HomeMy WebLinkAboutParcel Map 33488 Parcel 2 Hydrology ReportHYDROLOGY STUDY
FOR
PARCEL 2, PARCEL MAP 33488
PREPARED FOR:
Mr. Fred Connary
30876 Lolita Rd.
Temecula, Ca. 92592
• PREPARED BY:
R.R.F. & Associates
22734 GIERSON AVE.
WILDOMAR, CA. 92590
Tel: (951) 973-8076
DATE PREPARED:
January , 2008
DATE REVISED:
April, 2008
0
0
TABLE OF CONTENTS
I. PROJECT DESCRIPTION
IL RATIONAL METHOD INSTRUCTIONS
1. Instructions for Rational Method Hydrology Calculations
2. Hydrologic Soils Group Map
III. HYDROLOGY CALCULATIONS
A. PRE- DEVELOPED CONDITIONS
1.10 Year hydrology calculation
2.100 Year hydrology calculation
A. POST- DEVELOPED CONDITIONS
1. 10 Year hydrology calculation
• 2. 100 Year hydrology calculation
IV. EXHIBITS
1. Hydrology map
0
I
PROJECT DESCRIPTION
E
fe
0 I
PROJECT DESCRIPTION
This project is bounded by Santiago road on the north and Lolita road on the south. It is
approximately 2.8 Ac. The owner intend to create an access opening along Santiago
Road.
A 20`driveway will be constructed of which will result in the blockage of the existing
watercourse coming from the easterly boundary. A double 36" storm drain system will be
constructed crossing this driveway.
Hydrology analysis was based on the rational method of the Riverside County Flood
Control District. The Discharge use on the easterly boundary was derived from the
hydrology analysis prepared by BMB Tech Services.
F-
•
II
RATIONAL METHOD INSTRUCTIONS
0
•D
0
•
C1
INSTRUCTIONS FOR RATIONAL METHOD HYDROLOGY CALCULATIONS
(Based on the Rational Formula, Q = CIA)
1, on map of drainage area, draw drainage system and block off subareas
tributary to it.
2. Determine the initial time of concentration, "T", using Plate D-3.
The initial area should be less than 10 acres, have a flow path of
less than 1,000 feet, and be the most upstream subarea.
3. Using the time of concentration, determine "I", intensity of rain-
fall in inches per hour, from the appropriate intensity -duration
curve for the particular area under study. For areas where stan-
dard curves are available, use Plates D-4.1 and D-4.2 to reproduce
the standard curve. For areas where curves have not been published
by the District, use Plates D-4.3 through D-4.7 to develop a suit-
able intensity -duration curve.
4. Determine "C", the coefficient of runoff, using the runoff coeffi-
cient curve which corresponds as closely as possible with the soil,
cover type and development of the drainage area. Standard curves
(Plates D-5.1 through D-5.4) have been developed by the District
for the common case of urban landscaping type cover. Where these
curves are not applicable, curves may be developed using Plates
D-5.5 through D-5.8.
5. Determine "A", the area of the subarea in acres.
6. Compute Q = CIA for the subarea.
7. Measure the length of flow to the point of inflow of the next sub-
area downstream. Determine the velocity of flow in this reach for
the peak Q in the type of conveyance being considered (natural
channel, street, pipe, or open channel), using the tabling aids on
Plates D-6 through D-9.
Using the reach length and velocity determined above, compute the
travel time, and add this time to the time of concentration for the
previous subarea to determine a new time of concentration.
B. Calculate Q for the new subarea, using steps 3 through 6 and the
new time of concentration. Determine "Qp", the peak Q for all sub-
areas tributary to the system to this point by adding Q for the
new subarea to the summation of Q for all upstream subareas. Deter-
mine the time of concentration for the next subarea downstream using
Step 7. Continue tabling downstream in similar fashion until a
junction with a lateral drain is reached.
RCFC & WCD
HYDROLOGY NIANUAL
PLATE D-) U of 2)
7
10.
Start at the upper end of the lateral and table its Q down to the
junction with the main line, using the methods outlined in the
previous steps. -
Compute the peak Qat the junction. Let QA, TA, IA correspond to
the tributary area with the longer time of concentration,and QB,
TB, IB correspond to the tributary area with the shorter time of
concentration and Qp, Tp correspond tolthe peak Q and time of
concentration.
I
a. If the tributary areas have the same time of concentration,
the tributary Q's are added directly to obtain the combined
peak Q.
Qp = QA + QB Tp I1= TA = TB
b. If the tributary areas have different times of concentration,
the smaller of the tributary Q's must be corrected as follows:
(1) The usual case is where the tributary area with the lon-
ger time of concentration has the larger Q. In this case,
the smaller Q is corrected by la ratio of the intensities
and added to the larger Q to obtain the combined peak Q.
The tabling is then continued downstream using the longer
time of concentration.
Qp = QA + QB IA Tp TA
IB
i
(2) In some cases, the tributary alea with the shorter time
of concentration has the larger Q. In this case, the
smaller Q is corrected by a ratio of the times of concen-
tration and added to the larger Q to obtain the combined
peak Q. The tabling is then continued downsteam using
the shorter time of concentration_
Qp = QB + QA TB Tp
p
A
RCFC 8► WCD
r�YDRJLOGY JMANUAL
TB
RATIONAL METHOD
INSTRUCTIONS
PLATE D-1 (2 ofj2+1 1
RATIONAL METHOD
General - The Rational method is commonly used for determining peak dis-
charge from relatively small drainage areas. For areas in excess of 300
to 500 -acres the Synthetic Unit Hydrograph method should normally be used.
Before attempting to apply the information in this section,the engineer
should become thoroughly familiar with sections A, B and C of this manual.
Rational Equation - The Rational method is based on the following equation:
Q = CIA
where:
Q = Peak discharge - cfs
C = Coefficient of runoff
I = Rainfall intensity (inches/hour) corresponding to the time
of concentration
A = Area - acres
Time of Concentration - If rain were to fall continously at a con-
stant rate and be uniformly distributed over an impervious surface, the
rate of runoff from that surface would reach a maximum rate equivalent
to the rate of rainfall. This maximum would occur when all parts of the
surface were contributing runoff to the concentration point. The time
required to reach the maximum or equilibrium runoff rate is defined as
the time of concentration. The time of concentration is a function of
many variables including the length of the flow path from the most remote
point of an area to the concentration point, the slope and other charac-
teristics of natural and improved channels in the area, the infiltration
characteristics of the soil, and the degree and type of development. In
District Rational tabling, the time of concentration for an initial sub-
area can be estimated from the nomograph on Plate D-3. The time of con-
centration for the next downstream subarea is computed by adding to the
D-1
initial time, the time required for the computed peak flow to travel to
d
the next concentration point. Time of is computed for each
(concentration
subsequent subarea by computing travel iti.me between subareas and adding
r
3
the cumulative sum. Travel time may be',esti.mated using the tabling aids
i
on Plates D-6 through D-9.
1
To avoid distortion of travel time1large
subareas should be avoided.
a
'•
Where extremely large subareas are used,
peak flow entering a travel reach
may be much lower than the flow leaving1that
reach. Velocity normally
I
3
increases with discharge, therefore travel
time computed using the average
flow over a reach may be significantly
lower than travel time computed
�
using inflow to the reach. Since rainfall
intensity is inversely propor-...
f
i
tional to time, flow rates would be consistantly
underestimated by use
N;
:r;
.Y•z
of large subareas.
C•:
Intensity -Duration Curves - Rainfall
intensity,."I", is determined
k.
•5
using District intensity -duration curves
for the area under study. Stan-
.e
;
_ r
J d
dard intensity -duration curves have been
prepared for many population
centers in the District. Intensity -duration
data for these standard curves
9'
is given in tabular form on Plate D-4.1.1
The standard curves for these
areas may be reproduced by plotting the 10 and 60 -minute values on Plate
D-4.2, and drawing a straight line through them. For areas where curves
have not been published, Plates D-4.3 through D-4.7 should be used to
develop design intensity -duration curves!I.
Plates D-4.3 and D-4.4 are isohyetal maps of the maximum 2 -year -
;��;'`_:•
z
1 -hour and 100 -year - 1 -hour precipitation respectively. One-hour point
rh'1
d
rain for intermediate return periods can
be determined from Plate D-4.5.
_•.:=
t_Y t2
The slope of the intensity duration curve
can be obtained from Plate D-4.6;
yy
Intensity duration curves for a particular
area can be easily developed''`
`•
Yv
��,
i
A
•
using Plate D-4.7, plotting the 1 -hour punt
rain value for the desired
t
ID
Ssa:S
-2
}.•
�i
you
;t
return period, and drawing a straight line through the 1 -hour value
• parallel to the required slope.
The isohyetal maps.and return period diagram are based on NOAA
Atlas 2 discussed in more detail in Section B of this report. The map
of intensity -duration curve slope is based on District analysis of all
available recording rain gage records in and near the District. This
material is also discussed in Section B of this manual.
Coefficient of Runoff Curves - The coefficient of runoff is intended
to account for the many factors which influence peak flow rate. The co-
efficient depends on the rainfall intensity, soil type and cover, per-
centage of impervious area, antecedent moisture condition, etc. To
account for the difference between actual and effective impervious area
it is assumed the maximum runoff rate which can occur from impervious
surfaces is 90 -percent of the rainfall rate. The runoff from pervious
surfaces is further reduced by infiltration. Runoff coefficient curves
can be developed using the relationship:
C = 0.9[Aii + I -Fp A {
I FJI
where:
C = Runoff coefficient
I = Rainfall intensity - inches/hour
Fp = Infiltration rate for pervious areas - inches/hour'
Ai = Impervious area (actual) - decimal percent
A = Pervious area (actual) - decimal percent
and A = 1.00 - A•
P i
The infiltration rate for pervious areas, "Fp", can be estimated
using the methods discussed in Section C of this manual for various
D-3
combinations of soil type, cover type and antecedent moisture condition
• (AMC). In practice it is not necessary for the engineer to make these
computations, as runoff coefficient curve data has been tabulated by the
District on Plate D-5.7 for the working range of runoff index (RI) numbers.
I
Runoff coefficient curves can be developed for any combination of conditions
by simply Plotting the data from Plate ID -5.7 on Plate D-5.8. In addition,
for the common case of urban landscaping t e
curves have been plotted on Plates D-5,
•
yp cover, runoff coefficient
1 through D-5.4.
.,ew
LEGEND HYDROLOGIC SOILS GROUP MAP
SOILS GROUP BOUNDARY
A SOILS GROUP DESIGNATION FOR
R C F C 8i W C D PECHANGA
HYDROLOGY NJA\NUAL p FEET 5000
PI ATF f.-1 FI
i
III
HYDROLOGY CALCULATION
A. PRE -DEVELOPED CONDITION
1. 10 YEAR HYDROLOGY STUDY
2. 100 YEAR HYDROLOGY STUDY
B. POST - DEVELOPED CONDITION
I. 10 YEAR HYDROLOGY STUDY
. 2. 100 YEAR HYDROLOGY STUDY
•
• RIVERSIDE COUNTY RATIONAL HYDROLOGY PROGRAM
CIVILCADD/CIVILDESIGN ENGINEERING SOFTWARE, (C) 1989 - 2004 VERSION 7.0
RATIONAL HYDROLOGY STUDY DATE: 06/05/08 FILE: NODE22 PRE I OCONNARY. OUT
------------------------------------------------------------------------
PCL 2-PM33488
10 YEAR PRE -DEVELOPED CONDITION
FN:NODE22PRE1000NNARY
C:CIVIL\RF\CONNARY
------------------------------------------------------------------------
********* HYDROLOGY STUDY CONTROL INFORMATION **********
ENGLISH (IN -LB) UNITS USED IN INPUT DATA FILE
------------------------------------------------------------------------
PROGRAM LICENSE SERIAL NUMBER 4066
------------------------------------------------------------------------
RATIONAL METHOD HYDROLOGY PROGRAM BASED ON
RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT
1976 HYDROLOGY MANUAL
STORM EVENT (YEAR) = 10.00 ANTECEDENT MOISTURE CONDITION = 2
STANDARD INTENSITY -DURATION CURVES DATA (PLATE D-4.1)
• FOR THE [ MURRIETA,TMC,RNCH CANORCO I AREA USED.
