39
2.08
22
1.32
1.98
24
1.26
1.90
26
1.22
1.82
28
1.17
1.76
30
1.13
1.70
32
1.10
1.64
34
1.06
1.59
36
1.03
1.55
38
1.01
1.51
40
.98
1.47
45
.92
1.39
50
.88
1.31
55
.84
1.25
60
.80
1.20
65
IT
1.15
70
.74
1.11
75
.72
1.07
80
.69
1.04
85
.67
1.01
SLOPE _ .500
PALM
SPRINGS
3.78
DURATION
FREQUENCY
MINUTES
7
2,24
3.21
IO
100
3.01
YEAR
YEAR
5
4.23
6.76
6
3.80
6.08
7
3.48
5.56
8
3.22
5.15
9
3.01
4.81
10
2.83
4.52
11
2.67
4.28
12
2.54
4.07
13
2.43
3.88
14
2.33
3.72
15
2.23
3.58
16
2.15
3.44
17
2.08
3.32
18
2.01
3.22
19
1.95
3.12
20
1.89
3.03
22
1.79
2.86
24
1.70
2.72
26
1.62
2.60
28
1.56
2.49
30
1.49
2.39
32
1.44
2.30
34
1.39
2.22
36
1.34
2.15
38
1.30
2.09
40
1.27
2.02
45
1.18
1.89
50
1.11
1.78
55
1.05
1.68
60
1.00
1.60
65
.95
1.53
70
.91
1.46
75
.88
1.41
80
.85
1.35
85
.82
1.31
SLOPE _ .580
PERRIS VALLEY
DURATION FREQUENCY
MINUTES
10 100
YEAR YEAR
5
2.64
3.78
6
2,41
3.46
7
2,24
3.21
8
2.09
3.01
9
1,98
2.84
10
1.88
2.69
11
1.79
2.57
12
1.72
2.46
13
1.65
2.37
14
1.59
2.29
IS
1.54
2.21
16
1.49
2.14
11
1.45
2.08
IB
1.41
2.02
19
1.37
1.97
20
1,34
1.92
22
1.28
1,83
24
1.22
1.75
26
1.18
1,69
28
1,13
1.63
30
1,10
1.57
32
1.06
1.52
34
1.03
1.48
36
1.00
1.44
38
.98
1.40
40
.95
1.37
45
.90
1.29
50
85
1.22
55
.81
1.17
60
78
1.12
65
75
1.08
70
.72
1.04
75
.70
1.00
80
.68
.97
as
.66
.94
SLOPE = .490
-Lti 1 r.-
au A7W
L1 r A
-,", Wr
I.. E
LLL
PI
1V
j
ju
A,, T
I j
rt
T7,
•#
17
'ilk
Rip,
If 3Q, TLO
-TCIIS'-TrbW.NOAA'-
Olt
4001 F At
t v1*4 M—cad06,icl 10
&
—A
C -C� ',W
j Y j
71
6
RIVERSIDE COUNTY FLOOD CONTROL
A N D
M R. DISTRICT
-c. WATER CONSERVATION DIS
I
100- YEAR -24 -HOUR
�9s
I i,lL mcu L
T�
-e PRE IPITATION
E�
11, jt�p
"Mr -, 71
q7AV R6 5W'. a R4w
IN
PLAT F F-5.6
12" x 12" CATCH BASIN
CLEAR OPEN AREA
3/16" Dia.
Bars Q
1- 3/16" O.C.
AREA OF BARS: HORZ: 9 x 0.19 x 12 = 20.52 in
VERT: (3 x 0.19 x 12) - (9 x 0.19 x 0.19) = 6.52
OPEN AREA: 144 - (20.52 +6.52) = 117 in = 0.61 ft2
PERMITER: 4 x 12/12 = 4 ft
ASSUME FREEBOARD DEPTH OF 0.5'
ASSUME 50% CLOGGED, THEREFORE: OPEN AREA = 0.81 ft2 /2 = 0.41 ft2
PERIMETER = 6 fV2 = 3 ft
WIER FLOW:
OcAP = C,,Pd''s = 3.0 (2.Oft)(0.5)1'5 = 3.12 cfs
ORFICE FLOW:
QCAP _ CoA(2d)o.5 = 0.67 (0.41 ft2)(2 x 32.2 x 0.5)" = 1.56 cfs
24" x 24" CATCH BASIN
0.2" DIA
BARS @
2" 0. C.
CLEAR OPEN AREA
AREA OF BARS: (24/12 x 24/12) - ( 24/12 x48/1 x 0.2/12) = 2.4 ft'
PERMITER:
4x24/12 =8ft
ASSUME FREEBOARD DEPTH OF 0.5'
ASSUME 50% CLOGGED, THEREFORE: OPEN AREA= 2.4 ft2 /2 = 1.2 ft2
PERIMETER = 8 ft/2 = 4 ft
WIER FLOW:
QCAP = CWPd "5 = 3.0 (4.Oft)(0.5)1.5 = 4.24 cfs
ORFICE FLOW:
QcAP = CoA(2d)o 5 = 0.67 (1.2 ft2)(2 x 32.2 x 0.5)0'5 = 4.56 cfs
k
_ I'r`a , •y� _' � t 'i t-r ` "`� ._`.-�'-_.__. ....,_.,.___ .... � _ . � �. .. .` � At1;� .t- J �l � _
_ . - !
F _ _
, 7
I i
ter' 7
✓ t
f
J�l1 C.7rr7
i
/ !� a g v� ._� J4 1 1 � 1.
� U ;;
k 10 �
j- --- _ _......
?4 xiz
EXISTING WAL71VIART
FF-,67-7186 -/ 7,1 00
BASIN O
AREA =0.6 AC
0=1.30 CFS
10
0 =1.93 CFS
XISTING
I' SQ. DRAIN
O
)IN
02 AC
0 CFS
8 CFS
SIN O
a =0.8 AC
.00 CFS
95 CFS
LEGEND
PATH OF TRAVEL
BASIN O
BASIN BOUNDARY
BASIN
AREk-0.4A
40 0 40 80 120 160
o�
0=1.08 CFS
10
SCALE ��J-/ 1 " = 40' ��0=1.60
CFS
100
EXISTING
`CURB;INLE�T')69
-------------- '` ?
�, 9 j a i.
- ice
EXHIBIT B
HYDROLOGY MAP
PROPOSED CONDITIONS
NASLAND EN
GINEERING
CIVIL ENGINEERING SURVEYING LAND PLANNING
4740 Ruffner Street, San Diego, California, 92111 -858-292-7770
TEMECULA WAL
EXPANSION