10 YEAR STORM lO MINUTE INTENSITY = 2.360(IN/HR)
10 YEAR STORM 60 MINUTE INTENSITY = 0.880(IN/HR)
100 YEAR STORM 10 MINUTE INTENSITY = 3.480(It7/HR)
100 YEAR STORM 60 MINUTE INTENSITY = 1.300(IN/HR)
STORM EVENT YEAR = 10.0
CALCULATED RAINFALL INTENSITY DATA:
1 HOUR INTENSITY = 0.880(IN/HR)
SLOPE OF INTENSITY DURATION CURVE = 0.5500
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 12.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 359. 000(FT.)
TOP (OF INITIAL AREA) ELEVATION = 1268. 000 (FT.
BOTTOM (OF INITIAL AREA) ELEVATION = 1242.000(FT.)
DIFFERENCE IN ELEVATION = 26.000(FT.)
SLOPE = 0.07242 S(PERCENT)= 7.24
TC = K(0.390)*[(LENGTH^3)/(ELEVATION CHANGE) )^0.2
INITIAL AREA TIME OF CONCENTRATION = 6.936 MIN.
• RAINFALL INTENSITY = 2.883(IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.802
DECIMAL FRACTION SOIL GROUP A = 0.000
• DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION = 0.500
INITIAL SUBAREA RUNOFF = 6.083(CFS)
TOTAL INITIAL STREAM AREA = 2.630(AC.)
PERVIOUS AREA FRACTION = 0.500
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 12.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 1
STREAM FLOW AREA = 2.630(AC.)
RUNOFF FROM THIS STREAM = 6.083(CPS)
TIME OF CONCENTRATION = 6.94 MIN.
RAINFALL INTENSITY = 2.883(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 2
++++++++++++++++++++++++++++++++t++++++++++++++++++++++++++}}+++++++++
PROCESS FROM POINT/STATION 11.000 TO POINT/STATION 12.000
**** INITIAL AREA EVALUATION ****
• INITIAL AREA FLOW DISTANCE = 500.000 (FT. )
TOP (OF INITIAL AREA) ELEVATION = 1302.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 1242.000(FT.)
DIFFERENCE IN ELEVATION = 60.000(FT.)
SLOPE = 0.12000 S(PERCENT)= 12.00
TC = K(0.480)*[(LENGTH�3)/(ELEVATION CHANGE)J�0.2
INITIAL AREA TIME OF CONCENTRATION = 8.610 MIN.
RAINFALL INTENSITY = 2.528 (IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.727
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
INITIAL SUBAREA RUNOFF = 8.434(CFS)
TOTAL INITIAL STREAM AREA = 4.590(AT.)
PERVIOUS AREA FRACTION = 0.600
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 11.000 TO POINT/STATION 12.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
• IN MAIN STREAM NUMBER: 2
STREAM FLOW AREA = 4.590(AC.)
RUNOFF FROM THIS STREAM = 8.434(CFS)
TIME OF CONCENTRATION = 8.81 MIN.
• RAINFALL INTENSITY = 2.528(IN/HR)
SUMMARY OF STREAM DATA:
STREAM FLOW RATE TC RAINFALL INTENSITY
No. (CFS) (MIN) (IN/HR)
1 6.083 6.94 2.883
2 8.434 8.81 2.528
LARGEST STREAM FLOW HAS LONGER TIME OF CONCENTRATION
QP = 8.434 + SUM OF
QB IA/IB
6.083 * 0.877 = 5.333
QP = 13.767
TOTAL OF 2 MAIN STREAMS TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
6.083 8.434
AREA OF STREAMS BEFORE CONFLUENCE:
2.630 4.590
RESULTS OF CONFLUENCE:
TOTAL FLOW RATE = 13.767(CFS)
TIME OF CONCENTRATION = 8.810 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 7.220(AC.)
PROCESS FROM POINT/STATION 12.000 TO POINT/STATION 12.100
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1242.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1225.000(FT.)
LENGTH OF NATURAL CHANNEL = 800.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 26.161(CFS)
NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLISH UNITS)^. 352) (SLOPE^O . 5)
VELOCITY USING MEAN CHANNEL FLOW = 4.70(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0213
CORRECTED/ ADJUSTED CHANNEL SLOPE = 0.0213
TRAVEL TIME = 2.84 MIN. TO = 11.65 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.779
DECIMAL FRACTION SOIL GROUP A = 0.000
• DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2) = 62.50
• PERVIOUS AREA FRACTION = 0.500: IMPERVIOUS FRACTION = 0.500
RAINFALL INTENSITY = 2.168(IN/HR) FOR A 10.0 YEAR STORM
SUBAREA RUNOFF = 21.946(CFS) FOR 13.000(Ac.)
TOTAL RUNOFF = 35.713(CFS) TOTAL AREA = 20.220(Ac
•
PROCESS FROM POINT/STATION 12.100 TO POINT/STATION 13.000
**** PIPEFLOW TRAVEL TIME (PROGRAM ESTIMATED SIZE) ****
UPSTREAM POINT/STATION ELEVATION = 1225. 000(FT.)
DOWNSTREAM POINT/STATION ELEVATION = 1220.000(FT.)
PIPE LENGTH = 122.00(FT.) MANNING'S N = 0.015
No. OF PIPES = 1 REQUIRED PIPE FLOW = 35.713(CFS)
NEAREST COMPUTED PIPE DIAMETER = 24.00 (IN.)
CALCULATED INDIVIDUAL PIPE FLOW = 35.713(CFS)
NORMAL FLOW DEPTH IN PIPE = 17.79(IN.)
FLOW TOP WIDTH INSIDE PIPE = 21.02(IN.)
CRITICAL DEPTH COULD NOT BE CALCULATED.
PIPE FLOW VELOCITY = 14.30(FT/S)
TRAVEL TIME THROUGH PIPE = 0.14 MIN.
TIME OF CONCENTRATION (TC) = 11.79 MIN.
+.++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 13.000 TO POINT/STATION 14.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1220.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1195.000(FT.)
LENGTH OF NATURAL CHANNEL = 1130.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 43.890(CFS)
NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLISH UNITS)^.352)(SLOPE^0.5)
VELOCITY USING MEAN CHANNEL FLOW = 5.55(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0221
CORRECTED/ADJUSTED CHANNEL SLOPE = 0.0221
TRAVEL TIME = 3.40 MIN. TC = 15.19 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.765
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL(AMC 2) = 62.50
• PERVIOUS AREA FRACTION = 0.5001 IMPERVIOUS FRACTION = 0.500
RAINFALL INTENSITY = 1.874(IN/HR) FOR A 10.0 YEAR STORM
SUBAREA RUNOFF = 13.278(CFS) FOR 9.260(Ac.)
•
TOTAL RUNOFF = 48.991 (CFS) TOTAL AREA = 29.480 (AC. )
PROCESS FROM POINT/STATION 14.000 TO POINT/STATION 14.100
**** PIPEFLOW TRAVEL TIME (PROGRAM ESTIMATED SIZE) ****
UPSTREAM POINT/STATION ELEVATION = 1195.000(FT. )
DOWNSTREAM POINT/STATION ELEVATION = 1192.000(FT.)
PIPE LENGTH = 192.00(FT.) MANNING'S N = 0.013
N0. OF PIPES = 2 REQUIRED PIPE FLOW = 48.991(CFS)
NEAREST COMPUTED PIPE DIAMETER = 24.00 (IN.)
CALCULATED INDIVIDUAL PIPE FLOW = 24.496(CFS)
NORMAL FLOW DEPTH IN PIPE = 17.25(IN.)
FLOW TOP WIDTH INSIDE PIPE = 21.58(IN.)
CRITICAL DEPTH = 20.98(IN.)
PIPE FLOW VELOCITY = 10.13(FT/S)
TRAVEL TIME THROUGH PIPE = 0.32 MIN.
TIME OF CONCENTRATION (TC) = 15.50 MIN.
PROCESS FROM POINT/STATION 14.000 TO POINT/STATION 14.100
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: I
STREAM FLOW AREA = 29.480(AC.)
• RUNOFF FROM THIS STREAM = 48.991 (CFS)
TIME OF CONCENTRATION = 15.50 MIN.
RAINFALL INTENSITY = 1.853(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 2
PROCESS FROM POINT/STATION 1%.000 TO POINT/STATION 18.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA. FLOW DISTANCE = 932.000(FT.)
TOP (OF INITIAL AREA) ELEVATION = 1281.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 126".000(FT.)
DIFFERENCE IN ELEVATION = 19.000(FT.)
SLOPE = 0.02039 S(PERCENT)= 2.04
TC = R(O.4BO)*[(LENGTH^3)/(ELEVATION CHANGE) )"0.2
INITIAL AREA TIME OF CONCENTRATION = 16.112 MIN.
RAINFALL INTENSITY = 1.814(IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.680
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
• INITIAL SUBAREA RUNOFF = 0.937(CFS)
TOTAL INITIAL STREAM AREA = 0.760(AC.)
PERVIOUS AREA FRACTION = 0.800
PROCESS FROM POINT/STATION 18.000 TO POINT/STATION 19.100
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 18.000 TO POINT/STATION 19.100
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 2
STREAM FLOW AREA = 9.260(AD.)
RUNOFF FROM THIS STREAM = 11.368(CFS)
• TIME OF CONCENTRATION = 19.52 MIN.
RAINFALL INTENSITY = 1.632(IN/HR)
SUMMARY OF STREAM DATA:
TOP OF STREET SEGMENT ELEVATION = 1262.000(FT.)
END OF STREET SEGMENT ELEVATION = 1192.000(FT.)
LENGTH OF STREET SEGMENT = 1190.000 (FT. )
HEIGHT OF CURB ABOVE GUTTER FLOWLINE = 6.0(IN. )
WIDTH OF HALF STREET (CURB TO CROWN) = 20.000(FT.)
DISTANCE FROM CROWN TO CROSSFALL GRADE BREAK = 18.000(FT.)
SLOPE FROM GUTTER TO GRADE BREAK (V/HZ) = 0.069
SLOPE FROM GRADE BREAK TO CROWN (V/HZ) = 0.020
STREET FLOW IS ON [1) SIDES) OF THE STREET
DISTANCE FROM CURB TO PROPERTY LINE = 10.000(FT.J
SLOPE FROM CURB TO PROPERTY LINE (V/HZ) = 0.020
GUTTER WIDTH = 2.000(FT. )
GUTTER HIKE FROM FLOWLINE = 2.000(IN. )
MANNING'S N IN GUTTER = 0.0150
MANNING'B N FROM GUTTER TO GRADE BREAK = 0.0150
MANNING's N FROM GRADE BREAK TO CROWN = 0.0150
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF STREET = 6.175(CFS)
DEPTH OF FLOW = 0.325(FT.), AVERAGE VELOCITY = 5.574(FT/S)
STREETFLOW HYDRAULICS AT MIDPOINT OF STREET TRAVEL:
HALFSTREET FLOW WIDTH = 9.905(FT.)
FLOW VELOCITY = 5. 57(FT/S)
TRAVEL TIME = 3.91 MIN. TO = 19.52 MIN.
•
ADDING AREA FLOW TO STREET
SINGLE FAMILY (1/9 ACRE LOT)
RUNOFF COEFFICIENT = 0.752
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION =
0.500
RAINFALL INTENSITY = 1.632(IN/HR) FOR A 10.0
YEAR STORM
SUBAREA RUNOFF = 10.931(CFS) FOR 8.500(AC.)
TOTAL RUNOFF = 11.368(CFS) TOTAL AREA =
9.260 (AC
STREET FLOW AT END OF STREET = 11.368(CFS)
HALF STREET FLOW AT END OF STREET — 11.368(CFS)
DEPTH OF FLOW = 0. 383(FT.), AVERAGE VELOCITY = 6.426(FT/S)
FLOW WIDTH (FROM CURB TOWARDS CROWN)— 12.815(FT.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 18.000 TO POINT/STATION 19.100
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 2
STREAM FLOW AREA = 9.260(AD.)
RUNOFF FROM THIS STREAM = 11.368(CFS)
• TIME OF CONCENTRATION = 19.52 MIN.
RAINFALL INTENSITY = 1.632(IN/HR)
SUMMARY OF STREAM DATA:
• STREAM FLOW RATE TC RAINFALL INTENSITY
NO. (CFS) (MIN) (IN/HR)
1 48.991 15.50 1.853
2 11.366 19.52 1.632
LARGEST STREAM FLOW HAS LONGER OR SHORTER TIME OF CONCENTRATION
QP = 48.991 + sum OF
QA TB/TA
11.368 * 0.794 = 9.027
QP = 58.018
TOTAL OF 2 MAIN STREAMS TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
48.991 11.368
AREA OF STREAMS BEFORE CONFLUENCE:
29.480 9.260
RESULTS OF CONFLUENCE:
TOTAL FLOW RATE = 58.018(CFS)
TIME OF CONCENTRATION = 15.501 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 38.740(AC.)
CHECK OF PREVIOUS CONFLUENCE OPERATIONS ----
OF ALL MAIN STREAMS
•
TOTAL
OF 4 STREAMS TO
CONFLUENCE:
FLOW
RATES BEFORE AND
MAXIMUM AFTER CONFLUENCE
POINT:
NO.
FLOW RATE
TC
I MAX
CONFLUENCE
1
6.083
13.627
1.989
52.399
2
8.434
15.501
1.853
58.352
3
11.368
19.520
1.632
54.819
4
35.225
15.501
1.853
58.352
NOTE:
LAST STREAM IS
AREA ADDED BETWEEN
CONFLUENCES
RESULTS OF CONFLUENCE CHECK
TOTAL FLOW RATE = 58.352(CFS)
TIME OF CONCENTRATION = 15.501 MIN.
NOTE:
MAXIMUM FLOW RATE DERIVED FROM PREVIOUS CONFLUENCES = 56. 35 (CFS)
THIS EXCEEDS NORMAL CONFLUENCE RATE OF 58.02(CFS)
THEREFORE, LARGEST CONFLUENCE FLOW RATE AND TC = 15.50 MIN. IS USED.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 14.100 TO POINT/STATION 21.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1192.000(FT.)
• END OF NATURAL CHANNEL ELEVATION = 1173.000(FT.)
LENGTH OF NATURAL CHANNEL = 575.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 66.335 (CFS)
• NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLISH UNITS)^. 352)(SLOPE^ 0. 5)
VELOCITY USING MEAN CHANNEL FLOW = 7.64(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0330
CORRECTED/ ADJUSTED CHANNEL SLOPE = 0.0330
TRAVEL TIME = 1.25 MIN. TC = 16.76 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1/9 ACRE LOT)
RUNOFF COEFFICIENT = 0.760
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.500;
IMPERVIOUS FRACTION =
0.500
RAINFALL INTENSITY = 1.775(IN/HR)
FOR A 10.0
YEAR STORM
SUBAREA RUNOFF = 14.302(CPS)
FOR 10.600(AC.)
TOTAL RUNOFF = 72.659 (CFS)
TOTAL AREA =
99.390 (AC
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
• PROCESS FROM POINT/STATION 19.100 TO POINT/STATION 21.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 1
STREAM FLOW AREA = 99.390(AC.)
RUNOFF FROM THIS STREAM = 72.659(CFS)
TIME OF CONCENTRATION = 16.76 MIN.
RAINFALL INTENSITY = 1.775(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 20.000 TO POINT/STATION 21.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 583. OOO (FT. )
TOP (OF INITIAL AREA) ELEVATION = 1273.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 1173.000(FT.)
DIFFERENCE IN ELEVATION = 100.000(FT.)
SLOPE = 0.17153 S(PERCENT)= 17.15
TC = K(0.980)*[(LENGTH�3)/(ELEVATION CHANGE)]^0.2
INITIAL AREA TIME OF CONCENTRATION = 8.723 MIN.
RAINFALL INTENSITY = 2.542(IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.728
• DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
• RI INDEX FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
INITIAL SUBAREA RUNOFF = 6. 843 (CPS)
TOTAL INITIAL STREAM AREA = 3.700(Ac.)
PERVIOUS AREA FRACTION = 0.800
PROCESS FROM POINT/STATION 20.000 TO POINT/STATION 21.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 1
STREAM FLOW AREA = 3.700(Ac.)
RUNOFF FROM THIS STREAM = 6.843(CFS)
TIME OF CONCENTRATION = 6.72 MIN.
RAINFALL INTENSITY = 2.5542(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 2
+++++++++++++++++t+++-F.+++..+++++t+++++++++++++++++++++++++..+++++t+++
PROCESS FROM POINT/STATION 21.000 TO POINT/STATION 22.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1173.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1152.500(FT.)
LENGTH OF NATURAL CHANNEL = 520.000(FT.)
• ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 0.000(CFS)
NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) _ (7 + 8(Q(ENGLISH UNITS)^. 352) (SLOPE^O . 5)
VELOCITY USING MEAN CHANNEL FLOW = 1.39(FT/S)
•
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0394
CORRECTED/ADJUSTED CHANNEL SLOPE = 0.0394
TRAVEL TIME = 6.24 MIN. TC = 14.96 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.686
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.800;
IMPERVIOUS FRACTION
= 0.200
RAINFALL INTENSITY = 1.889(IN/HR)
FOR A 10.0
YEAR STORM
SUBAREA RUNOFF = 10.365(CFS)
FOR 8.000(Ac.)
TOTAL RUNOFF = 10.365(CFS)
TOTAL AREA =
11.700(Ac
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
•
PROCESS FROM POINT/STATION 21.000 TO POINT/STATION 22.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 1
STREAM FLOW AREA = 11.700(AC.)
RUNOFF FROM THIS STREAM = 10.365(CFS)
TIME OF CONCENTRATION = 14.96 MIN.
RAINFALL INTENSITY = 1.889(IN/HR)
PROGRAM IS HOW STARTING WITH MAIN STREAM N0. 2
PROCESS FROM POINT/STATION 19.000 TO POINT/STATION 22.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1194.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1152.500(FT.)
LENGTH OF NATURAL CHANNEL = 520.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 0.000(CPS)
NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (% + 8(O(ENGLISH UNITS)".352)(SLOPE^0.5)
VELOCITY USING MEAN CHANNEL FLOW = 1.98(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
• NORMAL CHANNEL SLOPE = 0.0798
CORRECTED/ADJUSTED CHANNEL SLOPE = 0.0798
TRAVEL TIME = 4.38 MIN. TC = 19.34 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.752
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.500;
IMPERVIOUS FRACTION =
0.500
RAINFALL INTENSITY = 1. 640(IN/HR) FOR A 10.0
YEAR STORM
SUBAREA RUNOFF = 9.380(CFS)
FOR 7. 600(AC.)
TOTAL RUNOFF = 9.380(CFS)
TOTAL AREA =
19.300(Ac
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 19.000 TO POINT/STATION 22.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 2
STREAM FLOW AREA = 19.300(AC.)
• RUNOFF FROM THIS STREAM = 9.380(CFS)
TIME OF CONCENTRATION = 19.34 MIN.
RAINFALL INTENSITY = 1.640(IN/HR)
PROGRAM I5 NOW STARTING WITH MAIN STREAM NO. 3
•
PROCESS FROM POINT/STATION 19.000 TO POINT/STATION 16.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 1000. 000(FT.)
TOP (OF INITIAL AREA) ELEVATION = 1194.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 1162.000(FT.)
DIFFERENCE IN ELEVATION = 32.000(FT.)
SLOPE = 0.03200 S(PERCENT)= 3.20
TC = K(0.390)*[(LENGTH A 3)/(ELEVATION CHANGE) ]"0.2
INITIAL AREA TIME OF CONCENTRATION = 12.304 MIN.
RAINFALL INTENSITY = 2.104(IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.776
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2 ) = 62.50
PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION = 0.500
INITIAL SUBAREA RUNOFF = 16.324 (CFS)
TOTAL INITIAL STREAM AREA = 10.000(AC.)
PERVIOUS AREA FRACTION = 0.500
PROCESS FROM POINT/STATION 19.000 TO POINT/STATION 16.000
**** CONFLUENCE OF MINOR STREAMS ****
ALONG MAIN STREAM NUMBER: 3 IN NORMAL STREAM NUMBER I
STREAM FLOW AREA = 10.000(AC.)
RUNOFF FROM THIS STREAM = 16.324(CFS)
TIME OF CONCENTRATION = 12.30 MIN.
RAINFALL INTENSITY = 2.104(IN/HR)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 15.000 TO POINT/STATION 16.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 428.000 (FT. )
TOP (OF INITIAL AREA) ELEVATION = 1204.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 1162.000(FT.)
DIFFERENCE IN ELEVATION = 42.000(FT.)
SLOPE = 0.09813 5(PERCENT)= 9.81
TC = K (0 . 390) * [ (LENGTH"3) / (ELEVATION CHANGE) ]^0.2
INITIAL AREA TIME OF CONCENTRATION = 7.003 MIN.
RAINFALL INTENSITY = 2.868(IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.802
DECIMAL FRACTION SOIL GROUP A = 0.000
• DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2 )
• PERVIOUS AREA FRACTION = 0
INITIAL SUBAREA RUNOFF =
TOTAL INITIAL STREAM AREA =
PERVIOUS AREA FRACTION = 0.
•
= 62.50
.500; IMPERVIOUS FRACTION = 0.500
7.635(CPS)
3.320(Ac.)
500
++++++++++++++++t+....+++++t+++++.+++++++++++++++f+++++++-h++++++++t+++
PROCESS FROM POINT/STATION 15.000 TO POINT/STATION 16.000
**** CONFLUENCE OF MINOR STREAMS ****
ALONG MAIN STREAM NUMBER:
STREAM FLOW AREA = 3
RUNOFF FROM THIS STREAM =
TIME OF CONCENTRATION =
RAINFALL INTENSITY =
SUMMARY OF STREAM DATA:
3 IN NORMAL STREAM NUMBER 2
320(Ac.)
7.635(CPS)
7.00 MIN.
.868(IN/HR)
STREAM FLOW RATE TC RAINFALL INTENSITY
N0. (CFS) (MIN) (IN/HR)
1 16.324 12.30 2.104
2 7.635 7.00 2.868
LARGEST STREAM FLOW HAS LONGER TIME OF CONCENTRATION
QP = 16.324 + SUM OF
QB IA/IB
7.635 * 0.733 = 5.600
QP = 21.923
TOTAL OF 2 STREAMS TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
16.324 7.635
AREA OF STREAMS BEFORE CONFLUENCE:
10.000 3.320
RESULTS OF CONFLUENCE:
TOTAL FLOW RATE = 21.923(CFS)
TIME OF CONCENTRATION = 12.309 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 13.320(AC.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 16.000 TO POINT/STATION 22.000
**** IMPROVED CHANNEL TRAVEL TIME ****
UPSTREAM POINT ELEVATION = 1162.000 (FT. )
DOWNSTREAM POINT ELEVATION = 1152.500(FT.)
CHANNEL LENGTH THRU SUBAREA = 85.000(FT.)
CHANNEL BASE WIDTH = 0.000(FT.)
SLOPE OR 'Z' OF LEFT CHANNEL BANK = 10.000
SLOPE OR 'Z' OF RIGHT CHANNEL BANK = 10.000
MANNING'S 'N' = 0.015
MAXIMUM DEPTH OF CHANNEL = 0.500(FT.
)
FLOW (Q) THRU SUBAREA = 21.923(CFS)
DEPTH OF FLOW = 0.430(FT.)I AVERAGE VELOCITY = 11.849(FT/S)
CHANNEL FLOW TOP WIDTH = 8.603(FT.)
FLOW VELOCITY = 11.85(FT/S)
++++++++++++++++++.......++++++i -+++++++.++.+++++++++++++-h .+++=+-F+t-F...
PROCESS FROM POINT/STATION 16.000 TO POINT/STATION 22.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
114 MAIN STREAM NUMBER: 3
STREAM FLOW AREA = 13.320(AC.)
RUNOFF FROM THIS STREAM = 21.923(CFS)
TIME OF CONCENTRATION = 12.42 MIN.
RAINFALL INTENSITY = 2.092(IN/HR)
SUMMARY OF STREAM DATA:
STREAM
TRAVEL TIME =
0. 12 MIN.
RAINFALL INTENSITY
•
TIME OF CONCENTRATION = 12.42 MIN.
(MIN)
(IN/HR)
SUB -CHANNEL NO.
1 CRITICAL DEPTH =
0.781(FT.)
1.889
2
CRITICAL FLOW
TOP WIDTH = 10.000(FT.)
1.640
' r
' CRITICAL FLOW
VELOCITY= 4.127(FT/S)
2.092
' r
' CRITICAL FLOW
AREA = 5.313(SQ.FT)
++++++++++++++++++.......++++++i -+++++++.++.+++++++++++++-h .+++=+-F+t-F...
PROCESS FROM POINT/STATION 16.000 TO POINT/STATION 22.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
114 MAIN STREAM NUMBER: 3
STREAM FLOW AREA = 13.320(AC.)
RUNOFF FROM THIS STREAM = 21.923(CFS)
TIME OF CONCENTRATION = 12.42 MIN.
RAINFALL INTENSITY = 2.092(IN/HR)
SUMMARY OF STREAM DATA:
STREAM
FLOW RATE
TC
RAINFALL INTENSITY
NO.
(CFS)
(MIN)
(IN/HR)
1
10.365
14.96
1.889
2
9.380
19.34
1.640
• 3
21.923
12.42
2.092
LARGEST
STREAM FLOW
HAS LONGER OR
SHORTER TIME OF CONCENTRATION
QP =
21.923 +
SUM OF
QA
TB/TA
10.365 *
0.831 =
8.609
QA
TB/TA
9.380 *
0.642 =
6.025
QP =
36.557
TOTAL OF 3 MAIN STREAMS TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
10.365 9.380 21.923
AREA OF STREAMS BEFORE CONFLUENCE:
11.700 19.300 13.320
RESULTS OF CONFLUENCE:
TOTAL FLOW RATE = 36.557(CFS)
TIME OF CONCENTRATION = 12.423 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 44.320(AC.)
---
CHECK OF PREVIOUS CONFLUENCE OPERATIONS ------
OF
ALL MAIN STREAMS
TOTAL OF 6
STREAMS TO CONFLUENCE:
•
FLOW RATES
BEFORE
AND MAXIMUM AFTER CONFLUENCE POINT:
NO.
FLOW
RATE TC I MAX CONFLUENCE
1
6.083
13.084
2.034
RUNOFF COEFFICIENT = 0.683
79.762
2
8.434
14.958
1.889
DECIMAL FRACTION SOIL GROUP C = 0.500
85.319
• 3
11.368
18.977
1.657
PERVIOUS AREA FRACTION = 0.800;
81.198
= 0.200
4
35.225
10.0 YEAR STORM
14.958
FOR 4 .4
1.889
TOTAL RUNOFF = 90.917(CFS)
85.319
= 48.750 (AC
5
9.380
THE FOLLOWING FIGURES MAY
19.341
1.640
OF THE SAME
80.626
6
21.923
12.423
2.092
77.426
RESULTS OF CONFLUENCE CHECK
TOTAL FLOW RATE = 85.319(CFS)
TIME OF CONCENTRATION = 14.958 MIN.
NOTE:
MAXIMUM FLOW RATE DERIVED FROM PREVIOUS CONFLUENCES = 85.32 (CFS)
THIS EXCEEDS NORMAL CONFLUENCE RATE OF 36.56(CFS)
THEREFORE, LARGEST CONFLUENCE FLOW RATE AND TC = 14.96 MIN. IS USED.
++++++++++++-F++++++++++++++++++++++++-F++++++++++t++++++++++.+++....+++
PROCESS FROM POINT/STATION 22.000 TO POINT/STATION 23.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHAN14EL ELEVATION = 1152.500(FT.)
END OF NATURAL CHANNEL ELEVATION = 1134.500(FT.)
LENGTH OF NATURAL CHANNEL = 354.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 89.583(CFS)
NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
• VELOCITY(FT/S) _ (7 + 8(Q(ENGLISH UNITS )A.352)(SLOPE^0.5)
VELOCITY USING MEAN CHANNEL FLOW = 10.36(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0508
CORRECTED/ADJUSTED CHANNEL SLOPE = 0.0508
TRAVEL TIME = 0.57 MIN. TC = 15.53 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.683
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX. FOR SOIL (AMC 2 ) = 62.50
PERVIOUS AREA FRACTION = 0.800;
IMPERVIOUS FRACTION
= 0.200
RAINFALL INTENSITY = 1.851(IN/HR)
FOR A
10.0 YEAR STORM
SUBAREA RUNOFF = 5.597 (CFS)
FOR 4 .4
30 (AC. )
TOTAL RUNOFF = 90.917(CFS)
TOTAL AREA
= 48.750 (AC
END OF COMPUTATIONS, TOTAL STUDY AREA =
86.39 (AC.)
THE FOLLOWING FIGURES MAY
BE USED FOR A UNIT HYDROGRAPH STUDY
OF THE SAME
AREA.
• AREA AVERAGED PERVIOUS AREA FRACTION(AP) = 0.575
AREA AVERAGED RI INDEX NUMBER = 62.5
• RIVERSIDE COUNTY RATIONAL HYDROLOGY PROGRAM
CIVILCADD/CIVILDESIGN ENGINEERING SOFTWARE, (C) 1989 - 2004 VERSION 7.0
RATIONAL HYDROLOGY STUDY DATE: 06/05/08 FILE: NODE22 PRE I OOCONNARY. OUT
------------------------------------------------------------------------
PCL 2 - PM 33488
100 YEAR PRE -DEVELOPED CONDITION
FN: NODE22PRE10000NNARY
C:CIVIL\RF\CONNARY
------------------------------------------------------------------------
HYDROLOGY STUDY CONTROL INFORMATION **********
ENGLISH (IN -LB) UNITS USED IN INPUT DATA FILE
------------------------------------------------------------------------
PROGRAM LICENSE SERIAL NUMBER 4066
------------------------------------------------------------------------
RATIONAL METHOD HYDROLOGY PROGRAM BASED ON
RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT
1978 HYDROLOGY MANUAL
STORM EVENT (YEAR) = 100.00 ANTECEDENT MOISTURE CONDITION = 3
STORM EVENT YEAR = 100.0
CALCULATED RAINFALL INTENSITY DATA:
1 HOUR INTENSITY = 1.300(IN/HR)
SLOPE OF INTENSITY DURATION CURVE = 0.5500
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 12.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 359.000 (FT. )
TOP (OF INITIAL AREA) ELEVATION = 1268. 000 (FT.
BOTTOM (OF INITIAL AREA) ELEVATION = 1242.000(FT.)
DIFFERENCE IN ELEVATION = 26.000(FT.)
SLOPE = 0.07242 S(PERCENT)= 7.24
TC = K(0.390) * [ (LENGTH'3) / (ELEVATION CHANGE) ] ^0.2
INITIAL AREA TIME OF CONCENTRATION = 6.936 MIN.
• RAINFALL INTENSITY = 4.259(IN/HR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.867
STANDARD
INTENSITY -DURATION CURVES DATA
(PLATE D-4.1)
•
FOR THE [
MURRIETA,TMC,RNCH CANORCO )
AREA USED.
10 YEAR STORM 10 MINUTE INTENSITY = 2.360(IN/HR)
10 YEAR STORM 60 MINUTE INTENSITY = 0.880(IN/HR)
100 YEAR
STORM 10 MINUTE INTENSITY =
3.480(IN/HR)
100 YEAR
STORM 60 MINUTE INTENSITY =
1.300(IN/HR)
STORM EVENT YEAR = 100.0
CALCULATED RAINFALL INTENSITY DATA:
1 HOUR INTENSITY = 1.300(IN/HR)
SLOPE OF INTENSITY DURATION CURVE = 0.5500
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 12.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 359.000 (FT. )
TOP (OF INITIAL AREA) ELEVATION = 1268. 000 (FT.
BOTTOM (OF INITIAL AREA) ELEVATION = 1242.000(FT.)
DIFFERENCE IN ELEVATION = 26.000(FT.)
SLOPE = 0.07242 S(PERCENT)= 7.24
TC = K(0.390) * [ (LENGTH'3) / (ELEVATION CHANGE) ] ^0.2
INITIAL AREA TIME OF CONCENTRATION = 6.936 MIN.
• RAINFALL INTENSITY = 4.259(IN/HR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.867
DECIMAL FRACTION SOIL GROUP A = 0.000
• DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION = 0.500
INITIAL SUBAREA RUNOFF = 9.715(CPS)
TOTAL INITIAL STREAM AREA = 2.630(AC.)
PERVIOUS AREA FRACTION = 0.500
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 12.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 1
STREAM FLOW AREA = 2.630(AC.)
RUNOFF FROM THIS STREAM = 9.715(CPS)
TIME OF CONCENTRATION = 6.94 MIN.
RAINFALL INTENSITY = 4.259(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 2
PROCESS FROM POINT/STATION 11.000 TO POINT/STATION 12.000
**** INITIAL AREA EVALUATION ****
• INITIAL AREA FLOW DISTANCE = 500.000(FT.)
TOP (OF INITIAL AREA) ELEVATION = 1302.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 1242.000(FT.)
DIFFERENCE IN ELEVATION = 60.000(FT.)
SLOPE = 0.12000 S(PERCENT)= 12.00
TC = K(0.480)*[(LENGTH^3) /(ELEVATION CHANGE)]^0.2
INITIAL AREA TIME OF CONCENTRATION = 6.810 MIN.
RAINFALL INTENSITY = 3. 734(IN/HR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.841
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
INITIAL SUBAREA RUNOFF = 14.414(CFS)
TOTAL INITIAL STREAM AREA = 4.590(AC.)
PERVIOUS AREA FRACTION = 0.800
PROCESS FROM POINT/STATION 11.000 TO POINT/STATION 12.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
• IN MAIN STREAM NUMBER: 2
STREAM FLOW AREA = 4.590(AC.)
RUNOFF FROM THIS STREAM = 14.414(CFS)
TIME OF CONCENTRATION = 8.81 MIN.
• RAINFALL INTENSITY = 3.734 (IN/HR)
SUMMARY OF STREAM DATA:
STREAM FLOW RATE TO RAINFALL INTENSITY
N0. (CFS) (MIN) (IN/HR)
1 9.715 6.94 4.259
2 14.414 8.81 3.734
LARGEST STREAM FLOW HAS LONGER TIME OF CONCENTRATION
QP = 14.414 + SUM OF
QB IA/IB
9.715 * 0.877 = 8.518
QP = 22.932
TOTAL OF 2 MAIN STREAMS TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
9.715 14.414
AREA OF STREAMS BEFORE CONFLUENCE:
2.630 4.590
RESULTS OF CONFLUENCE:
TOTAL FLOW RATE = 22.932(CFS)
TIME OF CONCENTRATION = 8.810 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 7.220(AC.)
PROCESS FROM POINT/STATION 12.000 TO POINT/STATION 12.100
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1242.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1225.000(FT.)
LENGTH OF NATURAL CHANNEL = 800.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 43.577 (CFS)
NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLISH UNITS) ^.352)(SLOPE^0.5)
VELOCITY USING MEAN CHANNEL FLOW = 5.42 (FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0213
CORRECTED/ADJUSTED CHANNEL SLOPE = 0.0213
TRAVEL TIME = 2.46 MIN. TC = 11.27 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FA14ILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.858
DECIMAL FRACTION SOIL GROUP A = 0.000
• DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX. FOR SOIL (AMC 3) = 80.00
• PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION = 0.500
RAINFALL INTENSITY = 3.261(IN/HR) FOR A 100.0 YEAR STORM
SUBAREA RUNOFF = 36.389(CFS) FOR 13.000(Ac.)
TOTAL RUNOFF = 59.320(CFS) TOTAL AREA = 20.220 (AC
0
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 12.100 TO POINT/STATION 13.000
**** PIPEFLOW TRAVEL TIME (PROGRAM ESTIMATED SIZE) ****
UPSTREAM POINT/STATION ELEVATION = 1225. 000(FT.)
DOWNSTREAM POINT/STATION ELEVATION = 1220.000(FT.)
PIPE LENGTH = 122.00(FT.) MANNING'$ N = 0.015
No. OF PIPES = 1 REQUIRED PIPE FLOW = 59.320(CFS)
NEAREST COMPUTED PIPE DIAMETER = 30.00(IN.)
CALCULATED INDIVIDUAL PIPE FLOW = 59.320(CFS)
NORMAL FLOW DEPTH IN PIPE = 20.77(IN.)
FLOW TOP WIDTH INSIDE PIPE = 27.70(IN.)
CRITICAL DEPTH COULD NOT BE CALCULATED.
PIPE FLOW VELOCITY = 16.38(FT/S)
TRAVEL TIME THROUGH PIPE = 0.12 MIN.
TIME OF CONCENTRATION (TC) = 11.39 MIN.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 13.000 TO POINT/STATION 14.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1220.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1195.000(FT.)
LENGTH OF NATURAL CHANNEL = 1130.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 72.909 (CFS)
NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLISH UNITS) ^. 352) (SLOPE^0 . 5)
VELOCITY USING MEAN CHANNEL FLOW = 6.43(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0221
CORRECTED/ ADJUSTED CHANNEL SLOPE = 0.0221
TRAVEL TIME = 2.93 MIN. TC = 14.32 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.853
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
• PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION = 0.500
RAINFALL INTENSITY = 2.858(IN/HR) FOR A 100.0 YEAR STORM
SUBAREA RUNOFF = 22.577(CPS) FOR 9.260(Ac.)
TOTAL RUNOFF = 81.897(CFS) TOTAL AREA = 29.480(AC.)
++++++++++++++++++..............++++++++++++++++++++ff++++++++++++++++
PROCESS FROM POINT/STATION 14.000 TO POINT/STATION 14.100
**** PIPEFLOW TRAVEL TIME (PROGRAM ESTIMATED SIZE) ****
UPSTREAM POINT/STATION ELEVATION = 1195.000 (FT.)
DOWNSTREAM POINT/STATION ELEVATION = 1192.000(FT.)
PIPE LENGTH = 192.00(FT.) MANNING'S N = 0.013
NO. OF PIPES = 2 REQUIRED PIPE FLOW = 81.897(CFS)
NEAREST COMPUTED PIPE DIAMETER = 27.00(IN.)
CALCULATED INDIVIDUAL PIPE FLOW = 40.949(CFS)
NORMAL FLOW DEPTH IN PIPE = 23.91(IN.)
FLOW TOP WIDTH INSIDE PIPE = 17.20(IN.)
CRITICAL DEPTH = 25.25(IN.)
PIPE FLOW VELOCITY = 11.00(FT/S)
TRAVEL TIME THROUGH PIPE = 0.29 MIN.
TIME OF CONCENTRATION (TC) = 14.61 MIN.
PROCESS FROM POINT/STATION 14.000 TO POINT/STATION 14.100
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 1
STREAM FLOW AREA = 29.480(AC.)
• RUNOFF FROM THIS STREAM = 81.897(CFS)
TIME OF CONCENTRATION = 14.61 MIN.
RAINFALL INTENSITY = 2.827(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 2
PROCESS FROM POINT/STATION 17.000 TO POINT/STATION 18.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 932.000(FT.)
TOP (OF INITIAL AREA) ELEVATION = 1281.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 1262. 000 (FT.
DIFFERENCE IN ELEVATION = 19.000(FT.)
SLOPE = 0.02039 S(PERCENT)= 2.04
TC = K ( 0.480) * [ (LENGTH^3) /(ELEVATION CHANGE) ] ^0.2
INITIAL AREA TIME OF CONCENTRATION = 16.112 MIN.
RAINFALL INTENSITY = 2. 679(IN/HR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.820
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
• INITIAL SUBAREA RUNOFF = I.670(CPS)
TOTAL INITIAL STREAM AREA - 0.760(AC.)
PERVIOUS AREA FRACTION = 0.800
PROCESS FROM POINT/STATION 18.000 TO POINT/STATION 14.100
**** STREET FLOW TRAVEL TIME + SUBAREA FLOW ADDITION ****
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 18.000 TO POINT/STATION 14.100
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 2
STREAM FLOW AREA = 9.260(AC.)
RUNOFF FROM THIS STREAM = 19.199(CFS)
• TIME OF CONCENTRATION = 19.13 MIN.
RAINFALL INTENSITY = 2.438(IN/HR)
SUMMARY OF STREAM DATA:
TOP OF STREET SEGMENT ELEVATION = 1262.000(FT.)
END OF STREET SEGMENT ELEVATION = 1192.000(FT.)
LENGTH OF STREET SEGMENT = 1140. 000 (FT.)
HEIGHT OF CURB ABOVE GUTTER FLOWLINE = 6.0(IN.)
WIDTH OF HALF STREET (CURB TO CROWN) = 20.000(FT.)
DISTANCE FROM CROWN TO CROSSFALL GRADE BREAK = 18.000(FT. )
SLOPE FROM GUTTER TO GRADE BREAK (V/HZ) = 0.064
SLOPE FROM GRADE BREAK TO CROWN (V/HZ) = 0.020
STREET FLOW IS ON [1] SIDES) OF THE STREET
DISTANCE FROM CURB TO PROPERTY LINE = 10.000(FT.)
SLOPE FROM CURB TO PROPERTY LINE (V/HZ) = 0.020
GUTTER WIDTH = 2.000(FT.)
GUTTER HIKE FROM FLOWLINE = 2.000(IN.)
MANNING's N IN GUTTER = 0.0150
MANNING's N FROM GUTTER TO GRADE BREAK = 0.0150
MANNING's N FROM GRADE BREAK TO CROWN = 0.0150
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF STREET = 10.473(CFS)
DEPTH OF FLOW = 0.374(FT.), AVERAGE VELOCITY = 6.303(FT/S)
STREETFLOW HYDRAULICS AT MIDPOINT OF STREET TRAVEL:
HALFSTREET FLOW WIDTH = 12.389(FT.)
FLOW VELOCITY = 6.30(FT/5)
TRAVEL TIME = 3.01 MIN. TC = 19.13 MIN.
•
ADDING AREA FLOW TO STREET
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.846
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION =
0.500
RAINFALL INTENSITY = 2.438(IN/HR) FOR A 100.0
YEAR STORM
SUBAREA RUNOFF = 17.529(CFS) FOR 8.500(AC.)
TOTAL RUNOFF = 19.199(CFS) TOTAL AREA =
9.260(AC.
STREET FLOW AT END OF STREET = 19.199(CFS)
HALF STREET FLOW AT END OF STREET = 19.199(CFS)
DEPTH OF FLOW = 0.443(FT.), AVERAGE VELOCITY = 7.287(FT/S)
FLOW WIDTH (FROM CURB TOWARDS CROWN)= 15.837(FT. )
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 18.000 TO POINT/STATION 14.100
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 2
STREAM FLOW AREA = 9.260(AC.)
RUNOFF FROM THIS STREAM = 19.199(CFS)
• TIME OF CONCENTRATION = 19.13 MIN.
RAINFALL INTENSITY = 2.438(IN/HR)
SUMMARY OF STREAM DATA:
• STREAM FLOW RATE TC RAINFALL INTENSITY
No. (CFS) (MIN) (IN/HR)
1 81.897 14.61 2.827
2 19.199 19.13 2.438
LARGEST STREAM FLOW HAS LONGER OR SHORTER TIME OF CONCENTRATION
QP = 81.897 + SUM OF
QA TB/TA
19.199 * 0.764 = 14.670
QP = 96.567
TOTAL OF 2 MAIN STREAMS TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
81.897 19.199
AREA OF STREAMS BEFORE CONFLUENCE:
29.480 9.260
RESULTS OF CONFLUENCE:
TOTAL FLOW RATE = 96.567(CFS)
TIME OF CONCENTRATION = 14.614 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 38.740(AC.)
RESULTS OF CONFLUENCE CHECK
TOTAL FLOW RATE = 97.058(CFS)
TIME OF CONCENTRATION = 14.614 MIN.
NOTE:
MAXIMUM FLOW RATE DERIVED FROM PREVIOUS CONFLUENCES = 97.06(CFS)
THIS EXCEEDS NORMAL CONFLUENCE RATE OF 96.57(CFS)
THEREFORE, LARGEST CONFLUENCE FLOW RATE AND TC = 14.61 MIN. IS USED.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 14.100 TO POINT/STATION 21.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1192.000(FT.)
• END OF NATURAL CHANNEL ELEVATION = 1173.000(FT.)
LENGTH OF NATURAL CHANNEL = 575.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 110.337 (CFS)
--------------
CHECK OF
PREVIOUS CONFLUENCE
OPERATIONS -------------
OF
ALL MAIN
STREAMS
•
TOTAL
OF 4 STREAMS TO CONFLUENCE:
FLOW
RATES BEFORE
AND MAXIMUM
AFTER CONFLUENCE
POINT:
No.
FLOW
RATE
TC
I
MAX
CONFLUENCE
1
9.715
12.740
3.048
86.474
2
14.414
14.614
2.827
97.058
3
19.199
19.126
2.438
90.255
4
58.965
14.614
2.827
97.058
NOTE:
LAST STREAM IS AREA
ADDED BETWEEN
CONFLUENCES
RESULTS OF CONFLUENCE CHECK
TOTAL FLOW RATE = 97.058(CFS)
TIME OF CONCENTRATION = 14.614 MIN.
NOTE:
MAXIMUM FLOW RATE DERIVED FROM PREVIOUS CONFLUENCES = 97.06(CFS)
THIS EXCEEDS NORMAL CONFLUENCE RATE OF 96.57(CFS)
THEREFORE, LARGEST CONFLUENCE FLOW RATE AND TC = 14.61 MIN. IS USED.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 14.100 TO POINT/STATION 21.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1192.000(FT.)
• END OF NATURAL CHANNEL ELEVATION = 1173.000(FT.)
LENGTH OF NATURAL CHANNEL = 575.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 110.337 (CFS)
• NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLISH UNITS) ^. 352) (SLOPE^O . 5)
VELOCITY USING MEAN CHANNEL FLOW = 8.89(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0330
CORRECTED/ ADJUSTED CHANNEL SLOPE = 0.0330
TRAVEL TIME = 1.08 MIN. TC = 15.69 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.851
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION = 0.500
RAINFALL INTENSITY = 2.718(IN/HR) FOR A 100.0 YEAR STORM
SUBAREA RUNOFF = 24.516(CFS) FOR 10.600(AC.)
TOTAL RUNOFF = 121.574 (CFS) TOTAL AREA = 49.340(AC
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
• PROCESS FROM POINT/STATION 14.100 TO POINT/STATION 21.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 1
STREAM FLOW AREA = 49.340(AC.)
RUNOFF FROM THIS STREAM = 121.574(CFS)
TIME OF CONCENTRATION = 15.69 MIN.
RAINFALL INTENSITY = 2.718 (IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 20.000 TO POINT/STATION 21.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 583.000(FT.)
TOP (OF INITIAL AREA) ELEVATION = 1273.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 1173.000(FT.)
DIFFERENCE IN ELEVATION = 100.000(FT.)
SLOPE = 0.17153 S(PERCENT)= 17.15
TC = K(0.480) * [ (LENGTH^3) / (ELEVATION CHANGE) ] ^0.2
INITIAL AREA TIME OF CONCENTRATION = 8.723 MIN.
RAINFALL INTENSITY = 3.755(IN/HR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.841
• DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
• RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
INITIAL SUBAREA RUNOFF = 11.688 (CFS)
TOTAL INITIAL STREAM AREA = 3.700(AC.)
PERVIOUS AREA FRACTION = 0.800
+++++++++++++++++++++++++++++++++++++++++++++++-h++++++++++++++++++++++
PROCESS FROM POINT/STATION 20.000 TO POINT/STATION 21.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 1
STREAM FLOW AREA = 3.700(AC.)
RUNOFF FROM THIS STREAM = 11.688(CFS)
TIME OF CONCENTRATION = 8.72 MIN.
RAINFALL INTENSITY = 3.755(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 21.000 TO POINT/STATION 22.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1173.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1152.500(FT.)
LENGTH OF NATURAL CHANNEL = 520.000(FT.)
• ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 0.000(CPS)
NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLISH UNITS) ^. 352)(SLOPE^O.5)
VELOCITY USING MEAN CHANNEL FLOW = 1.39(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0394
CORRECTED/ ADJUSTED CHANNEL SLOPE = 0.0394
TRAVEL TIME = 6.24 MIN. TO = 14.96 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.823
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
RAINFALL INTENSITY = 2.791(IN/HR) FOR A 100.0 YEAR STORM
SUBAREA RUNOFF = 18.379(CFS) FOR 8.000(AC.)
TOTAL RUNOFF = 18.379 (CFS) TOTAL AREA = 11.700 (AC
•
+++++++++++++++++++++++++++++++++++-F++++++++++++++++++++++++++++++++++
•
PROCESS FROM POINT/STATION 21.000 TO POINT/STATION 22.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: I
STREAM FLOW AREA = 11.700(AC.)
RUNOFF FROM THIS STREAM = 18.379(CFS)
TIME OF CONCENTRATION = 14.96 MIN.
RAINFALL INTENSITY = 2.791(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM N0. 2
++++++++++++++++++++++."f'+++++++++++++++++'f'"F".+'f'+++++++++++++++T++++++++
PROCESS FROM POINT/STATION 19.000 TO POINT/STATION 22.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1194.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1152.500(FT.)
LENGTH OF NATURAL CHANNEL = 520.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 0.000(CFS)
NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLISH UNITS) ^. 352) (SLOPE^O . 5)
VELOCITY USING MEAN CHANNEL FLOW = 1. 98(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
• NORMAL CHANNEL SLOPE = 0.079E
CORRECTED/ADJUSTED CHANNEL SLOPE = 0.079E
TRAVEL TIME = 4.38 MIN. TC = 19.34 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.846
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX, FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION = 0.500
RAINFALL INTENSITY = 2.423(IN/HR) FOR A 100.0 YEAR STORM
SUBAREA RUNOFF = 15.572(CFS) FOR 7. 600 (AD.
TOTAL RUNOFF = 15.572 (CFS) TOTAL AREA = 19.300 (Ac
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 19.000 TO POINT/STATION 22.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 2
STREAM FLOW AREA = 19.300(AC.)
• RUNOFF FROM THIS STREAM = 15.572(CFS)
TIME OF CONCENTRATION = 19.34 MIN.
RAINFALL INTENSITY = 2.423 (IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM N0. 3
PROCESS FROM POINT/STATION 19.000 TO POINT/STATION 16.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 1000.000(FT.)
TOP (OF INITIAL AREA) ELEVATION = 1194.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 1162.000(FT.)
DIFFERENCE IN ELEVATION = 32.000(FT.)
SLOPE = 0.03200 S(PERCENT)= 3.20
TO = R(0.390)*[(LENGTH�3)/(ELEVATION CHANGE) J^0.2
INITIAL AREA TIME OF CONCENTRATION = 12.304 MIN.
RAINFALL INTENSITY = 3.107 (IN/BR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.856
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION = 0.500
INITIAL SUBAREA RUNOFF = 26.613(CFS)
TOTAL INITIAL STREAM AREA = 10.000(AC.)
PERVIOUS AREA FRACTION = 0.500
PROCESS FROM POINT/STATION 19.000 TO POINT/STATION 16.000
**** CONFLUENCE OF MINOR STREAMS ****
ALONG MAIN STREAM NUMBER; 3 IN NORMAL STREAM NUMBER 1
STREAM FLOW AREA = 10.000(AC.)
RUNOFF FROM THIS STREAM = 26.613(CFS)
TIME OF CONCENTRATION = 12.30 MIN.
RAINFALL INTENSITY = 3.107(IN/HR)
PROCESS FROI4 POINT/STATION 15.000 TO POINT/STATION 16.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 428.000(FT.)
TOP (OF INITIAL AREA) ELEVATION = 1204.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 1162.000(FT.)
DIFFERENCE IN ELEVATION = 42.000(FT.)
SLOPE = 0.09813 S(PERCENT)= 9.81
TC = E(0.390)*[(LENGTH"3)/(ELEVATION CHANGE) ]"0.2.
INITIAL AREA TIME OF CONCENTRATION = 7.003 MIN.
RAINFALL INTENSITY = 4.237 (IN/HR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1/4 ACRE LOT)
RUNOFF COEFFICIENT = 0.86%
DECIMAL FRACTION SOIL GROUP A = 0.000
• DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
• PERVIOUS AREA FRACTION = 0.500; IMPERVIOUS FRACTION = 0.500
INITIAL SUBAREA RUNOFF = 12.197(CFS)
TOTAL INITIAL STREAM AREA = 3.320(AC.)
PERVIOUS AREA FRACTION = 0.500
•
+++++++tt.++++++++i-+++.++++....+i-++++++.+++++++++f++++++++++++++++++++
PROCESS FROM. POINT/STATION 15.000 TO POINT/STATION 16.000
**** CONFLUENCE OF MINOR STREAMS ****
ALONG MAIN STREAM NUMBER:
STREAM FLOW AREA = 3
RUNOFF FROM THIS STREAM =
TIME OF CONCENTRATION =
RAINFALL INTENSITY =
SUMMARY OF STREAM DATA:
3 IN NORMAL STREAM NUMBER 2
320(Ac.)
12.197(CFS)
7.00 MIN.
.237(IN/HR)
STREAM FLOW RATE TC RAINFALL INTENSITY
No. (CFS) (MIN) (IN/HR)
1 26.613 12.30 3.107
2 12.197 7.00 9.237
LARGEST STREAM FLOW HAS LONGER TIME OF CONCENTRATION
QP = 26.613 + SUM OF
QB IA/IB
12.197 * 0.733 = 8.997
QP = 35.559
TOTAL OF 2 STREAMS TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
26.613 12.197
AREA OF STREAMS BEFORE CONFLUENCE:
10.000 3.320
RESULTS OF CONFLUENCE:
TOTAL FLOW RATE = 35.559(CFS)
TIME OF CONCENTRATION = 12.309 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 13.320(AC.)
PROCESS FROM POINT/STATION 16.000 TO POINT/STATION 22.000
**** IMPROVED CHANNEL TRAVEL TIME ****
UPSTREAM POINT ELEVATION = 1162. 000(FT.)
DOWNSTREAM POINT ELEVATION = 1152. 500 (FT. )
CHANNEL LENGTH THEN SUBAREA = 85.000(FT.)
CHANNEL BASE WIDTH = 0.000(FT.)
SLOPE OR 'Z' OF LEFT CHANNEL BANK = 10.000
SLOPE OR 'Z' OF RIGHT CHANNEL BANK = 10.000
MANNING'S 'N' = 0.015
MAXIMUM DEPTH OF CHANNEL = 0.500(FT.)
FLOW(Q) THRU SUBAREA = 35.5S9(CFS)
• DEPTH OF FLOW = 0.513(FT.), AVERAGE VELOCITY = 13.538(FT/S)
!!WARNING: WATER IS ABOVE LEFT OR RIGHT BANK ELEVATIONS
CHANNEL FLOW TOP WIDTH = 10.000(FT.)
FLOW VELOCITY = 13.54(FT/S)
• TRAVEL TIME = 0.10 MIN.
TIME OF CONCENTRATION = 12.41 MIN.
SUB—CHANNEL NO. 1 CRITICAL DEPTH = 0.984(FT.)
CRITICAL FLOW TOP WIDTH = 10.000(FT
CRITICAL FLOW VELOCITY= 4.842(FT/S)
CRITICAL FLOW AREA = 7.344(SQ.FT)
ERROR - CHANNEL DEPTH EXCEEDS MAXIMUM ALLOWABLE DEPTH
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 16.000 TO POINT/STATION 22.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 3
STREAM FLOW AREA = 13.320(AC.)
RUNOFF FROM THIS STREAM = 35.559(CFS)
TIME OF CONCENTRATION = 12.41 MIN.
RAINFALL INTENSITY = 3.093(IN/HR)
SUMMARY OF STREAM DATA:
STREAM
FLOW RATE
TC
RAINFALL INTENSITY
NO.
(CFS)
(MIN)
(IN/FIR)
• 1
18.379
14.96
2.791
2
15.572
19.34
2.423
3
35.559
12.41
3.093
LARGEST
STREAM FLOW
HAS LONGER OR
SHORTER TIME OF CONCENTRATION
QP =
35.559 +
sum of
QA
TB/TA
18.379 *
0.830 =
15.246
QA
TB/TA
15.572 *
0.642 =
9.990
QP =
60.796
TOTAL OF 3 MAIN STREAMS TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
18.379 15.572 35.559
AREA OF STREAMS BEFORE CONFLUENCE:
11.700 19.300 13.320
RESULTS OF CONFLUENCE:
TOTAL FLOW RATE = 60.796(CFS)
TIME OF CONCENTRATION = 12.408 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 44.320(AC.)
-------------- CHECK OF PREVIOUS CONFLUENCE OPERATIONS --------
OF ALL MAIN STREAMS
• TOTAL OF 6 STREAMS TO CONFLUENCE:
FLOW RATES BEFORE AND MAXIMUM AFTER CONFLUENCE POINT:
NO.
FLOW
RATE
TC
I
MAX CONFLUENCE
. 1
9.715
13.084
3.004
131.874
2
14.414
DECIMAL FRACTION SOIL GROUP C = 0.500
14.958
2.791
DECIMAL FRACTION SOIL GROUP D = 0.000
141.284
3
19.199
19.470
2.414
= 0.200
133.752
4
58.965
14.958
2.791
141.284
5
15.572
END OF COMPUTATIONS, TOTAL STUDY AREA = 86.39
19.341
2.423
THE FOLLOWING FIGURES MAY
134.045
6
35.559
12.408
3.093
127.869
RESULTS OF CONFLUENCE CHECK:
TOTAL FLOW RATE = 141.284(CFS)
TIME OF CONCENTRATION = 14.958 MIN.
NOTE:
MAXIMUM FLOW RATE DERIVED FROM PREVIOUS CONFLUENCES = 141.28 (CFS)
THIS EXCEEDS NORMAL CONFLUENCE RATE OF 60.80(CFS)
THEREFORE, LARGEST CONFLUENCE FLOW RATE AND TC = 14.96 MIN. IS USED.
PROCESS FROM POINT/STATION 22.000 TO POINT/STATION 23.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1152.500(FT.)
END OF NATURAL CHANNEL ELEVATION = 1134.500(FT.)
LENGTH OF NATURAL CHANNEL = 354.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 148.345 (CFS)
• NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLISH UNITS) '. 352)(SLOPE^O. 5)
VELOCITY USING MEAN CHANNEL FLOW = 12.06(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0508
CORRECTED/ADJUSTED CHANNEL SLOPE = 0.0508
TRAVEL TIME = 0.49 MIN. TC = 15.45 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.822
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL(AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION
= 0.200
RAINFALL INTENSITY = 2.742 (IN/HR) FOR A 100.0
YEAR STORM
SUBAREA RUNOFF = 9. 984 (CFS) FOR 4 .4 30 (Ac.
)
TOTAL RUNOFF = 151.268(CFS) TOTAL AREA =
48.750(Ac
END OF COMPUTATIONS, TOTAL STUDY AREA = 86.39
(AC.)
THE FOLLOWING FIGURES MAY
•
BE USED FOR A UNIT HYDROGRAPH STUDY OF THE SAME AREA.
AREA AVERAGED PERVIOUS AREA FRACTION(AP) = 0.575
AREA AVERAGED RI INDEX NUMBER = 62.5
11
Ll
0
RIVERSIDE COUNTY RATIONAL HYDROLOGY PROGRAM
• CIVILCADD/CIVILDESIGN ENGINEERING SOFTWARE, (C) 1989 - 2009 VERSION 7.0
RATIONAL HYDROLOGY STUDY DATE: 06/05/08 FILE: POST 10. OUT
------------------------------------------------------------------------
PCL 2 - PM 33988
10 YEAR POST DEVELOPED CONDITION
FN:POST10
C: \CIVILD\RF\CONNARY
------------------------------------------------------------------------
********* HYDROLOGY STUDY CONTROL INFORMATION **********
ENGLISH (IN -LB) UNITS USED IN INPUT DATA FILE
PROGRAM LICENSE SERIAL NUMBER 9066
------------------------------------------------------------------------
RATIONAL METHOD HYDROLOGY PROGRAM BASED ON
RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT
1978 HYDROLOGY MANUAL
STORM EVENT (YEAR) = 10.00 ANTECEDENT MOISTURE CONDITION = 2
STANDARD INTENSITY -DURATION CURVES DATA (PLATE D-9.1)
STORM EVENT YEAR = 10.0
CALCULATED RAINFALL INTENSITY DATA:
I HOUR INTENSITY = 0.880(IN/HR)
SLOPE OF INTENSITY DURATION CURVE = 0.5500
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 10.000
**** USER DEFINED FLOW INFORMATION AT A POINT ****
RAINFALL INTENSITY = 1.889(IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.686
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL(AMC 2) = 62.50
• PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
USER SPECIFIED VALUES ARE AS FOLLOWS:
FOR THE
[ MURRIETA, TMC, RNCH CANORCO
] AREA USED.
•
10 YEAR
STORM 10 MINUTE INTENSITY =
2.360(IN/HR)
10 YEAR
STORM 60 MINUTE INTENSITY =
0.880(IN/HR)
100 YEAR STORM 10 MINUTE INTENSITY =
3.980(IN/HR)
100 YEAR STORM 60 MINUTE INTENSITY =
1.300(IN/HR)
STORM EVENT YEAR = 10.0
CALCULATED RAINFALL INTENSITY DATA:
I HOUR INTENSITY = 0.880(IN/HR)
SLOPE OF INTENSITY DURATION CURVE = 0.5500
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 10.000
**** USER DEFINED FLOW INFORMATION AT A POINT ****
RAINFALL INTENSITY = 1.889(IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.686
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL(AMC 2) = 62.50
• PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
USER SPECIFIED VALUES ARE AS FOLLOWS:
•
TC = 14.96 MIN. RAIN INTENSITY = 1.89(IN/HR)
TOTAL AREA = 81.96 (AC. ) TOTAL RUNOFF = 85.32 (CFS)
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 14.000
**** PIPEFLOW TRAVEL TIME (PROGRAM ESTIMATED SIZE) ****
UPSTREAM POINT/STATION ELEVATION = 1152.500(FT.)
DOWNSTREAM POINT/STATION ELEVATION = 1151.000(FT.)
PIPE LENGTH = 38.00(FT.) MANNING'S N = 0.013
No. of PIPES = 2 REQUIRED PIPE FLOW = 85.320(CFS)
NEAREST COMPUTED PIPE DIAMETER = 24.00(IN.)
CALCULATED INDIVIDUAL PIPE FLOW = 42.660(CFS)
NORMAL FLOW DEPTH IN PIPE = 18.66(IN.)
FLOW TOP WIDTH INSIDE PIPE = 19.97(IN.)
CRITICAL DEPTH COULD NOT BE CALCULATED.
PIPE FLOW VELOCITY = 16.28(FT/S)
TRAVEL TIME THROUGH PIPE = 0.04 MIN.
TIME OF CONCENTRATION (TC) = 15.00 MIN.
++++++++++++++++++}++}}}}}}}}}}}}}}}}}}}}}+++++++++++++}+}}t}+}}}}}}}}
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 14.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 1
STREAM FLOW AREA = 81.960(AC.)
• RUNOFF FROM THIS STREAM = 85.320(CFS)
TIME OF CONCENTRATION = 15.00 MIN.
RAINFALL INTENSITY = 1.886(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 2
PROCESS FROM POINT/STATION 13.000 TO POINT/STATION 13.000
**** USER DEFINED FLOW INFORMATION AT A POINT ****
RAINFALL INTENSITY = 2.104(IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.702
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.600; IMPERVIOUS FRACTION = 0.200
USER SPECIFIED VALUES ARE AS FOLLOWS:
TC = 12.30 MIN. RAIN INTENSITY = 2.10(IN/HR)
TOTAL AREA = 13.32 (AC. ) TOTAL RUNOFF = 21.92 (CFS)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 13.000 TO POINT/STATION 14.000
• **** IMPROVED CHANNEL TRAVEL TIME ****
PROCESS FROM POINT/STATION 13.000 TO POINT/STATION 14.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 2
• STREAM FLOW AREA = 13.320(AC.)
RUNOFF FROM THIS STREAM = 21.920(CFS)
TIME OF CONCENTRATION = 12.49 MIN.
RAINFALL INTENSITY = 2.086(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM No. 3
PROCESS FROM POINT/STATION 11.000 TO POINT/STATION 14.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 338.000(FT.)
TOP (OF INITIAL AREA) ELEVATION = 1205.000 (FT. )
BOTTOM (OF INITIAL AREA) ELEVATION = 1151.000(FT.)
DIFFERENCE IN ELEVATION = 54.000(FT.)
SLOPE = 0.15976 S(PERCENT)= 15.98
TO = K(0.480)*[(LENGTH"3)/(ELEVATION CHANGE) ]^0.2
INITIAL AREA TIME OF CONCENTRATION = 7.114 MIN.
RAINFALL INTENSITY = 2.843(IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.742
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX. FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
• INITIAL SUBAREA RUNOFF = 1.772(CFS)
TOTAL INITIAL STREAM AREA = 0.840(AC.)
UPSTREAM POINT ELEVATION = 1159. 350(FT.)
DOWNSTREAM POINT ELEVATION = 1151.000(FT.)
•
CHANNEL LENGTH THRU SUBAREA = 116.000(FT.)
CHANNEL BASE WIDTH 0. 000 (FT. )
SLOPE OR 'Z' OF LEFT CHANNEL HANK = 10.000
SLOPE OR 'Z' OF RIGHT CHANNEL BANK = 10.000
MANNING'S 'N' = 0.015
MAXIMUM DEPTH OF CHANNEL = 0.500(FT.)
FLOW(Q) THRU SUBAREA = 21.920(CFS)
DEPTH OF FLOW = 0.467(FT.), AVERAGE VELOCITY =
10.047(FT/S)
CHANNEL FLOW TOP WIDTH = 9.342(FT.)
FLOW VELOCITY = 10.05(FT/S)
TRAVEL TIME = 0.19 MIN.
TIME OF CONCENTRATION = 12.49 MIN.
SUB -CHANNEL NO. 1 CRITICAL DEPTH = 0.781(FT.)
CRITICAL FLOW TOP WIDTH =
10.000(FT.)
CRITICAL FLOW VELOCITY= 4.
126(FT/S)
CRITICAL FLOW AREA = 5.313(SQ.FT)
PROCESS FROM POINT/STATION 13.000 TO POINT/STATION 14.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 2
• STREAM FLOW AREA = 13.320(AC.)
RUNOFF FROM THIS STREAM = 21.920(CFS)
TIME OF CONCENTRATION = 12.49 MIN.
RAINFALL INTENSITY = 2.086(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM No. 3
PROCESS FROM POINT/STATION 11.000 TO POINT/STATION 14.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 338.000(FT.)
TOP (OF INITIAL AREA) ELEVATION = 1205.000 (FT. )
BOTTOM (OF INITIAL AREA) ELEVATION = 1151.000(FT.)
DIFFERENCE IN ELEVATION = 54.000(FT.)
SLOPE = 0.15976 S(PERCENT)= 15.98
TO = K(0.480)*[(LENGTH"3)/(ELEVATION CHANGE) ]^0.2
INITIAL AREA TIME OF CONCENTRATION = 7.114 MIN.
RAINFALL INTENSITY = 2.843(IN/HR) FOR A 10.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.742
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX. FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
• INITIAL SUBAREA RUNOFF = 1.772(CFS)
TOTAL INITIAL STREAM AREA = 0.840(AC.)
PERVIOUS AREA FRACTION = 0.800
PROCESS FROM POINT/STATION 11.000 TO POINT/STATION 14.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 3
STREAM FLOW AREA = 0.840 (Ac.
RUNOFF FROM THIS STREAM = 1.772(CPS)
TIME OF CONCENTRATION = 7.11 MIN.
RAINFALL INTENSITY = 2.843(IN/HR)
SUMMARY OF STREAM DATA:
STREAM FLOW RATE
TC
RAINFALL INTENSITY
No. (CFS)
(MIN)
(IN/HR)
1 85.320
15.00
1.886
2 21.920
12.49
2.086
3 1.772
7.11
2.843
LARGEST STREAM FLOW
HAS LONGER TIME
OF CONCENTRATION
QP = 85.320 +
SUM OF
QB
IA/IB
21.920 *
0.904 =
19.823
QB
IA/IB
1.772 *
0.663 =
1.176
QP = 106.318
•
TOTAL OF 3 MAIN STREAMS
TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
85.320
21.920 1.772
AREA OF STREAMS BEFORE CONFLUENCE:
81.960
13.320
0.840
RESULTS OF CONFLUENCE:
TOTAL FLOW PATE = 106.318 (CFS)
TIME OF CONCENTRATION = 14.999 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 96.120(AC.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 14.000 TO POINT/STATION 15.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1151.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1134.800(FT.)
LENGTH OF NATURAL CHANNEL = 320.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 107.579(CFS)
NATURAL VALLEY CHANNEL TYPE USED
L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLISH UNITS)^.352)(SLOPE "0.5)
• VELOCITY USING MEAN CHANNEL FLOW = 10.92(FT/S)
CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS WITH
DROPS AND WATERFALLS (PLATE D-6.2)
• NORMAL CHANNEL SLOPE = 0.0506
CORRECTED /ADJUSTED CHANNEL SLOPE = 0.0506
TRAVEL TIME = 0.49 MIN. TC = 15.49 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.683
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 2) = 62.50
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
RAINFALL INTENSITY = 1.853(IN/HR) FOR A 10.0 YEAR STORM
SUBAREA RUNOFF = 2.886(CFS) FOR 2.280(AC.)
TOTAL RUNOFF = 109.204(CFS) TOTAL AREA = 98.400(Ac
END OF COMPUTATIONS, TOTAL STUDY AREA = 98.40 (AC.)
THE FOLLOWING FIGURES MAY
BE USED FOR A UNIT HYDROGRAPH STUDY OF THE SAME AREA.
AREA AVERAGED PERVIOUS AREA FRACTION(AP) = 0.800
AREA AVERAGED RI INDEX NUMBER = 62.5
0
RIVERSIDE COUNTY RATIONAL HYDROLOGY PROGRAM
• CIVILCADD/CIVILDESIGN ENGINEERING SOFTWARE, (C) 1989 - 2004 VERSION 7.0
RATIONAL HYDROLOGY STUDY DATE: 06/05/08 FILE: POST100. OUT
------------------------------------------------------------------------
PARCEL MAP 33488, PAR 2
100 YEAR POST DEVELOPED CONDITION
FN:POST100
C\CIVIL\RF\CONNARY
______ ________
*k******* HYDROLOGY STUDY CONTROL INFORMATION **********
ENGLISH (IN -LB) UNITS USED IN INPUT DATA FILE
------------------------------------------------------------------------
PROGRAM LICENSE SERIAL NUMBER 4066
------------------------------------------------------------------------
RATIONAL METHOD HYDROLOGY PROGRAM BASED ON
RIVERSIDE COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT
1978 HYDROLOGY MANUAL
STORM EVENT (YEAR) = 100.00 ANTECEDENT MOISTURE CONDITION = 3
STANDARD INTENSITY -DURATION CURVES DATA (PLATE D-4.1)
STORM EVENT YEAR = 100.0
CALCULATED RAINFALL INTENSITY DATA:
I HOUR INTENSITY = 1.300(IN/HR)
SLOPE OF INTENSITY DURATION CURVE = 0.5500
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 10.000
**** USER DEFINED FLOW INFORMATION AT A POINT ****
RAINFALL INTENSITY = 2.791(IN/HR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.823
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
• PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
USER SPECIFIED VALUES ARE AS FOLLOWS:
FOR
THE [ MURRIETA,TMC,RNCH CANORCO
] AREA USED.
•
10
YEAR STORM 10 MINUTE INTENSITY =
2.360(IN/HR)
10
YEAR STORM 60 MINUTE INTENSITY =
0.880(IN/HR)
100
YEAR STORM 10 MINUTE INTENSITY =
3.480(IN/HR)
100
YEAR STORM 60 MINUTE INTENSITY =
1. 300(IN/HR)
STORM EVENT YEAR = 100.0
CALCULATED RAINFALL INTENSITY DATA:
I HOUR INTENSITY = 1.300(IN/HR)
SLOPE OF INTENSITY DURATION CURVE = 0.5500
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 10.000
**** USER DEFINED FLOW INFORMATION AT A POINT ****
RAINFALL INTENSITY = 2.791(IN/HR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.823
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
• PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
USER SPECIFIED VALUES ARE AS FOLLOWS:
•
TC = 19.96 MIN. RAIN INTENSITY = 2.79(IN/HR)
TOTAL AREA = 81 . 96 (AC. ) TOTAL RUNOFF = 191.28 (CFS)
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 19.000
**** PIPEFLOW TRAVEL TIME (PROGRAM ESTIMATED SIZE) rr++
UPSTREAM POINT/STATION ELEVATION = 1152.500(FT.)
DOWNSTREAM POINT/STATION ELEVATION = 1151.000(FT.)
PIPE LENGTH = 38.00(FT.) MANNING's N = 0.013
NO. OF PIPES = 2 REQUIRED PIPE FLOW = 191.280(CFS)
NEAREST COMPUTED PIPE DIAMETER = 30.00(IN.)
CALCULATED INDIVIDUAL PIPE FLOW = 70.690(CFS)
NORMAL FLOW DEPTH IN PIPE = 21.56(IN.)
FLOW TOP WIDTH INSIDE PIPE = 26.98(IN.
)
CRITICAL DEPTH COULD NOT BE CALCULATED.
PIPE FLOW VELOCITY = 18. 69(FT/S)
TRAVEL TIME THROUGH PIPE = 0.03 MIN.
TIME OF CONCENTRATION (TC) = 19.99 MIN.
PROCESS FROM POINT/STATION 10.000 TO POINT/STATION 19.000
**** CONFLUENCE OF MAIN STREAMS **+*
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 1
STREAM FLOW AREA = 81.960(AC.)
• RUNOFF FROM THIS STREAM = 191.280(CFS)
TIME OF CONCENTRATION = 19.99 MIN.
RAINFALL INTENSITY = 2.787(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 13.000 TO POINT/STATION 13.000
**** USER DEFINED FLOW INFORMATION AT A POINT +***
RAINFALL INTENSITY = 3.108(IN/HR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.830
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
USER SPECIFIED VALUES ARE AS FOLLOWS:
TC = 12.30 MIN. RAIN INTENSITY = 3.11(IN/HR)
TOTAL AREA = 13.32(AC.) TOTAL RUNOFF = 35.56(CPS)
PROCESS FROM POINT/STATION 13.000 TO POINT/STATION 19.000
• **** IMPROVED CHANNEL TRAVEL TIME *+**
UPSTREAM POINT ELEVATION = 1159. 350(FT.)
DOWNSTREAM POINT ELEVATION = 1151.000(FT.)
• CHANNEL LENGTH THRU SUBAREA = 116.000(FT.)
CHANNEL BASE WIDTH 0 000 (FT.)
SLOPE OR 'Z' OF LEFT CHANNEL BANK = 10.000
SLOPE OR 'Z' OF RIGHT CHANNEL BANK = 10.000
MANNING'S 'N' = 0.015
MAXIMUM DEPTH OF CHANNEL = 0.500(FT.)
FLOW (Q) THRU SUBAREA = 35.560(CFS)
DEPTH OF FLOW = 0.550(FT.), AVERAGE VELOCITY = 11.864(FT/S)
!WARNING: WATER IS ABOVE LEFT OR RIGHT BANK ELEVATIONS
CHANNEL FLOW TOP WIDTH = 10.000(FT.)
FLOW VELOCITY = 11.86(FT/3)
TRAVEL TIME = 0.16 MIN.
TIME OF CONCENTRATION = 12.46 MIN.
SUB -CHANNEL NO. 1 CRITICAL DEPTH = 0.984(FT.)
CRITICAL FLOW TOP WIDTH = 10.000(FT
CRITICAL FLOW VELOCITY= 4.842(FT/S)
CRITICAL FLOW AREA = V. 344(SQ. FT)
ERROR - CHANNEL DEPTH EXCEEDS MAXIMUM ALLOWABLE DEPTH
PROCESS FROM POINT/STATION 13.000 TO POINT/STATION 14.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
• IN MAIN STREAM NUMBER: 2
STREAM FLOW AREA = 13.320(AC.)
RUNOFF FROM THIS STREAM = 35.560(CFS)
TIME OF CONCENTRATION = 12.46 MIN.
RAINFALL INTENSITY = 3.086(IN/HR)
PROGRAM IS NOW STARTING WITH MAIN STREAM NO. 3
PROCESS FROM POINT/STATION 11.000 TO POINT/STATION 14.000
**** INITIAL AREA EVALUATION ****
INITIAL AREA FLOW DISTANCE = 338.000(FT. )
TOP (OF INITIAL AREA) ELEVATION = 1205.000(FT.)
BOTTOM (OF INITIAL AREA) ELEVATION = 1151.000(FT.)
DIFFERENCE IN ELEVATION = 54.000(FT.)
SLOPE = 0.15976 S(PERCENT)= 15.98
TC = K(0.480)*((LENGTH^3)/(ELEVATION CHANGE)]^0.2
INITIAL AREA TIME OF CONCENTRATION = 7.114 MIN.
RAINFALL INTENSITY = 4.200(IN/HR) FOR A 100.0 YEAR STORM
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.847
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
• RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION = 0.200
INITIAL SUBAREA RUNOFF = 2.989(CFS)
TOTAL INITIAL STREAM AREA = 0.840(AC.)
• PERVIOUS AREA FRACTION = 0.800
++++++++++++++++++++++++++++.+++++++++++++++++++++++++++++++++++++++++
PROCESS FROM POINT/STATION 11.000 TO POINT/STATION 14.000
**** CONFLUENCE OF MAIN STREAMS ****
THE FOLLOWING DATA INSIDE MAIN STREAM IS LISTED:
IN MAIN STREAM NUMBER: 3
STREAM FLOW AREA = 0.840(AC.)
RUNOFF FROM THIS STREAM = 2.989(CFS)
TIME OF CONCENTRATION = 7.11 MIN.
RAINFALL INTENSITY = 4 . 200 (IN/HR)
SUMMARY OF STREAM DATA:
TOTAL OF 3 MAIN STREAMS TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
141.280 35.560 2.989
AREA OF STREAMS BEFORE CONFLUENCE:
81.960 13.320 0.840
RESULTS OF CONFLUENCE:
TOTAL FLOW RATE = 175.385(CFS)
TIME OF CONCENTRATION = 14.994 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 96.120(AC.)
++++++++++++....++++++++++-F+++++++++++++++++++.+++++++i-++++.++++++++++
PROCESS FROM POINT/STATION 14.000 TO POINT/STATION 15.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1151.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1134.800(FT.)
LENGTH OF NATURAL CHANNEL = 320.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 177.465 (CFS)
NATURAL VALLEY CHANNEL TYPE USED
• L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLIS14 DNITS)^.352)(SLOPE^0.5)
STREAM
FLOW RATE
TC
RAINFALL INTENSITY
No.
(CFS)
(MIN)
(TN/HR)
1
141.280
14.99
2.787
2
35.560
12.46
3.086
3
2.989
7.11
4.200
LARGEST
STREAM FLOW
HAS LONGER TIME
OF CONCENTRATION
QP =
141.280 +
SUM OF
QB
IA/IB
35.560 *
0.903 =
32.122
QB
IA
•
2.989
0.664 =
1.983
QP =
175.385
TOTAL OF 3 MAIN STREAMS TO CONFLUENCE:
FLOW RATES BEFORE CONFLUENCE POINT:
141.280 35.560 2.989
AREA OF STREAMS BEFORE CONFLUENCE:
81.960 13.320 0.840
RESULTS OF CONFLUENCE:
TOTAL FLOW RATE = 175.385(CFS)
TIME OF CONCENTRATION = 14.994 MIN.
EFFECTIVE STREAM AREA AFTER CONFLUENCE = 96.120(AC.)
++++++++++++....++++++++++-F+++++++++++++++++++.+++++++i-++++.++++++++++
PROCESS FROM POINT/STATION 14.000 TO POINT/STATION 15.000
**** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION ****
TOP OF NATURAL CHANNEL ELEVATION = 1151.000(FT.)
END OF NATURAL CHANNEL ELEVATION = 1134.800(FT.)
LENGTH OF NATURAL CHANNEL = 320.000(FT.)
ESTIMATED MEAN FLOW RATE AT MIDPOINT OF CHANNEL = 177.465 (CFS)
NATURAL VALLEY CHANNEL TYPE USED
• L.A. COUNTY FLOOD CONTROL DISTRICT FORMULA FOR CHANNEL VELOCITY:
VELOCITY(FT/S) = (7 + 8(Q(ENGLIS14 DNITS)^.352)(SLOPE^0.5)
VELOCITY USING MEAN CHANNEL FLOW = 12.%2 (FTS)
• CORRECTION TO MAP SLOPE USED ON EXTREMELY RUGGED CHANNELS
WITH
DROPS AND WATERFALLS (PLATE D-6.2)
NORMAL CHANNEL SLOPE = 0.0506
CORRECTED/ ADJUSTED CHANNEL SLOPE = 0.0506
TRAVEL TIME = 0.42 MIN. TC = 15.41 MIN.
ADDING AREA FLOW TO CHANNEL
SINGLE FAMILY (1 ACRE LOT)
RUNOFF COEFFICIENT = 0.822
DECIMAL FRACTION SOIL GROUP A = 0.000
DECIMAL FRACTION SOIL GROUP B = 0.500
DECIMAL FRACTION SOIL GROUP C = 0.500
DECIMAL FRACTION SOIL GROUP D = 0.000
RI INDEX FOR SOIL (AMC 3) = 80.00
PERVIOUS AREA FRACTION = 0.800; IMPERVIOUS FRACTION =
0.200
RAINFALL INTENSITY = 2.745(IN/HR) FOR A 100.0 YEAR
STORM
SUBAREA RUNOFF = 5.145(CFS) FOR 2.280(AC.)
TOTAL RUNOFF = 180.530(CFS) TOTAL AREA = 98.400(Ac
END OF COMPUTATIONS, TOTAL STUDY AREA = 98.40
(AC.)
THE FOLLOWING FIGURES MAY
BE USED FOR A UNIT HYDROGRAPH STUDY OF THE SAME AREA.
AREA AVERAGED PERVIOUS AREA FRACTION (AP) = 0.800
AREA AVERAGED RI INDEX NUMBER = 62.5
/ •
0
0
IV
EXHIBITS
4
`!
PRE D
MAM
/ A 3
914ZOW 1 1 91 11 C6
�1�I��1L�iIi
Yj +
V,-7
JIL
E • w
*,
MW MITT'
left
`��• � � y� ++� -. yam' � � • � •
l �
® �., •.f_ � � JLC R-1 t
. _ . ,
EL=1134.8
Q10=180.53 CFS
,Q100=47.67 CFS
1
205.0
I%
7 4--71
51
HYDROLOGY STUDY
POST DEVELOPED CONDITION
SEE PRE—DEVELOPED PARCEL 2, P.M 33488
CONDITION HYDROLOGY
STUDY
Oro o '559 35 LEGEND:
Lpo\sCCFS 73
2.9Ac. TRIBUTARY AREA
197 TRAVEL LENGTH
�' 6y
NODE NUMBER
- FLOW TRAVEL PATH
EL=1152.50
Q10=85.32 CFS
Q100=141.28 CFS
AREA=81.96 Ac.
TC 10=14.96 MINS.
TC 100=14.96 MINS
10
SEE PRE—DEVELOPED
STUDY,
DRAINAGE BOUNDARY
80 0 40 80 160 240
1" = 80"
GRAPHIC SCALE